EXPORT:V09.02.00 UTANKS RUSERS 1024 0 32 0 Ð Fri May 18 19:31:55 2012tanksdat.dmpd`$     #G#G#A°GƒÐd`$     #G#G#A°Gƒ-04:00BYTE INTERPRETED PROCACTION ýÿBEGIN  sys.dbms_logrep_imp.instantiate_schema(schema_name=>SYS_CONTEXT('USERENV','CURRENT_SCHEMA'), export_db_name=>'DEPMAIN.STATE.ME.US', inst_scn=>'7465106633493'); COMMIT; END; CREATE SEQUENCE "AIR_BUREAU_DETAIL_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 4227 NOCACHE ORDER NOCYCLE CREATE SEQUENCE "ANNUAL_INSPECTION_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 24287 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "ANNUAL_INSPECT_FAILURE_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 12596 NOCACHE ORDER NOCYCLE CREATE SEQUENCE "INS_ENFORCEMENT_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 302 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "CONTRACTOR_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 378 NOCACHE ORDER NOCYCLE CREATE SEQUENCE "DEP_INSPECTOR_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 58 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "CP_TEST_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 21129 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "TANK_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 45603 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "FIRE_MARSHALL_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 1 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "DEP_UST_FAILURE_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 6285 NOCACHE ORDER NOCYCLE CREATE SEQUENCE "DEP_UST_INSPECTION_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 6150 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "ENFORCEMENT_LOG_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 38308 NOCACHE ORDER NOCYCLE CREATE SEQUENCE "ENFORCEMENT_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 14388 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "VIOLATION_CODE_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 301 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "INS_PENALTY_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 241 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "INS_ENF_STATUS_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 4 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "INST_INSP_CRSE_LUP_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 121 CACHE 20 NOORDER NOCYCLE CREATE SEQUENCE "CHAMBER_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 46872 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "INS_ENF_LOG_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 2247 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "SITE_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 21799 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "AST_FACILITY_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 1 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "SITE_FINANCE_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 1 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "VAPOR_RECOVERY_INSPEC_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 679 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "VAPOR_RECOVERY_FAILURE_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 212 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "TANK_STATUS_LOG_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 53851 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "TANK_MANUFACTURER_SEQ" MINVALUE 0 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 17 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "USERS_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 264 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "STAGE2_VAPOR_RECOVERY_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 113 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "SPCC_INSPECTION_FAILURE_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 1 NOCACHE ORDER NOCYCLE CREATE SEQUENCE "VIOLATION_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 30888 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "SIA_TEST_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 61958 NOCACHE ORDER NOCYCLE CREATE SEQUENCE "EVIDENCE_OF_LEAK_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 8903 NOCACHE ORDER NOCYCLE CREATE SEQUENCE "INSTALLER_INSPECTOR_COURSE_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 15 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "INSTALLER_CERTIFICATION_SEQ" MINVALUE 0 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 477 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "INSTALLER_CREDITS_LOG_SEQ" MINVALUE 0 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 21 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "INSTALLER_INSPECTOR_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 469 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "OPERATOR_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 1 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "REPORT_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 34 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "OWNER_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 43917 NOCACHE NOORDER NOCYCLE CREATE SEQUENCE "PRECISION_TEST_SEQ" MINVALUE 1 MAXVALUE 999999999999999999999999999 INCREMENT BY 1 START WITH 4054 NOCACHE NOORDER NOCYCLE TABLE "AIR_BUREAU_FACILITY_DETAIL" CREATE TABLE "AIR_BUREAU_FACILITY_DETAIL" ("AIR_BUREAU_FACILITY_ID" NUMBER(8, 0) NOT NULL ENABLE, "REGISTRATION_NUMBER" NUMBER(8, 0) NOT NULL ENABLE, "STAGE1_VAPOR_CONTROL_TYPE" VARCHAR2(20), "CONTACT_NAME" VARCHAR2(30), "HIGHEST_ANNUAL_GAS_THROUGHPUT" NUMBER(9, 0), "HIGHEST_GAS_THROUGHPUT_YEAR" NUMBER(4, 0)) PCTFREE 10 PCTUSED 40 INITRANS 1 MAXTRANS 255 STORAGE(INITIAL 131072 FREELISTS 1 FREELIST GROUPS 1) TABLESPACE "DATA_TS" LOGGING NOCOMPRESS INSERT INTO "AIR_BUREAU_FACILITY_DETAIL" ("AIR_BUREAU_FACILITY_ID", "REGISTRATION_NUMBER", "STAGE1_VAPOR_CONTROL_TYPE", "CONTACT_NAME", "HIGHEST_ANNUAL_GAS_THROUGHPUT", "HIGHEST_GAS_THROUGHPUT_YEAR") VALUES (:1, :2, :3, :4, :5, :6) Â$ÂE`þÿþÿÃ3þÿÂ$ TþÿþÿÃK[ÂÂ$Â/6þÿþÿÃ@ ÂÂ$ÂAþÿþÿÃ?ZþÿÂ$ÂIWþÿþÿÃ35&ÂÂ$ ÂUþÿþÿà S3ÂÂ$!Â5^þÿþÿÃA`ÂÂ$"ÂU=þÿþÿÃJþÿÂ$#ÃUþÿþÿÃFÂÂ$$Ã$>þÿþÿ€þÿÂ$%Â$þÿþÿÃ$@þÿÂ$&Â&VþÿþÿÃSþÿÂ$'Â?IþÿþÿÃ^þÿÂ$(Ã*Uþÿþÿ€þÿÂ$)Âþÿþÿà ?þÿÂ$*ÃþÿþÿÃ[ÂÂ$+Ã?þÿþÿ€þÿÂ$,Â)þÿþÿÂLþÿÂ$-ÂB>þÿþÿÃQþÿÂ$.ÂAþÿþÿà 2þÿÂ$/ÂYRþÿþÿÃ8[OÂÂ$0ÃRþÿþÿÃ[1þÿÂ$1Ã$^þÿþÿÃRbþÿÂ$2Â?6þÿþÿà  þÿÂ$3ÃQþÿþÿÃCþÿÂ$4ÂþÿþÿÃP4þÿÂ$5Ã#(þÿþÿ€þÿÂ$6Â-OþÿþÿÃ:^(þÿÂ$7Ã' þÿþÿÃþÿÂ$8Â9þÿþÿÃ+ÂÂ$9ÂCPþÿþÿà ÂÂ$:ÃPþÿþÿà 6þÿÂ$;Â3YþÿþÿÃ#KþÿÂ$<Â6bþÿþÿÃ\dþÿÂ$=Â)þÿþÿÃ5+6þÿÂ$>ÂA#þÿþÿ€þÿÂ$?ÃO[þÿþÿ€þÿÂ$@Â'þÿþÿ€þÿÂ$AÂb@þÿþÿÃE TÂÂ$BÂ/3þÿþÿ€þÿÂ$CÂ<þÿþÿ€þÿÂ$DÂ1þÿþÿ€þÿÂ$Eà þÿþÿÃIþÿÂ$FÃN+þÿþÿ€þÿÂ$GÃdþÿþÿ€þÿÂ$HÂ1Qþÿþÿà  þÿÂ$IÂ]þÿþÿà C\þÿÂ$JÃT þÿþÿÃþÿÂ$KÃ#@þÿþÿÄL+CþÿÂ$LÃOWþÿþÿ€þÿÂ$MÂ3þÿþÿ€þÿÂ$NÂþÿþÿÃ"9ÂÂ$OÃ=þÿþÿÃ!þÿÂ$PÂBþÿþÿà D3ÂÂ$QÃ5þÿþÿÃSdþÿÂ$RÃJþÿþÿ€þÿÂ$SÂQaþÿþÿà þÿÂ$TÃ&JþÿþÿÃ+3ÂÂ$UÃ3UþÿþÿÃ=ÂÂ$VÂþÿþÿ€þÿÂ$WÂ$'þÿþÿàÂ$XÂ==þÿþÿ€þÿÂ$YÃ&QþÿþÿÃ&dþÿÂ$ZÂ7#þÿþÿ€þÿÂ$[Â@OþÿþÿÃ0þÿÂ$\ÂHþÿþÿà þÿÂ$]ÂP@þÿþÿÃ@] þÿÂ$^Ã_þÿþÿÃK^*þÿÂ$_Â7þÿþÿÃ9BGþÿÂ$`à <þÿþÿÃÂÂ$aÃ3TþÿþÿÃ<'ÂÂ$bÂ7þÿþÿÃ)PþÿÂ$cÂþÿþÿÃF2- Â$dÃTþÿþÿ€þÿÂ%ÃYþÿþÿÄ5OÂÂ%Ã^þÿþÿÃ_9 ÂÂ%Â7+þÿþÿÃ7,þÿÂ%Ã=þÿþÿÃa)ÂÂ%Â7þÿþÿÃ/23 Â%Ã%;þÿþÿÃ-9FþÿÂ%Â\þÿþÿÃþÿÂ%Â>þÿþÿÃ:HþÿÂ% ÃJ?þÿþÿÃEdÂÂ%  cþÿþÿà >ÂÂ% à %þÿþÿà \ÂÂ% Âþÿþÿ€þÿÂ% Â7þÿþÿÄ# Â% þÿþÿÃ)*NþÿÂ%à :þÿþÿÃ' 0ÂÂ%Â6þÿþÿà U,þÿÂ%Â72þÿþÿà þÿÂ%ÂTcþÿþÿÃTAþÿÂ%ÃRþÿþÿÃK3þÿÂ%Â5þÿþÿà þÿÂ%à 0þÿþÿà ZþÿÂ%ÂF1þÿþÿÃ%*þÿÂ%Ã;þÿþÿÃ2 þÿÂ%ÂLþÿþÿÃ0Y"þÿÂ%Ã.þÿþÿÃSS[ÂÂ%ÂþÿþÿÃLÂÂ%ÂþÿþÿÃ!þÿÂ% þÿþÿÃVþÿÂ%Â^5þÿþÿÃPþÿÂ%ÂXIþÿþÿÃ(þÿÂ%Âþÿþÿ€þÿÂ% Ã7þÿþÿ€þÿÂ%!Ã-bþÿþÿÃCBþÿÂ%"ÂbþÿþÿÃ%4`ÂÂ%#ÂG0þÿþÿà _/þÿÂ%$ÂAþÿþÿÃ!dþÿÂ%%Ã4þÿþÿÃ)EþÿÂ%&ÂAYþÿþÿÃ4SLþÿÂ%'Ã5LþÿþÿÃO 5ÂÂ%(ÃþÿþÿÃYþÿÂ%)Â78þÿþÿÃ1XþÿÂ%*ÂAþÿþÿÃM/PþÿÂ%+ÃcþÿþÿÃ-þÿÂ%,Â7/þÿþÿÃdBþÿÂ%-Ã!GþÿþÿÃ'+]þÿÂ%.Â#[þÿþÿÄ<52þÿÂ%/ÂATþÿþÿÃO"þÿÂ%0Â75þÿþÿÃÂÂ%1Ã+LþÿþÿÃP`þÿÂ%2Â%0þÿþÿà @þÿÂ%3ÂQbþÿþÿÃAþÿÂ%4Â3þÿþÿÃW?þÿÂ%5Â-\þÿþÿÃ31SþÿÂ%6Ã;þÿþÿ€þÿÂ%7Ã,Jþÿþÿ€þÿÂ%8Â-9þÿþÿÃ3TþÿÂ%9ÃþÿþÿÃ*&þÿÂ%:ÂþÿþÿÃ2%d Â%;Â2PþÿþÿÃ<þÿÂ%<Ã.*þÿþÿà  Â%=Âþÿþÿ€þÿÂ%>ÂþÿþÿÃGÂÂ%?ÂþÿþÿÄ^. Â%@ÂSAþÿþÿÄWCÂÂ%AÂþÿþÿÄ aÂÂ%BÃ!þÿþÿÃI6þÿÂ%CÂ^3þÿþÿÃ4=ÂÂ%DÃCYþÿþÿà  Â%EÂ^:þÿþÿÄ AZÂÂ%FÂ^;þÿþÿÃNc=ÂÂ%GÃ&@þÿþÿ€þÿÂ%HÃ.þÿþÿÃ?cÂÂ%IÂ_þÿþÿ€þÿÂ%JÃMþÿþÿÃ%þÿÂ%KÃ<þÿþÿÃ/V0ÂÂ%LÃ[þÿþÿÃ1aÂÂ%MÂA þÿþÿÃaþÿÂ%NÂPWþÿþÿÃ$8þÿÂ%Oà þÿþÿÃHBaÂÂ%PÃ%4þÿþÿÃRþÿÂ%QÃþÿþÿÃC)þÿÂ%RÃþÿþÿÃ3ÂÂ%SÂ.(þÿþÿ€þÿÂ%TÃJþÿþÿÃþÿÂ%UÃOþÿþÿÃ9C@þÿÂ%VÃ!WþÿþÿÃ][þÿÂ%WÃ!VþÿþÿÄþÿÂ%XÃ0þÿþÿÃ5U ÂÂ%YÃKþÿþÿÃP7 Â%ZÂS8þÿþÿÃ0$[þÿÂ%[Ã;þÿþÿÃ?/ÂÂ%\ÃDþÿþÿÃBÂÂ%]à WþÿþÿÃþÿÂ%^Â5"þÿþÿÃaþÿÂ%_Â^2þÿþÿÃÂÂ%`Â@ þÿÂ& Â$þÿþÿÄ ,þÿÂ& Â-cþÿþÿÃ9 þÿÂ& Âþÿþÿà  ÂÂ& ÂþÿþÿÃL^þÿÂ&Â%þÿþÿ€þÿÂ&Â$%þÿþÿÃ!4þÿÂ&ÃþÿþÿÃG4þÿÂ&Ã$7þÿþÿà EþÿÂ&Â2Bþÿþÿà 3CþÿÂ&ÃMþÿþÿ€þÿÂ&Â-L2POINTþÿÃ$8=ÂÂ&ÂþÿþÿÃ1BþÿÂ&ÂTþÿþÿÃÂÂ&Â2þÿþÿÃ0B'þÿÂ&à þÿþÿÃDþÿÂ&Â4þÿþÿÃPcþÿÂ&Â$!þÿþÿÄYYHÂÂ&Â*þÿþÿÃYEþÿÂ&Â&#þÿþÿÃ6T þÿÂ&ÂO\þÿþÿÃYd^þÿÂ&Â_þÿþÿÄQÂÂ&Â[0þÿþÿÄÂÂ& Â-5þÿþÿÃ53þÿÂ&!Ã5EþÿþÿÄ-UdþÿÂ&"Â$IþÿþÿÄMI#þÿÂ&#Â^ þÿþÿÃ:+ÂÂ&$Â[ þÿþÿÃK_YþÿÂ&%ÂB?þÿþÿÃ"JþÿÂ&&Â$AþÿþÿÃþÿÂ&'Â^þÿþÿÃ%^þÿÂ&(Ã4PþÿþÿÃA-þÿÂ&)Ã-2þÿþÿÄQÂÂ&*à þÿþÿ€þÿÂ&+ÂþÿþÿÂ#3ÂÂ&,Â_@þÿþÿà ( ÂÂ&-ÂaHþÿþÿÃ1ÂÂ&.Â;þÿþÿà þÿÂ&/Â%þÿþÿÃ`M^ÂÂ&0Ã=^þÿþÿÃE"LÂÂ&1ÂcþÿþÿÄÂÂ&2ÂJ þÿþÿÃ,>`ÂÂ&3Ã"þÿþÿÃWF$þÿÂ&4Â[7þÿþÿÄÂÂ&5Â2IþÿþÿÃD.4ÂÂ&6ÂPþÿþÿÃþÿÂ&7Â.%þÿþÿÃ&ÂÂ&8ÃþÿþÿÃ3ÂÂ&9Â*þÿþÿÃ)cÂÂ&:Ãþÿþÿ€þÿÂ&;Âþÿþÿ€þÿÂ&<Ã9þÿþÿÃQNþÿÂ&=Â[@2POINTMAUREEN JERNSTEDTÄ<+%ÂÂ&> þÿþÿÃYþÿÂ&?Â7þÿþÿà  þÿÂ&@Â$þÿþÿÃ(5þÿÂ&AÂ9þÿþÿÃ28KÂÂ&BÂ1þÿþÿÃ$I  Â&CÂþÿþÿÄd3þÿÂ&DÃD$þÿþÿÄJT Â&EÂJ#þÿþÿÃ&3NþÿÂ&FÃ+G2POINTLESLIE ANDERSONÄ@ÂÂ&GÂ(?2POINT JAMES STEWARTÄ*PÂÂ&HÂ(YþÿþÿÃP7þÿÂ&Ià N2POINT PAUL RONDEAUÄdÂÂ&JÂ-%þÿþÿÃI?ÂÂ&KÂ(þÿþÿà IþÿÂ&LÂI2POINT RALPH LEOÄ3ÂÂ&MÂR;þÿþÿ€þÿÂ&NÂ86þÿþÿÃ'ÂÂ&OÂ*þÿþÿÃ$>RÂÂ&PÂZ(2POINT KEVIN MOOREÄ<FÂÂ&QÂ1&þÿþÿÃ<( Â&RÂaEþÿþÿÃN-þÿÂ&SÃ+<þÿþÿà 9]þÿÂ&TÂ%þÿþÿÃF:þÿÂ&UÂþÿþÿÃ. Â&VÂ'þÿþÿÃa! ÂÂ&WÂZ+2POINT KEVIN MOOREÄLQFþÿÂ&XÂ$þÿþÿÃaUþÿÂ&YÃ.2POINTVICTORIA CAROLINEÄFþÿÂ&ZÂ9!2POINT NED SEWALLÄ7'ÂÂ&[Â? þÿþÿÃJNþÿÂ&\Â12POINT KEVIN MOOREÃW>ÂÂ&]Â[AþÿþÿÄ)ÂÂ&^Â[?2POINTMAUREEN JERNSTEDTÄN ÂÂ&_Ã/2POINTLESLIE ANDERSONÄS-ÂÂ&`ÂEþÿþÿÃ)UþÿÂ&aÃ/SþÿþÿÃ[þÿÂ&bÂ_2POINTVICTORIA CAROLINEÃ[ÂÂ&cÂD5þÿþÿÃHZþÿÂ&dÂ`\þÿþÿÃþÿÂ'Ã9þÿþÿ€þÿÂ'ÂKMþÿþÿ€þÿÂ'ÂþÿþÿÃ&3ÂÂ'Â2WþÿþÿÃ)7GþÿÂ'ÃAþÿþÿÃN[3ÂÂ'Â.þÿþÿÃ[þÿÂ'ÂSDþÿþÿÃ-dþÿÂ'Ã8þÿþÿ€þÿÂ' ÃGFþÿþÿÄÂÂ' Ã#c2POINT JOHN SCIABAÄ +YÂÂ' Â[EþÿþÿÄ 3ÂÂ' Â62POINT GREGG JONESÃT[ÂÂ' Â$"þÿþÿ€þÿÂ'ÂPþÿþÿÃ&3ÂÂ'Ã#Wþÿþÿ€þÿÂ'à þÿþÿÃ!%þÿÂ'Ã: þÿþÿÃX'ÂÂ'ÂA þÿþÿÃ4H)ÂÂ'Â,+þÿþÿ€þÿÂ'Á þÿþÿÄ '3þÿÂ'Â[þÿþÿÃNþÿÂ'ÂAEþÿþÿÃ8 þÿÂ'Ã%Zþÿþÿà ÂÂ'Â7XþÿþÿÃGÂÂ' þÿþÿà þÿÂ'Â7,þÿþÿÃ)þÿÂ'Â2YþÿþÿÃ-3ÂÂ'Â4þÿþÿÃþÿÂ'à Iþÿþÿà þÿÂ'Ã(FþÿþÿÃ-*1ÂÂ'Ã^þÿþÿÃ`aþÿÂ' Â2POINTVICTORIA CAROLINEÄ)ÂÂ'!Ã(bþÿþÿÃ'3^þÿÂ'"ÃcþÿþÿÃ_ÂÂ'#ÂdþÿþÿÃ?þÿÂ'$Â2POINT DENNIS DILLONÄBFIÂÂ'%ÂCþÿþÿ€þÿÂ'&Â*0þÿþÿÄ TþÿÂ''Â?2POINT JIM SULLIVANÄJ]GÂÂ'(Â0þÿþÿÃþÿÂ')ÃFþÿþÿÃ$8þÿÂ'*Â$G2POINT JIM SULLIVANÄ[ ÂÂ'+ÂZ þÿþÿÃ-9+þÿÂ',Â=BþÿþÿÃP,QþÿÂ'-ÂEþÿþÿÄ:PþÿÂ'.ÃDþÿþÿÃaþÿÂ'/Ã-NþÿþÿÃÂÂ'0ÂFþÿþÿÃ'3ÂÂ'1ÃDþÿþÿÃ)ÂÂ'2ÃU2POINTMAUREEN JERNSTEDTÄ 3ÂÂ'3Ã-0þÿþÿÃ5QþÿÂ'4Ã-_þÿþÿÄUþÿÂ'5Â?þÿþÿÃ+bþÿÂ'6Ã%52POINT DENNIS DILLONÄV+ÂÂ'7ÂNþÿþÿ€þÿÂ'8Â_2POINT KEVIN MOOREÄ$\ÂÂ'9Â[<2POINTMAUREEN JERNSTEDTÄ[ÂÂ':à 2POINTLESLIE ANDERSONÄWP Â';Â_*þÿþÿÃ3GþÿÂ'<Â^ þÿþÿÃ:*ÂÂ'=Â*(2POINTVICTORIA CAROLINEÃN`4þÿÂ'>Â)2POINTþÿÃKþÿÂ'?Â4YþÿþÿÃ&7 þÿÂ'@Â- þÿþÿÃ?&þÿÂ'AÂ_þÿþÿÃQÂÂ'BÃþÿþÿÃ&9þÿÂ'CÃOþÿþÿÃ>.þÿÂ'DÃDdþÿþÿÃKþÿÂ'EÂ@þÿþÿ€þÿÂ'FÂ9þÿþÿ€þÿÂ'GÂ-þÿþÿ€þÿÂ'HÂþÿþÿÃ() Â'IÂ$þÿþÿÃ2þÿÂ'JÂ%>þÿþÿ€þÿÂ'KÂ3Zþÿþÿà bRþÿÂ'LÃG:þÿþÿ€þÿÂ'MÂ.þÿþÿÃ5A6ÂÂ'NÃCLþÿþÿ€þÿÂ'OÂþÿþÿÃA6þÿÂ'PÂ[8þÿþÿÃLÂÂ'QÂ.þÿþÿÃGCþÿÂ'RÃ2POINTDAVID FILLINGERÄYaÂÂ'SÃVþÿþÿÃJ@5ÂÂ'TÂIHþÿþÿÃA!þÿÂ'UÂ5D2POINT KEVIN MOOREÄ2bþÿÂ'VÂ5EþÿþÿÄ #þÿÂ'WÃUþÿþÿÃ/bWÂÂ'XÃþÿþÿÃþÿÂ(9Â%FþÿþÿÃ9MÂÂ(:Ã,3þÿþÿÃ1 XþÿÂ(;ÂCSþÿþÿÃb6ÂÂ(< þÿþÿà c þÿÂ(=ÃþÿþÿÃU2þÿÂ(>ÂaGþÿþÿÃ=ÂÂ(@Â[92POINTMAUREEN JERNSTEDTÄ[ÂÂ(AÂIþÿþÿÃ+V_þÿÂ(BÂ^þÿþÿÃEGþÿÂ(CÂ.þÿþÿÃ8þÿÂ(DÂ5bþÿþÿÃGþÿÂ(EÂNþÿþÿÃ\%ÂÂ(FÂ[J2POINTMAUREEN JERNSTEDTÄÂÂ(GÂ1'2POINT KEVIN MOOREÄ7#PÂÂ(HÂZ.þÿþÿÃ((þÿÂ(IÂ8þÿþÿÃ5:þÿÂ(JÂ[3þÿþÿÄÂÂ(KÂ$EþÿþÿÃF]QÂÂ(LÃ2/þÿþÿÃ>"PþÿÂ(MÂO5þÿþÿà \þÿÂ(NÃ3þÿþÿ€þÿÂ(OÂO6þÿþÿ€þÿÂ(PÂB$þÿþÿÃ&\QþÿÂ(QÂ"þÿþÿÃSþÿÂ(R RþÿþÿÃÂÂ(SÂF2POINT ANDREW BELANDÄQS+ÂÂ(TÂRS2POINT GARRY BLAIRÄ1 ÂÂ(UÂPTþÿþÿÃG3ÂÂ(VÂF þÿþÿÃ"dþÿÂ(WÃ/þÿþÿÃÂÂ(XÂ3þÿþÿ€þÿÂ(YÂOEþÿþÿÃ2HþÿÂ(ZÂ^þÿþÿÄ.=IÂÂ([Âþÿþÿà ]RþÿÂ(\ÃQþÿþÿÃ>"þÿÂ(]Ã0%þÿþÿ€þÿÂ(^Â=6þÿþÿ€þÿÂ(_Â%AþÿþÿÄ,[þÿÂ(`ÂD*þÿþÿÃd 6ÂÂ(aÂ2 þÿþÿ€þÿÂ(bÃPþÿþÿÃ0(4ÂÂ(cÂ,-þÿþÿ€þÿÂ(dÃ0"þÿþÿÃ?þÿÂ)ÃJþÿþÿ€þÿÂ)Â#=þÿþÿÄ ÂÂ)Â6=þÿþÿ€þÿÂ)Ã:KþÿþÿÃK:ÂÂ)Ã%7þÿþÿÃþÿÂ)Ã.'COAXIALþÿÃLÂÂ)Â8þÿþÿÃM2WÂÂ) Â+þÿþÿÃEÂÂ) Â)þÿþÿÄ1BÂÂ) ÂZ,þÿþÿÃ]þÿÂ) ÃHþÿþÿÃ_þÿÂ) ÂB2POINT KEVIN MOOREÄd9þÿÂ)Â92POINT NED SEWALLÃ\ ÂÂ)Â`2POINTVICTORIA CAROLINEÄ3ÂÂ)ÃþÿþÿÃ]3ÂÂ)Â[B2POINTMAUREEN JERNSTEDTÄ[ÂÂ)Â[H2POINTMAUREEN JERNSTEDTÄ3ÂÂ)ÂR[2POINTMAUREEN JERNSTEDTÄÂÂ)Â$42POINTMAUREEN JERNSTEDTÄQÂÂ)Â>;þÿþÿÃHSÂÂ)Ã/+þÿþÿÃ!IþÿÂ)à 2POINTVICTORIA CAROLINEÄC7?ÂÂ)Â(K2POINT JAMES STEWARTÄ=þÿÂ)Ã-*þÿþÿÄ/dXÂÂ)ÂJ`þÿþÿÃ#WþÿÂ)Â:þÿþÿà dbþÿÂ)Â]þÿþÿÃa"=ÂÂ)Â^þÿþÿÃQ%þÿÂ)Â02POINTVICTORIA CAROLINEÄ/ þÿÂ)ÂA`þÿþÿÃdWþÿÂ) Â*N2POINT JIM BLACKWELLÃ0:_þÿÂ)!ÃAþÿþÿÃ(GþÿÂ)"Ã<þÿþÿÃ/* þÿÂ)#Ã)CþÿþÿÃ?_'þÿÂ)$ÂC5þÿþÿÄR+þÿÂ)%Ã*=þÿþÿÃ'*1þÿÂ)&Â9þÿþÿÃ:þÿÂ)'Â_2POINTVICTORIA CAROLINEÄ8#ÂÂ)(ÂT#þÿþÿÃ4 þÿÂ))ÂþÿþÿÃ_ þÿÂ)*Ã5;þÿþÿà :þÿÂ)+Ã.Kþÿþÿà þÿÂ),à þÿþÿà GGþÿÂ)- þÿþÿÃ1P2 Â). COAXIALNAÃM(GÂÂ)/Âb>þÿþÿ€þÿÂ)0Â#2POINTVICTORIA CAROLINE€þÿÂ)1Â6þÿþÿ€þÿÂ)2Â-Gþÿþÿ€þÿÂ)3ÃBþÿþÿÃ=ÂÂ)4Ã3þÿþÿÃAdZ Â)5Â$Q2POINT KEVIN MOOREÃ=L@þÿÂ)6Ã;+2POINT TONY ACCOUSTIÅ6HÂÂ)7ÂþÿþÿÃS5ZÂÂ)8Ã]þÿþÿÃ= Â)9à þÿþÿÃ!NÂÂ):Ã.MþÿþÿÄ)ÂÂ);ÂLZþÿþÿÃTÂÂ)<à *þÿþÿÃG;þÿÂ)=Â$K2POINT BOB CROTEAUÄZÂÂ)>Â[L2POINTMAUREEN JERNSTEDTÄGÂÂ)?ÂþÿþÿÄ4 ÂÂ)@ÃTþÿþÿÃ=( þÿÂ)AÃ@2POINTVICTORIA CAROLINEÃ`;-þÿÂ)BÂ7þÿþÿÄD3þÿÂ)CÂ)þÿþÿÃþÿÂ)DÃGþÿþÿ€þÿÂ)EÃ5 þÿþÿ€þÿÂ)FÂ_2POINT KEVIN MOOREÄÂÂ)GÂ,þÿþÿÃLÂÂ)HÂ[62POINTMAUREEN JERNSTEDTÃdÂÂ)IÂ.þÿþÿÃY:ÂÂ)JÃ-&2POINT JAMES STEWARTÄKþÿÂ)KÂ.þÿþÿÃ5IþÿÂ)LÂ.þÿþÿÄQ3ÂÂ)MÂ*þÿþÿÃ,/dþÿÂ)NÂ.þÿþÿÃ#_OþÿÂ)O '2POINT KEVIN MOOREÄ39þÿÂ)PÂ*þÿþÿÃ4SaþÿÂ)QÂ=þÿþÿÃ?/þÿÂ)RÃ9þÿþÿÃRþÿÂ)SÂIPþÿþÿÃ'AþÿÂ)TÂ.þÿþÿÃ# þÿÂ)UÃ5þÿþÿÃþÿÂ)VÃ" þÿþÿ€þÿÂ)WÂ+þÿþÿÃ3P+ÂÂ)Xà 2POINT KEVIN MOORE€þÿÂ)YÂ-þÿþÿÃ@%þÿÂ)ZÂ*&2POINTVICTORIA CAROLINEÄ7ÂÂ)[Â$MþÿþÿÃQ þÿÂ)\Ã?þÿþÿÃ- þÿÂ)]Ã2POINT KEVIN MOOREÄ5'QþÿÂ)^Ã*þÿþÿÃ>þÿÂ)_Â&þÿþÿÃIþÿÂ)`ÃSþÿþÿ€þÿÂ)aÃOþÿþÿà "<þÿÂ)bÂ7IþÿþÿÃ5þÿÂ)cÂ]þÿþÿ€þÿÂ)dÃNQþÿþÿÃ5W[þÿÂ*à þÿþÿÃ=dÂÂ* DþÿþÿÂTþÿÂ*Â6þÿþÿÃ`þÿÂ*Â^þÿþÿÄ( Â*ÃSþÿþÿÃA2@þÿÂ*Âþÿþÿà -þÿÂ*Â\9þÿþÿÃ6 þÿÂ*Â[=þÿþÿÄÂÂ* Â&þÿþÿÃ?BGÂÂ* Ã%@þÿþÿÃ9_HþÿÂ* Â1þÿþÿÃ;_þÿÂ* Â?þÿþÿÃWþÿÂ*  þÿþÿÃ-O&ÂÂ*Â[2þÿþÿÃ/WNþÿÂ*Â1SþÿþÿÃGFþÿÂ*Â1þÿþÿÃOÂÂ*ÂO=þÿþÿ€þÿÂ*Â^BþÿþÿÃLÂÂ*Â3EþÿþÿÃ@( ÂÂ*Â^þÿþÿÃ&Y&þÿÂ*ÂA2POINT JOHN SCIABAÄCDÂÂ*Ã62POINTVICTORIA CAROLINEÃcGÂÂ*Â(JþÿþÿÃ% þÿÂ*ÂK_þÿþÿÃAþÿÂ*ÃZ2POINT FRANK BATHEÄ ÂÂ*ÂþÿþÿÄ9ÂÂ*Â\8þÿþÿÃ?HþÿÂ*Â$DþÿþÿÃO?þÿÂ*ÂþÿþÿÄU?(þÿÂ*ÂJ$þÿþÿÃL :þÿÂ*ÂA2POINT JOHN SCIABAÄQ`ÂÂ* Â>dþÿþÿÃ)68þÿÂ*!Â72POINT JOHN SCIABAÄ5X_þÿÂ*"Â[:2POINTMAUREEN JERNSTEDTÃIQÂÂ*#Ã!þÿþÿÄ%DÂÂ*$Ã5OþÿþÿÃUþÿÂ*%ÃUþÿþÿÃ$PÂÂ*&Â/@þÿþÿ€þÿÂ*'Â[þÿþÿ€þÿÂ*(Ã-]þÿþÿÃ[ÂÂ*)Â5þÿþÿÃ3þÿÂ**ÂIþÿþÿà 96ÂÂ*+à þÿþÿÃ(SþÿÂ*,Âd2POINTVICTORIA CAROLINEÄÂÂ*-Â2þÿþÿÃ\OþÿÂ*.ÃB4þÿþÿ€þÿÂ*0Ã-$þÿþÿÃ_þÿÂ*1ÂJþÿþÿÃ2S þÿÂ*2Â(EþÿþÿÃK)þÿÂ*4Â`<þÿþÿÃ^þÿÂ*5ÂB^þÿþÿÃ)-IÂÂ*6ÂA\þÿþÿÃDQ; Â*7ÂAMþÿþÿÄbVÂÂ*8ÃSþÿþÿ€þÿÂ*9ÂcþÿþÿÃ=ÂÂ*:Â%þÿþÿÃÂÂ*;Â%EþÿþÿÃIÂÂ*<Â%7þÿþÿÄ S Â*=Â*þÿþÿÃB $þÿÂ*>Ã2POINTMAREEN JERNSTEDTÃ^FþÿÂ*?ÂAþÿþÿÃGþÿÂ*@ÂAU2POINT JOHN LOVEGRENÄ8XþÿÂ*AÂ7þÿþÿÃKCþÿÂ*BÂ0þÿþÿÃ$]ÂÂ*CÂ.þÿþÿÃÂÂ*EÃþÿþÿÄQ:ÂÂ*FÂZ&þÿþÿÄS\þÿÂ*GÂ>þÿþÿÃ+FþÿÂ*IÂCþÿþÿÃÂÂ*MÂ>bþÿþÿÃR94þÿÂ*NÂH2POINT RALPH LEOÄÂÂ*OÂ&!þÿþÿ€þÿÂ*PÃ+JþÿþÿÃ6VþÿÂ*QÂAþÿþÿÃ-0ÂÂ*RÂ*"2POINTVICTORIA CAROLINEÄÂÂ*SÃ60þÿþÿÄ* Â*TÃBcþÿþÿ€þÿÂ*UÂ7þÿþÿ€þÿÂ*VÃBþÿþÿÄ#)NÂÂ*XÂ2HþÿþÿÃQQ>ÂÂ*YÂ&cþÿþÿÃ>þÿÂ*ZÂPþÿþÿÃ?57þÿÂ*[Â7;2POINT JOHN SCIABAÄ1XÂÂ*]Â$þÿþÿÃ_bþÿÂ*^ÃDþÿþÿ€þÿÂ*_Ã+IþÿþÿÃPÂÂ*`ÃK 2POINT NED SEWALLÄA ÂÂ*aÂþÿþÿÃ>W;þÿÂ*dÂ5a2POINT JOHN SCIABAÄ& ÂÂ+ÃbþÿþÿÃ6#.þÿÂ+Â2þÿþÿÃ[/ÂÂ+ÂS2þÿþÿÃXGþÿÂ+Â[;þÿþÿÃ#J=þÿÂ+Ã"MANIFOLDMCGRAW, MALCOMà ÂÂ+Ã_2POINT JOHN SCIABAÄd#ÂÂ+Ã52POINT GARY KANEÄ L1ÂÂ+Â62POINT JOHN SCIABAÄEVÂÂ+ Ã^!2POINT JOHN SCIABAÄN=CÂÂ+ Ã^$2POINT DENNIS DILLONÃ` M Â+ Ã(72POINT JOHN SCIABAÃ\ÂÂ+ Ã%2POINTJOHN MACKENZIEþÿþÿÂ+ à !NONEþÿþÿþÿÂ+Ã`32POINT GREGG GAGNONþÿþÿÂ+Ã-2POINT PAT HANLEYþÿþÿÂ+Ã]2POINT JOHN SCIABAþÿþÿÂ+Ã`92POINT JOHN SCIABAþÿþÿÂ+ÃO2POINT DENNIS DILLONÄ(ZÂÂ+Ã22POINT NED SEWALLÄ; Â+ÃTO2POINT JOHN SCIABAþÿþÿÂ*DÃNV2POINT NED SEWALLÃN^+ÂÂ*HÂ[C2POINTMAUREEN JERNSTEDTÄ[ÂÂ(?Ã?/2POINT KEVIN MOOREÄ/ÂÂ*WÂ[>2POINTMAUREEN JERNSTEDTÄ +!ÂÂ+Ã(2POINT KEVIN MOOREþÿþÿÂ*\Â2POINTVICTORIA CAROLINEÄ["ÂÂ*cÂ962POINTLESLIE ANDERSONÄ2YþÿÂ*bÃG2POINT TIME PETERSONÄ -ÂÂ)ÂRYCOAXIALROLANDÃ`ÂÂ,ÁIþÿþÿÃ6-(þÿÂ-Ã:TþÿþÿÃ0ÂÂ.Ã&_þÿþÿÃ$ÂÂ/Ã*`þÿþÿÂQÂÂ0ÂASþÿþÿ€þÿÂ1Â%þÿþÿÃ#9VþÿÂ2ÃþÿþÿÄ">=þÿÂ3ÃF2POINT GARY KANEÄ!SÂÂ4ÃYþÿþÿÄ-ZPþÿÂ5Ã4aþÿþÿÃ:cþÿÂ6Â$þÿþÿÃS bÂÂ7Â^ þÿþÿÃ-0þÿÂ8ÂZ)þÿþÿÃWNþÿÂ9ÃFbþÿþÿÃI#ÂÂ:ÂZ9þÿþÿÄ/ÂÂ;Â[OþÿþÿÄ%ÂÂ<ÃGþÿþÿÃ[1"þÿÂ=Â[NþÿþÿÃ6þÿÂ>Â>\þÿþÿÃBdþÿÂ?ÃOþÿþÿÄ1@3ÂÂ@ÂþÿþÿÃ;þÿÂAÂ_þÿþÿÃ[TZþÿÂBÂþÿþÿÃ?HþÿÂCÂþÿþÿÃ# PÂÂDÃ5þÿþÿÄ)7!ÂÂEÂ_!þÿþÿÄ$ ÂFÂWþÿþÿÃ6HÂÂGÁþÿþÿÃ[þÿÂHÃG#þÿþÿÃ9YÂÂIÃ@Yþÿþÿ€þÿÂJà (þÿþÿÄdNOÂÂKÃ4SþÿþÿÄB8b ÂLÂQþÿþÿ€þÿÂMÂ9þÿþÿÃ=ÂÂNÂ>4þÿþÿÃ! $þÿÂOÂ3TþÿþÿÃI ÂPÂ&AþÿþÿÃ=DCþÿÂQÃ5þÿþÿÃFIUÂÂRÂ6þÿþÿÃ_)þÿÂSÃ$_þÿþÿÃRþÿÂTÂG5þÿþÿÄ ÂÂUÃ5?þÿþÿÃK2[ÂÂV þÿþÿÃ"?þÿÂWÂEþÿþÿÃ:ZþÿÂXÂ?(þÿþÿÃ1%þÿÂYÃ5þÿþÿ€þÿÂZÂLþÿþÿ€þÿÂ[Â&Xþÿþÿà ^ÂÂ\à _þÿþÿÃSþÿÂ]Â#þÿþÿÃEþÿÂ^à -þÿþÿÃb4þÿÂ_ÂþÿþÿÃB<2ÂÂ`Ã/þÿþÿÃ@c:ÂÂaÂ-@þÿþÿÃ\3ÂÂbÂ4QþÿþÿÃO þÿÂcÂ2DþÿþÿÃ7 ÂÂdÂ1þÿþÿÃH=0þÿÂÂþÿþÿÃGþÿÂÂZþÿþÿÃþÿÂÂd;þÿþÿà 6ÂÂÂ='þÿþÿ€þÿÂÂCVþÿþÿÃAÂÂÂ!þÿþÿÃGÂÂÂþÿþÿÃ#?,þÿÂÃO+þÿþÿ€þÿ Â'þÿþÿÄ Z ÃQþÿþÿÃ]*þÿ  þÿþÿÃZ à þÿþÿÃVþÿ Â/;þÿþÿÃI3ÂÂÂ?,þÿþÿÃ8þÿÂÃ.XþÿþÿÃC ÂÂà þÿþÿÃ%[6ÂÂÂGXþÿþÿÃ)#ÂÂÂþÿþÿÃVÂÂÂ_Rþÿþÿà `þÿÂÂ2þÿþÿ€þÿÂÂ<þÿþÿà _þÿÂÃþÿþÿÃ+O\ÂÂÂM9þÿþÿÃ/(A ;þÿþÿÃWÂÂÂKþÿþÿÃF:þÿÂÃ%>þÿþÿÃ'3ÂÂÂ5þÿþÿÃ/þÿÂÂB!þÿþÿ€þÿÂÂ;þÿþÿÃFaEÂÂÃ'þÿþÿÃ:GJþÿÂà þÿþÿÄ ÂWBþÿþÿÃ!^þÿÂ!Ã#dþÿþÿÃ#7ÂÂ"Ã'þÿþÿÃIþÿÂ#ÂCþÿþÿÃ#AþÿÂ$ÂX*þÿþÿÃ#ÂÂ%Ã]þÿþÿÃBDþÿÂ&Ã:Xþÿþÿà GþÿÂ'Â/QþÿþÿÃ*AEþÿÂ(ÂRFþÿþÿÃVÂÂ)ÂþÿþÿÃXX6þÿÂ*ÂYþÿþÿÄ3ÂÂ+Ã.þÿþÿÄ[[þÿÂ,Â5þÿþÿÄ>`ÂÂ-Â$þÿþÿÃ?þÿÂ.Ã4þÿþÿÄ$ÂÂ/ÃMþÿþÿÃHþÿÂ0ÂþÿþÿÃ4TÂÂ1Â)MþÿþÿÃ%GÂÂ2Â(Dþÿþÿ€þÿÂ3ÂV`þÿþÿÄ*bþÿÂ4Ã- þÿþÿÄ&aTþÿÂ5Â#þÿþÿÃ-=þÿÂ6Ã4þÿþÿÃQQÂÂ7ÂZ$þÿþÿÃ(þÿÂ8Â[KþÿþÿÃ[ÂÂ9Â5 þÿþÿÄ#1ÂÂ:Â5 þÿþÿÃ[ :þÿÂ;Ã4þÿþÿÃ96þÿÂ<Â*þÿþÿÃ1)HþÿÂ=à WþÿþÿÃ]!XÂÂ>Â2OþÿþÿÃ3)þÿÂ?ÂO"þÿþÿ€þÿÂ@Ã.þÿþÿÃZÂÂAÂA%þÿþÿÃ\þÿÂBÂþÿþÿ€þÿÂCÂ>PþÿþÿÃJ!ÂÂDÂ$HþÿþÿÃ3)5þÿÂEÂ[/þÿþÿÄAþÿÂFÂ=SþÿþÿÄd"ÂÂGÂ4CþÿþÿÃKJþÿÂHÃ.HþÿþÿÃcþÿÂIÂ8LþÿþÿÃ:&þÿÂJÃ%JþÿþÿÃF$FÂÂKÃþÿþÿÃ*þÿÂLÂ_BþÿþÿÃQÂÂMÂþÿþÿÃ! þÿÂNÂOQþÿþÿÄ`#ÂÂOÃ/ þÿþÿÃ!_þÿÂPÃVþÿþÿ€þÿÂQÂ_þÿþÿÃ;2=þÿÂRÂ^bþÿþÿà W*þÿÂSÂ(bþÿþÿÃI þÿÂTÂ)bþÿþÿ€þÿÂUÃ6þÿþÿÃ82þÿÂVÃ4YþÿþÿÃJ*þÿÂWÂ-Vþÿþÿà XþÿÂXÂ>Nþÿþÿà ?ÂÂYÂ;aþÿþÿ€þÿÂZÃ"þÿþÿÄ%þÿÂ[Â1)þÿþÿÃ%X1ÂÂ\Â2CþÿþÿÄ5\ÂÂ]Â*þÿþÿÄ,BþÿÂ^ÂT3þÿþÿÃGC8 Â_Â[MþÿþÿÃ[ÂÂ`Â$.þÿþÿÄ!þÿÂaÂ* þÿþÿÄ ÂÂbÂZ%þÿþÿÃPcþÿÂcÃKþÿþÿÃ3ÂÂdÂBaþÿþÿÃY9ÂÂÂ$-þÿþÿÄ.@þÿÂÂ-Xþÿþÿ€þÿÂÂ4þÿþÿ€þÿÂÂ19þÿþÿà þÿÂà þÿþÿÄbcMþÿÂÂ%þÿþÿÂ:GþÿÂÂþÿþÿÃþÿÂÂXþÿþÿÄ=Zþÿ à /þÿþÿÄ8þÿ Â^þÿþÿÃ6;b ÃJ;þÿþÿÃ]d8  ÂþÿþÿÃ'( ÂJþÿþÿ þÿÂÂ$>þÿþÿÃ3U3ÂÂÂVþÿþÿÃ+þÿÂÂ^þÿþÿÃ#:JÂÂÃ+þÿþÿÃ5U&þÿÂÂ:þÿþÿÂ?cþÿÂÂ3Nþÿþÿ€þÿÂÂ=4þÿþÿÃ3ÂÂÂ%þÿþÿÃC*þÿÂÂ&OþÿþÿÃ)Lþÿ !þÿþÿÃ'ÂÂÂ=>þÿþÿÃBOþÿÂÂ[GþÿþÿÄE.ÂÂÂ&(þÿþÿÃ8,þÿÂÂ$,þÿþÿÄ H\ÂÂÂþÿþÿà þÿÂÂ-þÿþÿÃ/þÿÂÂCþÿþÿ€þÿÂÂ2þÿþÿÃc[  þÿþÿÃCORÂÂ!ÂþÿþÿÃ(3ÂÂ"ÃOþÿþÿ€þÿÂ#ÃN[þÿþÿÃ'TÂÂ$Â^þÿþÿÄ:ÂÂ%Â$+þÿþÿÃB@DþÿÂ&ÂY!þÿþÿ€þÿÂ'à /þÿþÿÃ! [ÂÂ(Â=7þÿþÿ€þÿÂ)Â<þÿþÿÃR50ÂÂ*ÃAPþÿþÿÃ,þÿÂ+ÂF,þÿþÿÃ,)þÿÂ,Ã3þÿþÿÃE;KÂÂ- þÿþÿ€þÿÂ.ÂWþÿþÿÃb@þÿÂ/Â@SþÿþÿÄ ÂÂ0ÂXþÿþÿÃ2þÿÂ1ÃHþÿþÿ€þÿÂ2Â(þÿþÿÃ3ÂÂ3Â-]þÿþÿà 'ÂÂ4ÂGþÿþÿÃ0dÂÂ5Ã-EþÿþÿÃdJ9þÿÂ6Â5þÿþÿÃ-YÂÂ7ÃEþÿþÿÃ%ÂÂ8ÂþÿþÿàÂ9Â.#þÿþÿÃ;þÿÂ:Ã]þÿþÿÂ\3þÿÂ;Ã)`þÿþÿÂþÿÂ<ÃþÿþÿÄ# ;ÂÂ=Ã!þÿþÿÃbÂÂ>ÂSCþÿþÿÃ^0cÂÂ?Ã!/þÿþÿÃ"]þÿÂ@Â%*þÿþÿÃ6VDÂÂAÂ.þÿþÿÃRþÿÂBÂþÿþÿÃRþÿÂCÂVHþÿþÿÃ@?<ÂÂDÂaPþÿþÿÃGÂÂEÃ-'þÿþÿÃ9U ÂÂFÂ&MþÿþÿÃT_þÿÂGÂ&TþÿþÿÃ.HþÿÂHÂaQþÿþÿÄÂÂIÂ$*þÿþÿÄ13þÿÂJÃ''þÿþÿÃY[ÂÂKÂ%XþÿþÿÃþÿÂLÂO`þÿþÿà RþÿÂMÂc-þÿþÿà E"þÿÂNÂZ8þÿþÿÃdþÿÂOÂ<)þÿþÿÂ@þÿÂPÃPþÿþÿÃÂÂQÃ-(þÿþÿ€þÿÂRÂ&Gþÿþÿ€þÿÂSÃN þÿþÿÃQÂÂTÂD1þÿþÿÃ.FZÂÂUÃ6þÿþÿ€þÿÂVÃ-%þÿþÿÃ$a2þÿÂWÂ2EþÿþÿÃJKcÂÂXÂ5þÿþÿÃUþÿÂYÃ+þÿþÿÂ81ÂÂZÂ1þÿþÿÃ(þÿÂ[ÃþÿþÿÃCS]þÿÂ\Ã(þÿþÿÃU+VþÿÂ]Â4SþÿþÿÃO þÿÂ^Ã6þÿþÿÃ!3þÿÂ_Ã3þÿþÿ€þÿÂ`Â=þÿþÿ€þÿÂaÃþÿþÿÃ;?ÂÂbÃ- þÿþÿÃ"OUÂÂcÂBFþÿþÿÃI#þÿÂdÂ^^þÿþÿÃ-)þÿ ÃLþÿþÿÄ Â  þÿþÿÃc5!þÿ Â^þÿþÿÃ:+Nþÿ Â.þÿþÿÃ[*$ Â/þÿþÿÃ-(cþÿ Ã.@þÿþÿÄSS. Â$þÿþÿÃH-þÿ ÂDþÿþÿÃ[ ÃGLþÿþÿÃ>þÿ  þÿþÿà $þÿ Âþÿþÿ€þÿ Â@^þÿþÿÃV8N ÂGþÿþÿÃ3 Â^ þÿþÿÃ98J Ã6þÿþÿÃ$ þÿ ÂDþÿþÿÃ:þÿ Ã.<þÿþÿÂA=þÿ Ã.;þÿþÿÃ)Uþÿ  UþÿþÿÃZP@  þÿþÿÃ(= Ã- þÿþÿ€þÿ Ã.=þÿþÿÃGþÿ Â4þÿþÿÃþÿ Â!<þÿþÿÂ[S Â.þÿþÿÃ]3Mþÿ ÂH!þÿþÿÃ5KDþÿ Ã^þÿþÿà ?, ÃAþÿþÿ€þÿ ÃFþÿþÿÃ,0D Â$8þÿþÿÃRHD ÂT2þÿþÿàÂ7FþÿþÿÃc% !ÂA^þÿþÿà bþÿ "Ã-Iþÿþÿ€þÿ # &þÿþÿÃ)7@ $ÃBþÿþÿÄ2DQ %ÃFOþÿþÿÃ?!_ &ÂþÿþÿÃ7aþÿ 'Â-þÿþÿÃO;# (Ã4ZþÿþÿÃ.X þÿ )Ã(*þÿþÿà S( *Â66þÿþÿÄ2'cþÿ + %þÿþÿÃRWþÿ ,ÃGþÿþÿÃ6Uþÿ -ÂXEþÿþÿÃ7"G .Âc3þÿþÿà Mþÿ /ÃLþÿþÿÄB_ 0Â2FþÿþÿÃ5+ 1ÃþÿþÿÃ7 þÿ 2Â<þÿþÿÃ5;% 3ÂXJþÿþÿà 3 þÿ 4ÃþÿþÿÃ"\L 5Â^þÿþÿÃ) 6Â&þÿþÿÃ;<$þÿ 7ÂMAþÿþÿÃ6`þÿ 8Â[1þÿþÿÃC 9Â[IþÿþÿÃ, Eþÿ :ÂM>þÿþÿÄ2þÿ ;Â@ZþÿþÿÃKCMþÿ <Â,[þÿþÿÃB3Sþÿ =Â<þÿþÿà ^þÿ >Â^þÿþÿÃ.J+þÿ ?Â*þÿþÿÄ&?)þÿ @ÃD%þÿþÿÃ<þÿ AÃ#þÿþÿÃ(þÿ BÂLþÿþÿÃ:Oþÿ CÃ$þÿþÿà  DÂ7þÿþÿ€þÿ EÃ)þÿþÿ€þÿ FÁ þÿþÿÃ@ GÃ5(þÿþÿà þÿ HÂB'þÿþÿÃ4 þÿ IÂ'þÿþÿÃ21 JÃ"^þÿþÿÃGþÿ KÃ5<þÿþÿÃ[ LÃ.þÿþÿÄ MÂ#?þÿþÿÃR8þÿ N þÿþÿÃ)þÿ OÃ1 þÿþÿÃ7W( PÂFdþÿþÿÃ"FEþÿ QÂ[FþÿþÿÄL RÂM=þÿþÿÃQ$þÿ SÂG[þÿþÿÄYD  TÃGþÿþÿÃ- UÂ[4þÿþÿÄ Xþÿ VÂB4þÿþÿÄS WÂdEþÿþÿà [ þÿ Xà þÿþÿà 28þÿ YÃ6þÿþÿ€þÿ ZÂbDþÿþÿÃ+Dþÿ [Ã* þÿþÿÃ&B:þÿ \Â$XþÿþÿÃ,Gþÿ ]Â7.þÿþÿÄQ^ ^Â=TþÿþÿÃF&4þÿ _Â2GþÿþÿÃ]== `Â8Mþÿþÿ€þÿ aÃJþÿþÿ€þÿ bÂ/.þÿþÿ€þÿ cÂ? þÿþÿÃ&QYþÿ dÂa'þÿþÿÃ/þÿÂ!Â9þÿþÿÄ+]þÿÂ!Â@þÿþÿÃaþÿÂ!Â?þÿþÿÄ+?MÂÂ!à KþÿþÿÃU)þÿÂ!Ã.CþÿþÿÃ;dþÿÂ!à þÿþÿÃD++ÂÂ!Ã5KþÿþÿÃ,ÂÂ!à 9þÿþÿÃC!ÂÂ! Â$þÿþÿÄR\ÂÂ! Â?þÿþÿÃ3ÂÂ! Â@PþÿþÿÄ<9þÿÂ! Â>^þÿþÿþÿþÿÂ! ÃT"þÿþÿÄJ?ÂÂ!Ã5þÿþÿÄþÿÂ!Â#_þÿþÿÃCaþÿÂ!Â$ þÿþÿÃ?NQÂÂ!Â?þÿþÿÃ?-ÂÂ!ÂCþÿþÿÄ:9ÂÂ!ÂþÿþÿþÿþÿÂ!Ã.AþÿþÿÃ]\[þÿÂ!Ã!XþÿþÿþÿþÿÂ!Â5þÿþÿÃI ÂÂ!Â?%þÿþÿÃ.\þÿÂ!Ã"DþÿþÿÃ`R þÿÂ!ÃH'þÿþÿÃ:GIþÿÂ!ÂþÿþÿÃ-;þÿÂ!ÂþÿþÿÄ0aÂÂ!Â#bþÿþÿÄaÂÂ!Â>SþÿþÿÃY 3ÂÂ!Â?þÿþÿÃD`_ÂÂ!Â?þÿþÿÃ%7,þÿÂ! Â@cþÿþÿÃ,JþÿÂ!!ÂCþÿþÿÄ&G.ÂÂ!"ÂJ&þÿþÿÄ*EÂÂ!#ÂTaþÿþÿÄ /ÂÂ!$Â?8þÿþÿÃ+_þÿÂ!%ÃaþÿþÿÃ+þÿÂ!&ÂCþÿþÿÃ)O  Â!'Â$þÿþÿÃ4(-ÂÂ!(Â?:þÿþÿÃ,=BþÿÂ!)ÂþÿþÿÃ)9#ÂÂ!*Â#`þÿþÿ€þÿÂ!+Â6\þÿþÿà VþÿÂ!,ÂTWþÿþÿ€þÿÂ!-Â&þÿþÿÂ)=þÿÂ!.ÂADþÿþÿÃ=ÂÂ!/ÂFþÿþÿÃ9]þÿÂ!0ÃþÿþÿÃ$ÂÂ!1Ã!*þÿþÿà BÂÂ!2Ã'$þÿþÿÃÂÂ!3Â*>þÿþÿ€þÿÂ!4Ã7þÿþÿÃcþÿÂ!5Ãþÿþÿ€þÿÂ!6ÃNSþÿþÿ€þÿÂ!7Â?1þÿþÿà 9bþÿÂ!8ÂUþÿþÿÃG-?ÂÂ!9 þÿþÿà + Â!:Â/þÿþÿ€þÿÂ!;à 8þÿþÿÃVVÂÂ!<ÃþÿþÿÄ0AÂÂ!=Ã"þÿþÿÃ]O>ÂÂ!>Ã5þÿþÿÄ$=þÿÂ!?Â$þÿþÿÄÂÂ!@Â?þÿþÿÃJR2ÂÂ!AÂG.þÿþÿÃ@R/ÂÂ!BÂ2þÿþÿÃ4!JÂÂ!C +þÿþÿÃ3ÂÂ!Dà þÿþÿÃ-GÂÂ!EÃ!KþÿþÿÃ$AGþÿÂ!FÃ- þÿþÿÃ=þÿÂ!GÃ@XþÿþÿÃ$-JþÿÂ!HÂAþÿþÿÄK*þÿÂ!IÂcþÿþÿÃPbþÿÂ!JÂþÿþÿà G^þÿÂ!KÂ^AþÿþÿÃNþÿÂ!L þÿþÿ€þÿÂ!MÂUþÿþÿÃ(ÂÂ!NÂHVþÿþÿ€þÿÂ!OÃ(=þÿþÿÃ>QÂÂ!PÂ@þÿþÿÃ$ÂÂ!QÃ:OþÿþÿÄ;ÂÂ!RÂ?4þÿþÿÃ@ FÂÂ!SÃ3VþÿþÿÃM%þÿÂ!TÂ=þÿþÿ€þÿÂ!UÃ@þÿþÿÃ,3cþÿÂ!Và þÿþÿÄ33þÿÂ!WÃObþÿþÿ€þÿÂ!XÂ$þÿþÿÃ9Z"ÂÂ!YÂ6*þÿþÿÃ&N2þÿÂ!ZÂ9þÿþÿÄ^þÿÂ![ÂAþÿþÿÄEÂÂ!\ÂUþÿþÿÄ<þÿÂ!] CþÿþÿÃ>EÂÂ!^ÂXBþÿþÿÃOÂÂ!_ÃOþÿþÿÃþÿÂ!`Ã%þÿþÿÃÂÂ!aÃ#/þÿþÿÃ$#þÿÂ!bà 5þÿþÿà ?LþÿÂ!cÂ. þÿþÿà ÂÂ!dÂUþÿþÿÃ=ÂÂ"Â9þÿþÿà þÿÂ"Ãþÿþÿ€þÿÂ"Ã+þÿþÿ€þÿÂ"Ã-þÿþÿÃ/ÂÂ"à &þÿþÿÃd6þÿÂ"Ã%þÿþÿ€þÿÂ"Ã6þÿþÿÃ"T ÂÂ"ÂIbþÿþÿÃS4DÂÂ" Ã[þÿþÿà `þÿÂ" à %þÿþÿÃ:(þÿÂ" Â>þÿþÿÃ/D0ÂÂ" Â@YþÿþÿÃ;7þÿÂ" Â*þÿþÿà NþÿÂ"Â=þÿþÿà NþÿÂ"Áþÿþÿ€þÿÂ"ÃB(þÿþÿ€þÿÂ" þÿþÿÃ"þÿÂ" Lþÿþÿà S þÿÂ"ÂOþÿþÿÃþÿÂ"Â*JþÿþÿÃ*þÿÂ"Â-aþÿþÿÃ35þÿÂ"Â/Aþÿþÿ€þÿÂ"Â6þÿþÿÃ33ÂÂ"Â@`þÿþÿÃGC+ÂÂ"ÂOLþÿþÿÄ DÂÂ"Ã!þÿþÿÃ'ÂÂ"ÂKþÿþÿà þÿÂ"ÂMþÿþÿÃ,_)ÂÂ"ÃGþÿþÿÃ]SÂÂ"ÂYMþÿþÿÃ[]EþÿÂ"Â_þÿþÿÃ4`YÂÂ" ÂYBþÿþÿÃ=^þÿÂ"!ÂþÿþÿÃþÿÂ""ÂþÿþÿÃþÿÂ"#Â!&þÿþÿ€þÿÂ"$Â/1þÿþÿ€þÿÂ"%ÃP þÿþÿ€þÿÂ"&Â>UþÿþÿÃ7 þÿÂ"'Ã!,þÿþÿÃ1O6þÿÂ"(Ã*þÿþÿÃ,ÂÂ")Â=(þÿþÿà FþÿÂ"*ÃFþÿþÿÃa?þÿÂ"+Ã"8þÿþÿÃ^W8ÂÂ",ÃQþÿþÿ€þÿÂ"-Â$þÿþÿÃ)C!ÂÂ".Â%þÿþÿà þÿÂ"/ÂbJþÿþÿÃÂÂ"0ÂC=þÿþÿÃþÿÂ"1Â:þÿþÿà þÿÂ"2ÃþÿþÿÃ:\þÿÂ"3Ã(þÿþÿÃ;4þÿÂ"4ÂDþÿþÿÃ"SBþÿÂ"5Â$ þÿþÿÄVJÂÂ"6Â3MþÿþÿÄ9ÂÂ"7ÂQSþÿþÿÄa UþÿÂ"8 þÿþÿÄÂÂ"9ÃXbþÿþÿà Z4ÂÂ":ÂQZþÿþÿÃ'')þÿÂ";Â>9þÿþÿÃ3[7ÂÂ"<Â#aþÿþÿÄ8þÿÂ"=ÃPþÿþÿÄ ?UÂÂ">Ã4Oþÿþÿ€þÿÂ"?ÃO"þÿþÿ€þÿÂ"@Â$#þÿþÿÃXY!þÿÂ"AÂPYþÿþÿÃ-+ÂÂ"BÂ2þÿþÿÃ!$þÿÂ"CÂSþÿþÿ€þÿÂ"DÃAbþÿþÿÃCÂÂ"EÃ)Tþÿþÿ€þÿÂ"FÂ-Zþÿþÿ€þÿÂ"Gà %þÿþÿÃ"3ÂÂ"H þÿþÿÃþÿÂ"IÃ;*þÿþÿÃ-Y!ÂÂ"JÂ8þÿþÿÃA UÂÂ"KÂ=5þÿþÿ€þÿÂ"LÂþÿþÿÃIþÿÂ"MÂ^#þÿþÿÃATþÿÂ"NÃ&þÿþÿÃ? ÂÂ"OÃ4Rþÿþÿà H þÿÂ"PÂþÿþÿÃ[ÂÂ"QÂþÿþÿÃ%Z0ÂÂ"RÂþÿþÿÃQþÿÂ"SÂ@\þÿþÿà YUþÿÂ"TÂ]þÿþÿ€þÿÂ"U OþÿþÿÃGþÿÂ"VÃ* þÿþÿ€þÿÂ"WÂ.þÿþÿÃ43þÿÂ"X þÿþÿÃþÿÂ"YÂYKþÿþÿÃXBþÿÂ"ZÃ3þÿþÿÃQ ÂÂ"[Ã;þÿþÿÃ@.þÿÂ"\Ã6+þÿþÿÃWbÂÂ"]ÂIþÿþÿÃ7)þÿÂ"^ÂJþÿþÿÃ"cÂÂ"_Â6BþÿþÿÃ:þÿÂ"`Â=GþÿþÿÃdþÿÂ"aÂ>VþÿþÿÃ*+þÿÂ"bÂ>`þÿþÿÃ=ÂÂ"cÂdþÿþÿÃ&DþÿÂ"dÂUEþÿþÿÃ'+þÿÂ#ÃGþÿþÿÃ`UMÂÂ#ÂMþÿþÿ€þÿÂ#ÃþÿþÿÃA ,þÿÂ#ÃGþÿþÿ€þÿÂ#Â_PþÿþÿÃ((WÂÂ#Â`_þÿþÿ€þÿÂ#à Qþÿþÿ€þÿÂ#Ã-Xþÿþÿà þÿÂ# ÂZ?þÿþÿÄ;ÂÂ# Ã3?þÿþÿÃ9GþÿÂ# Â2>þÿþÿÃATþÿÂ# ÁDþÿþÿÃ?^NþÿÂ# Â=/þÿþÿÄVRbÂÂ#Â(/þÿþÿÃ7_UÂÂ#ÂJþÿþÿÃcþÿÂ#Â7DþÿþÿÃ22 þÿÂ#Â6>þÿþÿÃ2 0ÂÂ#Ã@_þÿþÿà aLÂÂ#ÂJXþÿþÿà FþÿÂ#ÃMþÿþÿÃFþÿÂ#Ã!þÿþÿÃ6#þÿÂ#Ã-LþÿþÿÃ>BþÿÂ#Â#þÿþÿà ÂÂ#Â(!þÿþÿ€þÿÂ#Â>þÿþÿà 3ÂÂ#Ã9þÿþÿ€þÿÂ#ÂþÿþÿÃ!ÂÂ#Â%þÿþÿ€þÿÂ#ÃþÿþÿÃ1XþÿÂ#Ã[þÿþÿÃÂÂ#Ã=þÿþÿÃ>L Â# ÂGEþÿþÿÃÂÂ#!Ã%2þÿþÿ€þÿÂ#"ÃQþÿþÿÃHÂÂ##Â2þÿþÿ€þÿÂ#$Â$[þÿþÿ€þÿÂ#%Â-JþÿþÿÃ2K*ÂÂ#&ÃW#þÿþÿÄ Â#'ÂUþÿþÿÄ FþÿÂ#(Ã4þÿþÿÃdþÿÂ#)Ã$#þÿþÿà #3þÿÂ#*Ã,<þÿþÿÃ]OþÿÂ#+Ã43þÿþÿÃGaþÿÂ#,Â4þÿþÿÃ,JþÿþÿÃ% þÿÂ#1ÂARþÿþÿà 3þÿÂ#2Ã$:þÿþÿÃ*HBÂÂ#3Ã5\þÿþÿÃ@++þÿÂ#4 þÿþÿÃ3ÂÂ#5Â$þÿþÿà ?þÿÂ#6 Mþÿþÿ€þÿÂ#7ÃQþÿþÿÃ:4ÂÂ#8ÃLþÿþÿÃ!þÿÂ#9Ã"9þÿþÿÃ`@RÂÂ#:Ã5]þÿþÿÃS YþÿÂ#;Ã@þÿþÿ€þÿÂ#< þÿþÿÃQþÿÂ#=Â#\þÿþÿÃ+AþÿÂ#>Á<þÿþÿÃCQÂÂ#? EþÿþÿÂVþÿÂ#@ÂOþÿþÿÃ*.þÿÂ#AÂOþÿþÿÃO3þÿÂ#BÂþÿþÿÃJKIÂÂ#CÂ70þÿþÿÄ aþÿÂ#DÃbþÿþÿÃ-DÂÂ#EÃ%þÿþÿÃ%_þÿÂ#FÂ-;þÿþÿÃ91ÂÂ#GÂJMþÿþÿ€þÿÂ#HÃKþÿþÿÄNcÂÂ#IÂ0þÿþÿÃ=@1þÿÂ#JÂ?þÿþÿÃP6UÂÂ#Kà þÿþÿÃ.C`þÿÂ#LÃ"7þÿþÿÄE6`ÂÂ#MÃ&þÿþÿÃOþÿÂ#NÂdþÿþÿÃ83þÿÂ#OÂ1þÿþÿÃ^þÿÂ#PÂ)þÿþÿà GþÿÂ#QÂB5þÿþÿ€þÿÂ#RÂU3þÿþÿÃ!RþÿÂ#SÂ[þÿþÿÃ%$þÿÂ#T 7þÿþÿÃ$ÂÂ#UÂQþÿþÿÃXÂÂ#VÂ8XþÿþÿÃLQþÿþÿÃ2 <þÿÂ$Â=þÿþÿÃPd:ÂÂ$Ã"EþÿþÿÄ ZþÿÂ$ÃR#þÿþÿÃ`$QÂÂ$ÂI^þÿþÿÃE GÂÂ$à VþÿþÿÃMþÿÂ$ÃdþÿþÿÃ#5þÿÂ$Ã!þÿþÿ€þÿÂ$Â7-þÿþÿÃ1þÿÂ$ÂÂ"ÂÂ9xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ?Â"%ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  @Â"VÂÁ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  AÂ"aÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  BÂ#) xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg CÂ#.ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf DÂ#@ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg EÂ#JÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  FÂ#bÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  GÂ$ÂÂ!xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  HÂ$ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg IÂ$ ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg JÂ$ ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  KÂ$ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg LÂ$ÂÂ!xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  MÂ$ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg NÂ$ÂÂ!xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  OÂ$!ÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  PÂ$%ÂÂ!xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  QÂ$&ÂÂ!xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  RÂ$'ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg SÂ$, xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg TÂ$8ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg UÂ$>ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg VÂ$EÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  WÂ$IÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg XÂ$OÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  YÂ$QÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ZÂ%Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  [Â%ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  \Â%*ÂÂ9xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  ]Â%0ÂÁ xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ^Â%5ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  _Â%7ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  `Â%>ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg aÂ%?ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  bÂ%AÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  cÂ%MÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  dÂ%VÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ&Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ&(ÂÁ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ&) xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ'ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ'1Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ(/ÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ)ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ)ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â*ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â*ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf Â* ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Â*"ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Â*&Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ*(ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ*7ÂÁ xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ*NÂÂ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ*\ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ+ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ+0ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ+3ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ+=ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ+>ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ+?ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ,dÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ-%ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ-;ÂÂKxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ-@ÂÂ9xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ-JÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ-PÂÂ5xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ-]ÂÂ9xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ.ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Â.Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â!Â.Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â"Â.ÂÂ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â#Â.ÂÂ:xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ$Â.%ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%Â.(ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â&Â.+ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ'Â.6ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ(Â.7ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ)Â.8ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â*Â.9ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ+Â.=ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â,Â.YÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ-Â/>ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â.Â0ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ/Â0ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ0Â0$ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ1Â0'ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ2Â0)ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ3Â0*ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ4Â0AÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â5Â0aÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â6Â0cÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â7Â1ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ8Â1)ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ9Â1HÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â:Â1cÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â;Â2ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â<Â26ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ=Â2CÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ>Â2DÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â?Â2GÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â@Â2HÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂAÂ2IÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂBÂ2LÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂCÂ3 xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂDÂ3 xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÂ3ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂFÂ3%ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂGÂ3/ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂHÂ3;ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂIÂ3EÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂJÂ3TÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂKÂ4ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂLÂ4ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂMÂ4*ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂNÂ4.ÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂOÂ41ÂÁ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂPÂ5 ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂQÂ5 ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂRÂ5ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂSÂ5ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂTÂ5ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂUÂ5ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂVÂ5ÂÂ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂWÂ5@ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂXÂ5T xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂYÂ5aÂÂ!xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂZÂ5bÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â[Â6Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â\Â6$ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ]Â6/ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ^Â6cÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_Â7ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â`Â7ÂÂ!xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂaÂ7ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂbÂ7ÂÂ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂcÂ7ÂÂ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂdÂ7$ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ7'ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ7*Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ7.ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ70ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ76ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ7;ÂÁ$xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ7FÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ7IÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â7XÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â8ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Â86ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â8F xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Â9ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ9!ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ92ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ96ÂÂ5xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ9:ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ9AÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ9OÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ9PÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ9QÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ9TÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ:AÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ:CÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ:FÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ;ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿ.BEAUMONT SCHEDULED/DONE INSPECTIONS 11/04 -ACFxf ÂÂ;ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿ.BEAUMONT SCHEDULED/DONE INSPECTIONS 11/04 -ACFxf ÂÂ;WÂÁQxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ;dÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ< ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ<8ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ)Â>ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â*Â>PÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿgFACILITY OPENED IN JANUARY 2004. KEVIN MOORE HAS SCHEDULED ANNUAL INSPECTION WITHIN 30 DAYS. RR 9/29/04xf Â+Â>SÂÂ1xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ,Â>`ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ-Â>cÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â.Â?  xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ/Â?ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â0Â?QÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â1Â@2ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â2Â@SÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ3Â@\ÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ4ÂAÂÁ$xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ5ÂA ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ6ÂA Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â7ÂAÂÂ!xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ8ÂA0ÂÂ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â9ÂAEÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â:ÂAMÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿ LEO HAS SCHEDULED WITH MIKE LEWIS TO HAVE INSPECTION PERFORMED. STILL WAITING ON MIKE FOR THE ACTUAL INSPECTION DATE. WILL C/B WITH MORE INFORMATION. RR 9/23/04xf Â;ÂARÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ<ÂAUÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â=ÂA^ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â>ÂA`ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â?ÂAaÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â@ÂAcÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂAÂB xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂBÂB$Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂCÂB0ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂDÂBEÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÂB[ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂFÂB\ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂGÂB^ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂHÂCÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂIÂC' xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂJÂC.Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂKÂCQÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂLÂD xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂMÂDÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂNÂD,ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂOÂD5ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂPÂDBÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂQÂE ÂÂZxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂRÂE]ÂÂ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿO10/12/04 JIM WOODS, LILY TRUCKING: 2005 INSPECTION SCHEDULED FOR 10/21/04. -ACFxf ÂSÂE`ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂTÂF1ÂÂ!xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂUÂFVÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂVÂGÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂWÂG,ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂXÂG5ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂYÂGE xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂZÂGUÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â[ÂG[ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ\ÂGcÂÂ;xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ]ÂH!ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â^ÂIÂÂ;xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ_ÂIHÂÂ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â`ÂJÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂaÂJ=ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂbÂKÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂcÂKXÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂdÂK[ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂL  xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂL$ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂLKÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂLLÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂLMÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂLXÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂLZÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂM ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂM ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂM>ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂN# xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂN% xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂN*ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂN. xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂN0 xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂNU xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂN^ÂÂKxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂO Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂOÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂOÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂOÂÂ:xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂOÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂOÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂOÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂOÂÂKxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂOÂÂ6xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂOLÂÂ;xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂOQÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂOTÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂPÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂPJÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂPNÂÁ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ!ÂPYÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"ÂQÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â#ÂQÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â$ÂQÂÁ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â%ÂQ!Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â&ÂQ"Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â'ÂQ#ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â(ÂQ+ÂÁxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â)ÂQGÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â*ÂQNÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â+ÂQOÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ,ÂQQÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â-ÂQ\ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ.ÂR4ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ/ÂR@ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ0ÂRDÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ1ÂRKÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â2ÂRSÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â3ÂR]ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4ÂR_Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â5ÂSÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ6ÂSÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â7ÂS) xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ8ÂS+ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ9ÂS- xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ:ÂSCÂÂ9xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â;ÂSVÂÁ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ<ÂSZÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ=ÂT ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ>ÂT#Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â?ÂTaÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ@ÂTcÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂAÂUÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂBÂUÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂCÂUÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂDÂU3ÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂEÂU=Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂFÂUEÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿRON ROBINSON CALLED ON xfÂGÂVÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂHÂVÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂIÂVÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂJÂVÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂKÂVÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂLÂV ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂMÂV!ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂNÂV"ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂOÂV#ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂPÂV$ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂQÂV%ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂRÂV&ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂSÂV(ÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂTÂV7Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂUÂV>ÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂVÂVZÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂWÂV]ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂXÂVbÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂYÂW9ÂÂ>xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂZÂW:ÂÂ>xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ[ÂW;ÂÂ>xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ\ÂW<ÂÂ>xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ]ÂW=ÂÂ>xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ^ÂW>ÂÂ>xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_ÂW?ÂÂ>xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ`ÂW@ÂÂ>xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂaÂWOÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂbÂXÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂcÂX$ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂdÂX8ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂXIÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂXNÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂXPÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂX^ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂYKÂÂ;xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂYRÂÂ;xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂY^ÂÂ;xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂZ&ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂZ/ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂZ9ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂZ<Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  ÂZ?ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â[ ÂÂ4xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ[ÂÂKxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ\ ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ\ ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ\JÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ\LÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ]ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ^ ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ^ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ^ÂÂ-xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÂ^2ÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ^3ÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ^6ÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ^;ÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ^BÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ^\ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ^aÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ_Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂ_@ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â_BÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â!ÂaEÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"ÂaHÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â#ÂaQÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â$ÂbAÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%ÂbRÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ&ÂcÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â'ÂcÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â(Âc ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ)ÂcI xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*ÂcXÂÁ xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ+ÂdÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â,Âd xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ-Âd(Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â.Âd5ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â/ÂdbÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ0Ã,ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â1Ã. xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ2Ã/ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â3Ã'Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â4Ã)ÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ5ÃMÂÁxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ6ÃÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ7ÃAÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ8ÃYÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ9Ã^ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â:Ã_ÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ;ÃÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ<ÃÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ=Ã'ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â>Ã+ÂÂ;xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ?Ã>ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ@Ã@ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂAÃGÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂBÃÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂCÃF xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂDÃGÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÃLÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂFÃ(ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂGÃAÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂHÃÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂIÃÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂJÃ"ÂÁxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂKÃ#ÂÁxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂLÃ6ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂMÃ<ÂÁ"xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂNÃQÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂOÃaÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂPà Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂQà Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂRÃÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂSÃRÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂTà ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂUà ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂVà ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂWà ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂXà ÂÂ:xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂYà Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂZà ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â[à / xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ\à :ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â]à JÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ^à LÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_à NÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ`à ZÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂaà ÂÂ;xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Âbà D xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂcà NÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂdà SÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂà ]ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂà b xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Âà  xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà  xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà .ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Âà 1ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Âà <ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  à ÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿn10/4/04 BETH TAPLEY CALLED, SAID DAVE BEAUMONT WAS SCHEDULED FOR INSPECTION NEXT WEEK IN RESPONSE TO NOV. -ACFxg à ÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  à %Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  à &ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  à  xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà :ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Âà QÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂà ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂàxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂàxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃPÂÁ xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃÂÂ5xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ3ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃAÂÂ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂàxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ"ÂÂ9xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ2ÂÂDxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃB xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ[ÂÁQxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ)ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Ã8Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!ÃHÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â"ÃÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#ÃJÂÁQxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ$ÃBÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%ÃQÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â&ÃUÂÂKxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'ÃQÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â(ÃRÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)ÃGÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â*ÃÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â+ÃÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ,ÃÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ-Ã?ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ.ÃÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ/Ã1Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â0Ã7ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ1Ã<ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ2Ã>ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ3ÃDÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â4ÃOÂÂ5xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ5ÃTÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â6Ã] xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â7ÃÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â8ÃÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â9Ã.Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â:ÃYÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ;ÃÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ<ÃÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â=Ã!Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â>Ã#ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â?Ã&ÂÂ;xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ@Ã*ÂÂ:xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂAÃ,Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂBÃ.Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂCÃ>ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂDÃ?ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂEÃ@ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂFÃCÂÂ9xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂGÃQÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂHÃRÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿªTANK IS CURRENT;Y OUT OF SERVICE. OWNER SUBMITTING OUT OF SERVICE FORM. ALSO, TANK SCHEDULED FOR REMOVAL IN THE NEXT MONTH. REMOVAL FORM WILL BE SENT SHORTLY. RR 10/29/04xfÂIÃYÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂJÃ_ÂÁQxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂKÃcÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂLÃÂÁxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂMÃÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂNÃ4Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂOÃ;Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂPÃ<Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂQÃ>Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂRÃ?Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂSÃ@Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂTÃBÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂUÃTÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂVÃ[ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿŠJAMIE GOFF CALLED 10/10/07 - TOLD HIM THEY ARE WAY OVERDUE FOR ANNUAL AND WILL BE GETTING ANOTHER MM NOV. HE WILL GET SCHEDULED ASAP. -MLxf ÂWÃ\ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂXÃ'ÂÂ5xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂYÃ+ xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂZÃ, xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ[Ã2ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ\Ã6ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ]Ã9 xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ^ÃAÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ_ÃCÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â`ÃGÂÂ+xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂaÃYÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂbÃ[ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂcÃb xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂdÃcÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Âà ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Âà ÂÂ4xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Âà GÂÂ;xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà ] xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ!ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ!ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Ã!ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Ã!ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Ã!Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Ã!7ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Ã!FÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ!GÂÁxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ!NÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ!QÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ!TÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿNO ACTIVE TANKS IN THE GROUND AT THIS TIME. OWNER RECEIVED A NOV FROM OUR MASS MAILING. IN FACT, THERE ARE NO ACTIVE TANKS. A TANK IS PLANNED FOR INSTALL IN A MONTH. AT THAT POINT, THE TANK WILL BE DUE FOR INSPECTION IN A YEAR FROM INSTALL DATE. RR 9/24/04xgÂÃ"Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ"7ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ"8ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ"EÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ#ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ#1ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ#cÂÂ!xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ#dÂÂ9xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ$&ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ$7Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ$:ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ$^ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ%ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ%7ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Ã%;ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â!Ã%<ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â"Ã%AÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â#Ã%BÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â$Ã%JÂÂ9xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%Ã%ZÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&Ã& ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ'Ã&ÂÂ9xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(Ã'ÂÂ1xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Ã(ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*Ã(*ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â+Ã(7ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â,Ã(=ÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â-Ã(YÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ.Ã)TÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ/Ã*=ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ0Ã*DÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ1Ã*PÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ2Ã*[ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â3Ã+ ÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â4Ã+,Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â5Ã+HÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â6Ã,ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ7Ã,#ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ8Ã,)ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ9Ã,3Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â:Ã,<ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â;Ã- ÂÂ9xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ<Ã-ÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â=Ã-NÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â>Ã-PÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â?Ã-XÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â@Ã. xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂAÃ. ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂBÃ.ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂCÃ.@ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂDÃ.NÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂEÃ/+ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂFÃ/SÂÂZxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂGÃ/\ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂHÃ0ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂIÃ0ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂJÃ0Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂKÃ0&ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂLÃ05ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂMÃ1ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂNÃ21ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂOÃ3Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂPÃ3ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂQÃ3!ÂÁ2xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂRÃ3"ÂÁ2xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂSÃ3$ÂÁ2xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂTÃ3%ÂÁ2xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂUÃ3&ÂÁ2xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂVÃ3'ÂÁ2xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂWÃ3(ÂÁ2xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂXÃ3PÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂYÃ3TÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂZÃ3YÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â[Ã3ZÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â\Ã3[Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â]Ã3\Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â^Ã4ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ_Ã4ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â`Ã4)ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂaÃ45ÂÂ1xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂbÃ48ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂcÃ4OÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂdÃ4XÂÂHxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ4YÂÁ"xg xg Áxg þÿþÿþÿþÿþÿþÿþÿwINSPECTION UPDATED 6/30 BY WAYNE GIFFORD CONFIRMING THAT THEY ARE NOW DOING INVENTORY CORRECTLY. TIMOTHY RECTOR 7/3/03xg ÂÃ4ZÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ5 xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ5ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ5'ÂÁ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ5)ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ5/ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ5EÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Ã5IÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Ã5LÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Ã5ZÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf Ã5]ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Ã6Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ6ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ6Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ6*Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ6:ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ6N xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ7AÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ8Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ8 ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ9IÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ9dÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ: ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ:FÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ:IÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ:MÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ:TÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ; Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ;ÂÂ!xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ;*ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Ã;+Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â!Ã;NÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â"Ã;\ÂÁQxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ#Ã;]ÂÁQxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ$Ã4ÂÂOxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ(Ã?KÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Ã?LÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*Ã@ ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â+Ã@ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ,Ã@ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ-Ã@Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â.Ã@Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â/Ã@ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â0Ã@`ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ1ÃAÂÂ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â2ÃA xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ3ÃAPÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â4ÃA_ÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ5ÃAbÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ6ÃCHÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â7ÃCYÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿOWNER CALLED 10/25/04, SAID THAT COUNTY ENV. HAS HIM ON A LIST, BUT THAT THE LIST IS LONG. I HAD HIM CALL IRA @ GUERIN TO SEE IF HE COULD GET IT DONE SOONER. -ACF MAURICE CALLED 10/26/2004 TO SAY INSPECTION WAS COMPLETED TODAY, AND IT WOULD BE SENT IN ASAP. BBxf Â8ÃCbÂÁ xgxgÁxg þÿþÿþÿþÿþÿþÿþÿ…2ND FAIL ON CP. TANK DW CP, PASSED CP AT -1.024 PER DAVID BEAUMONT INSPECTION UPDATE OF 9/30/03. PIPING AND VENT BOTH FIBERGLASS. xgÂ9ÃDÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â:ÃD ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ;ÃD!ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ<ÃE@ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â=ÃFOÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â>ÃGÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ?ÃGÂÂ!xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â@ÃG#ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂAÃG$ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂBÃG&ÂÂKxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂCÃGFÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂDÃH%ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂEÃH&ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂFÃH'ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂGÃIÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂHÃJÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂIÃJÂÂ9xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂJÃJ:ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂKÃJ;ÂÂ5xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂLÃJ?ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂMÃJGÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂNÃJHÂÁQxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂOÃK ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂPÃK8ÂÁxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂQÃNQÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂRÃNVÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂSÃO*Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂTÃPCÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂUÃP]ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂVÃQ'Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂWÃQQÂÂ:xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂXÃQUÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂYÃQYÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂZÃR xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ[ÃR#ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â\ÃR+ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ]ÃR0 xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ^ÃR@ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â_ÃRAÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â`ÃRBÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂaÃRCÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂbÃRTÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂcÃRbÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂdÃSÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃS-Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃS0ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃS8 xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃT ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃTÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃT ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃT$ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃTHÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÃTOÂÂ!xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÃTVÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÃU ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÃU)ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÃU5ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃU;ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃUEÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃV ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃVÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃVÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃV#ÂÂ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃV3Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃV4Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃVNÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃVOÂÁ"xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃV[ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃW ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃW"ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃW#ÂÁ xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃW'ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃW=ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃWOÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃW^ÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÃW_ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!ÃXÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ"ÃXÂÂ!xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#ÃXÂÂ9xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$ÃX xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â%ÃXDÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&ÃXEÂÂxfxfÁþÿþÿþÿþÿþÿþÿþÿþÿCAN'T ACCESS VENT WHISTLE TO VERIFY HEIGHT. THIS WAS MARKED AS A PASSING INSPECTION, BUT DURING FILE REVIEW THE DISCREPANCY WAS CORRECTED. RRxfÂ'ÃXGÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ(ÃXSÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â)ÃXbÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â*ÃY ÂÂ5xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â+ÃZÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ,ÃZ)ÂÂ5xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ-ÃZLÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ.ÃZOÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ/ÃZXÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â0Ã[ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â1Ã[ ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ2Ã[ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ3Ã[ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ4Ã[ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ5Ã[5ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â6Ã\ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ7Ã\ÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ8Ã\$Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â9Ã\&ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â:Ã\*ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ;Ã\+ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â<Ã\-ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ=Ã\.ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ>Ã\9ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ?Ã\IÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â@Ã]ÂÂ!xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂAÃ] ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂBÃ]"ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂCÃ]#ÂÂ9xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂDÃ]% xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÃ]4ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂFÃ]7Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂGÃ]8Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂHÃ]9Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂIÃ];Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂJÃ]<Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂKÃ]=ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂLÃ]>Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂMÃ]?Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂNÃ^!ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂOÃ^#ÂÂ5xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂPÃ^*ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂQÃ^5Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂRÃ^IÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂSÃ^K xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂTÃ^UÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂUÃ_ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂVÃ_ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂWÃ_ ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂXÃ_ÂÂ!xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂYÃ_*ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂZÃ_`ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â[Ã` ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â\Ã` Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â]Ã`&ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â^Ã`'ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_Ã`(ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ`Ã`)ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂaÃ`*ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂbÃ`,Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂcÃ`-Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂdÃ`.ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ`/Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃ`0ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ`4ÂÂKxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ`9ÂÂ!xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ`FÂÂ;xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃ`\ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ`bÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃaÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÃaÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf Ãa'ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Ãa2ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Ãa<ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÃaA xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃa\ÂÂZxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃadÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃb? xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃbMÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃbNÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃbVÂÂ1xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃbXÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿ.BEAUMONT SCHEDULED/DONE INSPECTIONS 11/04 -ACFxf ÂÃbYÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃb[ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃbbÂÁ"xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃbcÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃcÂÁ xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃcÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃcÂÁ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃc&ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂÃcVÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃcWÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  ÂBÂÂxgxgÁ_xgà D3þÿþÿþÿþÿþÿþÿþÿxg ÂBÂÂxgxgÁ_xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÁÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÁÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Á%ÂÂ1xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Á(ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Á*ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Á+ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Á-ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Á4Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  Á:Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Á@Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÁDÂÂ!xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÁK xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÁNÂÁ2xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf !ÂÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg "ÂÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg #Â-ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg $Â0ÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf %Â8ÂÁ$xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf &ÂFÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ' ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg (Â:ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  )Â<ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  *ÂJÂÂZxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  +ÂNÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ,ÂQ xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf -ÂWÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  .Â^ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf /ÂÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf 0ÂÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf 1 ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  2ÂÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf 3Â#ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf 4Â(ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg 5ÂDÂÂ9xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  6ÂMÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  7ÂÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  8ÂÂÁQxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf 9ÂJÂÂKxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf :ÂXÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ; ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  < ÂÁxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  =ÂÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf >ÂÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ?ÂÂÂ;xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg @Â6ÂÂKxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf AÂ9ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  BÂLÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  CÂO xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg D ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg EÂÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg FÂ!ÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf GÂ'ÂÂ9xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg HÂ-ÂÁ"xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  IÂ.ÂÁ"xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  JÂRÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  KÂTÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf LÂÂÂKxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  MÂÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  NÂÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf OÂÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  P ÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf QÂ!ÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf RÂ@ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg S ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf T ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf U ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf V ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf W ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf X CÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Y DÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf Z IÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  [ NÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  \ TÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ] ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ^ %Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  _ 1Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ` 2Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  a 5ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg b 7ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  c aÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  d bÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   ;ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg  RÂÂ:xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf  VÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg   dÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   )ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg  3ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   ;ÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg  ?ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg  BÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   DÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf  /ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   0ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   PÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg  SÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg  XÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   ]ÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   Â xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg Â&Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â'Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂRÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf  ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿÓ3/15/07: CONTACTED TOM THORNTON OF HUMBLE BEGINNINGS TO NOTIFY OF OVERDUE ANNUAL INSPECTION. THORNTON SAYS TANK OOS SINCE PURCHASED IN 2003, AND PLANNING TO REMOVE THIS SUMMER. SENDING OOS AND NOI FORMS. - MLxf  ÂÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf Â>ÂÂ1xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂRÂÁxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂbÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ! Â xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg "Â#ÂÂ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  #Â/ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  $Â?ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  %ÂJÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  &ÂLÂÁ2xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  'ÂYÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg (Â[ÂÂKxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  )ÂÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf * xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg +ÂÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ,Â+ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿSIMARD & SONS SUBMITTED 2004 INSPECTION BUT DID NOT INSPECT ATGS. MIKE SIMARD WILL INSPECT AGAIN AND SUBMIT COMPLETE INSPECTION (10/05/04). BBxg -Â0ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  .Â>ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg /ÂPÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg 0ÂcÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf 1ÂÂÂDxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  2ÂÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  3Â#ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf 4Â9Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  5ÂDÂÂ-xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf 6ÂIÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf 7 ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  8ÂÂÂ"xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  9Â;ÂÁ"xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  :ÂIÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ;ÂÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg <ÂÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg =Â6Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  >ÂJÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ?ÂZÂÁ xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  @Â\ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  AÂÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg B ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg C ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg DÂ!ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  EÂ$ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg FÂ&ÂÁ xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf GÂ0ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf HÂ:Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  IÂ>ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  JÂAÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf KÂCÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf LÂKÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  MÂLÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf NÂNÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  OÂRÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf PÂSÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  QÂÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg RÂÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf SÂAÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  TÂIÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg UÂ]ÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  VÂÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg WÂÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  XÂÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  YÂÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ZÂ"ÂÂ1xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  [Â# xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg \Â'ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ]ÂBÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ^ÂDÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  _ÂJ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg `ÂXÂÂ1xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf aÂdÂÁ xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg bÂÂÂKxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg c Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  dÂ*ÂÂ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â<ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â%ÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â'ÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â(ÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â)ÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â+ÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â,ÂÁ$xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â. xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â1ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂDÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂFÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂGÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂHÂÂ"xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂMÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂOÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂQÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂÁQxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂCÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂMÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂTÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxf ÂWÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â_Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂRÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â`Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂcÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  ÂdÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf   Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  !ÂÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  "Â)ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg #Â2ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  $Â7ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  %ÂÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg &ÂÂÁ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  'ÂÂÁ4xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  (ÂÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf  )Â#ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg *Â&ÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxg AÃA>ÂÂxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxg BÂ>9ÂÂxg xg Á`xgÃ3[7þÿþÿþÿþÿþÿþÿþÿxg CÂ$?ÂÂxg xg Á`xgÄ-%þÿþÿþÿþÿþÿþÿþÿxg DÂ?ÂÂxg xg Á`xgÃ7[.þÿþÿþÿþÿþÿþÿþÿxg EÂ8XÂÂxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxg F ÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg  GÃ`1ÂÂ:xg xg Á`xgÃ41þÿþÿþÿþÿþÿþÿþÿxg HÂEÂÂxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxg IÂÂÂxg xg Á`xf Ä_ þÿþÿþÿþÿþÿþÿþÿxf  JÃ%5ÂÂxg xg Á`xf Ä0/þÿþÿþÿþÿþÿþÿþÿxf  KÃOÂÂxg xg Á`xf Ä-Sþÿþÿþÿþÿþÿþÿþÿxf  LÃÂÂxg xg  þÿþÿþÿþÿþÿþÿþÿþÿþÿxg MÃÂÂxg xg  xgþÿþÿþÿþÿþÿþÿþÿCP RESULTS: -1.037xg N ÂÁ xg xg Á`xf þÿþÿþÿþÿþÿþÿþÿ>CALLED 10/4/04, DAVE BEAUMONT IS SCHEDULED FOR NEXT WEEK. -ACFxf  OÃFÂÂxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxg PÂ>\ÂÂxg xg Âxg ÃþÿþÿþÿþÿþÿþÿQINSPECTION DATE WAS ENTERED IN ERROR. INSPECTION DATE WAS ACTUALLY 06/30/2003. xg  QÂ>\ÂÂxg xg ÂxgÃþÿþÿþÿþÿþÿþÿþÿxg RÂ"ÂÂTxg xg ÂxhþÿþÿþÿþÿþÿþÿþÿbTANK IS SCHEDULED FOR REMOVAL ON MAY 28, 2004. BB TANK REMOVED 06/03/2004. REPLACED WITH AST. BBxg SÂ@^ÂÂxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxg TÃBÂÂxg xg Á`xgÄR-þÿþÿþÿþÿþÿþÿþÿxg U DÂÂHxg xg Á_xg þÿþÿþÿþÿþÿþÿþÿþÿxg  VÂC] xg xg Á_xg ÃWþÿþÿþÿþÿþÿþÿþÿxg  WÂXÂÂ]xg xg Á_xg Ã./þÿþÿþÿþÿþÿþÿINSPECTION UPDATE. BBxg  XÁCÂÂ)xg xg Âxg þÿþÿþÿþÿþÿþÿþÿ®PIPINIG SUMPS DO NOT HAVE ELECTRONIC MONITORING. BOTH TANKS INSTALLED IN 1994 AND ARE REQUIRED TO HAVE MONITORING OF PIPING. BB SENSORS INSTALLED 10/9/2003 TIMOTHY RECTORxg  YÂ'ÂÂKxg xg ÂxgÃ4Hþÿþÿþÿþÿþÿþÿþÿxg ZÃ5ÂÂ!xg xg Âxg ÄVTþÿþÿþÿþÿþÿþÿþÿxg  [Â$KÂÂHxg xg Âxg ÄZþÿþÿþÿþÿþÿþÿþÿxg  \ÂWIÂÁ xg xg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg ]Ã`9ÂÂ!xg xg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg ^à ÂÂ!xg xg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg _Â5@ÂÂHxg xg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg `ÂK,ÂÂxg xg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg aÃ4ÂÂxg xg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg bÂV xg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg  cÂA`ÂÂ]xg xg Âxg ÃaC>þÿþÿþÿþÿþÿþÿþÿxg  dÂZ(ÂÂ]xg xg Âxg Ä<Fþÿþÿþÿþÿþÿþÿþÿxg Â!Â_ÂÂ]xg xg Âxg Ä$\þÿþÿþÿþÿþÿþÿþÿxg Â!ÃVÂÂ]xg xg Âxg ÃJ@5þÿþÿþÿþÿþÿþÿþÿxg Â!ÃUÂÂ]xg xg Âxg Ã/bWþÿþÿþÿþÿþÿþÿþÿxg Â!Ã[ÂÂ]xg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!à ÂÂ]xg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!ÂC xg xg ÂxgÄ&G.þÿþÿþÿþÿþÿþÿþÿxgÂ!Â$. xg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!Ã_  xg xg Âxg ÃSPWþÿþÿþÿþÿþÿþÿþÿxg Â! ÂX8ÂÂHxg xg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ! Ã@`ÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â! Â92ÂÂHxg xg Âxgà 3þÿþÿþÿþÿþÿþÿþÿxgÂ! Â*ÂÂ]xg xg ÂxgÃ)cþÿþÿþÿþÿþÿþÿIINSPECTOR FAILED TANK #8 FOR DAILY INVENTORY. EVIDENCE OF POSSIBLE LEAK.xgÂ! Á ÂÂ]xg xg ÂxhÃ@þÿþÿþÿþÿþÿþÿlTANK #8 PLUS SUMP IS NOT LIQUID TIGHT. DALE CHAMBERLAIN REPLACED SUMP WITH RED JACKET; NOW LIQUID TIGHT. RRxgÂ!Â>ÂÂ]xg xg ÂxhÃ/D0þÿþÿþÿþÿþÿþÿSTANK TOP REPLACEMENT SCHEDULED FOR 5/04 ACF TANKS REMOVED ON ABOVE PASSING DATE RRxgÂ!Ã''ÂÂ]xg xg ÂxhÃY[þÿþÿþÿþÿþÿþÿþÿxgÂ!ÃWEÂÂxg xg ÂþÿÃUaþÿþÿþÿþÿþÿþÿþÿxgÂ!ÃÂÂxg xg Âxh þÿþÿþÿþÿþÿþÿþÿÄBOTH TANKS ARE SUCTION SYSTEMS INSTALLED IN 1998 FOR MARKETING AND DISTRIBUTION. BALL-FLOATS NOT ALLOWED ON SUCTION SYSTEMS AFTER 1996. BB L. MCCALISTER REPLACED BALL FLOAT WITH FLAPPER 3/04 ACFxgÂ!Â8ÂÂxg xg Âxhþÿþÿþÿþÿþÿþÿþÿ TANKS REMOVEDxgÂ!Â^ ÂÂxg xg Âxg Ã:*þÿþÿþÿþÿþÿþÿINSPECTION UPDATE. BBxgÂ!Á ÂÂxg xg ÂxhþÿþÿþÿþÿþÿþÿþÿGNEED TO REPLACE SPILL-BUCKET LIDS. REPAIRED 3/8/04 BY MCCALLISTER -ACFxgÂ!ÂÂÂxg xg ÂxhÃ8&RþÿþÿþÿþÿþÿþÿþÿxgÂ!à ÂÂxg xg ÂxgÃD++þÿþÿþÿþÿþÿþÿ9TANK #6 DAILY INVENTORY SHOWED EVIDENCE OF POSSIBLE LEAK.xgÂ!Ã5ÂÂxg xg ÂþÿÃCIþÿþÿþÿþÿþÿþÿþÿxg Â!ÂMÂÂxg xg Âxgà þÿþÿþÿþÿþÿþÿ9TANK #4 DAILY INVENTORY SHOWED EVIDENCE OF POSSIBLE LEAK.xgÂ!ÂIÂÂxg xg Âxgà þÿþÿþÿþÿþÿþÿfTANK #3 FAILED DAILY INVENTORY. EVIDENCE OF POSSIBLE LEAK. TANK #1 HAS BEEN O-O-S DUE TO FAILING CP.xgÂ!Â$* xg xg Á`xgÃ<$&þÿþÿþÿþÿþÿþÿþÿxgÂ!ÂBÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!Ã,)ÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!ÂCÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!Â0ÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!Â'1ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â! Ã*PÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!!Â^ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!"ÂTÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!#ÂÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!$ÂNÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!%Ã9dÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!&ÂA ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!'Â26ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!(Â0ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!)ÃAÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!*ÂPJÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!+ÃTÂÂHxg xg Ácxg ÃTþÿþÿþÿþÿþÿþÿþÿxg Â!,ÂOÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!-ÂOÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!.ÃcÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!/Ã\-ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!0Â+3ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!1Â+=ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!2Â+0ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!3Â+?ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!4ÂÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!5ÂÂÂ]xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!6Ã[ÂÂ]xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!7ÂCÂÂ]xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!8Ã5]ÂÂ!xg xg Ácxg ÃBSþÿþÿþÿþÿþÿþÿþÿxg Â!9ÂÂÂ!xg xg ÁcxgÃ%Z0þÿþÿþÿþÿþÿþÿþÿxgÂ!:ÃGÂÂ!xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!; xg xg Ácxg Ã)9#þÿþÿþÿþÿþÿþÿþÿxg Â!<à KÂÂKxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!=ÂFÂÁ"xg xg ÁcxgÃþÿþÿþÿþÿþÿþÿþÿxgÂ!>ÂOÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿHVENT WHISTLE CAN NOT BE ACCESSED FOR INSPECTION. WATER IN SPILL BUCKET.xg Â!?Â.ÂÂ!xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!@ÂDÂÂCxg xg ÁcxgÃ[þÿþÿþÿþÿþÿþÿþÿxgÂ!AÂ76ÂÂ!xg xg Ácxg Ã0V^þÿþÿþÿþÿþÿþÿþÿxg Â!BÂUÂÂ!xg xg Ácxg Ã_þÿþÿþÿþÿþÿþÿþÿxg Â!CÂÂÂxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!DÂBEÂÂ)xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!EÂO ÂÂHxg xg Âxg Ã[þÿþÿþÿþÿþÿþÿ2TANK 3 SHOWED EVIDENCE OF LEAK IN DAILY INVENTORY.xg Â!FÂ(/ÂÁ xg xg Ácxg Ã7_Uþÿþÿþÿþÿþÿþÿ+REPLACED SENSOR ON DIESEL TANK INTERSTICIALxg Â!GÂ?ÂÂ]xg xg Ácxg ÃAM þÿþÿþÿþÿþÿþÿþÿxg Â!HÂ\ÂÂAxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!IÂ^ÂÂ]xg xg Ácxg Ã6;bþÿþÿþÿþÿþÿþÿ9FILL & PIPING CAPPED IN 2001 WAS USED AS H O FOR BUILDINGxg Â!JÃS1ÂÂ]xg xg Ácxg ÃJ )þÿþÿþÿþÿþÿþÿþÿxg Â!KÂWÂÂ]xg xg Ácxg Ã.DKþÿþÿþÿþÿþÿþÿþÿxg Â!LÃÂÂ4xg xg Âxg ÂþÿþÿþÿþÿþÿþÿPER MIKE SIMARD.xgÂ!MÂVHÂÂ]xg xg ÁcxgÃ2`þÿþÿþÿþÿþÿþÿþÿxgÂ!NÂ*ÂÂ]xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!OÂCÂÂ]xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!PÃ(ÂÂxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!QÂ[ÂÂxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!RÂ^ÂÂxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!SÃ: ÂÂ]xg xg ÂxhÃX'þÿþÿþÿþÿþÿþÿOLD TANKS REMOVED ACFxg Â!TÂZ-ÂÂxg xg ÁcþÿÃ` þÿþÿþÿþÿþÿþÿFOWNER SCHEDULED INSPECTION/REPAIRS TO OCCUR WITHIN 30 DAYS. RR 9/24/04xgÂ!UÂ+>ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!VÂ>NÂÂxg xg Âxg à ?þÿþÿþÿþÿþÿþÿ`FACILITY BEHIND ON DAILY INVENTORY RECONCILIATION AND INTERSTITIAL LOG AT TIME OF INSPECTION. BBxg Â!WÂ5aÂÁ$xg xg ÂxhÄþÿþÿþÿþÿþÿþÿþÿxg Â!XÂEÂÂ!xg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!Y U xg xg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!ZÂQZÂÂKxg xg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxfÂ![Â2ÂÂ]xg xg ÂxgÃ4!JþÿþÿþÿþÿþÿþÿþÿxgÂ!\Ã!*ÂÂxg xg Âxgà BþÿþÿþÿþÿþÿþÿþÿxgÂ!]ÃcÂÂxg xg Âxg ÃJWþÿþÿþÿþÿþÿþÿþÿxg Â!^ÃaÂÂTxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!_ÂA^ÂÂxg xg Âxg à þÿþÿþÿþÿþÿþÿþÿxg Â!`Â3%ÂÂxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â!aÃ_ÂÂ:xgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!bÃ-ÂÂxg xg Âxhþÿþÿþÿþÿþÿþÿþÿ=SPILL BUCKET LID NEEDS TO BE REPLACED. BILL CARVER REPLACED.xgÂ!cÂ*ÂÂKxg xg Âxg Ã$=þÿþÿþÿþÿþÿþÿþÿxg Â!dÃMÂÁxg xg ÂxgþÿþÿþÿþÿþÿþÿþÿIMPRESSED CURRENT SYSTEMxgÂ"ÃÂÂKxgxg Âxh þÿþÿþÿþÿþÿþÿþÿOFAULTY SENSOR IN TANK #1 PIPING SUMP. BB SENSOR REPAIRED PER SCOTT LETTELLIER.xgÂ"ÃbPÂÂxgxg ÂþÿÃ.O0þÿþÿþÿþÿþÿþÿþÿxgÂ"Ã!ÂÂxg xg ÂxhÃbþÿþÿþÿþÿþÿþÿREPLACED DROP TUBE. xgÂ"ÃDÂÂKxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"Ã+DÂÂ!xg xg Âxg þÿþÿþÿþÿþÿþÿþÿ$FACILITY IS O-O-S. CP TEST ONLY. BBxg Â"Ã:KÂÂHxg xg ÂþÿÃK:þÿþÿþÿþÿþÿþÿþÿxgÂ"ÂÂÂxg xg ÂxgþÿþÿþÿþÿþÿþÿþÿGFACILITY NOT RECONCILING DAILY INVENTORY MONTHLY AT TIME OF INSPECTION.xgÂ"Ã\1ÂÂxg xg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ" Ã#ÂÂxg xg ÂxgþÿþÿþÿþÿþÿþÿþÿBFACILITY NOT MONITORING GW MONITORING WELLS AT TIME OF INSPECTION.xgÂ" ÂG+ÂÂxg xg Âxg þÿþÿþÿþÿþÿþÿþÿQFACILITY NOT MAINTAINING OR MONITORING GW MONITORING WELLS AT TIME OF INSPECTION.xg Â" Â(YÂÂKxg xg ÂþÿÃ*/þÿþÿþÿþÿþÿþÿþÿxgÂ"/ÂKP xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"0Â^ÂÂ]xg xg Âxg Ä"=&þÿþÿþÿþÿþÿþÿKINSPECTION UPDATE OF 10/30/2003 PASSED PREVIOUSLY FAILING CP ON TANK #4. BBxg Â"1 ÂÂ]xg xg Âxg Ã,RXþÿþÿþÿþÿþÿþÿþÿxg ÂÃc\ÂÂKxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg  Ãd ÂÂ;xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â!Ãd*ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â"Ãd2ÂÂ;xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ#Ãd9ÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$ÃdGÂÂ:xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%ÃÂÁ xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&ÃÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â'ÃÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(Ã&ÂÁ xg xg Áxg þÿþÿþÿþÿþÿþÿþÿdDAN AIKEN CALLED ON 10/12/2004. RECEIVED NOV. GR ADAMS TO DO INSPECTION WITHIN NEXT FEW WEEKS. BBxg Â)Ã'Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â*Ã,Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â+Ã@Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â,ÃAÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â-ÃBÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ.ÃCÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ/ÃDÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ0ÃEÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ1ÃFÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â2ÃGÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ3ÃHÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â4ÃIÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ5ÃJÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ6ÃKÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ7ÃWÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ8ÃÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â9à Âþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â:ÃÂþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â;Ã!ÂÂ5xfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ<Ã<ÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ=Ã]ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â>Ã^ÂÂNxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â?ÃÂþÿxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â@à ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂAà ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂBÃ(ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂCÃ@ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂDÃM xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂEÃWÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂFÃYÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂGÃ[ xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂHÃ`ÂþÿxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂIÃÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂJÃÂÂxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂKÃ!ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂLÃ(ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂMÃ+ÂÂxf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂNÃ- xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂOÃ/ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂPÃ: xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂQÃ<ÂÂKxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂRÃ\ÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂSÃc xg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂTàxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂUÃÂÂxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂVÃÂÂ-xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂWÃ'ÂÂKxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂXÃBÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂYÃMÂÂxgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂZÃZÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ[ÃaÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â\ÃÂþÿxfxfÁxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ]ÃÂÂ4xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ^à ÂÁ"xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_Ã"Âþÿxg xg Áxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â`Ã5ÂÁ xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂaÃ9ÂÂ-xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂbÃ[ÂÂ!xf xf Áxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂcÃÂÂ!xgxgÁxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂdÂ9ÂÂKxgxgÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxgÂÃPÂÂxgxgÁ`xgÃ"]þÿþÿþÿþÿþÿþÿLSPOKE TO EDWARD GRAFT. HE HAS HIRED BILL CARVER TO DO INSPECTION. RR 9/28/04xgÂÂD/ÂÂKxgxgÁ`xg þÿþÿþÿþÿþÿþÿþÿ/ARTHUR GRANT (PORTLAND PUMP) REPAIRED 7/10/2003xgÂÃP` xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ]S xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂD xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ3 xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂcI xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂCP xgxgÁ`xgà þÿþÿþÿþÿþÿþÿþÿxg Â>D xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg  Â xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂP> xgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿ'61-SO OVERFILL RECOMMENDED BY JOHN SIMSxg Â!D xgxgÁ`xgà þÿþÿþÿþÿþÿþÿþÿxg Â.. xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃMÂÂxgxgÁ`xg þÿþÿþÿþÿþÿþÿþÿVPRECISION TANKS HAS ORDERED MATERIALS TO MAKE REPAIRS. REPIARS MADE PER TONY COUTURE.xg ÂÃ[ xgxgÁ`xgÃ7þÿþÿþÿþÿþÿþÿþÿxgÂÃ9 xgxgÁ`xg þÿþÿþÿþÿþÿþÿþÿ*INSPECTION UPDATE COMPLETED 10/30/2003. BBxg xgxgÁ`xgà þÿþÿþÿþÿþÿþÿþÿxgÂÃ3U xgxgÁ`xgÃ=þÿþÿþÿþÿþÿþÿþÿxgÂàxgxgÁ`xgÃ3þÿþÿþÿþÿþÿþÿþÿxgÂÂQÂÁ4xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ"VÂÁ4xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂÂÁ4xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂÂÁ4xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ&(ÂÁ4xgxgÁ`xgÃþÿþÿþÿþÿþÿþÿ1 TANK READING: LISTED AS 103.9 IN THE INSPECTION.xg ÂÃ5'ÂÁ4xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ1ÂÂCxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂRÂÂxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂX/ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ&JÂÂxgxgÁ`xgÃ*3þÿþÿþÿþÿþÿþÿH SPILL BUCKETS CLEAN?: DIRTY, CLEANED OUT AND NOTIFIED OWNER KEEP CLEAN.xgÂÂH:ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿg AUTO SHUT OFF / FLAPPER CHECKED AND WORKING PROPERLY: GAUGE STICK STUCK IN TANK 1 REMOVED BY INSPECTORxg  ÂLÂÂxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿ\ VENT WHISTLE CHECKED AND WORKING PROPERLY?: PLANNING TO INSTALL FLAPPER VALVE IN DROP TUBE.xgÂ!ÃÂÂxgxgÁ`xgÃW3þÿþÿþÿþÿþÿþÿþÿxgÂ"ÃGLÂÂxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿ#TANKS PLANNED FOR REMOVAL: EXPECTED REMOVAL DATE JUNE 14, 2005 ENTERING INSPECTION AS A FAIL DUE TO INCOMPLETE INSPECTION. NOTE IN THE INSPECTION INDICATES THAT THE FACILITY IS CLOSED. DEP RECORDS DO NOT REFLECT THIS. NO INFORMATION ON LINE LEAK DETECTORS, STAGE 1 VAPOR RECOVERY, CRASH VALVES. ALSO INSPECTOR INDICATES PASSING FOR ALL OVERFILL ON THE SUMMARY PAGE, OVERFILL PAGE ITSELF INDICATES A FAIL ON TANK 2-1 DUE TO NO OVERFILL PROTECTION AT ALL. TIMOTHY RECTOR 6/30/2003 LLD PRESENT?: UNABLE TO TEST TANK READING: ONLY 2 CHAMBERS CHECKEDxgÂ# ÂÂxgxgÁ`xgÃ0OþÿþÿþÿþÿþÿþÿþÿxgÂ$Â/QÂÂxgxgÁ`xgÃ7?þÿþÿþÿþÿþÿþÿxINSPECTOR REPORTED A CP READING OF -.056? REPAIR MADE TO OVERFILLS. TANK IS JACKETED AND PIPING IS FG, CP NOT AN ISSUE?xgÂ%Â(ÂÂxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&Ã8@ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ*PASSING FACILITY THOUGH THEY HAVE NOT BEEN DOING WEEKLY SAMPLING OF MONITORING WELLS. INSPECTOR IS PROVIDING LOG SHEETS AND BAILER TO FACILITATE PROPER MONITORING OF WELLS. FAILED THEM ON MONITOR WELL SAMPLING SECTION BUT LEFT AS OVERALL PASS DUE TO CORRECTIVE ACTION BEING TAKEN. TIMOTHY RECTORxgÂ'ÂADÂÂ;xgxgÁ`xgÃ=þÿþÿþÿþÿþÿþÿwSPILL BUCKET LID HITTING RISER, ACCORDING TO INSPECTOR REPAIR BEING MADE TO PREVENT THIS FROM OCCOURING. TIMOTHY RECTORxgÂ(ÂYMÂÂ;xgxgÁ`þÿÃY8DþÿþÿþÿþÿþÿþÿþÿxgÂ)ÂPÂÂ4xgxgÁ`xgÃ;þÿþÿþÿþÿþÿþÿþÿxf Â*Â$ÂÂ4xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ™STAGE ONE VAPOR RECOVERY, NO PRESSURE VENT CAP OR INVENTORY RECORDS, INSPECTOR FAILED FACILITY. PASSING FACILITY FAILING PRESSURE VENT CAP AND INVENTORY.xg Â+Â/ÂÂ4xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ,ÂAÂÂSxgxgÁ`þÿÃ'þÿþÿþÿþÿþÿþÿõ3/27/04 BEAUMONT REPORTS THAT CP REPAIRS STILL PENDING, PLANNED 5/1/04 -ACF THERE APPEARS TO BE NO LEAK DETECTION ON TANKS 9,10,11, THESE TANKS ARE 3,000 DIESEL, 3,000 K-1 AND 1,000 #2 RESPECTIVELY. CP FAILED ON VENT PIPES ONLY. TIMOTHY RECTORxgÂ- ÂÂSxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ´OVERFILL IS UNKNOWN. FAIL FACILITY. NO THROUGHPUT INFORMATION. TIMOTHY RECTOR 2 COAX DROP TUBES INSTALLED ON GASOLINE FILLS, 2 DROP TUBES INSTALLED ON DIESEL FILLS ON 7/31/03. RRxgÂ.Ã4@ÂÂSxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿ/BEAUMONT IS ON SCHEDULE FOR INSPECTION 3/04 ACFxgÂ/Â'ÂÂSxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ0ÂBÂÂSxgxgÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxgÂ1ÃJ@ÂÂSxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿS WRITTEN LOG OF SUMP CHECKS AVAILABLE?: INSTRUCTED OWNER TO LOG WEEKLY INSPECTION.xgÂ2à FÂÂSxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ3Ã)ÂÂSxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ4Ã5+ÂÂKxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxf Â5Ã@ ÂÂKxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxf Â6ÃHÂÂKxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxf Â7Ã/YÂÂKxgxgÁ`xg þÿþÿþÿþÿþÿþÿþÿ?LETELLIER REPLACED SPILL BUCKET AND STAGE 1 MANWAY 6/9/03 -ACFxf Â8Â'ÂÂKxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxf Â9Â'ÂÂKxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿØ61-SO REPLACED WITH ONE OF PROPER LENGTH, WORK ORDER ATTACHED. CHANGED INSPECTION FROM FAIL TO PASS. TIMOTHY RECTOR AUTO SHUT OFF / FLAPPER SET AT 95% FULL LEVEL?: REPAIRED PER WORK ORDER OF 5/12/03 61SO REPLACED.xf Â:Â'ÂÂKxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿCLETELLIER INSTALLED NEW FLAPPERS AND NEW SPILL BUCKET 5/15/03 -ACFxf Â;ÃGÂÂbxgxgÁ`xgÄ -þÿþÿþÿþÿþÿþÿþÿxgÂ<Ã!ÂÂ'xgxgÁ`xgÃ]B2þÿþÿþÿþÿþÿþÿþÿxg Â=Ã.IÂÂ'xgxgÁ`xgÃRTþÿþÿþÿþÿþÿþÿþÿxgÂ>Â(JÂÂ'xgxgÁ`xgÃCþÿþÿþÿþÿþÿþÿsANODE UPGRADE OF 08/05/2003 ON TANKS #1 AND #2 ACHIEVED PASSING READINGS OF -0.950 AND -1.05 VOLTS RESPECTIVELY. BBxgÂ@Ã-,ÂÂ'xgxgÁ`xgÄ=4dþÿþÿþÿþÿþÿþÿ>REPLACED FLAPPER WORK PERFORMED BY SCOTT CYR. TIMOTHY RECTORxgÂAÃ-+ÂÂ'xgxgÁ`xgÄ Cþÿþÿþÿþÿþÿþÿ/INSPECTION UPDATE OF 7/14/2003 BY SCOTT CYR. BBxgÂBÃ-2ÂÂ'xgxgÁ`xgÄQþÿþÿþÿþÿþÿþÿþÿxgÂCÃ--ÂÂ'xgxgÁ`xh Ä%;þÿþÿþÿþÿþÿþÿ"CYR UPDATE 3/9/04, INTERSTITIAL OKxgÂDÃ-*ÂÂ'xgxgÁ`xgÃ!þÿþÿþÿþÿþÿþÿþÿxg ÂEÃ+JÂÂ'xgxgÁ`þÿÃ%)0þÿþÿþÿþÿþÿþÿþÿxgÂFÃ+JÂÂ'xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂGÃ-'ÂÂ'xgxgÁ`þÿÃ6O þÿþÿþÿþÿþÿþÿcWASTE OIL AND #2 OIL TANKS TO BE REMOVED SOON -ACF (3/30/04) INSPECTION ONLY INCLUDED 2 GAS TANKS (#10 AND #11 (SPLIT CHAMBER 11/1, 11/2). NOT ON THE INSPECTION WERE TANKS 8 AND 9 A WASTE OIL AND A HEATING OIL TANK RESPECTIVELY. I HAVE FAILED THOSE TANKS ANYWHERE THAT MADE SENSE, SPILL BUCKETS, OVERFILL, CP AND INTERSTITIAL MONITORING. TIMOTHY RECTORxgÂIÂH ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ>INSPECTOR FAILED TANK, NO LEAK DETECTION, UNABLE TO DETERMINE OVERFILL, "EVERTHING IS BURIED". PASSING TANK, INSTALLED IN 1989, NO RETROFIT REQUIREMENT, SHOULD HAVE HAD MONITORING WELLS PROBABLY, ALSO OIL AND SOLID FUEL BOARD REQUIRES VENT ALARM, DEP HAS NO REQUIREMENT. CP PASSES AS DOES SPILL BUCKET. TIMOTHY RECTORxgÂJÃÂÁ xgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿû7/13/10-NOITR REC'D FOR DOGGET TO REMOVE TANKS AND PIPING, AND DON ROBBINS TO DO SA-PH NEW INSPECTION BY MARK BOSSE IN MAY 2004, RESULTS PENDING, BUT REPORTED THAT IT FAILED CP AGAIN. ACF 6/4/03 TANK 4 IS SPLIT AND IS OUT OF SERVICE. INSPECTION INDICATES THAT THE TANK VENT AND FILL ARE SECURED AND THAT PRODUCT PIPING IS CAPPED HOWEVER THERE IS NO INDICATION REGARDING THE AMOUNT OF PRODUCT PRESENT IN THE TANK. SO FAILED OOS. ALSO NO CP RESULTS FOR TANK 4. ALSO NO OVERFILL ON ANY OF THE TANKS. 1 TANK FAILED DAILY INVENTORY DUE TO OVER/SHORT GREATER THAN 1%. #3 TANK IS ONLY ONE WITH ADEQUATE THROUGHPUT (8582 + GALLONS) VERSUS #2 TANK (350+ GALLONS) OR #1 TANK (189- GALLONS). TANKS 1 AND 3 PASSED BUT TANK 1 HAD EXTREMELY LOW THROUGHPUT. TIMOTHY RECTORxgÂKÃ@_ÂÂCxgxgÁ`xgà aLþÿþÿþÿþÿþÿþÿþÿxgÂLÂ"9ÂÂxgxgÁ`xgÃPþÿþÿþÿþÿþÿþÿþÿxgÂMÂ/4ÂÂxgxgÁ`xgà OþÿþÿþÿþÿþÿþÿþÿxgÂNÂVÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂOÂA;ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂPÂ$ÂÂ!xgxgÁ`xgÃ4(-þÿþÿþÿþÿþÿþÿ`MULLINS WAS STILL SUSPENDED WHEN THIS INSPECTION WAS DONE. BUSTI ACTION PENDING. TIMOTHY RECTORxgÂQÃPÂÂ!xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ¯INSPECTION PERFORMED BY JOHN MULLINS WHILE STILL UNDER SUSPENSION. ACCEPTED AS PASSING BUT INSPECTION ITSELF WAS PASSED ON FOR ENFORCEMENT ACTION BEFORE BUSTI. TIMOTHY RECTORxgÂRÂ#[ÂÂ!xgxgÁ`þÿÄ þÿþÿþÿþÿþÿþÿ€TANK NUMBER 16 A 550 GALLON #2 OIL TANK WAS NOT LISTED ON THE INSPECTION. THE OTHER 8 TANKS WERE ALL LISTED AND PASSED. NOTE: THIS INSPECTION WAS PERFORMED BY JOHN MULLINS WHILE STILL UNDER SUSPENSION BY BUSTI. INSPECTION IS BEING ACCEPTED BY THE DEPARTMENT BUT IS ALSO BEING SENT ON TO ENFORCEMENT FOR USE IN BUSTI PROCEEDINGS. ACTUAL INSPECTION DATE WAS 06/26/2003. TIMOTHY RECTORxgÂS ÂÁ xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂTÂJ9ÂÁ xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ(INSTALLED 61-SO FOR OVERFILL PROTECTION xgÂU UÂÁ"xgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿñTANKS HAVE A HISTORY OF FAILING CP THEY PROBABLY NEED TO BE REMOVED. TIMOTHY RECTOR SENSORS ARE FUNCTIONING PROPERLY?: TANK PROBES REPAIRED 6/30/03 PER JOHN CROSS BALL FLOAT CHECKED AND WORKING PROPERLY?: REPLACED 1 BALL FLOAT WITH FLAPPERxgÂVÃ3RÂÂxgxgÁ`xhþÿþÿþÿþÿþÿþÿþÿêINSPECTOR INDICATES NO OVERFILL PROTECTION. DEP INSPECTION IN 2002 PASSED FACILITY, MAY HAVE EITHER A BALL FLOAT, WHICH WOULD NEED TO BE CHANGED OR MAY HAVE A WHISTLE WHICH WASN'T CHECKED. MAY NOT HAVE ACCESS TO EITHER ITEM WHICH IS ALSO A FAILING INSPECTION. FILE WILL BE PULLED FOR REVIEW. REVIEW OF FILE INDICATES FLAPPER PRESENT. DEP INSPECTION LISTS FLAPPER AND ORIGINAL INSTALLATION PAPERWORK INDICATES FLAPPER BEING INSTALLED. WE WILL NEED TO CHECK WHEN IN THE AREA. TIMOTHY RECTORxgÂW ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿÍFACILITY PASSED INSPECTION. ELECTRONIC RECORD OF REGISTRATION SHOWS 5 TANKS BUT IT APPEARS THAT 2 TANKS ARE DUPLICATES. NEED TO REVIEW FILE. NO INFO REGARDING THROUGHPUT OR VAPOR RECOVERY. TIMOTHY RECTOR xgÂXÃG"ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂYÂ5(ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂZÂIÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ[ÂWPÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿGSPILL BUCKET FAILED DUE TO WATER AND "CRUD" IN IT. PASSING INSPECTION.xgÂ\Â>ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ.NO THROUGH PUT INFORMATION OR VAPOR RECOVERY. xgÂ]à )ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ^Ã*CÂÂxgxgÁ`xg þÿþÿþÿþÿþÿþÿþÿ”SCHOOL DISTRICT IS PLANNING ON REMOVING THE TANK THIS SUMMER PER LARRY SAVAGE WHO PERFORMED THE INSPECTION. TIMOTHY RECTOR REMOVED 10/10/03 -ACFxgÂ_ÂÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ`ÃSÂÂxgxgÁ`xgÃUþÿþÿþÿþÿþÿþÿþÿxg ÂaÂGRÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂbÁ@ÂÂxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿiINSPECTOR INDICATES PIPING RUN IS ENCASED IN PVC, REGISTRATION SHOWS PIPING AS CP STEEL. TIMOTHY RECTORxgÂcÂÂÂSxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ¢TANK PLANNED FOR REMOVAL LATE FALL 2004. SPOKE TO STEPHEN BUCK ABOUT ANNUAL INSPECTION VIOLATION. LET HIM KNOW ONCE TANK IS REMOVED, NOV WILL BE TAKEN CARE OF. RRxgÂdÂÂÂSxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂGÂÂSxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿWRONG INSPECTOR ENTERED SHOULD BE RICHARD HAZEL II. ACTUAL INSPECTION DATE IS 6/20/03. INSPECTOR PASSED FACILITY WITHOUT PUTTING INFORMATION IN ABOUT CP RESULTS. TANK IS LISTED AS CP. ENTERED INSPECTION AS A FAIL DUE TO UNABLE TO DETERMINE STATUS OF THE CP. TIMOTHY RECTORxgÂÂ)ÂÂxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿSENSOR PROBLEM ON 5/1, 6000 GALLON CHAMBER PRODUCT #23. UNABLE TO GET OUT OF ALARM STATUS.OTHER REPAIRS MADE AT THE FACILITY. TIMOTHY RECTORxgÂÂPÂÂxgxgÁ`xgÃ3&5þÿþÿþÿþÿþÿþÿþÿxgÂÂU&ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿTHERE IS SOME DISAGREEMENT ABOUT THE PIPING SUMPS AT THIS LOCATION. WEBBER OIL INSISTS THAT THEY ARE "ABOVEGROUND, THOUGH BELOW GRADE", DEP HAS NEVER FULLY BOUGHT INTO THIS CONCEPT. THEY WERE NOT CHECKED FOR THIS INSPECTION SO I AM LEAVING THIS INSPECTION AS A PASS. TIMOTHY RECTORxgÂÂ>;ÂÂxgxgÁ`xgÃGb:þÿþÿþÿþÿþÿþÿHREPAIRS MADE DURING INSPECTION TO BRING INTO COMPLIANCE. TIMOTHY RECTORxgÂÂ@ÂÂCxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ@YÂÂCxgxgÁ`xgÃ3?þÿþÿþÿþÿþÿþÿþÿxg *ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ¬TANKS ARE MISSING OVERFILL PROTECTION, ALSO INTERSTITIAL MONITORING HAS PROBLEMS, PROBES NOT SET CORRECTLY. ALSO EVIDENCE (RUST) OF WATER IN PIPING SUMPS. TIMOTHY RECTORxg Â7/ÂÂ!xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿœINSPECTOR NOT CERTIFIED WHEN INSPECTION PERFORMED. ALLOWING INSPECTION TO GO THROUGH AS PASS, NOTIFY OWNER OPERATOR OF PROBLEM. NEED TO REINSPECT THIS FALL.xg Ã/ ÂÂCxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿB#5 HEATING OIL TANK WITH FAILING CP. SUBMITTED PASSING CP IN 1998.xg ÂN#ÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg  ÂN0ÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg  Ã+ÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂN.ÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ,ÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂN%ÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃXEÂÂZxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿ|CERT OF PROPER INSTALL SENT IN; FLAPPER INSTALLED FOR OVERFILL PREVENTION. SPILL BUCKET REMAINS A FAIL AS FAR AS WE KNOW. RRxgÂÃAÂÂZxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxg Âà ÂÁ$xgxgÂxgÄC7?þÿþÿþÿþÿþÿþÿ3REPAIRS MADE TO ALL FAILING ITEMS PER DENNIS DAVIS.xg 2ÂÂZxgxgÂxgþÿþÿþÿþÿþÿþÿþÿINSPECTOR FAILED TANK FOR NO OVERFILL, NONE REQUIRED BY DEP ON TANK INSTALLED IN 1989. OSFB REQUIREMENT ONLY. PASSING INSPECTION TIMOTHY RECTORxgÂÃ9ÂÂZxgxgÂxgþÿþÿþÿþÿþÿþÿþÿfRECEIVED CERTIFICATE OF PROPER INSTALLATION DATED 7/15/2003 FOR REPAIRS COMPLETED BY PAUL THOMPSON. BBxgÂÃ_ xgxgÂþÿþÿþÿþÿþÿþÿþÿþÿlCERT OF PROPER INSTALL SENT IN; CORRECTIONS MADE TO OVERFILL. INTERSTICE STILL FAILING AS FAR AS WE KNOW. RRxgÂÃXÂÂZxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ!ÂÂZxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂÂÂxgxg xgà  þÿþÿþÿþÿþÿþÿþÿxgÂÂNEÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿèNO OVERFILL ON THIS TANK, IT WAS INSTALLED PRIOR TO 1991. INSPECTOR FAILED DUE TO NO OVERFILL, O.S.F.B. REQUIRES WHISTLE, NO EVIDENCE THAT ONE EXISTS. PASSING INSPECTION AS DEP DOESN'T REQUIRE RETROFIT ON OVERFILL. TIMOTHY RECTORxgÂÂEÂÂxgxg xgÃ4TþÿþÿþÿþÿþÿþÿþÿxgÂÃIMÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ1ÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ\8 xgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿßINSPECTOR PASSED TANK, DEP FAILED DUE TO UNABLE TO VISUALLY INSPECT FLAPPER AND UNABLE TO VISUALLY INSPECT SENSOR IN SUMP. SUMP HAS A 2" OBSERVATION HOLE BUT COVER BOLTS ARE RUSTED AND COULDN'T BE REMOVED. TIMOTHY RECTORxgÂÂWÂÂCxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg Ã%LÂÂZxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿZNO OVERFILL ON GAS TANK ALSO NO VAPOR RECOVERY OR DROP TUBE. TANK FAILS. TIMOTHY RECTORxgÂ!ÃY^ÂÂxgxg xgÃGþÿþÿþÿþÿþÿþÿþÿxg Â"ÃLÂÂSxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â#ÃQ*ÂÂSxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$ÃUXÂÂSxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%Â0 xgxgÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&Ã9 xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ'ÂLÂÂ4xgxg xgà þÿþÿþÿþÿþÿþÿ~SPILL BUCKETS HAVE BEEN CLEANED AND THE LIDS REPLACED. A COPY OF THE INVOICE ATTACHED TO PAPER INSPECTION REPORT. RAQUEL ROSSxf Â(Â&ÂÂSxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Ã79 xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â*Â"$ÂÂSxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ+Â-O xgxgÁ`xgÃ*?FþÿþÿþÿþÿþÿþÿvITEMS THAT NEEDED REPAIR WERE REPAIRED ACCORDING TO INSPECTION FROM MR. LAGASSE. FACILITY IS PASSING. TIMOTHY RECTORxgÂ,Âb@ÂÂ)xgxg xgÃE TþÿþÿþÿþÿþÿþÿþÿxfÂ-ÂB%ÂÂ)xgxg xgà [þÿþÿþÿþÿþÿþÿþÿxfÂ.Ã_ÂÂ)xgxg xgÄ!þÿþÿþÿþÿþÿþÿþÿxgÂ/Ã3ÂÂ)xgxg xgÃPIWþÿþÿþÿþÿþÿþÿþÿxf Â0Â,ÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿ1REPLACED DAMAGE LID ON SPILL BUCKET. RAQUEL ROSSxgÂ1Â0ÂÁ$xgxgÁ`xgÄ þÿþÿþÿþÿþÿþÿûINSPECTOR FAILED LINE LEAK DETECTOR. INDICATED IT MAY BE ABLE TO BE CHECKED UNDER THE DISPENSER. DOESN'T INDICATE IT ACTUALLY WAS CHECKED ONLY INDICATES FAIL. TIMOTHY RECTOR REPLACED RELAY IN RED JACKET LLDS. RETESTED - ALL PASSED (7/14/2003). BB xgÂ2Ã^ÂÂxgxg xgà ?,þÿþÿþÿþÿþÿþÿ2BILL CARVER WAS SCHEDULED FOR BEFORE 10/31/04 BUT IS RUNNING LATE. TOLD THEM TO GET AN SIA DONE TOO. -ACF DAILY INVENTORY OVER FOR TANK 1 (EXCEEDS ALLOWABLE 1%). HOWEVER, THE OVERAGE IS CONSTANT AND GOES BACK MONTHS. BELIEVED TO INDICATE A NUMBER PROBLEM RATHER THAN A LEAK. OK BY TIM RECTOR RAQUEL ROSSxgÂ3Â8ÂÂ:xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxf Â4à ÂÂ:xgxg xgÃHBaþÿþÿþÿþÿþÿþÿ8STAGE 1 VAPOR RECOVERY OK BY DEP STANDARDS. RAQUEL ROSSxfÂ5ÂYÂÁ$xgxgÁ`xgÄ3þÿþÿþÿþÿþÿþÿƒFAILED GROUNDWATER MONITORING FOR HEATING OIL TANK (550 GALLON). REMAINDER OF INSPECTION PASSED, PASSED INSPECTION. TIMOTHY RECTORxgÂ6Ã3SÂÂKxgxg xgÃ]DYþÿþÿþÿþÿþÿþÿþÿxgÂ7ÂABÂÂKxgxg xgÄH]!þÿþÿþÿþÿþÿþÿ€INSPECTOR CLEANED WATER, DIRT FROM DIESEL SUMP, CLEANED WATER, GAS FROM AST TRANSISTION SUMP- RESET, TESTED SENSORS. RAQUEL ROSSxfÂ8ÃRÂÂKxgxg xgÃ.@þÿþÿþÿþÿþÿþÿþÿxfÂ9Ã=ÂÂKxgxg xgÃa)þÿþÿþÿþÿþÿþÿþÿxfÂ:ÂB,ÂÂCxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ;Ã]-ÂÂKxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ<ÂIÂÂKxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ=Â%HÂÂKxgxg xgÃ.1[þÿþÿþÿþÿþÿþÿþÿxgÂ>Â&]ÂÂ4xgxg xgÂþÿþÿþÿþÿþÿþÿþÿxf Â?ÂO xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ@Â4 xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂAÂD xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂBÂbÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂCÁ]ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂDÁJÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÁHÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂFÁYÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂGÁ\ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂHÂ-ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂIÂ7ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂJÃ`ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂKàxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂLÃ. xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂMÃXÂÂAxgxg xgÃRþÿþÿþÿþÿþÿþÿ¦TANK 1-2 HAS VENT WHISTLE AS OVERFILL PREVENTION. DEP ALLOWING USE OF VENT WHISTLES UNDER CONDITIONS LISTED IN ATTACHMENT OF PAPER COPY INSPECTION REPORT. RAQUEL ROSSxgÂNÃ7ÂÂ!xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂOÂÂÁ$xgxgÁ`xgÄ["þÿþÿþÿþÿþÿþÿNINSPECTION UPDATE RECEIVED 07/30/2003. REPLACED BALL-FLOATS WITH FLAPPERS. BBxgÂPÃÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿFINSPECTOR LENGTHENED WHISTLE VENT TO 90% OF TANK CAPACITY. RAQUEL ROSSxgÂQÃVÂÂ)xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂRÂ%5ÂÂ)xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂSÃaÂÂ)xgxg xgà 7þÿþÿþÿþÿþÿþÿþÿxg ÂTÃ^)ÂÂ)xgxg xgà Yþÿþÿþÿþÿþÿþÿþÿxg ÂUÃ%>ÂÂ)xgxg xgÃ`þÿþÿþÿþÿþÿþÿkWELLS ON SITE NOT BEING USED. INSPECTOR CHECKED HIGH WATER TABLE: 2 FT OVER TANKS; WATER CLEAN. RAQUEL ROSSxg ÂVà %ÂÂ)xgxg xgÃþÿþÿþÿþÿþÿþÿþÿxg ÂWÂJ&ÂÂ)xgxg xgÄ*EþÿþÿþÿþÿþÿþÿþÿxgÂXÂ(3 xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂYÂ2-ÂÂBxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂZÂWCÂÂBxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ[ÁTÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â\Ã$_ÂÂXxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ] ÂÂxgxg xgÃ(<7þÿþÿþÿþÿþÿþÿþÿxg Â^Â4QÂÂ)xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_ÃD3ÂÂbxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ`Â3ÂÂbxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂaÃNÂÂHxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂbà dÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxf ÂcÂB ÂÁ"xgxg xgþÿþÿþÿþÿþÿþÿþÿ'INSPECTOR INSTALLED FLAPPER RAQUEL ROSSxgÂdÂ8OÂÁ"xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg !ÂÁ"xgxg xgÃ'þÿþÿþÿþÿþÿþÿ‰SUPER LID CRACKED BADLY- REPLACED BY INSPECTOR. VENT CAPS 2-2" NEEDED VACUUM- INSPECTOR INSTALLED PRESSURE/VACUUM VENT CAPS. RAQUEL ROSSxgÂÂSVÂÁ"xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂSSÂÁ"xgxg xgþÿþÿþÿþÿþÿþÿþÿWSPILL BUCKET HAS HAD FILL PIPE INSTALLED. INSPECTOR REPAIRED FILL ADAPTOR. RAQUEL ROSSxgÂÃUÂÁ"xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃÂÂCxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ(ÂÂHxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà /ÂÂHxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂKÂÂ)xgxg xgà þÿþÿþÿþÿþÿþÿþÿxg  ÂM=ÂÂ)xgxg xgÃ7cþÿþÿþÿþÿþÿþÿþÿxg  Ã:OÂÂ!xgxg xgþÿþÿþÿþÿþÿþÿþÿUMULLINS ON SUSPENSION AT TIME OF INSPECTION. KEN LEGASSE TESTED CP ON 08/20/2003. BBxg Â]0ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â]$ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â5KÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ\ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ=ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃNVÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ>ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ6ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂD5ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExgÂÂ;:ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÁ^ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂEÂÂZxgxg xgþÿþÿþÿþÿþÿþÿþÿhDEP PASSES GROUNDWATER MONITORING (WELLS WERE DRY WHEN INSPECTOR CHECKED FOR WATER IN WELL). RAQUEL ROSSxg ÂÃP xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂB xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂZxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂÂÂZxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂQ xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ7ÂÂ)xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿfTANK PASSES PER INSPECTOR DON BUBAR. THERE IS NO OVERFILL PREVENTION ON THE TANK. DEAD RIVER, THE FUEL PROVIDER SAYS NO WHISTLE ON TANK. DEP REGULATIONS DON'T REQUIRE OVERFILL ON THIS TANK DUE TO SIZE AND AGE, 550 GALLON INSTALLED IN 1985(?). OIL AND SOLID FUEL BOARD REQUIRES VENT WHISTLE, NOT OUR REGULATION WE CAN'T ENFORCE. PASSING TANK. TIMOTHY RECTORxg ÂÃ#ÂÂxgxg xgÃ=þÿþÿþÿþÿþÿþÿ#THROUGHPUT FOR TANK #13 RAQUEL ROSSxg ÂÃ+ÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿCTANK INSTALLED BEFORE 1991- N/A FOR OVERFILL PREVENTION RAQUEL ROSSxg ÂÂ$=ÂÂKxgxg xgÃ4!\þÿþÿþÿþÿþÿþÿþÿxg  ÂÁxgxg xgþÿþÿþÿþÿþÿþÿþÿUGASKETS ON 4" RISER PIPE AT BOTTOM OF SPILL BUCKET REPLACED BY INSPECTOR RAQUEL ROSSxgÂ!Ã/WÂÂKxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"Ã9ÂÂKxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#Ã($ÂÁYxgxg xgþÿþÿþÿþÿþÿþÿþÿ1CP VENT PIPE FAILED, DEP PASSES TANK RAQUEL ROSSxf Â$ÂA\ÂÂ4xgxg xgÃ3( þÿþÿþÿþÿþÿþÿþÿxgÂ%Ã&_ÂÂTxgxgÂxg þÿþÿþÿþÿþÿþÿþÿ2REPAIRS COMPLETED BY TONY COUTURE ON 8/11/2003. BBxgÂ&ÂQÂÂCxgxg xgÃXþÿþÿþÿþÿþÿþÿþÿxgÂ'Â_ÂÁ$xgxgÁ`þÿÄþÿþÿþÿþÿþÿþÿkINSPECTOR PROVIDED FOLLOWING INFORMATION: TANK 7 INTERSTAIL SENSOR SITTING ON TOP OF TANK, NO STRING; TANK 8 COULDN'T REMOVE SENSOR FROM TANK BOTTOM TO TEST; TANK 8 BF RUSTED IN THE OPEN POSITION; TANKS 7 AND 10 BALL IS MISSING; TANK 9 FLAPPER IS BROKEN AND NOT SET CORRECT HEIGHT; ELLD'S ON TANKS 8 AND 9 WOULD NOT TRIP AFTER THREE (3) ATTEMPTS. TIMOTHY RECTORxgÂ(ÂB'ÂÂXxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Ã:[ÂÂYxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*Ã8ÂÂAxgxg xgà >þÿþÿþÿþÿþÿþÿ$SUMP PROBE'S WIRE CONNECTION CORRODED. INSTALLER REPAIRED AND RESET ALARM. REPLACED SPILL BUCKET ON #2-2. CLEANED OUT AND PAINTED OTHERS. REPLACED OPW 61-50 OVERFILL PROTECTION VALVE ON #2-2. INSTALLED 3" MORRISON VAPOR/VAC VENT CAP. REPLACED 2 VAPOR RECOVERY CAPS AND 1 FILL CAP. RAQUEL ROSSxgÂ+ÂEUÂÂKxgxg xgþÿþÿþÿþÿþÿþÿþÿKSCHEDULED 2005 INSPECTION WITH PORTLAND PUMP FOR 2ND WEEK OF NOVEMBER. -ACFxgÂ,ÃNÂÂKxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ-Â`ÂÂKxgxgÁ`xgÃcþÿþÿþÿþÿþÿþÿpNOTE: INSPECTOR REPORTS THAT AN ATG CAPABLE OF .1 GPH LEAK DETECTION HAS BEEN INSTALLED ON SITE. TIMOTHY RECTORxgÂ.Ã"ÂÂHxgxg xgÃ#þÿþÿþÿþÿþÿþÿþÿxgÂ/ÃJÂÂBxgxg xgþÿþÿþÿþÿþÿþÿþÿ5INSPECTOR REPAIRED TROUBLE LIGHT AT PANEL RAQUEL ROSSxgÂ0ÃGÂÂBxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ1ÂA-ÂÂBxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ4Ã`PÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ2à ÂÂCxgxg xgþÿþÿþÿþÿþÿþÿþÿ)INSPECTOR REPLACED SENSOR ON PIPING SUMP.xgÂ3Ã8ÂÂ)xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â5Ã<0ÂÂZxgxgÁ`xgÃþÿþÿþÿþÿþÿþÿþÿxgÂ6ÂLAÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ7Ã<ÂÂKxgxg xgÃ/V0þÿþÿþÿþÿþÿþÿQSTAGE 1 VAPOR RECOVERY- PRESSURE/VAC VENT CAP IN PLACE- PASSES BY DEP RAQUEL ROSSxfÂ8ÂÂÂBxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ9à 3ÂÂBxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ: CÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExgÂ;Ã:HÂÂKxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿBARE COPPER PRODUCT LINES. BBxgÂ<Ã&ÂÂKxgxgÂxg þÿþÿþÿþÿþÿþÿþÿKOWNERS ARE INTENDING TO REMOVE FAILING TANK. BB TANK REMOVED 09/13/2003. BBxgÂ=ÂV(ÂÁ xgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExgÂ>Ã+ÂÂ;xgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExgÂ?Â6cÂÂKxg xgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExgÂ@Ã7UÂÂTxgxgÂxg þÿþÿþÿþÿþÿþÿþÿÜINSTALLED NEW PIPING SUMP AND UNDERGROUND PIPING, A NEW TANK MONITORING SYSTEM WITH ELECTRONIC INTERSPACE AND SUMP MONITORING ON 10/24/2003. PER CERTIFICATE OF PROPER INSTALLATION, FACILITY PASSES ANNUAL INSPECTION. RRxgÂAÂY5ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂBÂY#ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂCÂ]EÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂDÂ2 ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÂ]MÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂFÃ9 xgxgÂxg þÿþÿþÿþÿþÿþÿþÿ5CP UPDATE INSPECTION UPDATE COMPLETED 10/30/2003. BBxgÂGÂQ6ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂHÂ1]ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂIÂ]PÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂJÂQ5ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂKÂQ4ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂLÂ15ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂMÂQMÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂNÃFOÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExg ÂOà ÂÂ4xgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExgÂPÂQ1ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂQÂQ0ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂRÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂSÃ?LÂÁ"xgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExgÂTÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂUÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂVÃ?KÂÁ"xgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExgÂWÂXFÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂXÂ]_ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂYÂ;ÂÁ"xgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExg ÂZÂ2ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ[Â2ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ\Â]NÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ]ÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ^Â]LÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_ÂQ3ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ`Â]`ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂaÂ]aÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂbÂ]bÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂcÂYHÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂdÂQ/ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ*NÂÂ4xgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExf ÂÂ]cÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ^ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ]FÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ$OÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExg ÂÂ2TÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂYDÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂdbÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExg Â]CÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â^ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â^ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂYIÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂXcÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ2ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ:JÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿåINSPECTOR INDICATES THE FOLLOWING, 3" OF WATER IN THE INTERSTICE OF THE SPLIT TANK. CONSOLE HORN NOT WORKING. FLAPPERS NOT ABLE TO BE CHECKED FILL ADAPTORS COULDN'T BE REMOVED. ALSO ONLY ONE TANK CHECKED FOR CP. TIMOTHY RECTORxgÂÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ2ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂLÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ]UÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂY ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ]RÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂY ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂQ.ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ]GÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ]OÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ]]ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ]WÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ^?ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ2ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂY ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!ÂY%ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"ÂLÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#Â2 ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$Â]TÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%ÂQ7ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&ÂLÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ'ÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ(ÂY'ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)ÂQPÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*ÂYEÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ+ÂXCÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ,Â]ZÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ-ÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ.Â]IÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ/Ã3ÂÂZxgxgÁ`xg þÿþÿþÿþÿþÿþÿþÿ*INSPECTOR INDICATES THERE ARE LEAK SENSORS IN THE MONITORING WELL(S) IT IS NOT CLEAR IF THERE ARE MORE THAN ONE WELL OR NOT. NOTE READS "MONITORING WELLS HAVE LEAK SENSOR BUT ONE OF THE TWO IS MISSING" ALSO NO BAILER PRESENT ON SITE. PAUL THOMPSON INIDCATES REPLACED SENSOR TO VEEDER ROOT ILS-350.xg Â0Â12ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ1Â1_ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ2ÂXDÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ3ÂY=ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ4Â]VÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ5Â,*ÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â6ÂY:ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ7ÂY\ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ8ÂY3ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ9Â]BÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ:ÂYZÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ;Â,)ÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ0VENT PIPE IS 20 FEET FROM FILL. TIMOTHY RECTORxg Â<ÂY[ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ=ÂY_ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ>ÃÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ?ÂY-ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ@ÂY)ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂAÂ3WÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂBÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂCÂ,,ÂÂZxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂDÂ3UÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÂY8ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂFÂYÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂGÂYAÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂHÂY?ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂIÂ^ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂJÂ]DÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂKÂ3XÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂLÂ]KÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂMÂ]^ÂÂUxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂOÃLÂÁ$xgxg xgþÿþÿþÿþÿþÿþÿþÿbREPLACED FLAPPER ON TANK #1 REPLACED SPILL BUCKETS ON TANKS 1 & 3 BY DENNIS DAVIS FACILITY PASSESxgÂPÂ9ÂÂ!xgxg ÂxgÃ6$þÿþÿþÿþÿþÿþÿþÿxgÂQÂ+SÂÂxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂRÂOAÂÂ4xgxg Âxg ÃAþÿþÿþÿþÿþÿþÿþÿxg ÂSÃaRÂÂCxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂTÃPFÂÁ xgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂUÃ(ÂÂCxgxg ÂxgÃ3[7þÿþÿþÿþÿþÿþÿþÿxgÂVÂ_ÂÂCxgxg ÂxgÃ32_þÿþÿþÿþÿþÿþÿþÿxgÂWÂ9ÂÂCxgxg ÂxgÃ*EþÿþÿþÿþÿþÿþÿþÿxgÂXÂ<ÂÂTxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂYÃOÂÂxgxg Âxgà ZQþÿþÿþÿþÿþÿþÿþÿxgÂZÃ.XÂÂHxgxg ÂxgÃC þÿþÿþÿþÿþÿþÿþÿxgÂ[Ã!]ÂÂHxgxg Âxh ÃCYþÿþÿþÿþÿþÿþÿ1TODD LAVALLEE REPLACED SPILL BUCKETS 2/11/04 -ACFxgÂ\Â.ÂÂxgxg ÂxgÃIHLþÿþÿþÿþÿþÿþÿþÿxgÂ]Ã&ÂÂZxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿÀINSPECTOR PROVIDED THE FOLLOWING INFORMATION: TANK #5 IS OUT OF SERVICE, THIS IS PROBABLY A RESULT OF THE ABOVEGROUND TANK INSTALLED IN 2001/2 BY CHRIS WILSON. THE TANK HAS BEEN CLEANED BUT THE FILL PIPE IS NOT LOCKED AND THE SPILL BUCKET HAS PRODUCT IN IT. TANK #6 IS ACTUALLY AN ABOVEGROUND TANK, DATA IN THE DATABASE IS INCOMPLETE AT THIS TIME. TANK #2 REMAINS ACTIVE, IT IS USED FOR DIESEL FUEL. ENTERING INSPECTION AS A PASS TIMOTHY RECTORxgÂ^ÃÂÂxgxg ÂxgÃ%þÿþÿþÿþÿþÿþÿþÿxgÂ_Â)ÂÂxgxg ÂxgÃþÿþÿþÿþÿþÿþÿþÿxgÂ`Ãa ÂÂHxgxg ÂxhÃ4þÿþÿþÿþÿþÿþÿBPER TODD LAVALLE OF A.L. DOGGETT FACILITY IS PASSING AS OF 2/4/04.xgÂaÂ^ÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂbÂ2FÂÂxgxg ÂxgÃ5+þÿþÿþÿþÿþÿþÿþÿxgÂcÂAÂÂxgxg ÂxgÃþÿþÿþÿþÿþÿþÿþÿxgÂdÃÂÂxgxg ÂxgÄ @JþÿþÿþÿþÿþÿþÿþÿxgÂÃ*`ÂÂHxgxg ÂxgÂPþÿþÿþÿþÿþÿþÿþÿxgÂÂR9ÂÂZxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿãMONITORING WELLS PRESENT, NO BAILER, NO LOG, NO SMPLING BEING DONE. NO OVERFILL PRESENT, TANK WAS INSTALLED IN 1986 OR 1987. OIL & SOLID FUEL BOARD REQUIRES VENT WHISTLE, NO DEP REQUIREMENT. PASSING INSPECTION. TIMOTHY RECTORxgÂÃ5; xgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ<ÂÂZxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ.ÂÂZxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿE11/8/04: MSAD SCHEDULED FOR REPAIRS NEXT NEEK WITH ADAMS & FOGG.- ACFxg OÂÂZxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃXA xgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ.ÂÂZxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿŒNO OVERFILL, NO SPILL BUCKET, NOT REQUIRED DUE TO AGE OF TANK. GROUNDWATER MONITORING NOT TAKING PLACE. PASSING INSPECTION. TIMOTHY RECTORxg ÃÂÂxgxg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂL'ÂÂxgxg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg Ã/6ÂÂxgxg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg Â_ÂÁ$xgxg  þÿÄQþÿþÿþÿþÿþÿþÿ°INSPECTION UPDATE OF 7/31/2003 BY DENNIS DAVIS ADDRESSED OVERFILL AND STAGE 1 VAPOR RECOVERY VIOLATIONS. HAVE NOT RECEIVED DOCUMENTATION ON INTERSTITIAL AND LLD VIOLATIONS. BBxg Â.ÂÂZxgxg Á`xh þÿþÿþÿþÿþÿþÿþÿCERT OF PROPER INSTALLxgÂÂ28ÂÂZxgxg Á`xh þÿþÿþÿþÿþÿþÿþÿ4CERT OF PROPER INSTALL FOR SPILL BUCKET AND OVERFILLxgÂÂ. ÂÂZxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿE11/8/04: MSAD SCHEDULED FOR REPAIRS NEXT NEEK WITH ADAMS & FOGG.- ACFxgÂÂ_ ÂÁ$xgxg  xgÄ#þÿþÿþÿþÿþÿþÿ3ALL DEFICENCIES CORRECTED BY DENNIS DAVIS 7/18/2003xgÂÂÂÁ$xgxg  xgÄ9þÿþÿþÿþÿþÿþÿ„INSPECTION UPDATE FROM DENNIS DAVIS, ALL ITEMS REPAIRED AND NOW IN COMPLIANCE, PASSING INSPECTION EFFECTIVE 7/7/03. TIMOTHY RECTORxgÂÂ7)ÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂL(ÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿAJEFF HUNTLYEY FILED AN UPDATED REPORT THAT CLEARED ALL PROBLEMS. xgÂÃ@ÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ_ÂÁ$xg xg  xgÄ8#þÿþÿþÿþÿþÿþÿ1INSPECTION UPDATE OF 8/18/2003 BY DENNIS DAVIS. xgÂÃIÂÂPxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ1+ÂÂxgxg ÂxgÃ'3þÿþÿþÿþÿþÿþÿþÿxgÂÂ1ÂÂXxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà ÂÂxgxg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ!ÂÂxgxg ÂxgÂÂT4ÂÂxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ?ÂWÂÂxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ@ÂW!ÂÂxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂAÂWÂÂxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂBÂW ÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂCÂWÂÂxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂDÂWÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÂd< xgxg Âþÿþÿþÿþÿþÿþÿþÿþÿ)BALL-FLOAT NOT ACCESSIBLE FOR INSPECTION.xgÂFÂ'ÂÂBxgxg Âxgþÿþÿþÿþÿþÿþÿþÿ[WILSON WILL INSTALL PETROMETER HIGH LEVEL ALARM AND ISOLATE COPPER LINES IN THE SPRING TEDxgÂGÃR7ÂÂBxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂHÃ"9ÂÂKxgxg  xfÃW Tþÿþÿþÿþÿþÿþÿ8STAGE 1 VAPOR RECOVERY- OK BY DEP STANDARDS. RAQUEL ROSSxfÂIÃ;)ÂÂBxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂJÂ5-ÂÂBxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂKÂXÂÂBxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂLÃ=_ÂÂBxgxg ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxgÂMÁUÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿWSUCTION/RETURN LINES SLOPE AWAY FROM MONITORING SUMP. CORMIER ADDED 2ND SUMP 7/31/2003xg ÂNÂQÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿÓTANK 2 IS CURRENLY PLANNED FOR REMOVAL. BILL CARVER SCHEDULED PIPING REPAIRS AND FOUND SOME MAJOR PROBLEMS WITH REPAIRS THAT HAD PREVIOUSLY BEEN DONE TO THE TANK. NEW TANK SCHEDULED FOR INSTALLATION. RR 12/15/04xgÂOÂQÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂPÂB_ÂÂCxg xg Á`xgÃGþÿþÿþÿþÿþÿþÿ¶ACCORDING TO THE INSPECTOR TANK #3 HAS BEEN TAKEN OUT OF SERVICE AS OF SEPTEMBER 2002. THERE IS NO PLAN TO PUT IT BACK INTO SERVICE AND IT IS PLANNED TO REMOVE IT IN 2007 WHEN BOTH TANKS ARE BEING REMOVED AND OR REPLACED. TIMOTHY RECTOR LESS THAN 1" OF PRODUCT: TANK 3 HAS BEEN TAKEN OUT OF SERVICE TANK VENTED AND FILL PIPE LOCKED?: TANK 3 IS OUT OF SERVICE PRODUCT PIPING CAPPED? PUMPS AND MANWAYS SECURE?: TANK 3 IS OUT OF SERVICExgÂQÂEM xgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂRÃCÂÂKxgxg Á`xgÃ.þÿþÿþÿþÿþÿþÿþÿxgÂSÂI^ÂÂ!xg xg Á`xgÃ1G2þÿþÿþÿþÿþÿþÿ•INSPECTOR NOT CERTIFIED AT TIME OF INSPECTION, ALLOWING INSPECTION TO PASS AND NOTIFYING TANK OWNER OF PROBLEM, NO NOV TO TANK OWNER. TIMOTHY RECTORxgÂTÂCVÂÂxgxg ÂþÿÃAþÿþÿþÿþÿþÿþÿþÿxg ÂUÃ_aÂÂxgxg Âxgþÿþÿþÿþÿþÿþÿþÿ6REPAIRS MADE BY BILL CARVER ALL CLEAR. TIMOTHY RECTORxg ÂVÂ+ZÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂWÂ!ÂÂxgxg ÂþÿÃGþÿþÿþÿþÿþÿþÿþÿxg ÂXÂ9+ÂÂTxgxg Âxgþÿþÿþÿþÿþÿþÿþÿ/REPAIRS MADE PER TONY COUTURE, PRECISION TANKS.xg ÂYÃ.ÂÂHxgxg Âxgþÿþÿþÿþÿþÿþÿþÿ<INSPECTOR INSTRUCTED OPERATOR ON GW MONITORING REQUIREMENTS.xgÂZÃ?ÂÂBxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿ|INSPECTION PASSED DUE TO REPAIR TO SENSOR 5/29/03. SENSORS ARE FUNCTIONING PROPERLY?: SENSOR WASN'T PASSING REPAIRED 5/29/03xgÂ[à ÂÂxgxg ÂxhþÿþÿþÿþÿþÿþÿþÿÓNO ACCESS TO BALL-FLOAT. LETTER DATED MARCH 9, 2004 INDICATES THAT THE PARKING LOT AND AREA ABOVE THE TANK IS BEING RESURFACED IN MAY/JUNE 2004 AND THEY WILL PROVIDE ACCESS TO THE BALL FLOAT AT THAT TIME. TRxgÂ\Âc^ÂÂBxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿeINTERSTIAL MONITORING SYSTEM REPAIRED AND FULLY OPERATIONAL 6/4/03 SYSTEM NOW PASSES. TIMOTHY RECTORxgÂ]ÃdÂÂBxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿ^ALARM ON OVERFILL REPAIRED 6/4/03 SYSTEM FULLY OPERATIONAL. PASSED INSPECTION. TIMOTHY RECTORxgÂ^ÃILÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_ÂGÂÂKxgxg Âxg ÃþÿþÿþÿþÿþÿþÿpSPOKE TO DAVE NELSON. INSPECTION FOR 2004 HAS BEEN DONE. WAITING ON PORTLAND PUMP FOR THE PAPERWORK. RR 10/4/04xgÂ`Â%1ÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿ²PIPING SUMPS CONTAINED SMALL AMOUNT OF WATER (200ML). REMOVED AND CLEANED. SLEEVED COPPER SUCTION/RETURN PIPING POSSIBLY PITCHED TOWARD BUILDING. RECOMMENDED FURTHER INSPECTION. xgÂaÃPÂÂHxgxg  xgÃ+þÿþÿþÿþÿþÿþÿµOPW SPILL CONTAINMENTS INSTALLED BY CHRIS WILSON. LEWIS PROVIDED NEW SPILL LOG & MONTHLY GASOLINE THROUGHPUT LOG WITH INSTRUCTIONS. WILSON INSTALLED 4 17LB. MAG. ANODES AT EACH TANKxgÂbÃS6ÂÂBxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂcÃÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿ…WATER IN PIPING SUMP. REMOVED AND CLEANED.PETROMETER OVERFILL ALARM COPPER LINES CONTAIN OXIDATION- REMOVED AND CLEANED. RAQUEL ROSSxgÂdÂEÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿ•REMOVED WATER FROM PIPING SUMP (<500ML). REMOVED BALL FLOAT FROM EXTRACTOR VALVE. REPLACED CAP ON BUCKET. REMOVED OIL FROM SPILL BUCKET. RAQUEL ROSSxgÂÂ6&ÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿPIPING SUMP LID AREA CONTAINED EXCESSIVE DEBRIS AND SAND (REMOVED AND CLEANED). SPILL BUCKET REMOVED AND CLEANED- CONTAINED WATER AND DEBRIS. REPLACED FILL CAP ADAPTER. RAQUEL ROSS NOTE: INSPECTION UPDATE 4/8/04 PASSING CP-.92, -1.02, -1.09 CTI MIKE LEWIS.xgÂÃdJÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂCSÂÂHxgxg  xgÃQþÿþÿþÿþÿþÿþÿÑNEW OVERFILL PLAQUE INSTALLED ON 4-1. REMOVED WATER AND DEBRIS FROM SPILL BUCKET. REPLACED FILL CAPS AND ADAPTERS. REPAIRED SEAL IN BOTTOM OF SPILL BUCKET. REPLACED VAPOR RECOVERY ADAPTER AND CAP. RAQUEL ROSSxgÂÃ+IÂÂHxgxg  xgÃPþÿþÿþÿþÿþÿþÿjREMOVED AND CLEANED PIPING ACCESS (CONTAINED WATER). CLEANED SPILL BUCKET. REPLACED FILL CAPS. RAQUEL ROSSxgÂÂ8ÂÂHxgxg  xf þÿþÿþÿþÿþÿþÿþÿRPELACED FILL CAP. RAQUEL ROSSxf ÂÂ1 ÂÂHxgxg  xf þÿþÿþÿþÿþÿþÿþÿREPLACED FILL CAP. RAQUEL ROSSxf ÂÃBÂÂHxgxg Âxg þÿþÿþÿþÿþÿþÿþÿ CP UPDATExg Âà ÂÂHxgxg Âxgþÿþÿþÿþÿþÿþÿþÿ CP UPDATExg Ã6*ÂÂHxgxg Âxg þÿþÿþÿþÿþÿþÿþÿ[CP UPDATE 7/5/03- VEEDER ROOT ILS350 TANK ANNULAR SPACE MONITOR INSTALLED BY CHRIS WILSON.xg  ÂbOÂÂHxgxg Âxhþÿþÿþÿþÿþÿþÿþÿþÿxg ÁÂÂHxgxg Âxhþÿþÿþÿþÿþÿþÿþÿþÿxg Â1/ÂÂHxgxg  xf þÿþÿþÿþÿþÿþÿþÿ(REPLACED FILL CAP ON TANK 5. RAQUEL ROSSxf  ÃT%ÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿ5REPLACED FILL CAP AND EXTRACTOR VALVE CAP RAQUEL ROSSxgÂÃK2ÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿRRESEALED SUMP LID. REPAIRED FLAPPER OVERFILL DEVICE, REPLACED FILL CAP RAQUEL ROSSxgÂÃ.FÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxg `ÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxg _ÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxg bÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂUÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿ0SPILL BUCKET CONTAINED FUEL- REMOVED RAQUEL ROSSxg aÂÂHxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ+VÂÂBxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿqINTERSTIAL SENSORS REPAIRED/REPLACED 6/4/03 PRIOR TO SUBMITTAL OF INSPECTION. INSPECTION PASSES. TIMOTHY RECTORxgÂÂTÂÂBxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂUÂÂxgxg Âxg ÃG-?þÿþÿþÿþÿþÿþÿþÿxgÂà 5ÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂUÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂUÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ)ÂÂxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ_YÂÂXxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿ„NO OVERFILL, TANK INSTALLED IN LATE 1980'S. MANUAL INTERSTIAL MONITORING, NO LOG OF ACTUAL MONITORING TAKING PLACE. TIMOTHY RECTORxgÂÃF/ÂÂXxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂGÂÁ xgxg  xgÂ<þÿþÿþÿþÿþÿþÿ,INSTALLED OMNITEC OVERFILL ALARM RAQUEL ROSSxgÂÃ6ÂÁ xgxg  xgÃ"T þÿþÿþÿþÿþÿþÿ+REPLACED SPILL BUCKETS ON 1-1. RAQUEL ROSS xg ÂVÂÁ xgxg  xg þÿþÿþÿþÿþÿþÿþÿyPUMPED 8" WATER FROM PIPING SUMP. RAQUEL ROSS OWNER SAYS BEAUMONT SCHEDULED TO INSPECT FACILITY FIRST WEEK MARCH 07 -MLxg Â! 'ÂÁ xgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"Ã8ÂÁ xgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#Ã8ÂÁ xgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$ÂLbÂÁ xgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%ÂG.ÂÂCxgxg  xgÃ@R/þÿþÿþÿþÿþÿþÿ[FIXED LOSE WIRE ON DIESEL SENSOR. INSTALLE DNEW FLAPPER VALVES ON 5-1, 5-2, 6. RAQUEL ROSSxgÂ& SÂÂxgxg  xgÃ:QþÿþÿþÿþÿþÿþÿþÿxgÂ'ÂAÂÂxgxg  xgÃ-0þÿþÿþÿþÿþÿþÿþÿxgÂ(ÃR=ÂÂXxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)Â&ÂÂYxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*ÃWÂÂYxgxg  xgþÿþÿþÿþÿþÿþÿþÿ&PUMPED WATER OUT OF SUMPS. RAQUEL ROSSxgÂ+Â]5ÂÂYxg xg Á`xhþÿþÿþÿþÿþÿþÿþÿ TANKS REMOVEDxgÂ,Â. ÂÂ)xgxg Âxgà þÿþÿþÿþÿþÿþÿþÿxgÂ-ÂNÂÂYxgxg Á`xh þÿþÿþÿþÿþÿþÿþÿ TANKS REMOVEDxgÂ.Ã-ÂÂCxgxg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â/Ã/ÂÂZxgxg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â0Ã-ÂÂCxgxg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â1ÃÂÂxgxg  xgÃ+^?þÿþÿþÿþÿþÿþÿþÿxgÂ2Â&ÂÂKxgxg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ3Ã&\ÂÂZxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ4Â-XÂÂxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ5Â@ xgxg Á`xgþÿþÿþÿþÿþÿþÿþÿ„VENT PIPE FAILED CP, NO SPILL BUCKET, NO ACCESS TO OVERFILL. TANK INSTALLED IN 1986, THESE ITEMS WERE NOT REQUIRED. TIMOTHY RECTORxgÂ6Â> xgxg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ7ÂAÂÂxgxg  xgÃH1þÿþÿþÿþÿþÿþÿþÿxgÂ8Â< ÂÂxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ9Â&$ÂÂAxgxg  xgþÿþÿþÿþÿþÿþÿþÿ“MUHAMMAD FROM NORM'S QUICK STOP CALLED ON 10/01/2004 TO SAY THE 2004 INSPECTION WAS DONE IN JUNE BUT WAS NOT SUBMITTED. HE MAILED IT OUT TODAY. BBxgÂ:ÂF_ÂÂSxgxg  xgÂþÿþÿþÿþÿþÿþÿþÿxgÂ;ÂQÂÂSxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ<ÃOÂÂSxg xg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ=Â+ÂÂSxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ>Â#ÂÂSxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ?Ã0ÂÂCxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ@Ã6ÂÂ9xgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂAÃa-ÂÂxgxg  xg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂBÃ0ÂÂxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂCà -ÂÂxgxg  xf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂDÃF,ÂÂBxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÃPÂÂBxgxg  xgþÿþÿþÿþÿþÿþÿþÿ5REPAIRED ALARM (NOT AUDIBLE UPON ARRIVAL) RAQUEL ROSSxgÂFÃ4ÂÂBxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂGÂ.@ÂÂBxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂHÃ8ÂÁ xgxg Á`xgþÿþÿþÿþÿþÿþÿþÿÈTANK FAILED MANUAL MONITORING OF INTERSTICE. NO LOG. ALSO WATER IN SUMP DUE TO NO GASKET IN THE LID. PASSING INSPECTION THIS YEAR, IF NO LOG NEXT YEAR ADDITIONAL ENFORCEMENT POSSIBLE. TIMOTHY RECTORxgÂIÂEPÂÂ!xg xg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂJÃ,ÂÂxgxg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxfÂMÂ/;ÂÂxgxg Á`þÿÃI3þÿþÿþÿþÿþÿþÿþÿxgÂNÂ<7ÂÂYxgxg Á`xg þÿþÿþÿþÿþÿþÿþÿ.TANKS REMOVED- PROBLEMS WITH THEM ARE SOLVED. xg ÂPÂ0ÂÂSxgxg  xg þÿþÿþÿþÿþÿþÿþÿPER KIRK ST PETER.xgÂQÃMÂÂSxgxg  xg þÿþÿþÿþÿþÿþÿþÿ!INSTALLED FLAPPERS ON 09/22/2003.xgÂR DÂÂSxgxg  xgþÿþÿþÿþÿþÿþÿþÿº MONITORING WELLS ACCESSIBLE?: NO GW MONITORING WELLS TALKED TO CLAYTON HARRINGTON 6/8/07 - KIRK ST.PETER SCHEDULED TO DO AI ASAP, BUT MANY OTHERS BEFORE THIS FACILITY ON HIS LIST - MLxgÂSÂ=RÂÂKxgxg Âxg Ã. þÿþÿþÿþÿþÿþÿþÿxg ÂTÃ?ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂUÂ'SÂÂZxg xg Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxgÂVÂT_ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂWÃRÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂXÃUÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂYÃSÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂZÂEGÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ[à @ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ\à :ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ]à DÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ^Â\&ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ;INSPECTED BY DAVID BURNS REPLACED BRINE SENSOR. RAQUEL ROSSxgÂ_Ã1KÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ`Â\ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂaÂXKÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ%INSPECTED BY DAVID BURNS RAQUEL ROSS xgÂbÂ[ÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ%INSPECTED BY DAVID BURNS RAQUEL ROSS xg ÂcÂ\ ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ%INSPECTED BY DAVID BURNS RAQUEL ROSS xgÂdÂ[,ÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg ÂÂ\ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÃGKÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÃJ=ÂÂKxg xg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÂ\ ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÂXRÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÂCÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSEPCTED BY DAVID BURNS RAQUEL ROSSxg Âà EÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂà KÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg  BÂÂZxg xg Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxg Â.ÂÂAxgxg ÂxgÂþÿþÿþÿþÿþÿþÿEFACILITY IS STILL OUT OF SERVICE, BUT COMPLETED ANNUAL INSPECTION. BBxg Â9OÂÂZxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿgINTERSTIAL MONITORING CONSOLE NOT WORKING PROPERLY. MUST MAINTAIN EXISTING ELECTRONICS. TIMOTHY RECTORxg Ã6ÂÂZxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ5ÂÂZxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿ^NO SPILL BUCKET, NO OVERFILL PROTECTION. NOT REQUIRED ON THIS TANK DUE TO AGE. TIMOTHY RECTORxg ÂÂZxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿONO SPILL BUCKET. TANK INSTALLED PRIOR TO 1991, NO REQUIREMENT TIMOTHY RECTORxgÂÁ&ÂÁ xgxg ÂxhþÿþÿþÿþÿþÿþÿþÿýTANKS #5 AND #6 PIPING SUMPS ARE NOT LIQUID TIGHT. PIPING MATERIAL IS ALSO IN QUESTION. TANK #8 INSTALLED AFTER INSPECTION PERFORMED. BB 2/20/04: CERTIFICATE OF PROPER INSTALLATION SENT IN. PIPING SUMP, PROBES REPAIRED/REPLACED ON TANKS 5 AND 6. RRxf ÂÂÂÂZxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ"ÂÂZxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿ<THOMPSON SUBMITTED CERT. PROPER INSTALL FOR REPAIRED FLAPPERxgÂà HÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ9INSPECTED BY DAVID BURNS REPLACED LEVEL PROBE RAQUEL ROSSxg ÂÂE8ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÂE6ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÃ< xgxg Á`xh þÿþÿþÿþÿþÿþÿþÿ TANK REMOVED.xgÂÃO_ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂà ?ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÂ\#ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÂ\$ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÂUÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÂcN xgxg Á`xgþÿþÿþÿþÿþÿþÿþÿüNOTE INSPECTOR FAILED SITE FOR NO MONITORING WELLS, APPARENTLY NONE WERE INSTALLED WITH THE TANK. NO OVERFILL OR SPILL BUCKET, NOT REQUIRED BY DEP. INSPECTOR NOTED SOME STAINED SOILS/CONTAMINATION AROUND THE FILL PIPE AND VENT PIPE. TIMOTHY RECTORxgÂÂJÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÂT`ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂÃÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg Ã"CÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg Â!ÃGÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ"ÃPÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ#ÃXÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ8INSPECTED BY DAVID BURNS REWIRED SUMP SENSOR RAQUEL ROSSxg Â$ÂTdÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ%ÂTYÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ&ÂS?ÂÂKxgxg  xgþÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxgÂ'Â[*ÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg Â(Â[!ÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg Â)ÂS:ÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg Â*ÃVJÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ:INSPECTED BY DAVID BURNS REPLACED BRINE SENSOR RAQUEL ROSSxg Â+ÂTSÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg Â,ÃCÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg Â-à ÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg Â.à OÂÂKxgxg  xg þÿþÿþÿþÿþÿþÿþÿ$INSPECTED BY DAVID BURNS RAQUEL ROSSxg Â/Â4ÂÂ4xgxg Á`xhþÿþÿþÿþÿþÿþÿþÿ7CTI DAVE HOWE INSTALLED NEW OMTEC MONITORING SYSTEM. BBxgÂ0Ã%ÂÂ4xg xg Á`xg Ä$þÿþÿþÿþÿþÿþÿþÿxg Â1Â*ÂÂbxgxg Á`xgÄþÿþÿþÿþÿþÿþÿjTANK 11 COMING OUT IN JULY 2003. DIESEL OVERFILL IS QUESTIONABLE. NEED TO CHECK SOMETIME. TIMOTHY RECTORxgÂ2 ÂÂKxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ3ÂTIÂÂKxgxg Á`xhþÿþÿþÿþÿþÿþÿþÿ]DAVID BURNS INSPECTED SPILL BUCKET INSTALLED BY IRA DODGE; CERT OF PROPER INSTALL SENT IN RRxgÂ4Ã;ÂÂBxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿ3SPILL BUCKET NOT REQUIRED BASED ON AGE OF THE TANK.xgÂ5Â]SÂÂUxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿÉOVERFILL DROP TUBE CORRODED INTO FILL PIPE, BEING REMOVED AND REPLACED IN JULY 2003 PAPERWORK IS BEING FILED. PASSING INSPECTION. FLAPPER DOES WORK AND WAS INSTALLED AT CORRECT HEIGHT. TIMOTHY RECTORxgÂ6Â^ÂÂUxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿÍFLAPPER PROPERLY INSTALLED UNABLE TO REMOVE DUE TO CORROSION. FLAPPER IS OPERATIONAL AND SET AT THE CORRECT HEIGHT, BEING REPLACED IN JULY/AUGUST 2003 BY KERRY SCATES. PASSING INSPECTION. TIMOTHY RECTORxg Â7Â]dÂÂUxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ8Ã'2ÂÂUxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿ NEW INSTALLxgÂ9Ã=ÂÂBxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿòINSPECTOR DIDN'T INDICATE TYPE OF OVERFILL PROTECTION. REGISTRATION INDICATES SPILL CONTAINMENT? TANK WAS INSTALLED IN THE LATE 90'S AND IS REQUIRED TO HAVE OVERFILL PROTECTION. SINCE IT IS #6 OIL OPTIONS ARE VERY LIMITED. TIMOTHY RECTORxgÂ:ÂXIÂÂSxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿËWATER IN INTERSTICE REMOVED INSPECTOR WILL RECHECK IN "A COUPLE WEEKS". TIMOTHY RECTOR VICKY SIROIS CALLED ON 11/01/2004 TO SAY KIRK ST PETER IS SCHEDULED TO DO ANNUAL INSPECTION WITHIN NEXT 2 WEEKS. BBxgÂ;ÁZÂÂSxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ=à FÂÂKxgxg Á`xg þÿþÿþÿþÿþÿþÿþÿ2SPILL BUCKET REPLACED BY ELWIN SCOTT 9/25/03 -ACFxg Â>Â\ÂÂKxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿ&DAVID BURNS INSPECTOR TIMOTHY RECTORxgÂ?ÁZÂÂSxgxg  xgþÿþÿþÿþÿþÿþÿþÿ PRODUCT PIPE READING: CUxgÂ@ÃQ1ÂÂxgxg  þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂA ÂÂxgxgÂxg Ã,Vþÿþÿþÿþÿþÿþÿ¡LEONARD CARR REPLACED SPILL BUCKETS, REPAIRED OVER-FILL, AND PUT MONITORING SYSTEM ON DEDICATED CIRCUIT 4/16/2003. CP PASSED ANNUAL INSPECTION OF 10/07/2003. BBxf ÂBÃOÂÂxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂCÂX'ÂÂHxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂDÂP@ÂÂSxf xgÂxf þÿþÿþÿþÿþÿþÿþÿþÿxf ÂEÂX0ÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿUCALLED 10/4/04 RE; SCHEDULING BILL CARVER FOR 2005 INSPECTION IN REPONSE TO NOV. -ACFxgÂFÂSTÂÁ"xgxg xfþÿþÿþÿþÿþÿþÿþÿ)INSPECTOR REPLACED SUMP PROBE RAQUEL ROSSxfÂGÃ-_ÂÂxgxgÂxf Ä Dþÿþÿþÿþÿþÿþÿþÿxf ÂHÃ?/ÂÂxgxgÂxgÄ/þÿþÿþÿþÿþÿþÿQPREVIOUSLY FAILING SPILL BUCKETS AND MONITORING SYSTEM PASSED IN 2004 INSPECTION.xf ÂIÂ_ÂÂxgxgÂxf Ä`]þÿþÿþÿþÿþÿþÿ*OVER/SHORTS WERE > 1% ON TANKS 1 AND 3. BBxf ÂJÂÂÂSxgxgÂxg þÿþÿþÿþÿþÿþÿþÿ4ALL TANKS, WITH THE EXCEPTION OF #10, ARE OUT OF SERVICE. CALED KIRK ST. PETER AND REMINDED HIM THAT CP READING FOR THIS TANK IS OVERDUE. HE IS GOING TO RETURN TO THE SITE TO DO A FULL INSPECTION. KIRK ST. PETER SENT IN INSPECTION FOR TANK # 10, INCLUDING PASSING CP READING. INSPECTION PERFORMED 11/18/03.xgÂKÂPTÂÂKxgxgÂxh ÃG3þÿþÿþÿþÿþÿþÿ8CERT OF PROPER INSTALL-DROP TUBE WITH FLAPPER INSTALLED.xf ÂLÂbdÂÁ xgxgÂxf þÿþÿþÿþÿþÿþÿþÿ%VENT WHISTLE IS 10 FEET FROM FILL. BBxf ÂMÃRÂÂxgxgÂxfþÿþÿþÿþÿþÿþÿþÿMTANK #1 DOES NOT HAVE OVERFILL. IT WAS NOT REQUIRED AT TIME OF INSTALLATION.xfÂNÂ" xgxgÂxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂOÂ6\ÂÂ!xgxgÂþÿþÿþÿþÿþÿþÿþÿþÿ?TANK #4 HAS NO VAPOR RECOVERY AND CRASHVALVES ARE NOT ANCHORED.xf ÂPÃRDÂÂ!xgxgÂxhþÿþÿþÿþÿþÿþÿþÿZELECTRONIC OVER-FILL NOT FUNCTIONING. INSPECTION UPDATE SUBMITTED, PERFORMED BY DON BUBARxf ÂQÃOÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ@CP UPGRADE AND FLAPPER VALVE INSTALLATION BY CTI DAVID BEAUMONT.xf ÂRÂXÂÂHxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿ!SUMP ON TANK #6 NOT LIQUID TIGHT.xg ÂTÃGÂÂ)xgxgÂxhþÿþÿþÿþÿþÿþÿþÿ"PASSED PER DAVID BEAUMONT 2/20/04.xgÂUÃ4ÂÂKxgxgÂxfÃ; þÿþÿþÿþÿþÿþÿþÿxfÂVÃ&ÂÂ)xgxgÂxg þÿþÿþÿþÿþÿþÿþÿzTANK # 3 HAS BARE COPPER LINES. PIPING MUST BE REPLACED. BB 61-SO INSTALLED FOR OVERFILL PROTECTION BY DON BUBAR 3/8/04.xg ÂWÃ-EÂÂKxgxgÂþÿÃJ!þÿþÿþÿþÿþÿþÿþÿxfÂXÂ`ÂÁ xgxgÂxgþÿþÿþÿþÿþÿþÿþÿúTANK #6 PROBE CAN NOT BE REMOVED FOR INSPECTION. PIPING SUMP TAKING ON WATER FROM PIPING SECONDARY. 8/4/03 BEAUMONT INSPECTION; REPAIRED RISER TO ALLOW ACCESS TO TANK 6, PIPING SUMP DRY. BEAUMONT SCHEDULED FOR 2005 AI THE WEEK OF OCTOBER 25TH. -ACFxgÂYà *ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ(REPAIRS MADE TO CORRECT BAD SPILL BUCKETxg ÂZÂdÂÂ)xgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxg Â[ÂWÂÂZxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ\ÃbTÂÂZxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ]Ã`"ÂÂAxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ^ÃbÂÂLxgxgÂxg Ä;TYþÿþÿþÿþÿþÿþÿ4JON PAIN PERFORMED INSPECTION AS MANUFACTURER'S REP.xf Â_Â]ÂÂHxgxgÂxh þÿþÿþÿþÿþÿþÿþÿ"TANKS REMOVED SEPTEMBER 2004. -ACFxg Â`ÃJÂÂHxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂaÂ<:ÂÂHxgxgÂxgþÿþÿþÿþÿþÿþÿþÿfSUCTION/RETURN LINES ARE NOT SLEEVED. PIPING MUST BE REPLACED. PIPING REPLACEMENT PERFORMED 7/15/05.xgÂb LÂÂxg xgÂþÿÃþÿþÿþÿþÿþÿþÿþÿxg ÂcÃÂÂ;xgxgÂxhÃ[þÿþÿþÿþÿþÿþÿþÿxgÂdÃ!ÂÂ)xgxgÂþÿÃ'þÿþÿþÿþÿþÿþÿþÿxgÂÃ!ÂÂxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂPÂÂKxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿÍPIPING RUN HAS SUMP MIDWAY ALONG PIPING RUN. SUMP HAS NO MONITOR AND IS CONSTANTLY FULL OF WATER. CHRIS CALLED. HE SAID HE WILL CALL PORTLAND PUMP AND HAVE THEM PERFORM INSPECTION. PP WILL DO IT ASAP. RRxgÂÂÂÂAxg xgÂxg þÿþÿþÿþÿþÿþÿþÿNO THRUPUT RECORDS ON SITE.xg ÂÃb xgxgÂxhþÿþÿþÿþÿþÿþÿþÿ8PER JOHN SIMS, REPAIRS MADE FACILITY NOW IN COMPLIANCE.xg ÂÂ8AÂÂHxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ?SUCTION/RETURN LINES ARE BARE COPPER. PIPING MUST BE REPLACED.xg Ã+ÂÂ.xgxgÂxgà \þÿþÿþÿþÿþÿþÿhELWIN SCOTT INSTALLED VEEDER ROOT TLS 300 ATG, (4) NEW OVERFILLS AND (4) 61- SO DROP TUBES. RAQUEL ROSSxg Â4 ÂÂxgxgÂxf þÿþÿþÿþÿþÿþÿþÿþÿxf  Â1'ÂÂxgxgÂþÿÄ3VEþÿþÿþÿþÿþÿþÿþÿxf  Ã$ÂÂKxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxg Ã:R xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ'$ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxf ÂÂGMÂÂxgxgÂxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂ6ÂÂKxgxgÂþÿÄþÿþÿþÿþÿþÿþÿ›OVERFILL CONTAINERS, LEAK DETECTORS AND DROP TUBES REPLACED 7/24/2003. BELIEVED TO STILL BE FAILING FOR INTERSTITIAL MONITORING AND STAGE 1 VAPOR RECOVERY.xg ÂÂ^ ÂÂAxgxgÂxgþÿþÿþÿþÿþÿþÿþÿNOT KEEPING THRUPUT RECORDS.xgÂÂ">ÂÂxgxg xg Ã<þÿþÿþÿþÿþÿþÿFIXED BY BILL CARVERxg ÂÂ2ÂÂKxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿ=NOT DOING DAILY INVENTORY AT TIME OF INSPECTION. FAILING CP.xg ÂÃNÂÂKxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿNREPORTED ON 4/2/04 THAT UPDATE IS DONE & PASSING; PAPERWORK STILL PENDING -ACFxg 1ÂÂxgxg þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂc=ÂÂBxgxg xg þÿþÿþÿþÿþÿþÿþÿRTANK WAS REMOVED ON 9/12/03. FOR COMPLIANCE PURPOSES, GIVEN PASS DATE OF REMOVAL. xgÂÃbÂÂKxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxg 1ÂÂSxgxg þÿþÿþÿþÿþÿþÿþÿþÿHC.P. NOT CHECKED, CTI PLANNING TO CHECK LATER. TANK READING: NOT CHECKEDxgÂÂ9ÂÂAxgxgÂxgþÿþÿþÿþÿþÿþÿþÿNO THRU-PUT RECORDS.xg AÂÂHxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ"^ÂÂZxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃ6 ÂÂZxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ*ÂÂKxgxgÂþÿÃ(þÿþÿþÿþÿþÿþÿþÿxfÂÂIWÂÂKxgxgÂþÿÃ!Jþÿþÿþÿþÿþÿþÿþÿxf ÂT* xgxgÂxi þÿþÿþÿþÿþÿþÿþÿaCERT OF PROPER INSTALL FOR SPILL BUCKET 10/27/04 RECEIVED INSPECTION UPDATE DATED 02/10/2005. BBxgÂ!à ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"Ã`ÂÂAxg xgÂxgþÿþÿþÿþÿþÿþÿþÿNO THRU-PUT RECORDS.xgÂ#Ã] ÂÂxgxgÂxg Ã.þÿþÿþÿþÿþÿþÿ WHILE REVIEWING FILE FOR 80K ACTION, I FOUND CERT OF PROPER INSTALLATION FROM SIMARDS FOR REPLACING ALL 4 SPILL BUCKETS. THIS PASSES THE 2003 ANNUAL INSPECTION. HOWEVER, THE FACILITY IS STILL IN VIOLATION FOR FAILING TO SUBMIT 2004 ANNUAL INSPECTION. BB 01/04/2005.xgÂ$à ÂÂxgxgÂxg ÃCþÿþÿþÿþÿþÿþÿþÿxfÂ%à ÂÂAxg xgÂxgþÿþÿþÿþÿþÿþÿþÿGFACILITY PASSES PER UPGRADE REGISTRATION, REPAIRS PERFORMED 7/29/03. RRxg Â&ÂQÂÂKxgxgÂxf ÃþÿþÿþÿþÿþÿþÿnANNUAL INSPECTION PERFORMED ON SEPTEMBER 27, 2004. GR ADAMS SCHEDULED TO RETURN TO INSTALL SENSORS. RR 10/1/04xf Â'Â18 xgxgÂxgþÿþÿþÿþÿþÿþÿþÿKINSPECTION UPDATE AND 2004 INSPECTION PERFORMED SIMULTANEOUSLY. RAQUEL ROSSxgÂ(Ãc<ÂÁ xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ) ÂÂSxgxg xgþÿþÿþÿþÿþÿþÿþÿ7TWO "2003" INSPECTIONS PRODUCT PIPE READING: SLEEVED CUxgÂ*ÂÂÂSxgxg þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ+Â!ÂÂSxgxg þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ,ÂÂÂSxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ-Ã@ÂÂSxgxg þÿþÿþÿþÿþÿþÿþÿþÿ PRODUCT PIPE READING: CU - BOTHxgÂ.Ã@ÂÂSxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ/Â&aÂÁ$xgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ0Ã.'ÂÁ$xgxg xgÃ$þÿþÿþÿþÿþÿþÿþÿxgÂ1Â^,ÂÂ!xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ2Â&ÂÂ!xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ3Â& ÂÂ!xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ4Â&ÂÂ!xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ5Â& ÂÂ!xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ6ÂÂÂ!xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ7Â@/ÂÂxgxgÂxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â8ÂÂÂxgxgÂxf þÿþÿþÿþÿþÿþÿþÿþÿxf Â9Ã//ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ:Ã/3ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ;Ã/-ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ<Ã/1ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ=Ã/7ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ>ÂIbÂÂxg xgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ?ÂKÂÂxgxgÂxg þÿþÿþÿþÿþÿþÿþÿDUANE FURGE WAS INSPECTOR. BBxg Â@Ã,PÂÂxgxgÂxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂAÃ5?ÂÂ]xgxgÂxgÃI-þÿþÿþÿþÿþÿþÿþÿxgÂBÃVÂÂ]xgxgÂxgÃ9þÿþÿþÿþÿþÿþÿþÿxgÂCÂ_PÂÂ]xgxgÂxhÃRþÿþÿþÿþÿþÿþÿþÿxgÂDÂSAÂÂ!xgxgÂxg Ã= 6þÿþÿþÿþÿþÿþÿþÿxg ÂE ÂÂ:xgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxg ÂFÃ+GÂÂDxgxgÂxgÄ@þÿþÿþÿþÿþÿþÿþÿxgÂGÂ%FÂÂHxgxgÂþÿÃ9MþÿþÿþÿþÿþÿþÿþÿxgÂHÃ%@ÂÂHxgxgÂxg Ã#_þÿþÿþÿþÿþÿþÿþÿxg ÂIÃ\MÂÂHxgxgÂxg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂJÃ#4ÂÂxgxg xgÃHU:þÿþÿþÿþÿþÿþÿþÿxgÂKÂ& xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂLÂ*ÂÂ:xgxgÂxhÃcTþÿþÿþÿþÿþÿþÿINSPECTION UPDATE SUBMITTEDxgÂMÃT"ÂÁ xgxgÂxgÄJ?þÿþÿþÿþÿþÿþÿþÿxgÂNÁEÂÂKxgxgÂxgÃOþÿþÿþÿþÿþÿþÿþÿxgÂOÃ`2ÂÂ2xgxgÂxgÃ&G"þÿþÿþÿþÿþÿþÿþÿxgÂPÃBÂÂxgxgÂxf Ä2DQþÿþÿþÿþÿþÿþÿþÿxf ÂQÂ(?ÂÂ'xgxgÂxg þÿþÿþÿþÿþÿþÿþÿ>INSPECTION UPDATE MISTAKENLY ENTERED AS INITIAL INSPECTION. BBxg ÂRÂPNÂÂ2xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂSÂFÂÁ"xgxgÂxgÃþÿþÿþÿþÿþÿþÿóTHIS IS LISTED AS A FAIL BECAUSE IT IS NOT A 2003 INSPECTION, NONE WAS SUBMITTED FOR 2003 . THIS IS A 2004 INSPECTION PERFORMED AFTER JULY 1, 2003. IT IS CORRECTLY LISTED AS A PASSING 2004 INSPECTION. T.R. PASSING 2003 ENTERED AFTER THIS ONE.xgÂUÃGDÂÂKxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂVÃ>ÂÂCxgxgÂxg ÃM=þÿþÿþÿþÿþÿþÿþÿxg ÂWÃN  xgxgÁ`xgÃJ0þÿþÿþÿþÿþÿþÿŠSPILL BUCKETS REPLACED AND INTERSTIAL SENSOR RELOCATED TO BOTTOM OF TANK AS A RESULT OF WORK DONE DURING THE INSPECTION. FACILITY PASSES. xgÂXÂP)ÂÂxgxgÁ`xh þÿþÿþÿþÿþÿþÿþÿ‘TANK 2 BEING REPLACED IN SEPTEMBER 2003. TANK 1 MAY BE A GENERATOR TANK. TIMOTHY RECTOR BOTH TANKS REMOVED AND NEW TANK INSTALLED 8/9/2004. BBxgÂYÂ"ÂÂxfxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxfÂ[Ã]T xgxgÂþÿþÿþÿþÿþÿþÿþÿþÿ/WASTE OIL TANK NEEDS TO BE UPGRADED OR REMOVED.xg Â\Â%ÂÂHxgxgÂxg Ã)þÿþÿþÿþÿþÿþÿ&UPDATED INSPECTION ENTERED TR 1/8/2004xgÂ]ÃdSÂÂHxgxgÂþÿà TPþÿþÿþÿþÿþÿþÿHINVENTORY RECORDS NOT BEING RECONCILED MONTHLY AT TIME OF INSPECTION. BBxgÂ^Â9ÂÂ!xgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_ÂUÂÂ!xgxgÂxg Ã_þÿþÿþÿþÿþÿþÿþÿxg Â`Â?"ÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿCNOT KEEPING MONITORING WELL LOG FOR TANK #10 AT TIME OF INSPECTION.xgÂaÂÂÁ$xgxgÂxg Ä)þÿþÿþÿþÿþÿþÿ2ANODES ON FLEX CONNECTORS - ALL PASSED CP TESTING.xg ÂbÂ?ÂÂYxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂcÂ,QÂÂYxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂdÃ5ÂÂYxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃFÂÂxgxgÂxgÃ%þÿþÿþÿþÿþÿþÿþÿxgÂÂ]<ÂÂKxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ9/22/04: OWNER CALLED RE: MASS MAILING NOV. HE HAS CONTRACTED MARK GREENWOOD TO PERFORM THE INSPECTION. RR 9/14/06: OWNER CALLED MARK GREENWOOD TO GET IT DONE. TR 2/27/07 GREENWOOD SAYS AI DONE, WILL FAX. ML 10/12/07 BERT CHAMPA SCHEDULED PORTLAND PUMP TO INSPECT ASAP. -MLxgÂÂÂÁ xgxgÂxgÃJKIþÿþÿþÿþÿþÿþÿXOWNER CALLED 12/2/05, DIDN'T UNDERSTAND SIA VS. AI. WILL GET BEAUMONT OUT ASAP. -ACF xgÂÂ&XÂÂxgxgÂxgà ^þÿþÿþÿþÿþÿþÿþÿxgÂÂRÂÁ xgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxfÂÃÂÂKxgxgÁ`xgÄ "þÿþÿþÿþÿþÿþÿnJEFFREY HANSEN FROM US TANK ALLIANCE PERFORMED THE INSPECTION. THROUGHPUT RECORDS ARE FROM 12/02 THROUGH 5/03.xgÂÃTÂÂLxgxgÂxgà þÿþÿþÿþÿþÿþÿrARTHUR JOHNSON INPECTOR FOR INITIAL INSPECTION 6/24/2003. FAIL. SCOTT CYR INSPECTION UPDATE 7/15/2003. PASS. BBxgÂÂG@ÂÂCxgxgÂxg þÿþÿþÿþÿþÿþÿþÿ.MONITORING WELL WAS DRY AT TIME OF INSPECTION.xg  ÂÂÂHxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿƒVENT PIPING FAILED CP, ALSO STICKING TANK USING WRONG CHART TO DETERMINE DAILY INVENTORY. DOUBLE WALLED TANK DRY ANNULAR SPACE. TRxg Â^ÂÂxgxgÂxg ÄTþÿþÿþÿþÿþÿþÿ™CP ON PREVIOUSLY FAILING TANKS PASSED ON ANNUAL INPSECTION OF 10/07/2003. PREVIOUSLY FAILING SPILL BUCKETS PASSED ON ANNUAL INSPECTION OF 10/07/2003. BBxf  ÂÂÁ xf xgÂþÿþÿþÿþÿþÿþÿþÿþÿMBOTH TANKS AND PIPING WERE INSTALLED 9/27/1991 WITHOUT ELECTRONIC MONITORING.xf   3ÂÂHxf xgÂxg þÿþÿþÿþÿþÿþÿþÿ TANK REMOVEDxf   ÂÂSxf xgÂxgþÿþÿþÿþÿþÿþÿþÿFCP PIPING REPLACED WITH FIBERGLASS ON 05/23/2003 BY KIRK ST PETER. BB xf ÂÂÂÂSxf xgÂxgþÿþÿþÿþÿþÿþÿþÿBCP PIPING REPLACED WITH FIBERGLASS BY KIRK ST PETER ON 05/23/2003.xf ÂÂ2PÂÂSxf xgÂxg ÃC$þÿþÿþÿþÿþÿþÿ&FAILING CP PIPING REPLACED 10/10/2003.xf ÂÃcÂÂSxf xgÂxgþÿþÿþÿþÿþÿþÿþÿTCP PIPING REPLACED WITH FIBERGLASS ON TANKS #3 & #4 BY KIRK ST PETER ON 8/28/2003. xf ÂÃÂÂKxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿw WATER IN WELL?: UNKNOWN NO FLOATING OIL OR SMELL OF OIL?: UNKNOWN SPILL BUCKETS PRESENT?: NO SPILL BUCKET, OFFSET FILLxgÂÂ-5ÂÂKxgxgÁ`xh þÿþÿþÿþÿþÿþÿþÿ"SCOTT CYR O.O.S. INSPECTION UPDATExgÂÂ@ZÂÂxg xg xgþÿþÿþÿþÿþÿþÿþÿLENGTHENED BALL FLOATS TO 90%xgÂÂ/ÂÂxg xg xgÃ$)þÿþÿþÿþÿþÿþÿ"THRUPUT MEASURED FROM AUG-DEC 2002xgÂÃ45ÂÂCxg xg xgÃ@!þÿþÿþÿþÿþÿþÿþÿxgÂÂÂÂ:xgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿ°FACILITY IS LISTED AS OUT OF SERVICE IN THE DATABASE BUT APPEARS, BASED ON THE INSPECTION TO BE IN SERVICE. INSPECTION ITSELF IS INCOMPLETE AND INCONCLUSIVE IN SOME AREAS. TRxg  ÂÂxg xg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÃF1ÂÂCxg xg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂ?ÂÂCxg xg xgÃP6UþÿþÿþÿþÿþÿþÿþÿxgÂÂ2ÂÂxg xg xgÃOþÿþÿþÿþÿþÿþÿþÿxgÂÂX)ÂÂHxg xg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂà ÂÂxg xg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂÂZCÂÂxg xg xgþÿþÿþÿþÿþÿþÿþÿ{MS. FAUCHER CALLED ON 10/27/2004. SIMARDS WILL DO ANNUAL INSPECTION, BUT IT WILL NOT BE BEFORE THE 10/31/2004 DEADLINE. BBxgÂÂX$ÂÂHxg xg xgþÿþÿþÿþÿþÿþÿþÿþÿxg ÃD"ÂÂxg xg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ!ÂOÂÂxg xg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"à LÂÂxg xg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#Â'JÂÂKxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$ÂPÂÂKxgxg xgþÿþÿþÿþÿþÿþÿþÿQINSPECTION DONE 5/2/08 BUT INCOMPLETE - MUST ACCESS VENT WHISTLE. PASSED CP. -MLxgÂ% ÂÂ!xgxg xg Ã%Y"þÿþÿþÿþÿþÿþÿþÿxg Â&ÂL`ÂÂTxgxg xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'ÂN]ÂÂTxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ(ÃPÂÂxgxg xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)ÂcÂÂTxgxg xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â*ÂFÂÂxgxg xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â+ÃQÂÂTxgxg xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â,ÃÂÂxgxg xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â-Â`ÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ.Ã8XÂÂTxgxg xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â/Â0ÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ0Ã"ÂÂxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ1ÃSÂÂTxgxg xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ2Ã'$ÂÂxgxg xg Ãþÿþÿþÿþÿþÿþÿ5INSPECTOR REPAIRED AND REINSTALLED FLAPPER ON TANK #1xg Â3ÂHÂÂxgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿvCERT OF PROPER INSTALL SUBMITTED. INSTALLED NEW LEAK DETECTION CONSOLE. STILL WAITING ON PAPERWORK FOR NEW SENSOR. RR*xgÂ4ÂÂÂHxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ?FACILITY NOT MAINTAINING DAILY INVENTORY AT TIME OF INSPECTION.xgÂ6Â&#ÂÂxgxgÁ`xg Ã"JþÿþÿþÿþÿþÿþÿþÿxgÂ7ÂRIÂÂHxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ/A.L. DOGGETT, INC. REMOVED TANK 8/23/2003 -ACFxg Â9ÂBaÂÂxgxgÁ`xgÃA$bþÿþÿþÿþÿþÿþÿþÿxgÂ:Ã4WÂÂTxgxgÁ`xhþÿþÿþÿþÿþÿþÿþÿIPLANNED FOR REMOVAL AND REPLACEMENT, SUMMER 04 -ACF REMOVED 7/16/2004 TEDxg Â;Ã!ÂÂTxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ<ÃQÂÂCxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ=Â(?ÂÂNxgxgÁ`xg Ä*Pþÿþÿþÿþÿþÿþÿ/INSPECTION UPDATE OF 7/11/2003 BY SCOTT CYR. BBxgÂ>Ã-&ÂÂNxgxgÁ`xgÄ'\þÿþÿþÿþÿþÿþÿ4REPLACED AND REPAIRED ALL DEFICINCIES PER SCOTT CYR.xgÂ?Ã`3ÂÂKxgxgÁ`xgÄ>)þÿþÿþÿþÿþÿþÿþÿxgÂ@ÂTÂÂ:xgxgÁ`xg Ãþÿþÿþÿþÿþÿþÿþÿxg ÂAÃH]ÂÂ:xgxgÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂBÂ5ÂÂ:xgxgÁ`xg Ã'C;þÿþÿþÿþÿþÿþÿþÿxg ÂCÃ'ÂÂ:xgxgÁ`xgÃ<þÿþÿþÿþÿþÿþÿþÿxgÂDÃD$ÂÂ:xgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂEÂ%ÂÂ:xgxgÁ`xgÃ`M^þÿþÿþÿþÿþÿþÿþÿxgÂFÂ.ÂÂ:xgxgÁ`xg Ã8P4þÿþÿþÿþÿþÿþÿþÿxg ÂGÃ`aÂÂ:xgxgÁ`xg Ã`M^þÿþÿþÿþÿþÿþÿþÿxg ÂHÃ(FÂÂ:xgxgÁ`xgÃ-*1þÿþÿþÿþÿþÿþÿþÿxgÂIÃ]ÂÂ:xgxgÁ`xg ÃC ,þÿþÿþÿþÿþÿþÿþÿxg ÂJÂ^:ÂÂCxg xg Á`xgÄþÿþÿþÿþÿþÿþÿþÿxgÂKÂ5ÂÂ:xgxg Á`xg Ã+B&þÿþÿþÿþÿþÿþÿþÿxg ÂLÂ*ÂÂ:xg xg Á`xgÃX3þÿþÿþÿþÿþÿþÿþÿxgÂMÂAÂÂxg xg Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂNÃ'"ÂÂxgxg Á`þÿÃGþÿþÿþÿþÿþÿþÿþÿxgÂOÃIÂÂxgxg Á`xgÃ2XþÿþÿþÿþÿþÿþÿþÿxgÂPÃPÂÂKxgxg Á`xg Ã*Xbþÿþÿþÿþÿþÿþÿ/INSPECTION UPDATE OF 7/11/2003 BY SCOTT CYR. BBxgÂQÂ(KÂÂKxgxg Á`xh Ã)&þÿþÿþÿþÿþÿþÿvORIGINAL INSPECTION BY FRANCIS DRYSLEWSKI. FOLOW UP INSPECTION BY SCOTT CYR. TANK READING: IMPRESSED CURRENT SYSTEMxgÂRÂ(AÂÂNxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿÚRECEIVED INSPECTION UPDATE OF 7/11/2003 ADDRESSING ALL VIOLATIONS EXCEPT FOR CP. CP UPGRADE SCHEDULED FOR END OF JULY 2003. BB RECEIVED INSPECTION UPDATE BY SCOTT CYR. REPAIRS TO CP WERE MADE, FACILITY NOW PASSING. RRxgÂSà (ÂÂNxgxg Á`xgÄK6þÿþÿþÿþÿþÿþÿ5SCOTT CYR PASSED ON UPDATE INSPECTION 7/23/2003 - ACFxgÂTÂ?4ÂÂCxg xg Á`xgÃ@ FþÿþÿþÿþÿþÿþÿþÿxgÂUÂ?ÂÂCxg xg Á`xgÃ?-þÿþÿþÿþÿþÿþÿþÿxgÂVÃ4SÂÂNxgxg Á`xg Ä"þÿþÿþÿþÿþÿþÿ/INSPECTION UPDATE OF 7/11/2003 BY SCOTT CYR. BBxgÂWÂX+ÂÂHxg xg Á`xhþÿþÿþÿþÿþÿþÿþÿ§TANK WAS INSTALLED IN 1989? MAJOR FAIL IS ACTUALLY INABILITY TO CHECK CP. OWNER INTENDS TO REPLACE WITH ABOVEGROUND NEXT YEAR. SEE FILE FOR LETTER TS TANK REMOVED RRxgÂXÃPÂÂxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿINTERSTITIAL MONITORING FAILEDxg ÂYÃ]ÂÂxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿyOVERFILL DEVICES NOT WORKING PROPERLY. 6/28/05: CERT OF PROPER INSTALL FOR OMNTEC LPD-3 FOR INTERSTITIAL AND PIPING SUMPxgÂZÃ9ÂÂxgxg Á`xg þÿþÿþÿþÿþÿþÿþÿDCOMPLIANCE INSPECTION OF 09/08/2003 VERIFIED REPAIRS TO FACILITY. BBxgÂ[Ã9ÂÂTxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ\Ã*ÂÂTxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ]Ã"ÂÂxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxg Â^ÃU.ÂÂxg xg Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ_Â@ÂÂTxg xg Á`xhþÿþÿþÿþÿþÿþÿþÿ›SCHEDULED PMI FOR REPAIRS ON 7/10/04 ACF REPAIRS DONE PER TONY COUTURE. INSTALLED OMNTEC TANK ABD SUMP MONITOR. ALSO INSTALLED HIGH LEVEL ELECTRONIC ALARMxgÂ`Â? ÂÁ$xgxgÁ`xgÃþÿþÿþÿþÿþÿþÿþÿxgÂaÃ\ÂÂxg xgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂbÂ?ÂÂxg xgÁ`xgÄ/Q`þÿþÿþÿþÿþÿþÿþÿxgÂcÂ@PÂÂxg xgÁ`xgÄYþÿþÿþÿþÿþÿþÿþÿxgÂdÂ@ÂÂTxg xgÁ`þÿþÿþÿþÿþÿþÿþÿþÿ(SCHEDULED PMI FOR REPAIRS ON 7/10/04 ACFxg Ã.ÂÂTxg xgÁ`þÿþÿþÿþÿþÿþÿþÿþÿ(SCHEDULED PMI FOR REPAIRS ON 7/10/04 ACFxg ÃÂÂ:xg xgÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg  Â,ÂÂKxg xgÁ`xgþÿþÿþÿþÿþÿþÿþÿNINSPECTION UPDATE 07/02/2003. INSTALLED FLAPPER. NOW DOING GW MONITORING. BBxg ÂRaÂÂHxg xgÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxg Ã-bÂÂSxg xgÁ`xhþÿþÿþÿþÿþÿþÿþÿREMOVEDxg ÃBÂÂBxg xgÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxg Ã`?ÂÂBxg xgÁ`xi þÿþÿþÿþÿþÿþÿþÿ-CERT OF PROPER INSTALL- OMNTEC OVERFILL ALARMxg  Â0 xgxgÂþÿþÿþÿþÿþÿþÿþÿþÿ~NO ACCESS TO INTERSTITIAL PROBE. FAILING CP. CP UPGRADE ON 11/05/2004. DEPT. DID NOT RECEIVE PAPERWORK UNTIL 11/01/2005. BBxg ÂE>ÂÂxgxgÂxgÃ:þÿþÿþÿþÿþÿþÿþÿxg Ã/ÂÂOxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxg ÂÂÂOxgxgÂxgþÿþÿþÿþÿþÿþÿþÿyGEORGE ERSKINE IS SCHEDULED TO PERFORM INSPECTION OF THIS FACILITY ON SEPTEMBER 29. OWNER CALLED TO NOTIFY US. RR 9/23/04xg ÂGÂÂTxgxgÂxgþÿþÿþÿþÿþÿþÿþÿþÿxg Â* ÂÂxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxg ÃLÂÂxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ:NOT DOING GROUNDWATER MONITORING AT TIME OF INSPECTION. BBxg Ã#ÂÂBxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxg Ã<ÂÂBxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿ6UNABLE TO REMOVE INTERSTITIAL PROBE FOR INSPECTION. BBxg ÃQÂÂBxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxg Ã5ÂÂBxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxg Ã9ÂÂBxgxgÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxg Â/ZÂÂ!xgxgÂþÿþÿþÿþÿþÿþÿþÿþÿ4FEDERAL FACILITY. REPAIRS MUST GO OUT FOR BID. BB xf  ÃJAÂÂKxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ‚INSPECTOR FAILED FOR NO OVER-FILL AND NO ELECTRONIC LEAK DETECTION ON PIPING. NEITHER REQUIRED AT TIME OF INSTALLATION (1990). BBxg ÃK1ÂÂHxgxgÂxgþÿþÿþÿþÿþÿþÿþÿ1UNABLE TO INSPECT VENT WHISTLE FOR INSPECTION. BBxg  JÂÂHxgxgÂxh þÿþÿþÿþÿþÿþÿþÿBCITY OF S. PORTLAND IS PLANNING ON REMOVING THE TANK. TR 11/20/03xg Â%4ÂÂHxgxgÂxgþÿþÿþÿþÿþÿþÿþÿšINPECTOR FAILED FACILITY FOR WATER IN PIPING SUMP. POSSIBLY A FAULTY GASKET. BB RECEIVED INSPECTION UPDATE DATED 8/22/03. REPAIRS TO SUMP WERE MADE. BBxg ÂFþÿþÿþÿþÿþÿþÿþÿxg 4ÂD* xgxgÁ`xgÃ]O5þÿþÿþÿþÿþÿþÿ=REPAIRS MADE TO BRING INTO COMPLIANCE AT TIME OF INSPECTION.xg 5Â$GÂÂxg xg Á`xg ÄJþÿþÿþÿþÿþÿþÿþÿxg  6ÂÂÂLxg xg Âxg þÿþÿþÿþÿþÿþÿþÿCARL DOUGHERTY WAS INSPECTOR.xg  7 ÂÂKxg xg Âxfà Uþÿþÿþÿþÿþÿþÿþÿxf 8 ÂÁ2xg xg Âxgþÿþÿþÿþÿþÿþÿþÿþÿxg 9Â"EÂÁQxg xg Âxfþÿþÿþÿþÿþÿþÿþÿþÿxf :ÂÂÁUxg xg Âxf Ä,Z+þÿþÿþÿþÿþÿþÿþÿxf  ;Ã^ÂÂDxg xg  xgÃ_9 þÿþÿþÿþÿþÿþÿÒTANK # 4 (#2 FUEL OIL) AND # 5 (KERO) FAILED DAILY INVENTORY TEST. CLEANED TANK PROBE. INSPECTOR NOTED NEEDS NO SMOKING AND STOP ENGINE SIGNS, NEEDS GUTTERS ADDED TO COLUMN DRAINS TO KEEP WATER FROM DISPENSERS.xf <Â\ÂÂYxg xg  xgþÿþÿþÿþÿþÿþÿþÿ!CLEANED AND PAINTED SPILL BUCKETSxg =Ã.ÂÂYxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿlDIESEL TANK IS OUT OF SERVICE, DRAINED TO 1" PRODUCT BUT NOT SECURED, O.K. BECAUSE FACILITY IS STILL ACTIVE.xg >ÂbÂÂKxgxg Á`xgþÿþÿþÿþÿþÿþÿþÿWINSPECTOR IS STEVE VEAYO. HE IS ALSO THE TANK OWNER/OPERATOR.THIS IS THE LAST TIME HE CAN INSPECT HIS OWN FACILITY. INSPECTION IS MARKED AS BEING AN UPDATE, NO DATE FOR ORIGINAL FILING. SPOKE TO STEVE VEAYO. HE IS TRYING TO CONTRACT MIKE ARBOUR TO DO INSPECTION. WILL CALL BACK WITH INSPECTION DATE IF LATER THAN DATE GIVEN ON NOV. RR 9/30/04xg ?ÂcÂÂLxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿzFACILITY INSPECTED BY CARL DOUGHERTY WHO IS A CP SPECIALIST. HE IS NOT CURRENTLY ON THE LIST OF INSPECTORS OR INSTALLERS. xg  @Ã4aÂÂxg xg Á`xgÃ2þÿþÿþÿþÿþÿþÿþÿxgÂ)OÃ=ÂÂxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿTANKS WERE REMOVEDxh Â)PÂ4ÂÂxh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ)QÃY ÂÂKxf xh þÿÃ=þÿþÿþÿþÿþÿþÿsTHIS INSPECTION WAS ENTERED ON 2/17/04. FOUND IN BOB WILLIAMS OLD ENFORCEMENT FILES AND NOT PREVIOUSLY ENTERED. RRxf Â)RÂOÂÂKxf xh xgþÿþÿþÿþÿþÿþÿþÿTHIS INSPECTION ENTERED 2/18/04. FOUND IN BOB WILLIAMS' OLD ENFORCEMENT FILES. RR FILE REVIEW SIGNIFIES THAT REPAIRS WERE MADE BY 2/3/2003. RRxf Â)SÂ4ÂÂbxhxh xgþÿþÿþÿþÿþÿþÿþÿmTHIS TANK IS PLANNED FOR REMOVAL IN THE SPRING, PER CONVERSATION WITH MAINTENANCE DIRECTOR, JIM L'HEUREUX. RRxgÂ)TÃ4PÂÂOxh xhÂ(xgþÿþÿþÿþÿþÿþÿþÿREPORT SUBMITTED 2/13/04 - ACFxgÂ)UÃa>ÂÂxhxh xhÃ.cþÿþÿþÿþÿþÿþÿþÿxhÂ)VÂ:RÂÂYxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿºTANK IS CURRENTLY NOT IN USE, AND THERE IS NO POWER TO THE LEAK DETECTION SYSTEM. 15.5 INCHES OF PRODUCT STILL IN TANK. OWNER EITHER HAS TO DRAIN TANK OR PROVIDE POWER TO MONITORING SYSTEM. BB RECEIVED CALL FROM STEPHEN NOVAK ON 9/29/2004. IRA DODGE HAS MADE REPAIRS AND WILL SEND IN UPDATED INSPECTION. PROPERTY HAS BEEN SOLD TO MR. NOVAK'S DAUGHTER; DIANE MACNUMEE. FAXED HER A CHANGE OF OWNERSHIP FORM. HER PHONE # IS 472-0780. BB xhÂ)XÃY ÂÂ4xhxh xhà JþÿþÿþÿþÿþÿþÿþÿxhÂ)YÃ\RÂÂ4xhxh xhà ;MþÿþÿþÿþÿþÿþÿþÿxhÂ)ZÂW!ÂÂ4xhxh xhþÿþÿþÿþÿþÿþÿþÿ,CTI IS ED GEORGE, NOT TODD LAVALLEE. -- DMCLxhÂ)[ÂT4ÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ)\ÃJ9 xhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxg Â)]ÂWÂÂxhxh xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â)^ÃKIÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿL2/6/08 DAVE MCGOWAN WILL SCHEDULE AI W/CARVER. JOHN, FATHER, DECEASED. -MLxh Â)_ÂJ"ÂÂxhxhÁ`þÿÃ$0dþÿþÿþÿþÿþÿþÿ‡SOME PARTS COULDN'T BE INSPECTED DUE TO ICE AND SNOW AND PARTS FROZEN. SIMARD WILL REINSPECT IN SPRING 2004. SPILL BUCKETS RUSTED OUT. xh Â)`Ã-ÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿÈUNABLE TO CHECK COPPER PIPING TO SEE IF PROPERLY SLEEVED. INSPECTOR FAILED SITE AND WILL RETURN ON THE SPRING TO INSPECT THE PIPING TO BE SURE IT IS PROPERLY SLEEVED. OVERFILL WORKS, TANK IS PRE 1991.xh Â)aÂ- xhxh xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)bÂEÂÂLxhxhÁcxhÃ'0þÿþÿþÿþÿþÿþÿþÿxhÂ)cÃ:O xhxhÁcxhÄ;þÿþÿþÿþÿþÿþÿþÿxhÂ)dÂd xhxhÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*Ã, xhxhÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*ÃHÂÂCxhxhÁcxfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ*Ã+,ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*Â* xhxhÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*àxhxhÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*Â$\ xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*ÃE xhxhÁcxg Ã$þÿþÿþÿþÿþÿþÿþÿxg Â* W xhxhÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*  xhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â* ÃZ: xhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â* Â3: xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ* ÃPÂÁ xhxhÁcxg ÃQþÿþÿþÿþÿþÿþÿXTHIS SHOULD BE A 2004 INSPECTION, NOT 2003!!! SOMEONE ENTERED INFORMATION INCORRECTLY RRxg Â* Â%0ÂÁ xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*ÃFÂÂxhxhÁcxgþÿþÿþÿþÿþÿþÿþÿ†LETTER TO FOLLOW UP PHONE CALL. TANK IS OOS AND BEING REMOVED SPRING/SUMMER 2009. THEY WILL NOT SUBMIT AN AI FOR THE OOS TANK. THESE CURRENT OWNERS HAVE NEVER USED THIS TANK. LETTER FROM JANE MALONE IN THE TANK REG FILE. TR 12/2/08 ADAMS PETROLEUM IS DOING AN INSPECTION 10/8/09, RECOMMENDED SHE GET THEM TO GIVE HER A REMOVAL PRICE. TR 9/30/09xgÂ*Â$AÂÂxhxhÁcxhÃ2þÿþÿþÿþÿþÿþÿ«SIDE NOTE: ORIGINAL INSTALLER FOR TANKS 2 AND 3 IS UNKNOWN. ORIGINAL INSTALLER FOR TANK 4 IS ELWIN SCOTT. UNABLE TO CORRECT THIS INFORMATION IN DATABASE AT THIS TIME. BBxhÂ*ÃBÂÂxhxhÁcxg Ä!&þÿþÿþÿþÿþÿþÿþÿxg Â*ÂM9ÂÂxhxhÁcxg Ã/(Aþÿþÿþÿþÿþÿþÿþÿxg Â*Ã5 xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*Â&OÂÂTxhxhÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*Ã+ÂÂ.xhxhÁcxg à \þÿþÿþÿþÿþÿþÿþÿxg Â*ÃG xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*ÂVÂÂ4xhxhÁcxh ÃJþÿþÿþÿþÿþÿþÿþÿxh Â*Â%VÂÂ4xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*ÃNÂÂ4xhxhÁcxh Ã"3?þÿþÿþÿþÿþÿþÿþÿxh Â*Â-%ÂÂ4xhxhÁcxh ÃI?þÿþÿþÿþÿþÿþÿþÿxh Â* ÂÂGxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â*Â'ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*Ã.LÂÂ4xhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿNO SPACERS BETWEEN LINES.xh Â*ÃYDÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ/UNABLE TO ACCESS PIPING UNDER DISPENSER ISLAND.xhÂ*Ã;ÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿmINSPECTION IS DATED 1/7/03, IT MAY ACTUALLY BE 1/7/04. WORK TO CORRECT PROBLEMS IS SUPPOSED TO BE SCHEDULED. xgÂ*ÃÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ¨FIRST INSPECTION HAS A DATE OF 02/04/2003 INSPECTION UPDATE HAS A DATE OF 03/10/2004 2003 INSPECTION MAY BE INCORRECT. OWNER IS CHECKING IF IT SHOULD HAVE BEEN A 2004xgÂ* Â- ÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â*!ÃEÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â*"ÃBÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â*#ÂGÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*$Â%ÂÂ4xhxh xh Ãþÿþÿþÿþÿþÿþÿþÿxh ÂÂbXÂÁxf xgÂxg þÿþÿþÿþÿþÿþÿþÿ)TANK WAS REMOVED, PAPERWORK SUBMITTED. RRxf Â*%ÂÂÂxhxh xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*&Â!ÂÂxhxh þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*'ÂÂÂxhxh xh þÿþÿþÿþÿþÿþÿþÿ~INSPECTOR REMOVED 12-15 GALLONS OF OIL FROM LOWER PIPING SUMP CAUSED BY LEAK IN PIPING. REPAIRS BY JOHN SIMS, TANKS UNLIMITEDxgÂ*( IÂÂxhxh þÿþÿþÿþÿþÿþÿþÿþÿPINSPECTOR UNABLE TO REMOVE BALL FLOAT- REMOVAL BAR EITHER BROKEN OR RUSTED AWAY.xgÂ*)ÃGVÂÂxhxh xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ**Â.0ÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*+Ã.ÂÂ4xhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿœCP ALL MARKED AS FAILED, SOME MAY HAVE PASSED, GROUND WAS FROZEN AT TIME OF INSPECTION. PRODUCT PIPE READING: GROUND FROZEN VENT PIPE READING: GROUND FROZENxhÂ*,ÃV3ÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*-ÃV4ÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂSÃY6ÂÂ)xgxgÂxhÃ!\þÿþÿþÿþÿþÿþÿ˜UNABLE TO REMOVE FLAPPER ON CHAMBER #2 TO INSPECT. DON BUBAR CALLED 3/3/2004, HE IS ON SITE AT HOWARDS MARKET REPLACING DROP TUBE. FACILITY NOW PASSES.xgÂ*.Á%ÂÂLxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*/Â$ xhxhÁ`xhÄþÿþÿþÿþÿþÿþÿþÿxhÂ*0Â=VÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ>TANKS OUT OF SERVICE. TIGHTNESS TEST PERFORMED SEPTEMBER 2003.xhÂ*1Â;RÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ/OUT OF SERVICE. TANKS TIGHTNESS TESTED IN 2003.xhÂ*2ÃÂÂLxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*3Ã>ÂÂLxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿNOTE:THIS IS AN AST IN A VAULT.xh Â*4Â&ÂÁ xhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ!RE-TEST IN SPRING, GROUND FROZEN.xhÂ*5Â+ÂÂKxhxh xhþÿþÿþÿþÿþÿþÿþÿZOWNER CALLED 12/2/05, INSPECTION DONE, PP DIDN'T SUBMIT. -ACF SPOKE TO DAVID FORTIN ON 3/3/04. HE SAID PORTLAND PUMP PERFORMED INSPECTION IN MAY, BUT LOST THE PAPERWORK. PP RETURNED IN FEBRUARY, REDID THE INSPECTION, AND THE CP FAILED DUE TO FROZEN GROUND. THEY WILL CALL PP IN THE SPRING TO HAVE THE CP RETESTED ONCE THE GROUND IS THAWED. RRxhÂ*6Â(ÂÁ xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂKÂ=,ÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿTANK REMOVED NOVEMBER 2003. RRxgÂ*7Ã! xhxhÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ*8ÃÂÂLxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿzINSPECTED BY MANUFACTURER CERTIFIED JEFFERY HANSON INTERSTITIAL MONITORING ON PIPING AND DI NOT INSPECTED/INCOMPLETE -ACF xgÂ*9àxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*:Ã, xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*;Ã.ÂÂZxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ1 TANK FAILING CP.xg Â*<ÃR0ÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿe ELECTRONIC HIGH LEVEL ALARM SET AT 90% FULL LEVEL?: HAD FAILED12/29/03, REPAIRS MADE WORKING 2/13/04xh Â*=ÃW_ÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ` SENSORS ARE FUNCTIONING PROPERLY?: SENSOR ON TANK 1 REPLACED, DEFECTIVE 12/23/03,PASSED 2/13/04xh Â*>Ã/SÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ¥ MONTORING CONSOLE IS FULLY OPERATIONAL?: NOT OPERATING 12/24/03, REPAIRED PASSED 2/13/04 SENSORS ARE FUNCTIONING PROPERLY?: NOT OPERATING 12/24/03, REPAIRED 2/13/04xh Â*?àxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â*@ÂYÂÂUxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â%ÂþÿþÿþÿþÿþÿþÿþÿxhÂ*NÂB?ÂÁRxhxh Á`xf Ãþÿþÿþÿþÿþÿþÿþÿxf Â*OÃ.ÂÂKxhxh Á`xh ÂcAþÿþÿþÿþÿþÿþÿþÿxh Â*PÃ1ÂÂxhxh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â*QÃÂÂxhxh Á`xhÃI(þÿþÿþÿþÿþÿþÿþÿxhÂ*RÂP\ÂÂxhxh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*SÃ5\ xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿV PRODUCT PIPING CAPPED? PUMPS AND MANWAYS SECURE?: DISPENSERS REMOVED NO ELECTRICITY.xhÂLà ÂÂYxgxg Á`þÿþÿþÿþÿþÿþÿþÿþÿ’CALL FROM IRA DODGE 3/15/04. REPAIRS BEING MADE IN MAY 2004, REPLACING SPILL BUCKET AND ANODES IN MAY 2004 WHEN EVER THE GROUND IS THAWED OUT. TRxgÂ*TÂÂÂ)xhxhÁ`xhà QþÿþÿþÿþÿþÿþÿþÿxhÂ*UÃZPÂÂ)xhxhÁ`xhÃQþÿþÿþÿþÿþÿþÿþÿxhÂ*VÂ5 xhxhÁ`xhÄ9PZþÿþÿþÿþÿþÿþÿþÿxhÂ*WÃÂÂ4xhxhÁ`xhà þÿþÿþÿþÿþÿþÿþÿxhÂ*XÂGÂÂxhxhÁ`þÿÃ0dþÿþÿþÿþÿþÿþÿþÿxhÂ*YÃTÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿCP TESTED PASSED.xhÂ*ZÂ7XÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*[ÃKÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*\Â3QÂÂKxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*]ÂÂÂAxhxhÁcxhÃ" þÿþÿþÿþÿþÿþÿþÿxhÂ*^ÂRÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ*_Â+ÂÂxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â*`ÂW ÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*aÃ]6ÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*bÂWÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*cÂWÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â*dÂWÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂOÂNÂÂTxgxg  xgþÿþÿþÿþÿþÿþÿþÿNTONY COUTURE REPLACED SENSORS AND ILS-350 UNIT TO BRING UP TO PASSING 11/4/03.xgÂ+à -ÂÂHxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxg Â+Â]ÂÂHxh xhÁ`xh þÿþÿþÿþÿþÿþÿþÿzCOPPER LINES SLEEVED NOT ISOLATED FROM EACH OTHER, 4 IN ONE PLASTIC SLEEVE. INSPECTOR INDICATES COULDN'T DO CP TEST, TANK IS NOT CP PROTECTED. MIKE LEWIS CALLED AND SAID THAT THE REMOTE FILL PASSED THE CP TEST. WILL SEND IN INSPECTION UPDATE ACCORDINGLY. THIS WILL TAKE CARE OF THE FACILITIES ANNUAL INSPECTION VIOLATIONS. RR 9/30/04 10/16 REC'D INSPECTION UPDATE, PASSING. TRxhÂ+Â_ÂÂHxh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿxCP FAILED DUE TO FROZEN GROUND. CP NOW PASSES PER MIKE LEWIS. READINGS OVER THE TANK ARE AS FOLLOWS: -.86, -.856, -.881.xhÂ+ÂYÂÂHxh xhÁ`þÿþÿþÿþÿþÿþÿþÿþÿFROZEN GROUND CAN'T TEST CP. TESTED STILL FAILS. MIKE LEWIS RETESTING CP. IF IT FAILS, FACILITY WILL CONTRACT FOR REPAIRS. FIRST FAIL FATE WAS 4/19/04. THEY HAVE 160 DAYS FORM THAT DATE TO DO REPAIRS, DESPITE MASS MAILING NOV THAT ONLY GAVE THEM UNTIL OCTOBER 31, 2004. RR 9/30/04xhÂ+ÂZÂÂHxh xhÁ`xh þÿþÿþÿþÿþÿþÿþÿÜCOPPER PIPING MAY NOT HAVE SPACERS, IS CONTAINED. SENSORS ARE FUNCTIONING PROPERLY?: PIPING SUMP SENSOR REPAIRED DURING INSPECTION. NO WATER IN SUMPS OR INTERSTITIAL SPACE?: SUMP HAD WATER, BOOTS MAY NOT BE LIQUID TIGHT.xhÂ+à + xh xhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â+Ã# xh xhÁ`þÿþÿþÿþÿþÿþÿþÿþÿSW FIBERGLASS TANK, NO MONITORING WELLS, NO ACCESS TO OVERFILL, NO SPILL CONTAINMENT, INSPECTOR ALSO NOTES BARE COPPER LINES BURIED IN CONCRETE.xg Â+Â< xh xhÁ`þÿþÿþÿþÿþÿþÿþÿþÿä1984 INSTALL, SW FIBERGLASS TANK, NO MONITORING WELLS, NO SPILL BUCKETS, OVERFILL NO ACCESS, BARE COPPER IN CONCRETE FLOOR, ALSO NOTE ON 2002 INSPECTION INDICATES BLACK IRON PIPING IN TRENCH AND FLOOR OF BOILER ROOM IS RUSTING. xg Â+ ÂX  xh xhÁ`xgþÿþÿþÿþÿþÿþÿþÿFBALL FLOAT VENT REPLACED BY FLAPPER, PRODUCT CHEGED IN #2 OIL IN 2003.xgÂ+ Â< xh xhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â+ Ã3O xh xhÁ`xg þÿþÿþÿþÿþÿþÿþÿCOPPER PIPING NOT ISOLATED.xg Â+ Ã- xh xhÁ`xg þÿþÿþÿþÿþÿþÿþÿ"NO ISOLATION BETWEEN COPPER LINES.xg Â+ Â9ÂÂxh xhÁ`þÿþÿþÿþÿþÿþÿþÿþÿFAILED CP DUE TO FROZEN GROUNDxhÂ+Ã%ZÂÂ4xh xhÁ`xhà þÿþÿþÿþÿþÿþÿINTERSTIAL SENSOR WIRE BROKEN DUE TO ICE IN CONDUIT, OWNER WILL MANUALLY CHECK INTERSTICE UNTIL SPRING WHEN AL DOGGETT WILL RETURN TO MAKE REPAIRS. PAUL BOSSE SUBMITTED ON 01/11/2005 AN INSPECTION UPDATE FOR REPAIRS COMPLETED ON 04/20/2004. (FACILITY WAS ON SHUTDOWN LIST) BBxhÂ+ÂYUÂÂZxhxhÂxhþÿþÿþÿþÿþÿþÿþÿARECEIVED COMPLETE AND PASSING INSPECTION REPORT ON 03/18/2004. BBxhÂ+Âd( xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+ÃJ? xhxhÁ`xhÃEAþÿþÿþÿþÿþÿþÿþÿxhÂ+Â/ÂÂ4xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+Â9:ÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+Â5(ÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â+Ã] ÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+Ã]ÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+ÂÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+ÂÂÂ;xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿSFACILITY IS AND HAS BEEN OUT OF SERVICE FOR QUITE A WHILE. DEP INSPECTION IN 2003. xhÂ+ÃbMÂÂYxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â+Ã5!ÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+ÂQÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+Ã/ÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ`INSPECTOR UNABLE TO DETERMINE IS SPACERS EXIST BETWEEN COPPER LINES, THEY ARE PROPERLY SLEEVED. xh Â+ÃÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+ÂP> xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ©61-SO HAS BEEN INSTALLED APPARENTLY. REGISTRATION RECORD NOT REVIEWED AT THIS TIME. CERT OF PROPER INSTALLATION SENT 3/16/04 VERIFYING THAT 61-SO HAS BEEN INSTALLED. RRxhÂ+Âd< xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ§61-SO HAS APPARENTLY BEEN INSTALLED, REGISTRATION FILE NOT REVIEWED AT THIS TIME. CERT OF PROPER INSTALLATION SENT 3/16/04 VERIFYING THAT 61-SO HAS BEEN INSTALLED. RRxhÂ+ ÂZcÂÂHxhxh þÿþÿþÿþÿþÿþÿþÿþÿ•COPPER PIPING FROM TANK TO BOILER ROOM NOT SLEEVED. ISSUED NOV. PER DOUR DORING, TANK WILL BE REMOVED JULY 2004. TANK PLANNED FOR REMOVAL 7/28/04 RRxhÂ+!Â6ÂÂKxhxhÁ`xhÄ 4þÿþÿþÿþÿþÿþÿþÿxhÂ+"Â^\ÂÂKxhxhÁ`xh Ãþÿþÿþÿþÿþÿþÿþÿxh Â+#Â9ÂÂKxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â+$Ã\8ÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ^RUSTED BOLTS FROM PRIOR INSPECTION DRILLED OUT AND REPLACED. ALL EQUIPMENT CHECKED AND PASSED.xh Â+%ÃGFÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿµPVC RISERS OFF INTERSTICE, BEING REPLACED WITH STEEL. ON MARCH 30, 2004, MIKE SIMARD REPLACED DAMAGED PVC RISERS WITH STEEL INTERSTITIAL RISERS. REMOVED WATER AND RESET ALARMS. BBxhÂ+&à IÂÁ=xh xhÁ_þÿþÿþÿþÿþÿþÿþÿþÿçOUT OF SERVICE NOW WITH OPERATER LEAVING. 7/13/04 -- NO CP TEST WAS DONE AT 10/21/2003 INSPECTION SO C.P. FAILS FOR ALL TANKS -- DMCL DEL CALLED. 2004 PASSING INSPECTION HAS BEEN DONE. INSTALLER WILL SUBMIT IT SHORTLY. 9/22/04 RRxg Â+'ÃcÂÁ xhxhÁ_xh þÿþÿþÿþÿþÿþÿþÿ‘TANK 5-1 OOS IT HAD A ABOVEGROUND LINE RUNNING FROM ONE DISPENSER TO THE OTHER. DISCONNECTED BECAUSE IT DID NOT HAVE A CRASH VALVE AS REQUIRED.xh Â+(ÂK[ÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+)Ã#AÂÂxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â+*ÂP[ÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â++ÂXÂÂLxhxhÁ`xhà Rþÿþÿþÿþÿþÿþÿ! PRODUCT PIPE READING: FIBERGLASSxhÂ+,Â)DÂÁ xhxhÁ`xi þÿþÿþÿþÿþÿþÿþÿTANK #3 REMOVED 10/05/05. -ACFxg Â+-ÂDÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+.ÂEYÂÂxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂÃ5<ÂÂ)xgxgÂxhÃ[þÿþÿþÿþÿþÿþÿSPOKE TO BARBARA AT NORTH WHITEFIELD SUPERETTE. BILL CARVER PERFORMED AN INSPECTION ABOUT A MONTH AGO THAT WAS PASSING, BUT HE IS ON VACATION AND THEY HAVE NOT YET RECEIVED IT. SHE WILL SEND THE INSPECTION IN ASAP. RR BIL CARVER PASSED 61-SO'S 3/5/04. TRxgÂ+/Ã`ÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿNEW 61-SO INSTALLED xh Â+0ÂDÂÂ4xhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â+1ÃCÂÂRxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â+2Ã!]ÂÂRxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â+3ÂTIÂÂYxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+4Â\ÂÂYxhxh xhþÿþÿþÿþÿþÿþÿþÿ«IRA DODGE REPLACED FAULTY SENSOR ON 4/7/2004. SPILL BUCKET VIOLATION IS STILL NOT RESOLVED. BB CERT OF PROPER INSTALL SUBMITTED FOR SPILL BUCKET. FACILITY NOW PASSES. RRxhÂ+5ÂÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿpTANK NOT CURRENTLY IN USE. CONTAINS 6" OF PRODUCT. ELECTRONICS ARE FUNCTIONING, OVERFILL AND SPILL BUCKETS PASS.xhÂ+6Â^ ÂÂAxhxhÁ`xhÃ5,HþÿþÿþÿþÿþÿþÿþÿxhÂ+7 SÂÂTxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+8ÃHÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â+9Ã;ÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh  #Ã#@ÂÂHxgxgÂxhÃ? %þÿþÿþÿþÿþÿþÿóTANK #9 INSTALLED IN 1997. BALL-FLOATS NOT ALLOWED ON SUCTION SYSTEMS SINCE 1996. BB JOE IRISH CALLED 04/02/2004. FLAPPERS HAVE BEEN INSTALLED. CRASHVALVE IS STILL AN ISSUE, BUT WILL BE REPAIRED PRIOR TO MIKE LEWIS' UPCOMING INSPECTION. BBxgÂ+:Â<ÂÂLxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+; ÂÁ"xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+<Â11ÂÂHxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿDATA ON TANK 32 MISSINGxgÂ+=Â16ÂÂHxhxh Á`xiþÿþÿþÿþÿþÿþÿþÿ¹CLEARING INSPECTION TO PASS. THE INSPECTION ACTUALLY WAS OF A FACILITY LOCATED NEARBY ON ROUTE 106 CALLED RADLO BROS. THIS IS ALSO A DECOSTER FACILITY AND THE TANK WAS INSTALLED THERE AND NOT AT THIS FACILITY. THE CORRECT REGISTRATION NUMBER RELATED TO THE INSPECTION LISTED HERE IS 20844. THIS IS BEING CLEARED TO PREVENT IT FROM COMING UP IN FUTURE BULK ENFORCEMENT ACTIONS LIKE THE 2005 MASS MAILING STOP DELIVERY ORDERS. TIMOTHY RECTORxgÂ+>Ã(ÂÂHxhxh Á`xgþÿþÿþÿþÿþÿþÿþÿ!CP ON VENT PIPE FAILED AT -.551.xgÂ+?Â'DÂÂHxhxh Á`xgþÿþÿþÿþÿþÿþÿþÿCP ON VENT PIPE FAILS, -.599xgÂ+@ÃAÂÂHxhxh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ+AÃ`"ÂÂAxhxh Á`xhÃ$2NþÿþÿþÿþÿþÿþÿþÿxhÂ+BÂ;*ÂÂBxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿ'NEW 61-SO INSTALLED TO CORRECT HEIGHT. xhÂ+CÃÂÂHxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿ’MONITORING WELL LOG SHEET AND BAILER PROVIDED TO DABNEY LEWIS, CODE ENFORCEMENT OFFICER SO THAT THE 2 MONITORING WELLS CAN BE CHECKED REGULARLY. xhÂ+DÃG&ÂÂKxhxh Á`xh ÃZþÿþÿþÿþÿþÿþÿþÿxh Â+EÃ/ ÂÂLxhxh ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+GÂUÂÂxh xh Á`xiÃ[[þÿþÿþÿþÿþÿþÿ DAILY INVENTORY SUBMITTED TO DEPxh Â+HÂ$ÂÂxhxh Á`xiÃBIþÿþÿþÿþÿþÿþÿ DAILY INVENTORY SUBMITTED TO DEPxhÂ+IÂTaÂÂxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+JÂ>ÂÂIxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿREPAIRS MADE PER JOHN JOHNSON.xh Â+KÂ_@ÂÂIxhxh Á`xhÃ`þÿþÿþÿþÿþÿþÿþÿxhÂ+LÂWPÂÂxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+MÂ9ÂÂxhxh Á`xhÃ6 OþÿþÿþÿþÿþÿþÿþÿxhÂ+NÃXAÂÂZxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+OÂ"^ÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+PÃ%LÂÂZxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+QÃ&\ÂÂZxhxhÁ`xhÃ-$þÿþÿþÿþÿþÿþÿþÿxhÂ+RÃ9ÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ`PASSING PER CTI, PAUL THOMPSON. PRODUCT PIPE READING: FIBERGLASS VENT PIPE READING: FIBERGLASSxh Â+SÃ.ÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿJINSPECTOR INDICATES CAN'T SEE SPACERS ON COPPER PIPING, THEY MAY BE THERE.xh Â+TÃÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ> PRODUCT PIPE READING: FLEX PIPE VENT PIPE READING: FIBERGLASSxh ÂÃ\) xgxgÂxhþÿþÿþÿþÿþÿþÿþÿREPAIRS MADE PER JOHN SIMS.xg Âà  xgxgÂxhþÿþÿþÿþÿþÿþÿþÿ>REPAIRS MADE TO FACILITY PER JOHN SIMS, FACILITY NOW PASSES. xg Â+UÂ[<ÂÂxhxhÂ(xhÃ4!þÿþÿþÿþÿþÿþÿ> BALL FLOAT CHECKED AND WORKING PROPERLY?: INSTALLED BF IN SNLxhÂ+VÃ]-ÂÂ:xhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â+WÂIÂÂ:xhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â+XÃÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+YÃ45ÂÂCxhxhÁ`xhÃ*WþÿþÿþÿþÿþÿþÿþÿxhÂ+ZÂ?ÂÂCxhxhÁ`xhÃD]þÿþÿþÿþÿþÿþÿþÿxhÂ+[Â@`ÂÂCxhxhÁ`xh ÃD]þÿþÿþÿþÿþÿþÿþÿxh Â+\Â@ÂÂCxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+]ÂbÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿNO OVERFILL DEVICE, ALSO PIPING IS DIRECT BURIED COPPER PIPING PER CTI ED GEORGE. NO CONTAINMENT, NO MONITORING. TANK INSTALLED IN 1990. PER CTI GEORGE ON INSPECTION UPDATE, PIPING IS NOW SLEEVED FROM THE TANK TO THE FURNACE. TANK IS ALSO NOT REQUIRED BY DEP RULES TO HAVE OVERFILL, OSFB DOES REQUIRE A VENT WHISTLE. SENSOR IS ALSO WORKING ACCORDING TO THE INSPECTION UPDATE FROM CTI ED GEORGE.xhÂ+^Â/6ÂÂ)xhxhÂ(xhÃ@ þÿþÿþÿþÿþÿþÿ¥ SPILL BUCKETS CLEAN?: CLEANED SLOW FLOW WHEN 3 GPH LEAK @ 10PSI IS SIMULATED?: REPLACED LLD ON T5 AND T7 NEW LID GASKETS AND HOLD DOWNS INSTALLED BY CTI DON BUBAR.xhÂ+_Ã3%ÂÁ2xhxhÂxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â+`Ã3'ÂÁ2xhxhÂxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â+aÃ3"ÂÁ2xhxhÂxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â+bÃ3!ÂÁ2xhxhÂxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â+cÃbSÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ+dÃ:YÂÂCxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿŸTHIS IS A MOTOR FUEL TANK NOT STRICTLY HEATING OIL. IT IS CONNECTED TO A GENERATOR. CTI FURGE INDICATED HE WAS UNABLE TO TEST THE INTERSTIAL LEAK DETECTOR. TRxgÂ,Ã]"ÂÁ"xhxhÁ`xhÄWMþÿþÿþÿþÿþÿþÿþÿxhÂ,Â*\ÂÂxh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿC PRODUCT PIPE READING: SLEEVED COPPER VENT PIPE READING: FIBERGLASSxhÂ,Á+ÂÂxh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,Â* ÂÂxh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿ0FACILITY NOW HAS ELECTRONIC OVERFILL PROTECTION.xhÂ,ÂXBÂÂ)xh xhÁ`xhÃOþÿþÿþÿþÿþÿþÿ[FACILITY HAS NOT SUBMITTED AN SIA SINCE 1996. MAY BE USING ATG BUT WE DON'T HAVE A RECORD OF IT. INSPECTOR NOTED THAT THEY ARE USING A TANK GAUGE TO DO DAILY INVENTORY, NO INDICATION IT IS BEING USED AS ATG FOR LEAK DETECTION. IT DOES NOT APPEAR THE PROBES WERE PULLED FOR INSPECTION. GAUGE STICK IN GOOD CONDITION?: USING TANK GAUGE FOR INVENTORYxhÂ, ;ÂÁ"xh xhÁ`xhÃWþÿþÿþÿþÿþÿþÿþÿxhÂ,Â1)ÂÁ"xh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ, ÂÂTxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ, ÃW'ÂÂAxh xhÁ`xhÃ1`AþÿþÿþÿþÿþÿþÿbPER DEAN DRISKO, VAPOR RECOVERY ADAPTORS REPLACED, SYSTEM NOW FULLY OPERATIONAL AND IN COMPLIANCE.xhÂ, ÃR#ÂÁ xh xhÁ`xhÃ`$QþÿþÿþÿþÿþÿþÿþÿxhÂ, ÂÂÂ"xh xhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â, Ã_ÂÂZxh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ, Ã79ÂÂZxh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,Â0ÂÂZxh xhÁ`xh þÿþÿþÿþÿþÿþÿþÿ; PRODUCT PIPE READING: COPPER VENT PIPE READING: FIBERGLASSxh Â,ÃXEÂÂZxh xhÁ`xh þÿþÿþÿþÿþÿþÿþÿ; PRODUCT PIPE READING: COPPER VENT PIPE READING: FIBERGLASSxh Â,Ã?ÂÂxhxhÁ`xh ÃþÿþÿþÿþÿþÿþÿòPER ED GEORGE, CTI, THE FOLLOWING REPAIRS WERE MADE TO THE OVERFILL, SHORTER NIPPLES ON THE SPILL BUCKETS ADJUSTING THE FLAPPER TO 95% FULL SHUT OFF, CRASH VALVES SECURED ON 1,2,4, AND RAISED AND SECURED ON 5,6, & 7. CRASH VALVE ON 4, IN THE NARRATIVE, BUT ACTUALLY #3 WAS CAPPED OFF BECAUSE THAT LINE WAS NOT BEING USED. THERE IS NO MENTION OF INVENTORY ISSUES ON THE INSPECTION UPDATE, DEP WILL ASSUME THAT THEY HAVE BEEN ADDRESSED AND WILL ADD THIS FACILITY TO A PRIORITY LIST FOR INSPECTION . xhÂ,Â6\ÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿBCORRECTIVE ACTIONS PER ED GEORGE, TANK #6 STILL OUT OF COMPLIANCE.xhÂ,ÂÂÂxhxhÁcxhÄ8þÿþÿþÿþÿþÿþÿþÿxhÂ,ÂÂÂxhxhÁcxhÄ8þÿþÿþÿþÿþÿþÿþÿxhÂ,ÂÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,Â?  xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,Ã0&ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,à ÂÁ"xhxhÁcxhÃd þÿþÿþÿþÿþÿþÿþÿxhÂ,Ã`(ÂÁ"xhxhÁcxhà J]þÿþÿþÿþÿþÿþÿþÿxhÂ,Ã8ÂÂAxhxhÁcxhÃ$%þÿþÿþÿþÿþÿþÿþÿxhÂ,ÂÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,ÂD*ÂÁ$xhxhÁcxhÃd 6þÿþÿþÿþÿþÿþÿþÿxhÂ,Â.ÂÂ2xhxhÁcxhÃ[*$þÿþÿþÿþÿþÿþÿþÿxhÂ,ÃbbÂÁ"xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,Â.ÂÁ"xhxhÁcxhÃ[*$þÿþÿþÿþÿþÿþÿþÿxhÂ,Â$ ÂÂxhxhÁcxhÃ5;þÿþÿþÿþÿþÿþÿþÿxhÂ"2ÃÂÂ]xg xg Âxg ÃYMþÿþÿþÿþÿþÿþÿTTANK #8 SHOWED EVIDEVECE OF POSSIBLE LEAK IN DAILY INVENTORY AT TIME OF INSPECTION. xg Â"3Â1ÂÂ]xg xg Âxh ÃE/þÿþÿþÿþÿþÿþÿL. MCALLISTER REPAIRED -ACFxg Â"4ÂLÂÂUxgxg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"5Ã\ xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"6Ã'ÂÂ:xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"7Ã? xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"8Ã? xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"9Â7;ÂÂ!xg xg Ácxg Ä1Xþÿþÿþÿþÿþÿþÿþÿxg Â":Ã\IÂÂ)xg xg Ácxg à 2þÿþÿþÿþÿþÿþÿþÿxg Â";Â6>ÂÁ xg xg Ácxg Ã2 0þÿþÿþÿþÿþÿþÿþÿxg Â"<ÃH%ÂÂxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"=ÃH&ÂÂxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â">Ãc&ÂÂxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"?Â_BÂÂxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"@ ÂÂxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"AÂ&#ÂÂxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"BÂÂÂxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"CÂ0ÂÂ:xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"DÃÂÂ:xg xg Ácxg Ã2&þÿþÿþÿþÿþÿþÿþÿxg Â"EÃ%BÂÂxg xg Ácxg Ãþÿþÿþÿþÿþÿþÿþÿxg Â"FÃ]$ÂÂ]xg xg Ácxg ÃROþÿþÿþÿþÿþÿþÿþÿxg Â"GÂMAÂÂ]xg xg ÁcxgÃ#LþÿþÿþÿþÿþÿþÿþÿxgÂ"HÂcXÂÁ xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"IÃ-AÂÂSxgxg Â(þÿþÿþÿþÿþÿþÿþÿþÿ€PER ST. PETER, BLUEPRINTS INDICATE SUPPY AND RETURN PIPES TO GENERATOR ARE CP SW STEEL. CP TEST FAILED (-0.59V) ON PIPING. -ACFxgÂ"JÂ[ ÂÂ4xg xg Â(xgÃ( þÿþÿþÿþÿþÿþÿþÿxgÂ"KÃPCÂÂ!xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"LÃ5ÂÂ!xg xg Â(xgÄ4þÿþÿþÿþÿþÿþÿþÿxgÂ"MÃ9ÂÂ!xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"NÂ\ÂÂYxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"OÃ[ ÂÂxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"PÂ?ÂÂxg xg Á`xgÄ+?MþÿþÿþÿþÿþÿþÿþÿxgÂ"QÂ?ÂÂxg xg Á`þÿÃJR2þÿþÿþÿþÿþÿþÿ[TANK #9 HAS NO LEAK DETECTION. ALSO UNCLEAR WHEN LAST SIA WAS SUBMITTED ON TANKS 6,7, & 8.xgÂ"RÂ?%ÂÂxg xg Á`xgÃ,`%þÿþÿþÿþÿþÿþÿþÿxgÂ"SÂ'ÂÂAxg xg Â(xgÄ ZþÿþÿþÿþÿþÿþÿþÿxgÂ"TÂ$MÂÂxg xg Á`xg Ã>G4þÿþÿþÿþÿþÿþÿ’FACILITY INSPECTED ON 10/15/03 BY JIM HYNSON AND EPA STAFF. INSPECTION REC'D AT DEP ON 10/16/03 DATED 5/12/03, VALID BUT OVERDUE. TIMOTHY RECTORxg Â"UÂÂÂ)xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"V XÂÂ)xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"WÂ#bÂÂ)xg xg Â(xgÄaþÿþÿþÿþÿþÿþÿþÿxgÂ"XÂc ÂÂ)xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿ.PER BUBAR: "LOW THROUGHPUT, IN-HOUSE USE ONLY"xgÂ"YÂ2>ÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â"ZÂ?,ÂÂ!xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"[ÂE^ÂÂ!xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"\Â$!ÂÂ!xg xg Â(xgÃQ+þÿþÿþÿþÿþÿþÿþÿxgÂ"]Â]ÂÂxgxg Â(xgÃa"=þÿþÿþÿþÿþÿþÿþÿxgÂ"^ÂÂÂxgxg Â(xgÃUþÿþÿþÿþÿþÿþÿþÿxgÂ"_ÂTÂÂxgxg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"`Â!ÂÂxgxg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"aÃTXÂÂxgxg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ"bÂ.6ÂÂxg xg Â(xg þÿþÿþÿþÿþÿþÿþÿI SENSORS ARE FUNCTIONING PROPERLY?: SIMARD RECOMMENDED REPAIRS BUT PASSEDxg Â"cÃbZÂÂxgxg Â(xgÃWþÿþÿþÿþÿþÿþÿñPER SIMARD, INTERSITIAL SENSOR REPLACED; FUNCTIONS AND IS PLACED PROPERLY. -ACF SENSORS ARE PROPERLY PLACED?: SIMARD REPLACED SENSOR DURING INSPECTION SENSORS ARE FUNCTIONING PROPERLY?: SIMARD INSTALLED NEW SENSOR & TESTED DURING INSPECTIONxgÂ"dÂ.8ÂÂxg xg Â(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#Â.9ÂÂxg xg Â(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#ÃQÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#Â[ÂÂ)xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#Ã]ÂÂ!xg xg Â(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#ÃXJÂÂ!xg xg Â(xgÄ5þÿþÿþÿþÿþÿþÿþÿxgÂ#ÂÂÂxg xg Â(xg Ã(3þÿþÿþÿþÿþÿþÿ9 SPILL BUCKETS CLEAN?: SAVAGE CLEANED SPILL BUCKET 7/9/03xg Â#Â7ÂÂ)xg xg Â(xgÃIþÿþÿþÿþÿþÿþÿþÿxgÂ#ÃR+ÂÂ)xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ# ÂUÂÂ)xg xg Â(xgÃ=þÿþÿþÿþÿþÿþÿa LAST 12 MONTHS OF THROUGHPUT RECORDS?: BUBAR REPORTS THIS DATA FROM COMPUTER, NOT OWNER/OPERATORxgÂ# Ã4ZÂÂ)xg xg Â(xgÃ(=þÿþÿþÿþÿþÿþÿþÿxgÂ# Ã@XÂÁ xg xg Â(xg þÿþÿþÿþÿþÿþÿþÿaONLY FAILURE RELEVANT IS STAGE 1 VAPOR RECOVERY. PASSING INSPECTION. TANKS REMOVED 10/31/2003.xgÂ# ÂBÂÂ]xg xg Âxg Ä`Qþÿþÿþÿþÿþÿþÿþÿxg Â# ÂSBÂÂ)xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#Ã/+ÂÂ]xg xg Âxg Ãþÿþÿþÿþÿþÿþÿþÿxg Â#ÂbdÂÁ xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿp ELECTRONIC HIGH LEVEL ALARM CHECKED AND WORKING PROPERLY?: BEAUMONT REPLACED WHISTLE WITH 90% HIGH LEVEL ALARMxgÂ#ÃHÂÂ]xg xg Âxg ÃZ3þÿþÿþÿþÿþÿþÿþÿxg Â#à ÂÁ xg xg Â(þÿÃ)>þÿþÿþÿþÿþÿþÿþÿxgÂ# ÂÂ]xg xg Âxg ÃM(Gþÿþÿþÿþÿþÿþÿþÿxg Â#ÂJÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#Â6ÂÂ:xg xg Â(xgÃT[þÿþÿþÿþÿþÿþÿ: MANHOLE LID IN GOOD CONDITION?: BROWN REPLACED LID ON T-6xgÂ#ÂZ&ÂÂ]xg xg Âxg Ä=þÿþÿþÿþÿþÿþÿþÿxg Â#Â%7ÂÂ]xg xg Âxg ÃEB8þÿþÿþÿþÿþÿþÿþÿxg Â#ÂXÂÂHxg xg Â(þÿþÿþÿþÿþÿþÿþÿþÿ‘PER LEWIS, TANK ANNULAR SPACE RISER IS NOT LIQUID-TIGHT; PIPING SUMP CONTAINED WATER DRISKO IS INSPECTING 3/24/04, REPAIRS WILL BE POST-DEADLINExgÂ#ÃSÂÂ]xg xg Âxg à þÿþÿþÿþÿþÿþÿC2ND FAILING CP READINGS. BB RECEIVED PASSING CP RETEST 10/30/2003.xg Â#ÂGXÂÂ]xg xg Âxg Ã)#þÿþÿþÿþÿþÿþÿ#INSPECTION UPDATE OF 10/30/2003. BBxg Â#ÂNÂÂHxg xg Â(xgÃ\%þÿþÿþÿþÿþÿþÿOINSPECTION UPDATE DATED 8/18/2003 SUBMITTED. UPDATE PERFORMED BY MICHAEL LEWIS.xgÂ# `ÂÂHxgxg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#Â^ÂÂ]xg xg Âxg Ã1dþÿþÿþÿþÿþÿþÿþÿxg Â#Â3EÂÂ]xg xg Âxg Ã@( þÿþÿþÿþÿþÿþÿþÿxg Â#ÂLZÂÂxg xg Á`xg ÃS)þÿþÿþÿþÿþÿþÿþÿxg Â#Â$ÂÂ!xg xg Âxg Ã4(-þÿþÿþÿþÿþÿþÿþÿxg Â# ÂaHÂÂxg xg ÂxhÃ0=þÿþÿþÿþÿþÿþÿþÿxg Â#!Ã%AÂÂxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#"Ã,#ÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿ¸PER SIMARD, NEED NEW INTERSTITAL SENSOR; NEED TO DRAIN INTERSTITAL SPACE OF WATER. SIMARD SUBMITTED AN UPDATED INSPECTION 7/30/03; REPLACED INTERSTITIAL SENSOR AND DRAINED INTERSTICE.xgÂ##Ã5ÂÂxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#$Ã,ÂÂxg xg Âxg þÿþÿþÿþÿþÿþÿþÿREPAIRS MADE TO FACILITY.xg Â#%ÃFÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#&ÂAÂÂ!xg xg Â(xgÄ1PþÿþÿþÿþÿþÿþÿþÿxgÂ#'Ã#cÂÂ!xg xg Â(xgÄ +YþÿþÿþÿþÿþÿþÿþÿxgÂ#(Â-OÂÂ!xg xg Â(xgÃ*?FþÿþÿþÿþÿþÿþÿþÿxgÂ#)Â&ÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿ6SIMARD REPORTS A CP SYSTEM, WITH A TANK READING OF -1VxgÂ#*ÂÂÂHxgxg Âxg Ã.,NþÿþÿþÿþÿþÿþÿBALL FLOATS NOT SET AT CORRECT HEIGHT AND MUST BE REPLACED. CP ON VENT PIPING FAILED. BB BALL FLOATS REPLACED WITH FLAPPERS ON 10/03/2003. BBxgÂ#+ÃOÂÁ xg xg Â(xg þÿþÿþÿþÿþÿþÿþÿxgÂ#,Â7ÂÂ4xg xg Â(þÿÃI3þÿþÿþÿþÿþÿþÿþÿxgÂ#-Ã.ÂÂxg xg Â(þÿÃZþÿþÿþÿþÿþÿþÿþÿxgÂ#.Ã!WÂÁ xg xg ÂxhÃOZþÿþÿþÿþÿþÿþÿW3/27/04 BEAUMONT REPORTS CP REPAIRS STILL PENDING ACF RECEIVED INS. UPDATE FOR CP. RRxg Â#/ÁIÂÂ!xg xg Âxgà WþÿþÿþÿþÿþÿþÿþÿxgÂ#0Â7ÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#1ÂÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#2Â2LÂÂxg xg Â(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#3ÃZ ÂÂxg xg Â(xgÃ"aþÿþÿþÿþÿþÿþÿþÿxgÂ#4Ã%ÂÁ xg xg Âxg Ãþÿþÿþÿþÿþÿþÿþÿxg Â#5Ã8 ÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#6Â:ÂÂ4xg xg Â(xgà þÿþÿþÿþÿþÿþÿþÿxgÂ#7Ã5NÂÂ4xgxg ÂxgÃ/*0þÿþÿþÿþÿþÿþÿþÿxgÂ#8Â%AÂÂ]xg xg Âxg ÃHcRþÿþÿþÿþÿþÿþÿþÿxg Â#9Ã@ÂÂ]xg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#: ÂÂQxg xg Á`þÿþÿþÿþÿþÿþÿþÿþÿ&TANK IS OLDER FIBERGLASS WITH VACUM TUBE(?) FOR INTERSTITIAL MONITORING. INSPECTOR INDICATED SPACE WAS TOO SMALL TO DROP IN AN ELECTRONIC MONITORING DEVICE. ALSO CONCRETE AROUND SPILL BUCKET DETERIORATED AND NO LONGER ABLE TO SHED WATER AWAY FROM BUCKET. 2ND INSPECTOR ON SITE, BENJAMIN BURDEN.xg Â#;ÃWdÂÂ]xg xg Á`xg Ã_J_þÿþÿþÿþÿþÿþÿþÿxg Â#<Ã`bÂÂ]xg xg Á`þÿÃBTþÿþÿþÿþÿþÿþÿINSPECTOR FAILED K-1 TANK BECAUSE VENT WHISTLE IS OVER 8' FROM TANK FILL. TANK IS 1000 GALLON AND IS LOCATED IN THE MIDDLE OF THE YARD, IT IS NOT POSSIBLE TO GET WHISTLE WITHIN 8'. FAILING TANK ON INSPECTION AND IF CONTACTED WILL RECOMMEND FLAPPER INSTALL.xg Â#=Â^ ÂÂxg xg Á`xgÃ7\JþÿþÿþÿþÿþÿþÿþÿxgÂ#>ÂO\ÂÂxg xg Á`xgÃRVUþÿþÿþÿþÿþÿþÿþÿxgÂ#?Ã#1ÂÂxg xg Â(xgÃ3þÿþÿþÿþÿþÿþÿþÿxgÂ#@ÂAWÂÂxg xg Á`xgÃ;CZþÿþÿþÿþÿþÿþÿþÿxgÂ#Aà :ÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#BÂ#=ÂÂxg xg ÂxgÄ þÿþÿþÿþÿþÿþÿþÿxgÂ#CÂ=ÂÂ]xg xg ÂxgÃPd:þÿþÿþÿþÿþÿþÿþÿxgÂ#DÂ*ÂÂxg xg ÂxgÃBþÿþÿþÿþÿþÿþÿþÿxgÂ#GÂ^ ÂÂ]xg xg ÂxgÃ,JþÿþÿþÿþÿþÿþÿþÿxgÂ#HÂ+ÂÂxg xg Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxgÂ#IÃÂÂ]xg xg Á`xgÄ @BþÿþÿþÿþÿþÿþÿþÿxgÂ#JÃaÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#KÂ2ÂÂXxg xg Ácxg Ãc[þÿþÿþÿþÿþÿþÿþÿxg Â#LÂ6ÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#MÃS-ÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#NÂ6$ÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#OÃ@ÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#PÂJ`ÂÁYxg xg Ácxg Ã5Wþÿþÿþÿþÿþÿþÿþÿxg Â#QÂ7ÂÂ!xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#RÃYb xg xg ÁcxgÄX&þÿþÿþÿþÿþÿþÿþÿxgÂ#SÂ39ÂÂxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#TÂ=SÂÂ!xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#UÂ-VÂÂTxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#VÃW=ÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#WÂT ÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#XÃVNÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#YÃRÂÂHxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#ZÃ83ÂÂKxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#[Â^bÂÂKxg xg Á`xg à þÿþÿþÿþÿþÿþÿþÿxg Â#\Â68ÂÂ4xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â#]Â/ÂÂHxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#^ÂXÂÁ2xg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#_Â-ÂÁ$xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿiFACILITY IS NOW OUT OF SERVICE AS OF 7/10/2003, LETTER ATTACHED TO INSPECTION. 0 GALLONS THRUPUT IN 2002?xg Â#`ÂZ ÂÂxg xg Á`xgÃ&b þÿþÿþÿþÿþÿþÿþÿxgÂ#aÃ_[ÂÂxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#bÂ$QÂÂxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ#cÂ;NÂÂxg xg Á`þÿÃ9 @þÿþÿþÿþÿþÿþÿLEAK DETECTION IS UNKNOWN, NA MARKED FOR ATG, GWM, AND INTERSTITIAL MONITORING. DAILY INVENTORY IS LEFT BLANK, MAYBE THAT'S WHAT THEY ARE DOING.xgÂ#dÂ1ÂÂxg xg Á`xgÃ"B þÿþÿþÿþÿþÿþÿþÿxgÂ$à WÂÂ]xg xg Á`xg Ã]!XþÿþÿþÿþÿþÿþÿHIGH CP READINGSxg Â$Ã\#ÂÂ]xg xg Á`þÿÃ6b þÿþÿþÿþÿþÿþÿŠSTORE HAD FIRE LAST WINTER. NEW STORE BUILT, TANK PIPING WAS REPLACED AT THAT TIME. ANNUAL INSPECTION SCHEDULED WITHIN 30 DAYS. RR 9/29/04xg Â$ÃÂÂ]xg xg Á`xg Ã&þÿþÿþÿþÿþÿþÿþÿxg Â$Â@`ÂÂCxg xg Á`xgÃGC+þÿþÿþÿþÿþÿþÿ7INSPECTION CAME IN MORNING MAIL 10/22/03 6 MONTHS LATE.xgÂ$Â?ÂÂCxg xg Á`xgÃA þÿþÿþÿþÿþÿþÿþÿxgÂ$Â6ÂÂ]xg xg Á`xhÃ2F1þÿþÿþÿþÿþÿþÿW TANK READING: DATA PER INSPECTION, UNSURE WHY CHEMBERS 1 & 2 ON TANK7 AREN' T THE SAMExg Â$Ã_bÂÂxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$ÂÂÂxg xg Á`xgÄ )þÿþÿþÿþÿþÿþÿþÿxgÂ$ Â1&ÂÂxg xg Á`xgÃKþÿþÿþÿþÿþÿþÿþÿxgÂ$ Â1ÂÂ]xg xg Á`xg €þÿþÿþÿþÿþÿþÿ4FACILITY IS OUT OF SERVICE AND HAS BEEN SINCE 1999. xg Â$ ÂZ$ÂÂ]xg xg Ácxg ÃEþÿþÿþÿþÿþÿþÿþÿxg Â$ Ã*E xg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$ Ã4ÂÂ]xg xg Ácxg ÃQQþÿþÿþÿþÿþÿþÿþÿxg Â$ÃbÂÂ]xg xg Ácxg Ä?Pþÿþÿþÿþÿþÿþÿþÿxg Â$ÃCcÂÂ!xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$ÂS ÂÂ!xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$Â/cÂÁ xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$Â^ÂÂ]xg xg Ácxg Ä_þÿþÿþÿþÿþÿþÿþÿxg Â$ÃZÂÂHxg xg Ácxg Ã3]þÿþÿþÿþÿþÿþÿþÿxg Â$Ã48ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$Ã;+ÂÂHxg xg Ácxg Å6Hþÿþÿþÿþÿþÿþÿþÿxg Â$Â0)ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$Â0$ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$Â:AÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$ÂQ\ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$Ã@ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$ÂLÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$ÃÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$Â:FÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$à SÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$à ]ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$ Ã3[ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$!ÂQGÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$"ÂcÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$#Ã@ÂÂHxg xg Ácxg Ãþÿþÿþÿþÿþÿþÿþÿxg Â$$ #ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$% $ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$&ÃTVÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$'Ã:FÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$(à ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$)Ã]ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$* ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$+ÃV[ÂÂHxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$,ÂV%ÂÂKxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$-ÂVÂÂKxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$.Â[ÂÂKxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$/ÂV$ÂÂKxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$0ÂV!ÂÂKxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$1ÂV ÂÂKxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$2ÂV&ÂÂKxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$3ÂVÂÂKxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$4ÂXÂÂKxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$5ÂV#ÂÂKxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿZSUMP MANHOLE NEEDS IMMEDIATE UPGRADE PER INSPECTION. REINSPECTED 11/10/2003 ALL PASSED. xg Â$6ÂVÂÂKxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$7ÂG xg xg Â(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$8Â&ÂÂCxg xg ÂxgÃþÿþÿþÿþÿþÿþÿþÿxgÂ$9Â1'ÂÂxg xg ÂþÿÄ7#PþÿþÿþÿþÿþÿþÿSECOND FAIL ON LLDS. BBxgÂ$:ÃPÂÂ!xg xg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$;Ã`&ÂÂ!xg xg Âxg Ä:-"þÿþÿþÿþÿþÿþÿþÿxg Â$<ÂOÂÂ]xg xg Á`xg €þÿþÿþÿþÿþÿþÿ¸TANKS OUT OF SERVICE SINCE 12/31/00. NO CHANGE IN STATUS. TIMOTHY RECTOR TANKS AND PIPING TO BE BROUGHT BACK INTO SERVICE. US TANK ALLIANCE TO PRECISION TEST END OF NOVEMBER 2003. BBxg Â$=ÂÂÁ xg xg Âxg à 45þÿþÿþÿþÿþÿþÿþÿxg Â$>Â0*ÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$?ÂJÂÂHxg xg Âxg Ä/>^þÿþÿþÿþÿþÿþÿþÿxg Â$@Â%M xg xg Â(þÿþÿþÿþÿþÿþÿþÿþÿ(TANK CP IN 2003 IS .984. ANNETTE HIGGINS CALLED. GAFTEK DID INSPECTION. PROBLEM LIES IN THAT THERE IS NO LEAK DETECTION FOR THE PIPING ON THIS TANK AND IT WAS INSTALLED 6 DAYS AFTER THE REGULATIONS CHANGED. THEY ARE WORKING WITH GAFTEK TO HAVE LEAK DETECTION INSTALLED FOR THE PIPING. RR 10/5/04xgÂ$AÂÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$BÃ?ÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿ,3/9/09-NOTICE OF INTENT TO ABANDON REC'D-PH 2/19/09-CALL FROM ALDEN TURNER (BOARD MEMBER FOR CHURCH) HE WILL CALL BACK BY 2/27/09 WITH A PLAN WHETHER IT IS TO ADDRESS ISSUES WITH TANK, OR PULL TANK AND INSTALL AST'S-PH 12/23/08-CTI WINSLOW DID AI AND SENT IN AS PASSING, BUT IS A FAIL. -LD IS MANUAL INT. SPACE MONITORING, BUT IS NOT BEING DONE -VENT WHISTLE CANNOT BE TESTED AS IT IS BURIED -TANK HAS REMOTE FILL, WHICH MAY OR MAY NOT BE CP -COPPER LINES DIRECT BURIED, NO SLEEVING OR SPACING PH ACTUAL INSPECTION DATE WAS 10/09/2003. PER MIKE LEWIS.xg Â$Cà ÂÂxg xg Â(þÿþÿþÿþÿþÿþÿþÿþÿ‘NO ELECTRONIC MONITORING. NO MONITORING OF PIPING SUMP SIMARD CONTRACTED TO INSTALL ELECTRONIC INTERSTITIAL MONITORING AND DO AI IN MAY 2007 -MLxgÂ$DÂV3ÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿ,REMOTE FILL AND VENT PIPE ARE BARE STEEL. BBxg Â$EÂÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$F 'ÂÂ!xg xg Â(xg ÃYTYþÿþÿþÿþÿþÿþÿ8PASSING CP ON PRODUCT PIPING FLEXES UNDER THE DISPENSERSxg Â$G ÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$HÂÂÁ xg xg Âxg Ã;þÿþÿþÿþÿþÿþÿZCP ON PIPING IS >1.6 VOLTS. 1.6 VOLTS IS MAX FOR MAGNESIUM ANODES. WILL DO FOLLOW UP. BBxg Â$IÃ,ÂÂxg xg Â(þÿþÿþÿþÿþÿþÿþÿþÿKTANK 5 REGISTERED AS SIA, NONE SUBMITTED; NO GW MONITORING SUBMITTED EITHERxgÂ$JÂ0'ÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿ#FAILING TANK WAS REMOVED 12/30/2003xg Â$KÂ.7ÂÂxg xg Â(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$LÃZOÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$MÂWOÂÂxg xg Â(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$NÃÂÂ:xg xg Â(xgÄ þÿþÿþÿþÿþÿþÿnATG NOT REGISTERED LD METHOD; SUBMITTED DAILY INVENTORY RECORDS SPILL BUCKETS PRESENT?: NEW BUCKET ON TANK #6 xgÂ$OÂÂÂ]xg xg ÂxhÃ4Tþÿþÿþÿþÿþÿþÿþÿxg Â$PÃ?/ÂÂxg xg ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$QÂ(QÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$R ÂÁ2xg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ$SÂ&ÂÁ xg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$TÂBÂÁ xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$UÂ4BÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿþÿxf Â$VÃQ:ÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿþÿxf Â$WÃQ;ÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿ/ SPILL BUCKETS CLEAN?: OIL CLEANED OUT 10/15/02xf Â$XÂ-ÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿx SENSORS ARE FUNCTIONING PROPERLY?: LEWIS REPAIRED PIPING SUMP SENSOR 10/15/02 SPILL BUCKETS LIQUID TIGHT?: LID REPLACEDxf Â$YÂ4YÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿëSMALL LEAK AT DIESEL DISPENSER SEAL, REPORTED TO DEP 10/18/02, REPAIRED SENSORS ARE PROPERLY PLACED?: REPLACED TANK INTERSTITIAL SENSOR ON TANK #10 NO OIL IN SUMPS OR INTERSTITIAL SPACE?: PIPING SUMPS ALL HAVE A LITTLE PRODUCT/WATER, REMOVED & CLEANED, SOURCE UNKNOWN SPILL BUCKETS CLEAN?: ALL BUCKETS REPORTED DIRTY SPILL BUCKETS LIQUID TIGHT?: REPLACED ONE FILL CAP SLOW FLOW WHEN 3 GPH LEAK @ 10PSI IS SIMULATED?: REPLACED LLD ON TANK #10 PRESSURE/VACUUM VENT CAP IN PLACE?: CAPS REPLACEDxf Â$ZÂ4PÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿ SPILL BUCKETS PRESENT?: CLEANEDxf Â$[Ã+ ÂÂ]xg xg Âxg þÿþÿþÿþÿþÿþÿþÿ!TANKS HAVE BEEN O-O-S SINCE 1999.xg Â$\Â5DÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿù NO WATER IN SUMPS OR INTERSTITIAL SPACE?: WATER IN PIPING SUMP AUTO SHUT OFF / FLAPPER CHECKED AND WORKING PROPERLY: FLAPPER ON #12 REPLACED LLD PRESENT?: LLD REPLACED ON TANK #12 LAST 12 MONTHS OF THROUGHPUT RECORDS?: NO THROUGHPUT RECORDS ON SITExf Â$]Â4CÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿÚ SENSORS ARE PROPERLY PLACED?: SUMP SENSORS REPLACED SENSORS ARE FUNCTIONING PROPERLY?: TANK INTERSTITIAL SENSORS REPLACED NO WATER IN SUMPS OR INTERSTITIAL SPACE?: SMALL AMOUNT OF WATER/PRODUCT IN PIPING SUMPS SPILL BUCKETS LIQUID TIGHT?: LIDS AND CAPS REPLACED SPILL BUCKET LID NOT TOUCHING FILL RISER?: SMALLER NIPPLE INSTALLED TO ALLOW TIGHT CLOSURE LAST 12 MONTHS OF THROUGHPUT RECORDS?: NO RECORDS ON SITE CRASH VALVES SECURED: INSTALLED TEMPORARY REPLACEMENT BRACKETSxf Â$^Ã3\ÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$_Ã3ZÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$`Â-ÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿ NO WATER IN SUMPS OR INTERSTITIAL SPACE?: SMALL VOLUME OF PRODUCT/WATER IN PIPING SUMP BALL FLOAT SET AT 90% FULL LEVEL?: REPLACED FLAPPER ON TANK #10 LAST 12 MONTHS OF THROUGHPUT RECORDS?: NO RECORDS ON SITE CRASH VALVES SECURED: INSTALLED TEMPORARY REPLACEMENT BRACKETSxf Â$aÂ- ÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿ" NO OIL IN SUMPS OR INTERSTITIAL SPACE?: PUMPED OFF, REPAIRED PIPING, NOTIFIED DEP SLOW FLOW WHEN 3 GPH LEAK @ 10PSI IS SIMULATED?: LLDS HAD FAILED. ALL REPLACED & PASSED LAST 12 MONTHS OF THROUGHPUT RECORDS?: NO RECORDS ON SITE CRASH VALVES SECURED: INSTALLED TEMPORARY REPLACEMENT BRACKETxf Â$bÃ3YÂÂHxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â$cÂFÂÂAxf xg Á_xf Ã'3þÿþÿþÿþÿþÿþÿLHAD SOME QUESTIONS OF THE INSPECTION BUT IT DID PASS AFTER THEY WERE ANSUREDxf Â$dÃ1ÂÂCxgxg Á_xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%Âd5ÂÂKxg xg Á_xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%ÂRMÂÂTxg xg Á_þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%ÃQPÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿ;ADDITIONAL ANODES INSTALLED ON TANK BY TONY COUTURE 7/11/03xg Â%Â5EÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿSMALL LEAK AT DISPENSER REPORTED TO DEP RESPONSE 10/22/02, PORTLAND PUMP CONTRACTED TO REPAIR. SENSORS ARE FUNCTIONING PROPERLY?: REPLACED MULTIPLE SENSORS SPILL BUCKETS LIQUID TIGHT?: REPLACED MULTIPLE FILL CAPS LAST 12 MONTHS OF THROUGHPUT RECORDS?: NO RECORDS ON SITExf Â%Â-#ÂÂHxgxg Â(xf þÿþÿþÿþÿþÿþÿþÿþÿxf Â%Â(QÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%Ã7ÂÂTxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%à ÂÂ"xg xg Â(þÿþÿþÿþÿþÿþÿþÿþÿK BAILER PRESENT, FUNCTIONAL AND CLEAN?: HAVE MONITORING WELLS BUT NO BAILERxf Â% Â%?ÂÂxg xg Âxg Ã*þÿþÿþÿþÿþÿþÿþÿxg Â%  ÂÂxg xg Â(xgþÿþÿþÿþÿþÿþÿþÿCTANK #7 FAILED INSPECTION 5/2/03. TANK #7 REMOVED 10/14/03. (ACF)xgÂ% ÂT2ÂÂxg xg Â(xg ÃBþÿþÿþÿþÿþÿþÿGPREVIOUS PROBLEMS CORRECTED BASED ON PASSING 2004 ANNUAL INSPECTION. BBxf Â% ÃKÂÂDxg xg Â(þÿÃ>=þÿþÿþÿþÿþÿþÿþÿxfÂ% ÃUSÂÂSxg xg Â(þÿþÿþÿþÿþÿþÿþÿþÿþÿxf Â%à 0ÂÁQxg xg Â(xfþÿþÿþÿþÿþÿþÿþÿ330 GALLON AST AT FACILITYxfÂ%Ã- ÂÂDxg xg Â(þÿÃN?Uþÿþÿþÿþÿþÿþÿþÿxf Â%Ã3ÂÂxg xg Â(xg ÃQ[þÿþÿþÿþÿþÿþÿ0CHAMBERLAIN FIXED DROP TUBES AND PV CAPS 6/11/02xf Â%Ã2 ÂÂxg xg Â(xf þÿþÿþÿþÿþÿþÿþÿþÿxf Â%Â^ÂÂxg xg Â(xg ÃRXþÿþÿþÿþÿþÿþÿþÿxf Â%ÂX*ÂÂxg xg Â(xg Ã#þÿþÿþÿþÿþÿþÿþÿxf Â%Â2YÂÂxg xg Â(xgÃ,Qþÿþÿþÿþÿþÿþÿ< SPILL BUCKETS LIQUID TIGHT?: SIMARD REPORT BUCKETS REPLACEDxgÂ%ÂXÂÂxgxg Â(xf à [Vþÿþÿþÿþÿþÿþÿ(LOW CP READING ON VENT PIPING OF TANK #7xf Â%Â:(ÂÁ xg xg Â(þÿþÿþÿþÿþÿþÿþÿþÿþÿxfÂ% +ÂÂ)xg xg Â(xg Ã3þÿþÿþÿþÿþÿþÿþÿxf Â% /ÂÂDxg xg Â(þÿÃ1?Rþÿþÿþÿþÿþÿþÿþÿxf Â%Ã(ÂÂDxg xg Â(þÿÃ;CÂÂxg xg Â(xgÃ(þÿþÿþÿþÿþÿþÿþÿxgÂ%Ã9ÂÂxg xg  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%ÂÂÂxg xg  xg þÿþÿþÿþÿþÿþÿþÿ·8" OF WATER IN PIPING SUMPED, PUMPED OUT, SENSOR SUBMERGED IN WATER, WOULDN'T COME OUT OF ALARM. INSPECTOR REPLACED SENSOR, NOW OPERATING PROPERLY. INSPECTOR CLEANED OUT SPILL BUCKETxg Â%à ÂÂxg xg  xg þÿþÿþÿþÿþÿþÿþÿ INSPECTOR CLEANED SPILL BUCKETS.xg Â%ÃBÂÂxg xg  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%  ÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿCP READING OF -.89 BY INSPECTORxg Â%! ÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿ CP READING OF -.88 BY INSPECTOR.xg Â%" ÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿ CP READING OF -.86 BY INSPECTOR.xg Â%# ÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿ CP READING OF -.96 BY INSPECTOR.xg Â%$ ÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿ CP READING OF -.94 BY INSPECTOR.xg Â%%ÃU;ÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%&ÂOÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%'Â3ÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿnCP READING OF -1.21 BY INSPECTOR ACCORDING TO INSPECTOR, OVERFILL PROTECTION HAS ELECTRONIC ALARM AND FLAPPER.xg Â%(ÃXÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%)Á:ÂÂSxg xg  xg ÃS þÿþÿþÿþÿþÿþÿþÿxg Â%*ÂBÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%+ÂRYÂÂxg xg Â(þÿþÿþÿþÿþÿþÿþÿþÿþÿxf Â%,ÃX?ÂÂKxg xg Â(þÿÃF Yþÿþÿþÿþÿþÿþÿþÿxf Â%-ÃEYÂÂSxg xg Â(xg þÿþÿþÿþÿþÿþÿþÿ361SO INSTALLED BY IRA DODGE 09/15/2003. (PASS). BBxfÂ%.Ã#ÂÂDxg xg Â(xg þÿþÿþÿþÿþÿþÿþÿþÿxf Â%/ÂaPÂÂbxg xg Â(xf ÃBþÿþÿþÿþÿþÿþÿþÿxf Â%0Â_ÂÂbxg xg Â(xf þÿþÿþÿþÿþÿþÿþÿþÿxf Â%1Â3ZÂÂHxg xg Â(xgÃþÿþÿþÿþÿþÿþÿþÿxgÂ%2ÃcÂÂSxg xg  xgþÿþÿþÿþÿþÿþÿþÿ.CP ON TANK #3 IS -1.09. CP ON TANK #4 IS -1.04xgÂ%3Â_*ÂÂ4xg xg  xgÃþÿþÿþÿþÿþÿþÿ:3/22/06: MANNY CALLED, PLANNED REMOVAL WITH DOGGETT. -ACFxgÂ%4 ÂÂxg xg  xh þÿþÿþÿþÿþÿþÿþÿ·INSPECTOR CLEANED SPILL BUCKETS REPLACED VAPOR ADAPTER ON RNL. REPLACED VAPOR CAPS ON RNL & SNL. FILL CAP REPLACED ON PNL. 02/12/2004 LARRY WINCHESTER RESET FLAPPERS TO 95% SHUTOFF.xgÂ%5Ã/ÂÂxg xg  xg Ã@c:þÿþÿþÿþÿþÿþÿjINSPECTION INDICATES ACTUALLY DONE BY TODD LAVALLE, APPARENTLY ENTERED INCORRECTLY INTIALLY. TR 11/12/03xg Â%6ÃÂÂxg xg  xg Ã,KþÿþÿþÿþÿþÿþÿoERRONEOUSLY ENTERED AS ED GEORGE, INSPECTOR WAS ACTUALLY TODD LAVALLE. ALL OTHER DATA CORRECT. TR 11/12/2003 xg Â%7 &ÂÂxg xg  xgÃ)7@þÿþÿþÿþÿþÿþÿ{INSPECTION ENTERED ERRONEOUSLY AS BEING DONE BY ED GEORGE, SHOULD BE TODD LAVALLE. ALL OTHER DATA CORRECT. TR 11/12/2003xgÂ%8Â&AÂÂ4xg xg  xhÃ0!þÿþÿþÿþÿþÿþÿ¢INTERSTITIAL SENSORS ON TANKS 5 & 6 NOT FUNCTIONING PROPERLY. TANK 5 EMPTY AND ALL NOZZLES FOR TANK WERE SHUT DOWN AT TIME OF INSPECTION DUE TO A SUCTION PROBLEM.xgÂ%:ÂÂÂxg xg  xg þÿþÿþÿþÿþÿþÿþÿœSPILL BUCKETS CLEANED BY INSPECTOR INSPECTION UPDATE DATED 10/22/03 REC'D 12/8/03 SHOWS PASSING CP AT THIS TIME, NO OTHER CHANGES. TIMOTHY RECTORxg Â%;Ã_ÂÂxg xg  xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ%<Ã3PÂÂSxg xg  xh þÿþÿþÿþÿþÿþÿþÿTNEW FIBERGLASS PIPING INSTALLED BY KIRK ST PETER. CERT OF PROPER INSTALL SUBMITTEED.xg Â%= ÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%>à ÂÂSxg xg  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â%?ÃaÂÂSxg xg  xg Ã`þÿþÿþÿþÿþÿþÿþÿxg Â%@Â@ÂÂCxg xg Â(xg Ã$3þÿþÿþÿþÿþÿþÿþÿxg Â%AÂ>SÂÂCxg xg Á`xg ÃY 3þÿþÿþÿþÿþÿþÿþÿxg Â%BÂ7.ÂÂ!xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿºINSPECTION IS NOT FILLED OUT CORRECTLY BUT ALL DATA IS THERE. WE HAVE ONE TANK LISTED AS OOS WITH #2 OIL, THIS ACTUALLY IS A DIESEL TANK ACCORDING TO THE INSPECTION AND IT IS IN SERVICE.xg Â%CÃ3(ÂÁ2xg xg  xg þÿþÿþÿþÿþÿþÿþÿ9INSPECTOR REPLACED SENSORS AT TOP OF THE TANK AND CONSOLExg Â%DÃ3$ÂÁ2xg xg  xg þÿþÿþÿþÿþÿþÿþÿREMOVED WATER FROM SPILL BUCKETxg Â%EÃ3&ÂÁ2xg xg  xg þÿþÿþÿþÿþÿþÿþÿ#REMOVED WATER IN BUCKET AND MANHEADxg Â%Fà %ÂÂSxg xg  xg à \þÿþÿþÿþÿþÿþÿ.CP READINGS ON TANK 4: -1.07, ON TANK 5: -1.01xg Â%GÂÂÂxg xg  xg þÿþÿþÿþÿþÿþÿþÿ2CP NOW PASSING UPON RETEST. -.883 TIMOTHY RECTORxg Â%IÃÂÂAxg xg Âxgà #þÿþÿþÿþÿþÿþÿyFACILITY NOT RECONCILING INVENTORY MONTHLY AT TIME OF INSPECTION, BUT WERE DURING COMPLIANCE INSPECTION ON 11/04/2003. BBxgÂ%JÂQZÂÂKxg xg Âxg þÿþÿþÿþÿþÿþÿþÿ7/17/03 INSPECTION SHOULD HAVE BEEN ENTERED AS 2004 INSPECTION. BB RECEIVED INSPECTION UPDATE AND CERT. OF PROPER INSTALLATION DATED 12/16/2003 (PASS). BBxgÂ%KÂ?8ÂÂCxg xg ÂxgÃ* xg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â& à  xg xg Âxg þÿþÿþÿþÿþÿþÿþÿ0TANK #4 IS SCHEDULED TO BE REMOVED THIS FALL. BBxg Â& Â0ÂÂxg xg Á`xg Ã$]þÿþÿþÿþÿþÿþÿþÿxg Â&Ã-NÂÂxg xg Á`xg Ãþÿþÿþÿþÿþÿþÿþÿxg Â&ÂLXÂÂHxg xg Á`xg Ã_þÿþÿþÿþÿþÿþÿþÿxg Â&Ãd*ÂÂxg xg Á`xg ÄUcþÿþÿþÿþÿþÿþÿþÿxg Â&ÂGÂÂxg xg Á`xg Ä9O-þÿþÿþÿþÿþÿþÿþÿxg Â&ÃMÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&ÃaÂÂxg xg Á`xg Ã.Gþÿþÿþÿþÿþÿþÿþÿxg Â&ÂaEÂÂxg xg Á`xg Ã=!þÿþÿþÿþÿþÿþÿþÿxg Â&Ã+ÂÂxg xg Á`xg Ã1b`þÿþÿþÿþÿþÿþÿþÿxg Â&ÃÂÂxg xg Á`xg Ã+O\þÿþÿþÿþÿþÿþÿþÿxg Â&Á-ÂÂxg xg Á`xg Ã=þÿþÿþÿþÿþÿþÿþÿxg Â&Â5bÂÂHxg xg Á`xg ÃT+þÿþÿþÿþÿþÿþÿþÿxg Â&Ãc4ÂÂ9xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&Ã*ÂÂGxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â& ÂÂCxg xg Á`xg Ãþÿþÿþÿþÿþÿþÿþÿxg Â&Â5ÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&ÃSÂÂ!xg xg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&ÂÂÂKxg xg Âxg Ã"9þÿþÿþÿþÿþÿþÿDUPLICATE ENTRY.xgÂ&Â^ÂÂxg xg Âxg þÿþÿþÿþÿþÿþÿþÿ CP UPDATE. BBxg Â& Ã6bÂÂ)xg xg Âxg þÿþÿþÿþÿþÿþÿþÿCP UPDATE FOR 2003 INSPECTION.xg Â&!ÂRÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&"ÂFÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿ[NO OVERFILL? ON TANK INSTALLED IN JULY 1991. OIL AND SOLID FUEL BOARD REQUIRES VENT ALARM. xg Â&#ÃBÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&$Ã@ÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&%Ã?ÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&&Ã>ÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&'Ã<ÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&(Ã;ÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&)Ã4ÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&*ÂP@ÂÂSxg xg Á`xgÃ#9 þÿþÿþÿþÿþÿþÿþÿxgÂ&+Â2PÂÂSxg xg Á`xg Ã^þÿþÿþÿþÿþÿþÿ. PRODUCT PIPE READING: PIPING REPLACED IN 2003xg Â&,Ã(7 xg xg Á`xg ÃaPþÿþÿþÿþÿþÿþÿFDROP TUBE ON DIESEL REPLACED 10/27/03 AND SPILL BUCKET ALSO REPLACED. xg Â&-Â*ÂÂxg xg Á`xg Ã.4þÿþÿþÿþÿþÿþÿþÿxg Â&.ÃcÂÂxg xg Á`xg Ã`G4þÿþÿþÿþÿþÿþÿþÿxg Â&/ÂIÂÂ)xg xg Á`xg Äþÿþÿþÿþÿþÿþÿþÿxg Â&0ÂHÂÂ)xg xg Á`xg Äþÿþÿþÿþÿþÿþÿþÿxg Â&1àxg xg Á`xg €þÿþÿþÿþÿþÿþÿFACILITY IS OUT OF SERVICE.xg Â&2ÃW" xg xg Á`xg Ä6[þÿþÿþÿþÿþÿþÿþÿxg Â&3 ÂÂCxg xg Á`xg Ãþÿþÿþÿþÿþÿþÿ,ELECTRONICS REPLACED BY DUANE FURGE 11/14/03xg Â&4Â1ÂÂxg xg ÂxgÃW>þÿþÿþÿþÿþÿþÿVENT PIPING FAILED CP TEST. BBxgÂ&5ÂZ+ÂÂxg xg ÂxgÄ A\þÿþÿþÿþÿþÿþÿNPIPING FROM LOADING RACK TO TANK #8 IS CP STEEL. CP READING OF -1.5 VOLTS. BBxgÂ&6Ã*ÂÂKxg xg Á`xgÃ+'1þÿþÿþÿþÿþÿþÿþÿxgÂ&7Â7ÂÂKxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&8ÂCÂÂKxg xg Á`xgÄ,GAþÿþÿþÿþÿþÿþÿþÿxgÂ&9Ã!ÂÂKxg xg Á`xg à 3þÿþÿþÿþÿþÿþÿþÿxg Â&:ÂbJÂÂKxg xg Á`xgÃ'BþÿþÿþÿþÿþÿþÿþÿxgÂ&;à 8ÂÂKxg xg Á`xgÃVVþÿþÿþÿþÿþÿþÿþÿxgÂ&<ÂQSÂÂKxg xg Á`xgÄJ-^þÿþÿþÿþÿþÿþÿCRASH VALVE(S) MAY BE SET HIGH.xgÂ&=Ã5ÂÂKxg xg Á`xgÃUþÿþÿþÿþÿþÿþÿþÿxgÂ&>Ã5ÂÂ:xg xg Á`xg à b þÿþÿþÿþÿþÿþÿþÿxg Â&?Ã=ÂÂKxg xg Á`xg ÃQþÿþÿþÿþÿþÿþÿþÿxg Â&@Ã5KÂÂ:xg xg Á`xg Ã".þÿþÿþÿþÿþÿþÿþÿxg Â&AÃ[ xg xg Á`xgþÿþÿþÿþÿþÿþÿþÿREOPENED NOV 2002xgÂ&BÃRÂÂKxg xg Á`xg Ã1aþÿþÿþÿþÿþÿþÿþÿxg Â&CÂ3MÂÂKxg xg Á`xh Ä-þÿþÿþÿþÿþÿþÿþÿxgÂ&DÂIWÂÂKxg xg Á`xgÃ35&þÿþÿþÿþÿþÿþÿþÿxgÂ&EÃ6+ÂÂKxg xg Á`xgÃWbþÿþÿþÿþÿþÿþÿþÿxgÂ&FÃ"9ÂÂKxg xg Á`xgÃWSþÿþÿþÿþÿþÿþÿþÿxgÂZÃ_]ÂÂKxgxgÂxgÃ?þÿþÿþÿþÿþÿþÿGREPAIRS MADE BASED ON LETTER AND PASSING 2004 ANNUAL UST INSPECTION. BBxfÂ&GÃ_]ÂÂKxg xg ÂxgÃ*:LþÿþÿþÿþÿþÿþÿþÿxgÂ&HÃUÂÂKxg xg ÂxgÃFþÿþÿþÿþÿþÿþÿþÿxgÂ&IÂJÂÂKxg xg ÂxhÃ"cþÿþÿþÿþÿþÿþÿþÿxg Â&JÂ-;ÂÂKxg xg ÂxgÃ91þÿþÿþÿþÿþÿþÿþÿxgÂ&KÃKÂÂKxg xg ÂxgÄ2`þÿþÿþÿþÿþÿþÿXINSPECTOR FAILED DIESEL SUMP AND ALL SPILL BUCKETS FOR CONTAINING DIRT/WATER/PRODUCT. BBxgÂ&LÃ<ÂÂKxg xg ÂxhÃ)'AþÿþÿþÿþÿþÿþÿþÿxgÂ&MÃ;ÂÂKxg xg ÂxhÃ?/þÿþÿþÿþÿþÿþÿPASSING NOW PER DON BUBAR.xg Â&NÃ1 ÂÂKxg xg ÂxhÄV7TþÿþÿþÿþÿþÿþÿþÿxgÂ&OÃEYÂÂYxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&PÃ3SÂÂKxg xg Â(xhÄ\IþÿþÿþÿþÿþÿþÿþÿxgÂ&QÃX?ÂÂKxg xg Â(xgÃK VþÿþÿþÿþÿþÿþÿþÿxgÂ&RÃ\&ÂÂKxg xg Â(þÿÃZ0þÿþÿþÿþÿþÿþÿþÿxgÂ&SÃ`ÂÂKxg xg Â(xgÃHbVþÿþÿþÿþÿþÿþÿþÿxgÂ&TÃ5"ÂÂKxg xg Â(xhÄ))þÿþÿþÿþÿþÿþÿREPAIRS MADE PER PAUL BROWN.xgÂ&UÂ5^ÂÂKxg xg Â(xgÃA`þÿþÿþÿþÿþÿþÿþÿxgÂ&VÁ<ÂÂKxg xg Â(xgÃ5[þÿþÿþÿþÿþÿþÿþÿxgÂ&WÂÂÂKxg xg Â(xg Ã"9þÿþÿþÿþÿþÿþÿEREPAIRS MADE BY DON BUBAR. FACILITIES PASSING PER INSPECTION UPDATE.xgÂ&XÂ8ÂÂTxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&YÂ1aÂÂXxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&ZÂÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â&[Ã'ÂÂKxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&\Ã#PÂÂKxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿ.PER ELWIN SCOTT ALL FAILING ITEMS NOW PASSING.xgÂ&]ÂGÂÂKxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿÃELWIN SCOTT REINSPCETED FACILITY 12/19/2003, NO INIDCATION IF REPAIRS MADE, FACILITY IN COMPLIANCE, BALL FLOATS ON BOTH FOR OVERFILL PROTECTION, ALSO ELECTRONIC MONITOR NOW WORKING PROPERLY. xgÂ&^Â[ÂÂ:xg xg Â(xh þÿþÿþÿþÿþÿþÿþÿ%PAUL BROWN REPLACED THE SPILL BUCKET.xgÂ&_Ã6ÂÂ:xg xg Â(xg þÿþÿþÿþÿþÿþÿþÿQUST MANWAY REPLACED AS OLD MANWAY WAS COLLAPSING. WORK DONE 2/9/04 BY PAUL BROWN.xg Â&` ÂÂKxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&aÂbÂÂKxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿ6PER SCOTTY AT SIMARD AND SONS VIOLATIONS RESOLVED. TRxgÂ&bÂGFÂÂKxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&c ÂÂKxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ&dà @ÂÂKxg xg Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxgÂ'Â^ÂÂxg xg ÂxhÃ#Nþÿþÿþÿþÿþÿþÿ+VENT CAPS NOT REQUIRED. PASSING INSPECTION.xg Â'Â86ÂÂxg xg Âxg Ã'þÿþÿþÿþÿþÿþÿþÿxg Â'ÃE@ÂÂxg xg Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'Â<ÂÂxg xg Âxg Ã? þÿþÿþÿþÿþÿþÿþÿxg Â'ÂÂÂxg xg Âxg Ã&3þÿþÿþÿþÿþÿþÿþÿxg Â'Ã-EÂÂKxg xg  xgÃT8&þÿþÿþÿþÿþÿþÿþÿxgÂ'Ã4ÂÂKxg xg  xg Ãþÿþÿþÿþÿþÿþÿþÿxg Â'ÂH] xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿlUPDATED FAILING INSPECTION FROM 9/24/03. EPA VISIT ISSUED FINE FOR NO 2003 INSPECTION. FACILITY NOW PASSING.xg Â' Ã3UÂÂKxg xg  xhÃ7Lþÿþÿþÿþÿþÿþÿ*INSPECTION UPDATE SENT IN FROM JOHN SIMS. xgÂ' Â8ÂÂKxg xg  xhÃA UþÿþÿþÿþÿþÿþÿþÿxgÂ' Ã.XÂÂHxg xg Âxg ÃC þÿþÿþÿþÿþÿþÿþÿxg Â' Ã1 ÂÂ:xg xg  xg ÃZ3þÿþÿþÿþÿþÿþÿ>INSPECTION SUBMITTED AFTER NOV AND EPA FIELD CITATION ISSUED. xg Â' ÃÂÂxg xg  xg Ã;?þÿþÿþÿþÿþÿþÿ,INSPECTOR NOTED TO KEEP SPILL BUCKETS CLEAN.xg Â'ÂÂÂxg xg  xg Ã7U þÿþÿþÿþÿþÿþÿ=INSPECTION RECEIVED AFTER NOV AND EPA FIELD CITATION ISSUED. xg Â'Â"EÂÂYxg xg Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxg Â'à 9ÂÂKxg xg ÂþÿÃC!þÿþÿþÿþÿþÿþÿþÿxgÂ'ÃZYÂÂ!xg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ'à /ÂÂxg xg ÁcxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ'ÂABÂÂKxg xg ÂxhÄFM*þÿþÿþÿþÿþÿþÿREPAIRS MADE PER PAUL BROWN. xgÂ'ÃZ)ÂÂDxg xg ÁcxgÃPcþÿþÿþÿþÿþÿþÿþÿxgÂ'Ã^ÂÂDxg xg ÁcxgÃ@9 þÿþÿþÿþÿþÿþÿþÿxgÂ'Â$EÂÂDxg xg Ácxg ÃDXþÿþÿþÿþÿþÿþÿþÿxg Â'ÃÂÂIxg xg Ácxg à \þÿþÿþÿþÿþÿþÿþÿxg Â'ÂZ9ÂÂIxg xg Ácxg ÃW7Hþÿþÿþÿþÿþÿþÿþÿxg Â'ÃOÂÂIxg xg Ácxg ÄL]þÿþÿþÿþÿþÿþÿþÿxg Â'Ã#ÂÂIxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'Ã/ÂÂDxg xg Ácxg ÄL88þÿþÿþÿþÿþÿþÿþÿxg Â'à ÂÂDxg xg Ácxg Ä L4þÿþÿþÿþÿþÿþÿþÿxg Â'Â;ÂÂxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'Â-\ÂÂYxg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'ÃG$ÂÂ:xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â' ÂN^ÂÂ:xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'!ÂOÂÂ:xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'"ÂOÂÂ:xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'#ÂAcÂÂ:xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'$ÂOÂÂ:xg xg Ácxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'%à ÂÂKxg xg  xg ÃH:þÿþÿþÿþÿþÿþÿþÿxg Â'&ÂT2ÂÂxg xg Âxg Ã8þÿþÿþÿþÿþÿþÿþÿxg Â''ÂV`ÂÂ4xg xg Á`xg à XDþÿþÿþÿþÿþÿþÿŒFLAPPERS FAILED AND WERE REPLACED. AUTO SHUT OFF / FLAPPER CHECKED AND WORKING PROPERLY: DAVID HOWE REPLACED BOTH FLAPPERS TO CORRECT HEIGHTxg Â'(ÂN&ÂÂMxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â')Ã!ÂÂ)xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'*ÂT5ÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿEFACILITY IS OUT OF SERVICE, SLIGHTLY MORE THAN 2" OIL STILL IN TANK. xg Â'+ÃcÂÁ xg xg Á`xg Ãþÿþÿþÿþÿþÿþÿþÿxg Â',ÃWÂÂxg xg Á`þÿÃ<þÿþÿþÿþÿþÿþÿ/INSPECTION SUBMITTED AS A RESULT OF ENFORCEMENT OF ANNUAL INSPECTION REGULATION. EPA TICKET ISSUED, INSPECTION HAD COPY OF PAYMENT ATTACHED.NOT ENOUGH THROUGH PUT FOR STAGE 1 VAPOR RECOVERY. CRASH VALVES ON 4 DISPENSERS ALL FAIL DUE TO HEIGHT AND LACK OF ANCHORING. NO CRASH VALVE ON DOCK DISPENSER. ALL PIPING AND CRASH VALVES ARE BEING REPLACED THIS WINTER AND WORK WILL BE COMPLETE PRIOR TO GOING BACK INTO SERVICE IN THE SPRING. SCOTTY FROM SIMARD'S CALLED ON 10/29/2004. CRASHVALVE ISSUES WILL BE CORRECTED, BUT NOT BEFORE THE OCTOBER 31ST DEADLINE. BBxg Â'-ÃZ)ÂÂDxg xg ÁcxgÃPcþÿþÿþÿþÿþÿþÿþÿxgÂ'.Ã- ÂÂDxg xg Á`xg ÃPcþÿþÿþÿþÿþÿþÿqINVENTORY PROBLEMS INSTALLER RECOMMENDED CHANGES. LAST 12 MONTHS OF THROUGHPUT RECORDS?: RECORDS NOT KEPT ON SITExg Â'/ÃKÂÂDxg xg Á`þÿÃ;'#þÿþÿþÿþÿþÿþÿJDAILY INVENTORY PROBLEMS. ATG INSTALLED IN 2003 NOT LISTED ON INSPECTION. xg Â'0Ã!ÂÂDxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿFAILED STAGE 1 ONLYxgÂ'1Ã"7ÂÂDxg xg Á`þÿÃc!_þÿþÿþÿþÿþÿþÿþÿxg Â'2ÂM>ÂÂIxg xg Á`xh ÃIþÿþÿþÿþÿþÿþÿ»NEW CP, PAD, BUCKETS, CRASH VALVES SCHEDULED FOR SUMMER 04 -ACF INSTALLER COMMENTED ON THE FACT THAT THE CRASH VALVES ARE SET A LITTLE LOW AND SHOULD BE RESET HIGHER. CP FAILS ON TANK #5xg Â'3Ã[ÂÂDxg xg Á`þÿÃþÿþÿþÿþÿþÿþÿþÿxg Â'4Â-LÂÂKxf xg Â(þÿà ,Iþÿþÿþÿþÿþÿþÿþÿxf Â'5Ã-ÂÂCxg xg Â(xgÃ/þÿþÿþÿþÿþÿþÿþÿxgÂ'6Ã"8ÂÂDxg xg Á`xhÃ^W8þÿþÿþÿþÿþÿþÿþÿxg Â'7ÃJ;ÂÂDxg xg Á`xhÃIa[þÿþÿþÿþÿþÿþÿþÿxgÂ'8Ã(ÂÂDxg xg Á`xhÃ;b+þÿþÿþÿþÿþÿþÿþÿxgÂ'9ÂV]ÂÂMxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â':Â\LÂÂMxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â';Â<ÂÂxg xg Á_xgþÿþÿþÿþÿþÿþÿþÿ"LATE SUBMITAL AFTER EPA INSPECTIONxgÂ'<ÂG[ÂÂ9xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'=Ã`\ÂÂ9xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿUACTUAL INSPECTION YEAR IS 2004, SO RE-ENTERED AS 2004. OPERATOR ERROR. TRxg Â'>ÃW1ÂÂ9xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'?Ã`\ÂÂ9xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'@Â$IÂÂ9xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'A ÂÂKxf xg  þÿþÿþÿþÿþÿþÿþÿþÿþÿxf Â'BÂ"JÂÂKxf xg  þÿþÿþÿþÿþÿþÿþÿþÿþÿxfÂ'CÃa'ÂÂ9xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'DÂR;ÂÂKxf xg  þÿþÿþÿþÿþÿþÿþÿþÿ³TANK # 10 NOT REGISTERED WHEN ANNUAL INSPECTIONS WERE SUBMITTED. CURRENTLY REGISTERED WITH BACK REG. FEES PAID. ADDED THE TANK ON TO THE INSPECTION IN TERMS OF WHERE IT FAILED. RRxf Â'EÂ?ÂÂxg xg Á`xg Ã3þÿþÿþÿþÿþÿþÿþÿxg Â'FÂJ ÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'GÃb[ÂÂ!xg xg Á`xg ÄSþÿþÿþÿþÿþÿþÿþÿxg Â'HÂAÂÂGxg xg Á`xg Ã( þÿþÿþÿþÿþÿþÿþÿxg Â'IÃXÂÂKxg xg Á`xgÃ(V$þÿþÿþÿþÿþÿþÿþÿxgÂ'JÂ6NÂÂCxg xg  xgþÿþÿþÿþÿþÿþÿþÿ+INSTALLED FLAPPER VALVE ON HEATING OIL TANKxgÂ'KÃ^ ÂÂ)xg xg Á`þÿÄ þÿþÿþÿþÿþÿþÿþÿxg Â'L ÂÂ)xg xg Á`xg Ã(=þÿþÿþÿþÿþÿþÿEILEEN MIAZGA SENT LETTER DATED 5/25/2007, ASKING FOR PERMISSION TO HAVE THE FACILITIES USTS OOS LONGER THAN 12 MONTHS. WILL LET FACILITY REMAIN TEMPORARILY OOS UNTIL DECEMBER 31, 2007, IF A PASSING A.I. IS SUBMITTED BY JULY 1, 2007 AND UST IS PLACE PROPERLY OOS. FACILITY ALSO NEEDS TO HAVE A PRECISION TEST PERFORMED BEFORE RE-OPENING. HAVE NOT RECEIVED EITHER AS OF 7/11/2007.xg Â'MÃ` ÂÂKxg xg Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ'NÂ$ ÂÂ!xg xg Á`xg Ãd cþÿþÿþÿþÿþÿþÿþÿxg Â'OÃFÂÂ!xg xg Á`xg ÄUVþÿþÿþÿþÿþÿþÿþÿxg Â'PÃ#ÂÂSxg xg Á`þÿþÿþÿþÿþÿþÿþÿþÿ;RECEIVED CALL FROM GARY THIBEAU (SITE MANAGER) ON 04/30/2004. CTI KIRK ST PETER TO COMPLETE WORK ON CP SYSTEM THIS SPRING. BB GARY CALLED ON 06/30/2004. HE IS IN PROCESS OF GETTING LOAN TO REPAIR TANKS, BUT HE WILL NOT HAVE MONEY BEFORE THE DEADLINE. NEEDS ANOTHER MONTH. KIRK IS STILL SCHEDULED TO DO WORK. BBxg Â'QÂSÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'R bÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'S ÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'TÂÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'UÃUSÂÂSxg xg Á`þÿÂþÿþÿþÿþÿþÿþÿ!OVERFILL FAILED IN 2003 AS WELL. xg Â'VÂ< ÂÂSxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'WÂÂÂSxg xg Á`xg Ã"G/þÿþÿþÿþÿþÿþÿþÿxg Â'XÂ'ÂÂ4xg xg Á`xg Ãþÿþÿþÿþÿþÿþÿþÿxg Â'YÂ4ÂÁ xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'ZÂ:(ÂÁ xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'[Ã`!ÂÁ xg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â'\ xg xg ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ']Â!ÂÂSxg xg Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxg Â'^Ã%ÂÂxg xg Á`xg Ä/ þÿþÿþÿþÿþÿþÿþÿxg Â'_Â.ÂÂxg xg Á`xg Ãcþÿþÿþÿþÿþÿþÿþÿxg Â'`Â7ÂÂxg xg Á`xg Ã4 þÿþÿþÿþÿþÿþÿþÿxg Â'aÃ&HÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿKINSPECTOR LISTS CP RESULTS OF -.87. THE TANK IS LISTED AS A JACKETED TANK. xg Â'bÂ2IÂÂxg xg Á`xg ÃD.4þÿþÿþÿþÿþÿþÿþÿxg Â'cÃ2ÂÂxg xg Á`xg Ä-SBþÿþÿþÿþÿþÿþÿþÿxg Â'dÃ>ÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(à ÂÂxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(ÂÂÂPxg xg Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(ÃN[ÂÂxhxhÂxg ÃWþÿþÿþÿþÿþÿþÿ4INSTALLED 61SO DROP TUBES AND PRESSURE VENT CAPS. BBxg Â(ÃMÂÂxhxhÁ`xgà þÿþÿþÿþÿþÿþÿ6OWNER CALLED 12/29/05, WILL SCHEDULE BILL CARVER ASAP.xgÂ(Â[7ÂÂLxhxhÂ(xgÃ\5þÿþÿþÿþÿþÿþÿ&2003 INSPECTION ENTERED IN ERROR - ACFxgÂ(Â[6ÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿ8INSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP.xgÂ(Â[=ÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿ4INSPECTED BY JEFFERY HANSEN (MANUFACTURER CERTIFIED)xgÂ(Â[;ÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿ4INSPECTED BY JEFFERY HANSEN (MANUFACTURER CERTIFIED)xgÂ( Â[8ÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿ8INSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP.xgÂ( Â[9ÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿ8INSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP.xgÂ( Â[BÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿ8INSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP.xgÂ( Ã-]ÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿ8INSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP.xgÂ( Â[.ÂÂLxhxhÂ(xgÄYCBþÿþÿþÿþÿþÿþÿ8INSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP.xgÂ(Â[LÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿsINSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP. SENSORS ARE FUNCTIONING PROPERLY?: SYSTEM IN ALARM 6/23/03xgÂ(Â[?ÂÂLxhxhÂ(xgÄN þÿþÿþÿþÿþÿþÿ8INSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP.xgÂ(Â[@ÂÂLxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿWINSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP. UPDATED BY ELWIN SCOTT 6/16/04xgÂ(ÃÂÂLxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿ8INSPECTED BY JEFFERY HANSON, MANUFACTURER CERTIFIED REP.xgÂ(ÂYUÂÂZxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿñINSPECTION INDICATES 7 TANKS? 3 15,000 GALLON , 2 IN SERVICE ONE OOS, AND 4 OTHER TANKS LISTED AS OIL WATER SEPERATORS SIZES UNKNOWN. INTERSTITIAL MONITORING FAILING FOR ONE REASON OR ANOTHER ON ALL OIL WATER TANKS. SITE FAILS INSSPECTION.xg Â(Â5ÂÂxhxhÁ`xgþÿþÿþÿþÿþÿþÿþÿSNO ACCESS TO VENT WHISTLE ON TANK 8. WORK TO BE DONE SPRING 2004 TO PROVIDE ACCESS.xgÂ(Ã` ÂÂ)xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿzSCOTT CLUKEY CALLED ON 04/13/2004. WORK HAS BEEN COMPLETED BY GAFTEK AND INSPECTION UPDATE WILL BE SENT TO DEPARTMENT. BBxg Â(Â.ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(Â.ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(Ã8ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(ÂR_ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(Ã'ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â( 2ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â( 1ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â( dÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â( NÂÂHxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxg Â(Ã.NÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿšNO CP READINGS ON THE INSPECTION. TANK LISTED AS DW CP STEEL. TANK DETERMINED TO BE JACKETED BY MIKE LEWIS. SEE MEMO FROM HIGHLAND TANK IN TANK FILE. BBxg Â( ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â( Ã;NÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(!Ã3ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â("Ã5IÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(#ÂÂÂxhxh xg Ã2 þÿþÿþÿþÿþÿþÿ9DEP NOV AND EPA FIELD CITATION ISSUED 12/10/2003. -- DMCLxg Â($ÂGGÂÂxh xh  xi þÿþÿþÿþÿþÿþÿþÿGOWNER REPORTS NO METER ON TANK. ACTUAL INSPECTION DATE IS OCTOBER 7, 2003, NOT JANUARY 9, 2004. SORRY. 0.1 GPH ATG INSTALLED ON TANK, PROPER PAPERWORK SUBMITTED INCLUDING SET-UP REPORT AND TANK TEST REPORT. DAVE BEAUMONT TO PERFORM ANNUAL INSPECTION DURING THE WEEK OF MARCH 14, 2005. OWNER NOTIFIED THAT IT IS WELL OVERDUE.xh Â(%ÃZXÂÂHxhxh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(&Ã\@ÂÂxhxh  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â('Ã\AÂÂxhxh  xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(( ÂÂxhxh Á`xg à þÿþÿþÿþÿþÿþÿþÿxg Â()ÃÂÂxh xh Á`þÿÃ"\Lþÿþÿþÿþÿþÿþÿ2ISSUED NOV ON 04/06/2004. SEE ENFORCEMENT TAB. BBxg Â(*Â-]ÂÂAxh xh Á`xhà ;þÿþÿþÿþÿþÿþÿþÿxhÂ(+Ã'ÂÂHxhxh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(,à @ÂÂHxhxh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(-Â[>ÂÂLxhxh Â(xgþÿþÿþÿþÿþÿþÿþÿ4INSPECTED BY JEFFERY HANSEN (MANUFACTURER CERTIFIED)xgÂ(.Â[=ÂÂLxhxh Â(xgþÿþÿþÿþÿþÿþÿþÿ4INSPECTED BY JEFFERY HANSEN (MANUFACTURER CERTIFIED)xgÂ(/Â[;ÂÂLxhxh Â(xgþÿþÿþÿþÿþÿþÿþÿ4INSPECTED BY JEFFERY HANSEN (MANUFACTURER CERTIFIED)xgÂ(0Â[6ÂÂLxhxh Â(xgþÿþÿþÿþÿþÿþÿþÿ4INSPECTED BY JEFFERY HANSEN (MANUFACTURER CERTIFIED)xgÂ(1Â[7ÂÂLxhxh Â(xgÃ\5þÿþÿþÿþÿþÿþÿ4INSPECTED BY JEFFERY HANSEN (MANUFACTURER CERTIFIED)xgÂ(2Â%-ÂÂbxhxh xhþÿþÿþÿþÿþÿþÿþÿMC.P. TESTED AT -4 DEGREES F. -- DMCL INSPECTION UPDATE DATED 05/05/2004. BBxh Â(3ÂÂÂZxhxhÂxg þÿþÿþÿþÿþÿþÿþÿˆTANKS TO BE BROUGHT BACK INTO SERVICE FOLLOWING PASSING PRECISION TEST. BB PASSING PRECISION TEST RECEIVED. TANKS BACK IN SERVICE. BBxg  Â$ÂÂxgxg Á`xgÃ[þÿþÿþÿþÿþÿþÿªPROBLEMS CORRECTED ALSO NEW BALL FLOATS INSTALLED AT 90% FULL OLD ONE REMOVED WERE AT 95% ALL OTHER PROBLEMS CORRECTED PER ROBERT CORMIER ON 8/17/2003. FACILITY PASSING. xgÂ(4ÂÂÂxh xhÁ`xg Ã)*þÿþÿþÿþÿþÿþÿx4/12/11-REG. REC'D FOR CTI BOSSE TO INSTALL TWO 2000 GAL DOUBLE WALLED JACKETED TANKS WITH SINGLE WALLED GLASS PIPING-PHxg Â(5ÂO`ÂÂxhxhÁ`xg Ã5aþÿþÿþÿþÿþÿþÿFACILITY PASSED. xg Â(6Ã`ÂÂAxhxhÁ`xhÃ>1þÿþÿþÿþÿþÿþÿÈBALL FLOATS ON SUCTION SYSTEM, MAY NEED TO BE LOOKED AT. OTHERWISE FACILITY IS FINE AND PASSES. FACILITY INSTALLED 12/4/1996 RULE CHENGE REGARDING BALL FLOATS EFFECTIVE 12/24/1996. THEY PASS, BARELY.xhÂ(7ÃZÂÂKxhxhÁ`xh Ä þÿþÿþÿþÿþÿþÿþÿxh Â(8ÃZPÂÂTxg xhÂ(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(9à Q xhxhÂ(xg ÂQþÿþÿþÿþÿþÿþÿþÿxg Â(:ÂOÂÂxhxhÂxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(;Â:-ÂÂ!xhxhÁ`xgþÿþÿþÿþÿþÿþÿþÿ(INSPECTED BY MULLINS DURING SUSPENSION. xgÂ(<Â#ÂÂxhxhÁ`xgÃ6þÿþÿþÿþÿþÿþÿþÿxgÂ(= ÂÂCxhxhÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ(>Âb ÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿÔ3/31/04 BUBAR SUBMITS UPDATE, ALL BUT T5 CP PASSES -ACF SOIL DRY AROUND TANKS, UNABLE TO PASS CP TEST. NOTES FROM INSPECTOR READ AS FOLLOWS: "MONITOR FOR TANK 5 IS IN ALARM AND IS INDICATING "HOLE" IN TANK. SYSTEM CANNOT BE RESET. MONITOR FOR TANK 6 WAS MANUFACTURED BY SYLVANIA STAFF. TEST PROTOCOL UNKNOWN. THERE IS A TYPE OF ELECTRONIC OVERFILL ALARM ON BOTH TANKS, #5 IS INACCURATE, #6 IS NON FUNCTIONAL." 3/31/04 DON BUBAR INSPECTS AND PASSES ALL BY T5 CP -ACFxgÂ(?Â_ÂÂxhxhÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ(@Â5+ÂÂPxhxhÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ(AÂ.ÂÂ:xhxhÂxgÃ-NþÿþÿþÿþÿþÿþÿþÿxgÂ(BÂUÂÂxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxfÂ(Cà N xhxhÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ(D @ÂÂxhxhÁ`þÿÃZ þÿþÿþÿþÿþÿþÿˆRECEIVED CALL FROM MARK LINCOLN ON 04/30/2004. CTI CARVER HAS CORRECTED ALL PROBLEMS AND A PASSING INSPECTION IS TO BE SENT IN ASAP. BBxg Â(E ÂÁ=xhxhÁ`xgÃ3þÿþÿþÿþÿþÿþÿþÿxgÂ(FÃNÂÂCxhxhÁ`xgþÿþÿþÿþÿþÿþÿþÿ #5 OIL TANK.xgÂ(GÃGÂÂDxhxhÁ`xhà ,þÿþÿþÿþÿþÿþÿ^ACTUAL INSPECTION YEAR IS 2004 NOT 2003. FACILITY IS GOOD UNTIL JANUARY 2005. TIMOTHY RECTORxhÂ(HÃ\EÂÂxgxhÁ`xgà aþÿþÿþÿþÿþÿþÿþÿxgÂ(IÃ]5ÂÂxhxhÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ(JÃK/ÂÂHxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿcRECOMMENDED REPLACING ELECTRONIC MONITORING SYSTEM. NEW MONITOR INSTALLED BY DON BUBAR. 10/29/2003xgÂ(KÃdSÂÂxhxh þÿþÿþÿþÿþÿþÿþÿþÿgMECHANICAL LLDS REPAIRED, PASSED 3 GPH LEAK TEST. CTI TO INSTALL ATG FOR LEAK DETECTION IN THE SPRING.xhÂ(LÃF- xhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â(MÃK+ÂÂKxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿgCONTACTED GEORGE SCHAACK AT RED STAR EXPRESS, PORTLAND PUMP WILL COMPLETE ATG FORM AND RETEST ATG. BBxgÂ(NÃ#ÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ(OÃ\%ÂÂKxg xh xhÃLþÿþÿþÿþÿþÿþÿ”SUBMITTED ANNUAL INSPECTION AFTER UST COMPLIANCE INSPECTION IN WHICH NOV WAS ISSUED. NOW AWARE THAT ANNUAL INSPECTIONS MUST BE SUBMITTED TO THE DEP.xhÂ(PÂPÂÂxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿiTHE INSPECTION DATE IS ACTUALLY 9/23/2002 AND THEREFORE 2003 INSPECTION NOT 2004. OPERATOR ERROR. TJRxg Â(QÃ4ÂÂxhxhÁ`xf þÿþÿþÿþÿþÿþÿþÿþÿxf Â(RÂÂÂKxhxhÁ`xhÃS5ZþÿþÿþÿþÿþÿþÿþÿxhÂ(SÂXEÂÁ xhxhÁ`xh Ã7"Gþÿþÿþÿþÿþÿþÿþÿxh Â(TÂD1ÂÂ4xhxhÁ`xhÃ.FZþÿþÿþÿþÿþÿþÿþÿxhÂ(UÂ2EÂÂ4xhxhÁ`xhÃJKcþÿþÿþÿþÿþÿþÿþÿxhÂ(VÃ\RÂÂ4xhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ(WÃGÂÂ4xhxhÁ`xg Ã-þÿþÿþÿþÿþÿþÿþÿxg Â(XÃ]ÂÂ4xhxhÁ`þÿÃ3þÿþÿþÿþÿþÿþÿþÿxgÂ(YÃ+<ÂÁ xhxhÁ`þÿà Aþÿþÿþÿþÿþÿþÿþÿxg Â(ZÃU6ÂÂ4xhxhÁ`xgÃaQQþÿþÿþÿþÿþÿþÿþÿxgÂ([ÂQ"ÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ(\ÃO*ÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ(]ÂOÂÂHxhxhÂ(xh þÿþÿþÿþÿþÿþÿþÿ_ NO WATER IN SUMPS OR INTERSTITIAL SPACE?: REMOVED, NOTIFIED DEP AND SCHOOL OF WATER IN SUMPS xhÂ(^ÂNÂÂHxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ(_ÂKÂÂHxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ(`ÃHÂÂKxhxh xg ÃUþÿþÿþÿþÿþÿþÿþÿxg Â(aÂcÂÂHxhxhÂ(þÿÂþÿþÿþÿþÿþÿþÿþÿxhÂ(bÂ'ÂÂKxhxh xg ÃJþÿþÿþÿþÿþÿþÿþÿxg Â(cÂ'ÂÂKxhxh xg ÃK/þÿþÿþÿþÿþÿþÿþÿxg Â(dÃ5+ÂÂKxhxh xg Ã2Jþÿþÿþÿþÿþÿþÿþÿxg Â)Ã/YÂÂKxhxh xg Ã,þÿþÿþÿþÿþÿþÿþÿxg Â)Â'ÂÂKxhxh xg à Haþÿþÿþÿþÿþÿþÿþÿxg Â)Ã@ ÂÂKxhxh xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)ÂVÂÂTxhxh xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Â(ÂÂ!xhxhÂ(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)Â?1ÂÂxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)ÂBÂÂxhxh xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Ã'ÂÂxhxhÂ(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â) ÃRÂÂxhxhÂ(xgÃL6þÿþÿþÿþÿþÿþÿþÿxgÂ) ÃÂÂ:xhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxgÂ) Ã]ÂÂxhxh xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ) ÂÂÂxhxh xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ) Ãb]ÂÂ)xhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Â'\ÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿ<ENTERED IN ERROR. NO WINCHESTER INSPECTION ON 3/26/03. -ACFxgÂ)Ã] ÂÂxhxh xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Ã$ÂÂKxhxhÂ(xg þÿþÿþÿþÿþÿþÿþÿ LEONARD CARRxg Â)ÂPÂÂCxhxhÂ(xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)ÃOÂÂHxhxh xhÄHþÿþÿþÿþÿþÿþÿ&INSPECTION UPDATE PERFORMED BY M LEWISxh Â)Ã%5ÂÂHxhxh xh Ä<Zþÿþÿþÿþÿþÿþÿþÿxh Â)ÂQ#ÂÂIxhxh xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)ÃY ÂÂDxhxh xg ÃYQ2þÿþÿþÿþÿþÿþÿ8INSPECTION UPDATE SENT IN. LINE LEAK DETECTORS REPLACED.xg Â)à ÂÂ)xhxh þÿþÿþÿþÿþÿþÿþÿþÿgSPOKE TO JOE PILON, ENV. CONSULTANT: HE DRAFTED A PROPOSAL AND SCHEDULE TO REPLACE OVERFILL. PUT CONTROLS IN PLACE UNTIL THE MONTH OF MAY WHEN OWNER CAN AFFORD TO DO REPAIRS. I TOLD HIM THAT THE FACILITY WILL REMAIN IN VIOLATION UNTIL THE NECESSARY REPAIRS ARE MADE. SPOKE TO TIM ABOUT IT, WHO WAS LEAD ENFORCEMENT STAFF FOR EPA NO ANNUAL INSPECTION VISIT. RRxg Â)ÂUÂÂTxhxhÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)ÂÂÂTxhxh xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Â'\ÂÂ4xhxhÂ(xg þÿþÿþÿþÿþÿþÿþÿ] WRITTEN LOG OF SUMP CHECKS AVAILABLE?: HOWE DIDN'T SEE LOG ON SITE, WILL CALL OPERATOR - ACFxg Â)ÃR\ÂÂLxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿPER WINCHESTER, TYPED COMMENTS IN INSPECTION REPORT ARE FIELD NOTES ENTERED IN ERROR BY CLERICAL STAFF. - ACF NO WATER IN SUMPS OR INTERSTITIAL SPACE?: FIXED LEAKING SUMP MENTIONED IN COMMENTS SPILL BUCKETS LIQUID TIGHT?: FIXED LEAKING GASKET MENTIONED IN COMMENTSxgÂ)Â;(ÂÂxhxhÂ(xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)Ãa(ÂÂCxg xhÁ_xgþÿþÿþÿþÿþÿþÿþÿ!POOR COPY GIVEN DURING INSPECTIONxgÂ) 5ÂÂSxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)ÃFÂÂPxhxhÁ`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)ÂKÂÂxhxhÁ`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â) Â!<ÂÂxg xh þÿÂ[SþÿþÿþÿþÿþÿþÿþÿxgÂ)!ÃXÂÂ!xh xh ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)"Â.ÂÂ:xh xh Á`xhÃ4&7þÿþÿþÿþÿþÿþÿ!DAVID HOWE REPLACED SPILL BUCKETSxgÂ)#ÂO'ÂÂxh xh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)$ÂO(ÂÂxh xh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)%Ã]6ÂÂxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)&Â<ÂÂxh xh Á`xg Ã5;%þÿþÿþÿþÿþÿþÿþÿxg Â)'ÃCFÂÂ!xhxh  xh þÿþÿþÿþÿþÿþÿþÿINSPECTION DATE IS 5/28/03. RRxh Â)(Ã60ÂÂHxhxh  xhà -AþÿþÿþÿþÿþÿþÿØM LEWIS SUBMITTED INSPECTION UPDATE FOR TANKS 1, 2, 3. TANK 3 STILL FAILING FOR OUT-OF-SERVICE VIOLATIONS. TANK #3 IS NOT BEING USED, BUT ELECTRONIC LEAK DETECTION AND CP ARE STILL BEING MAINTAINED FOR THIS TANK. BBxh Â))ÂÂÂxhxh  xhÃY Vþÿþÿþÿþÿþÿþÿ=RECEIVED INSPECTION UPDATE FROM BOB CORMIER ON O5/21/2004. BBxg Â)*ÂG5 xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ)+Ã"ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿURECEIVED INSPECTION ONLY FOR TANKS #410 AND #411. THIS SITE HAS MULTIPLE TANKS ON SITE. FAILING INSPECTION BECAUSE OF MISSING TANKS, TANKS #410 AND #411 ARE PASSING TANKS. UPDATE 6/22/04 REC'D 2 ADDITIONAL TANK INSPECTIONS FOR THIS LOCATION, TANKS #378 AND #415 ARE ALSO PASSING, #378 IS OUT OF SERVICE. INSPECTED MAY 2004.xg Â),Ã&ÂÂ!xh xh Âxgþÿþÿþÿþÿþÿþÿþÿ6MULLINS UNDER SUSPENSION DURING TIME OF INSPECTION. BBxgÂ)-ÃdLÂÁ=xh xh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ).ÂPÂÂxh xh Âxhþÿþÿþÿþÿþÿþÿþÿ¸FACILITY INFORMED OF GROUNDWATER MONITORING REQUIREMENT DURING COMPLIANCE INSPECTION ON 07/17/2002. ANNUAL INSPECTION INDICATES FACILITY IS STILL NOT MONITORING GW MONITORING WELL. BBxg Â)/ÂÂÂ)xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿrFACILITY HAS BEEN OUT OF SERVICE. INSPECTION INDICATES THAT IT WILL BE GOING INTO SERVICE IN THE IMMEDIATE FUTURE.xhÂ)0Ã&ÂÁ xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ)1ÂB\ÂÁ xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿPIPING SUMPS HAVE ICE IN THEM.xhÂ)2Â=/ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â)3ÃÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)4ÃKÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)5ÃJÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)6ÃIÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)7ÃGÂÂPxh xh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)8ÃFÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)9ÃEÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â):Ã@ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿ"TANK ONLY HAD 1/2" OF FUEL IN IT.xg Â);Ã'ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)<Ã`/ÂÂPxh xh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)=Ã`.ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)>Ã`,ÂÂPxh xh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)?Ã`)ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)@Ã^5ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)AÃ]?ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)BÃ]>ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)CÃ]=ÂÂPxh xh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)DÃ]<ÂÂPxh xh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)EÃ];ÂÂPxh xh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ)FÃ]9ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)GÃ]8ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)HÃ]7ÂÂPxh xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â)IÂ%XÂÂxh xh Á`xh€þÿþÿþÿþÿþÿþÿ]TWO CHAMBERED TANK IS OUT OF SERVICE AND HAS BEEN SINCE JANUARY 2002. BILL CARVER VERIFIED THAT IT IS PROPERLY OUT OF SERVICE. ********NOTE************ TANK TOP UPGRADE PERFORMED ON THIS TANK IN MARCH 2006 BY A.L. DOGGETT. PAPERWORK FILED WITH DEP IN DECEMBER 2006. NOT REQUIRING A 2006 INSPECTION, WILL BE DUE FOR INSPECTION IN MARCH 2007. TR xhÂ)JÂ.ÂÂ4xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿ INSPECTION INCOMPLETE. GROUND FROZEN SO NO CP TEST. INSPECTOR INDICATES ATG BEING USED, RECORDS SHOW DAILY INVENTORY AND SIA. NO SIA IN 2003. SPOKE TO MAPES; FACILITY DOES NOT USE ATG- THEY USE DAILY INVENTORY AND SIA. INSPECTION UPDATE SENT IN FROM DAVID HOWE. RRxh Â)KÂ%,ÂÂHxh xh Á`xgþÿþÿþÿþÿþÿþÿþÿMIKE LEWIS DID THE CP TEST IN APRIL 2003. TANK TOP UP WAS REBUILT BY PRECISION TANKS, TONY COUTURE, IN THE FALL OF 2003 SO NO OTHER INSPECTION DONE. DISCUSSED INTERNALLY AND AGREED TO PASS WITH STIPULATION THAT THE TANK STILL NEEDS A 2004 INSPECTION PRIOR TO JULY 1, 2004.xgÂ)LÃÂÂxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿBORIGINAL INSPECTION DATED 11/10/03 ON OLD SINGLE PAGE FORM. RESUBMITTED INSPECTION ON NEW FORM DATED 12/10/03, BOTH SIGNED BY MICHAEL KNAPP. FORM IS NOT COMPLETE AND IS FILL OUT INCORRECTLY IN AREAS THAT ARE COMPLETE. FACILITY FAILS. PER DON BUBAR, GAFTEK, FACILITY PASSES HIS INSPECTION OF THE PREVIOUSLY FAILING PARTS. xg Â)MÂ$ xh xh Á`xhÃU%Jþÿþÿþÿþÿþÿþÿ_INSPECTOR INDICATES THAT THE ENVIROFLEX PIPING IS SUSPECT, APPEARS TO BE DETERIORATING. TRxhÂ)NÃ=ÂÂxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7_ÃaÂÂSxhxh xh þÿþÿþÿþÿþÿþÿþÿdABOVEGROUND TANK. INSPECTION IS FOR UNDERGROUND PIPING ONLY. SPECIFICALLY, INTERSTITIAL MONITORING. xh Â7`Ã$ÂÂSxhxh xhþÿþÿþÿþÿþÿþÿþÿOABOVEGROUND TANK. INSPECTION FOR INTERSTITIAL MONITORING OF UNDERGROUND PIPING.xhÂ7aÃ(ÂÂSxhxh xhþÿþÿþÿþÿþÿþÿþÿXABOVEGROUND TANK. INSPECTION IS FOR INTERSTITIAL MONITORING OF UNDERGROUND PIPING ONLY. xhÂ7bÂ8ÂÁ$xhxh xh ÃLþÿþÿþÿþÿþÿþÿþÿxh Â7dÂ)ÂÁ$xhxh xh Ä þÿþÿþÿþÿþÿþÿþÿxh Â8Â^BÂÁ$xhxh xh ÃLþÿþÿþÿþÿþÿþÿ*FACILITY NOW PASSING PER CTI DENNIS DAVIS.xh Â8Â(ÂÁ$xhxh xh ÃLþÿþÿþÿþÿþÿþÿ>PASSED PER CTI DENNIS DAVIS. B/V LOCATED IN SUBMERSIBLE SUMPS.xhÂ8ÃdJÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8Ã+IÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8ÂXÂÂHxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â8Ã#@ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8Â$=ÂÂKxhxhÁcxhÃ4>þÿþÿþÿþÿþÿþÿþÿxhÂ8Â.ÂÂAxhxhÁcxh ÂþÿþÿþÿþÿþÿþÿëPHONE CALL AND NOTE ON LOG FROM DEAN DRISKO INDICATES THAT THIS TANK IS TECHNICALLY IN SERVICE BECAUSE OWNER IS USING GASOLINE FOR HIS VEHICLES. FACILITY IS SHUT DOWN TO THE PUBLIC AND OWNER IS IN THE PROCESS OF SELLING THE STATION. RRxh Â8 ÁÂÂTxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â8 ÃT$ÂÂUxhxhÁcxhÃ=U+þÿþÿþÿþÿþÿþÿþÿxhÂ8 Ã*`ÂÂUxhxhÁcxh ÂQþÿþÿþÿþÿþÿþÿþÿxh Â8 Â! ÂÂxhxhÁcxhÃ5BþÿþÿþÿþÿþÿþÿþÿxhÂ8 Ã\SÂÂxhxhÁcxhÃ`þÿþÿþÿþÿþÿþÿþÿxhÂ8Ã.XÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8à LÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8ÃÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8ÃQUÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8Ã5ÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8Â9ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8Â2DÂÂUxhxhÁcxhÃ7 þÿþÿþÿþÿþÿþÿþÿxhÂ8Â2GÂÂUxhxhÁcxhÃL'þÿþÿþÿþÿþÿþÿþÿxhÂ8ÃK ÂÂxhxhÁcxhÄA þÿþÿþÿþÿþÿþÿþÿxhÂ8Â2HÂÂUxhxhÁcxhÃQQ>þÿþÿþÿþÿþÿþÿþÿxhÂ8ÂB[ÂÂSxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8 ÂÂSxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8Â'ÂÁ$xhxhÁcxhÃLþÿþÿþÿþÿþÿþÿþÿxhÂ8ÂY ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8ÃNÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8Ã4ÂÂCxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â8Ã"9ÂÂ)xhxhÁcxhÃ`@RþÿþÿþÿþÿþÿþÿþÿxhÂ8Â#[ÂÂxhxh xiÄ 7 þÿþÿþÿþÿþÿþÿUINSPECTOR DID NOT INSPECT TANK #16. COMMENTED ON FORM THAT HE COULDN'T FIND THE TANK.xhÂ8 Â@PÂÂ:xhxhÂ(þÿà DþÿþÿþÿþÿþÿþÿƒINSPECTOR FAILED #2 OIL TANK FOR INTERSTITAL BUT IT'S SW WITH GW MONITORING. GW MONITORING LOG BOOK OBSERVED ON-SITE 7/28/04 -ACFxhÂ8!Â_ ÂÁ$xhxhÂ(xh þÿþÿþÿþÿþÿþÿþÿYCTI HAD TO SETUP PLLDS TO ALARM WHEN 3 GPH LEAK SIMULATED PASSING PER CTI DENNIS DAVIS. xhÂ8"Â0ÂÁ$xhxhÂ(xh þÿþÿþÿþÿþÿþÿþÿãCTI HAD TO CLEAN OUT SUMPS AND SET PROBES AT THE CORRECT HEIGHT. CLEANED OUT SPILL BUCKETS. -ACF LLDS REPAIRED AND RETESTED BY ART JOHNS AND CTI DENNIS DAVIS ON ON 07/20/2004. INITIAL INSPECTION DATE SHOULD BE 06/21/2004. BBxhÂ8#Â_ÂÁ$xhxhÂ(xiÄþÿþÿþÿþÿþÿþÿeWEEPS IN DISPENSERS 9/10 AND 11/12 RECEIVED INSPECTION UPDATE FROM DENNIS DAVIS DATED 02/17/2005. BBxhÂHÃ0ÂÂxgxgÁ`xgþÿþÿþÿþÿþÿþÿþÿ]MISSING INFORMATION ON 2000 GALLON UNLEADED GAS TANK. ALSO STILL WAITING FOR SITE ASSESSMENT FOR A TANK REMOVED SOMETIME AGO. TANKS 13 AND 14 ARE PASSING (THEY ARE BOTH DOUBLE CHAMBERED 13/1 IS 15,000 #2, 13/2 IS 5,000 DIESEL, 14/1 IS 35,000 #2 AND 14/2 IS 5,000 DIESEL). FAIL SITE DUE TO MISSING TANK. SPOKE TO TIM ZIOBRO. HE JUST RECEIVED SIA AND ANNUAL INSPECTION REPORTS. WILL BE SENDING THEM IN. HE HAD SOME QUESTIONS ABOUT TANK NUMBER 8. IT APPEARS THE INSPECTOR DID NOT INSPECT THE COMPONENTS OF THE TANK. I TOLD HIM THAT HE SHOULD SUBMIT THE INSPECTION FORMS OF ALL THE TANKS TOGETHER. RR 7/30/04xg Â8$Â>ÂÂxhxhÂ6xhÃ3þÿþÿþÿþÿþÿþÿþÿxhÂ8%Â;ÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8&Ã9ÂÂYxhxhÂxh þÿþÿþÿþÿþÿþÿþÿ[NEW SPILL BUCKET INSTALLED PER CERT OF PROPER INSTALL. IMPRESSED CURRENT SYSTEM INSTALLED.xhÂ8'Ã,#ÂÂUxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8(Ã,ÂÂUxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ‹NOTE: INSPECTOR FAILED DUE TO BAD LIDS ON SPILL BUCKETS, ONE WAS WRONG TYPE, ONE WAS BROKEN. PASSING INSPECTION AS LIDS ARE BEING REPLACED.xhÂ8)Â7ÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8*Ãa ÂÂUxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8+ÃDÂÂYxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8,ÃEYÂÂYxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8-Â-\ÂÂYxhxhÂxh þÿþÿþÿþÿþÿþÿþÿ&ANODES INSTALLED ON TANKS BY IRA DODGExhÂ8.ÃMÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8/Â5KÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ80Â(ÂÂxhxhÂxhÃ+þÿþÿþÿþÿþÿþÿþÿxhÂ81à ÂÂKxhxhÂxhÃ#.þÿþÿþÿþÿþÿþÿþÿxhÂ82Ã:TÂÂ)xhxhÂxh à Qþÿþÿþÿþÿþÿþÿ INSPECTOR NOTED BALL-FLOATS AND COAXIAL DROP TUBES. COAX DEFEATS PROPER OPERATION OF BALL-FLOATS. BB OWNER CALLED 9/23 TO SAY HE WILL BE HAVEING GAFTEC WORK ON CP. TED ISPECTION UPDATE OF 09/27/2004. REPLACED BALLFLOAT WITH FLAPPER AND RETESTED CP (-.87 VOLTS). BBxhÂ83ÂÂÂ)xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ84ÃPÂÂ)xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ85Ã=ÂÂCxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿ2UNABLE TO REMOVE BALL-FLOATS ON TANKS 6, 7, AND 8.xh Â86à QÂÂCxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ87Ã6+ xhxhÂxhÃS=þÿþÿþÿþÿþÿþÿþÿxhÂ88ÂO\ xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ89ÃQÂÂ)xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8:ÂbJÂÂ)xhxhÂxh Ãþÿþÿþÿþÿþÿþÿþÿxh Â8;Ã*ÂÂ)xhxhÂxhÃ,þÿþÿþÿþÿþÿþÿþÿxhÂ8<Â3MÂÂ)xhxhÂxhÄ9þÿþÿþÿþÿþÿþÿþÿxhÂ8=à ÂÂCxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8>Ã;ÂÂCxhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â8?Â&ÂÂCxhxhÂxh Ã&:þÿþÿþÿþÿþÿþÿþÿxh Â8@Ã<ÂÂCxhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â8AÂ@\ÂÂCxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8BÃ!ÂÂCxhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â8CÂQSÂÂCxhxhÂxh ÄTT3þÿþÿþÿþÿþÿþÿAINSPECTOR WAS ACTUALLY DON BUBAR. BB INSPECTION UPDATE SUBMITTEDxhÂ8DÂ5^ÂÂ)xhxhÂþÿþÿþÿþÿþÿþÿþÿþÿYBALL-FLOATS BEING USED WITH COAXIAL DROP TUBE. BALL-FLOATS WILL NOT OPERATE PROPERLY. BBxh Â8EÂ\ÂÂCxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â8FÂX]ÂÂAxhxhÂþÿÃ1þÿþÿþÿþÿþÿþÿþÿxhÂ8GÃWÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8HÂ&ÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8IÂ$4ÂÁ$xhxhÂxiÄQþÿþÿþÿþÿþÿþÿGINSPECTOR ALSO NOTED STEEL FLEXES ON PIPING HAS FAILING CP READINGS. BBxh Â8JÃ5 xhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxhÂ8KÂJÂÂ)xhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ"FACILITY NOW PASSES PER CTI BUBAR.xhÂ8L xhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ_VENT PIPE IS CP AND FAILED AT -.611 MAGNESIUM ANODE ADDED TO VENT PIPE CP NOW PASSING AT -.93.xhÂ8MÂ'ÂÂxhxhÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8NÂ/ÂÂKxhxhÂ6xgþÿþÿþÿþÿþÿþÿþÿVINSPECTION PERFORMED BY JOHN MULLINS- NOT ON LIST OF INSPECTORS AT TIME OF ENTRY DATE.xgÂ8OÂIÂÂxhxhÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8PÃ(ÂÂMxhxhÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8QÂ?%ÂÂ:xhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8RÂ<ÂÂ]xhxhÂxhþÿþÿþÿþÿþÿþÿþÿ†WAITING ON VALID PRECISION TEST BEFORE FACILITY CAN BE BROUGHT BACK INTO SERVICE. BB RECEIVED PASSING PRECISION TEST ON 08/19/2004. BBxhÂ8SÂ_PÂÂ]xhxhÂxhÃ*þÿþÿþÿþÿþÿþÿþÿxhÂ8TÃ5?ÂÂ]xhxhÂxhÃDD-þÿþÿþÿþÿþÿþÿþÿxhÂ8UÂ?ÂÂ]xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8XÂÂÁ$xh xh Âxh ÄGþÿþÿþÿþÿþÿþÿ|CP ON FLEXES UNDER DISPENSERS FAILED. BB ANODES INSTALLED UNDER DISPENSERS. 12/22/04 INSPECTION UPDATE DATED 10/27/2004. BBxh Â8YÃJ<ÂÂxh xh Â(xhþÿþÿþÿþÿþÿþÿþÿgNO OVERFILL DEVICE OR SPACERS BETWEEN SUCTION & RETURN LINES (NOT REQUIRED, BUT BOTH GOOD IDEAS). -ACFxh Â8ZÃRÂÂCxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â8\ÂÂÁ$xh xh Â(þÿþÿþÿþÿþÿþÿþÿþÿDCLEANED ALL SUMPS AND BUCKETS. INVENTORY UNAVAILABLE (NONEXISTANT?)xhÂ8]à ÂÁ$xh xh Â(xhÄUdþÿþÿþÿþÿþÿþÿþÿxhÂ8^Ã\&ÂÂ)xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8_à K xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8`ÂAB xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8aÃUÂÂ)xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8bÃ_]ÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â8cÂ=4ÂÂYxh xh Â<xhÃ3þÿþÿþÿþÿþÿþÿþÿxhÂ8d XÂÂ)xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9Â!UÂÂ:xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9ÂQÂÁ xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9Â8ÂÂ)xhxh Á`xhþÿþÿþÿþÿþÿþÿþÿkNOTE THIS IS A THREE CHAMBER TANK, INSPECTOR NOTED THAT THE SPILL BUCKET COVERS WERE NOT IN GOOD CONDITION.xhÂ9à 8 xhxh Á`xh þÿþÿþÿþÿþÿþÿþÿ(FACILITY NOW PASSING PER CTI DON BUBAR. xhÂ9Â#bÂÂ)xhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9Ã8  xhxh Á`xh þÿþÿþÿþÿþÿþÿþÿ%REPAIRS MADE PER KENNETH LEGASSE CTI.xhÂ9ÂJÂÂ)xhxh Á`xh þÿþÿþÿþÿþÿþÿþÿj COPPER LINES HAVE SPACERS?: INSTALLED PRIOR TO 1991 PER CTI BUBAR, FACILITY IN COMPLIANCE AT THIS TIME.xhÂ9 ÂGÂÂ)xhxh Á`xh þÿþÿþÿþÿþÿþÿþÿ_ COPPER LINES HAVE SPACERS?: PRE 1991 INSTALL SPACERS NOT REQUIRED. PASSING PER CTI DON BUBAR.xhÂ9 ÃCcÂÂ)xhxh Á`xh þÿþÿþÿþÿþÿþÿþÿ COPPER LINES HAVE SPACERS?: PRE 1991 INSTALLATION, SPACERS NOT REQUIRED. REPAIRS MADE TO ELECTRONIC MONITORING SYSTEM. PASSES PER CTI BUBAR.xhÂ9 ÃHÂÂ)xhxh Á`xh þÿþÿþÿþÿþÿþÿþÿF2003 INSTALL BY DAVID BEAUMONT. CTI BUBAR INSTALLED STRING ON SENSOR.xhÂ9 ÃKÂÂ)xhxh Á`xh ÄNcþÿþÿþÿþÿþÿþÿ>REPAIRS MADE TO FACILITY, FACILITY NOW PASSES PER CTI BUBAR.xhÂ9 ÃX?ÂÂ)xhxh Á`xh Ã"3þÿþÿþÿþÿþÿþÿ*FACILITY NOW PASSING PER CTI DON BUBAR. xhÂ9ÂDÂÂAxhxh Â(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9ÃJÂÂZxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9ÂMÂÂbxhxh ÂxhÃb3þÿþÿþÿþÿþÿþÿeSHOULD HAVE BEEN ENTERED AS A 2004 INSPECTION. CP TESTED BY CORRPRO UNDER INSTALLER'S SUPERVISION. BBxhÂ9Â)ÂÂLxh xh ÂxhÃ;MþÿþÿþÿþÿþÿþÿþÿxhÂ9ÃFb xh xh Âxhþÿþÿþÿþÿþÿþÿþÿ‰CP READINGS PASSED. TANK #1: -.85 VOLTS TANK #2: -.85 VOLTS TANK #3: -.94 VOLTS FACILITY PASSES PER CTI KENNETH LEGASSE. REPAIRS MADE. xhÂ9ÂCÂÂ)xh xh Âxh Ä:9þÿþÿþÿþÿþÿþÿLCP ON VENT PIPING PASSED (-.978 VOLTS) FACILITY IS PASSING PER CTI BUBAR. xhÂ9ÂIbÂÂLxh xh Âxh ÃS4DþÿþÿþÿþÿþÿþÿMPASSING CP NOW PER CTI DUANE FURGE. TWO TANKS ARE DOUBLE WALL ONE IS SINGLE.xh Â9Â* xh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9ÃVÂÂ)xh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9Â">ÂÂxh xh Â<xh ÃLþÿþÿþÿþÿþÿþÿþÿxh Â9ÂN.ÂÂZxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9àxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9ÂN.ÂÂZxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9Ã1 ÂÂ)xh xh Â<xhÄ .þÿþÿþÿþÿþÿþÿþÿxhÂ9ÂÂÂ)xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9Ã5"ÂÂ)xh xh Â<xhÄ NþÿþÿþÿþÿþÿþÿþÿxhÂ9ÂO ÂÂCxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9 Â1' xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9!Â/ÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9"à ÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9#Â$ÂÁ"xhxhÂ(xhÃ'BþÿþÿþÿþÿþÿþÿþÿxhÂ9$Ã`ÂÂ)xh xhÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9%à  xh xhÂ6xhþÿþÿþÿþÿþÿþÿþÿÆOPERATOR CALLED 1/18/06 RE: GR ADAMS PLANS FOR INSPECTION IN THE UNKNOWN FUTURE. I SUGGESTED ALTERNATIVE CONTRACTORS WHO MIGHT BE ABLE TO GET THERE SOONER. -ACF INSTALLED FLAPPER FOR OVERFILL.xhÂ9&ÂNÂÂXxhxhÂ<xhÃHþÿþÿþÿþÿþÿþÿþÿxhÂ9'Â7IÂÂXxhxhÂ<xhÃ?)þÿþÿþÿþÿþÿþÿþÿxhÂ9(Ã%@ÂÂHxhxhÂ<xhÃ#_þÿþÿþÿþÿþÿþÿCALLED 12/22/05 TO REPORT HE HAS RE-SCHEDULED 2006 INSPECTION WITH MIKE LEWIS. (EARLIER INSPECTION DIDN'T HAPPEN B/C THE BUILDING WAS VACANT)xhÂ9)Á&ÂÂ\xhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9*ÃVNÂÂHxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9+Â'DÂÂXxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9,Â&ÂÂxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9-ÂOÂÂZxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9.Â11ÂÂXxhxhÂ<þÿþÿþÿþÿþÿþÿþÿþÿ}VENT PIPE READING ON TANK 26: -0.704; TANK 27: -0.815; TANK 36: -0.661; TANK 33: -0.559; TANK 34: -0.834 AND TANK 40: -0.745.xhÂ, Â:(ÂÁ xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿÐNOTE: REC'D INSPECTION FORM FOR TANK #18 WHICH INDICATES THERE IS A CRACK IN THE MOUNTING RING OF THE PIPING SUMP ALLOWING WATER TO ENTER THE SUMP, IT MUST BE REPLACED. ADDED THIS SITE TO INSPECTION LIST. TRxhÂ,!ÂJÂÁ xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,"ÃÂÁ xhxhÁcxhÄ R:þÿþÿþÿþÿþÿþÿþÿxhÂ,#ÂZ?ÂÁ xhxhÁcxhÄ;þÿþÿþÿþÿþÿþÿþÿxhÂ,$ÂMÂÂ"xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â,%ÃJGÂÂ]xh xhÁcxh Ã1R)þÿþÿþÿþÿþÿþÿþÿxh Â,&ÃG#ÂÁ"xhxhÁcxh Ã9Yþÿþÿþÿþÿþÿþÿþÿxh Â,'ÂXÂÂ"xh xhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â,(Â-#ÂÂHxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â,)Â4PÂÂHxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â,*ÃQ;ÂÂHxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â,+Â-ÂÂHxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â,,Â4BÂÂHxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â,-ÃQ:ÂÂHxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â,.Ã&ÂÂ;xhxhÁcxhÃ>U[þÿþÿþÿþÿþÿþÿþÿxhÂ,/Â9ÂÂxhxhÁ`xhÄ8þÿþÿþÿþÿþÿþÿœNOTE COPPER PIPING ON HEATING OIL TANK CAN'T BE CHECKED AT TANK TOP. NO ACCESS PER ED GEORGE. ALSO CRASH VALVES HAD TO BE RESET TO CORRECT HEIGHT PROBLEMS.xhÂ,0ÃGÂÂxhxhÂ(þÿ€þÿþÿþÿþÿþÿþÿOUT OF SERVICE AS OF 3/24/04xhÂ,1ÂPÂÂFxhxhÁcxhÃQþÿþÿþÿþÿþÿþÿþÿxhÂ,2Â_ÂÂCxhxhÁcxhÃ4`YþÿþÿþÿþÿþÿþÿþÿxhÂ,3ÃXGÂÂ)xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â,4Â?4ÂÂCxhxhÁcxhÃ=dþÿþÿþÿþÿþÿþÿþÿxhÂ,5Â?ÂÂCxhxhÁcxhÃMD7þÿþÿþÿþÿþÿþÿþÿxhÂ,6Â8XÂÂCxhxhÁcxhÃLÂFÂÂxhxhÁcxhÃQ$þÿþÿþÿþÿþÿþÿþÿxhÂ,?Â!MÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,@Â9ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,AÃMÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,BÂ4ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,CÂU&ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,DÂRÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,EÂ&ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,FÂÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,GÂd;ÂÂxhxhÁcxhà 6þÿþÿþÿþÿþÿþÿ=OWNER CALLED 12/8/05 RE: GETTING ANNUAL SUBMITTED ASAP. -ACFxhÂ,HÃ1ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,I ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,JÂ'ÂÂAxhxhÁcxhÃ21þÿþÿþÿþÿþÿþÿþÿxhÂ,KÂ7'ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,LÃ.ÂÂZxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â,MÂ70 xhxhÁ`xh ÃLSþÿþÿþÿþÿþÿþÿ.LINE LEAK DETECTORS REPLACED. PER CTI LEGASSE.xh Â,NÂ[>ÂÂxhxhÂ(xhÄ9 þÿþÿþÿþÿþÿþÿ$DISPENSER SUMP BOOT NOT CLAMPED DOWNxhÂ,OÂ[.ÂÂxhxhÂ(xhÄ:þÿþÿþÿþÿþÿþÿ? NO WATER IN SUMPS OR INTERSTITIAL SPACE?: PUMPED OUT ALL SUMPSxhÂ,PÂ[NÂÂxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,QÂ[5ÂÂxhxhÂ(xhÃ>^>þÿþÿþÿþÿþÿþÿ4 SPILL BUCKETS LIQUID TIGHT?: PUMPED OUT ALL BUCKETSxhÂ,RÂ[<ÂÂxhxhÂ(xhÃ4!þÿþÿþÿþÿþÿþÿþÿxhÂ,SÂ[HÂÂxhxhÂ(xhÄ1aþÿþÿþÿþÿþÿþÿþÿxhÂ,TÂ- ÂÂHxhxh þÿþÿþÿþÿþÿþÿþÿþÿNO THROUGHPUT RECORDS ONSITE. UPGRADES WILL BE PERFORMED SHORTLY. INSPECTION AFTER THAT POINT. RR 10/12/04 PIPING REPLACEMENT PERFORMED 1/14/05xg Â,UÂ-ÂÂHxhxh þÿþÿþÿþÿþÿþÿþÿþÿ6PIPING SUMPS CONTAINED SMALL AMOUNT OF WATER, REMOVED.xg Â,VÂ4CÂÂHxhxh þÿþÿþÿþÿþÿþÿþÿþÿþÿxg Â,WÂÂÂLxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ/DROP TUBES EXTENDED TO MEET 95% SHUT OFF LIMIT.xhÂ,XÂÂÂLxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,Y ÂÂQxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ©MANUAL MONITORING LOG BEING MAINTAINED AT THIS TIME, PIPING IS SLEEVED COPPER, THERE DO NOT APPEAR TO BE SPACERS, ALSO NOTED THAT CONCRETE IS DETERIORATING AROUND FILL. xhÂ,Z ÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ)REPAIRS MADE, FACILITY NOW IN COMPLIANCE.xhÂ,[Â'SÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â%9ÂQÂÂSxg xg  þÿþÿþÿþÿþÿþÿþÿþÿWKIRK ST PETER CALLED ON 05/06/2004. SCHOOL IS SWITCHING FROM HEATED OIL TO #2 OIL. KIRK BELIEVES ONCE THEY STOP HEATING THE TANK, SOIL CONDITIONS WILL IMPROVE AND A PASSING CP READING MAY BE ACHIEVED. HOPEFULLY THE TANK HASN'T BEEN HEATED TO THE POINT OF DAMAGING THE COATING. KIRK WILL RETEST THIS SUMMER ONCE CONVERSION HAS BEEN MADE. BBxg Â,\ÃbÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿÿSINGLE WALL FIBERGLASS TANK INSTALLED IN 1986? MONITORING WELLS NOT BEING CHECKED, CTI GEORGE SUPPLIED OWNER WITH BAILER AND LOG BOOK. NO OVERFILL LISTED, REQUIRED UNDER OSFB RULES TO HAVE VENT WHISTLE. NO SPILL BUCKET. 2000 GALLON TANK, HEATING OIL ONLY.xhÂ,]ÃS8 xh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ,^Â^,ÂÂxh xhÁ`xh þÿþÿþÿþÿþÿþÿþÿÐ1997 INSTALL , 2003 INSPECTION PASSED BY CTI JOHN MULLINS, CTI GEORGE FAILED DUE TO OVERFILL AND INSTERSTIAL MONITORING PROBLEMS. SPILL BUCKETS CLEAN?: CTI CLEANED BUCKETS OUT. INSPECTION UPDATE SUBMITTEDxh Â,_Ã0ÂÂ)xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿÈNOTE THAT THE VENT IS OVER 8' FROM THE FILL AND IS AN OFFSET SCULLY FITTING WITH A WHISTLE.NO ACCESS TO WHISTLE. COPPER PIPING IS SLEEVED THROUGH THE FOUNDATION AND ALONG THE FLOOR NO SPACERS THOUGH. xhÂ,`Ã-ÂÂ)xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿOCOPPER PIPING IS SLEEVED BUT DOES NOT APPEAR TO HAVE SPACERS PER CTI DON BUBAR.xhÂ,aÃ-ÂÂ)xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿJSUMP GASKET REPAIRED DURING INSPECTION. COPPER PIPING SLEEVED NO SPACERS.xhÂ,bÂ?ÂÂCxhxhÁ`xhÃ#cþÿþÿþÿþÿþÿþÿÆCTI DUANE FURGE INSTALLED 61-SO DROP TUBES WITH FLAPPERS AND DISABLED BALL FLOAT VENTS TO BRING FACILITY INTO COMPLIANCE. INTIAL INSPECTION WAS 4/20/04, RETURNED THE NEXT DAY TO INSTALL DROP TUBES. xhÂ,cÃLÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿVFACILITY FAILED INSPECTION DUE TO COPPER PIPING NOT BEING SLEEVED OR HAVING ANY SPACERS BETWEEN THE TWO LINES. FACILITY NEEDS TO UPGRADE PIPING TO BRING INTO COMPLIANCE. SENT NOV ON 05/11/2004. NOT LISTED UNDER ENFORCEMENT AS COPPER PIPING WAS NOT A PREVIOUS INSPECTION CATEGORY, AND I DO NOT HAVE A FAIL TO LINK AN ENFORCEMENT CASE TO. BBxhÂ,dÃcWÂÂxhxhÁ`xhà W þÿþÿþÿþÿþÿþÿ+CORRECTIVE ACTION TAKEN BY CTI ELWIN SCOTT.xhÂ-ÃÂÂxhxhÁ`þÿÄ0Aþÿþÿþÿþÿþÿþÿ6CORRECT INSPECTOR IS ED GEORGE, PERFORMED ON 4/23/04. xhÂ-Ã.@ÂÁ$xhxhÁ`xhÄF6_þÿþÿþÿþÿþÿþÿ}DROP TUBES AND CRASH VALVES CORRECTED. 550 GALLON HEATING OIL TANK INSTALLED IN 1988 NO INDICATION REGARDING PIPING ON SAME. xhÂ-ÂYÂÂxhxhÁ`xhÄ!Cþÿþÿþÿþÿþÿþÿl550 GALLON HEATING OIL TANK BEING REMOVED AS A RESULT OF THIS INSPECTION. REMAINDER OF FACILITY PASSES. xhÂ-Ãa-ÂÂLxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â-Â*&ÂÂbxhxhÁ`xhÄ7þÿþÿþÿþÿþÿþÿþÿxhÂ-Ã4aÂÂxhxhÁ`þÿÃCþÿþÿþÿþÿþÿþÿ‚10/28/04 INSPECTION UPDATE STILL SHOWS FAILING CP. ON TANKS 6-1, 6-2 AND 6-3: -.70, -.64 AND -.45 RR SENT CP LETTER 12/8/2004. BBxhÂ-Â$ÂÂxhxhÁ`xhÃ,##þÿþÿþÿþÿþÿþÿ36/16/05: CERT OF PROPER INSTALL, VMI MECHANICAL LLDxhÂ-Â7/ÂÂxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ- Ãb[ xh xh ÁcxhÄCZþÿþÿþÿþÿþÿþÿþÿxhÂ- Â- ÂÂxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ- ÃEÂÂxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ- ÃBÂÂxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿR15 GALLON SPILL BUCKET REPLACED DURING INSPECTION; CERT OF PROPER INSTALL RECEIVEDxhÂ-  ÂÂ"xh xh ÁcxhÄF þÿþÿþÿþÿþÿþÿþÿxhÂ-ÂÂÂ"xh xh ÁcxhÃ^8\þÿþÿþÿþÿþÿþÿþÿxhÂ-Ã[5ÂÂ"xh xh ÁcxhÃ1$ þÿþÿþÿþÿþÿþÿþÿxhÂ-Ã7AÂÁ"xh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-Â;ÂÁ"xh xh ÁcxhÃD;,þÿþÿþÿþÿþÿþÿþÿxhÂ-Ã4YÂÁ"xh xh ÁcxhÃ(þÿþÿþÿþÿþÿþÿþÿxhÂ-ÃYÂÂ"xh xh ÁcxhÄ_,þÿþÿþÿþÿþÿþÿþÿxhÂ-Ã"ÂÂxh xh  xh ÃKRþÿþÿþÿþÿþÿþÿ1WASTE OIL TANK REMOVED; FACILITY NOW PASSING A.I.xhÂ-Â&ÂÂHxhxh  xhþÿþÿþÿþÿþÿþÿþÿ%CP RETEST ON 4/22/2004. -.916 VOLTS.xg Â- UÂÁ xhxh Á`xhÃT4 þÿþÿþÿþÿþÿþÿþÿxhÂÂN ÂÂHxgxgÂxhà þÿþÿþÿþÿþÿþÿÂPIPING UPGRADE AND NEW MOITORING SYSTEM INSTALLED PER CERTIFICATE OF PROPER INSTALL FROM CHRIS WILSON. NOTE: STILL FAILING FOR OVERFILL AND VENT PIPE READING. PASSING INSPECTION PER KEN LEWIS.xg Â-Ãc(ÂÂ4xhxh  xh þÿþÿþÿþÿþÿþÿþÿOPER DAVID HOWE, VENT WHISTLE LOCATED BEHIND SHED, CHECKED AND WORKING PROPERLY.xh Â-ÃW#ÂÁ xh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-Â$&ÂÂxh xh ÁcxhÃE%_þÿþÿþÿþÿþÿþÿþÿxhÂ-Ã+GÂÂDxh xh ÁcxhÄ 2þÿþÿþÿþÿþÿþÿþÿxhÂ-Â96ÂÂDxh xh ÁcxhÃ]$LþÿþÿþÿþÿþÿþÿþÿxhÂ-Ã^#ÂÂIxh xh ÁcxhÃJþÿþÿþÿþÿþÿþÿþÿxhÂ-ÂAÂÁ$xh xh ÁcxhÃPþÿþÿþÿþÿþÿþÿþÿxhÂ-Â;ÂÁ"xh xh ÁcxhÃD;,þÿþÿþÿþÿþÿþÿþÿxhÂ-Â$%ÂÂxh xhÁ`xhÃGþÿþÿþÿþÿþÿþÿþÿxhÂ- à 9ÂÂ:xhxhÁcxhÃ4Bcþÿþÿþÿþÿþÿþÿ¤PAUL BROWN ALSO SUBMITTED CERT OF PROPER INSTALL. HE INSTALLED ANODES ON ALL TANKS, REPLACED SPILL BUCKET ON REG. TANK AND INSTALLED FLAPPERS ON TANKS 9, 10, 11. RRxhÂ-!ÂÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-"Ãc(ÂÂ4xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-#Â.ÂÂ4xhxhÁcxhÄ+>þÿþÿþÿþÿþÿþÿþÿxhÂ-$Â.ÂÂ4xhxhÁcxhÃ1V4þÿþÿþÿþÿþÿþÿþÿxhÂ-%ÂH]ÂÂxhxhÁcxh Ã)þÿþÿþÿþÿþÿþÿþÿxh Â-&ÂH]ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-'Â3;ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-(Â7$ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-)Â5DÂÂHxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿmINSPECTION UPDATE SENT IN TO NOTIFY DEP THAT MR LEWIS REPLACED THE PIPING SUMP LID RETAINER ON TANKS 6 AND 7.xg Â-*Ã_ÂÁ xhxhÁcxhÄ AþÿþÿþÿþÿþÿþÿþÿxhÂ-+Ã3ÂÁ xhxhÁcxhÃQ þÿþÿþÿþÿþÿþÿþÿxhÂ-,Ãd9ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ--ÂÂÂLxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â-.Ã&ÂÂAxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â-/ÃCbÂÁ xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â-0Ã`9ÂÁ$xhxhÁcxhÄQ,þÿþÿþÿþÿþÿþÿþÿxhÂ-1ÃTOÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-2Â@ZÂÂCxhxhÁcxhÃNEþÿþÿþÿþÿþÿþÿþÿxhÂ-3Â?ÂÂYxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â-4Â>ÂÂYxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â-5Â-ÂÂYxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â-6ÃAÂÂ4xhxhÁcxh ÃN[3þÿþÿþÿþÿþÿþÿþÿxh Â-7Â$ÂÂxhxhÁ`xhà b$þÿþÿþÿþÿþÿþÿÄ SLOW FLOW WHEN 3 GPH LEAK @ 10PSI IS SIMULATED?: CHANGED DIESEL LLD TO MAKE OPERATIONAL. INSPECTION UPDATE SUBMITTED ON SAME FORM AS INITIAL INSPECTION. ALL DEFICINCIES REPORTED TO BE CORRECTED.xhÂ-8Â76ÂÂxhxhÁ`xhÃ/*6þÿþÿþÿþÿþÿþÿþÿxhÂ-9à JÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-:Â$ÂÂxhxhÁ`xhÃ)C!þÿþÿþÿþÿþÿþÿþÿxhÂ-;ÂZ<ÂÂHxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â-<Ã]#ÂÂAxhxhÁ`xhÃ#a[þÿþÿþÿþÿþÿþÿþÿxhÂ-=ÂC!ÂÂLxhxhÂxhþÿþÿþÿþÿþÿþÿþÿµNO ACCESS TO INTERSTITIAL. LARRY WINCHESTER TO REPLACE PETROMETER WITH NEW MONITORING SYSTEM. BB CERT OF PROPER INSTALL RECEIVED. WAYNE GIFFORD REPLACED PETROMETER WITH OMNTEC LU1xgÂ->ÂX^ÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-?ÃOÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-@ÂIÂÂ;xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â-AÃ(=ÂÂ;xhxhÁcxhÃ<+þÿþÿþÿþÿþÿþÿþÿxhÂ-BÂ<ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-CÂ-PÂÂIxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-DÂ4YÂÂHxh xhÁ`xg þÿþÿþÿþÿþÿþÿþÿGTHROUGHPUT RECORDS NOT ON SITE INSPECTION UPDATE SUBMITTED BY M. LEWISxg Â-EÃ[ ÂÁ$xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ]DENNIS DAVIS SUBMITTED INSPECTION UPDATE- DATED 6/1/04. STILL NO THRUPUT RECORDS PROVIDED. RRxhÂ-FÃ`&ÂÁ$xhxhÁ`xhÄEWUþÿþÿþÿþÿþÿþÿ³DROP TUBES AND FLAPPERS ON DIESEL BEING REPLACED, LINE LEAK DETECTORS NOT TESTED ON GAS TANKS, ONE FAILED ON DIESEL. INSPECTION UPDATE SUBMITTED. PASSING INSPECTION AS OF 5/17/04xhÂ-GÂ>`ÂÂ)xhxhÁ`xhÃ=þÿþÿþÿþÿþÿþÿ²INSPECTOR NOTED THAT THE BALL FLOAT VENT ON CHAMBER 1-2 WASN'T ABLE TO BE REMOVED. IT HAS BEEN REPLACED WITH A FLAPPER ON THE DROP TUBE. CHAMBER 1-1 STILL HAS A BALL FLOAT VENT. xhÂ-HÂ=ÂÂYxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ! TANK READING: -.99, -1.00, -1.01xh Â-IÃ.ÂÂ"xh xhÁ`xh ÃS6&þÿþÿþÿþÿþÿþÿþÿxh Â-JÂ&ÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxh Â-KÃ3ÂÂOxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿVOUR INSPECTION REVEALED A SUCTION SYSTEM WITH MARINA-FRIENDLY SOLENOID (NO LLDS). -ACFxhÂ-LÃ]4ÂÂTxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-MÂ#@ÂÂ)xhxhÂ(xh þÿþÿþÿþÿþÿþÿþÿL ATG PROGRAMMED TO TEST FOR 0.1 GPH LEAK?: APPROVED SYSTEM REGISTRATION -ACFxh Â-NÃY xhxhÁ`xhÃZ þÿþÿþÿþÿþÿþÿ¤INSPECTION TOOK PLACE INTIALLY 2/18/04, UPDATE TO CORRECT A COUPLE PROBLEMS, NO ACCESS TO INTERSTICE DUE TO ICE, IS UNKNOWN DATE. FACILITY IS PASSING AT THIS TIME. xhÂ-OÂCÂÂxhxhÁ`xiÄ&RþÿþÿþÿþÿþÿþÿDAILY INVENTORY SENT TO DEPxhÂ-PÃ@ ÂÂIxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿWCERT. OF PROPER INSTALL SUBMITTED FOR CP UPGRADE -ACF PRODUCT PIPE READING: FIBERGLASSxhÂ-Qà ÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-RÃcVÂÁ"xhxhÁcxhà ]þÿþÿþÿþÿþÿþÿþÿxhÂ-SÃdÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-Tà ÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-UÃGÂÂxhxhÁcxhÃ`UMþÿþÿþÿþÿþÿþÿþÿxhÂ-VÂG5ÂÁ$xhxhÁcxh Ä þÿþÿþÿþÿþÿþÿþÿxh Â-WÃ5ÂÁ$xhxhÁcxhÄ]SþÿþÿþÿþÿþÿþÿþÿxhÂ-XàxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-Yà  xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-ZÂD xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-[ÂD xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-\à  xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-]ÃB xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-^àxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-_Ã@ xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-`ÂJ xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-aÃR xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-bà  xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-cà D xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ-dàxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.ÂL  xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.Â!D xhxhÁcxhà _MþÿþÿþÿþÿþÿþÿþÿxhÂ.Ã7ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.ÃdÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.Ã4XÂÂCxhxhÁcxhÂþÿþÿþÿþÿþÿþÿþÿxhÂ.ÂWÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.Â^:ÂÂCxhxhÁcxhÄþÿþÿþÿþÿþÿþÿþÿxhÂ.Ãb]ÂÂ)xhxhÁcxhà þÿþÿþÿþÿþÿþÿþÿxhÂ. à  xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ. Â#.ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ. Ã3ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ. Ã(YÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ. Ã\*ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.Ã2ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.Ã\9ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ. AÂÂHxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.ÃP]ÂÂHxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.Â9TÂÂHxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.ÂD2ÂÂHxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.ÂZ<ÂÂHxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.Â9PÂÂHxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.Â5-ÂÂHxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.Ã$ÂÁ"xhxhÁcxhà ;+þÿþÿþÿþÿþÿþÿoCALL FROM JEFF DAMON ON 01/06/2005. MR. DAMON IS NEW OWNER OF FACILITY.I SENT HIM CHANGE OF OWNERSHIP FORM. BBxhÂ.Â.=ÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.Ã`4ÂÂKxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.Â5-ÂÂHxhxhÁcxh Ã$?þÿþÿþÿþÿþÿþÿþÿxh Â.ÂÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.ÂÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.ÃAbÂÂ)xhxhÁcxhÃCþÿþÿþÿþÿþÿþÿþÿxhÂ.Â-JÂÂ)xhxhÁcxhÃ2K*þÿþÿþÿþÿþÿþÿþÿxhÂ.Â6ÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ. Ã"ÂÂ)xhxhÁcxhà þÿþÿþÿþÿþÿþÿþÿxhÂ.!ÂIÂÂ)xhxhÁcxhà ]þÿþÿþÿþÿþÿþÿþÿxhÂ."Â-ÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.#ÂJ=ÂÂ)xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.$Ã`ÂÂ)xhxhÁcxh ÂR&þÿþÿþÿþÿþÿþÿþÿxh Â.%ÃYbÂÂ)xhxhÁcxh Ä Zþÿþÿþÿþÿþÿþÿþÿxh Â.&Ã_ÂÂCxhxhÁcxhÃ)þÿþÿþÿþÿþÿþÿþÿxhÂ.'ÂAaÂÂ)xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.(ÃVÂÂ)xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.)Ã;*ÂÂ)xhxhÁcxh Ã-Y!þÿþÿþÿþÿþÿþÿþÿxh Â.*Â"aÂÂ)xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.+ TÂÂ)xhxhÁcxhÃK[þÿþÿþÿþÿþÿþÿþÿxhÂ.,Â?8ÂÂCxhxhÁcxhÃ*SþÿþÿþÿþÿþÿþÿþÿxhÂ.-ÂQZÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ..Ã!FÂÂ)xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â./ÃU)ÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.0Â^aÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.1ÂU=ÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.2Ã^IÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.3Á4ÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.4Â?"ÂÂCxhxhÁcxhÄD\þÿþÿþÿþÿþÿþÿþÿxhÂ.5Â?"ÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.6à ÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.7Â.MÂÁ2xhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ8OUT OF SERVICE FACILITY. OWNERSHIP TRANSFERRING SOMETIME IN JUNE /JULY 2004. CONTACT FOR NEW OWNER IS DUANE WALTON AT 207-498-6333, FAX 498-8736. CHANGE OF OWNERSHIP PAPERWORK FAXED TO HIM. KEY BANK HOLDS CURRENT PAPER. TANK READING: ONLY 1 READING -.90 PRODUCT PIPE READING: COPPER VENT PIPE READING: FIBERGLASSxhÂ.8Â.ÂÂCxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿxTANKS NEED BETTER OVERFILL PROTECTION, CP PASSING ALSO SOME TANKS NEED SIRING REPAIRS AND INTERSTIAL MONITORING REPAIRS.xh Â.9Â5EÂÂHxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ)INSPECTION UPDATE SUBMITTED BY M. LEWIS. xg Â.:ÃZÂÂYxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ™SOME MONITORS NOT WORKING PROPERLY, ALSO ALL COPPER LINES NOT SLEEVED OR SEPERATED. TANK READING: SAME READING ALL THREE LOCATIONS (ONLY CP TANK IS #1) ?xh Â.;Ã; ÂÂHxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿlPER CTI LEWIS, TANK IS COMING OUT OF THE GROUND IN SUMMER 2004. FAILING CP AND NO MONITORING OF GROUNDWATER.xhÂ.<Â9QÂÂHxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿxVENT PIPE FAILED CP TESTING @ -.680. INSPECTION FROM CTI LEWIS INDICATES 6,000 GAL. TANK OUR RECORDS INDICATE 10,000. xh Â.= ÂÂKxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â.>ÂÂÂxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ@FACILITY MAY REMOVE UST AND INSTALL 2 275 AST'S IN THE BUILDING.xh Â.?ÂM]ÂÂ)xhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ9 SENSORS ARE FUNCTIONING PROPERLY?: BELL SENSOR REPLACED.xhÂ.@Ã-XÂÂ)xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿoINVENTORY ISSUES. INVENTORY ISSUES NEED TO BE REVIEWED WITH THE OWNER/OPERATOR TO CLARIFY, DROP TUBE REPAIRED.xh Â.AÂ^3ÂÂCxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.BÂ^;ÂÂCxhxhÁ`xhÃVþÿþÿþÿþÿþÿþÿþÿxhÂ.CÂFÂÁ"xhxhÁcxhÃþÿþÿþÿþÿþÿþÿþÿxhÂ.DÂ/cÂÁ"xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.EÂ.V xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿ$CP READINGS -.94, -1.06, -1.13xhÂ.FÃ3N xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿ)CP READINGS -1.18, -1.16, -1.14xhÂ.GÃ= xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿ CP READINGS -.92, -.98, -.98xhÂ.HÃ[ÂÂRxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.Ià /ÂÂAxhxhÁcxhÃOSþÿþÿþÿþÿþÿþÿþÿxhÂ.JÃaRÂÂLxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.KÂÂÂ)xhxhÁcxhà QþÿþÿþÿþÿþÿþÿþÿxhÂ.LÂ8OÂÁ"xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.MÂB ÂÁ"xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.NÃ_ÂÂCxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿÉCTI FURGE INDICATES NEED TO GO BACK AND RECHECK CP UNDER WETTER CONDITIONS. OUT OF SERVICE TANK STILL HAS 23" OF WATER IN IT PER CTI DUANE FURGE. ALL OTHER WORK DONE AT SITE AND PASSING AS OF 5/24/04.xhÂ.O CÂÂxhxhÁcxhÃ2*þÿþÿþÿþÿþÿþÿCP READINGS -.94, -.91xhÂ.PÂ@ÂÂxhxhÁcxhÃ$þÿþÿþÿþÿþÿþÿþÿxhÂ.QÂbAÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.RÂÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.SÂ.YÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.TÂÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.UÂPNÂÁ"xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.V !ÂÁ"xhxhÁcxhÃ"dþÿþÿþÿþÿþÿþÿþÿxhÂ.WÂ8ÂÁ"xhxhÁcxhà X;þÿþÿþÿþÿþÿþÿþÿxhÂ.XÂB4ÂÁ"xhxhÁcxhÄFþÿþÿþÿþÿþÿþÿCP READING -.87xhÂ.Y ÂÂxhxhÁcxhÃþÿþÿþÿþÿþÿþÿþÿxhÂ.ZÂ>ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿCP READING -.90xhÂ.[à ÂÂUxhxhÁcxhÃ!NþÿþÿþÿþÿþÿþÿþÿxhÂ.\à ÂÂUxhxhÁcxhÃ)þÿþÿþÿþÿþÿþÿCP READINGS -1.3, -1.3 xhÂ.]Â<ÂÂxhxhÁcxhÃ> &þÿþÿþÿþÿþÿþÿþÿxhÂ.^ÃÂÂxhxhÁcxhÃ*XþÿþÿþÿþÿþÿþÿþÿxhÂ._ÂaEÂÂUxhxhÁcxhÃ5>þÿþÿþÿþÿþÿþÿþÿxhÂ.`ÂdÂÂ)xhxhÁ`xh Ã$þÿþÿþÿþÿþÿþÿ1INSPECTION UPDATE SUBMITTED BY REGGIE FAULKINGHAMxhÂ.aÃÂÂMxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.bÃbWÂÂMxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.cÃbWÂÂMxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ.dÃ&ÂÂ)xhxhÂþÿþÿþÿþÿþÿþÿþÿþÿTANK #3 HAS BARE COPPER LINES AND FAILING CP. BB CALL FROM GAFTEK ON 12/21/2004. TANK #3 IS BEING REPLACED. GAFTEK COULD NOT INSTALL SPACERS ON REMAINING TANKS' PRODUCT LINES POSSIBLY DUE TO ICE. THEY WILL ATTEMPT IT AGAIN IN THE SPRING. BB TANK #3 WAS REMOVED ON 12/15/2004. xhÂ/ÂOLÂÂ;xhxhÁcxhÄ DþÿþÿþÿþÿþÿþÿþÿxhÂ/Ãd ÂÂ;xhxhÁcxhÃ^*ZþÿþÿþÿþÿþÿþÿþÿxhÂ/ÃW^ÂÂ;xhxhÁcxhÃSþÿþÿþÿþÿþÿþÿ(CP READINGS -.908, -.984, -.975xhÂ/Ãd2ÂÂ;xhxhÁcxhÄO]þÿþÿþÿþÿþÿþÿþÿxhÂ/ÂY^ÂÂ;xhxhÁcxhÃDE:þÿþÿþÿþÿþÿþÿþÿxhÂ/ÂXÂÂCxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â/ ÂÂ)xhxhÁcxhÄþÿþÿþÿþÿþÿþÿþÿxhÂ/Ã_*ÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/ ÂBEÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/ ÃÂÂ)xhxhÁcxhÃ=1þÿþÿþÿþÿþÿþÿþÿxhÂ/ Â?1ÂÂCxhxhÁcxhÃ)`þÿþÿþÿþÿþÿþÿþÿxhÂ/ à -ÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/ Ã] ÂÂXxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â/ÂQOÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â/ÂUÂÂTxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â/ÂIÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿP5/16/11-NOITR REC'D FOR BRANN EXCAVATING TO REMOVE TANK, TOM TRAINOR TO DO SA-PHxhÂ/ÃYÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â/Â0ÂÂxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â/Â5 ÂÂxhxhÁcxhÃ[þÿþÿþÿþÿþÿþÿþÿxhÂ/ÃXJ xhxhÁcxhÄ#62þÿþÿþÿþÿþÿþÿþÿxhÂ/Â1aÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿŽCP READINGS -.86, -.87, -.87 FACILITY INSTALLED ATG AND ELECTRONIC OVERFILL. TONY COUTURE SUBMITTED ALL PAPERWORK ON 01/14/2005. BBxhÂ/Â8ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿ+CP READINGS -.941, -.941, -.941xhÂ/ÃW ÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/Â]$ÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/Ã05ÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/Â]0ÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿ#CP READING -.96, -.90, -.89xhÂ/àxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/à NÂÂTxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â/Ã?ÂÂTxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ}NOTE: WRONG INSPECTOR, ACTUALLY DUANE BURTON PERFORMED INSPECTION MARCH 2, 2004. TANK READING: -1.31, -1.31xhÂ/ÂBÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/Â$-ÂÂxhxhÁ`xh Ä0þÿþÿþÿþÿþÿþÿ9PER ED GEORGE, ALL CRASH VALVES RESET TO CORRECT HEIGHT. xhÂ/ Â'ÂÂBxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ,REPLACEMENT REPORT SENT BY CTI CHRIS WILSON.xhÂ/!Ãa2ÂÂTxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â/"ÁBÂÁ"xhxhÁ`xhÃ-þÿþÿþÿþÿþÿþÿþÿxhÂ/#ÂNÂÂTxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿŠELECTRONIC HIGH LEVEL ALARMS ON 2 TANKS NOT OPERATING PROPERLY. BOTH TANKS ALSO HAVE FLAPPERS SET AT 95%, CORRECTLY. THESE ARE THE ONLY FAILS ON THESE 11 TANKS. PASSING INSPECTION BECAUSE IT CONTINUES TO HAVE OVERFILL PROTECTION. CERT OF PROPER INSTALL SUBMITTED BY TONY COUTURE, HI LEVEL ALARM INSTALLED ON TANKS INSPECTION UPDATE SUBMITTED BY TONY COUTURE. TANKS 40 AND 42 NOW BOTH PASSING.xhÂ/$Â/\ÂÂAxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿfTANK WAS NOT PREVIOUSLY REGISTERED. OWNER IS PLANNING TO REMOVE TANK. BB TANK REMOVED 06/21/2004. BBxhÂ/%ÃBÂÂUxh xh ÁcxhÄ#)NþÿþÿþÿþÿþÿþÿþÿxhÂ/&Â$MÂÂxh xh ÁcxhÃÂÂ:xh xh ÁcxhÃEþÿþÿþÿþÿþÿþÿþÿxhÂ/4à ÂÂxh xh Ácxhþÿþÿþÿþÿþÿþÿþÿ2CP -1.46, (MAGNESIUM ANODES ADDED DURING UPGRADE).xhÂ/5ÂRYÂÂxh xh ÁcxhÃ`þÿþÿþÿþÿþÿþÿþÿxhÂ/6 ÂÂTxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/7Â5 ÂÂxhxh Á`xhÄ @þÿþÿþÿþÿþÿþÿþÿxhÂ/8à ÂÂXxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿ= TANK READING: MIKE LEWIS CHECKED. -.875, -.871; -.911, -.934xhÂ/9ÂÂÂXxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿ& TANK READING: MIKE LEWIS. -1.13, -.92xhÂ/:Â3ZÂÂXxhxh Á`xhÃcþÿþÿþÿþÿþÿþÿþÿxhÂ/;Â2,ÂÂxhxh Á`xh þÿþÿþÿþÿþÿþÿþÿ TANK IS OUTxhÂ/<Ã+ÂÂxhxh  xgÂ81þÿþÿþÿþÿþÿþÿÛNO ANNUAL INSPECTION ON FILE WITH DEP UNTIL OWNER PROVIDED COPY ON SITE DURING DEP INSPECTION ON 6/8/2004. -- DMCL BAD WIRING ON INTERSTITIAL PROBE FIXED. INSPECTION UPDATE 7/18/03; ACTUALLY SUBMITTED TO DEP 6/8/2004.xgÂ/=Â5ÂÂxhxh  xh ÃJþÿþÿþÿþÿþÿþÿBILL CARVER UNABLE TO TEST CP IN FEBRUARY 2004. TO BE RETESTED BY JULY 8, 2004. ANNUAL INSPECTION NOT SUBMITTED UNTIL DEP WAS ON SITE FOR COMPLIANCE INSPECION 6/8/2004. ENTERED IN ERROR AS A 2003 ANNUAL INSPECTION. IT'S A 2004. -ACF CP RETEST ON 6/10/2004. PASS. BBxhÂ/>Ã*[ xh xh Âxh þÿþÿþÿþÿþÿþÿþÿYSNL LLD WAS REPLACED DURING INSPECTION. WATER AND PRODUCT REMOVED FROM DISPENSER 5/6. BBxh Â/?Ã=^ÂÂUxhxh Á`þÿÃ@:1þÿþÿþÿþÿþÿþÿþÿxhÂ/@ÂR4ÂÂxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿ11/19/07 TELEPHONE CALL FROM FACILITIES PERSON AT SAD 43. TANK IS OUT OF SERVICE AND HAS BEEN SINCE 2004? OR SO. NEW BOILERS AND INDOOR TANKS INSTALLED AT FACILITY. CHANGING STATUS OF TANKS TO OOS AND SENDING GET YOUR TANK OUT LETTER. THEY WILL BUDGET AND REMOVE IT IN SUMMER 2008. TRxhÂ/AÂYMÂÂ;xhxh Á`xhÃ[3þÿþÿþÿþÿþÿþÿþÿxhÂ/Bà .ÂÂCxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ?Â$XÂÂ'xgxgÁ`xgÃ1?þÿþÿþÿþÿþÿþÿQ TANK READING: TWO TANKS PASS TWO FAIL CYR UPDATED 7/22/04 WITH PASSING CP -ACFxgÂ/CÂJ9ÂÁ"xhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/DÃ!ÂÁ"xhxh xh Ã3AVþÿþÿþÿþÿþÿþÿþÿxh Â/EÃ1 ÂÁ"xhxh xhÃ,þÿþÿþÿþÿþÿþÿ(INSPECTOR IS PAUL BROWN, NOT JOHN CROSS.xhÂ/FÃMÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/GÂE`ÂÂ)xhxh þÿþÿþÿþÿþÿþÿþÿþÿ˜ACCORDING TO THE ANNUAL INSPECTION, THIS FACILITY HAS CHANGED OWNERS. CHANGE OF OWNERSHIP FORM SENT AND RETURNED ON 6/30/04. TANK 5 REMOVED 8/23/04. RRxhÂ/HÃ7UÂÂTxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/I ÂÂTxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/JÂÂÂTxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/KÂ3<ÂÂTxhxh xhþÿþÿþÿþÿþÿþÿþÿ;ACCORDING TO BOB TRASK, FLAPPER IS NOW PRESENT ON TANK #2. xhÂ/LÃÂÂTxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/MÂÂÂTxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/N ÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/OÃÂÂUxhxhÂ(xhÃ2N þÿþÿþÿþÿþÿþÿþÿxhÂ/PÂUÂÂxhxh xh Ä'HþÿþÿþÿþÿþÿþÿþÿxhÂ/QÂ$ÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿ;RECEIVED CERT OF PROPER INSTALL- FLAPPER FOR TANK 7 AND 8. xhÂ/RÂ[8ÂÂUxhxhÂ(xhÃ;XþÿþÿþÿþÿþÿþÿþÿxhÂ/SÃV ÂÂxhxh xhÃN54þÿþÿþÿþÿþÿþÿNCERT OF PROPER INSTALL SUBMITTED BY ED GEORGE. 3 NEW DROP TUBES INSTALLED. RRxhÂ/TÃÂÂUxhxhÂ(xhÃYþÿþÿþÿþÿþÿþÿþÿxhÂ/UÃU ÂÂxhxh xhÃ;/RþÿþÿþÿþÿþÿþÿBSITE IS SCHEDULED FOR VEEDER ROOT UPGRADE. NO TIME FRAME PROVIDED.xhÂ/VÂSAÂÂxhxh xh ÄWCþÿþÿþÿþÿþÿþÿþÿxhÂ/WÂTcÂÂxhxh xiÃNþÿþÿþÿþÿþÿþÿ DAILY INVENTORY SUBMITTED TO DEPxhÂ/XÃ;ÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿINSPECTION UPDATE SUBMITTEDxhÂ/YÂ[LÂÂUxhxhÂ(xhÄ)#þÿþÿþÿþÿþÿþÿB VAPOR RECOVERY POPPET CAP AND GASKET IN GOOD CONDITION?: REPLACEDxhÂ/ZÂ< ÂÂYxhxh þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/[Âb ÂÂ)xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ/\ÂPWÂÂxhxhÁ`xh€þÿþÿþÿþÿþÿþÿ*TANKS OUT OF SERVICE SINCE 2002 OR BEFORE.xhÂ/]à /ÂÂxhxhÁ`xhÃLþÿþÿþÿþÿþÿþÿ)INSPECTION UPDATE SUBMITTED BY ED GEORGE.xhÂ/^Â$,ÂÂxhxhÁ`xhÃcþÿþÿþÿþÿþÿþÿþÿxhÂ/_ ÂÂxhxhÁ`xhÃCORþÿþÿþÿþÿþÿþÿ:FLAPPERS ABOUT 2" HIGH INSPECTION UPDATE PERFORMED 6/1/04xhÂ/aÂ?ÂÂxhxhÁ`xhÄFRþÿþÿþÿþÿþÿþÿ INSPECTION UPDATE BY MIKE SIMARDxhÂ/bÂ>;ÂÂxhxhÁ`xhÃHSþÿþÿþÿþÿþÿþÿ#INSPECTION UPDATE BY JOSH BISKUPIAKxhÂ/cÁ(ÂÂUxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ%REPAIRS MADE PER C.T.INSP. BISKUPIAK.xhÂ/dà *ÂÂUxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ PRODUCT PIPE READING: FIBERGLASS VENT PIPE READING: FIBERGLASS CERT OF PROPER INSTALL RECEIVED. ELWIN SCOTT REPLACED SPILL BUCKETS ON TANK 7.xhÂ0Â&ÂÂ)xh xhÁ`xh þÿþÿþÿþÿþÿþÿþÿ:TANK INSTALLED IN 1989. PIPING APPEARS TO BE BARE COPPER THOUGH IT IS SLEEVED COMING INTO THE BOILER ROOM. FOAM INSULATION AROUND IT AT TANK. GROUNDWATER CHECKED BY CTI BUBAR, CLEAN, NO LOG OR BAILER ON SITE. SPOKE WITH OWNER- PIPING IS SLEEVED BUT NOT SPACED. SPACING WAS NOT REQUIRED AT TIME OF INSTALLATION. RRxhÂ0Â&ÂÂ)xh xhÁ`þÿþÿþÿþÿþÿþÿþÿþÿÜMONITORING WELLS NOT FUNCTIONAL, ONE BROKEN ONE FULL OF SAND. NO BAILER, NO WATER, NO LOG. BARE COPPER PIPING, SLEEVED ONLY THROUGH FOUNDATION, NO ACCESS AT TANK TOP PER CTI BUBAR. PIPING UPGRADE PERFORMED ON 9/3/2004. xhÂ0ÃK/ÂÂ)xh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0ÃK1ÂÂ)xh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿ5LINES SLEEVED AND MONITORED NO SPACERS PER CTI BUBAR.xhÂ0ÃK2ÂÂ)xh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿ.STEEL PIPING IS SLEEVED AND MONITORED IN SUMP.xhÂ0ÃXÂÂ)xh xhÁ`xh ÃM)þÿþÿþÿþÿþÿþÿ>THIS FACILITY HAS A VENT WHISTLE. LETTER ISSUED IN 2001 FROM DEP GRANTED PERMISSION TO USE WHISTLE AT THIS FACILITY UNDER CERTAIN CRITERIA. HOWEVER, INSPECTION NOTES THAT THERE IS NO ACCESS TO THE WHISTLE. THEREFORE, FACILITY FAILING FOR OVERFILL. RR ACESS NOT NEEDED. ALLOWED TO CONFIRM OPERATION DURING DELIVERY. TSxhÂ0ÂM'ÂÂ)xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿhCTI BUBAR MADE REPAIRS TO THE FACILITY, INCUDING REPLACEMENT SPILL BUCKET, AND NEW 61SO OVERFILL DEVICE.xhÂ0Ã/ ÂÂ)xh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿ¹CTI BUBAR RETURNED TO THE SITE 5/27/04 AND GOT A -.749 FROM THE WIRE, READING OFF BOTTOM OF TANK IS -.914. CTI PASSED TANK. TANK IS #5 FUELK AND SHOULD BE CAREFULLY MONITORED. TJRECTORxh Â0 ÂQ2ÂÂxh xhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ@NO ACCESS TO PIPING AT TANK TOP, 2 LINES SLEEVED AND OTHERS COME RIGHT THROUGH THE CONCRETE. NO OVERFILL PREVENTION, REQUIRED BY OIL AND SOLID FUEL BOARD TO AT LEAST HAVE A VENT WHISTLE, NO SPILL BUCKET, GROUNDWATER MONITORING WHILE PASSING ON SUMMARY PAGE IS NOT EVEN LOOKED AT IN THE INSPECTION ITSELF, MARKED AS FAIL.xhÂ0 ÂXÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ¶TANK 6-1 NOT INSPECTED. FULL TANK TOP UP UPGRADE DUE SUMMER 2004. CERT OF PROPER INSTALL SUBMITTED BY CHRIS WILSON. NEW SPILL BUCKET, FLAPPER AND PIPING SUMP INSTALLE DON TANK 6. RRxhÂ0 ÃS0ÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿ¼INSPECTOR CLEANED WATER FROM SUMPS. CLEANED AROUND THE LIDS OF SUMPS TO SEE IF DOING SO WILL PROVIDE A BETTER SEAL. NO THRUPUT RECORDS PROVIDED. INSPECTION UPDATE SUBMITTED BY ED GEORGE.xhÂ0 ÂPWÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿ£12/5/05 ARTHUR CARTON CALLED, WILL SCHEDULE INSPECTION ASAP. -ACF ANNE CARTON CALLED ON 10/04/2006. SHE WISHES TO REMOVE TANKS THIS FALL. REQUESTED CTI LIST. BBxhÂ0 Ã]S xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0ÃGÂÂ+xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0ÂcÂÂbxhxhÁcxhÄþÿþÿþÿþÿþÿþÿþÿxhÂ0ÂT#ÂÂbxhxhÁcxhÃ3þÿþÿþÿþÿþÿþÿþÿxhÂ0Â* ÂÂbxhxhÁcxhÄ þÿþÿþÿþÿþÿþÿþÿxhÂ0ÃAÂÂbxhxhÁcxhÄþÿþÿþÿþÿþÿþÿþÿxhÂ0Ã.ÂÂbxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0Â_ÂÂbxhxhÁcxhÃ[þÿþÿþÿþÿþÿþÿþÿxhÂ0Ã.ÂÂbxhxhÁcxhÄþÿþÿþÿþÿþÿþÿþÿxhÂ0Â*"ÂÂbxhxhÁcxhÄþÿþÿþÿþÿþÿþÿþÿxhÂ0Ã6ÂÂbxhxhÁcxhÃcGþÿþÿþÿþÿþÿþÿþÿxhÂ0Ã@ÂÂbxhxhÁcxhÃ9 þÿþÿþÿþÿþÿþÿþÿxhÂ0Â#ÂÂbxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0Â`ÂÂbxhxhÁcxhÄ3þÿþÿþÿþÿþÿþÿþÿxhÂ0ÂdÂÂbxhxhÁcxhÄþÿþÿþÿþÿþÿþÿþÿxhÂ0Â*&ÂÂbxhxhÁcxhÄ7þÿþÿþÿþÿþÿþÿþÿxhÂ0ÂÂÂbxhxhÁcxhÃGþÿþÿþÿþÿþÿþÿþÿxhÂ0ÂG@ÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0ÂM=ÂÂ)xhxhÁcxh Ã<þÿþÿþÿþÿþÿþÿþÿxh Â0 ÃY6ÂÂ)xhxhÁcxhÃþÿþÿþÿþÿþÿþÿþÿxhÂ0!ÂOÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0"Ã)TÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0#Â>ÂÂxhxhÁcxh Ãþÿþÿþÿþÿþÿþÿþÿxh Â0$Ã#1ÂÂxhxhÁcxhÃ=þÿþÿþÿþÿþÿþÿþÿxhÂ0%Ã&JÂÂxhxhÁcxh Ã+3þÿþÿþÿþÿþÿþÿþÿxh Â0&ÃSÂÂxhxhÁcxhÃ#3þÿþÿþÿþÿþÿþÿþÿxhÂ0'ÂÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0(ÂX/ÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0)à )ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0*ÂGRÂÂxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0+ÂÂ%5ÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0?ÂZ/ÂÂTxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0@à ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0AÂ3 xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0BÂ# xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0Cà N xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0DÁK xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0Eà b xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0FÃ]S xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0GÂB xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0HÂ(3 xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0IÂS) xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0JÂS+ xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0KÂS- xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0LÃ:R xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0MÃ^K xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0N xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0OÂCP xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0PÃ#ÂÂDxhxhÁcxhÃS]þÿþÿþÿþÿþÿþÿþÿxhÂ0QÂPÂÂxhxhÁcxhÃ1 þÿþÿþÿþÿþÿþÿþÿxhÂ0RÃ/\ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0SÂLZÂÂHxhxhÁcxhÃTþÿþÿþÿþÿþÿþÿþÿxhÂ0TÃ/\ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0UÃÂÂUxhxhÁcxhÃ6 *þÿþÿþÿþÿþÿþÿþÿxhÂ0VÃWÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0WÂ[3ÂÂUxhxhÁcxhÄ"O3þÿþÿþÿþÿþÿþÿþÿxhÂ0XÂ[-ÂÂUxhxhÁcxhÃ:&1þÿþÿþÿþÿþÿþÿþÿxhÂ0YÂ2CÂÂUxhxhÁcxhÃJPþÿþÿþÿþÿþÿþÿþÿxhÂ0ZÂ$8ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0[ÂE>ÂÂxhxh xh Ã^þÿþÿþÿþÿþÿþÿÁROBERT GORDON CALLED RE: PETROMETER T20 INSPECTION. TOLD HIM IT HAD TO BE PULLED & REINSTALLED OR REPLACED WITH AN INSPECTABLE SYSTEM. CERT OF PROPER INSTALL, ELECTRONIC MONITORING REPLACED.xhÂ0\ÂÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0]ÂGÂÂxhxhÂxh Ã3þÿþÿþÿþÿþÿþÿþÿxh Â0^ÃÂÂxh xhÂxhÃþÿþÿþÿþÿþÿþÿþÿxhÂ0_Á@ÂÂxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿGTANK INSTALLED 10/01/1991. CTI REPORTED NO OVERFILL DEVICE PRESENT. BBxhÂ0`ÂLÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ0aÃ8@ÂÂxhxhÂxh þÿþÿþÿþÿþÿþÿþÿwCTI PASSED FACILITY EVEN THOUGH THEY ARE STILL NOT DOING GW MONITORING. BB SUBMITTED RECORD SHOWING DOING MONITORING TSxhÂ0b ÂÂxhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0cÂ>D xhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â0dÂ3 xhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â1ÂcI xhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â1Â18 xhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â1Ã[ xhxhÂxhÃ5þÿþÿþÿþÿþÿþÿþÿxhÂ1ÂGE xhxhÂxhà GþÿþÿþÿþÿþÿþÿþÿxhÂ1Â&) xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1Ã' xhxhÂxh Ã'8þÿþÿþÿþÿþÿþÿ+FACILITY ALSO HAS 20,000 GALLON RNL AST. BBxh Â1Ã!QÂÂ)xhxhÂxhÃ"XþÿþÿþÿþÿþÿþÿþÿxhÂ1ÃFÂÁ"xhxhÂxhþÿþÿþÿþÿþÿþÿþÿ8PER DAVID LAPIERRE HORN ON MONITORING CONSOLE REPLACED. xhÂ1 ÂMÂÂXxhxhÂxhþÿþÿþÿþÿþÿþÿþÿ.MIKE LEWIS PERFORMED CP TEST ON 04/12/2004. BBxhÂ1 ÃGÂÂXxhxhÂxhþÿþÿþÿþÿþÿþÿþÿ.MIKE LEWIS PERFORMED CP TEST ON 05/07/2004. BBxhÂ1 Â<8ÂÂXxhxhÂxhþÿþÿþÿþÿþÿþÿþÿ.MIKE LEWIS PERFORMED CP TEST ON 05/07/2004. BBxhÂ1 ÃJÂÂXxhxhÂxhþÿþÿþÿþÿþÿþÿþÿ.MIKE LEWIS PERFORMED CP TEST ON 05/17/2004. BBxhÂ1 ÃD!ÂÂXxhxhÂxh þÿþÿþÿþÿþÿþÿþÿMIKE LEWIS PERFORMED CP TEST ON 05/07/2004. BB CP TESTED AGAIN 11/2/04 BY MIKE LEWIS, NOW PASSING. READINGS AS FOLLOWS: -.850, -.851, -.869.xhÂ1à 0ÂÂDxhxhÂxhþÿþÿþÿþÿþÿþÿþÿ&TANKS ARE CURRENTLY OUT OF SERVICE. BBxhÂ1Ã>4ÂÂOxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿf TANK READING: -1.362, -1.485 PRODUCT PIPE READING: COPPER IN PVC SLEEVE VENT PIPE READING: FIBERGLASSxhÂ1ÃAÂÂPxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ'FACILITY IS OUT OF SERVICE SINCE 10/03.xhÂ1Â2ÂÂTxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1ÃDÂÂPxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ&FACILITY OUT OF SERVICE AS OF 10/1/03.xhÂ1Ã`0ÂÂPxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1Ã`-ÂÂPxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1Ã`*ÂÂPxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxhÂ1ÃCÂÂPxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ!FACILITY IS OUT OF SERVICE 10/03.xhÂ1ÃUÂÁ"xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1Â68ÂÂ:xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1ÂL$ÂÂUxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1Â%*ÂÂAxhxhÁ`xhÃ1`þÿþÿþÿþÿþÿþÿþÿxhÂ1ÂSCÂÂAxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1Â/QÂÂxh xhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1ÁÂÂTxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿePIPING LISTED AS FIBERGLASS IN DATABASE, CTI SAYS COPPER IN SLEEVE, MAY NEED TO BE CHECKED SOMETIME.xh Â1Â(ÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿŠPETROMETER SYSTEM. NO ACCESS TO INTERSTITIAL. SECOND FAILING INSPECTION. BB NEW OMNTEC SYSTEM INSTALLED BY LARRY SAVAGE ON 8/31/2004. BBxhÂ1Ã"ÂÂHxhxhÁ`xhÃ]O>þÿþÿþÿþÿþÿþÿþÿxhÂ1 ÃQÂÂUxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿINSPECTION UPDATExhÂ1!ÃIÂÂUxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿINS. UPDATE SUBMITTEDxhÂ1"Ã+HÂÂxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ61 SO INSTALLEDxhÂ1#ÂH:ÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿ•OPERATOR SUBMITTED DAILY INVENTORY AFTER THE FACT. THIS IS THE SECOND TIME THE INSPECTOR NOTED A GAUGE STICK BEING USED TO DISABLE FLAPPER VALVE. BBxhÂ1$ÂSVÂÁ"xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1%ÂaPÂÂbxhxhÁ`xh ÃGþÿþÿþÿþÿþÿþÿþÿxh Â1&Â-LÂÂHxhxhÁ`xhÃ$8=þÿþÿþÿþÿþÿþÿ”INSPECTION FAILED FOR DAILY INVENTORY, NEW STICK ORDERED AND TRAINING PROVIDED BY CTI LEWIS IN PROPER D.I. METHOD. PASSING INSPECTION IN DATABASE.xhÂ1'à ÂÂbxhxhÁ`xhÄþÿþÿþÿþÿþÿþÿþÿxhÂ1(Ã#ÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1) PÂÂLxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ×SPOKE WITH SUPER. OF SCHOOL. WORK IS GOING TO BE DONE, MAYBE IN 2004, BUT IF WEATHER PROBLEM MAY NOT BE UNTIL 2005, HE WILL SEND A LETTER. LARRY WINCHESTER CTI WILL PROBABLY BE DOING THE WORK, ESTIMATE OF $5000. TRxhÂ1*Ã.ÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ9INSPECTION SHOWED FAILING OVERFILL AND FAILING CP. OVERFILL WAS CORRECTED PRIOR TO DATA ENTRY WITH THE INSTALLATION OF A 61-SO OVERFILL FLAPPER. THE CP IS SUPPOSED TO BE UPGRADED/REPAIRED BUT THERE IS NOT ANY PROOF OF THAT AT THE TIME OF DATA ENTRY. CP ON TANK #491 IS THE ONLY FAILING ITEM AT THIS TIME AND IS DUE TO BE UPGRADED. CP REPAIRED ON 6/28/2004. BB RECEIVED CERT OF PROPER INSTALL- PAUL THOMPSON INSTALLED ANODES ON THE TANK. HOWEVER, NO CP TEST RESULTS HAVE BEEN SENT IN. WILL REQUIRE INSPECTION UPDATE/ CP TEST RESULTS BEFORE IT IS MARKED AS PASSING. -RRxhÂ1+Â.ÂÂ)xhxhÂxh à O=þÿþÿþÿþÿþÿþÿ4THRUPUT INFORMATION IS BASED ON 6 MONTHS OF DATA. BBxh Â1,Ã>ÂÂCxhxhÂxhÃXþÿþÿþÿþÿþÿþÿþÿxhÂ1-Ã:IÂÂXxhxh þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1.ÃW_ÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1/Ã/SÂÂZxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ10Â4*ÂÁ"xhxh xh þÿþÿþÿþÿþÿþÿþÿPASSING PER WAYNE GIFFORD. xhÂ11ÃR0ÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ}NOTES ON INSPECTION INDICATE OIL LEAKING INTO DOUBLE WALL PIPE. NOT CLEAR WHERE FROM. PIPING REPLACED PER CTI PAUL THOMPSON.xhÂ12Ã=TÂÁ"xhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ,WADLEIGHS SLEEVED AND SPACED COPPER PIPING. xhÂ13ÃZYÂÂxhxh xh þÿþÿþÿþÿþÿþÿþÿNOW PASSIING PER CTI ED GEORGE.xhÂ14ÂÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿTANK WAS REMOVEDxhÂ15ÃaÂÂTxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ16ÂOQÂÁ"xhxh xhÄ+>þÿþÿþÿþÿþÿþÿþÿxhÂ17Â^ÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ18Ã]5ÂÂTxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ19ÁUÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1:ÁTÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ8ÃSJÂÂ!xgxgÁ`þÿþÿþÿþÿþÿþÿþÿþÿkONLY HAVE INSPECTION FOR THE 8000 GALLON GASOLINE TANK, IT IS INCORRECTLY LISTED ON THE INSPECTION AS BEING REGISTRATION #18272. THIS TANK FAILS AND THE OTHER TANK AT THE SITE IS NOT LISTED AND THEREFORE FAILS ALSO. TIMOTHY RECTOR INSPECTION UPDATE SUBMITTED. OVERFILL AND INTERSTITIAL NOW PASSING. NOTHING SUBMITTED FOR VAPOR RECOVERY, NO ANNUAL THROUGHPUT. RRxf Â1;ÂBaÂÂYxhxhÂxhÃY9þÿþÿþÿþÿþÿþÿþÿxhÂ1<Â1HÂÂ)xhxhÂxhÂ!QþÿþÿþÿþÿþÿþÿþÿxhÂ1=Â,ÂÁxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿDSPOKE TO OWNER ON 06/28/2004. TANK IS TO BE REMOVED THIS SEASON. BBxh Â1>Ã_`ÂÂ"xhxhÁcxhÃX6WþÿþÿþÿþÿþÿþÿþÿxhÂ1?ÂCÂÂUxhxhÂ(xhà &þÿþÿþÿþÿþÿþÿþÿxhÂ1@Â>ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1AÂ2DÂÂUxhxhÁcxhÃ7 þÿþÿþÿþÿþÿþÿþÿxhÂ1BÃ!NÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1Cà /ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1DÂ9ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1EÃÂÂHxhxhÁcxhÄ! þÿþÿþÿþÿþÿþÿþÿxhÂ1FÃ.MÂÂHxhxhÁcxhÃ^I8þÿþÿþÿþÿþÿþÿþÿxhÂ1GÂ[4ÂÂHxhxhÁcxhÃb$þÿþÿþÿþÿþÿþÿþÿxhÂ1HÂ#ÂÂCxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ–CERT OF PROPER INSTALL SENT FOR OVERFILL ISSUES. STILL NEED VERIFICATION SENSOR WAS REPAIRED. 8/19/04 PER CTI DUANE FURGE FACILITY NOW IN COMPLIANCE.xhÂ1IÂdbÂÂHxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1JÂ&ÂÂHxhxhÂxhÃ3þÿþÿþÿþÿþÿþÿþÿxhÂ1Kà 5ÂÂLxhxhÂxhÃ$þÿþÿþÿþÿþÿþÿþÿxhÂ1MÂ$?ÂÂUxhxhÁcxh ÄGASþÿþÿþÿþÿþÿþÿþÿxh Â1NÂ>\ÂÂUxhxhÁcxhÃ3@þÿþÿþÿþÿþÿþÿþÿxhÂ1Oà /ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1PÃXDÂÂUxhxhÁcxhÃ#AþÿþÿþÿþÿþÿþÿþÿxhÂ1QÂAÂÂxhxhÁcxhÃ4þÿþÿþÿþÿþÿþÿþÿxhÂ1RÂ[1ÂÂxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1SÂ2GÂÂUxhxhÁcxhÃL'þÿþÿþÿþÿþÿþÿþÿxhÂ1TÂ2HÂÂUxhxhÁcxhÃQQ>þÿþÿþÿþÿþÿþÿþÿxhÂ1UÃNÂÂHxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1VÃK ÂÂxhxhÁcxhÄA þÿþÿþÿþÿþÿþÿþÿxhÂ1WÃ%>ÂÂ)xhxhÁ`xhÃþÿþÿþÿþÿþÿþÿC6/30/05 CERT OF PROPER INSTALL 15 GALLON SPILL BUCKET ON SUPER TANKxhÂ1XÃKÂÂxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1YÂ5 ÂÂxhxhÁcxhÄ @þÿþÿþÿþÿþÿþÿþÿxhÂ1ZÂRFÂÂxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1[Â$ÂÂxhxhÁcxhÃ)C!þÿþÿþÿþÿþÿþÿþÿxhÂ1\Ã6ÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1]ÂbÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1^Â\ÂÂYxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1_ÂF1ÂÂxhxhÁcxhÃ$þÿþÿþÿþÿþÿþÿþÿxhÂ1`ÃLÂÂxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1aÃ\)ÂÂZxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1bÂ;:ÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1cÃ[ÂÂZxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ1dÂ%ÂÂ)xhxhÁcxhÂþÿþÿþÿþÿþÿþÿþÿxhÂ2Ã& ÂÂ)xhxhÁcxhÃþÿþÿþÿþÿþÿþÿþÿxhÂ2Á\ÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2Ã^)ÂÂ)xhxhÁcxhà XþÿþÿþÿþÿþÿþÿþÿxhÂ2ÂB'ÂÂTxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â2Â[FÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2 *ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿMINSPECTION UPDATE FROM DUANE BURTON ON 4/22/2004. ALL PROBLEMS CORRECTED. BBxhÂ2Â[0ÂÂHxhxhÂ(þÿÃ*R8þÿþÿþÿþÿþÿþÿþÿxhÂ2Â[?ÂÂHxhxhÂ(xhÄB\"þÿþÿþÿþÿþÿþÿ(REPAIR AND UPDATE BY ELWIN SCOTT 6/25/04xhÂ2 Ã8ÂÂ)xhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿUNABLE TO DETERMINE, NO ACCESS.xhÂ2 Â[MÂÁ$xhxhÂ(þÿÃLþÿþÿþÿþÿþÿþÿþÿxhÂ2 Ã7ÂÂ)xhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿPIPING SLEEVED IN FLOOR, NO ACCESS AT TANK TOP. ALSO NO OVERFILL DEVICE. AFTER DISCUSSION IN HOUSE, WE WILL PASS THIS SYSTEM. xhÂ2 Â[KÂÁ$xhxhÂ(þÿÃGþÿþÿþÿþÿþÿþÿþÿxhÂ2 Â[/ÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2Â[OÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2Á^ÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2ÁYÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2ÁJÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2ÁHÂÂYxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2Ã5LÂÂ"xhxhÂxhÃMÃcÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿPASSING PER CTI PAUL THOMPSON.xhÂ2?ÃÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ'PASSING FACILITY PER CTI PAUL THOMPSON.xhÂ2@à ÂÂZxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿPASSING PER CTI PAUL THOMPSON.xhÂ2AÃ-+ÂÂ'xhxhÂxhÄ*d4þÿþÿþÿþÿþÿþÿCP UPGRADE ON 06/23/2004. BBxhÂ2BÂ(JÂÂ'xhxhÂxhà  þÿþÿþÿþÿþÿþÿCP UPGRADE ON 06/23/2004. BBxhÂ2Cà ÂÂSxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2D ÂÂSxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2EÂDÂÂSxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2FÂSÂÂSxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2GÂ6ÂÂSxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2HÂ?ÂÂSxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2IÃaÂÂSxhxhÁcxhÃ4(þÿþÿþÿþÿþÿþÿþÿxhÂ2JÃUXÂÂSxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2KÂKÂÂ)xhxhÁcxhà GþÿþÿþÿþÿþÿþÿþÿxhÂ2LÃ/ÂÂ)xhxhÁcxhÃ(PPþÿþÿþÿþÿþÿþÿþÿxhÂ2MÂ^ÂÂ)xhxhÁcxhÃ#:JþÿþÿþÿþÿþÿþÿþÿxhÂ2NÂ6BÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2OÂ9ÂÂ)xhxhÁcxhÃ+þÿþÿþÿþÿþÿþÿþÿxhÂ2PÃaÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2QÂÂÂ)xhxhÁcxhÃKþÿþÿþÿþÿþÿþÿþÿxhÂ2RÂB%ÂÂ)xhxhÁcxhà 53þÿþÿþÿþÿþÿþÿþÿxhÂ2SÃXbÂÂCxhxhÁcxhà Z4þÿþÿþÿþÿþÿþÿþÿxhÂ2TÂ$'ÂÂ)xhxhÁcxhÃ*5þÿþÿþÿþÿþÿþÿþÿxhÂ2UÂb@ÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2VÃ$:ÂÂCxhxhÁcxhÃ*HBþÿþÿþÿþÿþÿþÿþÿxhÂ2WÃ\ÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2XÂ. ÂÂCxhxhÁcxhÃþÿþÿþÿþÿþÿþÿþÿxhÂ2YÂG.ÂÂCxhxhÁcxhÃ:dþÿþÿþÿþÿþÿþÿþÿxhÂ2ZÃ$^ÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2[ÂPYÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2\ÂWÂÂ)xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2]ÂL(ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2^Ã/6ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2_ Â xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2`Âd< xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2aÂP> xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2bà ] xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2cÃH  xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ2dÃ[ xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3Â8F xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3ÂTHÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3ÂT5ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3ÂT?ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3Â1ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3Â(?ÂÂ'xhxhÁcxhÄ !:þÿþÿþÿþÿþÿþÿþÿxhÂ3Ã-&ÂÂ'xhxhÁcxh Ä/[aþÿþÿþÿþÿþÿþÿþÿxh Â3Â-5ÂÂ'xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3 à (ÂÂ'xhxhÁcxhÄ8þÿþÿþÿþÿþÿþÿþÿxhÂ3 Â[AÂÂHxhxhÂ(xhÄd8þÿþÿþÿþÿþÿþÿ4DENNIS DAVIS REPAIRED AND UPDATED INSPECTION 6/29/04xhÂ3 Â[=ÂÂbxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿ+DROP TUBES REPLACED BY HAZEL ON 6/4/04 -ACFxhÂ3 Â[.ÂÂWxhxhÂ(xhÄ:þÿþÿþÿþÿþÿþÿþÿxhÂ3 Â[2ÂÂWxhxhÂ(xh€þÿþÿþÿþÿþÿþÿ1PUMPED OUT AND LOCKED DOWN 6/24/04 PER KI KRZCUIKxhÂ3Â[7ÂÂWxhxhÂ(xhÃ.68þÿþÿþÿþÿþÿþÿ(GR ADAMS REPLACED SENSOR & SPILL BUCKETSxhÂ3Â[GÂÂWxhxhÂ(xhÄE.þÿþÿþÿþÿþÿþÿKRZCUIK UPDATE 6/24/04xhÂ3Â[CÂÂbxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3Ã-]ÂÂbxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3Â[>ÂÂbxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3ÃUÂÂbxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3ÃÂÂWxhxhÂ(xhÄ9HþÿþÿþÿþÿþÿþÿþÿxhÂ3Ã]%ÂÂZxhxhÂxhþÿþÿþÿþÿþÿþÿþÿ\RECEIVED CERT OF PROPER INSTALL- SPILL BUCKET RAISED AND FILL CAP AND ADAPTOR WERE REPLACED.xhÂ3 LÂÂxhxhÂxh ÃLþÿþÿþÿþÿþÿþÿ<TANKS SCHEDULED FOR REMOVAL ON OCTOBER 20, 2004. RR REMOVEDxhÂ3ÂÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿtNEW OWNERS: RANDY BICKFORD AND CINDY STORER, (207) 695-2423. SENT CHANGE OF OWNERSHIP FORM TO THEM ON 07/01/2004. BBxhÂ3 ÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3ÂAÂÂxhxhÂxhÄEþÿþÿþÿþÿþÿþÿ615 GALLON SPILL BUCKETS INSTALLED BY ROBERT GORDON. RRxhÂ3ÂUÂÂLxhxhÂxhÃ(þÿþÿþÿþÿþÿþÿþÿxhÂ3ÂUÂÂLxhxhÂxhà S3þÿþÿþÿþÿþÿþÿþÿxhÂ3ÂUÂÂLxhxhÂxhÃ5þÿþÿþÿþÿþÿþÿþÿxhÂ3ÃJÂÂZxhxhÂxhþÿþÿþÿþÿþÿþÿþÿóVENT WHISTLES ON MOTOR FUEL TANKS. OPERATOR HAS SCHEDULED REPAIRS. BB FLAPPERS INSTALLED. STILL WAITING ON VERIFICATION FOR PRESSURE/VAC CAP RR VENT CAP INSTALLED AT SAME TIME AS FLAPPERS, BUT NOT INCLUDED IN CERT. OF PROPER INSTALLATION. BBxh Â3Ã)ÂÂZxhxhÂxhÃ!VaþÿþÿþÿþÿþÿþÿGFACILITY WAS ACTUALLY INSPECTED BY LARRY WINCHESTER ON MAY 17, 2004. BBxhÂ3 Ã*=ÂÂUxhxhÂxh Ã#þÿþÿþÿþÿþÿþÿ\CHAMBER 1 SPILLBUCKET HAS HOLE IN IT. BB CERT OF PROPER INSTALL, SPILL BUCKETS REPLACED. RRxhÂ3!Ã` ÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3"ÂH ÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿ”INSPECTOR NOTED THAT COPPER LINES WERE DIRECT BURIED BUT GAVE THEM A PASS. FACILITY FAILS. BB SITE VISIT BY DEP ON 7/7/2004. LINE ARE SLEEVED. BBxhÂ3#ÃÂÂxhxhÂxg þÿþÿþÿþÿþÿþÿþÿ9FACILITY INCLUDED AST INSPECTIONS WITH UST INSPECTION. BBxg Â3$Ã$&ÂÂxhxhÂxhÃ-2þÿþÿþÿþÿþÿþÿ|INSTALLER REPORTED OVER/SHORT GREATER THAN 1% THRUPUT ON TANK #6 FOR APRIL DATA. THIS WAS ALSO REPORTED BY OWNER IN MAY. BBxhÂ3%ÂEM xhxhÂxiþÿþÿþÿþÿþÿþÿþÿøOWNER SENT COPY OF FACILITY UPGRADE FORM ALONG WITH INSPECTION. SPILL BUCKET TO BE REPLACED. ALSO, INSPECTOR GAVE OPERATOR INTERSTITIAL LOG AND INSTRUCTED ON REQUIREMENTS. BB CERT OF PROPER INSTALL SUBMITTED FOR SPILL BUCKET- REPLACED WITH 15 GALxhÂ3&Â<ÂÂTxhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â3'Ã--ÂÂ'xhxhÂxh ÃZMþÿþÿþÿþÿþÿþÿ<INSTALLER REPLACED FAULTY SENSOR IN TANK #8 ON 6/26/2004. BBxh Â3(Ã-'ÂÂ'xhxhÂxh Ã7@IþÿþÿþÿþÿþÿþÿÙHEATING OIL TANK AND NON-CONFORMING WASTE OIL TANK TO BE REMOVED ON JULY 7, 2004. CP TESTED BY DREW LAWRENCE ON 04/29/2004. BB TANKS 8 AND 9 REMOVED ON 7/9/2004. INSPECTION UPDATE BY SCOTT CYR ON 7/19/2004. PASS. BBxhÂ3)ÃPÂÂ'xhxhÂxh ÃK+þÿþÿþÿþÿþÿþÿ2SPILL BUCKET REPLACED ON 6/18/2004 FOR TANK #9. BBxh Â3*Ã.IÂÂ'xhxhÂxh ÃAaþÿþÿþÿþÿþÿþÿþÿxh Â3+ÂA ÂÂ4xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3,Â3TÂÂ)xhxhÂxhÃ; bþÿþÿþÿþÿþÿþÿTANK IS ACTUALLY CHAMBERED. WILL MAKE CHANGE. BB REPLACED SENSOR AND REPLACED FLAPPER, FACILITY NOW PASSES, PER CTI DON BUBARxhÂ3-ÃÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3.Ã8XÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿgPER OPERATOR, WATER IN TANK INTERSTITIAL TO BE PUMPED OUT AND MONITORED FOR INFILTRATION BY BURTON -ACFxhÂ3/ÃQÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ30ÂFÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ31Ã9ÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿ NOT DOING GROUNDWATER MONITORINGxhÂ32ÃPÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ33ÃPÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿBARE STEEL REMOTE FILLxhÂ34ÃU.ÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿNOT DOING G-W MONITORINGxhÂ35Ã"ÂÂxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ36Â% xhxhÂþÿÃ[þÿþÿþÿþÿþÿþÿ@CP READINGS ON PIPING ARE FOR VENT PIPING NOT PRODUCT PIPING. BBxhÂ38Ã' xhxhÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ39ÂN xhxhÂxhþÿþÿþÿþÿþÿþÿþÿ1INSTALLER REPLACED FAULTY ELECTRONIC OVERFILL. BBxh Â@ÂÂTxgxgÁ`xhþÿþÿþÿþÿþÿþÿþÿlSCHEDULED PMI FOR REPAIRS ON 7/10/04 ACF TONY COUTURE INSTALLED OMNTEC TANK INTERSTITIAL MONITOR 6/22/04 RRxg Â@ÂÂTxg xgÁ`xhþÿþÿþÿþÿþÿþÿþÿeSCHEDULED PMI FOR REPAIRS ON 7/10/04 ACF ELECTRONIC HIGH LEVEL ALARM INSTALLED BY PRECISION TANKS RRxgÂ3:Â*9 xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3;Âd xhxhÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â3<ÂX  xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3=ÂD xhxhÂxhþÿþÿþÿþÿþÿþÿþÿ-INPSECTOR WAS KEN LEGASSE NOT TED HASKELL. BBxhÂ3>Â%? xhxhÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3?ÂL'ÂÂxhxhÂxh þÿþÿþÿþÿþÿþÿþÿ8INSPECTION UPDATE SUBMITTED. MONITORING CONSOLE REPLACEDxhÂ3@ÃÂÂxhxhÂxh þÿþÿþÿþÿþÿþÿþÿ#PROBE REPLACED PER CTI JEFF HUNTLEYxhÂ3AÂ7)ÂÂxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3BÂ!ÂÂSxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ3CÂÂÂZxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿ*GUERIN SCHEDULED FOR WEEK OF 1/16/06 -ACFxh Â4#Ã0ÂÂxhxhÁcxhÃ5U þÿþÿþÿþÿþÿþÿþÿxhÂ4$ÃSÂÂKxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4%ÃWOÂÂKxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4&Â]ZÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4'ÂY%ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4(ÂY'ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4)Â2 ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4*Â]FÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4+Â]`ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4,Â]dÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4-Â]CÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4.Â]JÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4/Â]SÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â40Â]aÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â41Â2ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â42Â2 ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â43Â2ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â44Â1^ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â45Â2ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â46Â2ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â47Â]_ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â48ÂYEÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â49Â^?ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4:Â]NÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4;Â2ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4<ÂYÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4=ÂLÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4>ÂYÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4?ÂYÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4@ÂQ/ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4AÂXCÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4BÂQ7ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4CÂYÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4DÂ]MÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4EÂY=ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4FÂ]VÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4GÂ]IÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4HÂ1_ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4IÂ]KÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4JÂYÂÂZxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4KÂY\ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4LÂYZÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4MÂQMÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4NÂ^ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4OÂ^ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿ"TANK PLANNED FOR REMOVAL ON 6/6/05xg Â4PÂY:ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4QÂY:ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â4RÂYHÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4SÂ3UÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4TÂ^ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4UÂ3WÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4VÂY ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4WÂYDÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4XÂ^ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4YÂ]cÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4ZÂ]RÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4[ÂYÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4\Â]DÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4]ÂYAÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4^ÂQ0ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4_Â]^ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4`ÂYÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4aÂQ5ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4bÂQ6ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4cÂ15ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ4dÂ]PÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂQ1ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5Â]]ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5Â]LÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5Â]GÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5Â]bÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂXcÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂYÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂLÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5 ÃÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5 ÂLÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â5 Â]GÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â5 Ã'2ÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â5 ÂY#ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5Â1]ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂYÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂXFÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5Â]UÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â5ÂQ3ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂY3ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂY-ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂY?ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂY)ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂY5ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂXDÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂY[ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5Â12ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5Â]BÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂQPÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5ÂY_ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5Ã/-ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5 )ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5 ÂM ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5! ?ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5"ÂM ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5#ÃUEÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5$ÂLLÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5%Ã$$ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5&ÃSÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5'Â0ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5(Ã9ÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5)Â`ÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5*ÃÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5+ÂcÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5,ÂN]ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5-ÂL`ÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5.Ã*ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5/ÂGcÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ50Ã-ÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ51Ã`FÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ52ÂYRÂÂ;xhxhÁcxhÃ.9&þÿþÿþÿþÿþÿþÿþÿxhÂ53ÂYKÂÂ;xhxhÁcxhÃU/þÿþÿþÿþÿþÿþÿþÿxhÂ54Ã+ ÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ55Ã\ÂÂCxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ56Â`ÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ57ÃÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ58ÂcÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ59Â]WÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5:ÂYÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿ!TANK PLANNED FOR REMOVAL 6/3/2005xhÂ5;Â]OÂÂUxhxhÁcxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â5<Â3XÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5=Ã`PÂÂZxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5>Ã<0ÂÂZxhxhÂxh þÿþÿþÿþÿþÿþÿþÿ0PER CTI PAUL THOMPSON, FACILITY IS NOW PASSING. xhÂ5?ÂIWÂÂCxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5@ÃP` xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5A xhxhÂxhÃ!þÿþÿþÿþÿþÿþÿþÿxhÂ5BÂ#ÂÂ$xhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5CÂTÂÂBxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5D ÂÂZxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5EÃ3ÂÂZxhxhÂxhþÿþÿþÿþÿþÿþÿþÿ7INSPECTOR FAILED FOR VENT NOT WITHIN 8 FEET OF FILL. BBxhÂ5FÃ- ÂÂAxhxhÂxh Ã"OUþÿþÿþÿþÿþÿþÿþÿxh Â5GÂÂÂxhxhÂxhÄKNþÿþÿþÿþÿþÿþÿþÿxhÂ5HÂA1ÂÂZxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ¬2.25" OF PRODUCT IN TANK. TANK IS OUT OF SERVICE. SPILL BUCKET AND OVERFILL ALSO FAIL. TANK ENTERED AS A PASS DUE TO BE OUT OF SERVICE. NO POWER TO INTERSTITAL MONITORING.xhÂ5IÂ]EÂÂ]xhxh Á`xhþÿþÿþÿþÿþÿþÿþÿ KERRY SCATES INSPECTED TANKS 19, 14, 6, & 7. TIMOTHY SOUCY INSPECTED TANKS 13, 18, 15, & 5, ACCORDING TO THE INSPECTION FORMS SUBMITTED TO THE DEPARTMENT. NOTE THAT THE WAST OIL TANK LISTS BALL FLOAT AS THE OVERFILL PREVENTION DEVICE. SHOULD BE UPGRADED TO ELECTRONIC. xhÂ5JÂQ.ÂÂUxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5KÂ]TÂÂUxhxh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â5LÂ^ÂÂUxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿNFLAPPER AND 15 GALLON SPILL BUCKET INSTALLED. CERT OF PROPER INSTALL RECEIVED.xhÂ5MÃÂÂXxhxh  xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5NÂRaÂÂHxhxh  þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5O _ÂÂHxhxh  þÿþÿþÿþÿþÿþÿþÿþÿ&BRINE FILLED INTERSTITIAL SPACE. DMCLxhÂ5P bÂÂHxhxh  xhþÿþÿþÿþÿþÿþÿþÿPINSPECTION DONE 6/28, RECEIVED 7/1/04, KEN LEWIS, NOT MIKE LEWIS. SORRY! DMCLxhÂ5Q `ÂÂXxhxh  xhþÿþÿþÿþÿþÿþÿþÿDMCLxhÂ5RÂA0ÂÂ$xhxh  xhþÿþÿþÿþÿþÿþÿþÿDMCLxhÂ5SÂÂÂBxhxh  xhþÿþÿþÿþÿþÿþÿþÿ+INSPECTION UPDATE SUBMITTED BY CHRIS WILSONxhÂ5TÃ?ÂÂBxhxh  xhþÿþÿþÿþÿþÿþÿþÿRDMCL PER CTI CHRIS WILSON FACILITY IS OPERATIONAL AND IN COMPLAINCE AT THIS TIME.xhÂ5UÃ6 ÂÂZxhxh  xhþÿþÿþÿþÿþÿþÿþÿDMCLxhÂ5VÂ,,ÂÂZxhxh  xhþÿþÿþÿþÿþÿþÿþÿDMCLxhÂ5WÂ2TÂÂZxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5XÂLMÂÂTxhxh Á`xh þÿþÿþÿþÿþÿþÿþÿ.SPILL BUCKET REPLACED WITH NEW 15 GALLON ONE. xhÂ5Y ÂÂLxhxh  xhþÿþÿþÿþÿþÿþÿþÿDMCLxhÂ5Zà 1ÂÁ"xhxh Á`xh þÿþÿþÿþÿþÿþÿþÿšINSPECTION UPDATE SENT IN, PASSES FOR COPPER PIPING. OTHER VIOLATIONS STILL UNRESOLVED. -RR INSPECTION UPDATE SUBMITTED, OTHER VIOLATIONS NOW RESOLVED RRxhÂ5[Ã9ÂÂBxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5\Â[9ÂÂbxhxh Â(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5]ÂÂÂHxhxh Á`þÿÃ>þÿþÿþÿþÿþÿþÿDAILY INVENTORY REMAINS AN ISSUE AT THIS FACILITY. ALSO NO CURRENT SIA. THIS HAS BEEN ADDRESSED REPEATEDLY BY BOTH C.T.INSPECTOR AND DEP STAFF.xhÂ5^ÂUÂÂHxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿ.NO SPACERS ON COPPER LINES PER CTI MIKE LEWIS.xhÂ5_ aÂÂXxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5`Â%4ÂÂHxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5aÂ%1ÂÂXxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5bÂ%,ÂÂXxhxh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ5cÂ7ÂÂxhxh ÂxhÃQ<þÿþÿþÿþÿþÿþÿþÿxhÂ5dÃ'$ÂÂxh xh Âxh Ã3þÿþÿþÿþÿþÿþÿPASSING PER LARRY SAVAGE CTI.xhÂ6Ã//ÂÂxh xh Âxh þÿþÿþÿþÿþÿþÿþÿWINSPECTION DATE IS ACTUALLY JUNE 23, 2004. INSPECTOR FAILED FOR DIRTY SPILL BUCKET. BBxh Â6Ã/3ÂÂxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Ã/1ÂÂxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Ã/7ÂÂxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ< ÂÂBxg xg Á`xhþÿþÿþÿþÿþÿþÿþÿ‚WASTE OIL TANK NEEDS AN OVERFILL DEVICE. -TR CERT OF PROPER INSTALL SUBMITTED BY CHRIS WILSON. HIGH LEVEL ALARM INSTALLED ON TANKxgÂ6ÂKÂÂLxhxh ÂþÿþÿþÿþÿþÿþÿþÿþÿLTANK HAS BEEN TAKEN OUT OF SERVICE AND WIIL BE REMOVED IN SPRING OF 2005. BBxh Â6ÂSZÂÂTxhxh  xhþÿþÿþÿþÿþÿþÿþÿqINITIALLY FAILED FOR SPILL BUCKETS. CERT OF PROPER INSTLAL SUBMITTED WITH INSPECTION, NEW SPILL BUCKET INSTALLED.xhÂ6ÂÂÂxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6à ÂÂ;xh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6 Â"EÂÂSxhxh Âxhþÿþÿþÿþÿþÿþÿþÿ&CP UPGRADE AND FLAPPER REPLACEMENT. BBxhÂ6 ÃUSÂÂSxh xh ÂþÿÂþÿþÿþÿþÿþÿþÿþÿxhÂ6 ÃJ@ÂÂSxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6 Ã3TÂÂSxh xh ÂþÿÃ<'þÿþÿþÿþÿþÿþÿþÿxhÂ6 Ã!ÂÂxh xh ÂxhÂ5þÿþÿþÿþÿþÿþÿ\INSPECTOR NOTED OVER/SHORTS SLIGHTLY GREATER THAN 1% THRUPUT. LOW THRUPUT ON BOTH TANKS. BBxhÂ6ÃN[ÂÂxhxh Âxh Ã'Tþÿþÿþÿþÿþÿþÿþÿxh Â6Â$OÂÂxh xh Âxh à R1þÿþÿþÿþÿþÿþÿþÿxh Â6ÂGUÂÂxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6ÃEJÂÁ"xh xh ÂxhþÿþÿþÿþÿþÿþÿþÿtNO SPACERS ON COPPER LINES, PRE 1991 INSTALL. CP READINGS LISTED FOR PRODUCT PIPING, THIS MAY BE AN OFFSET FILL? BBxhÂ6ÂCÂÁ"xh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6 ÂÂBxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Ã1ÂÂxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6ÃT"ÂÁ xh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Ã@XÂÁ xh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6ÂARÂÁ xh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6ÃÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6ÃÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Â[ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6ÂS:ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Ã"CÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Â\ ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6ÂXRÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Ã>ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6 ÂXKÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6!à EÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6"à NÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6#ÂT`ÂÂZxh xh Ácxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â6$ÂT`ÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6%ÂS?ÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6&ÃVJÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6'Ã8ÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6(ÃSÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6)ÃJ=ÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6*Â\&ÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6+ÂTdÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6,Â\ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6-ÂE8ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6.Ã21ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6/à HÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ60ÃUÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ61ÃU5ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ62ÃÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ63ÂUÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ64Â\ ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ65à :ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ66ÂTSÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ67Ã<ÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ68Â[*ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ69ÃO_ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6:ÂXPÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6;ÂE6ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6<ÃGKÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6=Â\ ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6>ÂEGÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6?ÃCÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6@à ?ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Aà KÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6BÂ\ ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Cà @ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6DÂTYÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6EÃQ'ÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6FÃRÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6GÂXNÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6HÂ[!ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6IÃPÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6Jà FÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6KÂ\$ÂÂYxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6LÃ` ÂÂ:xh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6MÃ<ÂÂZxh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6NÃ_ÂÂCxh xh ÁcxhÃHþÿþÿþÿþÿþÿþÿþÿxhÂ6OÃ5 xh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6PÂ#) xh xh ÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6QÃÂÂxhxhÁ`xhÃGþÿþÿþÿþÿþÿþÿþÿxhÂ6RÃ.ÂÂHxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ/INSPECTION UPDATE BY MIKE SIMARD 10/01/2004. BBxhÂ6Sà :ÂÂSxh xhÁ`þÿà Bþÿþÿþÿþÿþÿþÿk PRODUCT PIPE READING: FIBERGLASS PIPING SENT CP LETTER ON 01/04/2005. REMOVED FACILITY FROM 80K LIST. BBxhÂ6TÃ+DÂÂxh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿ¯FACILITY IS OUT OF SERVICE AND IS NOW SCHEDULED FOR REMOVAL. ANNUAL INSPECTION ONLY CHECKED CP ON TANKS. NO INFO ON OOS TANKS SECTION. TANK READING: ONLY ONE READING PER TANKxhÂ6VÃ5]ÂÂxh xhÁ`xhþÿþÿþÿþÿþÿþÿþÿÖUNABLE TO REMOVE DROP TUBE AND ASSOCIATED FLAPPER ON RNL TANK. DROP TUBE REMOVED ALONG WITH SPILL BUCKET, REPLACED AND INSTALLED 15 GALLON SPILL BUCKET. CLEARED INVENTORY ISSUE. PASSING FACILITY PER CTI ED GEORGExhÂ6WÂ&MÂÁ xhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿ0FACILITY IS UPGRADING TO FLAPPERS IN DROP TUBES.xhÂ6X ÂÂKxh xh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6YÃILÂÂxh xh xfþÿþÿþÿþÿþÿþÿþÿþÿxfÂ6ZÂ[,ÂÂZxh xh xh þÿþÿþÿþÿþÿþÿþÿ'FACILITY PASSING PER CTI PAUL THOMPSON.xhÂ6[ÂCÂÂZxh xh xh þÿþÿþÿþÿþÿþÿþÿPASSING PER PAUL THOMPOSON CTI.xhÂ6\ÃÂÂYxh xh xh þÿþÿþÿþÿþÿþÿþÿ(CERT OF PROPER INSTALL- NEW SPILL BUCKETxhÂ6]Ã%JÂÂAxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6^Ã\ÂÂHxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6_ VÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6`Â$GÂÂHxhxhÁcxhÄVV<þÿþÿþÿþÿþÿþÿþÿxhÂ6aÂ.%ÂÂHxhxhÁcxh Ã&þÿþÿþÿþÿþÿþÿþÿxh Â6bÃ"ÂÂHxhxhÁcxhÃ[þÿþÿþÿþÿþÿþÿþÿxhÂ6cÂÂÂTxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ6d ÂÂ:xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7àxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7ÂC]ÂÂCxhxhÁcxhÃ7þÿþÿþÿþÿþÿþÿþÿxhÂ7ÃV ÂÂxhxhÁcxhÃN54þÿþÿþÿþÿþÿþÿþÿxhÂ7ÃY^ÂÂxhxhÁcxh ÃKþÿþÿþÿþÿþÿþÿþÿxh Â7ÃR\ÂÂLxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7Ã^*ÂÂ2xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿ-THIS WAS PERFORMED BY JOHN CROSS- NOT GEORGE.xhÂ7ÃT#ÂÁ"xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7Ã^*ÂÁ"xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7 Ã_-ÂÁ"xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7 Â%ÂÂXxhxhÁcxhÃFBþÿþÿþÿþÿþÿþÿþÿxhÂ7 Â%+ÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7 ÂVÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7 ÂdÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7ÂVÂÂXxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿ.THIS INS. WAS PERFORMED BY MIKE LEWIS- NOT KENxhÂ7à ÂÂLxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7Ã%7ÂÂ:xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7Â6 xhxhÁcxhÃN þÿþÿþÿþÿþÿþÿþÿxhÂ7Ã\ÂÂSxhxhÁcxhÃ/(TþÿþÿþÿþÿþÿþÿþÿxhÂ%HÂX]ÂÂ4xg xg  þÿÃ8:þÿþÿþÿþÿþÿþÿ«SPOKE TO DEAN DRISKO. HE IS PERFORMING THE 2004 ANNUAL INSPECTION FOR THIS FACILITY. INSTALLING OVERFILL ON TANK 10, THEY TESTED TANK 11 AND THE WHISTLE PASSED. 7/15/04 RRxg Â7ÃÂÂYxhxh xh þÿþÿþÿþÿþÿþÿþÿ#PASSING FACILITY PER CTI IRA DODGE.xhÂ7Â\#ÂÂYxhxh xh þÿþÿþÿþÿþÿþÿþÿPASSING PER CTI IRA DODGE. xhÂ7à LÂÂZxhxh xh þÿþÿþÿþÿþÿþÿþÿþÿxhÂ7Â"PÂÂYxhxh xhþÿþÿþÿþÿþÿþÿþÿDRECEIVED CERT OF PROPER INSTALL FOR NEW SPILL BUCKET AND FLAPPER. RRxhÂ7ÃXÂÂYxhxh xh þÿþÿþÿþÿþÿþÿþÿ9CTI IRA DODGE CERTIFIES THAT THE FACILITY IS NOW PASSING.xhÂ7Ã?ÂÂYxhxh xh þÿþÿþÿþÿþÿþÿþÿ'FAICILITY NOW PASSING PER IRA DODGE CTIxhÂ7ÂT_ÂÂYxhxh xh þÿþÿþÿþÿþÿþÿþÿ'FACILITY NOW PASSING PER CTI IRA DODGE.xhÂ7ÃGÂÂYxhxh xh þÿþÿþÿþÿþÿþÿþÿ#PASSING FACILITY PER CTI IRA DODGE.xhÂ7à ÂÂYxhxh xhþÿþÿþÿþÿþÿþÿþÿAPASSING INSPECTION BY LARRY WINCHESTER INDICATES S.B. NOW PASSINGxhÂ7à OÂÂYxhxh xh þÿþÿþÿþÿþÿþÿþÿ"PASSING FACILITY PER IRA DODGE CTIxhÂ7ÁÂÂHxhxh xh þÿþÿþÿþÿþÿþÿþÿ‘MIKE LEWIS PROVIDED FACILITY WITH NEW GAUGE STICK, TRAINING SESSON ON STICKING AND KEEPING DAILY INVENTORY RECORDS, AND MONITORING GWM WELLS. BBxhÂ7 ÂLÂÂUxhxh xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â7!ÂY8ÂÂUxhxh xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â7"Â\ÂÂZxhxh xh þÿþÿþÿþÿþÿþÿþÿ(FACILITY PASSING PER CTI PAUL THOMPSON.xhÂ7#Ã?LÂÁ"xhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7$Ã?KÂÁ"xhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7%à DÂÂZxhxh xh þÿþÿþÿþÿþÿþÿþÿ¡NOTE ON INSPECTION THAT TANK IS OUT OF SERVICE. SENDING OOS NOTIFICATION FORM AND LETTER TO OWNER. RR TANK PLANNED FOR REMOVAL IN SEPTEMBER. RR TANK REMOVED. RRxhÂ7&Â2YÂÂUxhxhÂxhÃ-3þÿþÿþÿþÿþÿþÿ'CP TESTED BY E. SCOTT ON 06/03/2004. BBxhÂ7'ÂEÂÂHxhxhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7(Â$IÂÂ9xhxh xhþÿþÿþÿþÿþÿþÿþÿ6INSPECTION UPDATE SUBMITTED. NEW FLAPPER INSTALLED. RRxhÂ7)ÃW1ÂÂ9xhxh xhþÿþÿþÿþÿþÿþÿþÿfREPLACED FLAPPER ON TANK 1, REPLACED VAPOR RECOVERY POPPET ON TANK 2-1 NO THROUGHPUT RECORDS PROVIDED.xhÂ7*Â* xhxh xh þÿþÿþÿþÿþÿþÿþÿ5REPLACED LEAK DETECTOR NO THROUGHPUT RECORDS PROVIDEDxh Â7+Â-XÂÂGxhxh þÿþÿþÿþÿþÿþÿþÿþÿNO THROUGHPUT RECORDS PROVIDEDxhÂ7,ÃNÂÂKxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â7-ÂB%ÂÂ)xhxhÁcxhà 53þÿþÿþÿþÿþÿþÿþÿxhÂ7.Â0cÂÂ;xhxhÁcxhÃ.=þÿþÿþÿþÿþÿþÿþÿxhÂ7/Ã^UÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ70Â4.ÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ71Â0aÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ72Â\JÂÂ;xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ73Ãc4ÂÂ9xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â74Ãa'ÂÂ9xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ75ÂG[ÂÂ9xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ76Ã`\ÂÂ9xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ77ÃBÂÂXxh xhÂxhÃ0cþÿþÿþÿþÿþÿþÿ(CP TESTED BY MIKE LEWIS ON 4/12/2004. BBxhÂ78ÂÂÂHxhxhÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ79Â#YÂÂKxh xhÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7:Ã&_ÂÂTxh xhÂþÿþÿþÿþÿþÿþÿþÿþÿÈRECEIVED PHONE CALL FROM OWNER. HE HAS CONTACTED THREE DIFFERENT INSTALLERS TO GET QUOTE ON REPAIRS. LET HIM KNOW THAT WE CAN'T EXTEND DEADLINE BUT TOLD HIM TO KEEP US INFORMED ON REPAIRS. RR 10/19/04xhÂ7;ÃÂÂxhxhÂxhÃ3þÿþÿþÿþÿþÿþÿþÿxhÂ7<Â39ÂÂxhxh xhþÿþÿþÿþÿþÿþÿþÿ:INS. DATE 6/24/04- NOT 7/21/04. INS. UPDATE DATED 7/15/04.xhÂ7=ÂX$ÂÂHxhxh xhþÿþÿþÿþÿþÿþÿþÿ2REPAIRS MADE PER JOSHUA BISKUPIAK INSPECTOR #384. xh Â7>ÂX'ÂÂHxhxh þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â7?ÃCÂÂxhxh þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â7@Ã6ÂÂxhxh þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â7AÂMÂÂxhxh þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â7BÃ\,ÂÂLxhxh xh þÿþÿþÿþÿþÿþÿþÿþÿxhÂ7CÃ>CÂÂHxhxhÁcxhÃ2þÿþÿþÿþÿþÿþÿþÿxhÂ7DÂX)ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7EÂ?QÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7FÂ"ÂÂLxhxh þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7GÃ+ÂÂUxhxhÁcxhÃþÿþÿþÿþÿþÿþÿþÿxhÂ7HÃD"ÂÂUxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â7IÂ9!ÂÂUxhxhÁcxh Ä,þÿþÿþÿþÿþÿþÿþÿxh Â7Jà /ÂÂUxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7KÂAW xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â7LÂZ  xhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7MÂ^  xhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â7NÃÂÂKxhxhÁcxhÄ, :þÿþÿþÿþÿþÿþÿþÿxhÂ7OÂ,ÂÁ$xhxhÁcxhÃLþÿþÿþÿþÿþÿþÿþÿxhÂ7PÂ&aÂÁ$xhxhÁcxhÃ`þÿþÿþÿþÿþÿþÿþÿxhÂ7QÃBNÂÂxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7RÂYÂÂAxhxhÁcxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7SÂ^ÂÂUxhxhÁcxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â7TÂ2FÂÂUxhxhÁcxh Ã-^þÿþÿþÿþÿþÿþÿþÿxh Â7UÃ!]ÂÂxhxh xhÃPþÿþÿþÿþÿþÿþÿþÿxhÂ7VÂ1cÂÂUxhxhÂxhÃ/!þÿþÿþÿþÿþÿþÿþÿxhÂ7Wà  xhxh xg þÿþÿþÿþÿþÿþÿþÿAANNUAL INSPECTION SUBMITTED TO DEP ON SITE ON 6/14/2004. -- DMCL xg Â7X BÂÂCxhxh xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ7YÃ.'ÂÁ$xhxhÂ(xh ÃLþÿþÿþÿþÿþÿþÿ>NEW SPILL BUCKETS PER CERT OF PROPER INSTALL FROM DENNIS DAVISxh Â7ZÂcÂÂHxhxh þÿþÿþÿþÿþÿþÿþÿþÿHCOMMENT ON INSPECTION THAT TANK IS SCHEDULED FOR REMOVAL SUMMER OF 2004.xh Â7[ÂÂÂHxhxh xiþÿþÿþÿþÿþÿþÿþÿPASSING CP PER MIKE LEWIS CTI. xh Â7\ÂÃRbÂÂOxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂA?ÂQ+ÂÁxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAAÂ4ÂÁ xh xh Âxh þÿþÿþÿþÿþÿþÿþÿVENT PIPE FAILED CP. BBxh ÂABÂGÂÂZxh xh ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂACÃ+ xh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂADÃ+ xh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂAEÃ+ xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂAFÃ4PÂÂOxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂAGÃ*DÂÁ xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAHÃ+ xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂAIÃ+ xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAJÃ+ xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂAKÃ+ xh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂAL > xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂAM ? xh xh Â6xiþÿþÿþÿþÿþÿþÿþÿ@INSPECTION UPDATED FINALLY SUBMITTED BY TED HASKELL ON 6/7/2005.xhÂANÂÂÂxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxhÂAOÃQYÂÁ$xh xh Â6xh ÃcþÿþÿþÿþÿþÿþÿþÿxhÂAPÃÂÁ$xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿFACILITY STILL OUT OF SERVICExh ÂAQ Â xh xh Â6xkÃQþÿþÿþÿþÿþÿþÿhCOPI - 1/30/07 CTI ARBOUR INSTALLED 15 GAL SPILL BUCKET. AI WAS SCHEDULED TO BE COMPLETED W/REPAIRS. -MLxh ÂASÃH] xh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂATà LÂÂZxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAUà JÂÂZxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿ~CERT OF PROPER INSTALL- REPLACED CONCRETE PAD SO THAT SPILL BUCKET LID SHUTS PROPERLY. REVISED EXISTING SPILL BUCKET. 10/27/04xh ÂAVÂ,ÂÁ$xh xh Â<xhÃLþÿþÿþÿþÿþÿþÿþÿxhÂAWÃMÂÁxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAXÃ" xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAYÃ# xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAZàxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂA[Ã.H xh xh Â<xh Ã3þÿþÿþÿþÿþÿþÿþÿxh ÂA\ÂR xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂA]ÂP xh xh Â<xh Ãþÿþÿþÿþÿþÿþÿþÿxh ÂA^ SÂÂxh xh Â<xh Ã>þÿþÿþÿþÿþÿþÿþÿxh Â8WÂ_ÂÁ$xhxhÂxh þÿþÿþÿþÿþÿþÿþÿeFLEXES UNDER DISPENSERS PASSED CP. BB INSPECTION UPDATE DATED 11/17/2004. PIPING IS STILL AN ISSUE.xhÂ8[Â_ÂÁ$xh xh Â(xh Ä[=þÿþÿþÿþÿþÿþÿpCLEANED ALL SUMPS AND BUCKETS, LOWERED SUMP SENSORS. INSPECTION UPDATE DATED 09/09/2004 RECEIVED 11/19/2004. BBxhÂA_ÃSUÂÂ:xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.04, -1.06xh ÂA`ÃÂÂxh xh Á`xh Ã:þÿþÿþÿþÿþÿþÿþÿxh ÂAaÂ/;ÂÂxh xh Á`þÿÃGþÿþÿþÿþÿþÿþÿXOTHER VIOLATIONS FROM LAST YEAR MAY HAVE BEEN CORRECTED ACCORDING TO CURRENT INSPECTION.xh ÂAbÃFOÂÂxh xh Á`xh Ã?!_þÿþÿþÿþÿþÿþÿþÿxh ÂAc @ÂÂxh xh Á`xhÃ.þÿþÿþÿþÿþÿþÿF4/7/2004 CERT PROPER INSTALL OPW 61-S0 INSTALLED IN ALL 3 COMPARTMENTSxhÂAdÃ#4ÂÂxh xh Á`xhÃ@[þÿþÿþÿþÿþÿþÿþÿxhÂBÂ0ÂÂxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBÃ+ÂÂxh xh Â(xh Ã,c þÿþÿþÿþÿþÿþÿþÿxh ÂBÃaÂÂUxh xh Â(xh Ã+)þÿþÿþÿþÿþÿþÿþÿxh ÂBÁ-ÂÂxh xh Â(xh Ãþÿþÿþÿþÿþÿþÿþÿxh ÂBÂÂÂUxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBÂ5bÂÂUxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBÂ86ÂÂUxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB à ÂÂxh xh Â(xh Ã-Gþÿþÿþÿþÿþÿþÿþÿxh ÂB ÂKÂÂxh xh Âþÿþÿþÿþÿþÿþÿþÿþÿ.INTERSTITIAL SENSOR NOT WORKING IN TANK #6. BBxh ÂB ÂLXÂÂxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿAWHISTLE DEEMED ACCEPTABLE FOR #2 & #1 FUEL OIL TANKS. -ACF & TRxh ÂB ÂDBÂÂKxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂB ÃMÂÂUxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBÂKÂÂxh xh Âxh þÿþÿþÿþÿþÿþÿþÿ[TANK HAS BEEN TAKEN OUT OF SERVICE AND IS SCHEDULED TO BE REMOVED IN THE SPRING OF 2005. BBxh ÂBà ÂÂIxh xh Â(xh ÄQþÿþÿþÿþÿþÿþÿþÿxh ÂBÃKÂÂDxh xh Â(xi ÃD$bþÿþÿþÿþÿþÿþÿnSENT CP LETTER 12/20/2004. BB INSPECTION UPDATE BY CTI JOHN JOHNSON. CP RETEST ON 4/11/2005, -.867 VOLTS. BBxh ÂBÃY ÂÂDxh xh Â(xh Ã[þÿþÿþÿþÿþÿþÿþÿxh ÂBÃ^ÂÂDxh xh Â(xh ÃJ-9þÿþÿþÿþÿþÿþÿþÿxh ÂBÃ-ÂÂxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿSNEED TO INSTALL SUCTION AND RETURN ON TANK TOP AND SLEEVE COPPER PIPE INTO BUILDINGxh ÂBÂÂÁ xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ˜FACILITY WAS INSTALLED IN 1991. ONE TANK HAS ELECTRONICS ONE DOESN'T. ALSO FAILING CP ON THE SMALLER TANK. WORK WILL NEED TO BE DONE IN 2005 TO UPGRADE.xh ÂBÂZCÂÂxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxh ÂBÂcÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBÃCÂÂxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBà ÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.901, -.900xh ÂBÂ/ÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ PRODUCT PIPE READING: NAxh ÂBÃXÂÂZxh xh Â6xi þÿþÿþÿþÿþÿþÿþÿBPER CTI IRA DODGE, FACILITY NOW PASSES. UPDATED INSPECTION FILED. xh ÂBÂY ÂÂZxh xh Â6xi þÿþÿþÿþÿþÿþÿþÿ7REPAIRS MADE PER CTI IRA DODGE, FACILITY IS NOW PASSINGxh ÂBÃT ÂÂTxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿcNOV SENT TO OWNER 3/8/05 BASED ON ANNUAL INSPECTION. PASSING ANNUAL INSPECTION RECEIVED 5/25/05 RRxh ÂBÂÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBÂbdÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBÃ?ÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ: TANK READING: -1.662, -1.677 PRODUCT PIPE READING: COPPERxh ÂB Ã>ÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ9 TANK READING: -.946, -1.012 PRODUCT PIPE READING: COPPERxh ÂB!Â.ÂÂKxh xh Â6xh Ã5A6þÿþÿþÿþÿþÿþÿ&INSPECTION UPDATE DATED 11/09/2004. BBxh ÂB"ÁÂÂKxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB# ÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB$ÃÂÂKxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿ PRE-1986 TANKxh ÂB%Â*7ÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB&Â5aÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB'ÂEPÂÂxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿbCHAMBER 1 IS SUPPOSED TO BE OUT OF SERVICE ACCORDING TO THE INSPECTION. CHAMBER 2 IS FAILING ALSO.xh ÂB( ÂÂxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh ÂB)Ã_ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB*ÂEÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB+ÃFÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿCTI GEORGE NOTED THAT THE PIPING, DW FLEX, IN SUMP SEEMS TO BE "GROWING". 7/19/05: CERT PROPER INSTALL, REPLACED TANK PAD AND ALL MANHOLES AND SPILL BUCKETSxh ÂB,Ã-ÂÂxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿTANK TO BE REMOVED IN JUNE 2007xh ÂB-Â7ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB.ÃZEÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿÜFACILITY IS OUT OF SERVICE. BUILDING BURNED DOWN AND WAS LATER DEMOLISHED AND REMOVED, VENT PIPES ALSO REMOVED AT THAT TIME. UPON INSPECTION BY CTI GEORGE, TANKS EMPTIED, LOCKS PUT ON TANKS, AND VENT PIPES REINSTALLED. xh ÂB/Ã1ÂÁ$xh xh Á`xh Ã3þÿþÿþÿþÿþÿþÿBNEW FLAPPER OVERFILL AND DROP TUBE INSTALLED ON SITE BY CTI DAVIS.xh ÂB0Â=TÂÂxh xh Á`xiþÿþÿþÿþÿþÿþÿþÿ/SENT CP LETTER 12/03/2004. BB JIM BENNEDIX CALLED ON 12/13/2004. GR ADAMS TO RETEST CP IN THE SPRING. FACILITY WAS SHUTDOWN DUE TO FIRE AND ANNUAL INSPECTION WAS DELAYED UNTIL FALL. INSPECTION UPDATE PERFORMED BY DENNIS DAVIS BB 7/28/05: CERT OF PROPER INSTALL, TANK ANODE, PASSING READING OF -.866xh ÂB1Â$HÂÂxh xh Âxh Ã+Jþÿþÿþÿþÿþÿþÿþÿxh ÂB2Â%7ÂÂYxh xh Âxh Ã=1þÿþÿþÿþÿþÿþÿþÿxh ÂB3Â%EÂÂHxh xh Á`þÿÃIþÿþÿþÿþÿþÿþÿTANK IS DUE FOR REMOVAL. TANK IS NOT IN USE AND HAS BEEN DRAINED OF PRODUCT. MIKE LEWIS IS WORKING WITH OWNER TO REMOVE TANK. xh ÂB4ÃZXÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB5Ã5IÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ-ACTUALLY PERFORMED BY KENNETH LEWIS NOT MIKE.xh ÂB6Ã;NÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB7Â#JÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB8 ÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB9Ã3ÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB:Ã.NÂÂ\xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB;ÂZ) xh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB<ÃPÂÂxh xh Á`xh Ãþÿþÿþÿþÿþÿþÿþÿxh ÂB=Â75ÂÂYxh xh Á`xh Ãþÿþÿþÿþÿþÿþÿþÿxh ÂB>ÂX*ÂÂxh xh Â6xh Ãa`þÿþÿþÿþÿþÿþÿþÿxh ÂB?Ã.ÂÂxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxh ÂB@ÂR9ÂÂxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxh ÂBAÃCFÂÂxh xh Á`xiþÿþÿþÿþÿþÿþÿþÿ?GR ADAMS REPLACED SENSOR AND INSTALLED SPACERS ON COPPER PIPINGxh ÂBBÂ;WÂÂYxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿHINDICATION THAT AN ANODE WAS ADDED TO THE TANK. TANK READING: -1.1, -1.1xh ÂBCÃ\+ÂÂYxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBDÂbRÂÂYxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBEÂ%>ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBFÂ^2ÂÁ2xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ·NEW ANODES ATTACHED TO THE TANK PER CTI THIBODEAU. CORROSION EXPERTS DID THE WORK AND THE OFFICE IS SUPPOSED TO HAVE FILED THE PAPERWORK. RECEIVED CERT OF PROPER INSTALL FOR ANODES.xh ÂBGà ÂÂKxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBHÂcÂÁ"xh xh Â(xh Ã=þÿþÿþÿþÿþÿþÿ‰ MONTORING CONSOLE IS FULLY OPERATIONAL?: REPLACED ALARM HORN AUTO SHUT OFF / FLAPPER CHECKED AND WORKING PROPERLY: INSTALLED NEW FLAPPERxh ÂBIÃÂÁ"xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿx COPPER LINES HAVE SPACERS?: NOT REQUIRED PRODUCT PIPE READING: SLEEVED COPPER NO SPACERS. VENT PIPE READING: FIBERGLASSxh ÂBJÂ7FÂÂxh xh Â6xhþÿþÿþÿþÿþÿþÿþÿ•INITIALLY FAILED FOR SENSORS ON TANKS 5 AND 6 NOT WORKING. RECEVIED CERTIFICATE OF PROPER INSTALLATION- NEW MONITORING SYSTEM INSTALLED ON 10/8/2004.xhÂBKÃ3QÂÂLxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxh ÂBLÃÂÂ)xh xh Â6þÿà Wþÿþÿþÿþÿþÿþÿ’TANKS 2 AND 3 ARE OUT OF SERVICE AS OF 4/2004, BUT REGISTRATION INFO IS NOT UPDATED. SENDING OOS NOTIFICATION FORM. SENT CP LETTER 12/08/2004. BBxh ÂBMÃ\QÂÂKxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿuDATE MAY HAVE BEEN 2008. SPOKE WITH A MR. CONROY, OWNER OF THIS PROPERTY, NOT JOHN F. CONROY WHO PASSED AWAY IN 1998.... THIS TANK IS LOCATED NEXT TO A TANK ON REGISTRATION #1537 WHICH REMAINS IN SERVICE. IT IS NOT POSSIBLE TO REMOVE IT CURRENTLY BUT THEY ARE ALSO NOT ABANDONING IN PLACE BECAUSE IT WILL GET REMOVED ALONG WITH THE OTHER TANK AT SOME POINT IN THE FUTURE. THEY ARE NOT GETTING IT INSPECTED AND KNOW THAT THEY WILL CONTINUE TO BE IN VIOLATION AND GETTING NOV'S UNTIL IT COMES OUT. HE PERIODICALLY CHECKS THE INTERSTICE FOR WATER, THE TANK ITSELF HAS BEEN EMPTIED AND CLEANED OUT. TRxh ÂBNÃDÂÂ\xh xh Á`xh Ã)þÿþÿþÿþÿþÿþÿþÿxh ÂBOÃ'ÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBPÂ.ÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.29, -1.22xh ÂBQÂR_ÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBRÂ.ÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBSÃ8ÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBTÂ-OÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBUÃTHÂÂxh xh Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxh ÂBVÃ/ÂÂIxh xh Á`xh ÄS-þÿþÿþÿþÿþÿþÿþÿxh ÂBWÂ.ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBXÂ.ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBYÂ. ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂBZÂ28ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB[Ã#cÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB\Â.(ÂÁ xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB]Â"%ÂÁ xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB^Ãc<ÂÁ xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB_ÃDÂÁ xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂB`Â$MÂÂUxh xh Â<xh Ã`þÿþÿþÿþÿþÿþÿþÿxh ÂC%Ã&HÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ_-.87 TANK READING, TANK IS STILL LISTED AS JACKETED AND DEP HAS NO REASON TO BELIEVE OTHERWISE.xh ÂC&Ã>ÂÂUxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC'Â(QÂÂUxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC( 3ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC)Ã2ÂÂUxh xh Á`xh Ä"],þÿþÿþÿþÿþÿþÿþÿxh ÂC*ÂÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh ÂC+ cÂÂSxh xh Á`xh à .þÿþÿþÿþÿþÿþÿþÿxh ÂC,Ã#ÂÂSxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC-Ã6:ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh ÂC. ÂÂxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂC/ÂXIÂÂSxh xh Á`xh Ã:4þÿþÿþÿþÿþÿþÿþÿxh ÂC0ÃÂÂSxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC1Ã%;ÂÂSxh xh Á`xi þÿþÿþÿþÿþÿþÿþÿ<TANKS REMOVED 10/20/05. -ACF SENT CP LETTER 12/20/2004. BBxh ÂC2Ã)ÂÂSxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC3ÂP@ÂÂSxh xh Á`xh Ã% þÿþÿþÿþÿþÿþÿ? PRODUCT PIPE READING: FIBERGLASS VENT PIPE READING: FIBERGLASSxh ÂC4ÂÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿCSENT CP LETTER 12/20/2004. ALSO, CONTACTED MARK ROY REGARDING CP ISSUES. HE IS GETTING A QUOTE FROM KIRK ST PETER FOR REPAIRS. BB RECEIVED COPY OF DAILY INVENTORY AND MONTHLY RECONCILIATION FROM MARK ON 12/29/2004. BB RECEIVED LETTER FROM KIRK ST PETER ON 01/03/2005 REGARDING REPAIR OR REMOVAL OF TANKS IN THE SPRING. BBxh ÂC5ÂÂÂSxh xh Á`xh Ã$ aþÿþÿþÿþÿþÿþÿþÿxh ÂC6Ã^ÂÂSxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC7ÃLÂÂSxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>dÂÂÂ)xh xh Á`xiþÿþÿþÿþÿþÿþÿþÿý5/4/05 ANODES ADDED TO TANK SENT CP LETTER 12/02/2004. BB RECHECK OF THE CP BY DON BUBAR CTI ON 12/8/04 SHOWS CP STILL FAILING, CURRENT READING IS -.612, PRIOR READING WAS -.554. STILL BELOW THE -.85 THRESHOLD FOR PASSING. SPOKE TO JOHN PETERSON AT MSAD 48 ON 12/20/2004. SCHOOL WILL RETEST AND REPAIR IF NECESSARY IN THE SPRING. BB CP RETESTS DATED 3/31/2005 (-.698 VOLTS) AND 4/4/2005 (-.713 VOLTS). CP STILL FAILING. BB SPOKE TO BILL BRAUN (SUPERINTENDANT) 5/4/2005, WORK TO BE COMPLETED THIS SUMMER.xh ÂC8ÂGÂÂZxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ: TANK READING: -.97, -.93 PRODUCT PIPE READING: FIBERGLASSxh ÂC9Â\LÂÂMxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC:ÂV]ÂÂMxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC;Â+3ÂÂ\xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ'1997 TANK INSTALL BY TODD LAVALLEE, CTIxh ÂC<Ã5ÂÂ)xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC=Â&ÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC>Ã:  xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC?Ã$ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC@à ÂÁ xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂCAÂLbÂÁ xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂCBÂÂÂSxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂCCÃ-AÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿKPIPING IS SUPPOSED TO BE CP STEEL. READING PER CTI ST. PETER IS -.53 SO PIPING FAILS. DIDN'T PASS LAST YEAR EITHER. TANK IS 550 GALLON SW FIBERGLASS INSTALLED IN 1987 PER DATABASE, INSPECTOR INDICATES IT IS A DIESEL TANK AND THEREFORE SUBJECT TO MOTOR FUEL REGULATIONS,NEED UPGRADING. NO LEAK DETECTION, NO SPILL BUCKET, OVERFILL IS VENT WHISTLE, UNABLE TO CHECK, NO ACCESS, NO LINE LEAK DETECTION. SPILL BUCKETS PRESENT?: NO SPILL BUCKETS SPOKE TO TAMMY BONNER (TOWN MANAGER) ON ON 12/28/2004. INFORMED HER OF VIOLATIONS AND UPGRADE REQUIREMENTS. SENT CP LETTER ON 12/30/2004. BB xh ÂCDÂ#JÂÂHxg xh Á`xg þÿþÿþÿþÿþÿþÿþÿþÿxg ÂCEÂ:-ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿëCTI INDICATES NA FOR ALL AREAS, BUT DID INSPECT AND PASS INTERSTITIAL MONITORING AND INDICATRED NEED FOR NEW SUMP HARDWARE. ALSO NEED FOR MANWAY OVER INTERSTITIAL RISER. ALSO FLAPPER OVERFILL, SPILL BUCKETS AND COPPER LINE, ALL PASSESxh ÂCFÂ-ÂÂPxhxh Á`xgþÿþÿþÿþÿþÿþÿþÿþÿxgÂCGà ÂÂxg xh Á`xg Ã%[6þÿþÿþÿþÿþÿþÿþÿxg ÂCHÃQÂÂKxg xh Á`xgÃ9=IþÿþÿþÿþÿþÿþÿþÿxgÂCIÂVÂÂRxhxh Á`þÿþÿþÿþÿþÿþÿþÿþÿ<FACILITY IS OUT OF SERVICE BUT NOT PROPERLY OUT OF SERVICE. xhÂCJÂ!<ÂÂxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ³AS OF 6/11/2008 HAVE NOT RECEIVED ANNUAL INSPECTION. FACILITY NEEDS TO BE INSPECTED DURING 2008 INSPECTION YEAR. 12/4/2007 SUSAN MILLER CALLED AND LEFT MESSAGE. CALLED BACK ON 12/5/2007 AND 12/6/2007. A.W. MILLER PASSED AWAY RECENTLY. DAUGHTER SUSAN MILLER GOING THRU PAPERWORK AND UNCOVERED THE ON-GOING DEP VIOLATIONS. SENDING SUSAN MILLER SIA, DI, AND AI INFORMATION (INCLUDING CTI LIST) -LW FACILTY NEVER SEEMS TO DO INVENTORY OR MONITORING OF INTERSTITIAL SPACE. THERE ARE NO ELECTRONICS AT THE SITE AND THERE IS NEVER ANY INVENTORY KEPT. THRU PUT IS LOW ALSO SO INVENTORY ISN'T VERY ACCURATE EVEN WHEN IT IS BEING DONE. NO MANUAL CHECKING OF THE INTERSTICE BEING DONE, NO LOG.xhÂCKÃWdÂÂ)xh xiÁ`xhÄ9RþÿþÿþÿþÿþÿþÿþÿxhÂCLÃGÂÂDxixiÂ(xh ÃQþÿþÿþÿþÿþÿþÿþÿxh ÂCMÂM>ÂÂDxixiÂ(xh ÃKþÿþÿþÿþÿþÿþÿþÿxh ÂCNÂ?ÂÂKxixiÂ(xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂCO ÂÂxixiÂþÿÃZþÿþÿþÿþÿþÿþÿÍFACILITY WAS ON 80K LIST FOR NEVER SUBMITTING ANNUAL INSPECTION. OWNER SUBMITTED FAILING INSPECTION. HE THOUGHT THIS INSPECTION AND AN UPDATE HAD BEEN SENT IN. OWNER IS IN CONTACT WITH BILL CARVER. BB xhÂCPÃFÂÂSxi xi ÂxhþÿþÿþÿþÿþÿþÿþÿPRE 1991 INSTALL. INSPECTOR NOTED THAT THE TANK DOES NOT HAVE AN OVERFILL DEVICE, NO SPACERS BETWEEN COPPER LINES, AND THE VENT PIPE IS FAILING CP STEEL. THIS TANK WAS PREVIOUSLY NOT REGISTERED, HOWEVER REGISTRATION MATERIAL FROM 1990 WAS FOUND IN TANK FILE . BBxhÂCQÂ-]ÂÂAxi xi Á`xià 'þÿþÿþÿþÿþÿþÿþÿxiÂCRÂ;ÂÁ xi xi Á`xiþÿþÿþÿþÿþÿþÿþÿ©TANK SEEMS TO HAVE BEEN INSTALLED IN 1988 AND THE COPPER LINES MAY NOT REQUIRE SPACERS. NONE ARE VISIBLE. COPPER LINES HAVE SPACERS?: TANK 4 LINES MAY NOT HAVE SPACERS.xiÂCSÃ^$ÂÂxi xi Á_xh ÃR 1þÿþÿþÿþÿþÿþÿLATE SUBMITAL TSxh ÂCTÃ- ÂÂIxi xi Â6xh Ã]aþÿþÿþÿþÿþÿþÿ†JOHN JOHNSON CP TESTER- TESTING PERFORMED ON 12/20/04 INITIAL INSPECTION PERFORMED ON 9/23/04 TANK READING: CP TESTED BY JOHN JOHNSONxh ÂCUÃ_ÂÂKxi xi Á`xh þÿþÿþÿþÿþÿþÿþÿg9/11/07 COPI - CTI SIMS INSTALLED PNEUMERCATOR LC1000 FOR TANK 9 PIPING SUMP IN BOILER ROOM TANK 5 MAY HAVE PROBLEMS WITH PIPING. IT IS UNCLEAR IF THE COPPER PIPING IS PROPERLY SLEEVED AND IT MAY NOT HAVE SPACERS. THE TANK WAS INSTALLED IN 1989 PRIOR TO THE REQUIREMENT FOR SPACERS, THEY WERE REQUIRED TO BE SLEEVED. SPEAKING WITH DAN GEARAN FROM THE SCHOOL, THEY WILL DO A TANK TOP UPGRADE LATER THIS YEAR TO ADDRESS THE POTENTIAL PROBLEM. THIS TANK TOP UPGRADE WAS PREVIOUSLY DONE ON ANOTHER TANK AT THE LOCATION FOR THE SAME REASON. ENTERING THE INSPECTION AS A PASS. ALSO CORRECTING THE REGISTRATION NUMBER.xh ÂCVÃXÂÂAxi xi Á`xi Ã#D+þÿþÿþÿþÿþÿþÿþÿxi ÂCWÃ!ÂÂKxi xi Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂCXÂ^ÂÂxi xi Á`xh Ã)þÿþÿþÿþÿþÿþÿþÿxh ÂCYÃQÂÂxixiÂxi þÿþÿþÿþÿþÿþÿþÿ³SENT CP LETTER ON 01/14/2005. BILL CARVER RETESTED CP ON 5/16/2005. ALL PASSED. TANK #5 -0.851, TANK #6 -0.896, AND TANK #7 -0.859 VOLTS. ALSO SENT STEVE TANK REMOVAL FORM. BBxiÂCZÃ83ÂÂKxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ6LINES MAY NOT BE SLEEVED. CP ON TANK IS PASSING -1.03xh ÂC[ÃGÂÂRxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂC\Â&XÂÂxixiÂ(xh à Lþÿþÿþÿþÿþÿþÿ1BALL FLOATS SHOULD BE UPGRADED (SUCTION SYSTEM). xh ÂC]ÃOÂÁ xixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ_SENT CP LETTER AND SPOKE TO MIKE CORSON ON 9/22/2005. DAVE BEAUMONT TO RETEST THIS MONTH. BBxiÂ9/Ã&ÂÂHxhxhÂ6xhþÿþÿþÿþÿþÿþÿþÿMAST WITH UNDERGROUND CP PIPING. CP READING FOR THE PIPING WAS -.89 AND -.88xhÂ90ÂMÂÂ]xhxhÂxh Ã,_)þÿþÿþÿþÿþÿþÿþÿxh Â91à ÂÂ]xhxhÂxh Ã@Bþÿþÿþÿþÿþÿþÿþÿxh Â92Ã(ÂÂKxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿFCONTACTED STEVE DONOVAN OF WEBBER 8/20/04 RE: SCHEDULING REPAIRS. -ACFxhÂ93Â?ÂÂ:xhxhÁ_xhÄ 0`þÿþÿþÿþÿþÿþÿ2003 FOR THOUGHPUTxhÂ94ÂAUÂÂRxhxhÂ(xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â95Â7ÂÂRxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ96Â7ÂÂRxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ97ÂÂÂRxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿ82 PIPING SUMP SENSORS REPLACED; SPILL BUCKETS PUMPED OUTxhÂ98ÂIHÂÂRxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9:ÂB$ÂÂRxhxhÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9<ÂXÂÂHxh xhÂþÿþÿþÿþÿþÿþÿþÿþÿTANK REMOVED ON 11/08/2004. BBxhÂ9=ÂAÂÂCxhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9>Â>SÂÂCxhxhÂ<xh ÃVFþÿþÿþÿþÿþÿþÿþÿxh Â9?Ã_b xhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9@ xhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9AÂCÂÂ)xhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9BÃ_[ xhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9CÂ=ÂÂCxhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9DÂ2ÂÂCxhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9EÂIÂÂCxhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9FÂ;N xhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9GÃ\$ÂÂ)xhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9HÃR+ÂÂ)xhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9IÂ1& xhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9JÂ]ÂÂUxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9KÃ($ÂÂHxhxhÂ<xhÃK %þÿþÿþÿþÿþÿþÿþÿxhÂ9LÂÂÂxhxhÂ<xhÃþÿþÿþÿþÿþÿþÿþÿxhÂ9MÃFÂÂUxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9NÂÂÂUxhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9OÃÂÂUxhxhÂ<xh Ã3þÿþÿþÿþÿþÿþÿþÿxh Â9PÂ.6ÂÂUxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9QÂ.7ÂÂUxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9RÃbZÂÂUxhxhÂ<xhÃþÿþÿþÿþÿþÿþÿþÿxhÂ9SÂ.8ÂÂUxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9TÂ.9ÂÂUxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9UÃQÂÂUxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9VÃZOÂÂUxhxhÂ<xhÃP#*þÿþÿþÿþÿþÿþÿþÿxhÂ9WÃZOÂÂUxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9XÂHÂÂUxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9YÂV`ÂÂAxhxhÂ<xh Ã$:þÿþÿþÿþÿþÿþÿþÿxh Â9Zà VÂÂTxhxhÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â9[Ã-ÂÂLxhxhÂ<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9\ÂB^ÂÂ4xhxhÂ<xhÃdþÿþÿþÿþÿþÿþÿþÿxhÂ9]Â*ÂÂ4xhxhÂ<xhÃ(= þÿþÿþÿþÿþÿþÿþÿxhÂ9^Ã5/ÂÂUxhxhÂ(þÿþÿþÿþÿþÿþÿþÿþÿ˜NOT DOING GW MONITORING, HAVE ATG BUT NOT ACCEPTABLE AS LD ON WASTE OIL TANK. SIMARD IS WORKING WITH THEM TO GET THE GW MONITORING UP AND RUNNING. -ACFxhÂ9_ÂRIÂÂRxhxhÁ`xiþÿþÿþÿþÿþÿþÿþÿ©TANK REMOVED C.T.INSPECTOR JOSEPH BOSSE DID INSPECTION C.T.I. PAUL BOSSE DID CP TEST. FACILITY IS SENDING A LETTER OF INTENT REGARDING UST REMOVAL IN THE SPRING. BBxhÂ9`Ã!ÂÂRxhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9aÃ6*ÂÂ4xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.6, -1.95?xhÂ9b % xhxhÂxhÃ3þÿþÿþÿþÿþÿþÿþÿxhÂ9cÃÂÂ4xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ9dÂRKÂÂ4xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:ÃOÂÂPxhxhÁ`xiÃMþÿþÿþÿþÿþÿþÿ]NO ACCESS TO INTERSTITIAL SENSOR. FAIL INSPECTION. INTERSTITIAL MONITORING INSTALLED- OMNTECxh Â:ÂSBÂÂ)xhxhÁ`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:ÂÂÂxhxhÁ`þÿÃB<2þÿþÿþÿþÿþÿþÿþÿxhÂ:Ã5<ÂÂxhxhÁ`xhÃOþÿþÿþÿþÿþÿþÿENTERED INSPECTION AS PASSING. SPILL BUCKETS HAD WATER AND PRODUCT. CLEANED OUT, DAILY INVENOTRY ON TANK 1 OFF MORE THAN 1%. xhÂ:Ã_ÂÁ xhxhÁ`xg à +þÿþÿþÿþÿþÿþÿþÿxg Â:Ã4ÂÁ xhxhÁ`xg Ä$þÿþÿþÿþÿþÿþÿ„ REC'D INSPECTION 8/30/04 AFTER NOV ISSUED FOR NO 2004 INSPECTION. PRODUCT PIPE READING: FIBERGLASS VENT PIPE READING: FIBERGLASSxg Â:ÂbÂÂxhxhÁ`xhà þÿþÿþÿþÿþÿþÿ] SPILL BUCKETS LIQUID TIGHT?: IRON RING BROKEN ALLOWING WATER INTO BUCKET DURING HEAVY RAINS.xhÂ: ÂWOÂÂUxhxhÁ`xhÃ3þÿþÿþÿþÿþÿþÿ#PER MIKE SIMARD CTI, SYSTEM PASSES.xhÂ: ÃbÂÂLxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ°NEW OVERFILL DROP TUBE INSTALLED 7/13/04 TO BRING INTO COMPLIANCE. TANK READING: ONLY ONE READING PER TANK LISTED PRODUCT PIPE READING: FIBERGLASS VENT PIPE READING: FIBERGLASSxh Â: ÂCÂÂ)xhxhÁ`xiþÿþÿþÿþÿþÿþÿþÿPIPING COMING INTO BUILDING IS STEEL AND IT IS SLEEVED, NO ACCESS AT TANK TOP. INSPECTION UPDATE BY CHRIS GUADET DATED 8/5/2005. CP PASSES. BBxh Â: Âc  xhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿINSPECTION UPDATE SUBMITTEDxhÂ: Â?ÂÂ:xh xh ÂxhÃCDþÿþÿþÿþÿþÿþÿþÿxhÂ:ÂEBÂÂKxhxh Â6þÿþÿþÿþÿþÿþÿþÿþÿ®INSPECTION RECEIVED DURING SITE VISIT OF ROSS AND SCHARF INSPECTION UPDATE PERFORMED 8/14/04 BY JOSEPH BOSSE AND SUBMITTED ON 8/31/04. TANKS STILL FAILING FOR CP READINGS. xh Â:Ã0ÂÂTxhxh Â6þÿþÿþÿþÿþÿþÿþÿþÿ~INSPECTION FOR TANK 8 PERFOMED ON 8/17/04. TANK TOP REPLACEMENT SCHEDULED BY PRECISION TANKS IN A FEW WEEKS. AT THAT TIME, SPILL BUCKET WILL BE REMOVED AND REPLACED. 9/21/04 RR TANK REPLACEMENT IS TAKING LONGER THAN THOUGHT. TIM ZIOBRO WILL STICK TANK PRIOR TO EACH DELIVERY TO HELP GUARD AGAINST AN OEVERFOLW INTO SPILL BUCKET. WILL CALL WHEN SPILL BUCKET IS REPAIRED. 11/4/04 RRxhÂ:ÂJÂÂYxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿæCERT OF PROPER INSTALL SUBMITTED. IT APPEARS WORK WAS DONE. HOWEVER, WAITING FOR INSPECTION UPDATE TO CERTIFY THAT OVERFILL WORKS AND SPILL BUCKETS ARE LIQUID TIGHT (IRA PAINTED THEM?) 9/27/04 RR ALL WORK DONE PER CTI IRA DODGE. xhÂ:Â^  xhxh Â6xhþÿþÿþÿþÿþÿþÿþÿžINITIAL INSPECTION AND INSPECTION UPDATE SENT ON THE SAME FORM. REPAIRS DONE INCLUDE FILL CAP REPLACED FOR VAPOR RECOVERY ON TANK 6-1. NO THROUHPUT PROVIDED.xhÂ: xhxh Â6xhþÿþÿþÿþÿþÿþÿþÿINSTALLED FLAPPER ON TANK 9xhÂ:à - xh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿ+INSPECTED BY CTI KENNETH LEWIS, NOT LEGASSExhÂ:ÃA xh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿ+INSPECTED BY CTI KENNETH LEWIS, NOT LEGASSExhÂ:Ã(ÂÂHxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿ CP READING ON VENT PIPE OF -.565xhÂ:Â^ÂÂ]xh xh Â(xhÄ:þÿþÿþÿþÿþÿþÿþÿxhÂ:ÂMAÂÂ]xh xh Â(xhà CþÿþÿþÿþÿþÿþÿþÿxhÂ:Ã]$ÂÂ]xh xh Â(xhÄKþÿþÿþÿþÿþÿþÿþÿxhÂ:ÂZ*ÂÂ]xh xh Â(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:Á ÂÂ]xh xh Â(xhÃ<4;þÿþÿþÿþÿþÿþÿþÿxhÂ:ÂWÂÂ]xh xh Â(xhÃ6HþÿþÿþÿþÿþÿþÿþÿxhÂ:Ã\QÂÂKxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿNWASTE OIL TANK. PRODUCT PIPE READING: NO PIPING VENT PIPE READING: FIBERGLASSxgÂ:Â&ÂÂKxh xh Â6xhþÿþÿþÿþÿþÿþÿþÿzNO THROUGHPUT PROVIDED. INSPECTION UPDATE BY SCOTT LETELLIER. SENSORS REWIRED, SPILL BUCKETS REPLACED, P/V CAP INSTALLED.xg Â:Ã-ÂÂ)xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:Â1ÂÂxh xh ÂþÿþÿþÿþÿþÿþÿþÿþÿCTI BILL CARVER REPLACED FAILING LEAK DETECTION SYSTEM. VACUUM TESTED TANK (PASSED). CP FAILED AGAIN. SCHOOL DISTRICT IS STARTING CONSTRUCTION OF A NEW SCOOL NEXT YEAR, AND WILL BE REMOVING TANK AT THAT TIME. BB ALSO DURING INSPECTION, OMNTEC MONITORING SYSTEM INSTALLEDxh Â: ÂÂÁ$xh xh Â(xh à 3þÿþÿþÿþÿþÿþÿgSITE USES ELLD'S 0.1 GPH TEST FOR PIPING TIGHTNESS TEST. I REVIEWED THEIR RECORDS ON SITE AND ALL PIPING RUNS HAVE PASSED MANY TIMES IN 2004. COPPER PIPING TO HEATING OIL WAS NOT ACCESSIBLE AT TANK TOP, SLEEVED IN BOILER ROOM. DISPENSER FLEX CONNECTORS FAILED CP. -ACF CERT OF PROPER INSTALL STATING THAT ANODES WERE PLACED ON DISPENSER FLEX CONNECTORS. RRxh Â:!ÂC!ÂÁ xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿDVENT WHISTLE, OMNTEC LU-1 LEAK DETECTOR TANK READING: -1.141, -1.174xhÂ:"Â7ÂÂRxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿvJOSEPH NOTED THAT THE RNL PIPING SUMP LID AND ALL LID CLAMPS NEED ATTENTION, BUT DID NOT NOTE WATER INFILTRATION. -ACFxh Â:#Â*NÂÂRxh xh Â(þÿþÿþÿþÿþÿþÿþÿþÿÖCP TESTING BY PAUL BOSSE #011. JOSEPH BOSSE FAILED FACILITY FOR DAILY INVENTORY (OFF SITE). DRAKE RECORDS AND RECONCILES AT THEIR CORPORATE OFFICE AND REPORT OVER/SHORTS TO THE DEPARTMENT ON A REGULAR BASIS. -ACFxhÂ:$ÃÂÂLxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:%Â^,ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:&Â!ÂÁ xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:'Â1ÂÁ xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:(Â#ÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:)ÂT ÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:*ÃW=ÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:+Â6$ÂÂ\xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:,ÃS-ÂÂ\xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:-Ã@`ÂÂ\xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:.ÃAÂÂ\xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:/ÂA ÂÂ\xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:0 `ÂÂXxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:1Â5@ÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:2ÂTÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:3Â26ÂÂXxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:4ÂNÂÂXxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:5Ã,)ÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:6ÂCÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:7ÂAÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:8Â0ÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:9Ã3SÂÂ)xh xh Â<xhÄQþÿþÿþÿþÿþÿþÿþÿxhÂ::ÂÂÂ)xh xh Â<xhÃ3JþÿþÿþÿþÿþÿþÿþÿxhÂ:;Ã@_ÂÂCxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:<Ã[ÂÂCxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:=ÂÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:>Ã3PÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:? ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:@à %ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:AÂ#ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:BÂRÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:C 5ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:DÂGÂÂSxh xh Â<xhÂþÿþÿþÿþÿþÿþÿþÿxhÂ:EÃ"ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿ°NOTE THIS ENTRY IS WRONG THE TANKS LISTED HAVE BEEN TRANSFERED AND ARE NOW ON REGISTRATION #20841 THE TANKS ARE IN THE DATABASE AS STATUS "T" TRANSFERED. T.J. RECTOR 10/6/04xh Â:FÃOÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:GÂQÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:HÂ7ÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:I ÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:J ÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:KÃcÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:LÂÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:M ÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:N bÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:O aÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:PÃ.*ÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:QÁC xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:RÂ7ÂÂ)xh xh Â<xhÃGQþÿþÿþÿþÿþÿþÿþÿxhÂ:SÂUÂÂ)xh xh Â<xhà =þÿþÿþÿþÿþÿþÿþÿxhÂ:TÂ1 xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:UÂ5ÂÂ)xh xh Â<xhÃI þÿþÿþÿþÿþÿþÿþÿxhÂ:Vàxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:WÂ-;ÂÂ)xh xh Â<xhÃ4 þÿþÿþÿþÿþÿþÿþÿxhÂ:XÂI^ÂÂ)xh xh Â<xhÃE GþÿþÿþÿþÿþÿþÿþÿxhÂ:YÃ- xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:ZÃ3 xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:[Â$Q xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:\ÂÂÂSxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:]ÃRÂÂXxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ:^Ã;ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:_Ã>ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:`Ã@ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:aÃ<ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:bÃ4ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:cÃBÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â:dÃ?ÂÂSxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;ÂF,ÂÂTxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;Á  xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;ÃJ;ÂÂDxh xh Á`xhÃIIþÿþÿþÿþÿþÿþÿK PRODUCT PIPE READING: DOUBLE WALL FIBERGLASS VENT PIPE READING: FIBERGLASSxhÂ;Ã(ÂÂDxh xh Á`þÿÃ=þÿþÿþÿþÿþÿþÿHGUAGE STICK MISSING TIP. TWO TANKS FAILED TO MEET 1% LEAK CHECK NUMBER. xhÂ;Ã!ÂÂIxh xh Á`xh ÄJ&þÿþÿþÿþÿþÿþÿþÿxh Â;ÃOÂÂIxh xh Á`xh Ä)8!þÿþÿþÿþÿþÿþÿþÿxh Â;ÃÂÂ)xh xh Á`xhÄZQþÿþÿþÿþÿþÿþÿ#AST FACILITY, REGULARLY INSPECTED. xhÂ;ÂÂÂCxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ; ÂR;ÂÂOxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿANO THROUGHPUT RECORDS PROVIDED TANKS PLANNED FOR REMOVAL 7/15/05xhÂ; Â0ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿd TANK READING CENTER READING: -.80 VOLTS PRODUCT PIPE READING: COPPER VENT PIPE READING: FIBERGLASSxhÂ; Â[ xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ; Ã@ xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â; ÂZ+ xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;à  xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;Ã[ xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;ÂZ+ xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;ÂZ( xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;Â#= xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;Ã( xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;ÂRÂÂSxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿ VENT PIPE FAILED CP.xhÂ;Â_ xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;ÃV xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;ÃU xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;ÃFÂÂ)xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;Â-ÂÂ)xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;ÂHÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;Ã(ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;ÂWÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;Á<ÂÂ)xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;ÃPÂÂxh xh Â<xhÄ ?UþÿþÿþÿþÿþÿþÿQ6/16/05: CERT OF PROPER INSTALL, 15 GAL SPILL BUCKET AND MANHOLE ON BRINE MONITORxhÂ;ÃPCÂÂxh xh Â<xh Ä63þÿþÿþÿþÿþÿþÿþÿxh Â; Ã;]ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ. TANK READING: -1.02, -1.05 CP PIPING FAILING.xhÂ;!Â$ ÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;"Ã_ ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;#Â$!ÂÂxh xh Â<xhÃT`þÿþÿþÿþÿþÿþÿþÿxhÂ;$ÂB0ÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;%ÂOTÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;&Ã;\ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.01, -1.15xhÂ;' ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;( ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;) ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;*ÂXÂÂSxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;+Á:ÂÂSxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;,Â@2ÂÂ:xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;-Ã. ÂÂ:xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;.ÂKXÂÂ:xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;/ÂQÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;0ÂOÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;1ÃU;ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;2ÂFÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ1 PRODUCT PIPE READING: LISTED AS CONTAINED STEEL.xhÂ;3Â!ÂÂSxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿ8 TANK READING: -1.02, -1.07 PRODUCT PIPE READING: COPPERxhÂ;4Â&ÂÂKxh xh Á`xhÃ?BGþÿþÿþÿþÿþÿþÿ? PRODUCT PIPE READING: FIBERGLASS VENT PIPE READING: FIBERGLASSxhÂ;5 ÂÂSxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿE TANK READING: -.92, -.92 PRODUCT PIPE READING: COPPER IN CONTAINMENTxhÂ;6ÂÂÁ$xh xh Á`xi ÄþÿþÿþÿþÿþÿþÿþÿxhÂ;7ÂÂÁ4xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ PRODUCT PIPE READING: COPPERxh Â;8ÂÂÁ4xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿG PRODUCT PIPE READING: COPPER ACTUAL TANK READING IS .8931 NOT .08931xh Â;9ÂLÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ“9/30/04 SHARON WOOD STATED THE BUCKET WAS CLEAN AND THE LID IS ORDERED, BILL CARVER WILL BE SCHEDULED TO FIX FLAPPER. SUBMITTED UPDAT 11/3/04. -ACFxhÂ;:ÂXÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;;ÂV%ÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;<ÂV&ÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;=ÂVÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;>Â[ÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;?ÂVÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;@ÂVÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;AÂV#ÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;BÂV$ÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;CÂV!ÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;DÂV ÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;EÂ$ÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;FÃ`'ÂÂ)xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;GÃ'ÂÂ:xh xh Â6xhÃ<3þÿþÿþÿþÿþÿþÿþÿxhÂ;HÃPÂÁ xhxh Â6xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â;IÃ,ÂÂHxh xh Â6xhþÿþÿþÿþÿþÿþÿþÿ&FACILITY HAD SIA DONE 5/17/04, PASSED.xg Â;JÃ?ÂÂUxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;KÃc&ÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;LÂ7XÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;MÂ!ÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;NÂ7ÂÂxh xh Â<xh Ã=þÿþÿþÿþÿþÿþÿþÿxh Â;OÂTÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;PÂ_BÂÂUxh xh Â<xh ÃQþÿþÿþÿþÿþÿþÿþÿxh Â;QÂ&ÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;R ÂÂUxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;SÃZ ÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;TÃZ ÂÂxh xh Â<xhÃ#3þÿþÿþÿþÿþÿþÿþÿxhÂ;UÂ3%ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;VÂÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;WÃ!ÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;XÂ6ÂÂ)xh xh Â6xiÃ33þÿþÿþÿþÿþÿþÿ?CRASH VALVES REPAIRED/RESET TO CORRECT HEIGHT. FACILITY PASSES.xh Â;YÃ^  xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â;[Ã3ÂÂ]xh xh Â<xh Ã-:þÿþÿþÿþÿþÿþÿþÿxh Â;\ÂVHÂÂ]xh xh Â<xh Ã$H5þÿþÿþÿþÿþÿþÿþÿxh Â;]Ã''ÂÂ]xh xh Â<xh ÃUþÿþÿþÿþÿþÿþÿþÿxh Â;^Â2ÂÂ4xh xh Â<xh Ã# Sþÿþÿþÿþÿþÿþÿþÿxh Â;_Ã(FÂÂ4xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;`Ã]ÂÂ4xh xh Â<xh Ã5'þÿþÿþÿþÿþÿþÿþÿxh Â;aÂ%ÂÂ4xh xh Â<xhà LþÿþÿþÿþÿþÿþÿþÿxhÂ;bÃXÂÂAxh xh Â<xh Ã)þÿþÿþÿþÿþÿþÿþÿxh Â;cÃ3!ÂÁ2xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ;dÃ3'ÂÁ2xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<ÂOÂÂ]xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿTANKS STILL OUT OF SERVICE.xh Â<ÂZ& xh xh Â6xiþÿþÿþÿþÿþÿþÿþÿ³2/17/05 KEVIN MOORE, CN BROWN, SUBMITS LETTER STATING THAT GROMMETS STILL NOT FIXED, PLANNED FOR SPRING. -ACF SUBMITTED LETTER RE: REPAIRED GROMMETS FOR ELECTRICAL CONDUITS. -ACFxh Â<ÂB,ÂÂCxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ< Â xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿÎVENT PIPE READING FAILED CP TEST. CNB SENT LETTER TO DEPARTMENT REGARDING CP REPAIRS SCHEDULED FOR SPRING 2005. BB CERT OF PROPER INSTALL FROM ARTHUR GRANT- COATED VENT SWING JOINT WITH MASTIC. 4/22/2005xh Â<Ã'ÂÂCxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â<ÃG$ÂÂKxh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<ÂN^ÂÂ:xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<ÂOÂÂ:xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ< Ã6ÂÂ:xh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ< ÂÂÂUxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ< Â$KÂÂxh xh Â6xh Ä4C þÿþÿþÿþÿþÿþÿ7REPAIRS MADE PER ELWIN SCOTT CTI. FACILITY NOW PASSES. xh Â< Ã3U xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â< ÂM'ÂÂ)xhxh Â;xhþÿþÿþÿþÿþÿþÿþÿ&REINSPECTION REFLECTING ITEMS REPAIREDxhÂ<ÂÂÂxh xh Â6xhà þÿþÿþÿþÿþÿþÿþÿxhÂ<Â[ÂÂ:xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<ÂOÂÂKxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<ÂAcÂÂ:xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<ÂOÂÂ:xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<Â>ÂÂCxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<Â:ÂÂxh xh Â<xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â<Ã3%ÂÁ2xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<Ã3$ÂÁ2xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<Ã3(ÂÁ2xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<à ÂÁ2xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<Ã3&ÂÁ2xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<Ã3"ÂÁ2xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<Ã3%ÂÁ2xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<ÂWÂÂ)xh xh ÂxhÃNJDþÿþÿþÿþÿþÿþÿXINSPECTOR NOTED BOTH TANKS ARE SPLINT CHAMBERED TANKS. WILL MAKE CHANGE TO DATABASE. BBxhÂ<Ã5ÂÂ]xh xh Â6xh ÃCaþÿþÿþÿþÿþÿþÿUFIRST INSPECTION DATE WAS ACTUALLY 8/9/2004 INSPECTION UPDATE WAS ACTUALLY 9/13/2004xh Â<Â1ÂÂTxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ< Â"VÂÁ4xh xh Âxh þÿþÿþÿþÿþÿþÿþÿEINSPECTION COMPLETED USING OLD FORM. SENT INSTALLER UPDATED FORM. BBxh ÂÂW@ÂÂ>xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂÂÂ>xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ<@ÂW9ÂÂ>xh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ(þÿþÿþÿþÿþÿþÿþÿxh 0ÂÂ)xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿS SENSORS ARE FUNCTIONING PROPERLY?: PROBES REPLACED DURING INSPECTION, PASSING NOW.xh Â>Ã%<ÂÂ)xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿŸNOTE THIS TANK IS ATTACHED TO A GENERATOR SO IT IS A MOTOR FUEL TANK AND IS REQUIRED TO MEET MOTOR FUEL STANDARDS. IT DOES NOT CURRENTLY AND MUST BE UPGRADED.xh Â>Â5+ÂÂ)xh xh Á`xiþÿþÿþÿþÿþÿþÿþÿVR ILS 350 INSTALLEDxhÂ>ÂC.ÂÂxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>ÂC.ÂÂxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â> +ÂÂxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>ÂAMÂÂ\xh xh Âxh ÄI, þÿþÿþÿþÿþÿþÿCP ON VENT PIPING PASSED.xh Â>Ã'"ÂÂCxh xh ÂxhÃ$þÿþÿþÿþÿþÿþÿþÿxhÂ> ÃH xh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â> Â41ÂÁ xh xh Âxgà #PþÿþÿþÿþÿþÿþÿþÿxgÂ> Â4*ÂÁ xh xh ÂxgþÿþÿþÿþÿþÿþÿþÿþÿxgÂ> à W xh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>Â4QÂÂ)xh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>Â7ÂÂYxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ>Â41ÂÂ2xh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ>Â&ÂÂYxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>Â< ÂÂYxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>à ÂÂYxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ>ÃGÂÂHxh xh Âxh Ä ^?þÿþÿþÿþÿþÿþÿþÿxh Â>Â'JÂÂHxh xh ÂþÿþÿþÿþÿþÿþÿþÿþÿjOWNER CALLED 10/24/06 RE: CP REPAIR, GETTING A PASSING INSPECTION AS OPPOSED TO REMOVAL DISCUSSED 10/18/06xh Â>Ã.FÂÂHxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>Â.*ÂÂ:xh xh Âxh þÿþÿþÿþÿþÿþÿþÿºINSPECTION WAS ON FORM THAT DID NOT INCLUDE COPPER PIPING SECTION. CONTACTED DAVE CROXFORD. BASED ON HIS RECORDS PIPING IS SLEEVED. SENT DAVE CURRENT ANNUAL INSPECTION FORM TO USE. BBxh Â>ÃÂÂTxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>ÃQÂÂGxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>Â&#ÂÂZxh xh Â(þÿþÿþÿþÿþÿþÿþÿþÿõPAUL THOMPSON REPORTED FINDING WATER IN TANK & PIPING TRANSITION SUMP. INTERSTITIAL RISER IS BROKEN ON T3, ALLOWING WATER INTO TANK. SYSTEM IN ALARM. SNL'S LLD DOESN'T TRIP. DSL & SNL FLAPPER PROBLEMS. NOTHING FIXED AT TIME OF INSPECTION. -ACFxhÂ>Ã2/ÂÂZxh xh Â(þÿþÿþÿþÿþÿþÿþÿþÿ…PAUL THOMPSON REPORTS FINDING THE PIPING SUMPS ARE NOT AT ALL WATER TIGHT. PIPING INTERSTITAL PROBES NOT CONNECTED TO A CONSOLE. -ACFxhÂ3Fà FÂÂSxhxhÂxh þÿþÿþÿþÿþÿþÿþÿŠIRA DODGE SUBMITTED CERT OF PROPER INSTALL TO SAY THAT ONE PIPE IS COVERED AND BOTH ARE IN 4" DUCT. THEREFORE, SPACERS NOT NEEDED. 10/8/04xhÂ>Ã$ÂÂKxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>Â-ÂÂ)xh xh Á`xiþÿþÿþÿþÿþÿþÿþÿ•VR TLS 300-C INSTALLED COPPER LINES HAVE SPACERS?: INSTALLED IN 1986, NOT REQUIRED. REGISTRATION SHOWS 1992 INSTALL DATE, SPACERS ARE REQUIRED.xhÂ>Â/ÂÂXxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.27, -1.26xhÂ>ÂRDÂÂxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â> Ã!ÂÂxh xh Âxh Ã#LAþÿþÿþÿþÿþÿþÿþÿxh Â>!à GÂÂ;xh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>"ÂÂÂxh xh ÂxhÃUþÿþÿþÿþÿþÿþÿ,CP ON PRODUCT AND VENT PIPING ALL PASSED. BBxhÂ>#Â4ÂÂ4xh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>$Â)ÂÂ4xh xh ÂþÿÃ*þÿþÿþÿþÿþÿþÿ·1/5/05: I DISCOVERED THAT THIS SITE HAS A PETROMETER, NO ACCESS TO INTERSTITIAL & SENSOR WAS NOT TESTED. MADE THE INSPECTION A "FAIL". WORKING WITH POTENTIAL BUYER TO RESOLVE. -ACFxh Â>%Ã^ÂÂ)xh xh Âxi þÿþÿþÿþÿþÿþÿþÿÕKEN LEGASSE SUBMITTED INSPECTION UPDATE DATED 11/1/04 FOR CP. STILL FAILING WITH READINGS OF -.621 FOR TANK 1 AND -.828 FOR TANK 2. SENT CP LETTER 12/02/2004. BB NEW ANODES INSTALLED. PASSING CP READING. 7/13/05xh Â>'ÂaHÂÂxh xh ÂþÿÃ1þÿþÿþÿþÿþÿþÿNALL CP READINGS FOR TANKS, PRODUCT PIPING, AND VENT PIPING WERE -.74 VOLTS. BBxh Â>(ÂA^ÂÂHxh xh Âþÿà þÿþÿþÿþÿþÿþÿþÿxh Â>)ÂX8ÂÂ\xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿ3 COPPER LINES HAVE SPACERS?: TANK INSTALLED IN 1990xhÂ>*Ã9dÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ3 COPPER LINES HAVE SPACERS?: TANK INSTALLED IN 1989xh Â>+Â0ÂÂXxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â>, ]ÂÁ2xh xh Âxh þÿþÿþÿþÿþÿþÿþÿ¸INSPECTION REPORT SUBMITTED ON OLD FORM. LEFT MESSAGE FOR CTI LEE THIBODEAU REGARDING USE OF CURRENT FORM. ALSO LEFT MESSAGE REGARDING NEW CP REQUIREMENTS FOR SINGLE WALLED TANKS. BBxh Â>-ÂDÂÂCxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ1CERT OF PROPER INSTALL- REPLACED 3 SPILL BUCKETS.xh Â>.Â2WÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>/Â+ÂÂxh xh Â<xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ>0ÃGÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>1Ã!ÂÂxh xh Â<xg þÿþÿþÿþÿþÿþÿþÿþÿxg Â>2Â%HÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>3Ã@ÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>4ÂT2ÂÂUxh xh Â<xh Ãþÿþÿþÿþÿþÿþÿþÿxh Â>5ÂB_ÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>6ÃS1ÂÂGxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>7à ÂÂGxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>9Â7;ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>:ÂÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>;ÁDÂÂ)xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ\CTI DON BUBAR WAS ASKED TO LEAVE FACILITY BEFORE DOING ALL THE WORK NEEDED AT THE FACILITY. xhÂ><Â;ÂÂKxh xh Â6xhþÿþÿþÿþÿþÿþÿþÿ]INSPECTION UPDATE RECEIVED. DROP TUBE PRESENT, BALL FLOAT PRESENT, SPILL BUCKET REPOSITIONED.xgÂ>=Â^  xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ®10/21/2004 ALL PASSING EXCEPT FOR CP, NO NEW RESULTS REPORTED. CP PASSING PER LARRY MCALLISTER. 7/19/05 CERT OF PROPER INSTALL, VR TLS 350 AND LINE LEAK DETECTORS INSTALLEDxhÂ>>Â1 xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿDVENT PIPE CP READING -1.200 SYSTEM NOW PASSES PER CTI KEN LEGASSE. xh Â>?ÂQQÂÂ)xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.981, -.957xhÂ>@ 1ÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ¦ PRODUCT PIPE READING: COPPER W/SECONDARY CONTAINMENT. ****NOTE: TANK INSTALLED IN 1989, BUT PIPING SHOWS A 1997 UPGRADE. SITE DOES REQUIRE SPACERS ON COPPER LINES.xhÂ>AÂ[ÂÂ)xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿdELECTRONIC MONITOR UNRESPONSIVE, REPLACED WITH NEW OMNTEC LU-1 ON 8/24/04. TANK IS A 1989 INSTALL. xhÂ>BÃ5'ÂÂxh xh Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â>C UÂÂxh xh Âxhþÿþÿþÿþÿþÿþÿþÿ’INSPECTOR NOTED THAT COPPER LINES ARE SLEEVED GOING INTO BUILDING. THERE IS NO ACCESS TO PIPING ON TANK TOP TO VERIFY PIPING IS TOTALLY SLEEVED. xhÂ>DÂÂÂSxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿqNO SPACERS ON COPPER LINES NOT REQUIRED TANK INSTALLED IN 1988 PRODUCT PIPE READING: COPPER IN 2NDARY CONTAINMENTxhÂ>Eà IÂÂYxh xh Â6xhþÿþÿþÿþÿþÿþÿþÿtFACILITY JUST OPENED UPON INSPECTION. INSPECTOR SET THEM UP WITH DAILY INVENTORY FORMS. NEW SPILL BUCKET ON TANK 7.xhÂ>FÂ5ÂÂ4xh xh Â<xh Ã$Hþÿþÿþÿþÿþÿþÿþÿxh Â>GÂ.ÂÂ4xh xh Â<xh Ã3BEþÿþÿþÿþÿþÿþÿþÿxh Â>HÂ.ÂÂ4xh xh Â<xh ÃP4Aþÿþÿþÿþÿþÿþÿþÿxh Â>IÃAPÂÂxh xh Â<xh Ã/"þÿþÿþÿþÿþÿþÿþÿxh Â>JÂQÂÁ$xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â>KÃ.EÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿžNO MONITORING WELLS PRESENT AT SITE- 1987 INSTALL. COPPER PIPING SLEEVED IN PVC WHERE IT ENTERS BUILDING. SPILL BUCKET WAS DIRTY, INSPECTOR CLEANED IT OUT.xh Â>LÂVZÂÂxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿŠNOTE: FACILITY HAS A 275 GALLON TANK LOCATED NEXT TO THE BUILDING. APPARENTLY THEY ARE NOT USING THE UST AT THIS TIME. SHOULD BE REMOVED.xh Â>MÂH!ÂÂxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxhÂ>NÃbVÂÂ)xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â>OÂ'ÂÂCxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿvFACILITY IS OUT OF SERVICE BUT NOT INCOMPLIANCE. DEP INSPECTION REVEALED PROBLEMS CONFIRMED BY CTI FURGE OF GAFTEK. xh Â>PÂKÂÂYxh xh Âxh þÿþÿþÿþÿþÿþÿþÿJPRE-SEPT. 1991 INSTALLATION DOESN'T NEED OVERFILL IF IT HAS SPILL BUCKETS.xh Â>RÂdÂÁ xh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ>SÃ5KÂÂ)xh xh Á`xh Ã,þÿþÿþÿþÿþÿþÿŸSPILL BUCKETS RUSTY BUT NOT YET PERFORATED. PER CTI DON BUBAR, ALL TANKS HAVE NEW 61-SO 4000'S INSTALLED WHICH CORRECTS ALL OUTSTANDING PROBLEMS AT THE SITE.xh Â>TÃUÂÂKxh xh Â6xhÃ$PþÿþÿþÿþÿþÿþÿþÿxhÂ>UÃ`2ÂÁ"xh xh Á`xh Ã?cþÿþÿþÿþÿþÿþÿ@PER WAYNE GIFFORD CTI, REPAIRS MADE TO INTERSTIAL SPACE MONITOR.xh Â>WÂV3ÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿúNOTE INSPECTION INDICATES A "FAIL". FAILING COMPPONENTS ARE AS FOLLOWS: VENT PIPE CP IS -.48, COPPER PIPING IS SLEEVED BUT NO SPACERS, 1989 INSTALL, NO RETROFIT REQUIREMENT. CTI LEWIS MADE SOME RECOMMENDATIONS THAT SHOULD BE FOLLOWED UP ON BY OWNER.xh Â>XÃ:FÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿuITEMS INSPECTOR FAILED PASSED BY DEP BASED ON DATE OF INSTALL OF TANK. NO OVERFILL REQUIREMENT, WHISTLE EXISTS ON SITE CAN'T BE REMOVED FOR INSPECTION, NO SPACERS ON COPPER LINES, TANK INSTALL IN 1989 SO NOT REQUIRED. VENT WHISTLE CHECKED AND WORKING PROPERLY?: HARD PIPED CAN'T BE INSPECTED, NO DEP REQUIREMENT COPPER LINES HAVE SPACERS?: 1989 TANK INSTALL, NOT REQUIRED.xh Â>YÂcÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ<NO SPACERS ON COPPER LINES, 1989 TANK INSTALL NOT REQUIRED. xh Â>Z $ÂÂXxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿKNO SPACERS ON COPPER LINES 1989 TANK INSTALL NOT REQUIRED TO HAVE SPACERS. xh Â>[Â,dÂÁ2xh xh Âxh þÿþÿþÿþÿþÿþÿþÿÆSPOKE TO NELSON JANDREAU AT DEAD RIVER OIL CO. NEW SPILL BUCKETS WERE INSTALLED PRIOR TO INSPECTION, BUT APPARENTLY NO UPGRADE FORM WAS SUBMITTED. HE WILL SUBMIT AN AFTER THE FACT UPGRADE FORM. BBxh Â>\ ÂÂ)xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â>]Ã' xh xh Á`xi þÿþÿþÿþÿþÿþÿþÿþLOTS OF PROBLEMS RELATED TO EMCO WHEATON 3000 LEAK DETECTION SYSTEM. DONNA TOWLE CALLED ON 10/25/2004. GAFTEK WILL BE REPLACING MONITORING SYSTEM AS SOON AS EQUIPMENT COMES IN. BB VEEDER ROOT TLS 350 INSTALLED 12/17/04. SPILL BUCKET LID FAILING STILL.xh Â>^ÂX xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ1CP RESTEST. TANK 5 -.93; TANK 6 -.97, TANK 7 -.88xh Â>_à ÂÂ)xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â>aÂ0AÂÂ)xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ0WHILE OVERFILL MAY NOT BE REQUIRED IT IS REQUIRED TO MAINTAIN IT IF IT EXISTS WHICH IT DOES AND THAT WOULD INCLUDE INSPECTION. REC'D REPORT FROM CTI BUBAR INDICATING HE WAS PRESENT DURING TANK FILL, WHISTLE WORKED AND CHECKED BY STICKING TANK WHEN FULL AND DETERMINED THAT SHUT OFF WAS AT 90% CAPACITY. xh Â>bÃ[ÂÂDxh xh Â(xh ÃB/þÿþÿþÿþÿþÿþÿEDAILY INVENTORY OVER/SHORTS EXCEEDING 1% REPORTED ON INSPECTION. -ACFxh Â>cÂÂÂ)xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿGSENT CP LETTER 12/02/2004. BB PASSING PER CTI BUBAR READING IS -.872xh Â)WÂO5ÂÂHxhxhÁ`xh þÿþÿþÿþÿþÿþÿþÿ‘DISCUSSED SITUATION WITH MIKE LEWIS, AGREED TO PASS TANK FOR 2005 INSPECTION YEAR AND GIVE HIM ONE YEAR TO REPLACE TANK MONITORING SYSTEM WITH SOMETHING OTHER THAN EXISTING PETROMETER SYSTEM. MIKE LEWIS WILL LOOK FOR A USED TANK MONITOR WITH ONE CHANNEL TO INSTALL WITHIN THE NEXT 6-8 MONTHS. SYSTEM PASSES PER PETROMETER TESTING PROTOCOL, DEP REQUIRES PULLING PROBE/BELL WHICH THEN REQUIRES REPLACEMENT OF COPPER VACUM LINE. SO TESTING PER MANUFACTURER WORKS AND SYSTEM DID PASS THAT, PULLING IT WOULD HAVE MEANT REPLACEMENT AND WOULD HAVE REQUIRED TEARING UP PAVEMENT, USING ENFORCEMENT DISCRETION TO PASS FOR 1 YEAR PERIOD. TIMOTHY RECTORxhÂ?Ã`b xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ›OVERFILL FAILED LAST INSPECTION AS WELL, TANK SHOULD BE RETROFITTED WITH FLAPPER OR ELECTRONIC OVERFILL PROTECTION. REPLACED TANK #2 SPILL BUCKET 1/25/05xh Â?ÃUQÂÂHxh xh Á`xh ÃX!Zþÿþÿþÿþÿþÿþÿþÿxh Â?Â*RÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?ÂN ÂÂHxh xh Á`xhÃþÿþÿþÿþÿþÿþÿ TANK READING: -.909, -.901xhÂ?Ã3\ÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?Ã3[ÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿX1990 INSTALL, NO SPACERS REQUIRED. COPPER LINES HAVE SPACERS?: NO SPACERS, 1990 INSTALL.xh Â?Ã3ZÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿFSW FIBERGLASS TANK 1982 INSTALL 1000 GALLON NO REQUIREMENTS TO BE MET.xh Â? Â!ÂÂxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ/PETROMETER MODEL 20 TYPE TX INTERSTIAL MONITOR.xh Â? ÂFÂÂKxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â? Â>cÂÂ;xh xh Á`xh ÂR+þÿþÿþÿþÿþÿþÿþÿxh Â? ÃJÂÂxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ?  OÂÂLxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿšMONITORING PROBLEMS NEED TROUBLESHOOTING PER LARRY WINCHESTER CTI. THIS WOULD ACTUALLY BE A 2005 INSPECTION NOT 2004, OPERATOR ERROR DURING DATA ENTRY.xh Â?Â4ÂÂZxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?Â=RÂÂKxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ¦INSPECTOR SCOTT LETTELIER FAILED FOR NO PRESSURE VACUM CAP ON VENT PIPE. FACILTY IS TOWN GARAGE, LOW THROUGHPUT, UNLIKELY TO REQUIRE CAP. CHANGING INSPECTION TO PASS.xh Â?Â@ÂÂXxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ?Â@ÂÂXxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ?Â@ÂÂXxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ?Ã.ÂÂXxh xh Âxh þÿþÿþÿþÿþÿþÿþÿREMOTE FILL AT FACILITY.xh Â?Â@ÂÂXxh xh ÂxhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ?Â'ÂÂ4xh xh Â6xh Ã<þÿþÿþÿþÿþÿþÿ<CERT OF PROPER INSTALL RECEIVED, SPILL BUCKETS INSTALLED. RRxh Â?ÂOAÂÂ4xh xh Â6xh à þÿþÿþÿþÿþÿþÿþÿxh Â?ÂQ4ÂÂUxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?ÂZ- xh xh Á`xiþÿþÿþÿþÿþÿþÿþÿ¥SPOKE TO JODY AT CN BROWN ON 12/02/2004. CATHODICS TO BE UPGRADED SPRING 2005 BY PCA ENGINEERING. CNB ALSO SENT LETTER 02/08/2005. BB CP UPGRADE ON 04/05/2005. BBxh Â?Ã\,ÂÂLxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿ+SPACERS PLACED ON PIPING. SENSORS REPLACED.xh Â?ÃÂÂKxh xh Â6xh Â1)þÿþÿþÿþÿþÿþÿþÿxh Â?Â:FÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?Â:AÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿAAUGUST 1991 INSTALL- SPACERS NOT REQUIRED AT TIME OF INSTALLATIONxh Â?Â6ÂÂ\xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ?ÂQ\ÂÂHxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â? Ã@ÂÂ\xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.925, -.970xhÂ?!Â0)ÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?"Â0*ÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?#Â0$ÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?$Â0'ÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?%Ã@ÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?&ÂSÂÂKxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?'ÂT3ÂÂ4xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ§DAVE HOWE CALLED ON 11/03/2004. HE WILL BE UPGRADING CP WITHIN THE NEXT WEEK. BB ALL WORK DONE, NEW ANODES INSTALLED, FACILITY IS NOW PASSING PER DAVID HOWE, CTI. xh Â?(Ã4ÂÂHxh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿ(PROVIDED LOG AND BAILER UPON INSPECTION.xh Â?)à SÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?*ÃR7ÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?+ÃÂÂHxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?,Ã,ÂÂHxh xh Â6þÿà 'þÿþÿþÿþÿþÿþÿþÿxh Â?-ÃaÂÂxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?.ÁEÂÂKxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿNO THROUGHPUT RECORDS PROVIDED.xh Â?/ÃUÂÂKxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?0ÃPFÂÁ xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?1Ã_aÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?2Ã:YÂÂxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ†PETROMETER. INTERSTIAL SENSOR NOT REMOVED FOR CHECK, NOT A VALID INSPECTION. STILL IN DISCUSSION WITH VET'S HOME REGARDING SITUATION. xh Â?3ÃRÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ¦THEY ARE NOT DOING THEIR GROUNDWATER MONITORING, WELLS ARE PRESENT BUT DRY, NO BAILER, AND NO LOG OF WEEKLY CHECKS. PASSING INSPECTION LEAVING THOSE ITEMS AS FAILS. xh Â?4Ã.ÂÂ)xh xh ÂþÿþÿþÿþÿþÿþÿþÿþÿßNATE HERSEY DID INITIAL INSPECTION. DON BUBAR TESTED CP AND REPLACED OVERFILL. CONTACTED OWNER. HE WISHES TO REPLACE TANK IN THE SPRING. HE WILL SEND LETTER STATING HIS PLANS. CP READINGS MAY BE TOO LOW TO BE VALID. BBxh Â?5 5ÂÂKxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?6ÃTÂÂKxh xh Á`xh Ãþÿþÿþÿþÿþÿþÿ? PRODUCT PIPE READING: FIBERGLASS VENT PIPE READING: FIBERGLASSxh Â?7ÃÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?8ÂJÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?9 'ÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?:Â3/ÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?;ÂSÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?<Â=GÂÁ xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ?=ÃK+ÂÂxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?>Â]ÂÂYxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â??Ã.ÂÂYxh xh Á`xh Ã?cþÿþÿþÿþÿþÿþÿþÿxh Â?@Ã4@ÂÂYxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.88, -.89xh Â?AÃÂÂHxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?BÂF_ÂÂYxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?C 7ÂÂ)xh xh Âxh ÃVþÿþÿþÿþÿþÿþÿþÿxh Â?DÂGX xh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?EÂ^ xh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?FÂU3ÂÂ)xh xh Âxiþÿþÿþÿþÿþÿþÿþÿ«SENT CP LETTER 12/01/2004. BB INSPECTION UPDATE FROM CTI BEAUMONT DATED 5/17/2005. CP RETEST: TANK #1 = -.868 VOLTS, TANK #2 = -.890 VOLTS, AND TANK #3 = -1.028 VOLTS. BBxh Â?Gàxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿÏNOTE: CTI LEGASSE LISTS ALL FLAPPERS AS BEING 1/2" TOO HIGH. ENFORCEMENT DECISION TO PASS THIS FACILITY ITEM ANYWAY AND MAKE SURE THAT AS THEY GET REPLACED OVER TIME THEY ARE ADJUSTED TO THE CORRECT HEIGHT.xh Â?H Â xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ(MCCALLISTER UPDATEED CP 10/28/04. -ACFxh Â?IÂRMÂÂXxh xh Â7xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?JÂ^ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ/FACILITY NOW PASSING PER CTI LARRY WINCHESTER. xh Â?KÂB xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿºVENT PIPE CP FAILED AT -.57 CP RETEST ON VENT PIPE 11/04/2004. -0.862 VOLTS. BB CERT OF PROPER INSTALL- REPLACED JOINT ON VENT LINE WITH FLEX CONNECTOR- ISOLATED FROM SOIL ON 11/22/04.xh Â6UÃ,PÂÂxh xhÁ`xh þÿþÿþÿþÿþÿþÿþÿ.OMNTEC ELECTRONICS DISCONNECTED AND BOARD REMOVED FOR UPGRADE TO BE DONE. SYSTEM NOT WORKING FOR EITHER OVERFILL PROTECTION OR INTERSTIIAL MONITORING PURPOSES. RECEIVED LETTER TO JOHN D FROM ED GEORGE DATED 7/13/04 THAT ONMTEC PROBE WAS UPGRADED AND A MODULE WAS INSTALLED IN THE MONITOR TO ACCEPT NEW PROBE. WAITING FOR CONFIRMATION THAT OVERFILL AND INTERSTITIAL MONITORING WAS TESTED AND IS NOW WORKING. RR ED GEORGE CALLED ON 10/25/2004. WORK HAS BEEN COMPLETED, AND HE WILL SUBMIT INSPECTION UPDATE. BB INSPECTION UPDATE SUBMITTED ON 11/03/2004. BBxhÂ?LÂ*ÂÂ:xh xh Â<xh Ã$>Rþÿþÿþÿþÿþÿþÿþÿxh Â?MÂN*ÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?NÂADÂÂ;xh xh Â<xh ÃKþÿþÿþÿþÿþÿþÿþÿxh Â?OÃK+ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?PÃ,ÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?QÃ!ÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?RÂ<ÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?SÂ:ÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?TÃA>ÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?Uà ÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?VÂJÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?WÃ!ÂÂUxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?XÃGÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?YÃÂÂMxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?Z ;ÂÂKxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?[Â.+ÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?]ÂÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?^ OÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?_Ã\IÂÂ)xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â?`ÂUEÂÂ)xh xh Â<xh Ã"Qþÿþÿþÿþÿþÿþÿþÿxh Â?aÂÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?b ÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?cÃb xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â?d ÂÂYxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@ÃCH xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@ ÂÂ)xh xh Â<xh ÃQþÿþÿþÿþÿþÿþÿþÿxh Â@Ã\.ÂÂKxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿESUMP COVER NOT WATERTIGHT, MAY REQUIRE REPLACEMENT SUMP BE INSTALLED.xh Â@Â&$ÂÂHxh xh Âxi þÿþÿþÿþÿþÿþÿþÿ0INSPECTION UPDATE RECEIVED ON MARCH 15, 2005. BBxh Â3VÃÂÂxhxhÂxh þÿþÿþÿþÿþÿþÿþÿ`INSPECTOR INDICATED A FAILING CP TANK. BASED ON DOCUMENTATION IN TANK FILE, IT IS JACKETED. BB SPOKE TO ALAN CHAMBERLAIN. HE IS GETTING UPDATED QUOTE FROM BILL AND WILL SUBMIT IT TO THE BOARD FOR APPROVAL. REPAIRS WILL HAPPEN AT THAT TIME. 9/21/04 RR PER CTI BILL CARVER, REPAIRS MADE TO SYSTEM, NOW PASSING. TR 10/04: OPW SO-61 OVERFILL INSTALLEDxh Â@ÃKCÂÂFxh xh Á`xi þÿþÿþÿþÿþÿþÿþÿ@TED HASKILL REPLACED NON CONFORMING PIPING LINE ON 9/29/2005. BBxh Â@ÂGBÂÂ!xh xh Âxg þÿþÿþÿþÿþÿþÿþÿþÿxg Â@ÂJÂÂHxh xh Â6xh Ã0dþÿþÿþÿþÿþÿþÿþÿxh Â@ÂR]ÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿÊSPOKE TO MARK FORNIER AT PW GARAGE. TOWN WILL REPLACE FAILING PIPING IN DECEMBER. REGISTRATION MATERIAL ALREADY SENT IN. 12/01/2004. BB CERT OF PROPER INSTALL RECEIVED. NEW PIPING INSTALLED. 12/3/04xh Â@ Ã5EÂÂUxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿÙMULTIPLE FAILURES CERT OF PROPER INSTALL. 15 GAL SPILL BUCKETS, FLAPPER VALVES AND ONE MECHANICAL LINE LEAK DETECTOR. 12/16/04 RECEIVED PASSING SIA RESULTS FOR FACILITY IN DECEMBER- OCTOBERS DAILY INVENTORY WAS USED.xh Â@ ÂQ#ÂÂIxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@ ÃÂÂDxh xh Á`xh Ã#þÿþÿþÿþÿþÿþÿþÿxh Â@ Ãc xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@  xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@ÃZ: xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@Â" xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â@ÂAÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿR10/13/05: CERT OF PROPER INSTALL NEW SPILL BUCKETS INSTALLED ON REG AND SUPER TANKxh Â@à ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@Â6\ÂÂxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿÔTANK 6 MUST EITHER BE REMOVED OR PROPERLY ABANDONED IN PLACE AFTER GETTING PERMISSION FROM RESPONSE STAFF. IT REMAINS IN ALARM AND CANNOT BE CHECKED ACCORDING TO THE INSPECTOR AND DEP STAFF THAT VISITED THE SITE.xh Â@ÃW"ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@ÃdGÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@Â:MÂÂLxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@Â;(ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ>TANK IS PRE 1991 INSTALL. COPPER PIPING DOES NOT HAVE SPACERS.xh Â@Ã0ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@ÂXEÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@Ã/ÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@Â&OÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@Â2EÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@Â&AÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@ÂD1ÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@Ã\ÂÂDxh xh Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@ÃSA xh xh Â6þÿþÿþÿþÿþÿþÿþÿþÿ1ANNUAL INSPECTION RECEIVED DURING OEU INSPECTION.xhÂ@  &ÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@!ÃÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@"ÃSKÂÂLxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿ’EMPTY & O.O.S. TANK. SEE FILE. -ACF NOV TO REMOVE, DEADLINE 6/30/07. CONTACTS KEEP CHANGING. FOLLOWUP LETTER TO CHAIRMAN OF BOARD 9/11/08. -MLxh Â@#Â)ÂÂLxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿ%EMPTY & O.O.S. TANKS. SEE FILE. -ACFxh Â@$ÂRÂÁxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@%ÂWCÂÂBxh xh Â6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@&Ã1KÂÂZxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@'ÂÂÂxh xh Á`xh €þÿþÿþÿþÿþÿþÿcFACILITY IS OUT OF SERVICE. ELECTRONICS ARE STILL OPERATIONAL AS OF 10/21/04 PER LARRY SAVAGE, CTI.xh Â@(ÂÂÂ;xh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@)Â^ÂÂGxh xh Á`xi þÿþÿþÿþÿþÿþÿþÿ#TANK #10 PLANNED FOR REMOVAL. -ACFxh Â@*Â4 ÂÂ)xh xh Á`xi þÿþÿþÿþÿþÿþÿþÿO COPPER LINES HAVE SPACERS?: NOT REQUIRED FACILITY PASSES PER JON PAINE, CTI. xh Â@+Ã/+ÂÂGxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿCP TESTED BY CTI DON BUBAR. BBxh Â@,ÃÂÂGxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â@-ÂO(ÂÂMxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â@.ÂO'ÂÂMxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â@/ 2ÂÂZxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@0Ã$ÂÂLxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@1Â.#ÂÂxh xh Â(þÿþÿþÿþÿþÿþÿþÿþÿSENT CP LETTER 12/01/2004. BBxh Â@2Ãb?ÂÂZxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@3ÃS$ÂÂZxh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@4ÃÂÁYxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@5 ÂÁxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@6ÃZLÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@7ÂGÂÂRxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@8ÁÂÂRxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@9ÃR xh xh Â6xhÃL0þÿþÿþÿþÿþÿþÿ$THIS IS A 2004 INSPECTION, NOT 2005.xhÂ@:ÃR xh xh Â6xhÃL0þÿþÿþÿþÿþÿþÿþÿxhÂ@;Ã7 xh xh Â6xhÃNþÿþÿþÿþÿþÿþÿþÿxhÂ@<ÃNQÂÂRxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@=Ã1ÂÂRxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@>ÃCYÂÂYxh xh ÂþÿþÿþÿþÿþÿþÿþÿþÿNO ACCESS TO BALL-FLOATS.xh Â@?ÂV>ÂÂYxh xh Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â@@à + xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@AÂ< xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@BÃ# xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿ_NO GW MONITORING WELLS. NO ACCESS TO VENT WHISTLE, COPPER LINE IN DIRECT CONTACT, NO SLEEVING. xh Â@CÂ< xh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿNO GW MONITORING WELLS. xh Â@DÃ3O xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@E W xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@FÃ] xh xh Á`xh ÂLþÿþÿþÿþÿþÿþÿ~BFV WAS REPLACED IN THE PAST WITH FLAPPER. FACILITY IS CONFORMING AND PASSING PER CTI TED HASKELL. TANK READING: -1.01, -1.02xh Â@GÃE xh xh Á`xh Ã%þÿþÿþÿþÿþÿþÿ²DIESEL TANK WITH BALL FLOAT ON SUCTION SYSTEM. INSPECTOR, CTI TED HASKELL NOTED SPILL BUCKETS VERY RUSTY, GOOD IDEA TO REPLACE THEM. ALSO REPLACED SPILL BUCKET COVER ON 1 TANK. xh Â@HÃ! xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.97, -1.01xhÂ@IÃ` xh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@JÃbcÂÂKxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@KÃ\1ÂÂTxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿ»FACILITY BEING BROUGHT BACK INTO SERVICE. PURCHASED BY JAY GALUSHA IN 2004. CTI BOB TRASK INSPECTED TO BRING BACK INTO SERVICE, SOME WORK BEING DONE BUT FACILITY IS CONFORMING CURRENTLY. xh Â@LÂ5ÂÂ)xh xh Á`xh Ã-Yþÿþÿþÿþÿþÿþÿþÿxh Â@MÂZ9ÂÂIxh xh Á`xh Ã_ þÿþÿþÿþÿþÿþÿþÿxh Â@NÂ$EÂÂIxh xh Á`xh ÃF]Qþÿþÿþÿþÿþÿþÿþÿxh Â@OÃZÂÂHxh xh Á`xh ÃBþÿþÿþÿþÿþÿþÿþÿxh Â@Pà ]ÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@QÃ48ÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@RÃ;+ÂÂ\xh xh Á`xh Ä6Hþÿþÿþÿþÿþÿþÿþÿxh Â@SÂ+>ÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@TÃ\-ÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@UÂ+=ÂÂHxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â@VÂ+?ÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@WÂ+0ÂÂHxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â@XÂR@ÂÂHxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@YÃQÂÁ xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@ZÃ]ÂÂRxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@[Ã.LÂÂRxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxh Â@\ÃU6ÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@]Â:ÂÂRxh xh Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂ@^ÃQÂÂRxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@_Â?ÂÂRxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@`ÃQQÂÂTxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@aÂ%-ÂÂ4xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@bÂLÂÂYxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@cÂ6NÂÂOxh xh Â6xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â@dÂ5ÂÂYxh xh Á`xh Ã3þÿþÿþÿþÿþÿþÿþÿxh ÂAÂ5ÂÂKxh xh Âxh þÿþÿþÿþÿþÿþÿþÿ-INSPECTOR FAILED FACILITY FOR NO P/V CAPS. BBxh ÂAÂÂÂYxh xh Á`xiþÿþÿþÿþÿþÿþÿþÿîFACILITY IS NOT DOING DAILY INVEMTORY. SW CP STEEL TANKS. FAILING INSPECTION BECAUSE THEY ARE NOT DOING INVENTORY AT ALL PER CTI IRA DODGE. ANDY WHITE SUBMITTED DAILY INVENTORY FOR OCTOBER AND NOVEMBER 2004. SIA STILL NOT RECEIVED. BBxh ÂAÃ+ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAÂGÂÂKxh xh Á`þÿþÿþÿþÿþÿþÿþÿþÿB PRODUCT PIPE READING: COPPER PIPING VENT PIPE READING: FIBERGLASSxh ÂAÂbÂÁxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂA RÂÂKxh xh Á`xiÃ1þÿþÿþÿþÿþÿþÿ*INSPECTION UPDATE COMPLETED 04/20/2005. BBxh ÂAÂ/4ÂÂxh xh Á`xh à \þÿþÿþÿþÿþÿþÿþÿxh ÂAÃ_ÂÂxh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂA ÂÂÁ2xh xh Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂA Â5"ÂÂYxh xh Á`xh Ãþÿþÿþÿþÿþÿþÿþÿxh ÂA ÃXSÂÂYxh xh Á`xh à þÿþÿþÿþÿþÿþÿþÿxh ÂA ÃQÂÂ)xh xh Â(xh ÃHþÿþÿþÿþÿþÿþÿþÿxh ÂA Ã!ÂÂ)xh xh Â(þÿþÿþÿþÿþÿþÿþÿþÿGCERT OF PROPER INSTALL SUBMITTED, SPILLS BUCKETS AND FLAPPERS INSTALLEDxh ÂAÂbÂÂ)xh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAÃÂÂ)xh xh Â(xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂAÃ0BÂÂ)xh xh Â(xh þÿþÿþÿþÿþÿþÿþÿ{NO SPACER BETWEEN SUCTION & RETURN LINE ON T#5 (DW ELECTORNIC MONITORED PIPING). CONTACTED OWNER TO HAVE IT REPAIRED. -ACFxh ÂAÂ@ÂÂ)xh xh Â(xh Ã$þÿþÿþÿþÿþÿþÿþÿxh ÂOÃ:OÂÂxixiÂ6xi Ä2YþÿþÿþÿþÿþÿþÿINSPECTION UPDATE SUBMITTED: TANKS 2, 3 AND 4 NOW PASSING. TANK 1 STILL FAILING CP READINGS (SECOND TEST). SENT CP LETTER ON 7/25/2005. BB 8/11/2005: INSPECTION UPDATE, NEW ANDOES INSTALLED ON ALL TANKS, ALL TANKS NOW PASSING CP. CERT. OF PROPER INSTALL ALSO ISSUED. RRxiÂOÃJ?ÂÂxixiÂ6xjÃEdþÿþÿþÿþÿþÿþÿPASSING PER CTI JOHN MULLINS.xiÂOÃPÂÂxixiÂ6xiÃa2þÿþÿþÿþÿþÿþÿþÿxiÂOÂW@ÂÂ>xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÃ5ÂÁ$xixiÂ6xiÄ L1þÿþÿþÿþÿþÿþÿþÿxiÂOÂW9ÂÂ>xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂB?ÂÁRxixiÂ<xiÃ3þÿþÿþÿþÿþÿþÿþÿxiÂOÃb xixiÂxiÃ) DþÿþÿþÿþÿþÿþÿþÿxiÂOà  xixiÂxiÃ7aþÿþÿþÿþÿþÿþÿþÿxiÂO Â?  xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO! Â xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO"Â^ÂÂxixiÂxiÃW<0þÿþÿþÿþÿþÿþÿþÿxiÂO#ÂZÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO$ÃRÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO%ÃbMÂÂYxixiÂ<xiÃ(FþÿþÿþÿþÿþÿþÿþÿxiÂO&Ã.ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ¨THIS REGISTRATION NUMBER HAS MULTIPLE INSPECTION DATES WITHIN 2005 INSPECTION YEAR. TANK 481 CP: -1.03 482: -1.05 491: -1.01 479: -1.01 480: -.98 487: -1.01 484: -1.02xiÂO'Â"^ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO(Ã/]ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO)à NÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO*Ã"CÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO+Ã?ÂÂBxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO,Â.@ÂÂBxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO-ÃPÂÂBxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO.Ã5ÂÂBxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO/Ã#ÂÂBxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO0ÃF,ÂÂBxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO1à b xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO2à N xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO3ÁK xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO4à  xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO5Â(3 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO6ÂCP xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO7Ã[ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO8Â8F xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO9Ã]S xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ16/24/05: CERT OF PROPER INSTALL, OMNTEC LU2 ALARMxiÂO:Ã+JÂÂ'xixiÂxiÃ&'þÿþÿþÿþÿþÿþÿ;SENT CP LETTER ON 7/22/2005. BB CP UPGRADE ON 8/18/2005. BBxiÂO;Ã-,ÂÂ'xixiÂxi Ä7<*þÿþÿþÿþÿþÿþÿ³TANK #5 PLANNED FOR REMOVAL. OEU & TECH SERVICES ON-SITE FOR REMOVAL INSTALLER NOTED WATER IN INTERSTITIAL SPACE OF TANK #5. EVIDENCE OF A LEAK REPORTED TO A. FLINT 6/30/05. BBxiÂO<ÂYÂÂHxixiÂxi þÿþÿþÿþÿþÿþÿþÿÅ2ND FAIL ON CP. SENT CP LETTER ON 7/22/2005 WITH DEADLINE FOR REPAIR OR REMOVAL BE 9/30/2005. BB CERT OF PROPER INSTALL: INSTALLED 15 GALLON SPILL BUCKET AND PERFORMED ANODE UPGRADE ON 9/8/05. RRxiÂO=ÂGÂÂZxixiÂþÿþÿþÿþÿþÿþÿþÿþÿ2INSTALLER DID NOT TEST CP AS GROUND WAS FROZEN. BBxi ÂO?Â0ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO@ ÂÂBxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOAÂ7ÂÂxixiÂxi Ä6þÿþÿþÿþÿþÿþÿþÿxi ÂOBÂ1)ÂÂAxixiÁ`xi Ã%!Pþÿþÿþÿþÿþÿþÿþÿxi ÂOCÂ/ÂÂUxixiÁ`xiÄ&þÿþÿþÿþÿþÿþÿþÿxiÂODÂY'ÂÂ]xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOEÂ]DÂÂZxhxiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOFÂQ7ÂÂZxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOGÂW=ÂÂ>xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOHÃÂÂHxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOIÂ1]ÂÂ]xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOJÂ1^ÂÂ]xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOKÂ]JÂÂZxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOLÂ^\ÂÂKxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOMÂ68ÂÂKxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂONÃ9ÂÂBxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ3PASSING INSPECTION UPDATE RECEIVED 9/21/2005. DMCLxiÂOOÂ" xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂOPÃ+ xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂOQÃ+ xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂORÃ+ xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂOSÃ, xixiÂ6xjþÿþÿþÿþÿþÿþÿþÿ$INSTALLED NEW OMNTEC ON 2/2/2006. BBxiÂOTÃSA xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂOUÃ60ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿ"THIS IS THE TANK INSTALLATION DATExiÂ>8Â=SÂÂxh xh Â<xh þÿþÿþÿþÿþÿþÿþÿM6/15/05: CERT PROPER INSTALL, 15 GALLON SPILL BUCKET, FLAPPER ON REGULAR TANKxh Â8V 'ÂÁ$xhxhÂxh Ã`þÿþÿþÿþÿþÿþÿ6NOTE! 3 5-GALLON SPILL BUCKETS INSTALLED ON 6/1/05 BY ARTHUR GRANT. NEXT UST INSPECTION, VERIFY THAT NO THERE WAS NO SPACE FOR 15 GALLON. INSPECTOR DOCUMENTED PASSING CP READINGS ON PIPING. DATABASE SHOWS FIBERGLASS PIPING. INSPECTOR MAY BE TESTING PIPING FLEXES. BB INSPECTION UPDATE DATED 11/01/2004. BBxh ÂOVÂ_ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOWÂ"JÂÂKxixiÂ6xiÃR`ZþÿþÿþÿþÿþÿþÿþÿxiÂOXÂ&ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOYÂLÂÂYxixiÂxiÃ" þÿþÿþÿþÿþÿþÿþÿxiÂOZà FÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO[ÂAÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿxACCORDING TO INSPECTOR, TANK #11 HAS BEEN OUT OF SERVICE SINCE 2004. TANK DRAINED, FILL LOCKED, AND PASSING CP TEST. BBxiÂO\ÃXEÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO]Ã*ÂÂKxixiÂþÿà þÿþÿþÿþÿþÿþÿÄSENT CP LETTER ON 7/25/2005. BB CONTACTED BILL FIELDING ON 8/22/2006. SIMARDS SCHEDULED TO REPAIR CP IN SEPTEMBER. BB RECEIVED CERT OF PROPER INSTALL DATED 9/11/2006. WAITING FOR CP READINGS. BBxiÂO^Â,*ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO_ÃAÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO`ÂN%ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOaÂ,,ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂObÂ$ÂÂJxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOcÃUÂÂ`xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOdÂd xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÃc xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÃ+ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÃ+ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÃZ: xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂQ/ÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂYDÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP ÂLÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP ÂYÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP ÂXCÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP Â2ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP Â^ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂ2TÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂ]EÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂ]aÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂ^?ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂYÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂ^ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÃÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂY)ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂ3WÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂ3UÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂYAÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂYAÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂY5ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂ^ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂY-ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂY3ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂY?ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPÂ3XÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP ÂSSÂÂ`xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP!ÂSTÂÂ`xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP"Â0ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂP#ÂG+ÂÂxi xi Â6xiþÿþÿþÿþÿþÿþÿþÿxINSPECTOR FAILED COPPER LINES FOR NOT HAVING SPACERS; HOWEVER, IT WAS A 1986 INSTALL. COPY OF MONITORING WELL PROVIDEDxiÂP$Â(JÂÂ'xi xi Âxià þÿþÿþÿþÿþÿþÿþÿxiÂP%Â$XÂÂ'xi xi Âxi ÃEþÿþÿþÿþÿþÿþÿþÿxi ÂP&Ã!ÂÂ'xi xi ÂxiÄ;CþÿþÿþÿþÿþÿþÿuCP UPGRADE INDICATED BY INSPECTION UPDATE FROM SCOTT CYR DATED 8/26/2005. PREVIOUS READINGS WERE LOW BUT PASSING. BBxiÂP'ÂG@ÂÂxi xi Â6xiþÿþÿþÿþÿþÿþÿþÿ)THIS IS THE INSTALLATION DATE FOR TANK #3xiÂP(à ÂÂxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂP)ÃEJÂÁMxixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP*ÂÂÂ`xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP+Ã/]ÂÂ`xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP,à ÂÂTxixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP-ÂCÂÁMxixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP.Ã&_ÂÂxixi Â<xiÃ$þÿþÿþÿþÿþÿþÿþÿxiÂP/Ã0ÂÂxixi Â<xi Ã#<þÿþÿþÿþÿþÿþÿþÿxi ÂP0ÂOÂÂYxixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP1 ÂÂ`xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP2 !ÂÂ`xixi Â<xiÃ%,XþÿþÿþÿþÿþÿþÿþÿxiÂP3à 1ÂÂ`xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP4ÂX  xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂP5à + xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿCONTRACTOR AT SITE SEVERED CONDUIT CONTAINING WIRING FOR INTERSTITIAL MONITORING, PIPE MONITORING AND ELECTRONIC OVERFILL. WEIGHT OF EQUIPMENT ON PAD ALSO SANK PAD SO SPILL BUCKET LID HITS RISER. REPAIRS WILL BE MADE IN JULY 2005. 10/3/05: CERT OF PROPER INSTALL, 15 GAL SPILL BUCKETxiÂP6Â< xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ* COPPER LINES HAVE SPACERS?: NOT REQUIRED.xiÂP7ÂX$ÂÂxixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂP8ÂX'ÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿLEAK DETECTOR IS A PETROMETER.xi ÂP9à ÂÂDxixiÂxiþÿþÿþÿþÿþÿþÿþÿ*INSPECTION DATE WAS ACTUALLY 6/13/2005. BBxiÂP:Ã0ÂÂTxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP;Ã3O xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP<Â< xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP=Ã- xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP>Ã+ xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP?ÂN xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂP@Â6NÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPAÃH]ÂÂKxixiÂxiþÿþÿþÿþÿþÿþÿþÿPBASED ON ANNUAL INSPECTION, TANK HAS 2 CHAMBERS (DIESEL AND OFF-ROAD DIESEL). BBxiÂPBÂ&aÂÂ_xi xiÂ<xi Ã[_Pþÿþÿþÿþÿþÿþÿþÿxi ÂPDÃÂÂ_xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPEÂ(ÂÂ_xi xiÂ<xiÃ@+þÿþÿþÿþÿþÿþÿþÿxiÂPFÃXÂÂ_xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPGÃ- ÂÂAxixiÂxiÃ+þÿþÿþÿþÿþÿþÿþÿxiÂPHÂ'ÂÂ_xi xiÂ<xiÃ__1þÿþÿþÿþÿþÿþÿþÿxiÂPIà ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂPJÃU.ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPKÃ3ÂÂYxixiÂxi þÿþÿþÿþÿþÿþÿþÿ@SENT CP LETTER ON 7/25/2005. BB INSPECTION UPDATE 12/13/2005. BBxiÂPLÂL`ÂÂxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂPMÂN]ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPNÃ<0ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿdCP READINGS FOR TANK #4 = -.89 VOLTS. TANK #5 = -.88 VOLTS. BB INSPECTION UPDATE DATED 8/1/2005. BBxiÂPOÃ# xi xiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ8 COPPER LINES HAVE SPACERS?: NOT REQUIRED, 1984 INSTALL.xiÂPPÃ%LÂÂYxixiÂxjþÿþÿþÿþÿþÿþÿþÿz2ND FAILING CP TEST REPORT. SENT CP LETTER ON 7/25/2005 WITH DEADLINE FOR REPAIR OR REPLACEMENT BY SEPTEMBER 30, 2005. BBxiÂPQÃ]ÂÂxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂPRÃ9ÂÂxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂPSÃ9ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿ%INSPECTION UPDATE DATED 7/21/2005. BBxiÂPTÂcÂÂxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂPUÂFÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPVÃQÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPWÂ`ÂÂxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂPXÃ9ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂPYÃ8XÂÂxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂPZÃ-*ÂÂ'xixiÂxiÃCQ;þÿþÿþÿþÿþÿþÿþÿxiÂP[Ã-2ÂÂ'xixiÂxi ÄQ\Tþÿþÿþÿþÿþÿþÿþÿxi ÂP\Â(KÂÂ'xixiÂxi Ãþÿþÿþÿþÿþÿþÿþÿxi ÂP]ÃQYÂÂ_xi xiÁ`xi ÄBþÿþÿþÿþÿþÿþÿ)PASSING PER C.T. INSPECTOR TIMOTHY CLARK.xi ÂP^Ã.'ÂÂ_xi xiÁ`xjÃ0/[þÿþÿþÿþÿþÿþÿZPER GARY KANE, CTI FACILITY IS PASSING AT THIS TIME. LETTER AND INSPECTION UPDATE IN FILE.xiÂP_Â8ÂÂ_xi xiÁ`xiÃM2Wþÿþÿþÿþÿþÿþÿ3 SENSORS ARE FUNCTIONING PROPERLY?: SENSOR IN ALARMxiÂP`Ã4SÂÂ'xixiÂxi Ä]þÿþÿþÿþÿþÿþÿþÿxi ÂPaÃY ÂÂRxixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂC^Â4YÂÂHxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿ¨CRASH VALVES CONTINUE TO BE SET TOO LOW THEY ARE BEING ADDRESSED IN THE MULTI YEAR PLAN FOR MTA. LISTING THEM AS FAILS ON THE INDIVIDUAL ITEMS, PASSING THE INSPECTION. xh ÂC_Â-ÂÂHxixiÁ`xjþÿþÿþÿþÿþÿþÿþÿ FACILITY PASSING PER MIKE LEWIS.xh ÂC`Â4CÂÂHxixiÁ`xjþÿþÿþÿþÿþÿþÿþÿ“SPILL BUCKET DRAIN PLUGS NOT WORKING PROPERLY, NEED TO BE REPAIRED/REPLACED. CRASH VALVES SET TOO LOW, 2" BELOW CONCRETE, ALSO BRACKETS ARE CORRODED. SPILL BUCKET DRAINS NOT SEATING PROPERLY, THEY DRAIN BACK INTO THE TANK. THE SPILL BUCKETS THEMSELVES ARE THE 25 GALLON TYPE THAT HAVE A COVER BELOW GRADE AND THERE IS ANOTHER COVER AT GRADE PER CTI MIKE LEWIS. PASSING THE SPILL BUCKETS AT THIS TIME. xh ÂCaÂ5DÂÂHxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿ­ALL CRASH VALVES SET AT WRONG HEIGHT. SOME ALSO NOT PROPERLY SECURED. BEING ADDRESSED IN MTA SERVICE PLAN ALL OTHER PARTS OF FACILITY PASS. ENTERED AS A PASSING INSPECTION. xh ÂCbÂ5EÂÂHxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿžDRAIN ON SPILL BUCKET FAULTY. ALL CRASH VALVES TOO LOW. INSPECTION UPDATE RECEIVED 5/5/05 AND DATED 4/27/05 BY CTI MIKE LEWIS. FACILITY IS NOW IN COMPLIANCE.xh ÂCcÂ-#ÂÂHxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂCdÂ-ÂÂHxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÂ4BÂÂHxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÃQ:ÂÂHxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÂ4PÂÂHxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.16, -1.15xh ÂDÃQ;ÂÂHxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÃ] ÂÂHxixiÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÃW'ÂÂAxixiÁ`xiÃ.S1þÿþÿþÿþÿþÿþÿþÿxiÂDÃBÂÂxixiÁ`xh Ä\2þÿþÿþÿþÿþÿþÿþÿxh ÂDÂ=6ÂÂRxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂD ÃaLÂÂRxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD Ã\9ÂÂAxixiÁ`xiÃ0þÿþÿþÿþÿþÿþÿþÿxiÂD ÃÂÂxixiÂxh à þÿþÿþÿþÿþÿþÿUUPGRADED CP AND SPILL BUCKETS- CERTIFICATE OF PROPER INSTALL RECEIVED. DATED 11/16/04xh ÂD Ã8ÂÁ xixiÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂD Ã8ÂÁ xixiÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÃ8ÂÁ xixiÂxh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÂ%0ÂÁ xixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÃPÂÁ xixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÃ`"ÂÂAxixiÁ`xiÃ!B*þÿþÿþÿþÿþÿþÿþÿxiÂDÃbXÂÁ xixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿgSPILL BUCKET IS GOING TO BE RAISED TO DISCOURAGE WATER INTRUSTION. NO VISIBLE SPACERS ON COPPER LINES.xiÂDÂ;ÂÁ xi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿ•INSPECTOR FAILED FOR NO SPACERS ON COPPER LINES, TANK INSTALLED IN 1989, NOT MANDATORY AT THAT TIME. NO RETROFIT REQUIREMENT. PASSING INSPECTION. TRxiÂDÂA;ÂÂxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDÂVÂÂxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþTANK #2 IS SW FIBERGLASS INSTALLED IN 1982, NO OVERFILL PRESENT. TANK #5 IS DW CP STEEL INSTALLED IN 1990 NO OVERFILL PRESENT. TANK #9 IS DW CP STEEL INSTALLED IN 1994 W/FLAPPER. PRODUCT PIPE READING: COPPER LINES VENT PIPE READING: FIBERGLASS VENT PIPExh ÂDÂÂÂAxixiÁ`xiÃ'(þÿþÿþÿþÿþÿþÿXNOTE FROM INSPECTOR RELATES TO VR PROBE TAKING ABOUT 10 MINUTES TO ALARM WHEN SUBMERGED.xiÂDÂ^ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿmIN BANKRUPTCY PROCEEDINGS, LIKELY OWNERSHIP CHANGE SOON. TS 1/27/05 PASSING PER STEPHEN REDMOND,CTI. 3/17/05xiÂ7cÂ+ÂÁ$xhxh xi ÃEþÿþÿþÿþÿþÿþÿvNEW SPILL BUCKETS AND BALL FLOATS PER CERT OF PROPER INSTALL FROM DENNIS DAVIS CERT PROPER INSTALL- SENSORS INSTALLEDxh Â>`ÂFVÂÂ)xh xh Á`xi þÿþÿþÿþÿþÿþÿþÿPER CTI DON BUBAR.xh Â?à ÂÂ)xh xh Á`xi þÿþÿþÿþÿþÿþÿþÿ!FACILITY PASSES PER CTI DON BUBARxh ÂDÃ+,ÂÂ\xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ- TANK READING: MIKE LEWIS PERFORMED CP TESTS.xiÂDÃTÂÂ\xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ/ TANK READING: MIKE LEWIS PERFORMED CP TESTING.xiÂDÂOÂÂHxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDÂNÂÂHxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ„NOTE TANK HAS AN INSITU MONITOR THAT IS BATTERY OPERATED, NO ELECTRICAL CONNECTION. NEEDS TO BE REPLACED WITH NEW MONITORING SYSTEM.xiÂDÂKÂÂHxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDÁ&ÂÂ\xixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ|THIS INSPECTION ORIGINALLY CAME IN ON 2 FORMS, THE JET FUEL TANK ALWAYS PASSED AND HAD BEEN ENTERED BEFORE THE FAILING TANKS INSPECTION WAS FOUND. THE FAILING TANKS WERE NEVER ENTERED. THIS ENTRY WILL ADD THE FAILING TANKS TOT HE SYSTEM. TIM RECTOR GAUGING PROBES BEING USED ON #6 OIL TANKS, DOUBTFUL THAT THEY ARE WORKING CORRECTLY, ALSO OVERFILL NOT WORKING ON # 6 OIL TANKS. xhÂDÃZ)ÂÂDxixiÁ`xh ÃOEXþÿþÿþÿþÿþÿþÿþÿxh ÂDÃ"8ÂÂDxixiÁ`þÿÃH\þÿþÿþÿþÿþÿþÿþÿxi ÂD Ã"7ÂÂDxixiÁ`xiÄE6`þÿþÿþÿþÿþÿþÿtCATHODIC PROTECTION UPGRADED, NEW ANODES CP TEST ON 8/30/2005: TANK #4 -0.91, TANK #5 -0.997, AND TANK #6 -0.92. BBxiÂD!Â!ÂÂKxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD"Â'ÂÂTxixi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD#Â6ÂÂxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD$Ã,<ÂÁ xi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD%ÂD,ÂÂKxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿµPER LETTER FROM JETPORT, REPAIRS MADE TO FACILITY BY GUERIN ASSOCIATES. NO FOLLOW UP INSPECTION UPDATE PROVIDED. DID SEND IN COPY OF REGISTRATION MATERIALS SHOWING WORK TO BE DONE.xh ÂD&Â2ÂÂ]xixiÂxiÃ3=þÿþÿþÿþÿþÿþÿ“FAILING CP PIPING IS ACTUALLY VENT PIPING. CNB SENT LETTER TO DEPARTMENT REGARDING SCHEDULED REPAIRS SPRING 2005. BB CP UPGRADE ON 05/03/2005. BBxh Â+FÃ"EÂÂxhxh Á`xiÄ,'þÿþÿþÿþÿþÿþÿAVEEDER ROOT TLS 350 INSTALLED IN LIEU OF DAILY INVENTORY. 1/20/05xhÂD'ÃHÂÂKxixiÁ`xh Ãdþÿþÿþÿþÿþÿþÿþÿxh ÂD(Â'ÂÂKxixiÁ`xh Ã. þÿþÿþÿþÿþÿþÿþÿxh ÂD)Ã5+ÂÂKxixiÁ`xh Ã)Vþÿþÿþÿþÿþÿþÿþÿxh ÂD*Ã/YÂÂKxixiÁ`xh Ã+þÿþÿþÿþÿþÿþÿþÿxh ÂD+Â'ÂÂKxixiÁ`xh Ã]þÿþÿþÿþÿþÿþÿþÿxh ÂD,Â'ÂÂKxixiÁ`xh à T3þÿþÿþÿþÿþÿþÿþÿxh ÂD-Ã@ ÂÂKxixiÁ`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂD. ÂÂxixiÂþÿþÿþÿþÿþÿþÿþÿþÿôCOULD NOT ACCESS BALL-FLOATS FOR INSPECTION DUE TO ICE IN MANWAYS. BILL CARVER TO RETURN IN SPRING TO INSPECT OVERFILL AND RE-LOCATE CRASHVALVES TO CORRECT POSITION. CP READING WAS -1.046 VOLTS, WILL RETEST IN THE SPRING FOR VALID CP TEST. BBxiÂD/à ÂÂxixiÂþÿþÿþÿþÿþÿþÿþÿþÿ‚MANY ITEMS FAILED INSPECTION DUE TO NOT BEING ABLE TO ACCESS AND/OR TEST BECAUSE OF ICE. LARRY SAVAGE TO RETURN IN THE SPRING. BBxi ÂD0à ÂÂUxixiÂxiÃ=dþÿþÿþÿþÿþÿþÿþÿxiÂD1ÃFÂÂxixiÁ`xi Ã,0Dþÿþÿþÿþÿþÿþÿþÿxi ÂD2ÂAÂÂ)xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂD3Â*ÂÂxixiÁ`þÿÃ37Hþÿþÿþÿþÿþÿþÿ1CP FAILED, INSPECTION DONE FEBRUARY 2, 2005. GROUND FROZEN SOLID. FAILED INSPECTION WILL NEED TO RECHECK CP ON TANKS AFTER THE THAW. ALL OTHER COMPONENTS PASSED. SENT CP LETTER ON 03/07/2005. BB VOICE MAIL MESSAGE FROM EJ AT FABIAN OIL ON O4/29/2005. BILL CARVER TO RETEST WITHIN NEXT COUPLE OF DAYS. BBxiÂD4ÃcÂÂxixiÁ`þÿÄ0þÿþÿþÿþÿþÿþÿþÿxiÂ1LÂD5ÂÂHxhxhÂxh þÿþÿþÿþÿþÿþÿþÿÞINSPECTOR NOTED HE COULD NOT REMOVE FLAPPERS FOR INSPECTION. CP PASSED - TANK #1 = -1.1 VOLTS. TANK #2 = -.87 VOLTS. BB PER MIKE SIMARD, TECH REMOVED AND INSPECTED FLAPPERS, PASSED. SYSTEM PASSING AS OF 10/16/2004. TRxhÂD5Â9ÂÂAxixiÁ`xi Ã=þÿþÿþÿþÿþÿþÿþÿxi ÂD6 ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD7Ã^ÂÂxixiÂxh þÿþÿþÿþÿþÿþÿþÿMCP ORIGINALLY FAILED TESTING IN OCTOBER BUT WAS LATER RETESTED AND PASSED. BBxh ÂD8ÃSJÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿFRECEIVED CERT OF PROPER INSTALLATION DATED 10/28/2005 FOR OVERFILL. BBxi ÂD9ÃR@ÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ’FAIL ON ELECTRONIC OVERFILL MAY BE A MINOR REPAIR, IT IS UNCLEAR ON THE INSPECTION. CERT OF PROPER INSTALLATION FOR OVERFILL DATED 10/28/2005. BBxi ÂD:ÃRCÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿwTANK IS 1992 INSTALL, NO SPACERS VISIBLE ON COPPER LINES. CERT OF PROPER INSTALLATION FOR SPACERS DATED 10/28/2005. BBxi ÂD;ÃRBÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂD<ÃRAÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂD=ÃRDÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿmONLY FAILURE IS NO SPACERS ON COPPER LINES. CERT OF PROPER INSTALLATION DATED 10/28/2005 FOR NEW SPACERS. BBxi ÂD>ÃRTÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ`COPPER LINES LACK SPACERS. RECEIVED CERT OF PROPER INSTALLATION FOR SPACERS DATED 10/28/2005. BBxi ÂD@Â1ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDAÂ<ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDBà ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDCÂ/ZÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿÿDON BUBAR COMMENTED ON THE FACT THAT TANK #25 (THEIR #21) HAS A VENT WHISTLE FOR OVERFILL PROTECTION. THE VENT IS APPROXIMATELY 18' FROM TANK TOP AND THE FILL IS A REMOTE FILL APPROXIMATELY 40' FROM THE TANK AND ABOUT THE SAME AMOUNT AWAY FROM THE VENT. THE TANK WAS INSTALLED IN 1990. THERE SHOULD BE SOME OTHER OVERFILL PROTECTION PROVIDED FOR THE TANK BUT DUE TO THE INSTALL DATE WE ARE UNABLE TO FORCE THEM TO RETROFIT ANYTHING. ALSO TANKS #27 (THEIR 22) AND 21 (THEIR 15) ARE LISTED AS INACTIVE IN OUR DATABASE. THESE TANKS ARE ACTIVE AT THIS TIME AND BOTH CONTAIN #2 HEATING OIL. THE DATABASE IS BEING UPDATED TO ACCURATELY REFLECT THIS INFORMATION. TJR 3/3/05 CERT OF PROPER INSTALLATION FOR NEW VENT PIPING AND ACCESS TO VENT WHISTLES DATED 11/30/2005. BBxi ÂDDÂÂÂ)xixiÁ`xiÃVþÿþÿþÿþÿþÿþÿþÿxiÂDE SÂÂXxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ9Ã?/ xh xh Âxh þÿþÿþÿþÿþÿþÿþÿ‡CP REPAIR AND CERTIFICATE OF PROPER INSTALLATION ON 10/19/2004. NEW VOLT READINGS: TANK 1= -1.32, TANK 2= -0.91, AND TANK 3= -1.01 BBxhÂDFÃ5)ÂÂKxixiÂ(xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDGÂÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxh ÂDHÂÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxh ÂDIÂ!ÂÂxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿVCERT PROPER INSTALL 7/6/04: OMNTEC MONITORING INSTALLED (REPLACEMENT PANEL AND PROBES)xh ÂDJÃGVÂÂxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂDK IÂÂxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿFLAPPER FOR OVERFILLxh ÂDLÂRÂÁ xixiÂxiþÿþÿþÿþÿþÿþÿþÿxCP ON TANK #5 FAILED CP AGAIN. ELECTRONIC MONITORING ON TANK #7 (INTERSTICE AND PUMPING SUMP) NOT CHECKED DO TO FROZEN COVERS. DAVE BEAUMONT TO RE-INSPECT IN THE SPRING. SPOKE TO BILL CONARY MAINT. DIRECTOR AT HOSPITAL. HE IS PREPARED TO REPAIR CP SYSTEM IN THE SPRING. BB INSPECTION UPDATE ON 03/30/2005. TANK #5 CHANGED PRODUCT TO #2 FUEL. CP READING OF -.86 VOLTS. BBxiÂDMÂ9:ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDNÂVÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDOÃ] ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDPÂÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDQÃ]ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDRÃ`ÂÂAxi xi Â6xià )þÿþÿþÿþÿþÿþÿþÿxiÂDSÁ%ÂÂLxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDTÂ^ xixiÂ(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂDUÂ-LÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ]INSPECTION ENTERED IN ERROR, DUE TO WRONG REGISTRATION NUMBER (SEE REG. #4485). -ACF 3/25/05xiÂDVÂG5ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDWÂ-LÂÂTxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿXNO CP TEST RESULTS. NOTE THAT THIS IS THE SECOND TIME THIS INSPECTION HAS BEEN ENTERED. xiÂDXÂRÂÂUxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDYÂ* ÂÂUxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDZÃZPÂÂ)xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD[ÂYUÂÂYxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ-TANK 12 IS CURRENTLY PROPERLY OUT OF SERVICE.xi ÂD\Â,*ÂÂZxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ¢INSPECTION INDICATES BOTH MANUAL MONITORING AND ELECTRONIC MONITORING BEING DONE AND PASSING. ALSO FAILING ITEMS FROM 2004 INSPECTION NOW PASSING. SAME INSPECTOR.xiÂD]Ã5!ÂÂZxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD^Â$ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD_Â$ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂD`ÃV4ÂÂHxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.892, -.999xi ÂDaÃO*ÂÂHxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂDbÃV3ÂÂHxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.869, -.859xi ÂDcÂQ"ÂÂHxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿNOTE TANK 6 PASSES IN ITS ENTIRETY, TANK 4 IS BEING REMOVED IN THE SUMMER OF 2005. IT WAS NOT INSPECTED BECAUSE IT IS BEING REMOVED. WHEN IT IS REMOVED THIS INSPECTION WILL BE UPGRADED TO A PASSING INSPECTION. TANK 4 ABANDONED IN PLACE TANK 7 INSTALLED IN JULY 2005. TRxiÂDd ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEÂ-VÂÂTxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEÂTaÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿp6/14/05: CERT OF PROPER INSTALL: 15 GAL SPILL BUCKET, NEW ELECTRICAL BOXES AND CONDUIT ON MONITORS FOR ALL TANKSxiÂEÃ"EÂÂxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ INSPECTOR COMMENTED THAT SPACERS EXISTED WHERE PIPING COMES THROUGH THE FLOOR BUT HE IS UNABLE TO CONFIRM IF THE PIPING IS SLEEVED. INSTALLATION IS 1987, SPACING WAS OPTIONAL AT THE TIME BUT SLEEVING WAS REQUIRED. REMOVAL NOTICE SUBMITTED; PLANNED FOR SPRING 2006. xiÂEÂ$ÂÂxixiÁ`xiÃR#þÿþÿþÿþÿþÿþÿe INVENTORY RECORDS RECONCILED MONTHLY?: TANK 1 WAS SHORT 25 GALLONS LEAK NUMBER WAS 24 PASSED ANYWAY.xiÂEÂ76ÂÂxixiÁ`xiÃ(P2þÿþÿþÿþÿþÿþÿþÿxiÂEÃV ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEÃMÂÂxixiÁ`xj þÿþÿþÿþÿþÿþÿþÿZPER TONY COUTURE, NEW TLS-350 INSTALLED AT SITE. FACILITY IS NOW PASSING. TIMOTHY RECTORxiÂEÂD*ÂÁ$xixiÂ6xiÃ_50þÿþÿþÿþÿþÿþÿþÿxiÂE Ã0&ÂÁ$xixiÂ6xiÄ(=þÿþÿþÿþÿþÿþÿ`6/9/2005: CERT PROPER INSTALL, SPILL BUCKETS REPLACED DIESEL AND PREMIUM, NEW DROP TUBES PREMIUMxiÂE ÂAÂÁ$xixiÂ6xiÄPWþÿþÿþÿþÿþÿþÿþÿxiÂE ÂGGÂÁ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ- TANK READING: -1.117, -1.113 // -.921, -.902xiÂE Ã6ÂÁ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.068, -1.118xiÂE Ã;* xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE TÂÂ)xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEÂXBÂÂ)xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ*PRECISION TESTED TANKS ON 6/3/2005 (PASS).xiÂEÃ\@ÂÁ xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂEÃ\AÂÁ xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂEÂ2ÂÂxixiÂ7xiþÿþÿþÿþÿþÿþÿþÿwFAILED SPILL BUCKET ON TANK 5-3 REPLACED WITH 15 GAL. SPILL BUCKET. DMCL INSPECTION DATE IS 3/24/2005 , NOT 4/4/2005.xiÂEÃ%JÂÂAxixiÁ`xiÃF$FþÿþÿþÿþÿþÿþÿþÿxiÂ9; /ÂÂDxhxhÂ(þÿÃ"$þÿþÿþÿþÿþÿþÿìLESLIE ANDERSON: PIPING SCHEDULED FOR REPLACEMENT -ACF PER JOHN JOHNSON CTI, AS OF 3/11/05 TANKS ARE OUT OF SERVICE. PASSING INPSECTION BASED ON OUT OF SERVICE. NOT PASSING INSPECTION IN DATABASE DUE TO FAILURES FOR PIPING ISSUES. TRxhÂEÂ$-ÂÁ$xi xi Â6xiÄ (þÿþÿþÿþÿþÿþÿB8/24/05: 15 GALLON SPILL BUCKET, FLAPPER INSTALLED ON REGULAR TANKxiÂEÃ#ÂÂDxi xi Â(xiþÿþÿþÿþÿþÿþÿþÿb8/5/05: CERT OF PROPER INSTALL, MECHANICAL LINE LEAK DETECTOR INSTALLED ALONG WITH NEW SUMP RISERSxiÂEÃ[ ÂÁ$xi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEÃXÂÁ$xi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEÃ[ ÂÁ$xi xi Â<xi ÃN!'þÿþÿþÿþÿþÿþÿþÿxi ÂEÂd(ÂÂTxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEÃXÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEÃXÂÂZxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿÃCTI IRA DODGE PASSED THIS LAST YEAR AFTER IT HAD A FAILING INSPECTION SUBMITTED BY CTI PAUL THOMPSON WHO ONCE AGAIN FAILED THE SAME PROBLEMS. CTI IRA DODGE REPLACED SPILL BUCKET ON 2/24/2006. BBxiÂEÂY ÂÂZxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ\PER CTI THOMPSON, FACILITY CONTINUES TO FAIL DUE TO SENSOR FAILURE ON INTERSTIAL MONITORING.xiÂEÂNEÂÂZxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿWCOPPER LINES DO NOT HAVE SPACERS. THE TANK WAS INSTALLED IN 1990, SPACERS NOT REQUIRED.xiÂEÃ5ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEÃZÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ$ACTUAL INSPECTION DATE IS 3/28/2005.xiÂE ÂPÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ$ACTUAL INSPECTION DATE IS 3/28/2005.xiÂE!Â!MÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ$ACTUAL INSPECTION DATE IS 3/28/2005.xiÂE"ÃÂÂUxixiÂ<xiÃPþÿþÿþÿþÿþÿþÿ$ACTUAL INSPECTION DATE IS 3/28/2005.xiÂE#ÂK[ÂÂUxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂE$ÂT*ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE%Â- ÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE&Ã3R xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE'Â>` xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE(ÂIÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE)ÃXG xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE*Ã`' xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE,ÃT% xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE-ÃK2 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE.Ã7ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE/Ã8ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE0ÂW xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE1ÃYb xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE2ÃÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE3ÂJ= xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE4Á4 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE5Ã-X xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿVCALL FROM OWNER 9/18/06 GAFTEK WILL GET INSPECTION DONE BY MID OCTOBER 2006. TRxiÂE6Ã0 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE7Ã- xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE8Â/6ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE9Â-J xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE:Ã_*ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE;Â)MÂÂ)xixiÂ<xiÃ%GþÿþÿþÿþÿþÿþÿþÿxiÂE<Á*ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE=Â^aÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE>Ã`ÂÂ)xixiÂ<xiÃS>þÿþÿþÿþÿþÿþÿþÿxiÂE?Ã^IÂÂ)xixiÂ<xiÃ&GþÿþÿþÿþÿþÿþÿþÿxiÂE@Ã`  xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEAÃ!ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEBÂ[,ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂECÂ\ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEDÂ\ ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEEÃGKÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEFÂ[ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEGÃ1KÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEHÂXPÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEIà HÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEJÂ\ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEKÂ\ ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂELÂXKÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEMÃU5ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂENÃ>ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEOÂ\ ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEPÃÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEQÂ[*ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂERÃVJÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂESÂE6ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂETÃa<ÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEUÁ+ÂÂUxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEVÂU&ÂÂUxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEWÃ)ÂÂTxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEXÃ_ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEYÂ"aÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEZÃÂÂ)xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE[ÃV xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE\ÂI xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE]Â@SÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE^ÃLÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE_ÃKÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂE`ÃMÂÂUxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂEaÃ/ÂÂZxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿCTI PAUL THOMPSON SAY THERE ARE NO SPACERS. TANK WAS INSTALLED IN JULY 1990, SPACERS WERE NOT MANDATORY AND THERE IS NO RETROFIT REQUIREMENT.xiÂEbÃEÂÂZxi xiÁ`xi þÿþÿþÿþÿþÿþÿþÿ¦NO LEAK DETECTION, NO MONITORING WELLS, NO ELECTRONICS. COPPER LINES HAVE SPACERS?: NOT APPLICABLE, 1990 INSTALL CERT OF PROPER INSTALL, OMNTEC CONTINUOUS ELECTRONICxiÂEcÂ[!ÂÂZxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿ7SPACERS NOT REQUIRED ON COPPER LINES JULY 1991 INSTALL.xiÂEdÃÂÂZxi xiÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂFÃ21ÂÂZxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿ?TANK INSTALLED IN 10/90, SPACERS NOT REQUIRED ON COPPER LINES.xiÂFà .ÂÂ)xi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿaRISER PIPE REPLACED AND SEALED SO NO LONGER TAKING ON WATER REPAIRED PER CTI DON BUBAR 5/4/2005.xiÂFà -ÂÂ)xi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿREPAIRS MADE PER CTI DON BUBARxiÂFÂYÂÁ$xixiÂ<xiÄ YZþÿþÿþÿþÿþÿþÿþÿxiÂ>QÃ)ÂÂYxh xh ÂþÿþÿþÿþÿþÿþÿþÿþÿÔLOUIS AT FACILITY CALLED ON 4/19/2005 TO LET THE DEPARTMENT KNOW REPAIRS ARE TO BEGIN AS SOON AS FROST IS OUT OF THE GROUND. BB LOUISE CYR SAYS GETTING LOAN TO REMOVE TANK(S) IN SPRING 2007. WORKING WITH BB. MLxh ÂFÂaGÂÂ\xixiÂ<xi Ã=þÿþÿþÿþÿþÿþÿþÿxi ÂFÃP xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF Â xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFÃa xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF Â?8 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF Ã\ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF à  xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂF à  xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂF àxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂF xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFÂ5ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFÃO_ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFà EÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFà JÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFà KÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFà FÂÂZxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂFà :ÂÂZxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂFà @ÂÂZxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂFà ?ÂÂZxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂFÂS:ÂÂZxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂFÃSÂÂZxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂFÃÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFÂS+ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFÂS) xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFÂW xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFÂE8ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ99 ÂÂRxhxhÂ(xiÃ=þÿþÿþÿþÿþÿþÿþÿxh ÂFÂd xixiÂxi þÿþÿþÿþÿþÿþÿþÿPASSING PER CTI LEGASSE.xiÂF Ã[ xixiÂxiÃþÿþÿþÿþÿþÿþÿþÿxiÂF!ÂGE xixiÂxiÃþÿþÿþÿþÿþÿþÿþÿxiÂF"àxixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂF#ÃB xixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂF$ÂJ xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF%ÂL  xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF&Ã@ xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF'Â`ÂÁ xixiÂxiþÿþÿþÿþÿþÿþÿþÿgBEAUMONT INSPECTED WEEK OF 1/29/07. GROUND FROZEN; WILL RETURN TO TEST CP IN SPRING. - ML 6/26/07 UPGRADE REGN FOR CTI COUTURE TO INSTALL NEW PIPING SUMP, 3/4" FLEX S&R PIPING, AND PNEUMERCATOR TMS-300 10/07 CTI COUTURE REPLACED TANK 6 PIPING BECAUSE NEW BOILER ROOM. -ML 2/26/08 SUPERINTENDENT SAYS PRECISION TANK DID AI, WILL CALL AND GET COPY SENT. -MLxiÂF(Ã:TÂÂ)xixiÂxiÃ0þÿþÿþÿþÿþÿþÿþÿxiÂF)Â*\ÂÂHxixiÂþÿþÿþÿþÿþÿþÿþÿþÿ SENT CP LETTER ON 04/28/2005. BBxiÂF*Â&ÂÁ xixiÂþÿþÿþÿþÿþÿþÿþÿþÿ®CONTACTED LEW DIFEDDERICO (MAINT) ON 5/2/2005. DAVE BEAUMONT TO REPAIR CP THIS SUMMER (JUNE 1ST). SENT CP LETTER ON 9/23/2005 WITH REPAIR DEADLINE OF NOVEMBER 1, 2005. BB xiÂF+Â(ÂÁ xixiÂxiþÿþÿþÿþÿþÿþÿþÿsREG #3037 AND 3039 COMBINED ON SAME INSPECTION FORM. BB 2/26/08 CALLED SUPERINTENDENT - WILL GET AI SCHEDULED - MLxiÂF,ÂAa xixiÂxiÃQOþÿþÿþÿþÿþÿþÿþÿxiÂF-ÃAb xixiÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂF.ÂU= xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF/Ã6b xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF0Ã6b xixiÂxiþÿþÿþÿþÿþÿþÿþÿINSPECTION ENTERED IN ERROR. BBxiÂF1ÃK/ xixiÂþÿþÿþÿþÿþÿþÿþÿþÿ3COPPER LINES DO NOT HAVE SPACERS. 1994 INSTALL. BBxiÂF2ÃK1 xixiÂxjþÿþÿþÿþÿþÿþÿþÿRCOPPER LINES DO NOT HAVE SPACERS. 1994 INSTALL. NOW PASSING PER CTI KEN LEGASSE.xiÂF3Ã/ ÂÂ)xixiÂxiþÿþÿþÿþÿþÿþÿþÿCP TESTED ON 4/1/2005. BBxiÂF4ÂE` xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF5Âb ÂÂ)xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF6Ã60ÂÂxixiÂxiÃ+Gþÿþÿþÿþÿþÿþÿ;TANKS ARE PLANNED FOR REMOVAL THIS SPRING. BB TANKS REMOVEDxiÂF7ÃOÂÂxixiÂxiÄ;bþÿþÿþÿþÿþÿþÿþÿxiÂF8ÂX]ÂÂAxixiÂxiÃþÿþÿþÿþÿþÿþÿ”COPPER LINES ARE SLEEVED ENTERING BOILER ROOM, BUT THERE IS NO ACCESS TO PIPING AT TANK TOP TO VERIFY IF SLEEVED THE ENTIRE LENGTH OF PIPING RUN. BBxiÂF9Ã;ÂÂAxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF:à /ÂÂAxixiÁ`xiÃ! [þÿþÿþÿþÿþÿþÿþÿxiÂF; ÂÂxixiÁ_xh Ã0I@þÿþÿþÿþÿþÿþÿþÿxh ÂF<ÂÂÂXxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF=ÂÂÂXxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF>ÂEGÂÂZxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂF?Ã"ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿkOVER SHORT ON SUPER TANK THROUGHPUT WAS 4907 AND INVENTORY WAS OVER +96 FAILS OVER SHORT, FAILS INSPECTION.xiÂF@Â[GÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿsSUPER TANK THROUGH PUT WAS 3010 IN FEBRUARY 2005, OVER/SHORT SHOWS OVER 93 GALLONS. INVENTORY AND INSPECTION FAILS.xiÂFAÂRÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFBÂUÂÂXxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFCÃ`aÂÂ4xixiÁ`xiÃVaPþÿþÿþÿþÿþÿþÿþÿxiÂFDÂSCÂÂAxixiÂxiÃ^0cþÿþÿþÿþÿþÿþÿDEAN DRISKO CALLED ON 05/04/2006 TO REQUEST WAIVER FROM 10 DAY WAITING PERIOD ON FACILITY UPGRADE FORM. DEAN IS REPLACING SPILL BUCKETS AND WILL FAX OVER SIGNED FACILITY UPGRADE FORM. BB SPILL BUCKET WORK COMPLETED ON 5/5/2006 ACCORDING TO CERT OF PROPER INSTALLATION. BBxiÂFEÂ%*ÂÂAxixiÂxiÃ6VDþÿþÿþÿþÿþÿþÿþÿxiÂFFÃILÂÂxixiÂxhþÿþÿþÿþÿþÿþÿþÿ(THIS INSPECTION IS A 2004 INSPECTION. BBxhÂFGÃÂÂYxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿêINSPECTOR INDICATED IT IS A 10,000 GALLON TANK. ALL OTHER RECORDS IN THE DEPARTMENT INDICATE IT IS A 12,000 GALLON TANK. REGISTRATION WAS IN 1998, IT IS UNLIKELY TO BE DIFFERENT THAN THE 12,000 GALLON TANK AS LISTED IN THE DATABASE. xiÂFHÂCÂÂZxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂFJÂRFÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFKÂ[FÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿF9/16/05 15 GAL SPILL BUCKET AND STRAIGHT DROP TUBE INSTALLED ON TANK 1xiÂFLÂ[OÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿTANKS 1 & 2 ARE SIPHONED REGULAR, TANK 3 IS SUPER. FEBRUARY READINGS REGULAR, PUMPED 43,693, INVENTORY SHORT 1,029 SUPER, PUMPED 2,325, INVENTORY SHORT 56 JANUARY READINGS REGULAR, PUMPED 39,340, INVENTORY OVER 126 SUPER, PUMPED 2,384, INVENTORY OVER 33.xiÂFM ÂÂXxixiÂ(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂFNÂ[1ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFOÃW xixiÁ`xiÃ')þÿþÿþÿþÿþÿþÿþÿxiÂFPÂM= xixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ6OWNER CALLED 12/05/05; LARRY SAVAGE TO FIX ASAP. -ACFxiÂFQÂ\ ÂÂZxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ&PASSING PER DAVID BURNS, REPAIRS MADE.xiÂFRà ÂÁ xixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿCP PIPING FAILURE, OVERFILL FAILURE, TANK #3 O.O.S., NOT PROPERLY OOS. INSPECTION SENT IN RESPONSE TO SHUT DOWN ORDER ISSUED BY DEP DUE TO FAILURE TO SUBMIT PASSING INSPECTION. TANK READING: ADD. #1 -1.040,-1.040;#2-.935, -.948;#3-1.016.-1.011 SIA TEST RESULTS FOR TANK #3 ARE NOT CORRECT AS TANK #3 HAS BEEN OUT OF SERVICE FOR 2 YEARS. CAN NOT CHANGE SIA INFORMATION IN DATABASE. BBxiÂFSà ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFTà ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFUà ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂFVÂGÂÂUxixiÁ`xiÂWþÿþÿþÿþÿþÿþÿFORIGINAL INSPECTION BY SCOTT LETTELLIER FAILED 8/30/2004. THIS WAS NEVER FILED WITH THE DEPARTMENT. IT WAS INCLUDED WITH THE APRIL 18, 2005 INSPECTION UPDATE PERFORMED BY JOSHUA BISKUPIAK. FACILITY IS PASSING AT THIS TIME. DENNIS RODERICK CALLED BACK ON 2/21/2007, CONTRACTED SIMMARDS & SONS TO COMPLETE A.I. THIS MONTH. -LW xiÂFWÃGFÂÂxixiÁ`xiÄþÿþÿþÿþÿþÿþÿÉPER INSPECTION: SPILL BUCKETS FAIL ALL AREAS. NOTE TANK 2 CP READING ACTUALLY -.90 NOT -.87 AS ENTERED. TR CERT OF PROPER INSTALL: NEW SPILL BUCKETS, PIPING REPLACEMENT AND DISPENSER SUMPS. 5/20/05xiÂFXÃWÂÂUxixiÁ`xiÃ[Dþÿþÿþÿþÿþÿþÿ xiÂFYÃÂÂUxixiÁ`xiÃ' QþÿþÿþÿþÿþÿþÿþÿxiÂFZÂ<ÂÂUxixiÁ`xi Ã=:=þÿþÿþÿþÿþÿþÿnSTAGE ONE VIOLATIONS. DROP TUBE IS 12.5 INCHES OFF THE BOTTOM OF THE TANK. PASSING INSPECTION REC'D 10/28/05.xi ÂF[ÃWÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ/NEW SOLENOID VALVES INSTALLED PER MIKE SIMARD. xiÂF\Â[/ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿ1TANK 3 OVER/SHORT -71. TOTAL MONTHLY SALES 5182. xiÂF]Â$ÂÁ"xixiÁ`xiÃþÿþÿþÿþÿþÿþÿþÿxiÂF^Â%? xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂF_Â:$ÂÂ)xixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂF`Ã)T xixiÂxi þÿþÿþÿþÿþÿþÿþÿ&CP VENT PIPE READINGS -1.068 VOLTS. BBxi ÂFaÂ?1ÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿÌCRASH VALVES NEED TO BE LOWERED, OWNER HAS REQUESTED THAT WORK BE DONE ASAP ACCORDING TO CTI DON BUBAR. CALL FROM OWNER DUE TO MASS MAIL NOV, HE HAS CONTACTED GAFTEK AGAIN TO GET WORK DONE. T.R.xiÂFbÃRÂÁ$xixiÂ6þÿÃN^þÿþÿþÿþÿþÿþÿTANK 8 REMOVED 6/23/05xiÂFcÂUÂÂxixiÂ6xi ÃYPHþÿþÿþÿþÿþÿþÿþÿxi ÂFdÂSAÂÂxixiÂ6xiÃ9)6þÿþÿþÿþÿþÿþÿþÿxiÂGÃ$&ÂÂxixiÂ6xiÃ0?SþÿþÿþÿþÿþÿþÿþÿxiÂGÂ70ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿ64/15/05 CERT OF PROPER INSTALL, 15 GALLON SPILL BUCKETxiÂGÃ;ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ<5/20/2005: CERT PROPER INSTALL VEEDER ROOT TLS 350 INSTALLEDxiÂGÃU ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂTcÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÃJGÂÂ]xixiÂ<xiÃS0-þÿþÿþÿþÿþÿþÿþÿxiÂGÃEYÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÃcWÂÂUxixiÂ<xiÃ#þÿþÿþÿþÿþÿþÿþÿxiÂG Ã05ÂÂYxixiÂ<xiÃB2IþÿþÿþÿþÿþÿþÿþÿxiÂG Ã5ÂÂYxixiÂ<xiÃ5W+þÿþÿþÿþÿþÿþÿþÿxiÂG Â>ÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂG Â?ÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂG Â[-ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂ[3ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂ[?ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂ[AÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÃÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂGÂ[HÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂGÃ!FÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂ%5ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂ3T xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂ^ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGà %ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂ-ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂWÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂBEÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂOÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂC]ÂÂ)xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ}REGGIE CALLED ON 10/04/2005. WORKING WITH OWNER AND TOTAL CONTAINMENT TO REPAIR INTERSTITIAL RISER. WATER IN TANK INTERSTITIAL WAS IDENTIFIED IN ANNUAL INSPECTION BUT NEVER PROPERLY REPORTED. BB CERT OF PROPER INSTALLATION DATED 10/11/2005 INDICATES HIGHLAND TANK REPAIRED INTERSTITIAL RISER. NOTHING YET ON OVERFILL DEVICE. BB REPLACED WITH NEW DROP TUBE AND FLAPPER. TRxi ÂGÃÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGÂ[4ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ8REPLACED SPILL BUCKETS ON TANKS 1 AND 2 ON 2/27/2006. BBxiÂGÂ[NÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG ÂR[ÂÂxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂG!Â[0ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG"ÂZ?ÂÁ xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂG#Â@ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxi ÂG$Â6/ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG%Â7ÂÂYxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.97, -.98xiÂG&Ã`ÂÂYxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG'Â&ÂÂXxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂG(ÃXAÂÂ\xixiÁ`xiÃþÿþÿþÿþÿþÿþÿþÿxiÂG)Â\ÂÂYxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ§INSPECTION SAYS 10,000 GALLON TANK. FILE REVIEW AND OTHER INSPECTIONS REVEAL THAT THE DATABASE IS CORRECT, IT IS A 12,000 GALLON ELUTRON TANK WITH A 30 YEAR WARRANTY.xiÂG*ÃÂÂHxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG+Ã:IÂÂHxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.921, -.950xiÂG,Â&ÂÂ)xixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ;MW LOG SUBMITTED BY JOHN LODGE (MAINT) AFTER INSPECTION. BBxiÂG-Â&ÂÂ)xixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ?MW LOG SUBMITTED BY JOHN LODGE (MAINT) AFTER THE INSPECTION. BBxiÂG.Ã45 xi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG/Â7'ÂÂxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿ&TANKS 20 AND 21 INSTALLED AUGUST 2005.xiÂG0à  xi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG1ÃXb xi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG2Â9 xi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG3Ã8ÂÂAxi xi Â<xiÃ5þÿþÿþÿþÿþÿþÿþÿxiÂG4 ÂÂTxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG5ÃÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG6 ÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG7ÂÂÂTxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG8ÂRMÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG9Ã7UÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG:ÂSZÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG;ÃCbÂÁ xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG<ÂBa xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG=Â]0ÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG>Â>ÂÂHxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG?Â+ÂÂHxi xi ÂxiÃ3P+þÿþÿþÿþÿþÿþÿþÿxiÂG@à ÂÂHxi xi Âxià 'þÿþÿþÿþÿþÿþÿþÿxiÂGAÂLÂÂAxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿGNO SIA SINCE 2000, DAILY INVENTORY IS BEING MAINTAINED PER CTI DRISKO. xi ÂGBÂaEÂÂUxi xi Á`xiÃ1þÿþÿþÿþÿþÿþÿþÿxiÂGCÂ-PÂÂDxi xi Â(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGDÂ96ÂÂDxi xi Â(xiÃ]'7þÿþÿþÿþÿþÿþÿ?CP TANK #10: -0.875 ; TANK #11: -0.867 ; TANK #12: -0.861 -ACFxiÂGEÃ^#ÂÂDxi xi Â(xiÃR_Zþÿþÿþÿþÿþÿþÿ>SPILL BUCKT WILL NEED REPLACEMENT SOON, SCHEDULED FOR FALL 05.xiÂGFÂQÂÂxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿx11/8/08-COPI- CTI HASKEL INSTALLED 15 GAL SPILL BUCKET AND VENT AND WHISTLE-PH INSPECTION FOR TANK #3, NEW INSTALLATIONxh ÂGGÂQÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿ1TANK SCHEDULED FOR PIPING REPLACEMENT SPRING 2005xh ÂGHÂ8OÂÂ`xixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂGIÂ.ÂÁ"xixiÂxi ÃX!%þÿþÿþÿþÿþÿþÿþÿxi ÂGJÃT"ÂÁ xi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂGKÂ&ÂÂXxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂGLÂ]$ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGMÂJÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGNÂT`ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGOÂ\#ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGPÃJ=ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGQÂS?ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGRÂ\$ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGSÂUÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGTÂ\ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGUÂTYÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGVÂTSÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGWÃ<ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGXÃGÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGYÃÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGZÃ8ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG[ÃQ'ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG\ÃCÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG]ÃXÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG^ÂTIÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG_ÃÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂG`ÂTdÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGaÂT_ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGbÃRÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGcÃ?LÂÁ"xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂGdÃ?ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÃ?KÂÁ"xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÂFÂÂxi xiÂ<xiÄQS+þÿþÿþÿþÿþÿþÿþÿxiÂHÂ?ÂÂUxi xiÂ<xiÃ.\þÿþÿþÿþÿþÿþÿþÿxiÂHÃBÂÂUxi xiÂ<xiÄI!þÿþÿþÿþÿþÿþÿþÿxiÂHà ÂÂUxi xiÂ<xiÃ!NþÿþÿþÿþÿþÿþÿþÿxiÂHÂJ9ÂÁ"xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÂWIÂÁ"xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÂB ÂÂ`xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂH Ã7ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH ÂbAÂÂxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂH Â.YÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂH ÂÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂH Ã="ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÂ'ÂÁ"xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÂ0GÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿhBASED ON 2005 ANNUAL INSPECTION, THE FACILITY IS STILL OUT-OF-SERVICE (TANK DRAINED AND FILL LOCKED). BBxiÂHÃbbÂÂ2xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHÂ8OÂÂ`xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHÂÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂH ÂÁ$xixiÂ6xi þÿþÿþÿþÿþÿþÿþÿDOOS INSPECTION LESS THAN 1" PRODUCT, THEREFORE NO MONITORING TO TANKxi ÂHÃ.@ÂÁ$xi xiÂ6xi ÄSS.þÿþÿþÿþÿþÿþÿþÿxi ÂHÃb]ÂÁ$xi xiÂ6xi Ä*4þÿþÿþÿþÿþÿþÿþÿxi ÂHÂNÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÂG.ÂÂxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÂA xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ5SOME MINOR REPAIRS MADE, LLD REPLACED, CAPS REPLACED.xiÂHÂQZ xixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÃ=TÂÁ"xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÃFÂÁ"xixiÂxi þÿþÿþÿþÿþÿþÿþÿAAUDIBLE ALARM NOT WORKING. INSPECTION UPDATE DATED 5/11/2005. BBxiÂHÂUÂÁ"xixiÂxiþÿþÿþÿþÿþÿþÿþÿ,INSPECTOR WAS KEN LEGASSE NOT JOHN CROSS. BBxiÂHÂU xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÂU xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHÃ'ÂÂ)xixiÂxjþÿþÿþÿþÿþÿþÿþÿÕCTI INDICATES PIPING DOES NOT HAVE ELECTRONIC MONITORING. PIPING INSTALLED IN 1997. FIXED 12-12-05 GAFTEK WILL PULL PIPING TO CHECK SPACERS WHEN THEY RETURN 5/06. --ACF SPACERS INSTALLED PER CTI DON BUBAR. TJRxiÂH Ã4aÂÂHxi xiÁ`xiÃV^þÿþÿþÿþÿþÿþÿþÿxiÂH!à OÂÂYxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿNOW PASSING PER DAVID BURNSxiÂH"Â\&ÂÂYxi xiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ¯CTI DODGE INDICATES LINES ARE COPPER INSIDE 3" PIPE, NO SEPERATORS. TANK INSTALLED IN 1990, SPACERS NOT REQUIRED. CTI ALSO SAYS TANK IS 600 GALLON, DATABASE SHOWS IT AS 1000.xiÂH#Ã5NÂÂbxixiÂ(xi Ã,Mþÿþÿþÿþÿþÿþÿ'DAVID HOWE RETESTED CP ON 7/29/2005. BBxi ÂH$ÂD xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH%ÂS+ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH&ÂS) xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH'ÂS- xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH(ÃH  xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH)à 5 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH*ÂH] xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ¹2006 A.I. DONE BY K. LEGASSE, JR. ON 5/17/2006: FAIL. SPILL BUCKET ON TANK 12 FAILED, TANK INTERSTITIAL MONITORING ON TANK 13 FAILED. SARGENT SUBMITTED THIS A.I. ON 9/11/2007. -- DMCLxiÂH+ÃcVÂÂ`xixiÂ<xi Ã![ þÿþÿþÿþÿþÿþÿþÿxi ÂH,Ãb[ÂÂxixiÂ<xi Ä:þÿþÿþÿþÿþÿþÿþÿxi ÂH-Ã`&ÂÁ$xixiÂ<xi ÄLACþÿþÿþÿþÿþÿþÿþÿxi ÂH.Ã`9ÂÁ$xixiÂ<xi ÄF2Vþÿþÿþÿþÿþÿþÿþÿxi ÂH/ÂCÂÂxi xiÂ<xi Ä a_þÿþÿþÿþÿþÿþÿþÿxi ÂH0Â9ÂÂxi xiÂ<xiÄP+þÿþÿþÿþÿþÿþÿþÿxiÂH1Â$ÂÂxi xiÂ<xiÃ9Z"þÿþÿþÿþÿþÿþÿþÿxiÂH2ÃGÂÂxi xiÂ<xiÃ`1þÿþÿþÿþÿþÿþÿCREPLACED SPILL BUCKET ON 8,000 GALLON DIESEL TANK ON 02/15/2006. BBxiÂH3Â#) xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH4Ã)ÂÂYxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH5 BÂÂ)xixiÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂH6Â!D xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH7àxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH8 xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH9ÂT?ÂÂxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH:ÂTHÂÂxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH;ÃJÂÂxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH<Â$%ÂÂxi xiÂ6xiÃUþÿþÿþÿþÿþÿþÿþÿxiÂH=ÃbPÂÂxixiÂ6xjþÿþÿþÿþÿþÿþÿþÿ‚NEW OWNERS, DON'T HAVE LAST YEARS THROUGHPUT RECORDS GR ADAMS INSTALLED A REPLACEMENT INTERSTITIAL MONITORING SYSTEM 8/25/06 -ACFxh ÂH>à /ÂÁ$xixiÂ6xiÃS(þÿþÿþÿþÿþÿþÿþÿxiÂH?ÃXJÂÁ$xixiÂ6xiÄ'(,þÿþÿþÿþÿþÿþÿKDENNIS DAVIS REPLACED SPILL BUCKETS FOR TANKS 1, 2, AND 3 ON 02/27/2006. BBxi ÂH@à ]ÂÂ4xixiÂ(xh þÿþÿþÿþÿþÿþÿþÿ4NEW INSTALLATION / CERT. OF PROPER INSTALLATION -ACFxh ÂHAà : xixiÂ(xiþÿþÿþÿþÿþÿþÿþÿ0NEW INSTALLATION / CERT. OF PROPER INSTALL -ACFxiÂHBÂZ)ÂÂ:xixiÂ(xg þÿþÿþÿþÿþÿþÿþÿ+NEW INSTALL / CERT. OF PROPER INSTALL -ACFxg ÂHCàxixiÂ(xh þÿþÿþÿþÿþÿþÿþÿ*NEW INSTALL / CERT. OF PROPER INSTALL -ACFxh ÂHDÂ>ÂÂDxh xiÂ(xh þÿþÿþÿþÿþÿþÿþÿ+NEW INSTALL / CERT. OF PROPER INSTALL -ACFxh ÂHEà GÂÁ xixiÂ(xh þÿþÿþÿþÿþÿþÿþÿ0NEW INSTALL / CERT. OF PROPER INSTALLATION -ACFxh ÂHFÃ4WÂÂHxixiÂ(xhþÿþÿþÿþÿþÿþÿþÿ0NEW INSTALL / CERT. OF PROPER INSTALLATION. -ACFxhÂHGÃ4ÂÂxixiÂ(xh þÿþÿþÿþÿþÿþÿþÿ2NEW INSTALL / CERT. OF PROPER INSTALLATION. -ACFxh ÂHHÂ>PÂÂ:xixiÂ(xhþÿþÿþÿþÿþÿþÿþÿ+NEW INSTALL / CERT. OF PROPER INSTALL. -ACFxhÂHIà GÂÁ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHJÂARÂÁ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHKÂYRÂÂ;xixiÂ<xiÃ8[OþÿþÿþÿþÿþÿþÿþÿxiÂHLÂOLÂÂ;xixiÂ<xiÃXb5þÿþÿþÿþÿþÿþÿþÿxiÂHMÂGcÂÂ;xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHNÂIÂÂ;xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHOÂ4.ÂÂ;xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHPÃ^UÂÂ;xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHQÂYÂÂ;xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHRÂX^ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHSÂ.+ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHTÃ&ÂÂAxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHUÃ$_ÂÂTxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHVÂ<ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHW >ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHX ?ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHYÂ/4ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHZÂ;ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂH[ÃT ÂÂxixiÂ<xiÃ2 þÿþÿþÿþÿþÿþÿþÿxiÂH\Â2DÂÂUxixiÂ<xi Ã2Q)þÿþÿþÿþÿþÿþÿþÿxi ÂH]ÃIÂÂUxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂH^à /ÂÂUxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂH_Â?ÂÂUxixiÂ<xiÄJ]GþÿþÿþÿþÿþÿþÿþÿxiÂH`ÂdbÂÂHxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHaÃ1ÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂHbÃWÂÂUxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHcà /ÂÂUxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂHdà *ÂÂHxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂIÃ.ÂÂUxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿ|CTI SCOTT SUBMITTED INSPECTION UPDATE DATED 06/15/2005. PRODUCT PIPING IS CP. TEST READING OF -0.95 VOLTS WAS OBTAINED. BBxi ÂIÃ/\ÂÂUxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂIÂCÂÂUxixiÂ<xiÃ) þÿþÿþÿþÿþÿþÿþÿxiÂIÂ2GÂÂUxixiÂ<xi Ã]==þÿþÿþÿþÿþÿþÿþÿxi ÂIÃ.H xixiÂ(xg þÿþÿþÿþÿþÿþÿþÿ0NEW INSTALLATION, CERT. OF PROPER INSTALL. -ACFxg ÂIà  xixiÂ(xh þÿþÿþÿþÿþÿþÿþÿ0NEW INSTALL / CERT. OF PROPER INSTALLATION -ACFxh ÂIÂP)ÂÂxixiÂ(xh þÿþÿþÿþÿþÿþÿþÿ0NEW INSTALL /CERT. OF PROPER INSTALLATION. -ACFxh ÂIÂ;ÂÂKxixiÂ(xhþÿþÿþÿþÿþÿþÿþÿ6NEW INSTALLATION / CERT. OF PROPER INSTALLATION. -ACFxhÂI à )ÂÂxixiÂ(xhþÿþÿþÿþÿþÿþÿþÿ5NEW INSTALLATION / CERT. OF PROPER INSTALLATION -ACFxhÂI Ãc xixiÂ(xgþÿþÿþÿþÿþÿþÿþÿ5NEW INSTALLATION / CERT. OF PROPER INSTALLATION. -ACFxgÂI Â1!ÂÂxixiÂ(xg þÿþÿþÿþÿþÿþÿþÿ'NEW INSTALLATION/CERT OF PROPER INSTALLxg ÂI à ÂÂXxixiÂ(xhþÿþÿþÿþÿþÿþÿþÿ6NEW INSTALLATION / CERT. OF PROPER INSTALLATION. -ACFxhÂI ÂRPÂÂ)xixiÂ(xh þÿþÿþÿþÿþÿþÿþÿ5NEW INSTALLATION / CERT. OF PROPER INSTALLATION -ACFxh ÂIÃ^ÂÂXxixiÂ(xhþÿþÿþÿþÿþÿþÿþÿ1NEW INSTALL / CERT. OF PROPER INSTALALTION. -ACFxhÂIà ! xixiÂ(xiþÿþÿþÿþÿþÿþÿþÿ0NEW INSTALL / CERT. OF PROPER INSTALLATION. -ACFxiÂIÂÂÁxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿ0NEW INSTALL / CERT OF PROPER INSTALLATION. -ACFxiÂIà DÂÁxixiÂ(xhþÿþÿþÿþÿþÿþÿþÿ1NEW INSTALL / CERT. OF PROPER INSTALLATION. -ACFxhÂIÂAÂÂxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿ4NEW INSTALLATION / CERT. OF PROPER INSTALLATION -ACFxiÂIÃNVÂÂxixiÂ(xhþÿþÿþÿþÿþÿþÿþÿ6NEW INSTALLATION /CERT. OF PROPER INSTALLATION. -ACF xhÂIÂÂÂTxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÃÂÂRxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÃNÂÂRxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÂ/ÂÂRxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÂGÂÂRxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÃbYÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÃ6ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÃÂÁ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÃW ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÃQUÂÂYxixiÂ<xiÃ$þÿþÿþÿþÿþÿþÿþÿxiÂIÃ6ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIÃ6 ÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂI Â[!ÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂI!ÃÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂI"Ã21ÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂI#ÂÂÂ"xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI$Ã_`ÂÂ"xixiÂ<xiÃV 'þÿþÿþÿþÿþÿþÿþÿxiÂI%ÃÂÂAxixiÂ<xià >:þÿþÿþÿþÿþÿþÿþÿxiÂI&Â.ÂÂbxixiÂ<xiÃ-TþÿþÿþÿþÿþÿþÿþÿxiÂI'Â)MÂÂ)xixiÂ<xiÃ%GþÿþÿþÿþÿþÿþÿþÿxiÂI(ÂF,ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI)ÂXÂÂ"xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI*Á(ÂÂUxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿžNOTE: FACILITY NAME ON INSPECTION FORM IS SELTZER AND RYDLHOLM, THEY ARE PART OF PBG, A.K.A. PEPSI BOTTLING GROUP. THE REGISTRATION NUMBER IS CORRECT AT #39. xi ÂI+ ÂÂLxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂI,ÂMÂÂ"xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI-ÂÂÂ"xixiÂ<xiÄ aþÿþÿþÿþÿþÿþÿþÿxiÂI.Ã@XÂÁ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI/Ã3ÂÁ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI0ÃR#ÂÁ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI1ÂZ/ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI2ÂXÂÂLxixiÂxià  þÿþÿþÿþÿþÿþÿþÿxiÂI3Ã& xixiÂxiþÿþÿþÿþÿþÿþÿþÿmCTI REPLACED BALL FLOAT ON TANK #4 WITH FLAPPER. BB AI CONDUCTED 12/5/06. GAFTEK TO SEND REPORT. 3/26/07 MLxiÂI4à GÂÂ;xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI5Ã(=ÂÂ;xixiÂxiÃ:B1þÿþÿþÿþÿþÿþÿoTANK #8 LISTED ON INSPECTION REPORT AS OUT-OF-SERVICE SINCE 8/15/2001. WILL CHANGE TANK STATUS ON DATABASE. BBxiÂI6Ã.ÂÂ"xixiÂxiÃSS[þÿþÿþÿþÿþÿþÿ-FACILITY UPGRADE SCHEDULED FOR JULY 2006. BBxiÂI7Â&ÂÂKxixiÂxiÃGþÿþÿþÿþÿþÿþÿþÿxiÂ>VÂ^bÂÂKxh xh Á`xià Vþÿþÿþÿþÿþÿþÿ‚SENT CP LETTER 12/02/2004. BB RECEIVED INSPECTION UPDATE FROM CTI LETELLIER DATED 4/26/2005. CP RETEST: TANK #5 = -.971 VOLTS. BBxh ÂI8à GÂÂxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿSTHIS ANNUAL INSPECTION IS THE UST INSTALL DATE, ENTERED FOR REPORT MAKING PURPOSES.xi ÂI9Ã5LÂÂ"xixiÂxiÃO 5þÿþÿþÿþÿþÿþÿþÿxiÂI:ÂdÂÁ xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI;Â,QÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI<ÂBÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI=Á^ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿHSENT CP LETTER ON 6/7/2005. BB CP UPGRADE ON 6/16/2005. (-1.10 VOLTS) BBxiÂI>Â=ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI?ÂbÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1xiÂI@Â&ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIAà ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIBÃ4@ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂICÂ)ÂÁ xixiÂxiþÿþÿþÿþÿþÿþÿþÿ;DUSTIN BULLY WILL SCHEDULE AI WITH BEAUMONT ASAP -ML 4/2/07xiÂIDÃaÂÂTxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIEÂEÂÂLxixiÂxi þÿþÿþÿþÿþÿþÿþÿhFACILITY HAS A 2,000 GALLON DIESEL AST WITH BELOW GROUND CP PIPING. CP PIPING READING = -.893 VOLTS. BBxi ÂIFÃ7ÂÁ$xixiÂ6xiÄ:þÿþÿþÿþÿþÿþÿ›DENNIS DAVIS REPLACED DIESEL SPILL BUCKETS (TANKS #1 AND #2 ) ON 10/17/2005 WITH NEW 15 GALLON BUCKETS. SEE CERT. OF PROPER INSTALLATION IN TANK FILE. BBxiÂIGÂ\JÂÂ;xixiÂxiþÿþÿþÿþÿþÿþÿþÿiBASED ON INSPECTION REPORT AND CONVERSATION WITH CTI, THE TANK IS DOUBLE-WALLED CP. WILL MAKE CHANGE. BBxiÂIHÂ1aÂÂTxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIIÂ8ÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIJÃ! xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂIKÃ/ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂILÂ.ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂIMÂXRÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂINà LÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIOÃPÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIPÂ\&ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIQÂ1ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIR ÂÂ:xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂISÂ-ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂITÂ;:ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIUÂ9QÂÂ\xixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ”VENT PIPE CONTINUES TO FAIL CP. CURRENT RESULTS SHOW -.601. ALL OTHER ASPECTS OF THE FACILITY ARE PASSING. CONTINUES TO BE VOLUME SIZE DISCREPANCY. xi ÂIVÃ\$ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ#SPILL BUCKET REPLACED 6/30/2005. BBxi ÂIWÂZÂÂRxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIXÂ\ÂÂRxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIYÃJÂÂYxixiÂxiÃZYþÿþÿþÿþÿþÿþÿþÿxiÂIZÂE ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI[ÃUÂÂKxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI\Â_YÂÂTxixiÂþÿþÿþÿþÿþÿþÿþÿþÿZPREVIOUS INSPECTION ALSO INDICATED THE TANK INTERSTITIAL SPACE WAS NOT BEING MONITORED. BBxiÂI]ÂXNÂÂYxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ®INSPECTION UPDATE DATED 06/30/2005 SUBMITTED BY IRA DODGE . BB CTI LISTED TANK AS 1,000 GALLONS. REGISTRATION MATERIAL AND PREVIOUS INSPECTIONS LIST TANK AS 2,500 GALLON. BBxiÂI^Â6&ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂI_ÂZ<ÂÂ\xixiÂxi þÿþÿþÿþÿþÿþÿþÿ%MIKE LEWIS TESTED CP ON 4/25/2005. BBxi ÂI`Â9PÂÂ\xixiÂxi þÿþÿþÿþÿþÿþÿþÿ%MIKE LEWIS TESTED CP ON 4/11/2005. BBxi ÂIaÃÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIb AÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIcÃ(YÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂIdÂ#.ÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÂ3ZÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÃQQÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÃ:YÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÃF/ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÃP]ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿCP WAS TESTED ON 4/20/2005. BBxiÂJÃ3ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿ%MIKE LEWIS TESTED CP ON 4/26/2005. BBxiÂJÃ2ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿCP TESTED ON 4/27/2005. BBxiÂJ Ã\*ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿCP TESTED ON 4/27/2005. BBxiÂJ à ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿCP TESTED ON 5/9/2005. BBxiÂJ Â^6ÂÂDxixiÂþÿÃ.\8þÿþÿþÿþÿþÿþÿ„BASED ON INSPECTION, TANK #4 WAS TAKEN OUT OF SERVICE IN 11/2004, BUT PRODUCT HAS NOT BEEN DRAINED TO LESS THAN 1". FAILING SIA. BBxiÂJ à NÂÂTxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ(SIA FAILED ALSO DUE TO INADEQUATE DATA. xiÂJ Ã"CÂÂYxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÃ`FÂÂ;xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÂH xi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿtAFTER RECEIVING NOVEMBER 2005 NOV, RALPH LEO SUBMITTED DOCUMENTATION SHOWING GAFTEK REPAIRED OMNTEC ON 4/25/2005. BBxiÂJÃ` ÂÂKxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ?ÃD$ÂÂHxh xh ÂxiþÿþÿþÿþÿþÿþÿþÿXSENT CP LETTER 12/02/2004. BB PER DAVID HOWE, ALL THREE TANKS NOW PASSING CP TESTS. TJRxh ÂJÂ_!ÂÂ]xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ,FACILITY REMAINS OUT OF SERVICE AND CLOSED. xiÂJÂ0aÂÂ;xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.905, -.896xiÂJÃd9ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÃ.H xixiÂ<xiÃþÿþÿþÿþÿþÿþÿþÿxiÂJ W xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂJÁÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÁÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÃR xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÃ^K xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÃ:R xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÂ3 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÂ# xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÂP> xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÂd< xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJÂD xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ ÂB xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ!Ã5 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ"ÂADÂÂ;xixiÂ<xiÃEþÿþÿþÿþÿþÿþÿþÿxiÂJ#ÃAÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ$Â3ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ%Ã=^ÂÂUxixiÂ<xiÃE"LþÿþÿþÿþÿþÿþÿþÿxiÂJ&ÂAÂÂUxixiÂ<xiÃEKþÿþÿþÿþÿþÿþÿþÿxiÂJ'Â$8ÂÂUxixiÂ<xiÃRHDþÿþÿþÿþÿþÿþÿþÿxiÂJ(ÃXDÂÂUxixiÂ<xiÃ#LþÿþÿþÿþÿþÿþÿþÿxiÂJ)Â2HÂÂUxixiÂ<xiÃK)<þÿþÿþÿþÿþÿþÿþÿxiÂJ*ÂLZÂÂUxixiÂ<xiÃ9/þÿþÿþÿþÿþÿþÿþÿxiÂJ+Â2CÂÂUxixiÂ<xiÄ5\þÿþÿþÿþÿþÿþÿþÿxiÂJ,ÃNVÂÂUxixiÂ<xiÃN^+þÿþÿþÿþÿþÿþÿþÿxiÂJ-ÂPÂÂUxixiÂ<xiÃ-B=þÿþÿþÿþÿþÿþÿþÿxiÂJ.Â2LÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ/Ã!NÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ0 VÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ1Ã!]ÂÂxixiÂ<xiÃ@bþÿþÿþÿþÿþÿþÿþÿxiÂJ2Ã&ÂÂ;xixiÂ<xiÃ? þÿþÿþÿþÿþÿþÿþÿxiÂJ3Â0cÂÂ;xixiÁ`xiÃ+QþÿþÿþÿþÿþÿþÿþÿxiÂJ4ÃÂÂKxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿCTI FAILED DUE TO NO THROOUGHPUT RECORDS. PASSING INSPECTION FOR TANKS PURPOSES. VERY FEW FACILITIES HAVE RECORDS OR PROVIDE THEM FOR THE ANNUAL INSPECTION.xiÂJ5ÃR=ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿèTANK #1 REOMVED 8/23/05. -ACF PLEASE NOTE THAT THIS TANK WAS INSTALLED IN 1985. IT APPEARS THAT OIL AND SOLID FUEL BOARD RULES REQUIRE IT TO HAVE A VENT WHISTLE FOR OVERFILL PREVENTION. ALSO SUCTION/RETURN LINES SHOULD BE SLEEVED.xiÂJ6ÂÂÂLxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ7Â[<ÂÂ'xixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ<THIS IS FOR A TANK INSTALLATION, WHICH OCCURRED ON 5/11/2005xi ÂJ8Â>;ÂÂUxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ9 xixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ¼9/13/05: CERT PROPER INSTALL: 15 GAL SPIL BUCKETS ON TANKS 6 & 7; 61SO DROP TUBES ON TANKS 5,6, & 7 INSPECTION UPDATE DATED 9/13/2005 . 643,000 GALLONS THRU TRAILING YEAR-TO -DATE. -ACFxiÂJ:Â7 xixiÂ6xi þÿþÿþÿþÿþÿþÿþÿŸ7/15/05: CERT OF PROPER INSTALL, PIPING SUMP REPLACEMENT 9/15/05: CERT OF PROPER INSTALL, 15 GAL SPILL BUCKETS TANKS 10 & 12 OVERFILL ALL CHECKED AND PASSING.xiÂJ;Â9ÂÂUxixiÁ`xiÃ\ þÿþÿþÿþÿþÿþÿþÿxiÂJ<ÂB$ xixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ+REPLACED STP SUMPS PER CTI KENNETH LEGASSE.xiÂJ=Â7 xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ>ÃYÂÁ$xixi Â<xiÃQ$þÿþÿþÿþÿþÿþÿþÿxiÂJ?Â5 ÂÁ$xixi Â<xiÃIOþÿþÿþÿþÿþÿþÿþÿxiÂJ@ÂIHÂÁ$xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJA Â xixi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂJBÂ7 xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJCÂ*N xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJDÂAU xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJEÂ$MÂÂUxixi Â<xiÃ8JþÿþÿþÿþÿþÿþÿþÿxiÂJFÂ$?ÂÂUxixi Â<xiÄ?þÿþÿþÿþÿþÿþÿþÿxiÂJGÃK ÂÂUxixi Â<xiÄ62ZþÿþÿþÿþÿþÿþÿþÿxiÂJHÂ$GÂÂUxixi Â<xiÄ[ þÿþÿþÿþÿþÿþÿþÿxiÂJIÂ;WÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJJÁJÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJKÁYÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJLÁHÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJMÁ\ÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJNÂ5KÂÂYxi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ»SENT CP LETTER 06/10/2005. SENT JACKIE HAINES REMOVAL NOTICE ON 12/21/2005. BB SENT JACKIE HAINES OOS FORM, REMOVAL NOTICE, AND LETTER EXPLAINING OOS REQUIREMENTS (AI, ETC) ON 12/14/06 MLxiÂJOÃJHÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJPÃMÂÂYxi xi ÂxiÃ)þÿþÿþÿþÿþÿþÿþÿxiÂJQÂF_ÂÂYxi xi Âxiþÿþÿþÿþÿþÿþÿþÿx550 GALLON GASOLINE TANK. INSPECTOR DOCUMENTED A VENT WHISTLE FOR OVERFILL (PROBABLY NOT ACCEPTABLE FOR MOTOR FUEL). BBxiÂJRÃ9ÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJSÃ!ÂÂ`xi xi Â(xiÃB"þÿþÿþÿþÿþÿþÿþÿxiÂJTÂ8ÂÂ`xi xi Â(xià þÿþÿþÿþÿþÿþÿþÿxiÂJUÃG&ÂÂKxi xi Â(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJVÃP` xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJWÂcI xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJXÂ3 xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJYÂ&) xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJZÂ>D xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ[Á-ÂÂHxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ\ÂEMÂÂHxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿMIKE SIMARD WAS INSPECTOR. BBxiÂJ]Ã*=ÂÂUxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ^ÃW^ÂÂ;xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJ_à ÂÂ;xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿaINSTALLER DID NOT INCLUDE PAGE ON COPPER PIPING, BUT PASSED THAT PORTION ON THE SUMMARY PAGE. BBxiÂJ`Â%ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿŸTANKS ARE DBL-WALLED WITH MANUAL MONITORING. CTI INSTRUCTED OPERATOR ON INTERSTITIAL MONITORING REQUIREMENT AND PROVIDED LOG SHEETS. LAST SIA WAS IN 1998. BBxiÂ> ÃQ1ÂÂxh xh Âxh þÿþÿþÿþÿþÿþÿþÿ&8/12/04 CERT PROPER INSTALL OPW SO-61 xh ÂJaà ]ÂÂSxi xi Â6xiþÿþÿþÿþÿþÿþÿþÿ#THIS IS THE TANK INSTALLATION DATE.xiÂJbà NÂÂYxixi Â6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJcÃd2ÂÂ;xixi Â6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂJdÃGÂÂ;xixi Â6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKÃ[ ÂÂ)xixi Â(xi ÃX$*þÿþÿþÿþÿþÿþÿcPLEASE NOTE: INSPECTION SUBMITTED 6/13/2005; INSPECTION DATE 5/6/2005. SORRY FOR THE MIX-UP. -ACFxi ÂKÃ?ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKÃ@ ÂÂDxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKÃ'ÂÂDxi xi ÂxiÃ%bþÿþÿþÿþÿþÿþÿþÿxiÂKÂGÂÂHxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKÂÂÂ\xi xi Âxiþÿþÿþÿþÿþÿþÿþÿ%MIKE LEWIS TESTED CP ON 4/25/2005. BBxiÂKÃ+<ÂÂxi xi Âþÿà 3þÿþÿþÿþÿþÿþÿãSENT CP LETTER ON 6/14/2005. BB SPOKE TO ED EASTMAN ON 6/16/2005. ADAMS & FOGG TO RETEST CP. ADAMS & FOGG CORRECTED INTERSTITIAL PROBLEM A WEEK AFTER DEP COMPLIANCE INSPECTION. ED WILL CALL AND SEE WHERE THE PAPERWORK IS. BBxiÂKÃVÂÂ\xi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿDMIKE LEWIS TESTED CP ON 5/2/2005. BB SENT CP LETTER ON 6/27/2005. BBxiÂK Ã&ÂÂxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ›TANK #6 IS AN AST. MATERIAL LISTED AS CP. WILL CHANGE. BB SENT CP LETTER ON 6/14/2005. BB INSPECTION UPDATE DATED 6/21/2005. CP RETEST OF -.85 VOLTS. BBxiÂK Â,ÂÂxi xi Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂK Ã+GÂÂDxi xi ÂþÿÄ; þÿþÿþÿþÿþÿþÿŸSENT CP LETTER ON 6/27/2005. BB CATHODIC PROTECTION UPGRADED 6/23/05 CP TEST ON 8/29/2005. TANK #1-1.18, TANK #2 -1.09, TANK #3 -1.08, AND TANK #4 -1.17. BBxiÂK Â28ÂÂxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿZINTERSTICE SENSOR NOT WORKING PROPERLY PER INSPECTION. NO ADDITIONAL INFORMATION PROVIDED.xiÂK Ã.ÂÂxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ#SAME FAILURE, NO BAILER AND NO LOG.xiÂKÂ.ÂÂxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ:WATER IN PIPING SUMP, NO ADDITIONAL INFORMATION AVAILABLE.xiÂKÂR9ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿÕNO ACCESS TO OVERFILL THOUGH IT IS PRESENT. ALSO GROUNDWATER MONITORING FAILING DUE TO NO BAILER AND NO LOG. SCHOOL SUBMITTED GW MONITORING WELL LOG. TANK TO BE REMOVED IN SPRING. MORRISON ENV. IS CONSULTING. BBxiÂKÂ-\ÂÂYxixiÂxiÃ;þÿþÿþÿþÿþÿþÿþÿxiÂKÃ1 ÂÂ:xixiÂxiÃQþÿþÿþÿþÿþÿþÿþÿxiÂKÃ8 ÂÂxi xiÁ`xi þÿþÿþÿþÿþÿþÿþÿ@REPAIRS MADE FACILITY IS NOW PASSING PER CTI, JOSHUA BISKUPIAK.xiÂKÃ"ÂÂxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿINSPECTION UPDATE SUBMITTEDxiÂKÂ-ÂÂxi xiÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂKÃJ9ÂÂxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿ¯CTI GEORGE FAILED THE INSPECTION DUE TO NO SPACERS ON S/R LINES. TANK WAS INSTALLED IN 1990 PRIOR TO THE ABSOLUTE REQUIREMENT THAT SPACERS BE INSTALLED. PASSING INSPECTION. TRxiÂKÂ1cÂÂUxi xiÁ`xiÃ,!;þÿþÿþÿþÿþÿþÿþÿxiÂKÃ4YÂÁMxixiÁ`xiÃNþÿþÿþÿþÿþÿþÿŠ TANK READING: -.99, -1.04 BOB MOODY IS NEW OWNER AS OF DEC 2005. SENT MR. MOODY CHANGE OF OWNERSHIP FORM AND SIA INFO ON 11/30/2005. BBxiÂKÃK8ÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂKÁTÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂKÁUÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂKÃ]4ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKÃGÂÂHxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKÂD2ÂÂ\xi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂKÂXÂÂHxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKÂ. ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK Â.ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK!Â]LÂÂUxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK"ÂYZÂÂUxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK#ÂY=ÂÂUxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK$ÂYÂÂUxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK%ÂYÂÂ]xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK&ÂLÂÂZxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK'Â]]ÂÂ]xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK(ÂY:ÂÂZxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂK)Ã'2ÂÂUxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂK*ÂY\ÂÂUxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂK+ÂY8ÂÂUxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂK,ÂLÂÂ]xi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿ2PIPING REPLACEMENT, SPILL BUCKET, OMNTEC ON 8/9/05xi ÂK-ÂYÂÂ]xi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂK.Â?  xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK/ÂIÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK0Â?4ÂÂxi xiÂ<xhþÿþÿþÿþÿþÿþÿþÿmCONTACTED ROD AT GAFTEK 10/04/2005. INSPECTION WAS PERFORMED ON 5/23/2005. DATE ON REPORT WAS INCORRECT. BBxhÂK1Â?ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK2Â@Z xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK3Â8XÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK4 ?ÂÂXxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK5ÂLMÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK6ÂLLÂÂxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂK7ÂBÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK8ÃÂÂUxi xiÂ<xiÃ'1(þÿþÿþÿþÿþÿþÿþÿxiÂK9ÃÂÂUxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK:ÃÂÂTxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK;ÂB'ÂÂTxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK<ÃUEÂÂxi xiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂK=Â#ÂÂbxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK> Â xi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿóFACILITY IS PASSING. JOHN SIMS HAS INSPECTED THE LAST 3 YEARS AND CONTINUES TOI LIST THE TANK SIZE AS 5,000 GALLONS. TANK IS REGISTERED AND A FILE REVIEW CONFIRMS THAT IT IS AN 8,000 GALLON ELUTRON TANK INSTALLED BY JEFF HUNTLEY IN 1997. T.R.xiÂK?Ã! xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK@Ã_ÂÁ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKAÃ\1ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKBÂ5ÂÂTxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKCÃ6ÂÂ9xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKDÂ$ ÂÂxixiÂ6xi Ã?NQþÿþÿþÿþÿþÿþÿþÿxi ÂKEÂ_!ÂÂ]xixiÂ(xi €þÿþÿþÿþÿþÿþÿ CHAMBERLAIN INSTALLED A FLAPPER ON K-1 TANK. -ACF CERT PROPER INSTALL 6/10/05: FLAPPER AND 15 GAL SPILL BUCKET BOTH ON TANK 6 SCOTT CYR INSTALLED 5GAL SPILL BUCKETS ON TANKS 7,8,9 ON 10/31/06. 15GAL BUCKETS WOULD NOT FIT DUE TO PROXIMITY TO VAPOR RECOVERY RISER. -MLxiÂKFÂUÂÂxixiÂ6xiÄ]þÿþÿþÿþÿþÿþÿ"INSPECTION UPDATE SUBMITTED 6/2/05xiÂKGÂ$ÂÂxixiÂ6xiÃ$6)þÿþÿþÿþÿþÿþÿþÿxiÂKHÂ5ÂÁ$xixiÂ6xi Ä>`þÿþÿþÿþÿþÿþÿþÿxi ÂKJÂ7/ÂÂxixiÂ6xiÃ);þÿþÿþÿþÿþÿþÿþÿxiÂKKÂVÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿŽSENT CP LETTER ON 8/1/2005. (HEATED OIL) BB CONTACTED BOB STANELY ON 8/22/2006. THOUGHT GR ADAMS HAD COMPLETED WORK. WILL FIND PAPERWORK. BBxiÂKLÃbNÂÂxixiÂ6xiÄ(YþÿþÿþÿþÿþÿþÿþÿxiÂKMÂ$ÂÂxixiÂ6xià 4þÿþÿþÿþÿþÿþÿINSPECTION UPDATE 5/31/05xiÂKNÃS0ÂÂxixiÂ6xiÃ(>'þÿþÿþÿþÿþÿþÿþÿxiÂKOÃ9ÂÂxixiÂþÿþÿþÿþÿþÿþÿþÿþÿ+TANK IS SCHEDULED FOR REMOVAL JUNE 2005. BBxiÂKPÃ6ÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKQÂM,ÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKRÃCÂÂxixiÂxi þÿþÿþÿþÿþÿþÿþÿ€ PRODUCT PIPE CP READING: FILL PIPE. MONTORING WELL ISSUE RESOLVED 12/5/05 PER BILL ROODY AT SAD 40. TELEPHONE # 542-1471 T.R.xiÂ:ÃTXÂÂUxhxhÁ`þÿþÿþÿþÿþÿþÿþÿþÿÁINSTALLED IN 1992, NO MONITORING ON PIPING, NO ACCESS TO INTERSTICE. ACCESS INSTALLED TO INTERSTICE. NO INDICATION THAT THERE IS MONITORING ON THE PIPING YET. SO KEEPING INSPECTION AS A FAIL. xhÂKSÂ/cÂÁ"xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿŽCTI CROSS FAILED INSPECTION BECAUSE MONITORING WELL LOG WAS NOT BEING KEPT UP. PASSING INSPECTION PRIMARY LEAK DETECTION INS DAILY INVENTORY. xiÂKTÂ[JÂÂbxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿYTHIS IS THE INSTALLATION DATE; ONLY FOR TANKS 5, 6 AND 7. ALL OTHERS PLANNED FOR REMOVAL.xiÂKUÃ"ÂÂUxi xiÁ`xià þÿþÿþÿþÿþÿþÿþÿxiÂKVÂ&$ÂÂAxixiÂxiÃ0GþÿþÿþÿþÿþÿþÿþÿxiÂKWÃ8@ÂÂxixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂKXÂBÂÂxixiÂxiÃþÿþÿþÿþÿþÿþÿþÿxiÂKYÂV`ÂÂAxixiÂxiÃYþÿþÿþÿþÿþÿþÿþÿxiÂKZÂ&ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK[ÂE>ÂÂxixiÂxiÃ-þÿþÿþÿþÿþÿþÿþÿxiÂK\ÂJÂÁ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK]Â@ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK^à 5 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂK_Ã5(ÂÂAxixiÂ<xià KþÿþÿþÿþÿþÿþÿþÿxiÂK`Â9+ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKaÃ+ÂÂUxixiÂ<xiÃ#/TþÿþÿþÿþÿþÿþÿþÿxiÂKbÃ]"ÂÁ"xixiÂ<xiÄ'IþÿþÿþÿþÿþÿþÿþÿxiÂKcÃNÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂKdÃ[ÂÂ)xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿ#THIS IS THE TANK INSTALLATION DATE.xiÂLÂMÂÂbxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂAÂÂxixiÂxiÃO þÿþÿþÿþÿþÿþÿþÿxiÂL CÂÂxixiÂxiÃ94cþÿþÿþÿþÿþÿþÿþÿxiÂLÃ"ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ0ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÃÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÃSÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÃPÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL Ã*ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL Ã"ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL Ã0ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL à !ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL ÃXSÂÂYxixiÂ<xià þÿþÿþÿþÿþÿþÿþÿxiÂLÃaRÂÂLxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ*"ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ*ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂdÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÃ6ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ*&ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÃ@ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂaPÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂaQÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ$4ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLà ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ#ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ0ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ`ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂT#ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ* ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLÂ_ ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL ÂÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL!ÃAÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL"Â*(ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL#Â_ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL$ÂÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL%Ã.ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL&à ÂÂbxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂL'Ã.ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL(Â_ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL)ÂcÂÂbxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂL*ÃYÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL+Â_ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL,ÂY[ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL-Â12ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL.Â]BÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL/ÂY_ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL0ÂQPÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL1Â]SÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL2ÂYHÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL3ÂYÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL4Â]NÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL5Â]^ÂÂ]xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂL6Â]^ÂÂ]xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂL7ÂY ÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL8ÂLÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL9Â1_ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL:Â]TÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL;Â]UÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL<Ã?'ÂÂxixiÂ(xh ÃVRþÿþÿþÿþÿþÿþÿþÿxh ÂL=Ã%7ÂÂ:xixiÂxi þÿþÿþÿþÿþÿþÿþÿDSENT CP LETTER ON 6/27/2005. BB PASSING CP RETEST ON 10/24/2005. BBxiÂL>ÃJÂÂAxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂL?Â^;ÂÂDxixiÂxiÃ:ULþÿþÿþÿþÿþÿþÿþÿxiÂL@Â^3ÂÂDxixiÂxiÃ4=þÿþÿþÿþÿþÿþÿþÿxiÂLAà 0ÂÂDxixiÂxi þÿþÿþÿþÿþÿþÿþÿ{OOS INSPECTION IN JUNE 2005 UPDATED IN DECEMBER WITH ADDITIONAL INFO. NOT INCLUDED IN OOS INSPECTION FOR RETURN TO SERVICE.xiÂLBÃPÂÂxixiÂþÿþÿþÿþÿþÿþÿþÿþÿ|SPOKE WITH JOHN HANSON ON 6/27/2005. HE IS AWARE OF THE PROBLEM AND IS WORKING WITH PRECISION TANKS TO COMPLETE REPAIRS. BBxiÂLCÂM ÂÂxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂLDÂM ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLEÂ&]ÂÁ xixiÂ(xk þÿþÿþÿþÿþÿþÿþÿe12/9/05 SPOKE WITH PAUL BOSSE, THEY WILL SLEEVE PIPING IN THE SPRING. 6/11/07 COPI - PIPING REPLACEDxiÂLFÃ]?ÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿOUT OF SERVICE TANK INSPECTIONxh ÂLGÃAÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿOUT OF SERVICE INSPECTIONxh ÂLHÃ9IÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿHOOS TANK INSPECTION TANK READING: CP READING PERFORMED BY KIRK ST. PETERxhÂLIÃCÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿ OOS TANK INSPxh ÂLJÃ`-ÂÂPxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLKÃ`)ÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂLLÃ`,ÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂLMÃKÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂLNÃÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂLOÃJÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂLPÃBÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂLQÃBÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿREPLACED FUSE ON OUTSIDE ALARMxhÂLRÃ];ÂÂPxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿþÿxhÂLSÃ]7ÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂLTÃ`0ÂÂPxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿCORRECT INSP DATE IS 5/17/05xiÂLUÃ]=ÂÂPxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ:FUEL PROBE INSTALLED IMPROPERLY- GIVES FALSE WATER READINGxhÂLVÃ`*ÂÂPxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂLWÃIÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂLXÃ'ÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂLYÃEÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂLZÃGÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂL[ÃHÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂL\Ã]>ÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂL]ÃFÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂL^Ã^5ÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂL_ÃDÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂL`Ã]<ÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂLaÃ]8ÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂLbÃ]9ÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂLcÃ`/ÂÂPxixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂLdÃ`.ÂÂPxixiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂMÃ2 ÂÂHxi xiÁ`xi þÿþÿþÿþÿþÿþÿþÿJ TANK READING: -.940, -.944 CP PIPING REPLACED WITH APT ON 11/25/2005. BBxi ÂMà ÂÂYxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÂ"PÂÂYxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÃ\)ÂÂYxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂMÃ]%ÂÂYxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂMÃ>4ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÂMÂÂHxixiÂxiÃ=þÿþÿþÿþÿþÿþÿþÿxiÂMÃ+ÂÂTxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM Ã<ÂÁ"xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM Ã+ÂÂ;xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM Ã!7ÂÂKxixiÂxiÂXUþÿþÿþÿþÿþÿþÿþÿxiÂM ÃBNÂÂxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ< TANK READING: -.901, -1.010 PRODUCT PIPE READING: FILL PIPExi ÂM Â39ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÁBÂÂ`xixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ„TERRY GODDARD @ PINE STATE CALLED 12/1/05 REGARDING SCHEDULING SPILL BUCKET REPAIRS FOR SPRING 2006. I APPROVED OF THIS PLAN. -ACFxiÂM BÂÂYxixiÁ`xjþÿþÿþÿþÿþÿþÿþÿPASSING PER IRA DODGE, CTI. xiÂMÂ'SÂÂYxixiÁ`xjþÿþÿþÿþÿþÿþÿþÿDSENT CP LETTER ON 9/22/2005. BB PER IRA DODGE, CTI, CP NOW PASSING.xiÂM ÂÂYxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ€SENT CP LETTER ON 9/23/2005 WITH REPAIR DEADLINE OF 11/01/2005. BB INSPECTION UPDATE DATED 11/30/2005 INDICATES A CP UPGRADE. BBxiÂMÃXÂÂ_xixiÂ(xiþÿþÿþÿþÿþÿþÿþÿ5NEED "CLEAN" COPY OF INSPECTION FROM TANKNOLOGY -ACFxiÂMà b xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÂYKÂÂ;xixiÂ<xiÃX þÿþÿþÿþÿþÿþÿþÿxiÂMÃd ÂÂ;xixiÂ<xiÃ\6þÿþÿþÿþÿþÿþÿþÿxiÂMÂY^ÂÂ;xixiÂ<xiÃERþÿþÿþÿþÿþÿþÿþÿxiÂMÃ-ÂÂ;xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÃ+ ÂÂ;xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÂ9ÂÂCxixiÂ<xiÃ*EþÿþÿþÿþÿþÿþÿþÿxiÂMÃ.ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÃÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÃa\ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÃa\ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÂLAÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMÂQÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM ÂQÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM!ÂÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM"ÂOÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM#Ã&\ÂÂYxixiÂ<xiÃ&þÿþÿþÿþÿþÿþÿþÿxiÂM$Â4ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM%Ã"ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM&ÂÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM' ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM( ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM)Â7$ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂM*Ã(ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM+ÂPNÂÂ`xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM,Ã_-ÂÂ`xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM-ÂFÂÂ2xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM.Ã^*ÂÂ`xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM/ÃT#ÂÂ`xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM0Â7$ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂM1à NÂÂxixiÂ<xiÄdþÿþÿþÿþÿþÿþÿþÿxiÂM2Â(ÂÂxixiÂ<xiÃ3þÿþÿþÿþÿþÿþÿþÿxiÂM3 ÂÂxixiÂ<xiÃQ<þÿþÿþÿþÿþÿþÿþÿxiÂM4ÂD5ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM5Ã&_ÂÂxixiÂ<xiÃ$þÿþÿþÿþÿþÿþÿ'FACILITY REMOVED FROM SHUTDOWN LIST. BBxiÂM6Â$ÂÁ"xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM7ÂOQÂÁ"xixiÂ<xiÄ`#þÿþÿþÿþÿþÿþÿþÿxiÂM8Â%ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM9Â-%ÂÂRxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM:ÂWÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM;Â-%ÂÂRxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM<Â2ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM=Ã7AÂÂ2xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM> ;ÂÁ"xixiÂ<xià 8cþÿþÿþÿþÿþÿþÿþÿxiÂM?Â1ÂÂxixiÂ<xiÃOþÿþÿþÿþÿþÿþÿþÿxiÂM@ÂXFÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMAÂ]FÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMBÂ]`ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMCÂ]CÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMDÂY%ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMEÂ2 ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMFÂ]IÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMGÂ]VÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMHÂYÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMIÃ&ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMJÂQ0ÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMKÂQ1ÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMLÂ]_ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMMÂ]MÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMNÂ]RÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMOÂ2ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMPÂVÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMQÂdÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMRÂCSÂÂHxixiÂ<xiÃb6þÿþÿþÿþÿþÿþÿþÿxiÂMSà ÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMTÂ.ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMUÂ28ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMVÃMÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMWÃ:ÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂMXÃ]TÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMYà ;ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMZà ÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂM[ÃÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂM\ÃcÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂM]à =ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM^à >ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM_à <ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂM`ÃaAÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMaÃ[ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMbÃCÂÂRxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMcÂ_ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂMdÃ+ÂÂLxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÂ2YÂÂHxixiÂ(xi Ã-3þÿþÿþÿþÿþÿþÿþÿxi ÂNà DÂÂ_xixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÂ3ÂÂbxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÃ#]ÂÂRxixiÂ(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂN )ÂÂXxixiÂ(xj þÿþÿþÿþÿþÿþÿþÿHI-LEVEL ALARM IS NOT INSPECTABLE. -ACF CHANGED OVERFILL PROTECTION FROM ELECTRONIC TO 61-SO DROP TUBE. PER TONY COUTURE, CTI. TIMOTHY RECTORxiÂNÂ[BÂÂxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿH7/15/05 CERT PROPER INSTALL, INTERSTITIAL SENSORS REPOSITIONED/REPLACED.xi ÂNÂ[9 xixiÂ(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂNÃ9 xixiÂxi à Vþÿþÿþÿþÿþÿþÿþÿxi ÂN ÂÂÂxixiÂxiÃ:þÿþÿþÿþÿþÿþÿþÿxiÂN ÃILÂÂxixiÂþÿþÿþÿþÿþÿþÿþÿþÿaSENT CP LETTER ON 7/22/2005. BB RECEIVED LETTER FROM BRYAN JANDREAU DATED JULY 29, 2005. TANK FAILED RETEST (-0.75 VOLTS). COUNTY WILL NOT HAVE FUNDS TO REPAIR SYSTEM UNTIL SPRING 2006. COUNTY WILL SUBMIT COPY OF CONTRACT WITH CTI. BB KIRK ST PETER TO DO CP UPGRADE MAY 2006. BB CERT OF PROPER INSTALL DATED 7/21/2006. WAITING ON CP TEST RESULTS. BBxi ÂN Ã1ÂÂxixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂN à ÂÂxixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂN ÃIMÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÂG[ÂÂ9xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÂ'ÂÂAxixiÂþÿÃ+þÿþÿþÿþÿþÿþÿœWATER IN INTERSTITIAL SPACE OF TANK #3. FACILITY IS USING DAILY INVENTORY AS LEAK DETECTION ON TANK #3 UNTIL REPLACEMENT OF ALL 3 CP TANKS IN SEPTEMBER. BBxiÂNÂ[= xixiÂ(xi þÿþÿþÿþÿþÿþÿþÿþÿxiÂNÃ-] xixiÂ(xiþÿþÿþÿþÿþÿþÿþÿINSTALLED BALL FLOAT IN TANK 6xiÂNÂ[5ÂÂxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÂ[8 xixiÂ(xiþÿþÿþÿþÿþÿþÿþÿ'REPLACED SPILL BUCKETS ON 2/21/2006. BBxi ÂNÂ[J xixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÂPÂÂFxixiÁ`xiÃþÿþÿþÿþÿþÿþÿþÿxiÂNÂ[KÂÂxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÂ[MÂÂxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿfREPLACED LIDS ON SUMPS, TOO. T1 SUMP AND ENCLOSURE MAY NEED TOTAL REPLACEMENT IN THE NEAR FUTURE. -ACFxiÂNÃ.IÂÂ'xixiÂ(xjÃFcIþÿþÿþÿþÿþÿþÿ&UNCLEAR IF CP TESTED AT 3 POINTS (NOT ENTERED THAT WAY). 8/2/05 PCA REPORT: RETESTED AND ADDED ANODES. PT 2/16/06 IN PREPARATION FOR RETURN TO SERVICE -ACF INSPECTION UPDATE BY SCOTT CYR DATED 8/26/2005. CP UPGRADE. INSPECTION UPDATE DID NOT ADDRESS PREVIOUSLY FAILING DAILY INVENTORY. BBxiÂNÂ_ÂÂbxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÃ!*ÂÂxixiÂxiÃA þÿþÿþÿþÿþÿþÿICP READINGS ON VENT PIPING ARE TOO HIGH. MIGHT NOT BE VALID READINGS. BBxiÂNÂ4ÂÂbxixiÂxiÃþÿþÿþÿþÿþÿþÿCTI DAVID HOWE TESTED CP. BBxiÂNÂ^ ÂÂAxixiÂxiÃ6*IþÿþÿþÿþÿþÿþÿþÿxiÂNÂ9ÂÂHxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNÃ-+ÂÂ'xixiÂxi Ä0A þÿþÿþÿþÿþÿþÿþÿxi ÂNÃTÂÂ'xixiÂxi Ã3:þÿþÿþÿþÿþÿþÿþÿxi Â< ÂÂOxh xh Â6xiþÿþÿþÿþÿþÿþÿþÿùFACILITY UPGRADE FORM SUBMITTED- BALL FLOATS REPLACED. DAILY INVENTORY REVIEWED; IDENTIFIED LEAK TREND. DOA WEIGTHS AND MEASURES ASKED PER DEP TO PERFORM METER CALIBRATION- METERS ACTUALLY GIVING AWAY GAS. METERS RECALIBRATED BY ADAMS AND FOGG ON FEBRUARY 1. SUSBEQUENT D.I. REVIEW FOUND LEAK TREND NO LONGER PRESENT. 9/15/05: CERT OF PROPER INSTALL: ATGS INSTALLED ON ALL TANKS 9/25/06 CALL FROM CURRENT OWNER, THEY WILL GET INSPECTION DONE BY MID OCTOBER, THE INSPECTOR HASD A HUGE BACKLOG. TRxhÂN Â#YÂÂKxixiÂþÿþÿþÿþÿþÿþÿþÿþÿ›SENT CP LETTER ON 7/6/2005. BB OWNER SENT LETTER INDICATING PORTLAND PUMP WOULD BE REMOVING THE TANK THIS SEASON. BB SENT OWNER REMOVAL FORM 01/09/2006. BBxiÂN!Â(AÂÂ'xixiÂxi ÃXPþÿþÿþÿþÿþÿþÿþÿxi ÂN"Ã-'ÂÂ'xixiÂxiÃ9U þÿþÿþÿþÿþÿþÿþÿxiÂN#ÃD3ÂÂbxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ;PER CTI RICHARD HAZEL ALL REPAIRS NOW DONE AT THE FACILITY.xiÂN$Ã$^ÂÂ]xixiÂ(xiÂ3þÿþÿþÿþÿþÿþÿþÿxiÂN&Â?ÂÂUxixiÁ`xj þÿþÿþÿþÿþÿþÿþÿYSTEVE DONAVAN CALLED 12/06/2005. SIMARDS TO MAKE REPAIRS WITHIN NEXT COUPLE OF WEEKS. BBxiÂN'Â?ÂÂUxixiÁ`xiÃD`_þÿþÿþÿþÿþÿþÿ‚DROP TUBES ARE TOO SHORT, PASSING INSPECTION OVERALL, NO OTHER PROBLEMS. E-MAIL SENT TO DAVE SIMONSEN IN AIR BUREAU BANGOR OFFICE.xiÂN(ÃH'ÂÂxixiÂ6xiÃ%"Lþÿþÿþÿþÿþÿþÿ#3-15 GALLON SPILL BUCKETS INSTALLEDxiÂN)à ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂN*ÂUÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN+Â(ÂÂxixiÂ6xjþÿþÿþÿþÿþÿþÿþÿþÿxiÂN,ÃÂÁ$xixiÂ6xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂN-Â6\ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂN.Â[C xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN/Â18 xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN0ÂR[ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂN1Â[-ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN2Ã.M xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂN3Â[AÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN4Â[?ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN5Â[HÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂN6ÃLÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN7Â[6 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ0REPLACED SPILL BUCKET ON RNL TANK ON 02/10/2006.xiÂN8Â[; xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN9Â[: xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN:Â[> xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN;Â[E xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN<Â[7ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN=Â[. xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN>Â[L xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN?Â[@ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN@àxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNAÂ[3ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNBàxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNCÂ[< xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNDÃUÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNEÂ(?ÂÂ'xixiÂ<xi Ä@Gþÿþÿþÿþÿþÿþÿþÿxi ÂNFÂL'ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNGÃÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNHÃ/6ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNIÂL(ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNJÂ7)ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNKÂ-5ÂÂ'xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂNLÂ$IÂÂ9xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNMÃc4ÂÂ9xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNNÃa'ÂÂ9xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNOÃ`\ÂÂ9xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNPÃW1ÂÂ9xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂNQÃ]#ÂÂAxixiÂ<xià .1þÿþÿþÿþÿþÿþÿ>7/11/05: CERT OF PROPER INSTALL: REPLACED REGULAR SPILL BUCKETxiÂNRÂ-@ÂÂAxixiÂ<xiÃR+#þÿþÿþÿþÿþÿþÿþÿxiÂNSÃNQÂÂRxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNTÂ2 ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNUÂ2ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNVÂ2ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNWÂ]OÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNXÂ]GÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNYÂY#ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNZÂY ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN[Â]bÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN\ÂXcÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN]Â^ÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN^Â]dÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN_Â]cÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂN`Â]ZÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNaÂQ5ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNbÂ15ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNcÂQ6ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂNdÂYÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂYÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂQMÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO ÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÃ--ÂÂ'xixiÂ<xiÃZ#CþÿþÿþÿþÿþÿþÿþÿxiÂOÂYEÂÂ]xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂ]KÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂYÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂ5 ÂÁ$xixiÂ6xiÄD-þÿþÿþÿþÿþÿþÿþÿxiÂO ÂF1ÂÂxixiÂ6xiÃW7þÿþÿþÿþÿþÿþÿþÿxiÂO Â$&ÂÂxixiÂ6xiÃ?0þÿþÿþÿþÿþÿþÿþÿxiÂO ÂYÂÂZxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO Â]PÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO ÂXDÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂ<ÂÂTxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂOÃ[5ÂÂ"xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÃ\ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂ>ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂ3ÂÂbxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÃPÂÂ'xixiÂ<xi ÄSDþÿþÿþÿþÿþÿþÿþÿxi ÂOÃ-&ÂÂ'xixiÂ<xi Ä þÿþÿþÿþÿþÿþÿþÿxi ÂOÂ.  xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂOÂ$ÂÂxixiÂ6xiÃ2S þÿþÿþÿþÿþÿþÿþÿxi ÂXHÂ!ÂÁ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ¼PASSING INSPECTION VENT PIPE IS STRAIGHT OUT OF THE TANK AND DOESN'T CONTAIN PRODUCT, EVER PER CTI DAVID BEAUMONT. VENT PIPE READING: VENT IS STRAIGHT OUT OF TANK, DOES NOT CONTAIN PRODUCTxi ÂXIÃDÂÁ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXJà ] xi xi Á`xiþÿþÿþÿþÿþÿþÿþÿJLATE INSPECTION RECEIVED 10/31/05 REPLACED SPILL BUCKET ON 10/22/2005. BBxiÂXKÂ-XÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXLÃ`aÂÂbxi xi Á`xi ÃVaPþÿþÿþÿþÿþÿþÿþÿxi ÂXMÂ)ÂÂ_xixi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂXNÃ"7ÂÂDxi xi Á`þÿÃ=X:þÿþÿþÿþÿþÿþÿþÿxi ÂXOà ÂÂDxi xi Á`xi Ä'Kþÿþÿþÿþÿþÿþÿþÿxi ÂXPÃ#ÂÂDxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXQÃ"8ÂÂDxi xi Á`xi ÃH\þÿþÿþÿþÿþÿþÿJJ UPDATE 11/8/05xi ÂXRÃ3!ÂÁ2xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXSÃ3"ÂÁ2xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXTÃ3$ÂÁ2xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXUÃ3%ÂÁ2xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXVÃ3&ÂÁ2xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXWÃ3'ÂÁ2xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXXÃ3(ÂÁ2xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXYà ÂÁ2xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXZÂÂÂSxi xi Á`xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂX[Â$>ÂÂ:xi xi Á`xi Ã.@þÿþÿþÿþÿþÿþÿþÿxi ÂX\Ã9ÂÂ:xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX]ÂDÂÂSxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿTANK IS A 1997 INSTALL, SPACERS ARE REQUIRED, INSPECTOR INDICATED THERE WERE NONE. INSPECTOR IS ALSO THE INSTALLER OF RECORD.xi ÂX^Ã4ÂÂ\xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ3TANK IS A JULY 1988 INSTALL. SPACERS NOT REQUIRED. xi ÂX_Â0*ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿTANK INSTALLED IN AUGUST 1989. SPILL BUCKETS NOT REQUIRED. COPY OF MONITORING WELL LOG INCLUDED WITH INSPECTION. TANK READING: -.933,-.933 MIKE LEWIS 5/4/05xi ÂX`ÂQ\ÂÂXxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿÚTANK IS A JUNE 1986 INSTALL. SPACERS NOT REQUIRED ON PIPING, ALSO NO SPILL BUCKET IS REQUIRED. WHISTLE FOR OVERFILL, NO ACCESS SO UNABLE TO CHECK PROPER HEIGHT IN TANK. FAILED INSPECTION DUE TO UNABLE TO CHECK WHISTLE.xi ÂXaÂ0$ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ¿JULY 1986 INSTALL. NO SPILL BUCKET, NO OVERFILL NO SPACERS ON COPPER LINES. NONE OF THESE ITEMS ARE REQUIRED TO BE RETROFITTED. OIL AND SOLID FUEL BOARD REQUIRES WHISTLE. PASSING INSPECTIONxi ÂXbÃ;+ÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXcÃ@ÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXdÂ:AÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ"1991 INSTALL SPACERS NOT REQUIRED.xi ÂYÂ0)ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ 8/89 INSTALL xi ÂYÂ:FÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ1/1/81 INSTALL???xi ÂYÂ0'ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ6/1/86 INSTALLxi ÂYÂZ9ÂÂIxi xi Á`xi Ä/þÿþÿþÿþÿþÿþÿþÿxi ÂYÃ/ÂÂIxi xi Á`xi Äc?þÿþÿþÿþÿþÿþÿJJ FIXEDxi ÂYÂV(ÂÁ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.310, -1.360xi ÂYÂXÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ÷SENT CP LETTER ON 11/07/2005. BB CP RETESTED ON 11/02/2005. TANKS FAILED RETEST: TANK #5 -0.61 VOLTS. TANK #7 -0.59 VOLTS. CONTACTED JODY AT CN BROWN. JODY TO SEND LETTER REGARDING REPAIRS. BB INSPECTION UPDATE DATED 11/11/2005. CP PASSES. BBxi ÂYÂ2>ÂÂxixi Á`xiþÿþÿþÿþÿþÿþÿþÿDREPAIRS MADE TO FACILITY TO BRING INTO COMPLIANCE PER CTI ED GEORGE.xiÂY Â&ÂÁ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿf TANK READING: 2 21 LB MAG ANODES INSTALLED 2/26/08 CALLED SUPERINTENDENT - WILL GET AI SCHEDULED -MLxi ÂY Â@^ÂÂUxi xi Â(xiÃV8NþÿþÿþÿþÿþÿþÿþÿxiÂY Ã\-ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY Â+=ÂÂXxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿkFACILITY WAS INSTALLED IN 1997 BY LAVALLE. LIKELY TO BE HOOKED UP TO A GENERATOR THEREFORE MOTOR FUEL TANK.xi ÂY Â+3ÂÂXxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂYÂ+>ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYÂ.#ÂÂxi xi Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂYÃV xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿuSUMP ON 8 ALWAYS HAS WATER ISSUE BASED ON WATER LINE STAINING AND RUST STAINS INSPECTION UPDATE DATED 12/08/2005. BB xi ÂYÂ+?ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYÂ+0ÂÂXxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ 1997 INSTALL.xi ÂYÂ2>ÂÂxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂYÂ^ÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYÃ.ÂÂ)xi xi Â(xi þÿþÿþÿþÿþÿþÿþÿCERT. OF PROPER INSTALLATIONxi ÂYÂ&XÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYÃ?/ÂÂ)xi xi Á`xjþÿþÿþÿþÿþÿþÿþÿICTI BUBAR FAILED SPILL BUCKETS ON PAGE ONE SUMMARY AND ONLY INDICATED THAT THEY WERE PRESENT WITHIN THE BODY OF THE INSPECTION. FAILING INSPECTION BASED ON SUMMARY AND LACK OF ADDITIONAL INFORMATION. SPILL BUCKETS REPLACED 1/24/2006. CTI INDICATED ONLY 5-GALLON BUCKETS COULD BE INSTALLED DUE TO LOCATION OF OTHER MANHOLES. BBxi ÂYÂÂÂxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿŽ1/17/2008 SHARON NEWMAN CALLED REPRESENTING OUTWARD BOUND. OB SOLD PROPERTY THIS SUMMER. ASKING ABOUT OB RESPONSIBLITIES. TOLD THEM TO LET NEW OWNERS KNOW THAT THEY HAVE TO REG. WITH DEP WITHIN 10 DAYS OF DATE OF TRANSFER. -LW CONTACTED NEW OWNER. TOLD THEM ABOUT CHANGE OF OWNERSHIP REQUIREMENTS AND AI. BILL CARVER CONDUCTED AI, WILL SUBMIT. E-MAILED CHANGE OF OWNERHSHIP FORM WILL SUBMIT.xiÂYÂN*ÂÂ:xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYÂXIÂÂSxi xi Á`xi à þÿþÿþÿþÿþÿþÿþÿxi ÂYÃ%>ÂÂUxi xi Âxj Ã'3þÿþÿþÿþÿþÿþÿ"NOW PASSING PER JOSHUA BISKUPIAK, xi ÂY Â xi xi Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂYÂ%MÂÂ)xi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ/PIPING SUMP IS NOT ELECTRONICALLY MONITORED. BBxi ÂY 7ÂÂxi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ[SENT CP LETTER ON 11/17/2005. BB CP RETESTED BY CTI DON BUBAR AND PASSED ON 11/22/2005. BBxi ÂY ÃOÂÁ xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY!ÂPJÂÂ\xi xi Âxi þÿþÿþÿþÿþÿþÿþÿÖMIKE LEWIS TESTED CP ON 04/18/2005. BB TANK IS DOUBLE-WALLED WITH INTERSTITIAL MONITORING AND ONLY REQUIRES ONE PASSING CP READING. TANK PASSED TWO OUT OF THREE TEST LOCATIONS (-.748, -.896, AND -1.06 VOLTS). xi ÂY"Â"ÂÂHxi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿTANKS TO BE REMOVED ASAP. BBxi ÂY#Â;ÂÁ xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY$Ã5;ÂÂKxi xi Â(þÿà YSþÿþÿþÿþÿþÿþÿþÿxh ÂY%Ã5;ÂÂKxi xi Â(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂY&Â-XÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY'ÂÂÂxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY(Ã+ÂÂUxi xi Â<xi Ã1Lbþÿþÿþÿþÿþÿþÿþÿxi ÂY)ÂÂÂUxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY*Ã]ÂÂXxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY+Ã.NÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY,Â)ÂÂ\xi xi Â<xi Ã.þÿþÿþÿþÿþÿþÿþÿxi ÂY-Ã*PÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY.Â3EÂÂxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY/Â;RÂÂHxi xi Â(xiþÿþÿþÿþÿþÿþÿþÿ«OUT OF SERVICE; SCOTTIE DIDN'T ID WHAT TYPE OF LEAK DETECTION THERE MIGHT BE ONT HE #2 OIL TANK. JOSH B. CALLED AND COULDN'T FIND MONITORING WELLS. WILL INSTALL. -ACF xiÂY0à ÂÂxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY1ÃÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY2ÃT ÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY3ÃÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂY4Â$EÂÂIxi xi Â<xi ÃC'þÿþÿþÿþÿþÿþÿþÿxi ÂY5Ã_ÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY6 ÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY7Â2>ÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂY8ÂABÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂY9ÂB_ÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY:ÂQ#ÂÂIxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY;ÃOÂÂIxi xi Â(xi Ä/:þÿþÿþÿþÿþÿþÿþÿxi ÂY<ÃTHÂÂxi xi Âxi Ã+þÿþÿþÿþÿþÿþÿþÿxi ÂY=ÂM>ÂÂDxi xi ÂþÿÃTIþÿþÿþÿþÿþÿþÿþÿxi ÂY>Â)ÂÂ4xi xi ÂþÿÃ$Xþÿþÿþÿþÿþÿþÿ@PETROMETER LEAK DETECTION SYSTEM. NO ACCESS TO INTERSTITIAL. BBxi ÂY?Ã(FÂÂ4xi xi Âxi Ã2þÿþÿþÿþÿþÿþÿþÿxi ÂY@ÂCÂÂxi xi Âxi þÿþÿþÿþÿþÿþÿþÿDDREW LAWRENCE ADJUSTED RECTIFIER AND RETESTED CP (-1.02 VOLTS). BBxi ÂYAÃ!QÂÂ*xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYBÂTÂÂHxi xi Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂYCÂÂÂ)xi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYDÂDÂÂxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYEÂGBÂÂ)xi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYFÃ[ÂÂ)xi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYGÁ  xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ CP ON FLEX CONNECTORS PASSED. BBxi ÂYHÃ^ xi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ9NO SPACERS ON COPPER LINES. PIPING INSTALLED IN 1997. BBxi ÂYI ÂÂ)xi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYJà ÂÂUxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYKÃÂÂUxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYLÃaÂÂUxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYMÂ%HÂÂUxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYNÂ5bÂÂUxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYOÂ0ÂÂUxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYPÂIÂÂxi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿCP RETESTED ON 10/27/2005. BBxiÂYQÃH xi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿVCP ON TANK #6 RETESTED AND PASSED ON 11/02/2005. CN BROWN WILL STILL REMOVE TANKS. BBxi ÂYRÃCHÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ-INSTALLED 61-SO DROP TUBE. NOW IN COMPLIANCE.xi ÂYSÂ;ÂÁ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ"1988 INSTALL NO SPACERS REQUIRED.xi ÂYTÃbXÂÁ xi xi Á`xjþÿþÿþÿþÿþÿþÿþÿ"1997 INSTALL SPACERS ARE REQUIRED.xi ÂYUÂ- ÂÂxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ´THIS SHOULD HAVE BEEN ENTERED AS A 2005 INSPECTION. BB CTI WAYNE GIFFORD REPLACED THE COPPER LINES PREVIOUSLY INSTALLED BY BURNER TECH. WAITING ON CERT OF PROPER INSTALLATION. BBxiÂYVÃ.LÂÂXxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿnSCHOOL IS APPLYING TO DHHS-DWP GRANT PROGRAM FOR REPLACEMENT IN LATE SPRING 2006 (AFTER HEATING SEASON). -ACFxi ÂYWÃ4OÂÂ)xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ…FACILITY IS CORRECTLY OUT OF SERVICE. BUT STILL HAS 9 1/2 " OF PRODUCT IN DIESEL TANK. ALSO MANWAYS AND PIPING AND FILLS NOT SECURED.xi ÂYXÂZ)ÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ6REPAIRS MADE BY KENNETH LEGASSE. FACILITY NOW PASSES. xi ÂYY OÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ'FACILITY NOW PASSING PER CTI ED GEORGE.xi ÂYZÂ6ÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ§CHAMBER 7-1 IS CURRENTLY OUT OF SERVICE. THE DISPENSER REMAINS IN PLACE ON THE ISLAND BUT ALL VALVES AND POWER ARE SHUT OFF. CHAMBER WENT OUT OF SERVICE IN APRIL 2005.xi ÂY[Ã`bÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿNOW PASSING PER CTI DON BUBAR.xi ÂY\ ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY]Ã5IÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY^Ã3ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY_Ã;NÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂY`Â#JÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYaÃZXÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYbÂ,ÂÂ:xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿÚ******* NOTE ********** THIS IS A CHEMICAL TANK ONLY USED FOR PHOTO PROCESSING. IT DOES HAVE INTERSTITIAL MONITORING AND ALSO ELECTRONIC OVERFILL ALARM. IT CONTAINS MATERIALS FROM THE PHOTO PROCESSING SYSTEM, FIXER. xi ÂYcà ÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂYdÃMÂÁxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZÂZ  xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZÃVÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZÃ@ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZÃ:  xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZÂ1! xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿPASSING PER JON PAINE.xi ÂZÂ^ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ?TANK 10 IS PROPERLY OUT OF SERVICE AND IS GOING TO BE REMOVED. xi ÂZÃ/+ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿCP DONE BY CTI DON BUBARxi ÂZ àxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ Ã3ÂÂTxi xi Â(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ Â(/ÂÁ xi xi Â(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ Â+ÂÂ:xi xi Â(xiþÿþÿþÿþÿþÿþÿþÿ*NEW INTERSTITAL MONITORING SYSTEM PUT IN.xiÂZ ÃbTÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZÂ"9ÂÂxi xi Âxi Ã;þÿþÿþÿþÿþÿþÿþÿxi ÂZà -ÂÂxi xi Âxi þÿþÿþÿþÿþÿþÿþÿ*INSPECTION INDICATES RECENT CP UPGRADE. BBxi ÂZà DÂÂRxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ)INSPECTION SHOWS FAILED, TALKED WITH PAUL BOSSE ON 12/5/05. HE INDICATED TYPO. FRONT PAGE SHOWS FAILED, BODY OF INSPECTION SHOWS PASSED. OVERFILL IS ELECTRONIC, REPAIRS WERE MADE AND IT DOES PASS JUST DIDN'T CARRY INFORMATION ACROSS TO FRONT PAGE. CORRECTING AND ENTERING INSPECTION AS A PASS. TR xi ÂZÃbVÂÂ)xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂZÃ!T xh xi Â(xh þÿþÿþÿþÿþÿþÿþÿRE-INSTALLED, RE-CERTIFIEDxh ÂZÂ'ÂÂ)xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿž3.5 AND 4.5 INCHES OF PRODUCT IN THE TWO CHAMBERS. FILL NOT LOCKED, PRODUCT PIPING NOT CAPPED, DISPENSERS NOT SECURED. FACILTIY NOT PROPERLY OUT OF SERVICE. xi ÂZÂL$ÂÂUxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZÂEÂÂTxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZÂ.=ÂÂXxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVSÂÂÂxi xi Âxi þÿþÿþÿþÿþÿþÿþÿ¨513 GALLONS THRUPUT; OVER 19 GALLONS. VERY LOW THRUPUT, ACCEPTABLE MEASURIGN ERROR. CALLED RE: SIAS 12/6/05. SUBMITTED PASSING 2005 SIAS. UPDATED TO A "PASS". -ACFxi ÂZà  xi xi Âxjþÿþÿþÿþÿþÿþÿþÿ§SENT CP LETTER ON 12/15/2005. INSPECTION UPDATE ON ELECTRONIC MONITORING 12/12/2005. BB CP RETESTED TO PASS 6/22/06 DAN LANDRY HAVING ALDOGGETT DO AI ASAP -ML 8/31/07xi ÂZÂFVÂÂ)xi xi Âxjþÿþÿþÿþÿþÿþÿþÿþÿxi ÂZÃQÂÂxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ+CTI KEN LEGASSE TESTED CP ON 11/10/2005. BBxiÂZÂ@ÂÂ)xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂR%Â@PÂÂUxixiÂ6xjþÿþÿþÿþÿþÿþÿþÿ´STEVE DONAVAN CALLED 12/06/2005. SIMARDS TO MAKE REPAIRS WITHIN NEXT COUPLE OF WEEKS. BB REPAIRS MADE FACILITY PASSING AT THIS TIME PER CTI JOSHUA BISKUPIAK'S UPDATE 2/8/06. -ACFxiÂZÂB xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ*CP ON VENT PIPING FAILED (-.537 VOLTS). BBxi ÂZÂ?ÂÂxi xi Âxi þÿþÿþÿþÿþÿþÿþÿSTEVE DONOVAN FAXED INSPECTION ON 12/06/2005. SIMARDS ARE WORKING ON REPAIRS. BB ALL REPAIRED PER JOSHUA BISKUPIAK OF SIMARDS. xiÂZÃ5<ÂÂxi xi Á`xjÃ]Jþÿþÿþÿþÿþÿþÿ`NEED TO REPLACE SPILL BUCKET RIMS TO MAKE LIQUID TIGHT. SPILL BUCKETS REPLACED ON 8/23/2006. BBxi ÂZÂIKÂÂRxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿON APRIL 30, 2007, WAYNE HARLOW FROM PINE TREE ACADEMY CALLED. IN ORDER TO FIX THE FAILING COMPONANTS ON THE ANNUAL INSPECTION HE STATED IT WILL COST $18,000. HE IS CONSIDERING REMOVING THE UST AND INSTALLING AN AST. SENDING HIM INFORMATION REGARDING UST REMOVAL. -LWxi ÂZÃ.ÂÂ)xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ ÂDÂÂAxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ!ÃQPÂÂxi xi Â(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂZ"ÃQPÂÂxi xi Â(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ#ÂP@ÂÂSxi xi Âxi Ã#Sþÿþÿþÿþÿþÿþÿþÿxi ÂZ$Ã?ÂÁ xi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ@TANK OOS AND PLANNED FOR REMOVAL WHEN GROUND THAWS (3/16/07) -MLxi ÂZ%Ã>ÂÁ xi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿUSENT CP LETTER ON 12/19/2005. ALSO REFERENCED PROBLEM WITH COPPER LINE IN LETTER. BBxi ÂZ& ÂÁ xi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿDAN VIOLETTE AT GARAGE WORKING WITH PIM TO GET SIAS COMPLETED. NEEDS BETTER DAILY INVENTORY. 01/24/2007. ALSO LATE ON ANNUAL INSPECTION. BB xi ÂZ'à <ÂÂYxi xi Á`xi Ãþÿþÿþÿþÿþÿþÿþÿxi ÂZ(Â=BÂÂbxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ)ÃG"ÂÂLxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ* ÂÂUxi xi Â(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ+Â^  xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ'CP UPGRADE ON TANK #9 ON 12/06/2005. BBxi ÂZ,Â1ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ.Ãb xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ/ÂBÂÂxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ0ÃÂÂxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ1ÃGÂÂRxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ2Ã%ZÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ3à ]ÂÂRxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ4ÂO`ÂÂxi xi Â<xi Ã!@þÿþÿþÿþÿþÿþÿþÿxi ÂZ5Ã_ÂÂMxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ6ÃÂÂRxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ7ÃÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ8Ã/ÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ9Â&AÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ:ÂXEÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ;Â2EÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ< &ÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ=ÂD1ÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ>Â&OÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ?ÃÂÂRxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ@ÂVÂÂRxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZAÃa2ÂÂTxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZBà ÂÁ xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZCÃ<ÂÂYxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂARàxh xh Â6þÿÂþÿþÿþÿþÿþÿþÿECALL FROM PAUL BONEFANT 12/9/05. HE WILL ARRANGE FOR TED HASKELL TO COME AND DO A CURRENT INSPECTION AND ALSO WILL MAKE ARRANGEMENTS FOR ACCESS TO BE PROVIDED FOR THE INTERSTITIAL SPACE. SHOULD ALSO GET ACCESS TO THE OVERFILL DEVICE FOR THE OIL SIDE. MAY NEED ADDITIONAL UPGRADING. IT WILL BE DONE AS SOON AS PRACTICAL. TJRxh ÂZDÂ1ÂÁ xi xi Á_xjþÿþÿþÿþÿþÿþÿþÿINEED TO SUBIMIT WORK PLAN TO MAKE REPAIRS. TS TANK READING: -1.34, -1.21xi ÂZEÂT5ÂÂxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿ}FACILITY IS OUT OF SERVICE AND HAS BEEN FOR AT LEAST TWO YEARS. THE TANK WAS INSTALLED IN 1998 AND THE FACILITY IS FOR SALE. xiÂZFÃWOÂÂKxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZGÃPÂÁ xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZHÂGX xi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿHSENT CP LETTER ON 12/15/2005. BB CP RETESTED AND PASSED ON 8/23/2006. BBxi ÂZIÂ'\ÂÂ4xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZKÃJÂÂPxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZLÂGRÂÂxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ1986 TANK INSTALL. xi ÂZMÂ>ÂÂxi xi Á`xi à 3þÿþÿþÿþÿþÿþÿþÿxi ÂZNÂ:(ÂÁ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ@LEAKING GASKET ON MANWAY. REPAIRS MADE PER CTI DAVID BEAUMONT.xiÂZOÃcÂÁ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂQ0Â%4ÂÂ\xixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ¦ TANK READING: READING ON MIDDLE OF TANK; READINGS ON END PASSED TANK IS DOUBLE-WALLED AND HAD A ONE PASSING READING. BB CP UPGRADE BY CHRIS WILSON ON 11/28/2005. BBxi ÂZPÃ"ÂÂPxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ†THE 15 TANKS AT UNDER THIS REGISTRATION HAD VARIOUS INSPECTION DATES FROM JULY - NOVEMBER 2005. CTI KIRK ST PETER TESTED CP ONLY. BBxiÂZQÃ9IÂÂPxi xi Âxi þÿþÿþÿþÿþÿþÿþÿ"CP TESTED BY CTI KIRK ST PETER. BBxi ÂZRÃTÂÂxi xi ÂþÿÂþÿþÿþÿþÿþÿþÿþÿxi ÂZSÃ- xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZTà :ÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZUÃ@ÂÂPxi xi Á`xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂZVÂZ+ xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZWÂ+VÂÂBxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZXÃS6ÂÂBxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZYÃbÂÂ:xi xi Â<xi Ã<=þÿþÿþÿþÿþÿþÿþÿxi ÂZZÃ!ÂÂ:xi xi Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂZ[ÂJÂÁ xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ\Â%0ÂÁ xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ]ÂR@ÂÂXxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ^Ã]7ÂÂPxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZ_Ã]8ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZ`Ã]9ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZaÃ];ÂÂPxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂZbÃ]<ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZcÃ]=ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂZdÃ]>ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[Ã]?ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[Ã^5ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[Ã`)ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[Ã`*ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[Ã`,ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[Ã`-ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[Ã`.ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[Ã`/ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ Ã`0ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ Ã'ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ Ã@ÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ ÃAÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ ÃBÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ÃCÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ÃDÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ÃEÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ÃFÂÂPxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ[ÃGÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ÃHÂÂPxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ[ÃIÂÂPxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ÃKÂÂPxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ[ÃÂÂPxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ9Â>ÂÂxhxh Á`þÿþÿþÿþÿþÿþÿþÿþÿ~BOB CORMIER REPLACED ELECTRIONIC LEAK DETECTION SYSTEM AND OVERFILL ON 12/15/2005. COPPER LINES STILL DO NOT HAVE SPACERS. BBxhÂ>&ÂJ&ÂÂ)xh xh Âxi þÿþÿþÿþÿþÿþÿþÿOREPLACED SPILL BUCKET. PULLED BALLFLOATS & REPLACED WITH COAXIAL FLAPPERS. -ACFxh Â[ÂA;ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ÂVÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿgNOTE THERE IS A THIRD TANK #10, THAT WS INSTALLED IN 2005 AND IS NOT DUE FOR AN INSPECTION UNTIL 2006.xi Â[ÂÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[Ã'ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂSHÂ)ÂÂxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿ*TOOK CHAMBER 7-2 AND ASSOCIATED PIPING OOSxiÂ[ÃZ)ÂÂDxi xi Â(xi ÃLTþÿþÿþÿþÿþÿþÿþÿxi Â[ÃDÂÂ\xi xi Á`xi ÃN:þÿþÿþÿþÿþÿþÿþÿxi Â[Â5TÂÂTxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[ÃAÂÂ4xi xi Á`þÿÃK[Dþÿþÿþÿþÿþÿþÿþÿxi Â[Â[ ÂÂ4xi xi Á`xi Ã,"Xþÿþÿþÿþÿþÿþÿþÿxi Â[ ÂÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[!Ã`PÂÂ\xi xi Á`xj þÿþÿþÿþÿþÿþÿþÿFGROUND FROZEN AT TIME OF INSPECTION CTI, IRA DODGE NOTED ON THE INSPECTION THAT CP COULD NOT BE ACCURATELY CHECKED. FAILING INSPECTION AT THIS TIME FOR CP, ALL OTHER ITEMS PASS. ******NOTE ACTUAL INSPECTOR WAS IRA DODGE NOT AARON THORNDIKE.****** TR CONTACTED TOWN MANAGER ON 6/5/2006. GUERINS TO RETEST AND INSPECT. BBxi Â["ÃbSÂÂYxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[#ÃÂÁ$xi xi Âxi Ãþÿþÿþÿþÿþÿþÿ7JOHN MULLINS REPLACED 3 SPILL BUCKETS ON 04/27/2006. BBxi Â[$Â[ xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[%Â>ÂÂxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[&ÂEPÂÂ*xi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ˜CHAMBER 1 IS O-O-S. BB SPOKE TO BRUCE CHAMBERLAIN (ADELPHIA) ON 12/22/2005. BRUCE IS AWAITING APPROVAL TO REPAIR OR REMOVE. BRUCE WILL SEND LETTER. BBxi Â['ÂO(ÂÂ)xi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿÃINSPECTION UPDATE DATED 12/07/2005 PASSED MONITORING SYSTEM. COPPER PIPING STILL FAILING. BB MIKE GALLGER, SUPER CALLED. WORK WAS DONE BY GAFT JUST RECENTLY. PAPERWORK TO FOLLOW. 9/21/2006 TEDxi Â[(ÃÂÂTxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[)Â$,ÂÁ$xi xi Á`xi Ä H\þÿþÿþÿþÿþÿþÿBCTI JOHN MULLINS REPLACED SPILL BUCKET ON TANK #5 ON 2/23/2006. BBxi Â[* +ÂÁ$xi xi Á`xi à d9þÿþÿþÿþÿþÿþÿþÿxi Â[+ÂcXÂÁ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂKIÂ=/ÂÂxixiÂ6xiÄVRbþÿþÿþÿþÿþÿþÿ*PER CTI ROBERT CORMIER, FACILITY PASSING.xi Â[,ÃZ"ÂÁ$xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi Â[-Ã(ÂÂTxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[.ÂEÂÂTxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[/ÃIJÂÂLxi xi Á_þÿþÿþÿþÿþÿþÿþÿþÿmOWNER SENT LETTER SAYING THEY INTEND TO REMOVE TANK SPRING 2006 UNABLE TO GET SOMEONE TO DO INSPECITON. TSxi Â[0Á>ÂÂKxi xi Â7xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[1ÃTXÂÂUxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ*INSPECTION IS MARKED AS A PASS, DEP FAILED DUE TO NO MONITORING ON THE PIPING, TANK IS A 1992 INSTALL. ALSO NOTE THERE IS A CHANGE OF OWNERS ADDRESS, ALSO UPDATE TO FACILITY ADDRESS, NOT 1 KNOTTINGHAM, BUT SHOULD BE 10 KNOTTINGHAM. OWNER/OPERATOR IS JOHN BENNEETT. PROPERTY IS FOR SALE CURRENTLY. xiÂ[2Â.ÂÂ4xi xi Á`xi Ä7þÿþÿþÿþÿþÿþÿþÿxi Â[3Ãc(ÂÂ4xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[4Â%-ÂÂ4xi xi Á`xi Ãaþÿþÿþÿþÿþÿþÿ»INSPECTION ALSO SIGNED AND DATED IN BLACK INK BY ERIC T. ELLIOTT DATED BY ELLIOTT IS 12/27/05, I BELIEVE IT WAS ACTUALLY 12/26/05 AS IT WAS RECEIVED IN DEP ON 12/27/05. INSPECTION PASSES.xi Â[5Â5-ÂÂ\xi xi Á`þÿÃ$@þÿþÿþÿþÿþÿþÿþÿxi Â[6ÂEÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿhMIKE LEWIS CHECKED CP ON 12/12/05, FACILITY WAS PASSING. TANK READING: -.917, -1.19 PER MIKE LEWIS, CTIxi Â[7Â.ÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[8ÂR_ÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[9Ã8ÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿNO OVERFILL PROTECTION ON 1989 INSTALL EXCEPT SPILL BUCKET. OIL SOLID FUEL BOARD DOES REQUIRE VENT WHISTLE. INSPECTION PASSES PER DEP RULES. xi Â[:Â.ÂÂ\xi xi Á`xj þÿþÿþÿþÿþÿþÿþÿ…FACILITY FAILS CP TEST PER MIKE LEWIS, CTI. RETESTING IN SPRING SENT CP LETTER ON 01/04/2005. BB CP RETEST ON 04/12/2006. PASSED BBxi Â[;ÂRKÂÂRxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ[<ÃÂÂRxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ[=Ã6*ÂÁ xi xi Á`xiþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.01, -1.05xiÂ[>Ã!ÂÂRxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ[?ÂC.ÂÂ4xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[@Ã!ÂÂKxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[AÂB4ÂÁ"xi xi Á`xiÄD:þÿþÿþÿþÿþÿþÿPASSING PER CTI CROSS.xi Â[BÃ_ÂÂ`xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[CÃ?ÂÂYxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂPbÃ!ÂÂxixiÂ(xi Â3þÿþÿþÿþÿþÿþÿ¤FAILED FOR THRUPUT. VISITIED SITE 7/14/05 AND FOUND THEY WERE STARTING EACH MONTH WITH A BOOK (NOT STICK) READING, THUS CARRYING THE PREVIOUS MONTH'S ERROR. -ACFxi ÂPcÃ#ÂÂDxixiÂ(xiÃ\@þÿþÿþÿþÿþÿþÿxINSPECTOR FAILED FOR INVENTORY. OWNER REPORTED MINOR INVENTORY DISCREPANCIES THROUGHOUT 2004-2005 ON LOW THRU-PUT. -ACFxiÂQÂ_@ÂÂDxixiÂ(xiÃU[þÿþÿþÿþÿþÿþÿþÿxiÂQÂÂÂxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂ3<ÂÂTxi xiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂ?"ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂ?ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÃdÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂ?%ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂ>9ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ Â@`ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ Ãa( xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ ÂUE xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ Â% xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ ÂPY xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÃ;ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿCALL FROM OWNER INSPECTION WAS DONE THIS WEEK. LATE FAILED FOR DROPTUBES DUE TO TOO SHORT. WILL GET FIXED AND INSPECTION IN SOON. 9/26/2006 TEDxiÂQÃ1ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂB\ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÃ9 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÃ^) xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂG@ÂÂ)xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÃ!ÂÂTxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂbÂÂxixiÂ<xi Ã%4`þÿþÿþÿþÿþÿþÿ/9/7/05: 15 GAL SPILL BUCKET INSTALLED ON DIESELxi ÂQÂ$=ÂÂKxixiÂ<xiÃ2WbþÿþÿþÿþÿþÿþÿþÿxiÂQÃ!VÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÁ]ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂN0ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÃ+ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÃ,ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÂ,)ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÃR\ÂÂLxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQÃ` ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ à ÂÂLxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ!ÂX)ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂQ"ÂHÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂQ#ÃQÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿmDATE OF 7/2005 ANNUAL INSPECTION IS 7/8, NOT 7/18. INSPECTOR WAS JOSHUA BISKUPIAK, NOT MICHAEL SIMARD. DMCLxiÂQ$Ã.XÂÂUxixiÂ<xiÃ6:þÿþÿþÿþÿþÿþÿþÿxiÂQ%Ã,#ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ&Â(ÂÂOxi xiÂ6xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂQ'Ã(ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿEAST, INSPECTION IS FOR BELOW GROUND INTERSTITIAL MONITORING ON PIPINGxiÂQ(ÂB[ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ)Ã$ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿGAST; INSPECTION IS FOR INTERSTITIAL MONITORING OF BELOW GROUND PIPING. xiÂQ*à @ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ+ ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ,ÃaÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿDAST; INSPECTION IS FOR INTERSTITIAL MONITORING ON UNDERGROUND PIPINGxiÂQ-ÃJÂÂHxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ/ _ÂÂ\xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ1à /ÂÂLxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ92006 INSPECTION HAS BEEN DONE; IN THE MAIL 9/15/06 -ACFxiÂQ3ÃÂÂxixiÂ<xiÃMþÿþÿþÿþÿþÿþÿþÿxiÂQ4 ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ5Â#ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂQ7ÂÃaÂÂSxixiÂ<xiÃR þÿþÿþÿþÿþÿþÿþÿxiÂQ?ÃÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ@ÂBÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQA ÂÂSxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂQBÃ3PÂÂSxixiÂ<xi ÃB#þÿþÿþÿþÿþÿþÿ_TANK 1 -.97, -.93, -.93 TANK 2 -.93, -.91, -.89 K. ST. PETER 6/13/05xi ÂQCÂ3ÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ&-1.25 TANK 6/28/05 K. ST. PETERxiÂQD ÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ-.89 TANK 7/6/05 K. ST. PETERxiÂQE ÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ$-.96 TANK 7/7/05 K. ST. PETERxiÂQF ÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ-.99 TANK 7/7/05 K. ST. PETERxiÂQG ÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ-1.10 K. ST. PETER 7/6/05xiÂQH ÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ-1.02 K ST. PETER 7/7/05xiÂQIÂGÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQJÃGÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ--.958, -.851, -.909 TANK M. LEWIS 6/30/05xiÂQKÂ<8ÂÂHxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ--.998, -.889, -.901 TANK M. LEWIS 6/27/05xiÂQLÃ+IÂÂ\xixiÂ<xià =þÿþÿþÿþÿþÿþÿþÿxiÂQM `ÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQN bÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQO aÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQPÂ%+ÂÂ\xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂQQÂ%1ÂÂ\xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿE-1.06, -1.01, -1.14 TANK -.877 VENT 4/18/05 M. LEWISxi ÂQRÂ%,ÂÂ\xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿ+-1.01, -1.07, -1.08 4/18/05, M. LEWISxi ÂQSÂ%ÂÂ\xixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂQTÃBÂÂHxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿ515-GAL SPILL BUCKET INSTALLED BY CHRIS WILSON 7/12/05xi ÂQUÂ0ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQVÃ*EÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQWÃ!WÂÂYxixiÂxi þÿþÿþÿþÿþÿþÿþÿRSENT CP LETTER ON 7/22/2005. BB CP UPGRADE AND INSPECTION UPDATE ON 09/08/2005. BBxiÂQXÃÂÂLxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQYÃ.JÂÂLxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQZÃ>ÂÂLxixiÂxiþÿþÿþÿþÿþÿþÿþÿTANK IS IN CONCRETE VAULT. BBxiÂQ[Ã>ÂÂ)xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ\Â1H xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ]à 9ÂÂ)xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ^ÃHÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ_ÃÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ`Ã'ÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQaÃ*`ÂÂxixiÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂQbÃ=ÂÂBxixiÂxiþÿþÿþÿþÿþÿþÿþÿYCTI LISTED TANK AS 10,000 GALLONS. CERT OF PROPER INSTALLATION LISTED 20,000 GALLONS. BBxiÂQcÂQ.ÂÂ]xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQdÂMÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿ|CTI LISTED TANK AS 1,000 GALLONS. CERT OF PROPER INSTALLATION AND PREVIOUS INSPECTION INDICATE TANK TO BE 2,500 GALLONS. BBxiÂRÂ3;ÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRÃ!GÂÁxixiÂxiþÿþÿþÿþÿþÿþÿþÿ(JIM THOPMPSON OWNS THE FACILITY AND INSPECTS THE FACILITY. IN-SITU MONITORING SYSTEM FAILED AND COULD NOT BE REPAIRED. MR. THOMPSON ASSUMED HE COULD GO BACK TO DAILY INVENTORY AND NOT REPLACE THE ELECTRONICS. I INFORMED HIM HE COULD NOT. BB INSPECTION UPDATE ON 8/23/2005, INSTALLED OMNTEC. BBxi ÂRÃ.ÂÂYxixiÂxiþÿþÿþÿþÿþÿþÿþÿ5INSPECTION SHOULD BE A 2005 INSPECTION NOT A 2006. BBxiÂRÃ$ÂÁ"xixiÂxi à þÿþÿþÿþÿþÿþÿþÿxi ÂRà JÂÂXxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿ)THIS IS THE INSTALLATION DATE OF THE TANKxiÂRÂ-ÂÂ`xixiÂxi Ã(N4þÿþÿþÿþÿþÿþÿ$REPAIRS MADE PER CTI WAYNE GIFFORD. xiÂRÃG#ÂÂ`xixiÂxiÃ;þÿþÿþÿþÿþÿþÿ[10/6/07 COPI - CTI PAUL BOSSE INSTALLED DISPENSER SUMPS W/PROBES. COPI RECEIVED 9/17/07. xiÂRÃÂÂMxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR ÃbWÂÂMxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR  UÂÁ"xixiÂxiÃ@-þÿþÿþÿþÿþÿþÿþÿxiÂR ÂD,ÂÂYxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂR Ã<ÂÂYxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂRÂ.ÂÂbxixiÂxi ÃM1Bþÿþÿþÿþÿþÿþÿ,CP TESTED BY CTI DAVID HOWE ON 7/20/2005. BBxi ÂRÂKÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRÂB^ÂÂbxixiÂþÿÃ' þÿþÿþÿþÿþÿþÿJERIC ELLIOT NOT CERTIFIED AS A CP TESTER. CTI DAVID HOWE TO RETEST CP. BBxiÂRÃ%ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂRÂIWÂÂ)xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿ¯CERT OF PROPER INSTALLATION DATED 4/25/2006 FOR NEW PIPING SUMPS. SENSORS NOT INCLUDED IN CERT OF PROPER INSTALLATION. WAITING FOR ANNUAL INSPECTION OR INSPECTION UPDATE. BBxiÂRÃYÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRÂ_ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR ÂÂxixiÂxi Ã@3þÿþÿþÿþÿþÿþÿþÿxi ÂRÂ+ÂÂ_xixiÂ6xiÃ18þÿþÿþÿþÿþÿþÿ*INSPECTION UPDATE SUBMITTED BY KEN LEGASSExiÂRÂ^BÂÂ_xixiÂ6xiÃE>þÿþÿþÿþÿþÿþÿþÿxiÂRÂ)ÂÂ_xixiÂ6xiÄ+U`þÿþÿþÿþÿþÿþÿ,INSPECTION RE-ENTERED AS 2006 INSPECTION. BBxiÂRÂ,ÂÂ_xixiÂ6xi ÃE@ þÿþÿþÿþÿþÿþÿþÿxiÂRÂSVÂÂ`xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂRÂN.ÂÂYxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ(PER CTI IRA DODGE, FACILITY PASSES NOW. xiÂRÂ68ÂÂYxixiÂ6xjþÿþÿþÿþÿþÿþÿþÿPASSING PER IRA DODGE CTI.xiÂRÃR0ÂÂYxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRÃW_ÂÂYxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRÃ/SÂÂYxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR"ÃQÂÂBxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂR$Â?ÂÂUxixiÂ6xiÃV^þÿþÿþÿþÿþÿþÿþÿxiÂR&à (ÂÂ'xixiÂ6xi ÄdNOþÿþÿþÿþÿþÿþÿþÿxi ÂR(ÂYMÂÂ;xixiÂ6xiÃXb5þÿþÿþÿþÿþÿþÿþÿxiÂR)Ã] ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂR*ÂQOÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR,Ã5'ÂÂxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿEUPDATED TO PASS IN ERROR!!!! OWNER PLANS A SPRING 2006 REMOVAL. -ACFxiÂ7Â$*ÂÂxhxhÁcxhÃ=NOþÿþÿþÿþÿþÿþÿE7/20/05: CERT OF PROPER INSTALL, 15 GAL SPILL BUCKET ON REGULAR TANK.xhÂR-ÃSÂÂxixiÂ<xiÃQþÿþÿþÿþÿþÿþÿþÿxiÂR.à dÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR/Ã+HÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR0Â(ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ"-.87 TANK 6/3/05 L. SAVAGExiÂR1ÂH:ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ-.91 TANK 6/3/05 L. SAVAGExiÂR2Ã#1ÂÂxixiÂ<xiÃþÿþÿþÿþÿþÿþÿþÿxiÂR3Ã] ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR4 OÂÂYxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿ/-.89, -.87, -.88 TANK 7/12/05 IRA DODGExi ÂR5ÃWEÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR6Ãa ÂÂUxixiÂ<xiÃ9þÿþÿþÿþÿþÿþÿþÿxiÂR7Â9!ÂÂUxixiÂ<xi Ä7'þÿþÿþÿþÿþÿþÿþÿxi ÂR8Ã5/ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR9ÃD"ÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR:Â*ÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR;ÂLÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ!-.88 TANK 7/18/05 L. SAVAGExiÂR<Â2FÂÂUxixiÂ<xi Ã'J%þÿþÿþÿþÿþÿþÿþÿxi ÂR= ÂÂxixiÂ<xiÃ3þÿþÿþÿþÿþÿþÿþÿxiÂR>ÂÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿTANK 1 -.853, -.862, -.858 TANK 2 -.872, -.869, -.888 TANK 3 -.893, -.890, -.903 TANK 4 -.917, -.880, -.875 ED GEORGE 7/5/05xiÂR?ÂÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿzTANK 8-1 -1.069, -.962, -.907 TANK 9-1 -.856, -.870, -.885 TANK 9-2 -.856, -.870, -.885 ED GEORGE 7/1/05xiÂR@ÂX xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRAÂ# xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRBÂ^  xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿZTANK 5 -.975, TANK 6-1 -1.016, TANK 6-2 -1.016, K. LEGASSE 7/8/05xiÂRCÂ^  xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿRTANK 6 -1.123, TANK 7 -.887, TANK 8 -1.066 K. LEGASSE 7/6/05xiÂRDÂIÂÂKxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂREÃ]-ÂÂKxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂRFÃbZÂÂUxixiÂxiÃþÿþÿþÿþÿþÿþÿþÿxiÂRGÃVOÂÂUxixiÂxiÃ1þÿþÿþÿþÿþÿþÿþÿxiÂRHÃ>CÂÂxixiÂxiÃ[þÿþÿþÿþÿþÿþÿþÿxiÂRIÂ?QÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRJÂ^ÂÂUxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂRKÃÂÂxixiÂ6xiÃþÿþÿþÿþÿþÿþÿnNEW OWNER: TRACEY BENNETT. OWNERSHIP CHANGE LETTER AND FORM SENT 7/27/05; INFO RETURNED & PROPERLY UPDATED. RRxiÂRLÂÂÂxixiÂ6xi ÄYWþÿþÿþÿþÿþÿþÿ×SENT CP LETTER ON 8/2/2005. BB RECEIVED CERT OF PROPER INSTALLATION AND INSPECTION UPDATE DATED 10/15/2005. CTI INSTALLED 5 GALLON SPILL BUCKET ON TANK #5-2. CONTACTED CTI, AND HE WILL SUBMIT JUSTIFICATATION. BBxiÂRMÂGÂÂxixiÂ6xiÃQþÿþÿþÿþÿþÿþÿþÿxiÂRNÂ0ÂÂYxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿeSENT CP LETTER ON 8/2/2005. BB CP RETEST ON 8/31/2005. TANK #3 -.85 VOLTS AND TANK #4 -.85 VOLTS. BBxiÂROÂD xixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿGNOV REMOVAL DATED 6/1/2007; SEE REG. FILE - LW OOS FACILITY INSPECTIONxiÂRPÂM'ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿINSPECTION UPDATE SUBMITTEDxiÂRQÃCYÂÂYxixiÂ<xiÃ%þÿþÿþÿþÿþÿþÿ-TANK -1.05, -.97, -.95 IRA DODGE 7/19/05xiÂRR 2ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRSÃK ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRTÃ&\ÂÂYxixiÂ<xiÃ&þÿþÿþÿþÿþÿþÿþÿxiÂRUÂ4ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRVÂPÂÂLxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ`TANK 5 -1.119, -1.119, -1.119, TANK 6 -.937, -.968, -.979 L. WINCHESTER 6/17/05xiÂRWÃ4ÂÂLxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRXÃÂÂMxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRYÃ//ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ-.892 TANK 7/21/05 M. WILSONxiÂRZÃ/3ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ$TANK -1.012 M. WINSLOW 7/21/05xiÂR[Ã/1ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ"-1.02 TANK 7/21/05 M. WINSLOWxiÂR\Ã/7ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ!TANK -1.01 M. WINSLOW 7/21/05xiÂR]Ã/-ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR^Â6ÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR_Â6$ÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂR`ÃS-ÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRaÃcÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂRbÃ@ÂÂ\xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ.-1.10, -1.00, -1.12 TANK 4/26/05 M. LEWISxiÂRcÃ"ÂÂPxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿªTHIS REGISTRATION HAS MULTIPLE 2005 ANNUAL INSPECTION DATES. TANKS 412, 413, 414, 409, 401 OOS FACILITY INSPECTION. KIK ST PETER TESTED CP ON 6/27/2005 (ALL PASSED). BBxiÂRd /ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSÃ$$ÂÁ$xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿ-REMOVED WATER FROM SUMP, REPLACED SUMP COVER xiÂSÃ2/ÂÁ$xixiÂ6xiÃ'þÿþÿþÿþÿþÿþÿ°REPROGRAMMED VEEDER ROOT AS WAS NOT PROGRAMMED FOR OUTSIDE ALARM UPON ARRIVAL. REPLACED BULBS ON VEEDER ROOT. CLEANED SPILL BUCKETS. REPLACED SPILL BUCKET LID ON PREMIUM TANK. xiÂSÃPCÂÁ$xixiÂ6xiÄ 0þÿþÿþÿþÿþÿþÿþÿxiÂSÂ<ÂÁ$xixiÂ6xiÃþÿþÿþÿþÿþÿþÿmGILBARCO NOT WORKING PROPERLY UPON ARRIVAL. NEW WIRES, BULBS, RETESTED OK. CORRECTED HEIGHT ON CRASH VALVESxiÂSÃ%<ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿ°NOTE THIS FACILITY IS ATTACHED TO A GENERATOR AND IS THEREFORE A MOTOR FUEL TANK AND MUST MEET MOTOR FUEL STANDARDS. NO SPILL BUCKET, OVERFILL, LEAK DETECTION- NEEDS UPGRADING.xiÂSÂÂÂxixiÂ6xiÄ0aþÿþÿþÿþÿþÿþÿþÿxiÂSÂ#[ÂÂxixiÂ6þÿÄ)]þÿþÿþÿþÿþÿþÿoTANK 13 SLATED FOR REMOVAL TANK 16 LISTED AS OOS, BUT NOT REGISTERED ACCORDINGLY. SENT OOS LETTER ON 7/28/05. xiÂSÂ$*ÂÁ$xixiÂ6þÿÃ=!_þÿþÿþÿþÿþÿþÿþÿxiÂS ÂGÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS ÂKÂÂTxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿOOS FACILITY INSPECTIONxiÂS Ã,ÂÂHxixiÂxi þÿþÿþÿþÿþÿþÿþÿ3CP PIPING FOR TANK #6 PASSED WITH A -0.95 VOLTS. BBxi ÂBÃ-NÂÂHxh xh ÂþÿÃþÿþÿþÿþÿþÿþÿîSPOKE TO JOE SOLARI AT FACILITY. HE HAS BEEN IN CONTACT WITH SIMARD & SONS REGARDING RETEST OR REPAIR. SENT CP LETTER 12/22/2004. BB FAILED CP RETEST ON 6/20/2005. SENT CP LETTER ON 8/1/2005 WITH DEADLINE FOR REPAIR BY 9/30/2005. BBxh ÂS Â;dÂÁ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS à ÂÁ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ*FACILITY HAS BEEN BROUGHT INTO COMPLIANCE.xiÂSÂSÂÁ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSÂ3/ÂÁ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ9FACILITIES MAINT SCOTT ATHENS WILL FAX 2007 AI 9/5/07 -MLxiÂS 'ÂÁ xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSàxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSÃU) xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ–******NOTE: INSPECTION IS ACTUALLY A 2005 INSPECTION NOT A 2006 INSPECTION. ERROR DOING DATA ENTRY BECAUSE INSPECTION CAME IN LATE. T.J.RECTORxiÂ;ZÂA` xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿ(7/8/05 CERT OF PROPER INSTALL VR TLS 350xh ÂSÃWÂÂYxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ TANK READING: .99, 1.02xiÂSÃT$ÂÂUxixiÁ`xiÃ:-þÿþÿþÿþÿþÿþÿ0FLAPPER INSTALLED ON TWO TANKS BALL FLOAT ON ONExiÂS ÂÂAxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS ÂÂLxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿcLARRY CALLED 8/24/06, 2006 INSPECTION COMPLETED & PASSED BUT OMMITTED SENDING. WILL SEND ASAP -ACFxi ÂSÂRÂÂLxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿ&NOW PASSING PER CTI LARRY WINCHESTER. xiÂSÂWÂÂLxixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂSÂAÂÂUxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSÂGKÂÂUxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSÂGDÂÂUxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSÂGLÂÂUxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSÂGHÂÂUxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSÃ-aÂÂUxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSÃÂÂUxixiÂ(xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS Â7ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS!ÂW<ÂÂ>xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS"ÂW;ÂÂ>xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS#ÂW:ÂÂ>xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS$ÂW?ÂÂ>xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS%ÂW>ÂÂ>xixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ6Â&ÂÂSxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿ0-1.01 TANK 6/30/05 K. ST. PETERxiÂQ2Â$OÂÂxixiÂ<xiÃ^9þÿþÿþÿþÿþÿþÿ)-1.053 TANK 6/1/05 B. CARVERxiÂS&Â* xixi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂS' xixi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂS(Ã4X xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS)Â5 xixi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂS* xixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS+à GÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS,Â1'ÂÂxixi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS- ÂÂSxi xi Âxià *þÿþÿþÿþÿþÿþÿAKIRK ST PETER COMPLETED CP UPGRADE PRIOR TO ANNUAL INSPECTION. BBxiÂS.Á:ÂÂSxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS/à ÂÂSxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS0ÂÃSÂÂxi xi Âxià Q0þÿþÿþÿþÿþÿþÿþÿxiÂS?Ã9IÂÂSxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿTANK IS O-O-S.xiÂS@ÂABÂÂxixi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSAÂ#bÂÂxixi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSBÁNÂÁ2xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSCà *ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂSDà ÂÂSxi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ6SENT JASON GATCHELL GW MONITORING LOG ON 8/23/2005. BBxiÂSEÃXÂÂSxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ@SENT JASON GATCHELL INTERSTITIAL MONITORING LOG ON 8/23/2005. BBxiÂSFÃÂÂLxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSGÂ^2ÂÁ2xi xi ÂxiÃþÿþÿþÿþÿþÿþÿþÿxiÂSIÂÂÂUxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂSJÂ)ÂÂxi xi Â(xjþÿþÿþÿþÿþÿþÿþÿzCORRECTED FOR CP, SUPERCEDES OTHER INSPECTION DATED 6/17/05. BALL FLOATS WERE TOO SHORT AND WERE REPLACED WITH FLAPPERS.xiÂSKà  xi xi Â6xi þÿþÿþÿþÿþÿþÿþÿsNOV DATED JULY 28, 2008 TO REMOVED TANKS BY SEPT. 30, 2008. IMPROPERLY OOS; DEP NOT NOTIFIED, NO ANNUAL INSPECTIONxi ÂSLÂNÂÂ\xi xi Â6þÿÃ:þÿþÿþÿþÿþÿþÿSENT CP LETTER 9/22/2005. BB xiÂSMÃ#@ÂÂ\xi xi Â6xi Ã3AþÿþÿþÿþÿþÿþÿuRECEIVED CERT. OF PROPER INSTALLATION DATED 10/14/2005. CTI CHRIS WILSON REPLACED PIPING SUMPS AND SPILL BUCKETS. BBxiÂSNÂRaÂÂ\xi xi Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂSOÁÂÂ\xi xi Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂSPÂÂÂ\xi xi Â6þÿÃ:QþÿþÿþÿþÿþÿþÿþÿxiÂSQÂÂÂ\xi xi Â6þÿþÿþÿþÿþÿþÿþÿþÿTANK RISER PIPE READING: -.612xiÂSRÂFÂÂKxi xi Â6xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂSSÂ7IÂÂ\xi xi Â6xiÃ[þÿþÿþÿþÿþÿþÿþÿxiÂSTÂÂÂHxi xi Â6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSUÂN ÂÂHxi xi Â6xiÂ]GþÿþÿþÿþÿþÿþÿþÿxiÂSV xi xi Â6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSWÂ\ xi xi Â6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSXÃ! xi xi Â6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSZÃ6+ÂÂxi xi Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂS[Ã;ÂÂxi xi Â6xiþÿþÿþÿþÿþÿþÿþÿ$INSPECTOR KEN LEGASSE, NOT ED GEORGExiÂS\Ã1 ÂÂGxi xi Â6xjÄc%?þÿþÿþÿþÿþÿþÿ3REPLACED DROP TUBES, 61-SO PER CTI, ED GEORGE. TRxiÂS]ÃNÂÂxi xi Â6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS^Ã!ÂÂxi xi Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂS_Âb@ xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂS`à KÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSaÃY6ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂSbÂ=4ÂÂxi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂScÁ&ÂÂ\xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿå11/14/05 FACILITY WAS RECHECKED TO REMOVE AND VISUALLY CHECK ALL PROBES AND OVERFILL DEVICES IN ACCORDANCE WITH INCON REQUIREMENTS. FACILITY IS STILL PASSING. THIS WAS ONLY SUBMITTED AS AN INSPECTION UPDATE, NOT A NEW INSPECTION.xiÂSdÂO5ÂÂXxi xiÂ<xiÃþÿþÿþÿþÿþÿþÿþÿxiÂTÃR xi xiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÃdSÂÂ\xixiÂ6þÿÃ/þÿþÿþÿþÿþÿþÿþÿxi ÂT *ÂÂLxi xiÂ6xi þÿþÿþÿþÿþÿþÿþÿ*ALL REPAIRS MADE PER LARRY WINCHESTER CTI.xiÂTÃSÂÂSxi xiÂ6þÿþÿþÿþÿþÿþÿþÿþÿhTANK 2 HOOKED UP TO GENERATOR, THEREFORE CONSIDERED MOTOR FUEL TANK, NEEDS LEAK DETECTION AND OVERFILL. xiÂTÃLÂÂSxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÂG,ÂÂHxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÂT4ÂÂLxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÂWÂÂLxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂT ÂAWÂÂxixiÂ6xjþÿþÿþÿþÿþÿþÿþÿJULT-AUGUST 2005: SPOKE TO CN BROWN AND CONTRACTOR RE: DOING INVENTORY AND 0.1 MONTHLYS UNTIL THE CSLD UPGRADE IS COMPLETED AND APPROVED. -ACFxiÂT Ã`(ÂÂAxixiÂ6xià þÿþÿþÿþÿþÿþÿþÿxiÂT Â?ÂÂ]xixiÂ6xiÃ<6þÿþÿþÿþÿþÿþÿþÿxiÂT Â9ÂÂxixiÂ6xjÃ28Kþÿþÿþÿþÿþÿþÿ-REPLACED THREE SPILL BUCKETS ON 3/16/2006. BBxi ÂT Â1ÂÂxixiÂ6xi ÃHþÿþÿþÿþÿþÿþÿþÿxi ÂT ÂÂxixiÂ6xi Ã-O&þÿþÿþÿþÿþÿþÿþÿxi ÂTÂ1&ÂÂxixiÂ6xi Ã1Iþÿþÿþÿþÿþÿþÿþÿxi ÂTÃDÂÂYxixiÂ<xi Ã=þÿþÿþÿþÿþÿþÿþÿxi ÂTÃ_[ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÂ[ÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÂOÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÂAcÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÂOÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÃ6ÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÂOÂÂKxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂTÂN^ÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÃG$ÂÂKxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTÂFÂÂKxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂTÂSXÂÂKxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂTÂ*;ÂÁ xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿÄTANK 11 OOS, INFORMATION NOT INCLUDED IN INSPECTION REPORT REVIEW OF FILE SHOWS THAT TANK #11 HAS A PASSING INSPECTION FROM WAYNE GIFFORD DATED 10/26/04 WITH PASSING CP OF -.853. TIMOTHY RECTORxiÂTà ÂÂ`xixiÂ6þÿÃ]%þÿþÿþÿþÿþÿþÿþÿxi ÂTÂ;ÂÂ2xixiÂ6xi ÃA þÿþÿþÿþÿþÿþÿ]SENT CP LETTER ON 9/28/2005. BB CP RETEST ON 10/14/2005 BY CTI WAYNE GIFFORD. -.869 VOLTS. BBxiÂR ÂÂÁ"xixiÂxi à bþÿþÿþÿþÿþÿþÿ8/12/05: CERT OF PROPER INSTALL, 15 GALLON OVERFILL BUCKET 8/23/05: CERT OF PROPER INSTALL: REPLACED VR SYSTEM WITH OMNTEC LU-2xiÂTÂ&ÂÂxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂT Â^: xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿ8NEW DROP TUBES INSTALLED, ANODES INSTALLED ON EACH TANKxiÂT!Ã< xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT"Ã= xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT#à  xixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT$ÂÂÂxixiÂ6þÿÃ>Vþÿþÿþÿþÿþÿþÿþÿxi ÂT%ÂQÂÂSxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT&ÃHÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT'Â*ÂÂxixiÂ6xiÃ8( þÿþÿþÿþÿþÿþÿþÿxiÂT(Ã!ÂÂxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿüPLANNED TO RETURN TO SERVICE IN MAY 2007; DIFFICULTIES WITH REBUILDING DELAYED OPENING TO LATE SUMMER. -ML TANK & PIPING PASSED VACUUM TEST 7/17; REPORT PENDING. PASSING ANNUAL DONE 7/11/07 - INCOMPLETE, MISSING OOS SECTION. COMPLETION PENDING. -MLxi ÂT)ÂÂÂxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿDON'T / CAN'T DO DI. -ACFxi ÂT*Ã>ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂT+ÃTOÂÁ$xixiÂ6xiÄJMþÿþÿþÿþÿþÿþÿþÿxiÂT,Ã\)ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT-Ã]%ÂÂYxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT.ÃcÂÂxixiÂ<xiÄ#EþÿþÿþÿþÿþÿþÿþÿxiÂT/ÃZOÂÂxixiÂ<xi ÃH Xþÿþÿþÿþÿþÿþÿþÿxi ÂT0ÃQÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂT1ÂÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂT2ÃZ ÂÂxixiÂ<xi Ã#þÿþÿþÿþÿþÿþÿþÿxi ÂT3Â.8ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT4Â! ÂÂUxixiÂ<xiÃ1?þÿþÿþÿþÿþÿþÿ$TANKS PLANNED FOR REMOVAL ON 5/25/07xiÂT5Â.7ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT6Â.9ÂÂxixiÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂT7Â.6ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT8Ã($ÂÂxixiÂ<xiÄL þÿþÿþÿþÿþÿþÿþÿxiÂT9ÃÂÂxixiÂ<xiÃþÿþÿþÿþÿþÿþÿþÿxiÂT:ÃÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT;à LÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT<Â+ÂÂUxixiÂ<xi ÃYþÿþÿþÿþÿþÿþÿþÿxi ÂT=ÂÂÂUxixiÂ<xi Ä4 þÿþÿþÿþÿþÿþÿþÿxi ÂT>ÂGNÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿeDENNIS RODERICK CALLED BACK ON 2/21/2007, CONTRACTED SIMMARDS & SONS TO COMPLETE A.I. THIS MONTH. -LWxiÂT?ÂGNÂÂUxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT@Â6ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTAÃ4 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTBÃ\ÂÂSxixiÂ<xi Ã,5_þÿþÿþÿþÿþÿþÿþÿxi ÂTCÃ;ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTDÂÂÂKxixiÂ<xiÃ!OLþÿþÿþÿþÿþÿþÿþÿxiÂTEà ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂTF 0ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿ 2-3" WATER IN INTERSTITIAL SPACExiÂTGÃ,PÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTHÃ\8ÂÂxixiÂ6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂTIÂ$ ÂÂxixiÂ6xiÄVJþÿþÿþÿþÿþÿþÿþÿxiÂTJÃ@ÂÂSxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ#PIPING IS STEEL. PASSING INSPECTIONxi ÂTKÃ>ÂÂSxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿÕREC'D UPDATE OF INSPECTION, DATED 9/9/05 REC'D 9/13/05. NO CHANGE INDICATES COPPER LINES STILL NO SPACERS AND THE TANK IS A 1996 INSTALL, SPACERS REQUIRED. TIMOTHY RECTOR PIPING IS STEEL PASSING INSPECTION.xi ÂTMÃU;ÂÂSxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂTOÃ4ÂÂSxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿÄUPDATED INSPECTION DATED 9/9/05 REC'D 9/13/05, NO CHANGE APPARENT, STILL SHOWS NO SPACERS ON COPPER LINES INSTALLED IN 1996, THEY ARE REQUIRED. TIMOTHY RECTOR PIPING IS STEEL, PASSING INSPECTION.xi ÂTQÂOÂÂSxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂTRÂ'DÂÂUxixiÂxiþÿþÿþÿþÿþÿþÿþÿFILE REVIEW REVEALS THAT THE PASSING INSPECTION IS INCORRECT. THIS FACILITY SHOULD FAIL DUE TO NO SPACERS ON THE COPPER LINES THE INSTALLATION IS POST 1991, ACTUALLY IT APPEARS IT WAS INSTALLED IN 1994. THIS TANK IS REQUIRED TO HAVE SPACERS ON THE COPPER LINES. TJ RECTOR 10/4/05xiÂR ÂVÂÂHxixiÂ6xiÃ=þÿþÿþÿþÿþÿþÿ9CERT PROPER INSTALL: OMNTEC TDL6/LU2 INSTALLED ON 8/19/05xiÂTTÂVHÂÂ]xixiÂxiÃ@?<þÿþÿþÿþÿþÿþÿþÿxiÂTUÂ_PÂÂ]xixiÂxiÃ((WþÿþÿþÿþÿþÿþÿþÿxiÂTVÂ%AÂÂxixiÂxi ÃZ=þÿþÿþÿþÿþÿþÿþÿxi ÂTWÃ''ÂÂ]xixiÂxi ÃXKþÿþÿþÿþÿþÿþÿþÿxi ÂTXÂMÂÂ]xixiÂxiÃJþÿþÿþÿþÿþÿþÿþÿxiÂTYÃ'$ÂÂxixiÂþÿþÿþÿþÿþÿþÿþÿþÿ>FACILITY O-O-S SINCE JAN/2005. BB SENT CP LETTER 8/29/2005. BBxiÂTZÂÂÂxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT[Â.ÂÂ4xixiÂxià !FþÿþÿþÿþÿþÿþÿþÿxiÂT\Ã` xixiÂxj þÿþÿþÿþÿþÿþÿþÿbFLAPPER ON TANK #1 NOT WORKING PROPERLY. BB DROP TUBE AND FLAPPER REPLACED PER KEN LEGASSE, CTI.xiÂT]Â< ÂÂSxixiÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂT^ÂÂÁ2xixiÁ`xiÃLþÿþÿþÿþÿþÿþÿþÿxiÂT_ÂUÂÂ\xixiÁ`þÿþÿþÿþÿþÿþÿþÿþÿ=1992 TANK INSTALL. COPPER LINES ARE REQUIRED TO HAVE SPACERS.xiÂT`ÂOÂÂ]xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ6TANKS REMAIN OUT OF SERVICE AND HAVE BEEN SINCE 2001. xiÂTaÂRSÂÂ_xixiÁ`þÿÄ þÿþÿþÿþÿþÿþÿþÿxi Â7Ã-E xhxh þÿþÿþÿþÿþÿþÿþÿþÿŽNO THROUGHPUT RECORDS PROVIDED CRASH VALVE STILL AT WRONG HEIGHT PER CTI ED GEORGE 7/20/05, ALL OTHER PROBLEMS ADDRESSED IN INSPECTION UPDATExhÂTbÃ-EÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ¿UPDATE DONE ON 7/20 CORRECTED ALL ISSUES EXCEPT HEIGHT OF DIESEL CRASH VALVE WHICH REMAINS TOO HIGH, BALL FLOAT SET AT 90% FULL LEVEL?: SET AT WRONG HEIGHT, REPLACED/CORRECTED CTI ED GEORGE.xiÂTcÂDÂÂRxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿuPASSING INSPECTION SUBMITTED IN RESPONSE TO NOV ISSUED 8/4/05 BY DIANA MCLAUGHLIN. OMNTEC REPLACED DURING INSPECTION.xi ÂTdÂd5ÂÂKxixiÁ`xiÃ4DþÿþÿþÿþÿþÿþÿþÿxiÂUÂDÂÂRxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿACORRECTING INSPECTION YEAR WITH DUPLICATE ENTRY. TIMOTHY RECTORxi ÂUÂH ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ9 TANK READING: -.941, -.941 ALL THREE READINGS THE SAME?xiÂUÃ]5ÂÂxixiÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUÂ-LÂÂHxixiÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂUÃFb xixiÁ`xiþÿþÿþÿþÿþÿþÿþÿ)INSPECTION INDICATES PIPING SUMP FOR TANK 1-1 HAS A FAULTY SWITCH BUT NARRATIVE INDICATES THAT PIPING SUMP 3-1 IS DEFECTIVE. FAILED BOTH IN DATABASE AND WILL AWAIT REPAIRS TO CLARIFY. 7/28/05: 1-1 ONLY TANK ACTUALLY FAILING, NUMBERED INCORRECTLY. FREED UP STUCK SWITCH SHAFT AND ADJUSTED SWITCH. xi ÂUÃ5" xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUÃ-ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂU ÃK xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂU Ã5 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂU à 8 xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂU ÂJ xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂU ÃX? xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUÃ\& xixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUÂÂÂxixiÂ<xiÃ`þÿþÿþÿþÿþÿþÿþÿxiÂUÃFÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUÂ>ÂÂxixiÂ<xiÂþÿþÿþÿþÿþÿþÿW10/29/08-INTENT TO ABANDON FORM, COUNTY TO DO SA, OWNER WILL BE PULLING TANK HIMSELF PHxiÂUÂX/ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUÃ&JÂÂxixiÂ<xiÃ*QþÿþÿþÿþÿþÿþÿþÿxiÂUà )ÂÂxixiÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUÂÃJ;ÂÂDxi xi ÂxiÃBþÿþÿþÿþÿþÿþÿþÿxiÂU?ÃBÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂU@ÃEÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUAÃQÂÂxi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂUBÃ*ÂÂxi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂUCÂ5^ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUDÂbJÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUEÃ'" xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUFà Q xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUGÃ3UÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUHÂ.ÂÂ4xi xi ÂxiÃ-9þÿþÿþÿþÿþÿþÿþÿxiÂUIÂ/ÂÂ\xi xi ÂxjþÿþÿþÿþÿþÿþÿþÿLMIKE LEWIS TESTED CP ON 4/26/2005. BB SPILL BUCKET REPLACED ON 6/21/2006. BBxiÂUJÂ#ÂÂ\xi xi Âxiþÿþÿþÿþÿþÿþÿþÿ%MIKE LEWIS TESTED CP ON 4/21/2005. BBxiÂA@Â4ÂÁ xh xh Âxiþÿþÿþÿþÿþÿþÿþÿ3HEATED OIL TANK FAILING CP. BB INSPECTION UPDATE DATED 3/31/2005 BY CTI DAVE BEAUMONT. CP FAILED RETEST -.668 VOLTS. BB CONTACTED KEN OSBORN (MAINT. DIRECTOR) ON 05/02/2005. DAVE BEAUMONT TO REPAIR CP SYSTEM THIS SUMMER (JUNE 1ST). BB INSPECTION UPDATE DATED 8/15/2005. CP UPGRADED: TANK -1.189 VOLTS. BBxh ÂUKÂÂÁ4xi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ£SENT CP LETTER ON 9/15/2005. BB GARY WALLACE CALLED ON 9/16/2005. REQUESTED O-O-S AND REMOVAL FORMS. TANK TO BE TAKEN O-O-S THIS YEAR AND REMOVED MAY OF 2006. BBxiÂULÂÂÁ4xi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ¬SENT CP LETTER ON 9/15/2005. BB RECEIVED CALL FROM GARY WALLACE ON 9/19/2005. REQUESTED O-O-S AND REMOVAL FORMS. TANK TO BE TAKEN O-O-S NOW AND REMOVED IN MAY OF 2006. BBxiÂUMÂ"VÂÁ4xi xi Âxi þÿþÿþÿþÿþÿþÿþÿPASSING FACILITY. xiÂUNÂQÂÁ4xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUOÂ&(ÂÁ4xi xi ÂxiÃ//þÿþÿþÿþÿþÿþÿþÿxiÂUPÂWOÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUQÂ1+ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂURÂ*ÂÂ4xi xi ÂxiÃ)IþÿþÿþÿþÿþÿþÿþÿxiÂUSÃ5]ÂÂxi xi Â6xi ÃB)5þÿþÿþÿþÿþÿþÿ6ALL CRASH VALVES HEIGHTS CORRECTED PER GARY KANE, CTI.xiÂUTÃ^!ÂÁ$xi xi Â6xjÄN=Cþÿþÿþÿþÿþÿþÿ!NOW PASSING PER CTI DENNIS DAVIS.xiÂUUÂEÂÁ$xi xi Â6xi ÃWGþÿþÿþÿþÿþÿþÿþÿxi ÂUVÃc&ÂÂUxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂUWÂ_BÂÂUxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂUXÂ3%ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.1, -1.1xi ÂUYÂÂÂYxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂUZÂK,ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂU[Ã4ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿCSENT CP LETTER ON 9/15/2005. BB PER CTI BILL CARVER PASSING NOW.xiÂU\Á ÂÂ]xi xi ÂxiÃ81VþÿþÿþÿþÿþÿþÿþÿxiÂU]Â2ÂÂ]xi xi ÂxiÃ0K#þÿþÿþÿþÿþÿþÿþÿxiÂU^Â^ÂÂ]xi xi Âxi Ä.=IþÿþÿþÿþÿþÿþÿSENT CP LETTER ON 9/15/2005. BBxiÂU_ÂMAÂÂ]xi xi Á`xiÃ"I þÿþÿþÿþÿþÿþÿþÿxiÂU`ÂZ*ÂÂ]xi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUaÃ9dÂÂXxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUb ÂÂKxi xi ÂxhþÿþÿþÿþÿþÿþÿþÿeDENNIS RODERICK CALLED BACK ON 2/21/2007, CONTRACTED SIMMARDS & SONS TO COMPLETE A.I. THIS MONTH. -LWxhÂUcÂÂÁ=xi xi Â6xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂUdÂGFÂÂKxi xi ÂxhþÿþÿþÿþÿþÿþÿþÿeDENNIS RODERICK CALLED BACK ON 2/21/2007, CONTRACTED SIMMARDS & SONS TO COMPLETE A.I. THIS MONTH. -LWxhÂV ÂÂKxi xi ÂxhþÿþÿþÿþÿþÿþÿþÿeDENNIS RODERICK CALLED BACK ON 2/21/2007, CONTRACTED SIMMARDS & SONS TO COMPLETE A.I. THIS MONTH. -LWxhÂVÃ#PÂÂKxi xi ÂxhþÿþÿþÿþÿþÿþÿþÿeDENNIS RODERICK CALLED BACK ON 2/21/2007, CONTRACTED SIMMARDS & SONS TO COMPLETE A.I. THIS MONTH. -LWxhÂVÃ\.ÂÂAxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂVÂGÂÂYxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂQ.ÃD!ÂÂHxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿrSENT CP LETTER ON 7/25/2005. BB CERT OF PROPER INSTALL: TANK ANODES INSTALLED AND VEEDER ROOT ILS-350 WITH SENSORxiÂR#Ã;ÂÂBxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ3PASSING INSPECTION UPDATE RECEIVED 9/21/2005. DMCLxiÂVÃAÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂO>Ã:JÂÂYxixiÂxi þÿþÿþÿþÿþÿþÿþÿ×CTI DOCUMENTED WATER IN TANK #1 INTERSTITIAL. EVIDENCE OF LEAK NOT REPORTED. SENT CP LETTER TO STEVE RODERICK ON 9/22/2005. BB INSPECTION UPDATE - RETEST ON TANK 1 (PASSED) AND CP UPGRADE ON TANK 2 11/30/2005. BBxiÂVÂJ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV ÃH xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿPASSING PER ED GEORGE, CTI.xi ÂV ÃP xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ@SUMP APPEARS TO LEAK WHERE BOLTED TOGETHER. SENSOR NOW PASSING.xi ÂV Â$HÂÂxi xi Á`xi Ã%Zþÿþÿþÿþÿþÿþÿ•FACILITY IS OUT OF SERVICE IT APPEARS TO DEP STAFF AS OF SEPTEMBER 14TH 2005. PASSING INSPECTION FAIL OF INVENTORY IS DUE TO LOW THROUGHPUT ISSUES. xiÂV ÂOEÂÂxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿœFACILITY IS CURRENTLY OUT OF SERVICE. MAY BE REOPENED IN THE FUTURE, TANKS PLANNED FOR REMOVAL AND REPLACEMENT. INSPECTION INDICATES TANKS ARE PROPERLY OOS.xiÂV ÃOÂÂSxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVÂ+ÂÂ;xixi Â7xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂVÂaHÂÂxi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ}SIMARDS TO UPGRADE CP IN THE SPRING. BB CERT OF PROPER INSTALLATION DATED 4/6/2006 FOR ANODES. WAITING FOR TEST RESULTS. BBxi ÂVÂ.%ÂÂUxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVÂÂÂYxi xi Âxi Ã=þÿþÿþÿþÿþÿþÿiSENT CP LETTER ON 9/23/2005. BB INSPECTION UPDATE DATED 10/03/2005. INSTALLED NEW ANODES ON TANK #6 . BBxi ÂVÃ6:ÂÂSxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂVÃLÂÂSxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV ÂÂUxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVÂP)ÂÂxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂVÃBÂÂSxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVÃ/ÂÂYxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVÂ0ÂÂ\xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂVÃAÂÂ$xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVÂ!ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVà QÂÂSxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ!CP ON VENT PIPE (-1.25 VOLTS). BBxiÂVà RÂÂSxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿCP ON VENT PIPE (-1.35). BBxiÂVà SÂÂSxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ CP ON VENT PIPE (-1.4 VOLTS). BBxiÂVà TÂÂSxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ!CP ON VENT PIPE (-1.10 VOLTS). BBxiÂVà UÂÂSxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ!CP ON VENT PIPE (-1.15 VOLTS). BBxiÂV à VÂÂSxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ CP ON VENT PIPE (-1.2 VOLTS). BBxiÂV!Ã#ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV"Â.MÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV#ÂXÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV$ÂQÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV%Â7ÂÂxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV&ÃNÂÂHxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ1INSPECTION REPORT INDICATES RECENT CP UPGRADE. BBxiÂV'Â26ÂÂ\xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ­12/13/2006 RECEIVED NOTES ON THE NOV THAT WAS SENT OUT, THAT THE WORK WILL BE PERFORMED IN JUNE 2007, BECAUSE IT WAS APPROVED FOR THE BUDGET. SEE NOV WITH NOTES IN FILE. LWxi ÂV(Â5@ÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV)ÃAÂÂ\xi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿoMIKE LEWIS TESTED CP ON 4/25/2005. BB TANK WAS INSTALLED IN 1985 NOT REQUIRED TO HAVE SPACERS ON COPPER LINES.xi ÂV*Â'1ÂÂ\xi xi Âþÿþÿþÿþÿþÿþÿþÿþÿ$MIKE LEWIS TESTED CP ON 5/3/2005. BBxi ÂV+Ã@`ÂÂ\xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ$MIKE LEWIS TESTED CP ON 4/7/2005. BBxi ÂV-ÂA ÂÂ\xi xi Âxiþÿþÿþÿþÿþÿþÿþÿ$MIKE LEWIS TESTED CP ON 4/7/2005. BBxiÂV.ÂX8ÂÂ\xi xi Âxiþÿþÿþÿþÿþÿþÿþÿ;CP ON RISER PIPE ONLY. TESTED BY MIKE LEWIS AND PASSED. BBxiÂV/ÂÂÁMxi xi Âxi à bþÿþÿþÿþÿþÿþÿDOVER/SHORTS GREATER THAN 1% FOR K-1 TANK. EXTREMELY LOW THRUPUT. BBxi ÂV0 aÂÂSxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV1 XÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂV2ÂÂÂSxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV3ÂAÂÂ)xi xi Â<xiþÿþÿþÿþÿþÿþÿþÿ:10/12/2005: CERT OF PROPER INSTALL, VR TLS 350 INSTALLED. xiÂV4ÂCÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂV5 xi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂV6Â2ÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿ…10/12/2005: CERT OF PROPER INSTALL: VR TLS 350 PROBE UPGRADES, MANWAYS ON DIESEL, RNL, SNL AND PNL, FLAPPER VALVES ON SNL, PNL, RNL. xiÂV7Â7ÂÂSxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV8Â92ÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV9Â>SÂÂxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV:ÂO ÂÂxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV;Ã]ÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV<ÃV[ÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV=ÃXÂÂSxi xi Â<xh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂV>Ã[ÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂV?Ã_b xi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂV@ÂTÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVAÂÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVB ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVCÃ,)ÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVDÂCÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVEÂ0ÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVFÂÂÂ\xi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂVGÃH%ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVHÂAEÂÂRxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂVIÂ%VÂÂRxi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂVJÃ[ÂÂRxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿÏINSPECTOR ALSO INDICATED THAT THE VENT PIPES WERE IMPROPERLY PLACED AND NOT PROPERLY SECURED. DEP STAFF ON PREVIOUS VISITS DID NOT NOTE THAT ERROR. FAULTY ILS 350 REPLACED WITH NEW UNIT PER CTI PAUL BOSSE.xi ÂTPÃ?ÂÂSxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ¥REC'D INSPECTION UPDATE DATED 9/9/05 AND REC'D 9/13/05. NO APPARENT CHANGES PIPING STILL INDICATED AS BEING COPPER, NO SPACERS. PIPING IS STEEL, PASSING INSPECTION.xi ÂTLÃ;ÂÂSxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ˜INSPECTION UPDATE REC'D 9/13/05 DATED 9/9/05. NO CHANGES NOTED, COPPER LINES STILL NO SPACERS. TIMOTHY RECTOR PIPING IS STEEL PASSING INSPECTION. xi ÂTNÃ<ÂÂSxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿïREC'D INSPECTION UPDATE DATED 9/9/05 ON 9/13/05. UPDATE SHOWS NO CHANGES FROM ORIGINAL INSPECTION, TANK WAS A 1996 INSTALL SPACERS REQUIRED, CHECK LIST REMAINS SAME, NO SPACERS. TIMOTHY RECTOR PIPING IS STEEL PASSING INSPECTION.xi ÂVKÂSBÂÂxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂVLÂ[ÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ&INSPECTION UPDATE DATED 09/09/2005. BBxiÂVMÃ@_ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿAOLD DROP TUBE CUT OUT AND NEW ONE INSTALLED PER KEN LEGASSE, CTI.xi ÂVNÂQQÂÂxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿcTANK #1 POIPING MAY BE BARE STEEL DIRECTLY BURIED. TANK USES #2 OIL. TANK READING: -1.105, -1.112xiÂVO bÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVPà :ÂÂSxi xi Âxi ÃZþÿþÿþÿþÿþÿþÿ1INSPECTION REPORT INDICATES RECENT CP UPGRADE. BBxi ÂVQÃcÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVRÃJ<ÂÂxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVTÃ3SÂÂxi xi Âxjþÿþÿþÿþÿþÿþÿþÿ!PASSING PER CTI, ED GEORGE. TRxi ÂVUÃ3 xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂVVÂZ- xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿH9/19/05: CERT OF PROPER INSTALL, VR TLS 350, VR ELECTRONIC PLLD, PROBES.xiÂVWÂ;N xi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂVXÂ=ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂVYÂ^ÂÂ\xi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿEMIKE LEWIS TESTED CP ON 9/20/2005. BB SENT CP LETTER ON 9/29/2005. BBxi ÂVZ ÂÂ\xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ%MIKE LEWIS TESTED CP ON 4/20/2005. BBxi ÂV[ÂA-ÂÂHxi xi ÂþÿþÿþÿþÿþÿþÿþÿþÿSENT CP LETTER ON 9/29/2005. BBxi ÂV\Â'ÂÂBxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV] ÂÂxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂV^Â^ÂÂ]xi xi Âxi Ãc`Fþÿþÿþÿþÿþÿþÿþÿxi ÂV_Â>PÂÂ]xi xi Âxi Ã8Lþÿþÿþÿþÿþÿþÿþÿxi ÂV`Ã3ÂÂ]xi xi Âxi Ãþÿþÿþÿþÿþÿþÿþÿxi ÂVaÃ5ÂÂ]xi xi Âxi ÃFIUþÿþÿþÿþÿþÿþÿfSENT CP LETTER ON 10/03/2005. BB INSPECTION UPDATE DATED 10/05/2005. PASSING CP RETEST -.91 VOLTS. BBxiÂVbà ÂÂ]xi xi Âxi Ã?CþÿþÿþÿþÿþÿþÿfSENT CP LETTER ON 10/03/2005. BB INSPECTION UPDATE DATED 10/05/2005. CP RETEST PASSED -1.19 VOLTS. BBxiÂVcÂ.ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂVdÂ&ÂÂxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿJSENT CP LETTER ON 10/04/2005. BB CP RETEST ON 10/26/2005. (-0.86 VOLTS) BBxi ÂWÂ@\ÂÂxi xi Â(xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWÃ^ÂÂDxi xi Â(þÿÃM @þÿþÿþÿþÿþÿþÿþÿxi ÂWÃ_ÂÂDxi xi Â(þÿÃ7ÂÂIxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWÃ!ÂÂIxi xi Â<xi Ä :þÿþÿþÿþÿþÿþÿþÿxi ÂWÃ- ÂÂIxi xi Â<xi Ãb!þÿþÿþÿþÿþÿþÿNOTE: THESE ARE CP TANKS AND SHOULD BE ENTERED BY TANKS ENFORCEMENT STAFF. I WOULD NOTE THAT THE FACILITY DID PASSS AND ALL TANK READINGS WERE GREATER THAN -1.00 (LOWEST WAS -1.17, HIGHEST IS -1.47). TJ RECTOR 10/4/05 CP TANKS WERE TESTED BY JOHN JOHNSON ON 9/8/2005. BBxi ÂWÃ[ÂÂDxi xi ÂþÿÃ,þÿþÿþÿþÿþÿþÿþÿxi ÂWÂ* ÂÁ$xi xi Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂW Â=SÂÁ$xi xi Â6xi Äd"þÿþÿþÿþÿþÿþÿþÿxi ÂW Ã(7ÂÁ$xi xi Â6xi Ã\þÿþÿþÿþÿþÿþÿþÿxi ÂW ÂB0ÂÂ*xi xi Â6xj þÿþÿþÿþÿþÿþÿþÿ±SENT CP LETTER ON 10/04/2005. BB RECEIVED LETTER FROM ST JOSEPH'S PARISH DATED 12/06/2005. CP UPGRADE TO BE COMPLETED SPRING OF 2006. BB CP UPGRADED 4/10/2006 (-0.93 VOLTS). BBxi ÂW ÃK,ÂÁ$xi xi Â6xi þÿþÿþÿþÿþÿþÿþÿ1DENNIS DAVIS MADE REPAIRS, FACILITY NOW PASSING. xi ÂW ÂbdÂÂ*xi xi Â6xi þÿþÿþÿþÿþÿþÿþÿOPIPING NOT SPACED BUT JULY 1991 INSTALL SO NOT REQUIRED AT TIME OF INSTALLATIONxi ÂWÃCFÂÂ*xi xi Â6xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW UÂÂ*xi xi Â6xjþÿþÿþÿþÿþÿþÿþÿPASSES PER CTI DENNIS DAVIS. xi ÂWÃ:MÂÂ*xi xi Â6þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂTSÃ(ÂÂUxixiÂxiþÿþÿþÿþÿþÿþÿþÿ¾REVIEW OF FILE SHOW THE FOLLOWING: TANK SHOULD HAVE FAILED DUE TO NO SPACERS ON COPPER PIPING. TANK WAS AN AUGUST 1994 INSTALL AND SPACERS WERE REQUIRED TO BE INSTALLED. TJ RECTOR 10/4/05xiÂWà ÂÁ$xi xi Â6xi þÿþÿþÿþÿþÿþÿþÿREPLACED FLAPPER TUBExi ÂWÂQÂÁ$xi xi Â6xi ÃGþÿþÿþÿþÿþÿþÿþÿxi ÂWÃ5[ÂÂ*xi xi Â6xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWÂ$!ÂÁ$xi xi Â6xi Ä Yþÿþÿþÿþÿþÿþÿþÿxi ÂWÃ_ ÂÁ$xi xi Â6xi ÃVAþÿþÿþÿþÿþÿþÿþÿxi ÂWÃÂÂ*xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ.C&C CONTRACTORS WILL INSPECT IN APRIL 2007 -MLxi ÂWÂGUÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWÂWÂÂ]xi xi Âxi þÿþÿþÿþÿþÿþÿþÿeANNUAL INSPECTION INDICATES TANKS HAVE BEEN O-O-S SINCE 1/1/2005. WILL CHANGE STATUS IN DATABASE. BBxi ÂUÃ-EÂÂxixiÁ`xi þÿþÿþÿþÿþÿþÿþÿlTHIS IS TO CORRECT INCORRECT INSPECTION YEAR DATA ENTERED. TIMOTHY RECTOR 10/6/05: SPOKE WITH REGGIE FAULKINGHAM. CRASH VALVES SET ACCORDING TO MANUFACTURERS SPECS; USING MANUFACTURER'S EQUIPMENT. NO WAY TO LOWER CRASH VALVES WITHOUT CHANGING OUT SUMPS ENTIRELY. REGGIE SENT INSPECTION UPDATE STATING THAT IT IS PASSING IN ACCORDANCE WITH MANUFACTURER'S SPECS. RRxiÂWÂ^,ÂÂ*xi xi Â6xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWÂ/ÂÂ*xi xi Â6xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂR!Ã<ÂÂBxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ+REPLACED OMNTEC W/ CUSTOM UPGRADE. -- DMCL xiÂWÃ5ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWÃÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿPLEASE NOTE: FACILITY HAS 2 TANKS LISTED INSPECTION ONLY SHOWS ONE TANK. TANK IS ACTUALLY TANK NUMBER 2 IN THE DATABASE, TANK NUMBER ONE IS USED FOR WATER STORAGE AND AS SUCH IS NOT SUBJECT TO ANNUAL INSPECTION. IT IS NOT LISTED ON THE REPORT. TIMOTHY RECTORxi ÂWÃ%BÂÂxi xi Á`xi Ãþÿþÿþÿþÿþÿþÿþÿxi ÂWÃÂÂxi xi ÂþÿÃ`W<þÿþÿþÿþÿþÿþÿ=SENT CP LETTER ON 10/11/2005. BB CP UPGRADE ON 12/06/2005. BBxi ÂWÃ%AÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW à :ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW! xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ²CTI LEGASSE STATES: REPLACED VAPOR ADAPTER AND CAP, PUMP WATER FROM STP SUMPS, CLEANED EYE ON ANNULAR SPACE SENSOR AND RESET SAME. VENT PIPE CP PASSING AT -1.120. TIMOTHY RECTORxi ÂW"Â/ÂÂ*xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW#Â7;ÂÁ$xi xi Â6xi Ä$0þÿþÿþÿþÿþÿþÿþÿxi ÂW$Ã]$ÂÂ]xi xi Âxi Ä H-þÿþÿþÿþÿþÿþÿIHEATING FUEL TANKS (#3 AND #4) WERE INSPECTED SEPARATELY ON 9/15/2005. BBxi ÂW%Ã'ÂÂbxi xi Á`xi Ãþÿþÿþÿþÿþÿþÿþÿxi ÂW&Â7ÂÂdxi xi Â6xi Ä þÿþÿþÿþÿþÿþÿ:10/19/05: INSPECTION UPDATE, REPLACED 2 MANHOLE COVERS. RRxi ÂW'ÃFÂÂ*xi xi Â6xi Ä!Sþÿþÿþÿþÿþÿþÿþÿxi ÂW(ÂSÂÂ:xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW)Â,dÂÁ2xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ¯TANK HAS VENT WHISTLE. 2" FILLS. ONLY OTHER OPTION WOULD BE ELECTRONIC. VENT WHISTLE HAS ACCESS FOR ANNUAL INSPECTION AND VENTS ARE NEXT TO TANK. ENFORCEMENT DISCRETION. BBxi ÂW*ÂA ÂÂbxi xi Á`xi Ã4H)þÿþÿþÿþÿþÿþÿþÿxi ÂW+à SÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ/ TANK READING: MIKE LEWIS 4/26/05 -.914, -.927xi ÂW,ÂÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ/ TANK READING: MIKE LEWIS 4/26/05 -.908, -.917xi ÂW-Ã.ÂÂ*xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ CTI KANE NOTES CAN'T ACCESS INTERSTITIAL SENSOR, S.WHITTIER AND BB SAID OK BEC TANK INSTALLED 1987 THIS ISSUE WAS REVISITED 10/16/08 AND SCOTT WHITTEIR HAS AGREED THAT THIS ONE FACUILITY IS THE EXCEPTION TO THE RULE. WE WILL NOT REQUIRE RETROFITTING OF ACCESS TO THE INTERSTICE DUE TO THE DATE OF THE INSTALL OF THE TANK. THERE ARE NOTES IN THE HARD COPY FILE FROM SCOTT WHITTIER DATED 9/22/05 THAT INDICATE THERE WAS A DISCUSSION OF THE SITUATION AND THAT THE DEPARTMENT WOULD ALLOW OPERATION AS INSTALLED. T. RECTORxi ÂW.ÃTÂÂ\xi xi Á`xi ÃM/þÿþÿþÿþÿþÿþÿ' TANK READING: -1.02 MIKE LEWIS 4/25/05xi ÂW/Ã-ÂÂ)xixi Â6þÿþÿþÿþÿþÿþÿþÿþÿû7/25/05: SENT LETTER TO CURRENT OWNERS, RETURNED WITH NO FORWARDING ADDRESS. 10/14/05: CALLED DYSARTS, WHO IS LISTED AS THE OWNER ON THE A.I. SPOKE WITH DAVE WRIGHT, DYSARTS WAS SUPPLIER, PULLED OUT PUMPS AND NO LONGER HAS ANY TIES TO THE PROPERTY. RRxiÂW0ÂFÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿ-CP REPAIR JUST PRIOR TO ANNUAL INSPECTION. BBxi ÂW1Ã`!ÂÁ xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW2ÃÂÂDxi xi Â(xi Ã#"þÿþÿþÿþÿþÿþÿþÿxi ÂW3ÃY ÂÂDxi xi Â(xi Ã\1-þÿþÿþÿþÿþÿþÿþÿxi ÂW4ÃK xi xi Âxi þÿþÿþÿþÿþÿþÿþÿASTxi ÂW5à ÂÂUxi xi Âxh þÿþÿþÿþÿþÿþÿþÿþÿxh ÂW6à ÂÂUxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW7ÂZ$ÂÂ)xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW8Â_ xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ"VENT LINES ARE CP. ALL PASSED. BBxi ÂW9ÂA` xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW:Â>ÂÂ)xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW;ÂÂÂ)xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW<ÂÂÂ)xi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW=Ã5ÂÁ$xi xi Â6xi Ä)7!þÿþÿþÿþÿþÿþÿþÿxi ÂW>Ã5KÂÂ)xi xi Âxjþÿþÿþÿþÿþÿþÿþÿ§SENT CP LETTER ON OCTOBER 25, 2005. BB SPOKE TO TOM GUERRETTE AT RH FOSTER ON 01/09/2006. SPILL BUCKET BEING REPLACED TODAY. CP UPGRADE SCHEDULED FOR APRIL 2006. BBxi ÂW?ÂÂÂSxi xi Âxi Ã" 8þÿþÿþÿþÿþÿþÿþÿxi ÂW@Ã(ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿDSENT CP LETTER ON 10/25/2005. BB PASSING NOW PER KIRK ST. PETER CTIxi ÂWAÃ.*ÂÂSxi xi Âxi Ã!1þÿþÿþÿþÿþÿþÿþÿxi ÂWBÃ;\ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWCÃ;]ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWD 5ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWEÂ!ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWFÂÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿCP UPGRADE ON TANK 4. BBxi ÂWG 1ÂÂSxi xi ÂxiþÿþÿþÿþÿþÿþÿþÿCP UPGRADE ON TANK. BBxiÂWH ÂÂSxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWI ]ÂÁ2xi xi Âxi þÿþÿþÿþÿþÿþÿþÿf4/13/07 TALKED TO JOCELYN HALEY. INSPECTION SCHEDULED FOR LATE MAY. WARNED CURRENTLY IN VIOLATION -MLxi ÂWJÂ0ÂÂYxi xi Âxi þÿþÿþÿþÿþÿþÿþÿKCP UPGRADE ON 11/15/2004. FACILITY IS DOING BUSINESS AS BOB'S DISCOUNT. BBxi ÂWKÃ4PÂÂxi xi Âxi þÿþÿþÿþÿþÿþÿþÿ[PASSED SIA 10/19/05. INSPECTED SITE 9/05 TO REVIEW & ASSIST IN INVENTORY PROCEEDURES. -ACFxi ÂWLÂÂÂYxi xi Âxi Ã8-Gþÿþÿþÿþÿþÿþÿþÿxi ÂWMÃ+<ÂÂxi xi Âxi à 3þÿþÿþÿþÿþÿþÿþÿxi ÂWNÂO'ÂÂ*xi xi Â6þÿþÿþÿþÿþÿþÿþÿþÿ›INSPECTION UPDATE FOR ELECTRONIC MONITORING SYSTEM ON 12/07/2005. BB MIKE GALLAGER, SUPER CALLED GAFTK DID THE WORK. PAPERWORK TO FOLLOW. 9/21/2006 TEDxi ÂWO `ÂÂHxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWPÃcÂÂHxi xi Âxi Ã]=þÿþÿþÿþÿþÿþÿþÿxi ÂWQÂcÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWR ÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWS DÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWTÂ<ÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWUÃ@ÂÂ\xi xi Â<xi Ãþÿþÿþÿþÿþÿþÿþÿxi ÂWVÂAMÂÂHxi xi Â<xi ÄVþÿþÿþÿþÿþÿþÿþÿxi ÂWWÂQGÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWX $ÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWY #ÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWZÂOÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW[ÂOÂÂ\xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW\Ãd*ÂÂUxi xi Â<xi Ä<9þÿþÿþÿþÿþÿþÿþÿxi ÂW]ÂGÂÂUxi xi Â<xi ÃN@þÿþÿþÿþÿþÿþÿþÿxi ÂW^Ã!ÂÂUxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW_Ã!ÂÂUxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂW`Â<ÂÂUxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWaÂ:ÂÂUxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWbÂJÂÂUxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWcÃ?ÂÂUxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂWdÃH&ÂÂUxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÂRDÂÂxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÃ6:ÂÂSxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÂRÂÂSxi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX cÂÂSxi xi Â<xi à >þÿþÿþÿþÿþÿþÿþÿxi ÂXÂ0AÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿ[CP TEST ON TANK PERFORMED 12/13/05 BY CTI DON BUBAR. TANK PASSES WITH A -.961 READING. TRxi ÂXÂ$'ÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÃ\#ÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÂZ& xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX ÃÂÂxi xi Â<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂX ÃS1ÂÂ)xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX ÂZ+ xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX Â$Q xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX Ã( xi xi Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÂAÂÂdxi xi Â6xi ÄQ`þÿþÿþÿþÿþÿþÿ½FLAPPERS REPLACED ON 10/13 DUE TO A CHANGE IN RISER HEIGHT RESULTING FROM A SPILL BUCKET REPLACEMENT. SPILL BUCKET REPLACED ON 10/13, 15 GALLONS. VAPOR RECOVERY CAPS AND MANHOLES REPLACED. xi ÂXà )ÂÂUxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÂR]ÂÂHxi xi Á`þÿÃþÿþÿþÿþÿþÿþÿ^SENT CP LETTER ON 10/25/2005. BB CERT OF PROPER INSTALLATION DATED 4/11/2006 FOR ANODES. BBxi ÂXÃdGÂÂUxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÃ%ÂÂUxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÂ$MÂÂUxi xi Á`xi Ã8Jþÿþÿþÿþÿþÿþÿþÿxi ÂXÃ@ÂÂUxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÃ'ÂÂ:xi xi Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂXÂÂÁMxi xi Á`xi ÃEþÿþÿþÿþÿþÿþÿþÿxi ÂXÂÂÂ)xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÃBÂÂ)xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂXà ÂÂ)xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÃ9ÂÂ)xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÂXÂJ"ÂÂUxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿØPUMPED 5 GALLONS OF WATER OUT OF MIDDLE REGULAR TANK SUMP AND 5 GALLONS OUT OF THE MIDDLE TANK INTERSTITIAL. WATER CONTINUED TO SETTLE AND WOULD NOT CLEAR ALARM. NEED TO RETURN TO PUMP WATER AND DO FURTHER TESTING. xi ÂXÂ%7ÂÂxi xi Â(xi Ã3dYþÿþÿþÿþÿþÿþÿþÿxi ÂXÂÂÂ\xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ%MIKE LEWIS TESTED CP ON 4/20/2005. BBxi ÂXÃcÂÂ\xi xi Âxi þÿþÿþÿþÿþÿþÿþÿ(CP TESTED BY MIKE LEWIS ON 4/20/2005. BBxi ÂXÃ(ÂÂDxi xi ÂþÿÃ; 0þÿþÿþÿþÿþÿþÿþÿxi ÂX ÃKÂÂDxi xi ÂxjÃG"þÿþÿþÿþÿþÿþÿDSENT CP LETTER ON 10/25/2005. BB CP RETEST ON 04/05/2006 (PASS). BBxi ÂX!Ã5EÂÂUxi xi Á`þÿÄ H.þÿþÿþÿþÿþÿþÿ`COMMENT ON INPSECTION INDICATES OPERATOR THINKS SOMEONE IS STEALING REGULAR GAS ON THE WEEKENDS.xi ÂX"ÃÂÂHxi xi Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX#ÃÂÂ;xi xi Á`xiþÿþÿþÿþÿþÿþÿþÿ“NEGLECTED TO ENTER CP DATA WHEN ENTERING INSPECTION. RESULTS ARE AS FOLLOWS: TANK #1 -1.038, -1.085, -1.041 TANK #2 -1.037, -1.073, -1.032xiÂX$Ã:FÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ¯1989 INSTALL. SPACERS NOT REQUIRED OVERFILL REQUIRED BY OIL AND SOLID FUEL BOARD. INSPECTION IS PASSING THOUGH RECOMMENDED THAT IMPROVEMENT SHOULD BE MADE REGARDING OVERFILL. xi ÂX%ÂV3ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿCVENT PIPE ONLY FAILED CP. NO SPACERS ON COPPER LINES NOT REQUIRED. xi ÂX&ÂV7ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX'Ã3YÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX(Ã3ZÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ1982 INSTALL NO REQUIREMENTS.xi ÂX)Ã3[ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX*Ã3\ÂÂXxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX+ÂLÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX,ÃÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX-Ã,ÂÂ\xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ–FAILING INSPECTION MOSTLY DUE TO INVENTORY ISSUES. THEY WILLL BE NOTIFIED OF THE NEED TO BE MORE ACCURATE AND DILIGENT IN PERFORMING INVENTORY CHECKS.xi ÂX.ÂJÂÂ\xi xi Á`xi ÃK-þÿþÿþÿþÿþÿþÿD TANK READING: -1.17 VENT PIPE READING: CHECKED 5/1/05 BY MIKE LEWISxi ÂX/ÃPÂÂ\xi xi Á`xi Ã/_Gþÿþÿþÿþÿþÿþÿ# TANK READING: 5/2/05 BY MIKE LEWISxi ÂX0Â>9ÂÂKxi xi Â(xhþÿþÿþÿþÿþÿþÿþÿþÿxhÂX1Â/ÂÂ:xi xi Â(xhÄ=?þÿþÿþÿþÿþÿþÿ8INTERSTITIAL WIRING REPLACED 4/22/04; FLAPPERS SET LOWERxhÂX2Ã[ ÂÂ:xi xi Â(xhÃ`&bþÿþÿþÿþÿþÿþÿþÿxhÂX3Ã^ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿ¬RECEIVED A CALL FROM AN ALMOST BUYER OF THIS FACILITY. CALLER REPORTED THAT OWNERS HAVE MOVED TO AZ AND LEFT THE FACILITY AS IS. SHOULD INSPECT THIS SEASON. 6/15/2006 BBxi ÂX4à ÂÂ\xi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ1994 INSTALL SPACERS REQUIRED.xi ÂX5ÃTVÂÂXxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ 1992 INSTALL.xi ÂX6ÂOÂÂ\xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿgNO SPACERS ON COPPER PIPING. JULY 1990 INSTALL, SPACERS RECOMMENDED NOT REQUIRED. PASSING INSPECTION. xi ÂX7Â+SÂÂxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ¨NO OVERFILL OR SPILL BUCKETS DUE TO INSTALLATION DATE. COPPER LINES HAVE SPACERS?: NOT REQUIRED 1986 INSTALL. CP UPGRADE ON 9/1/2006. STILL NEED CP TEST REPORT. BBxi ÂX8Ã0ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX9 ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂV,ÂAÂÂ\xi xi Âxi þÿþÿþÿþÿþÿþÿþÿMIKE LEWIS TESTED WAS CP TESTER ON 9/6/2005. BB SENT CP LETTER ON 9/29/2005. BB RECEIVED CALL FROM T.J. AT YORK SCHOOL DEPT. MIKE LEWIS TO ARRANGE FOR REPAIR JOB. BB PASSING PER MIKE LEWIS CTI CHRIS WILSON RAPAIRED CP ON 10/07/2005. SE CERT. OF PROPER INSTALLATION IN TANK FILE. BBxi ÂX:Ã\IÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿREPLACED BALL FLOATxi ÂX;ÂB,ÂÂxi xi Á`þÿþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.88, -.89xi ÂR'Ã(ÂÂxixiÂ6þÿþÿþÿþÿþÿþÿþÿþÿkMIKE SIMARD CALLED ON 10/27/2005. SPILL BUCKET HAS BEEN REPLACED. MIKE WILL SEND IN INSPECTION UPDATE. BBxiÂX<Ã#dÂÂAxi xi ÂxiÃ#7þÿþÿþÿþÿþÿþÿþÿxiÂX=Â-OÂÁ$xi xi Á`xi Ã+3þÿþÿþÿþÿþÿþÿþÿxi ÂX>Ã`2ÂÁ xi xi Á`xi ÃM8Fþÿþÿþÿþÿþÿþÿþÿxi Â?\ÂEÂÂ)xh xh Â<xh þÿþÿþÿþÿþÿþÿþÿ@SENT LEON AT POST 4917 A BAILER AND LOG SHEETS ON 10/27/2005. BBxh ÂX?Â">ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂX@ÂQ+ÂÁxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXAÂT2ÂÂUxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXBÃ_ÂÂxi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂXCÂEÂÂxi xi Á`xj þÿþÿþÿþÿþÿþÿþÿQNOBODY PRESENT ON SITE FAILING MONITORING REQUIREMENT FOR HEATING OIL TANK. SENT LEON COLLINS AT POST 4917 A BAILER AND LOG SHEETS ON 10/27/2005. BB SENT LEON COLLINS AT POST 4917 MORE LOG SHEETS ON 11/17/2006. PER TIM RECTOR CHANGED THEIR ANNUAL INSPECTION FROM A FAIL TO A PASS, BECAUSE THEY HAVE CONTINUED MONITORING THE WELL. LWxi ÂXDÃÂÂ)xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿNOW PASSING PER CTI DON BUBAR.xi ÂXEÂ%ÂÂbxi xi Á`xi ÃI þÿþÿþÿþÿþÿþÿþÿxi ÂXFÂOAÂÂ4xi xi Á`xj Ãþÿþÿþÿþÿþÿþÿ0FLAPPERS INSTALLED PER DAVID HOWE & ERIC ELLIOTTxi ÂXGÃ,<ÂÁ xi xi Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Ã]ÃYÂÁ xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿkOMNTEC SYSTEM INSTALLED 6/13/06 AND ONLINE OEL 8000 II. NEW 15 GALLON SPILL BUCKETS INSTALLED WITH UPGRADES. NEW F.E.PETRO TURBINES INSTALLED WITH VAPORLESS LLD'S ALONG WITH NEW APT SUMPS AND PIPING. TANK 1-1 IS NO LWO SULFUR DIESEL AS OF 6-12-06. TANK 2-1 IS STILL UNL. TANK 3-1 IS NOW PREMIUM UNL. TANKS 4-1 AND 5-1 WERE REMOVED ON 6-5-06 PER CTI BEAUMONT. TJRxjÃ^ÃGÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ_ÂMÂÂ\xj xj Á`xkÃG]þÿþÿþÿþÿþÿþÿtSENT CP LETTER ON 8/8/2006. BB ANODE UPGRADE COMPLETED 1/4/07. AI UPDATE WITH PASSING READINGS RECEIVED 1/16/07. MLxj Ã`à ÂÂXxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿF5/7/07 UPGRADE REGN FOR CTI WILSON TO INSTALL IMPRESSED CURRENT SYSTEMxjÃaÂ%ÂÂ\xj xj Â<xjÃ54þÿþÿþÿþÿþÿþÿþÿxjÃbÂ%,ÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃcÂ%+ÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃdÂ%4ÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃR#ÂÁ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ(/ÂÁ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂXRÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ@/ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ0ÂÂxj xj Â<xjà 8þÿþÿþÿþÿþÿþÿþÿxjÃÂ%1ÂÂ\xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿS TANK READING: -1.12, -1.12 MIKE LEWIS 4/10/06 REPLACED SPILL BUCKET 8/16/2006. BBxjÃÃYÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂLÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â2 ÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂY%ÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂY'ÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂYEÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ]dÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ+IÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ[ÂÂ^xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ7*ÂÂ^xj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿlINSPECTOR IS INCORRECT. IT SHOULD BE EITHER DALE EMERY OR KIRK ST PETER, THEY BOTH SUBMITTED PARTIAL SHEETS.xj ÃÂMÂÂbxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂOÂÂSxjxj Á`þÿþÿþÿþÿþÿþÿþÿþÿ?PO ORDER ISSUED 9/13/2006 WORK NOT YET COMPLEATED 10/11/2006 TSxjÃÃDÂÂYxj xj Á`xjÃ=þÿþÿþÿþÿþÿþÿþÿxjÃÂ!ÂÁ xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃBÂÂ\xj xj Á`xjÃ20Qþÿþÿþÿþÿþÿþÿ& TANK READING: MIKE LEWIS CTI 4/10/06xjÃÃWÂÂYxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ TANK READING: .99, .98xjÃÃ`ÂÂAxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂEUÂÂAxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿ)CTI DRISKO NOW SAYS FACILITY IS PASSING. xjÃà <ÂÂYxjxjÁ`xjÃUþÿþÿþÿþÿþÿþÿþÿxjÃÂ$MÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂW>ÂÂ>xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂP[ÂÂAxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂB[ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃà :ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÃK xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ!Â<ÂÁ$xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ"ÃU) xjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã#Â81ÂÂ:xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ$à ÂÂLxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã%ÂX)ÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ&Ã*`ÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ'ÂHÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ(ÃJGÂÂ]xjxjÂ<xjÃP JþÿþÿþÿþÿþÿþÿþÿxjÃ)Ã$^ÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ*ÃF/ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ+Â4ÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ,Â*ÂÂxjxjÁ`xj ÃB,Rþÿþÿþÿþÿþÿþÿþÿxj Ã-ÁYÂÂYxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿ> TANK READING: 1.01, 1.25 PER CTI DODGE RECENT CP UPGRADE. BBxj Ã.ÃK ÂÂYxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã/Â"PÂÂ^xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ0ÃLÂÂSxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿZNOTE THAT CTI ST PETER INDICATES THERE ARE SPACERS THOUGH IT FAILED LAST YEAR FOR SPACERS.xjÃ1ÃR0ÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ2Â7'ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ3Ã-&ÂÂ'xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ4Â-5ÂÂ'xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã5Â(?ÂÂ'xjxjÂ<xjÂ*þÿþÿþÿþÿþÿþÿ$PRECISION TEST PASSED 12/18/06. MLxjÃ6ÂH ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ8ÂBaÂÂ*xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿ&REPLACED VEEDER-ROOT ON 10/04/2006. BBxjÃ9ÃR=ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ:à GÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ;ÃN ÂÁ$xjxjÂ<xjÃQþÿþÿþÿþÿþÿþÿþÿxjÃ<ÂO  xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã=Ã,PÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ> ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ?ÃX? xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ@ÂAB xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃAÂGUÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃBÃGÂÂxjxjÂ(xj þÿþÿþÿþÿþÿþÿþÿFACILITY PROPERLY TAKEN OOSxj ÃCÂGÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ?CP PASSED -0.91 VOLTS. BB TANK PLANNED FOR REMOVAL IN AUG 2007xjÃDÃ3ÂÂxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxjÃEÃÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿ13/7/08 COPI - CTI BISKUPIAK REPLACED SPILL BUCKETxjÃFÃbZÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿREPLACED (2) 61-SO.xjÃGÃT$ÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿ2INSTALLED NEW SENSOR IN DIESEL INTERSTITIAL SPACE.xjÃH `ÂÂ\xjxjÂWxj þÿþÿþÿþÿþÿþÿþÿ7FILL CAP AND ADAPTER FAULTY REPLACED PER CTI AARON THORNDIKE. NO FLOATING OIL OR SMELL OF OIL?: MONITOR WELLS 1&2 NO APPARENT SHEEN OR ODOR OBSERVED. SPILL BUCKETS CLEAN?: CONTAINS FUEL/WATER, REMOVED AND CLEANED, RECOMMENDED SPILL BUCKET BE KEPT FREE OF ALL LIQUIDS/DEBRIS AT ALL TIMES PER CTI AARON THORNDIKE.xj ÃIÂ<8ÂÂHxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿ MONTORING CONSOLE IS FULLY OPERATIONAL?: INSITU BATTERY OPERATED TANK MONITOR, RECOMMENDED REPLACEMENT WITH CONTINUOUS TYPE MONITOR, PER CTI MIKE LEWIS. SPILL BUCKETS LIQUID TIGHT?: FILL CAP NOT LIQUID TIGHT, REPLACED PER CTI MIKE LEWIS. TANK BOTTOM CONTAINS .25" OF WATER.xj ÃJÃ0ÂÂTxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃKÃD!ÂÂHxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿÎTANK BOTTOM CONTAINS 1 7/8" OF WATER RECOMMEND REMOVAL PER CTI MIKE LEWIS. FILL CAP NOT LIQUID TIGHT, REPLACED PER CTI MIKE LEWIS. COPPER LINES HAVE SPACERS?: NOT ISOLATED, RECOMMENDED SPACERS BE INSTALLED.xj ÃLÃGÂÂHxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿHFILL CAP NOT LIQUID TIGHT REPLACED PER CTI MIKE LEWIS. NO WATER IN SUMPS OR INTERSTITIAL SPACE?: PIPING SUMPS CONTAIN A SMALL AMOUNT OF WATER- LESS THAN 1 GALLON , REMOVED AND CLEANED. WATER INFILTRATION APPEARS AT LID, APPLIED SEALANT TO LID AREA PER CTI MIKE LEWIS. SPILL BUCKETS CLEAN?: CONTAINED WATER, REMOVED AND CLEANED.xj ÃNÂ7$ÂÂTxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃOÂQÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿYCLEANED SPILL BUCKETS. PER IRA DODGE, CTI, PROBES CHANGEDNOW PASSING FACILITY. TRxjÃPÂ<:ÂÂ\xjxjÂWxj þÿþÿþÿþÿþÿþÿþÿžFAULTY FILL CAP AND ADAPTER, REPLACED PER CTI AARON THORNDIKE. SPILL BUCKETS CLEAN?: SPILL BUCKET CONTAINS WATER, REMOVED AND CLEANED PER CTI AARON THORNDIKE.xj ÃQÂ3;ÂÂTxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃRÂG,ÂÂ\xjxjÂWxj þÿþÿþÿþÿþÿþÿþÿ< COPPER LINES HAVE SPACERS?: RECOMMENDED LINES HAVE SPACERS.xj ÃSÂ,)ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿÖTHE INSPECTOR CALLED THIS A FAIL DUE TO NO SPACERS BETWEEN THE COPPER PIPING; HOWEVER, THE UST WAS INSTALLED BEFORE 1991 AND IS NOT REQUIRED TO HAVE SPACERS. THE PIPING SUMP MAN HOLE NEEDS TO BE REPLACED ASAP. LWxjÃTÂÂÁ xjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[SÂ"%ÂÁ xjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[TÂ4ÂÁ xjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿtVENT PIPE FAILED CP, NEED TO BE DEALT WITH BUT DOESN'T WARRANT FAILING WHOLE INSPECTION. PRODUCT PIPE READING: N/Axi Â[UÂ4ÂÁ xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿ…PRODUCT PIPING AND VENT PIPE BOTH FAIL CP TEST. SENT CP LETTER ON 01/06/2006. BB CP RETEST 4/27/2006 (PASS). PIPING REPLACED 10/06xi Â[Và ÂÂxi xjÁ`þÿþÿþÿþÿþÿþÿþÿþÿNCALL FROM REGGIE AT GAFTEK ON 9/25/2006 . WORK TO BE COMPLETED THIS FALL. BB xi Â[WÂ3QÂÂKxjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[XÃN ÂÁ$xi xjÁ`þÿÃE 8þÿþÿþÿþÿþÿþÿnCERT OF PROPER INSTALLATION FOR NEW ENTRY BOOTS IN PIPING SUMPS. BB CERT OF PROPER INSTALL FOR CRASH-VALVES BBxiÂ[YÂ4ÂÁ xjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿ“11/5/09-COPI REC'D FOR CTI LEGASSE JR TO INSTALL NEW INT. RISER PIPE AND NEW 4" FILL PIPE AND REPLACED SPILL BUCKET-PH 10/14/09 PER TELEPHONE CALL FROM JOHN MULLINS, CURRENT PLAN IS TO REMOVE THIS TANK IN SUMMER 2010 AND REPLACE WITH AN AST. JOHN HAS INSPECTED AND WILL BE SLEEVING THE COPPER LINES TO MAKE INSPECTION PASS FOR 2010 INSPECTION YEAR. TRxi Â[ZÂÂÁ xjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[[ÂKÂÁxi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿPASSING PER CTI, ED GEORGE. xi Â[\Â\LÂÂMxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ[]Ã#cÂÁ$xi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿ^PASSING PER DAWSON DAVIS. *****NOTE****** ORIGINAL INSPECTOR IS ALSO DAWSON AND NOT DENNIS. xi Â[^Â1ÂÁxi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[_ÂE^ÂÂTxi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿÁINSPECTOR LISTS OVERFILL AS FLAPPER. THIS IS SUPPOSED TO BE A WASTE OIL TANK AND WOULD REQUIRE ELECTRONIC OVERFILL. SPILL BUCKET REPLACED ON 02/06/2006. BB INTERSTITIAL REPAIRED 12/21/2005. BBxi Â[`Â3:ÂÂTxi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[aÂPÂÂKxjxjÁ`þÿÃ&3þÿþÿþÿþÿþÿþÿÞFACILITY HAS A MIDWAY SUMP, IT APPEARS THERE MAY NOT BE ELECTRONIC MONITORING ON THAT SUMP. IT IS FULL OF OILY WATER, RUNOFF FROM LOT. ALL THREE SUMPS HAVE TORN SUMP EXITS WHERE THE MONITOING CONDUIT EXITS THE SUMP. LLD ON SUPER SIDE FAILED SLOW FLOW TEST. CHRIS V. CALLED 2/20/07. HE'S GETTING ESTIMATES FOR WORK ON UST. SENT CTI LIST. BB CHRIS V. CALLED 3/20/2007. PORTLAND PUMP CONTRACTED TO MAKE REPAIRS, AS SOON PRACTICAL WITH THE WEATHER. -LW UPGRADE REGN RECD 5/8/07xi Â[bÃdÂÂRxjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â[cÂK ÂÂUxjxjÂxiþÿþÿþÿþÿþÿþÿþÿeDENNIS RODERICK CALLED BACK ON 2/21/2007, CONTRACTED SIMMARDS & SONS TO COMPLETE A.I. THIS MONTH. -LWxiÂ[dÂ1@ÂÂxjxjÂ7xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\Ã:KÂÁ xjxjÂ(þÿþÿþÿþÿþÿþÿþÿþÿuSENT CP LETTER ON 01/06/2006. BB OWNER GETTING LOAN TO UPGRADE FACILITY, INCLUDING REPLACING ALL TANKS. 12/13/06 -MLxiÂ\à WÂÂ)xi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\ÂV]ÂÂMxj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\Â:ÂÂRxj xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\ÂEBÂÁ xj xj ÂxiþÿþÿþÿþÿþÿþÿþÿþAT THE TIME OF INSPECTION 3 CP TANKS WERE STILL FAILING. CP TANKS WERE REMOVED ON 10/05/2005 AND REPLACED WITH JACKETED TANK. COULD NOT ENTER CP AS FAIL BECAUSE TANKS HAD BEEN REMOVED BEFORE DEPT RECEIVED THE INITIAL INSPECTION REPORT ON 01/10/2006. BBxiÂ\Ã]ÂÂdxi xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\ÂÂÂ)xi xj Á`þÿþÿþÿþÿþÿþÿþÿþÿ*FACILITY OUT OF SERVICE AT TIME OF INSPECTION, CLOSED SO UNABLE TO INSPECT ELECTRONICS. TANK CHAMBERS CONTAIN BETWEEN 5 AND 10 INCHES OF PRODUCT. MULTIPLE FAILS DUE TO INABILITY TO CONFIRM. ADDITIONAL NOTE: FACILITY MAY HAVE BEEN SOLD AT AUCTION ON 1/5/06. IT IS NOT KNOWN WHO THE BUYER MAY BE. xi Â\Â&  xi xj Á`þÿþÿþÿþÿþÿþÿþÿþÿ2 COPPER LINES HAVE SPACERS?: SPACERS NOT REQUIRED.xi Â\ ÂÂÂ)xi xj Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi Â\ ÃW"ÂÂdxi xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\ Ã^ ÂÂxi xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\ Ã&ÂÂ)xi xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\à QÂÂxj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿEGROUND FROZEN WHEN CP WAS TESTED. BB SENT CP LETTER ON 01/11/2006. BBxi Â\ÂC xj xj Âxi þÿþÿþÿþÿþÿþÿþÿ;CP ON VENT PIPING FAILED (-0.569 VOLTS). GROUND FROZEN. BBxi Â\ÂYUÂÂYxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\Ã8ÂÁ xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\Ã8ÂÁ xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\ÂÂÂ$xj xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\Ã=3ÂÂYxi xj Á`þÿþÿþÿþÿþÿþÿþÿþÿºFACILITY IS OUT OF SERVICE, PIPING IS STILL HOOKED UP BOTH ENDS, TO TANK AND DISPENSER. LINE MAY STILL CONTAIN SOME PRODUCT. TANKS ARE PUMPED OUT, TANK IS VENTED AND FILL PIPE LOCKED. xi Â\Ã!OÂÂYxi xj Á`þÿÃ3þÿþÿþÿþÿþÿþÿþÿxi Â\Ã8ÂÁ xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ1CORRECT REGISTRATION FOR JACKETED TANK NOT DW CP.xjÂ\ÂEYÂÂAxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ*TANK #3 AND TANK #4 REMOVED ON 10/03/2006.xi Â\ÂP[ÂÂAxj xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\Ã%@ÂÂHxj xj Á`xjÃ"MþÿþÿþÿþÿþÿþÿK DROP TUBE?: UNABLE TO INSPECT DUE TO REMOTE FILL AND NO ACCESS AT TANK TOPxjÂ\ÃD ÂÂ\xj xjÁ`þÿþÿþÿþÿþÿþÿþÿþÿ•TANKS HAVE BEEN OUT OF SERVICE SINCE BARBER FOODS PURCHASED THE PROPERTY. THEY ARE REMOVING ALL PRODUCT FROM THEM AND WILL TAKE THEM OUT OF SERVICE. xi Â\ÃNOÂÂ\xj xjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\Â>cÂÂ;xj xjÁ`xj  AþÿþÿþÿþÿþÿþÿtGLENN DORE CALLED 12/7/07, BILL ROBINSON IS COMING OVER TO INSPECT THE FACILITY WITHIN 10 DAYS. TRxj ÂSYÂQS xi xi Â6xj þÿþÿþÿþÿþÿþÿþÿ*CERT OF PROPER INSTALLATION 01/12/2006. BBxiÂ\Ã,ÂÁ$xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\ÂQNÂÂYxjxjÁ`xjÃ(QþÿþÿþÿþÿþÿþÿþÿxjÂ\ ÃF-ÂÂYxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\!ÂÂÂAxjxjÁ`xjÃ$,[þÿþÿþÿþÿþÿþÿþÿxjÂ\"Â/>ÂÂYxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\#ÃZYÂÁ$xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\$ÂGÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿFAILING TANKS REMOVED 7/18/06xi Â\%ÃBÂÁ$xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\&Â&MÂÂRxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿtSENT MARITIME A L.O.W. ON 1/30/06 FOR FAILING TO REPORT EOL. PRECISION TEST 12/05 & 1/06. UPDATED TO A "PASS" -ACFxi Â\'ÃÂÂxjxjÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\(ÂJ ÂÂxjxjÂxi Ã,>`þÿþÿþÿþÿþÿþÿþÿxi Â\)Â31ÂÂUxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\*Âd;ÂÂxjxjÂ<xi à 6þÿþÿþÿþÿþÿþÿþÿxi Â\+ÃE@ÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\, 3ÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\-Ã!TÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\.Ã2ÂÂUxjxjÂ<xi Ä;ÂÂUxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\0Â86ÂÂUxjxjÂ<xi Ã3þÿþÿþÿþÿþÿþÿþÿxi Â\1à ÂÂUxjxjÂ<xj Ã-Gþÿþÿþÿþÿþÿþÿþÿxj Â\2Â<ÂÂUxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\3ÃGÂÂ+xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\4à ZÂÁ$xjxjÂxj þÿþÿþÿþÿþÿþÿþÿtOWNER SENT LETTER REGARDING HAVING THE CP SYSTEM RETESTED INTHE SPRING OF 2006. BB CP RETEST ON 4/11/2006 (PASS). BBxjÂ\5ÂÂÂ;xjxjÁ`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ\6Â!ÂÂxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿ5MONITORING SYSTEM REMAINS A PROBLEM AT THIS FACILITY.xi Â\7ÂA1ÂÂZxjxjÂ(þÿþÿþÿþÿþÿþÿþÿþÿ TANK PLANNED FOR REMOVAL 4/30/07xjÂ\8ÃQ1ÂÂxjxjÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\9Â>\ÂÂxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â\:Â81ÂÂ:xjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\;Ã"ÂÂAxjxjÂ<xjÃþÿþÿþÿþÿþÿþÿ+1/18/08 COPI - CTI SIMARD INSTALLED ILS 250xjÂ\<Ã2ÂÂDxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ\=Â-@ÂÂAxjxjÂ<xjÃZ8PþÿþÿþÿþÿþÿþÿþÿxjÂ\>ÂV&ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\?ÂXÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\@ÂVÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\AÂVÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\BÂV%ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\CÂVÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\DÂ[ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\EÂV!ÂÂKxjxjÂ<xh þÿþÿþÿþÿþÿþÿþÿþÿxh Â\FÂV ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\GÂV$ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\HÃ[ÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\IÃRCÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\JÃRDÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\KÃR@ÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\LÃRBÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\MÃRAÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\NÃRTÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\OÃSJÂÂXxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\PÂÂÂYxjxjÂ<xjÃXþÿþÿþÿþÿþÿþÿ±7/5/11-NOITR REC'D FOR LES WILSON TO REMOVE TANKS AND PIPING, ST. GERMAIN TO DO SA-PH FACILITY HAS RECIEVED A NOV FOR REMOVAL. FYI- OWNER, STUART GANNETT, IS A TOWN SELECTMAN.xjÂ\QÂWCÂÂBxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â\RÃ=_ÂÂBxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â\SÃ`"ÂÂAxjxjÁ`xjÃ"VKþÿþÿþÿþÿþÿþÿþÿxjÂ\TÂ/ZÂÂxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi Â\UÂV#ÂÂKxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi Â\VÃN[ÂÂxjxjÂxi ÃC þÿþÿþÿþÿþÿþÿþÿxi Â\WÃJÂÂBxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â\XÃZÂÁxi xjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxi Â\YÂTÂÂxjxjÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\Z ' xjxjÂxi þÿþÿþÿþÿþÿþÿþÿFCP ON FLEXES UNDER DISPENSERS FAIL. BB FLAPPER REPLACED 12/23/2005. BBxi Â\[Â-ÂÁ$xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxi Â\\Ã' xjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿ*WATER PUMPED FROM SUMPS PER CTI ED GEORGE.xi Â\]Ã_ÂÂdxi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\^Ãa-ÂÂLxi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\_ÂPÂÂxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿþÿxi Â\`Â-]ÂÂAxjxjÂ<xjÃX0þÿþÿþÿþÿþÿþÿþÿxjÂ\aÂKPÂÂ)xjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\bÃ-ÂÁ$xjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â\cÂ9ÂÂAxjxjÂ<xjÃF/þÿþÿþÿþÿþÿþÿþÿxjÂ\dÃ=_ÂÂBxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â]ÂWCÂÂBxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â]ÃBÂÂBxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â]Â+VÂÂBxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]Â7XÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]Â7XÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]ÂX ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]Ã"ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]ÃÂÂUxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â] ÃaÂÂUxjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿwNOTE: THE CTI LISTED REGISTRATION 13793. SAME OWNER/OPERATOR BUT NO TANKS LISTED. CORRECT REGISTRATION IS THIS ONE.xi Â] Âc^ÂÂBxjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â] ÃdÂÂBxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿ+CTI CHRIS WILSON INDICATES ALL OPERATIONAL.xj Â] Â;*ÂÂBxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿTINTERSTITIAL PROBE CAP CRACKED AND BARE WIRES SHOWING, CTI RECOMMENDED REPLACEMENT. xj Â] ÂLXÂÂUxjxjÁ`xi Ã_#þÿþÿþÿþÿþÿþÿþÿxi Â]Ã`(ÂÂAxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]Â2IÂÂxjxjÂxi Ã>]þÿþÿþÿþÿþÿþÿ‰INSPECTOR INDICATES TWO TANKS AT FACILITY. ONE 12,000-GALLON AND A 12,000 SPLIT 6,000/6,000. VERIFY WITH NEXT COMPLIANCE INSPECTION. BBxi Â]Ã&HÂÂxjxjÂxi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]Â_ÂÁxi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿ/PER KEN LEGASSE, CTI, ALL SYSTEMS NOW PASSING.xi Â]ÂÂÁxi xjÁ`xj þÿþÿþÿþÿþÿþÿþÿNOW PASSING PER MIKE ARBOUR.xi Â]Â4ÂÂ)xi xjÁ`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂN%Â7ÂÂKxixiÁ`xjþÿþÿþÿþÿþÿþÿþÿxTROUBLE LIGHT ON , UNABLE TO RESET SAME, NEEDS REPAIRS. CTI DENNIS DAVIS REPLACES MONITORING SYSTEM ON 02/06/2006. BBxiÂ]ÂV!ÂÂKxj xj Âxi þÿþÿþÿþÿþÿþÿþÿ?INSPECTION PREVIOUSLY ENTERED AS INSPECTION DATE 12/16/2004. BBxi Â]ÂA0ÂÂ$xj xjÁ`xjþÿþÿþÿþÿþÿþÿþÿ½INSPECTION IS LABELD AS INSPECTION UPDATE, BUT IT IS A FULL INSPECTION AND THERE IS NO FAILING INSPECTION IN THE DATABASE SO, ENTERING AS AN INITIAL INSPECTION AND PASSING. TIMOTHY RECTORxjÂ]Â[-ÂÁxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]Â1ÂÂTxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â] %ÂÂxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿ¹CTI CARVER NOTES: "BOLTS FOR COMPRESSION SEAL RETAINER STRIPPED OUT AND COMPRESSION SEAL TORN ON TANK 5-1 SPILL BUCKET". FAILED PREVIOUSLY AND OWNER HAS FAILED TO MAKE NEEDED REPAIRS. xjÂ]Â9ÂÂYxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]ÃGÂÂKxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]ÂJ"ÂÂUxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿvREMOVED WATER FROM T#2 INTERSITIAL & RESET. REPLACED BALLFLOAT WTH FLAPPER T#1 REPLACED SPILL BUCKETS ON 4/7/2006. BBxjÂ]ÂBÂÂxjxjÂ(xj þÿþÿþÿþÿþÿþÿþÿREPLACED SUMP SENSOR IN T#6xj Â]Ã?ÂÂxjxjÂ(xj þÿþÿþÿþÿþÿþÿþÿIT APPPEARS THAT BOB TRASK DID A CP TEST ON TANK #4 ON 3/27/06 THE RESULTS ARE AS FOLLOWS: -1.079, -1.00, -.972 THEY ALSO APPEAR TO BE USING AN ATG ON THIS TANK AND PASSING RESULTS WERE SUBMITTED. 9/17/07 UPGRADE REGN FOR CTI COUTURE TO INSTALL DAY TANK W/HI-HI-LEVEL ALARMxj Â]Â'ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]Ã@ ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â] Â'ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]!Ã/YÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]"Â'ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]#Ã5+ÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]$ÃHÂÂKxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]%Â2ÂÂKxjxjÂxj Ã[/þÿþÿþÿþÿþÿþÿiCP FAILED 12/05 (GROUND FROZEN). LETELLIER RETESTED 4/13/06 7/27/07 NOI FOR CTI DAVIS TO REPLACE PIPINGxi Â]&ÃÂÂxi xjÂ(xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]'Â-VÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ](ÃT ÂÂAxjxjÁ`xjà IOþÿþÿþÿþÿþÿþÿeLEVEL PROBE ON TANK CHAMBER 2 NOT OPERATING. INTERSTITIAL MONITORING IS FINE. PASSING INSPECTION. TRxjÂ])Â%?ÂÂHxjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿ=4,000 GALLON GAS TANK OUT OF SERVICE. TANK READING: .86, .86xi Â]*Â@ÂÂxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]+Ã.ÂÂxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿI4/23/09-COPI, CTI CARVER TO REPLACE BALL FLOATS WITH FLAPPER OVERFILL PHxjÂ],à ÂÂUxjxjÁ`xjÃ=dþÿþÿþÿþÿþÿþÿ,INSTALLED NEW SPILL BUCKETS ON 2/27/2006. BBxjÂ]-ÂDÂÂAxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ].Ã/WÂÂHxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]/ÃW'ÂÂAxjxjÁ`xjÃ+,7þÿþÿþÿþÿþÿþÿþÿxjÂ]0Ã] ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]1ÂÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]2Ã]ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]3ÂVÂÂXxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]5Â=TÂÁ$xjxjÂþÿÃ2 0þÿþÿþÿþÿþÿþÿtFACILITY TO HAVE GR ADAMS COMPLETE FULL INSPECTION IN APRIL OR MAY AND REMAIN ON THAT SCHEDULE FOR CP COMPLIANCE. BBxj Â]6Ã,ÂÁ$xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]7ÃZYÂÁ$xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]8ÃÂÁxjxjÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ]9ÂÂÂxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]:Ã"ÂÁxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ];Ã*ÂÂ)xjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿ1AI SCHEDULED WITH SIMARD & SONS FOR JUNE 2007 -MLxi Â]<ÂKPÂÂ)xjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]=ÂSBÂÁ$xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]>ÂbÂÂ*xjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]?ÂOTÂÂTxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â]@Â7FÂÁ$xjxjÂ<xjÃc%þÿþÿþÿþÿþÿþÿþÿxjÂ]AÃA_ÂÂ!xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]BÂ'ÂÁ$xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿSENT CP LETTER 3/10/2006. BBxj Â]CÃ& xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿ~SENT CP LETTER ON 3/10/2006. BB CALL FROM DOUG FRYE AT AT&T ((908) 234-4675) ON 5/22/2006. TANK TO BE REMOVED THIS SEASON. BBxj Â]DÃ]ÂÂ)xjxjÂxi þÿþÿþÿþÿþÿþÿþÿqREPLACED MOTHER BOARD ON ILS-250 AND REPLACED INTERSTITIAL SENSORS PER CTI, KEN LEGASSE. FACILITY NOW PASSES. TRxi Â]EÃJ:ÂÁ$xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]FÂK[ÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]GÂCOÂÂ!xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]HÃ#ÂÁxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿPROBE MISSING.xjÂ]IÂ"PÂÂ!xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]JÂKÂÂ!xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿßCTI QUESTIONED PIPING AT DISPENSERS. IT APPEARED TO BE GALV PIPING. CERT OF PROPER INSTALL SHOWS FIBERGLASS. DEP ON SITE IN 2004 INVESTIGATING INSTALLER VIOLATIONS WITH HEATING AND WASTE OIL TANKS. SITE VISIT NEEDED. BBxjÂ]KÂGÂÂ!xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]LÃQÂÂxj xj Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]MÃ0&ÂÁ$xj xj Á`xjÄ þÿþÿþÿþÿþÿþÿþÿxjÂ]NÂ?, xj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿQBILL CARVER REPLACED LLD ON 01/23/2006. BB REPLACED SPILL BUCKETS ON 9/8/2006. BBxi Â]OÂ$ÂÂ!xj xj Á`xjÄR\þÿþÿþÿþÿþÿþÿþÿxjÂ]PÂTaÂÂ!xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]QÃ*[ÂÁxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ NOW PASSING PER MIKE ARBOUR CTI.xi Â]RÃXÂÁxj xj Á`xi þÿþÿþÿþÿþÿþÿþÿCTI ARBOUR FAILED INSPECTION ON TANK 1-2 DUE TO NO OVERFILL AND NO STAGE 1 VAPOR RECOVERY. PASSING INSPECTION LETTER EXEMPTING OVERFILL INSPECTION FROM DEP DATED IN 2001. EXEMPTING FOR VAPOR RECOVERY, LARGEST THROUGHPUT LESS THAN 10,000 GALLONS/MONTH ANNUAL IS UNDER 60,000. xi Â]SÃ1ÂÁ$xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]Tà VÂÁ$xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â]UÂ6ÂÁ$xj xj Â<xj ÄEVþÿþÿþÿþÿþÿþÿþÿxj Â]VÂAÂÁxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]WÂd(ÂÂ!xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]XÂ* ÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]YÃÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿNOTE: PHONE CALL FROM PAUL BOSSE 2/6/07. HE INSTALLED AN ATG AT THIS SITE INTHE SUMMER OF 2006. NO LONGER DOING SIA. PAPERWORK FORTHCOMING. TRxjÂ]ZÂbÂÂ!xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ][ P xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]\Ã,ÂÁ$xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]]Â5(ÂÁxj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â]^Ã\SÂÂxj xj Á`xi þÿþÿþÿþÿþÿþÿþÿ)PASSING PER CTI GEORGE. SENSOR REPLACED. xi Â]_ÂB%ÂÂ!xj xj Á`xjÃþÿþÿþÿþÿþÿþÿþÿxjÂ]`Ã"EÂÂ!xj xj Á`xjÄIJþÿþÿþÿþÿþÿþÿDHEATING OIL TANK IS OOS AND SCHEDULED TO BE REMOVED WITHIN 60 DAYS.xjÂ]aÂ<ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]bà ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ]dÃBÂÂxj xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â^Ã3RÂÂLxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^ÂWÂÂLxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^ÂW ÂÂLxj xj Á`xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂ^Â68ÂÂYxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^Ã$:ÂÂ)xjxj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi Â^ ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^Ã3ÂÂbxjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿ43/19/08 JIM SAYS CTI REDMOND CONTRACTED TO DO AI -MLxi Â^ ÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^ ÃXÂÂ!xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^ Â$ÂÂ!xjxjÁ`xjÃ+2XþÿþÿþÿþÿþÿþÿþÿxjÂ^ ÂG.ÂÂ)xjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿ SEE NOTES xjÂ^ ÃVÂÁxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^ Â$ÂÂ!xjxjÁ`xjÄ#>þÿþÿþÿþÿþÿþÿþÿxjÂ^ SÂÂXxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^ ÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^Â@^ÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^ÂU&ÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿvJOSH BISKUPIAK CALLED ON 3/16/2007 TO LET THE DEPARTMENT KNOW THAT THE FACILITY FAILED THE A.I., BECAUSE THE VENT PIPE IS LOCATED ON THE TANK, AND WATER SURROUNDED THE BOTTOM OF THE VENT, SO IF HE REMOVED THE VENT TO EXAMINE THE BALLFLOAT WATER WOULD OF GOTTEN INTO THE TANK. SO, HE MARKED THE A.I. AS A FAIL, BUT HE WILL RETURN THIS SPRING TO COMPLETE AND UPDATED A.I. -LWxjÂ^ÃMÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿ‹PIPIING WORK WAS DONE AT THIS LOCATION IN 2007 SEE THE FILE FOR MORE INFORMATION. THERE IS NO 2007 INSPECTION ON FILE HOWEVER. 1/22/08 TRxj Â^Ã^$ÂÂxjxjÂ(þÿÃV_þÿþÿþÿþÿþÿþÿNBILL WAS UNABLE TO ACCESS TANK TOP DUE TO ICE; COULDN'T CHECK ANY PROBES. -ACFxjÂ^Â2WÂÂxjxjÂ(þÿÃ)þÿþÿþÿþÿþÿþÿ0BILL COULDN'T PULL TANK PROBES DUE TO ICE. -ACFxjÂ^ÂAÂÂxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿzGROUND FROZEN DURING CP TEST. DEVIN TAPLEY AT LAMPRONS SENT LETTER STATING CP WOULD BE RETESTED OR REPAIRED IN SPRING. BBxjÂ^ÃOÂÂxjxjÂþÿÄ(ZþÿþÿþÿþÿþÿþÿwGROUND FROZEN DURING CP TEST. DEVIN TAPLEY AT LAMPRONS SENT LETTER STATING CP TO BE RETESTED OR REPAIRED IN SPRING. BBxjÂ^ÂRÂÂUxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^Á(ÂÂUxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^ÂPÂÂUxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^Ã\.ÂÂAxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^Ã#4ÂÂxjxjÂ<xjÃQAþÿþÿþÿþÿþÿþÿþÿxjÂ^ÂÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^Ã%5ÂÂxjxjÂ<xjÄV+þÿþÿþÿþÿþÿþÿþÿxjÂ^ Ã?'ÂÂxjxjÂ<xjÃþÿþÿþÿþÿþÿþÿþÿxjÂ^!ÂE]ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^"ÁÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^#ÃQÂÂXxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^$ÃÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^%ÃÂÂ!xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^&à ÂÁxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿPASSING PER CTI, MIKE ARBOUR.xjÂ^'Ã^IÂÂxjxjÁ`xjÃ3þÿþÿþÿþÿþÿþÿþÿxjÂ^(ÁÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^)à NÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^*ÂNÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^+à /ÂÂAxjxjÁ`xjÃ,ZþÿþÿþÿþÿþÿþÿþÿxjÂ^,Â/QÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^-Â'ÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^.Â]ÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿNOW PASSING PER CTI SIMARD. xjÂ^/Â*\ÂÂxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿ›IN CONTACT WITH SCOTT DAGGETT AT COURTHOUSE. CURRENTLY SEEKING BIDS ON CP REPAIR. 04/04/2006. BB SENT SECOND FAIL CP LETTER WITH DEADLINE OF 8/31/2006. BBxjÂ^0ÃQÂÂBxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^1Ã`1ÂÂbxjxjÁ`xjÃ84[þÿþÿþÿþÿþÿþÿþÿxjÂ^2Ã="ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^3Ã8XÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^4Ã9ÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^5Â`ÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^6ÃQÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^7ÂFÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^8ÂcÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^9Ã9ÂÂxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxj Â^:Ã]ÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^;ÂN]ÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^<ÂL`ÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^=Á4ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^>Â70ÂÂ!xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^?ÂAÂÁ$xjxjÁ`xjÄCDþÿþÿþÿþÿþÿþÿ$REPAIRS MADE REPLACED SPILL BUCKETS.xjÂ^@Ã[ ÂÁ$xjxjÁ`xjÃE&þÿþÿþÿþÿþÿþÿþÿxjÂ^AÂ$ ÂÂ!xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^BÃU.ÂÂxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿ COPPER LINES PROPERLY SLEEVED?: TANKS DATABASE SHOWS FLEX PIPING INSPECTOR PASSED COPPER TANK IS BEING REPLACED IN 2007? TRxjÂ^Cà ÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^DÃ\9ÂÂAxjxjÁ`xjÃ+BþÿþÿþÿþÿþÿþÿþÿxjÂ^EÂ0ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^FÃ] ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^GÂQOÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^HÂ.=ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^IÂ'ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^JÃV xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^KÂ.V xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^LÃ= xjxjÂxjþÿþÿþÿþÿþÿþÿþÿGTANK IS STILL OUT OF SERVICE DUE TO FIRE IN BLDG. OWNER TO REBUILD. BBxjÂ^MÃWÂÂxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿOPER MICHAEL SIMARD, CTI, FACILITY IS NOW PASSING. REPLACE INTERSTITIAL SENSOR. xjÂ^NÂFÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^OÃa<ÂÂUxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^PÂd;ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^QÂ<ÂÂxj xj Á`xjÃR50þÿþÿþÿþÿþÿþÿþÿxjÂ^RÃÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^SÃWÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ%PHONE CALL FROM MIKE SIMARD 4/5/06. ALL PENETRATION BOOTS ARE CRACKED AND NEAR FAILURE. NONE CURRENTLY TOTALLY BROKEN/ROTTEN BUT NEED TO BE REPLACED. MIKE BELIEVES IT IS SIMPLY A BAD BATCH OF BOOTS SINCE THEY ARE ALL SIMILIARLY CRACKED/DAMAGED. HE IS CONTACTING MANUFACTURER FOR REPLACEMENTS.xjÂ^TÃ_ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^UÂ.ÂÂ4xj xj Á`xjà @WþÿþÿþÿþÿþÿþÿLALSO ERIC ELLIOTT ASSISTED TANK READING: T-5; -1.01,-.966. T-4; -1.01, -1.00xjÂ^VÂD,ÂÂYxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^WÃL xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^XÂYÂÂ!xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^YÂW xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^ZÂ3TÂÂ)xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^[ÃPÂÂ)xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^\ÂIÂÂ)xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^]Ã" xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^^ÂRF xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^_ÃRÂÂ!xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^`ÂQZ xj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿACHECKING INVENTORY. SPILL BUCKET LIDS REPLACED PER CTI GARY KANE.xjÂ^aÃT% xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â^bÂWÂÂ)xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^cÂRÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ^dÂT5ÂÂxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ‰10/2/08-RECIEVED NOTICE OF INTENT TO ABANDON PH FACILITY STILL OUT OF SERVICE, 1998 INSTALL. HAS BEEN OUT OF SERVICE FOR ABOUT 4 YEARS.xj Â_ÃJÂÂxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_ÂTHÂÂxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_ÂT?ÂÂxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_Ã4ÂÁ"xjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿQNOTE THAT TANK 3 HAS BEEN TRANSFERRED AND IS NO LONGER PART OF THIS REGISTRATION.xi Â_Ã/ ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_Ã&ÂÂAxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_ÂKÂÂ\xjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_ÂOÂÂ\xjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_ à ÂÂHxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_ ÃTÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ#ACTUAL INSPECTION DATE 4/7/2006. BBxjÂ_ ÂNÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ¬ACTUAL INSPECTION DATE 4/11/2006. BB SENT CP LETTER ON 4/21/2006. BB ACTUAL PASS DATE 4/11/2006, COMPUTER WILL NOT LET YOU ENTER A SOONER PASS DATE THEN INSPECTION DATE. LWxjÂ_ ÂJÂÂ!xjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_ Â[/ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿF2 SPILL BUCKETS AND SUMP MANHOLE REPLACED BY CTI LEGASSE JR ON 3/29/07xjÂ_Â$-ÂÁ$xjxjÁ`xjÄ+þÿþÿþÿþÿþÿþÿþÿxjÂ_ ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_ IÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿ#1990 INSTALL SPACERS NOT REQUIRED. xj Â_ÂÂÂxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿJFACILITY UPGRADE REGISTRATION FOR PIPING SPACER INSTALL SUBMITTED 12/27/06xj Â_Â!ÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_ÃGVÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿJFACILITY UPGRADE REGISTRATION SUBMITTED FOR PIPING SPACER INSTALL 12/27/06xjÂ_Â^ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_Ã/ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_à %ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿ+VENT BALL ON SUCTION SYSTEM OK BEFORE 12/96xjÂ_à @ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_ÂC]ÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_Á* xjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿpCLEANED OIL FROM SUMP FOR FRYE BUILDING. FOUND LEAK IN PRESSURE RELIEF VALVE AND REPAIRED PER CTI KEN LEGASSE.ALxjÂ_ÂWÂÂLxjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿPASSING PER CTI WINCHESTER.xi Â_Ã]6ÂÂLxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿBPOST 1991 INSTALL, 1/1996 INSTALL, MISSING SPACERS ON COPPER LINE.xi Â_Â=/ÂÂ!xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_Â.ÂÂ4xjxjÂxjÃ.L þÿþÿþÿþÿþÿþÿþÿxjÂ_Â.ÂÂ4xjxjÂxjÃY:þÿþÿþÿþÿþÿþÿþÿxjÂ_ ÂCÂÂ!xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_!ÂR]ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿRECENT CP UPGRADE . BBxj Â_"ÂaHÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿRECENT CP UPGRADE ON TANKS. BBxjÂ_#Ã+,ÂÂ\xj xjÂxjþÿþÿþÿþÿþÿþÿþÿMIKE LEWIS WAS CP TESTER. BBxjÂ_$à ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿiNEW OWNERS AS OF 10/10/06. SENT CHANGE OF OWNERSHIP FORM AND CTI LIST, TOLD THEM OD FOR AI. -ML 11/16/07xjÂ_%ÂaEÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿ`CTI THOMPSON INSTALLED INCON TS 1001 AND PIPING SUMP SENSORS; MOVED VENT PIPE TO BLDG ON 5/18/07xjÂ_(Â?ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_)ÂaGÂÂ\xjxjÂ<xjÃ3þÿþÿþÿþÿþÿþÿþÿxjÂ_*ÂQ"ÂÂHxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_+ÃO*ÂÂHxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_,Â>ÂÂYxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_-Â?ÂÂYxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_.ÂA ÂÂbxjxjÂ<xjÃ'1þÿþÿþÿþÿþÿþÿþÿxjÂ_/ ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿ SIA FAILEDxjÂ_0ÂW xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_1Â[4 xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_2ÃXÂÂ!xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_3Â$%ÂÂ!xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_4Â=/ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_5ÃV3ÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿHSENT CP LETTER ON 4/26/2006. BB RETESTED ON 5/22/2006. (-0.851 VOLTS) BBxjÂ_6ÃV4ÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_7Â=ÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_8à ÂÂxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿ5TANKS ARE TAKING ON WATER. SCHEDULED FOR REMOVAL. BBxjÂ_9ÂdÂÁ xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_:ÃCbÂÁ xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_;Ã5/ÂÂUxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxj Â_<Â9+ÂÂTxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_=ÃW ÂÂYxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_>Á-ÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿo5/18/07 UPGRADE REGN FOR CTI BISKUPIAK TO INSTALL SPILL BUCKET AND REPLACE ANODES BISKUPIAK ADDED ANODES 8/1/07xjÂ_?ÂEMÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_@Ã.ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿCP PIPING -0.95. BBxjÂ_BÂ;WÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_CÃ!ÂÂTxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ3CP PRODUCT PIPING -0.946, CP VENT PIPING -0.851. BBxjÂ_DÃUÂÂKxjxjÂxj ÃQþÿþÿþÿþÿþÿþÿþÿxj Â_EÂÂÂLxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_FÂÂÂLxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_GÃ*=ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_HÂ>;ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_IÂAÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_Jà NÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_KÂ$GÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_LÂ?ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_Mà /ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_NÂ2DÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_OÃ"ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_PÂ9ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_QÂ2HÂÂUxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_RÃ\,ÂÂLxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_SÂ%?ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_TÂd xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_Uà /ÂÂLxixjÁ`xiþÿþÿþÿþÿþÿþÿþÿ.THIS CORRECTS THE PRIOR INSPECTION ENTRY. TRxiÂ_VÃ8ÂÁxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿlALSO, NO VISIBLE WELLS FOR GROUNDWATER MONITORING. INSPECTOR FAILED FOR THIS ALSO. TANK TO BE REMOVED 12/07xjÂ` ÃaÂÂ)xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿPER CTI BUBAR NOW PASSING.xjÂ_WÂ?1 xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_XÂ>`ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_YÂ[O xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_ZÂ-JÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_[ÃU xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_\Â[C xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_]Â[@ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_^Â[9 xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ__àxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_`Â[KÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_aÂ[?ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_bÂ[7ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â_cÃ;ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ_dÂF1ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`àxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â`Â[B xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â`Â[6ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`Â[AÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿ;5/14/07 CTI DAVIS INSTALLED 15 GAL SPILL BUCKET ON RNL TANKxjÂ`ÃK xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`Â[E xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿ)COPI FOR SPILL BUCKETS REPLACEMENT 4/4/07xj Â`Â[- xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`Â[; xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â` Â[H xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿ5NEW 15 GALLON SPILL BUCKET ON RNL TANK. 5/4/2006. BBxj Â` ÂR[ xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â` Â[>ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â` Â[1 xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿRGUAGE STICK IS IN BAD CONDITION, TOP BROKEN, BUTTON MISSING AND UNABLE TO READ. xjÂ`Â[M xjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿƒNOTE CTI LEGASSE FAILED THE INSPECTION DUE TO INVENTORY ISSUE FOR MONTH OF MARCH 2006. TOTAL THRUPUT WAS 1,647, LEAK CHECK # 16, ACTUAL OVER/SHORT NUMBER IS 76+. TANKS FAILS. BASED ON LOW THROUGH PUT AND POSSIBLE CROSS DROP I AM PASSING THE INSPECTION. WE WILL NEED TO REVISIT OVER/SHORT AT THIS FACILITY. TR CUMBERLAND FARMS SUBMITTED PASSING INVENTORY FOR APRIL 2006. BBxjÂ`Â1cÂÂHxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ2CTI BISKUPIAK REPAIRED INTERSTITIAL RISERS 6/14/07xj Â`Â'ÂÂAxjxjÁ`xhÃ\Hþÿþÿþÿþÿþÿþÿ|COPY OF ANNUAL INSPECTION PROVIDED TO MARY SAUER AAG DURING DISCUSSIONS ABOUT POSSIBLE LAW SUIT CONCERNING MONIES OWED DEP. xhÂ`Â' xjxjÁ`xi þÿþÿþÿþÿþÿþÿþÿ/CTI LEGASSE INDICATES THAT THE REGISTRATION MAY BE IN ERROR, TANK IS A 12,000 GALLON TWO CHAMBER TANK, DEP HAS REGISTERED AS 8,000 AND 4,000, CTI SAYS IT IS ACTUALLY 9,000 AND 3,000. REVIEW OF RECORDS NEED TO BE DONE TO CONFIRM. NOTE THIS INSPECTION WAS RECEIVED BY AAG MARY SAUER AT A MEETING 5/4/06.xi Â`Â.ÂÁMxjxjÂxjÃL3þÿþÿþÿþÿþÿþÿþÿxjÂ`ÃD$ÂÂKxjxjÂxjÄ0Q-þÿþÿþÿþÿþÿþÿþÿxjÂ`à GÂÂ;xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`ÃW^ÂÂ;xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`Ã6N xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿcNO POWER TO MONITORING SYSTEM FOR TANKS 5, 6, AND 11. BB ACTUALLY 5,6,&8. TANK 11 REMOVED IN 2004.xjÂ`Ã[ xjxjÂxjÃF:þÿþÿþÿþÿþÿþÿþÿxjÂ`ÂL  xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`ÃbbÂÂ`xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`Ã7ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`Ã]5ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`Â\ÂÂYxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`ÂIÂÂ;xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`ÂOLÂÂ;xjxjÂ<xjÃ]S9þÿþÿþÿþÿþÿþÿþÿxjÂ`Â-PÂÂDxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â` Â96ÂÂDxjxjÂ<xj ÃH0þÿþÿþÿþÿþÿþÿ-CP READINGS -.890, -.903, -.862 ALL PASSING.xj Â`!Ã^#ÂÂDxjxjÂ<xjÃVþÿþÿþÿþÿþÿþÿþÿxjÂ`"ÂD xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`#ÃH  xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`$ )ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`%ÂM ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`&ÂLMÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`' ?ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`(ÂM ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`)ÂLLÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`*Ã`'ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`+Â$,ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`,Â[: xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Â`-Ãb[ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`.ÂUÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`/ÂJ xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`0ÂGÂÂKxjxjÂxjÃSþÿþÿþÿþÿþÿþÿþÿxjÂ`1ÂÂÂ)xjxjÂxj þÿþÿþÿþÿþÿþÿþÿ|INVENTORY RECORDS NOT ON SITE. BB DAILY INVENTORY FAXED TO THE DEPARTMENT ON 02/07/2007. STILL WAITING FOR SIA RESULTS. LWxjÂ`2Â]$ÂÂYxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`3ÂbÂÂYxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿ TANK READING: .96, .98xjÂ`4Â. xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`5Â]0ÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ:SENT CP LETTER ON 5/8/2006. BB CP UPGRADE ON 7/14/2006. BBxjÂ`6ÂX*ÂÂxjxjÂxi à þÿþÿþÿþÿþÿþÿþÿxi Â`7Â>ÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`8ÃK ÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`9ÃNVÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`:ÂPÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`;Ã+ÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`<ÃWEÂÂxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`=ÂÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`>ÂC!ÂÂLxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`?ÂM9ÂÂxjxjÂ(þÿþÿþÿþÿþÿþÿþÿþÿµ2/26/08 RAY WINN WILL MAIL CARVER'S AI, KNOWS OVERDUE FOR SIA, STOPPED PUMPING GAS IN 12/07 BUT ELEC MONITORING STILL ON DW TANK. WILL START PUMPING FROM SW TANK TO AVOID OOS. -MLxjÂ`@Ã_-ÂÂ`xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`AÃG&ÂÂKxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`BÃQUÂÂYxj xj Á`xjÃ.LþÿþÿþÿþÿþÿþÿþÿxjÂ`CÃbMÂÂYxj xj Á`xjÃ$*þÿþÿþÿþÿþÿþÿþÿxjÂ`DÃJHÂÂYxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ& TANK READING: 1.17, 1.15, 1.16, 1.15xjÂ`EÃdLÂÂbxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`FÂ[0 xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿPDAILY INVENTORY FAILS DUE TO LOW THRUPUT ON SNL TANK. BB CHANGING TO PASS. TRxjÂ`GÂ[G xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ­DAILY INVENTORY FAILS DUE TO LOW THRUPUT FROM SNL TANK. CSLD ON SITE BUT NOT REGISTERED AS PRIMARY LEAK DETECTION METHOD. BB TANK PASSED DAILY INVENTORY FOLLOWING MONTH. BBxjÂ`J Â xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`HÃ'ÂÂ)xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ÷INSPECTION INDICATES FAILING BECAUSE OF NO SPACERS ON COPPER LINES. HOWEVER, THE 2005 INSPECTION ALSO FAILED FOR THE SAME REASON, AND THE DEPARTMENT RECEIVED AND INSPECTION UPDATE DATED 4/3/06 IN WHICH CTI DON BUBAR INDICATES THAT THE LINES NOW HAVE SPACERS. THIS WAS ENTERED AS AN UPDATE TO THE MAY 2005 INSPECTION. WHEN THE MARCH 2006 INSPECTION CAME INTO THE OFFICE THE FAILING ITEM, NO SPACERS, HAD ALREADY BEEN CORRECTED, AS OF 4/3/06, SO THIS INSPECTION WAS ENTERED AS A PASSING INSPECTION. TJRxjÂ`IÂ[=ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿîINSPECTOR INDICATES SUMPS ARE IN POOR CONDITION, NEED A MINIMUM OF NEW LIDS TO MAKE LIQUID TIGHT. ALSO SOME WEEPING UNDER THE DISPENSERS. WEEPS CORRECTED AND PARTS FOR SUMPS ORDERED. PER JON PAINE, SENSORS REPLACED FACILITY NOW PASSING. xjÂ`Kàxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿCBALL FLOAT REPLACED. TJR SPILL BUCKETS REPLACED BY LEGASSE 9/8/06xj Â`L /ÂÂDxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿwE-MAIL FROM LESLIE ANDERSON ON 5/16/2006. PIPING TO BE REPLACED THIS SUMMER AND FACILITY BROUGHT BACK INTO SERVICE. BBxjÂ`MÃMÂÂYxjxjÂxjÃGþÿþÿþÿþÿþÿþÿþÿxjÂ`NÂV`ÂÂAxjxjÂxjÃ>þÿþÿþÿþÿþÿþÿþÿxjÂ`OÃ>4ÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`PÂA-ÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`QÃR7ÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`RÃ\*ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ%MIKE LEWIS TESTED CP ON 4/20/2006. BBxjÂ`SÃ]ÂÂTxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`TÃ<ÂÁ"xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Â`UÂ[L xj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`VÃZYÂÂ!xj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`WÂ$ÂÂ!xj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`XÃ.@ÂÁ$xj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`YÂÂÂxj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`ZÃ!]ÂÂxj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`[ xj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`\ÂB xj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`]ÃÂÂHxj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`^ÃUEÂÂTxj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`_ÃXÂÂ\xj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ``Ã!ÂÂ\xj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`aÂY ÂÂHxj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`bÃ.@ÂÁ$xj xjÂ<xjÄM7þÿþÿþÿþÿþÿþÿþÿxjÂ`cÃaRÂÂLxj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂ`dÂcÂÁ"xj xjÂ<xj Ã=þÿþÿþÿþÿþÿþÿþÿxj ÂaÂ/cÂÁ"xjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaÂ8ÂÁ"xjxjÁ`xj Ã`_þÿþÿþÿþÿþÿþÿþÿxj ÂaÃT#ÂÂ`xjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaÂÂÂ\xjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿsINSPECTOR INDICATES THAT THE TANK IS NOT IN USE BUT STILL HAS 8" OF FUEL IN IT AND ALL SYSTEMS ARE OPERATIONAL. TJRxj Âa *ÂÂLxjxjÂ(þÿþÿþÿþÿþÿþÿþÿþÿEUPDATE & THE REST OF THE TANKS WILL BE FORTHCOMMING PRE-7/1/06. -ACFxi ÂaÃ&\ÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaÃCÂÂRxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaÂDÂÂRxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa Â-%ÂÂRxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa Ã%ZÂÂRxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa Â%VÂÂRxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa à &ÂÁ xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa Ã_`ÂÁ xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaÂARÂÁ xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaÃT"ÂÁ xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaÂZ?ÂÁ xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaÂJÂÁ xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaÃ\@ÂÁ xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaÂ?8ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaÃ\AÂÁ xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaÂU=ÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaÃFÂÁMxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaÃT ÂÂAxjxjÂ(xjà INþÿþÿþÿþÿþÿþÿþÿxjÂaÂGGÂÁ xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿ¯TANK #2 WAS USED FOR #2 HEATING FUEL AND OFF ROAD DIESEL. IS NOW USED FOR ONLY #2 FUEL THAT HEATS BUILDING ACCORDING TO CTI DAVE BEAUMONT. BB SENT CP LETTER ON 5/22/2006. BBxjÂaÃQPÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaÃOÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ¡SENT CP LETTER 5/25/2006. ALSO SPOKE TO OWNER REGARDING REPLACEMENT OF FLAPPER VALVE AND SIA REQUIREMENTS. (NEW OWNER) BB INSPECTION UPDATE DATED 6/16/2006. BBxjÂaÃ:TÂÁxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿsCP RETEST ON 5/3/2006 FAILED (-0.684 VOLTS). SENT 2ND FAIL CP LETTER ON 5/25/2006 WITH A DEADLINE OF 8/31/2006. BBxjÂaÂIÂÂKxjxjÂ7xj þÿþÿþÿþÿþÿþÿþÿjANNUAL INSPECTION REPORT SUBMITTED DURING DEP STAFF INSPECTION. TANK TOP UPGRADE PLANNED FOR SUMMER 2006.xjÂaÃ]-ÂÂKxjxjÂ7xjþÿþÿþÿþÿþÿþÿþÿGANNUAL INSPECTION REPORT SUBMITTED ON SITE DURING DEP STAFF INSPECTION.xjÂaÃ5LÂÁ xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿ³CP PIPING TO BE REPLACED SPRING OF 2007 BASED ON LETTER FROM OWNER DATED 9/14/2006. BB BURT CALLED TO SAY THEY ARE ON TRACK TO REMOVE THE PIPING AND TANKS IN THE SPRING OF 2007 TSxj Âa ÃMÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa!ÁYÂÂYxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿSENT CP LETTER 5/30/2006. BBxjÂa"ÁHÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa#Á^ÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa$Á\ÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa%ÁJÂÂYxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿ_SENT CP LETTER AND CHANGE OF OWNERSHIP FORM TO TOM STEVENS AT CITY OF PRESQUE ISLE 6/2/2006. BBxjÂa'ÂLÂÂYxjxjÂxjÃ#./þÿþÿþÿþÿþÿþÿþÿxjÂa(Ã3ÂÁ xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa)Ã_ÂÁ xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa*ÃÂÁ xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa+ÃbYÂÂTxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âa,Ã8 ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa-ÂÂÁ"xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âa.Ã/]ÂÁ"xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âa/Â8OÂÁ"xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âa0ÂB ÂÁ"xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âa1ÂL'ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa2ÂL(ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa3Ã/6ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa4Ã?LÂÁ"xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa5Ã]"ÂÁ"xjxjÂ<xjÄ$þÿþÿþÿþÿþÿþÿþÿxjÂa6ÂTÂÂKxjxjÂ<xjÃ`?þÿþÿþÿþÿþÿþÿþÿxjÂa7Ã?KÂÁ"xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa8Ã`ÂÂYxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿžHAD ANNUAL INSPECTION DONE IN 2007. WILL CONTACT COMPANY TO GET A COPY OF ANNUAL INSECTION. TOLD THEM LETTER GIVES THEM 30 DAYS TO SUBMIT ANNUAL INSPECTION.xjÂa9Á]ÂÂYxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa:Ã-ÂÂLxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âa;Ã-ÂÂLxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âa<Ã[ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa=ÂCÂÁ"xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Âa>ÃaAÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa?à ;ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa@Ã=TÂÁ"xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaAà >ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaBÃÂÂxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaCÃcÂÂxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaDÃ/ÂÂxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaE 2ÂÂxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaFÃbSÂÂxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaGÂLAÂÂxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂaHÃ:JÂÂYxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ{SENT CP LETTER ON JUNE 5, 2006. TANK 2 HAD CP UPGRADE 11/30/05. BB IRA DODGE RETESTED TANK 1 ON 10/11/06 -.91, -.90, -.93xj ÂaIÃ$ÂÂKxjxjÂxjþÿþÿþÿþÿþÿþÿþÿžJAMES BRAINARD (774-6201) CALLED 11/8/2007. PORTLAND PUMP CONTRACTED TO DO ANNUAL INSPECTION WEEK AFTER THANKSGIVING. WILL SEND IN COPY AS SOON AS POSSIBLE.xjÂaJàxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaKà  xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaLà  xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaMàxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaNÂD xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaOà ] xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaPÃW xjxjÂ<xjÃJBþÿþÿþÿþÿþÿþÿþÿxjÂaQÂP> xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaRÂd< xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaS Â xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaTÃPÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaUÃXJÂÁ$xjxjÂ<xjÄ$5PþÿþÿþÿþÿþÿþÿþÿxjÂaVÃZÂÂHxjxjÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂaWÃ48ÂÂHxjxjÂ<xiþÿþÿþÿþÿþÿþÿþÿþÿxiÂaXÃ2ÂÂ\xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaYÃÂÂ\xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂaZÂD2ÂÂ\xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa[ AÂÂ\xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa\à ] xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa]Â2GÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa^Â#ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa_ÃB xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂa` xjxjÂxjÃ0þÿþÿþÿþÿþÿþÿ;BASED ON DATABASE, THE FACILITY HAS NEVER SUBMITTED SIA. BBxjÂaaàxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂabÂ!D xjxjÂxjÂQ+þÿþÿþÿþÿþÿþÿþÿxjÂacÃ@ xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂadÂZ<ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ$MIKE LEWIS TESTED CP ON 4/7/2006. BBxjÂbà ]ÂÂHxjxjÂxiþÿþÿþÿþÿþÿþÿþÿþÿxiÂbÂ9PÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ$MIKE LEWIS TESTED CP ON 4/7/2006. BBxjÂbÃ2 ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ%MIKE LEWIS TESTED CP ON 4/25/2006. BBxjÂbÃP]ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ,CP WAS TESTED BY MIKE LEWIS ON 5/22/2006. BBxjÂbÂF_ÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ9OVERFILL IS LISTED AS VENT WHISTLE. NEEDS SITE VISIT. BBxjÂbÃ1ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb1ÂAÂÂxjxjÂxjÃ?cþÿþÿþÿþÿþÿþÿþÿxjÂbÂÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb Ã.ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb Â*ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb ÂdÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb Ã6ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb Â*&ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÃ@ÂÂbxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂbÂaQÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÂaPÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÂ*"ÂÂbxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂbÂT#ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÂ0ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÂ#ÂÂbxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿ¨%%%%%%%% NOTE **************** INSPECTOR INDICATES STATION IS TEMPORARILY CLOSED, TANKS NOT OUT OF SERVICE, DATE UNKNOWN, INSPECTION WAS PERFORMED 2/9/06. T.R.xj Âbà ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÂ`ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÂ_ÂÂbxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂbÂ* ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÂ_ ÂÂbxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âbà ÂÂbxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂbÃAÂÂbxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÂbÂ*(ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÂ_ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbÂÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbà ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb Ã.ÂÂbxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âb!Â_ÂÂbxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âb"ÂcÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb#ÃYÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb$Â_ÂÂbxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb%Â=BÂÂbxjxjÂ<xi þÿþÿþÿþÿþÿþÿþÿˆ********** NOTE &&&&&&&&&&&&& INSPECTOR INDICATES THAT THE FACILITY IS CLOSED AS OF THE DATE OF THE INSPECTION, 11/11/05. T.R. xi Âb2 CÂÂxjxjÂxjÃ>EþÿþÿþÿþÿþÿþÿþÿxjÂb'Ã5ÂÂYxjxjÂ<xjÃ(PdþÿþÿþÿþÿþÿþÿþÿxjÂb(Â@ÂÂxjxjÂ<xjÃ3 þÿþÿþÿþÿþÿþÿþÿxjÂb)Ã%;ÂÂYxjxjÂ<xjÃ+*2þÿþÿþÿþÿþÿþÿþÿxjÂb*Ã+ ÂÂ;xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb+Ã-ÂÂ;xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb,ÂÂÂ;xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb-Ã`FÂÂ;xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb.ÂB'ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb/Ã&ÂÂ;xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb0ÂXÂÂAxixjÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxiÂb3ÂBÂÂxjxjÂxjÃ\þÿþÿþÿþÿþÿþÿþÿxjÂb4ÃCYÂÂYxjxjÂxjÃb^þÿþÿþÿþÿþÿþÿþÿxjÂb5Ã(=ÂÂ;xjxjÂxjÃ:=dþÿþÿþÿþÿþÿþÿ£TANK 8 OOS APPROVED UNTIL OTHER TANKS AT FACILITY ARE REMOVED, PER 11/5/01 BETH DEHAAS LETTER CTI ROBINSON REPLACED TANK 6'S DAMAGED 15 GAL SPILL BUCKET ON 5/9/07xjÂb6ÂRMÂÂTxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âb7ÃÂÂTxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿªIT APPEARS THIS ENTRY MAY BE INCORRECT BECAUSE THE INSPECTION IN QUESTION ONLY LISTS TANK #5-1. IT ALSO LISTS THE FACILITY AS "HAYDEN HOUSE" AND LOCATION AS AUGUSTA....xj Âb8ÂSZÂÂTxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âb9 ÂÂTxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âb:ÂÂÂTxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âb;à 5ÂÁxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb<ÂADÂÂ;xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb=ÃÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb>Â.YÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb?ÂÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb@ÂbAÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbAÂ3ÂÂbxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂbBÃ[5ÂÁ xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbCÃÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbDÂÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbEÃ#/ xjxj Â(xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbFÃ+ÂÂ;xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbGà ÂÂ;xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbHÃ7UÂÂTxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂbIÂE>ÂÂxj xj ÂxjÃaþÿþÿþÿþÿþÿþÿþÿxjÂbJÂRYÂÂxj xj ÂþÿÃ-OþÿþÿþÿþÿþÿþÿþÿxjÂbKÂ&ÂÂYxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ&INSTALLED NEW OMNTEC ON 10/05/2006. BBxjÂbLÃ.ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbMÂQ/ÂÂZxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbNÂ]LÂÂZxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbOÂLÂÂZxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbPÂYÂÂZxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbQÂLÂÂZxj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbRÂY#ÂÂ]xj xjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbSÂ2ÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbTÂ]aÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbUÂ2ÂÂZxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbVÂ]GÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbWÂ]IÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbXÂXDÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbYÂY[ÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbZÂ12ÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb[ÂY_ÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb\Â]VÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb]ÂY:ÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂb^ÂY=ÂÂ]xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âb_Ã'2ÂÂ]xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âb`ÂYÂÂZxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbaÂ]DÂÂZxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbbÂ3WÂÂ]xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbcÂ^ÂÂZxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂbdÂY\ÂÂ]xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂcÂ]MÂÂ]xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂcÂ2ÂÂ]xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂcÂ]_ÂÂ]xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿ(PIPING TO BE UPGRADED IN 6/07 TO FLEX DWxj ÂcÂbRÂÂYxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂcÃbWÂÂMxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcÃ\ÂÂHxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcÂ(ÂÂ_xjxjÁ`xjÃOB;þÿþÿþÿþÿþÿþÿaCTI INDICATES RESET WOODEN BLOCK IN RNL SPILL BUCKET. BLOCK IS USED TO RETAIN SPILL BUCKET SHAPE.xjÂc Ã79ÂÂxjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿgOWNER HAS CONTACTED GUERIN ASSOC AND THEY WILL GET SLEEVING DONE WITIHN 60 DAYS OF NOV (8/31/06) TRxj Âc Ã`1ÂÂbxjxjÁ`xjÃT^þÿþÿþÿþÿþÿþÿþÿxiÂc ÂÂÂ`xjxjÁ`xjÃ# PþÿþÿþÿþÿþÿþÿþÿxjÂc Â-ÂÂ`xjxjÁ`xjÃK þÿþÿþÿþÿþÿþÿþÿxjÂcÃVÂÂ\xjxjÂxj ÃLþÿþÿþÿþÿþÿþÿ©SECOND CP FAIL ON TANK #1. SENT SECOND CP LETTER 6/23/2006. REPAIR OR REMOVAL DEADLINE OF 9/1/2006. BB ANODES REPLACED BY CTI TONY COUTURE UPDATED INSPECTION 10/25/06xjÂcÂ@ÂÂTxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcÂ@ÂÂTxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcÂÂÂxjxjÂxj Ã"þÿþÿþÿþÿþÿþÿPSENT CP LETTER ON 6/28/2006. BB RETESTED 11/13/06 READINGS: -.985, -.942, -.971xjÂcÃJÂÂAxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ3/10/08 LETTER TO OWNER -MLxjÂcÃ!ÂÂxjxjÂxjÂ-[þÿþÿþÿþÿþÿþÿBRNL TANK FAILED DAILY INVENTORY. LEAK CHECK SHORT TEN GALLONS. BBxjÂcÂBÂÂYxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Âcà FÂÂYxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂcÃ4@ÂÂYxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂcÂK,ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcÂB4ÂÁ"xjxjÂxj Ãc @þÿþÿþÿþÿþÿþÿPUNABLE TO REMOVE FLAPPERS ON TANK # 12. BB NOW PASSING PER CTI WAYNE GIFFORD MLxjÂcà *ÂÂSxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcÃYÂÂ!xjxjÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂcÃV#ÂÂ$xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcà b xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂcÃR xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âcà  xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc ÃS8 xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc! ÂÂ:xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âc"Â# xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc#Ã^K xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc$Ã:R xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc%Â3 xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âc&Ã5 xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc'ÁK xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc(Â&$ÂÂAxjxjÂxj Ã7)þÿþÿþÿþÿþÿþÿþÿxj Âc)à ÂÂXxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc*Â#) xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿTANK SERVES GENERATORxjÂc+ÃBÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc, >ÂÂTxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âc- ?ÂÂTxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âc.ÂX$ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc/Ã#dÂÂAxjxjÂ<xjÃ5þÿþÿþÿþÿþÿþÿþÿxjÂc0Â^ÂÂxjxjÂ<xjÃþÿþÿþÿþÿþÿþÿþÿxjÂc1ÂdbÂÂUxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿMSENT CP LETTER ON 06/29/2006. BB EXTENDED REPAIR DEADLINE TO JULY 31, 2007 MLxjÂc2ÃPÂÂ'xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc3à (ÂÂ'xjxjÂ<xjÄb0þÿþÿþÿþÿþÿþÿþÿxjÂc4à *ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ2ANODES TO BE ADDED IN LATE MAY, FOLLOWED BY AI -MLxjÂc5Ã--ÂÂ'xjxjÂ<xjÃd$þÿþÿþÿþÿþÿþÿþÿxjÂc6ÃÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc7Ãc4ÂÂ9xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc8ÃW1ÂÂ9xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc9Ãa'ÂÂ9xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc:Ã`\ÂÂ9xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc;Â$IÂÂ9xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc<ÃQQÂÂXxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc=ÃAÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc>Ã7AÂÂ`xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc?ÂPNÂÂ`xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc@à 1ÂÂ`xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcAÂ(JÂÂ'xjxjÂþÿÃ"þÿþÿþÿþÿþÿþÿBVENT PIPES FAILED CP. TANKS SCHEDULED FOR REMOVAL THIS SEASON. BBxjÂcBÃcVÂÂ`xjxjÂ<xjÃ`_þÿþÿþÿþÿþÿþÿþÿxjÂcCÂJ9ÂÂ`xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcDÂOQÂÁ"xjxjÂ<xjÄZ9þÿþÿþÿþÿþÿþÿþÿxjÂcEÃ!ÂÂ`xjxjÂ<xjÃUDþÿþÿþÿþÿþÿþÿþÿxjÂcFÃZÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿH6/4/07 UPGRADE REGN FOR CTI BISKUPIAK TO INSTALL SPACERS ON COPPER LINESxjÂcGÂ2CÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcHÃIÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcIÃ/\ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcJÃWÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcKÃXDÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcLÂ(AÂÂ'xjxjÂxjÃ]*&þÿþÿþÿþÿþÿþÿRCP ON VENT PIPING FAILED. BB VENT PIPING DETERMINED TO BE FIBERGLASS 7/20/2006. BBxjÂcMÂ2LÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcN VÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcOÃ!NÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcPÂLZÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿSFACILITY FOR SALE; CURRENTLY OPERATING. PROSPECTIVE BUYER CONTACTED DEP 7/9/07 -MLxjÂcQÃÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcRÃTXÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcSÂL$ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcTÃ-,ÂÂ'xjxjÂxj Ä9Y þÿþÿþÿþÿþÿþÿzCP ON VENT PIPING FAILED. BB UPGRADE REGN SUBMITTED 2/19/07 FOR CTI CYR TO INSTALL "PIPING SUCTION PUMP SUMP" WITH SENSORxj ÂcUÃ.IÂÂ'xjxjÂxjÃ-þÿþÿþÿþÿþÿþÿgCP ON VENT PIPING FAILED. CTI SCOTT CYR REPLACED STEEL VENT PIPING WITH 3" AMERON FRP ON 10/27/06. -ML xjÂcVÃ!ÂÂ'xjxjÂxjÄ%DþÿþÿþÿþÿþÿþÿþÿxjÂcWÃ4SÂÂ'xjxjÂxj ÄP&þÿþÿþÿþÿþÿþÿþÿxj ÂcXÃ-'ÂÂ'xjxjÂxjÃ7]ZþÿþÿþÿþÿþÿþÿþÿxjÂcYÃ-*ÂÂ'xjxjÂxjÄ'`þÿþÿþÿþÿþÿþÿþÿxjÂcZÃ-+ÂÂ'xjxjÂxjÄ'- þÿþÿþÿþÿþÿþÿþÿxjÂc[Ã+JÂÂ'xjxjÂxjÃScþÿþÿþÿþÿþÿþÿþÿxjÂc\ÂG[ÂÂ9xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc]Â'ÂÂ`xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ¼CP ON VENT PIPE FAILED. BB KAREL JACOBS CALLED 06/30/2006. NEW OWNER - JESSIE ABBOTT CURRENTLY AT PO BOX 547 SCARBOROUGH, ME 04070-0547. SENT CHANGE OF OWNERSHIP FORM AND PLAIN TALK. BB xjÂc^ UÂÂ`xjxjÂxjÃZP@þÿþÿþÿþÿþÿþÿþÿxjÂc_Â18 xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂc`ÂcI xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂcaÂ>D xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Âcbà  xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂccÂ&) xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂcdÂ3 xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdÃ!ÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ-REPLACED SPILL BUCKETS AND FLAPPER VALVES. BBxj ÂdÂ,QÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÃ+GÂÂDxjxjÂþÿÄ@ þÿþÿþÿþÿþÿþÿþÿxj Âdà ÂÂIxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdÂ^3ÂÂDxjxjÂxj à JþÿþÿþÿþÿþÿþÿoINSPECTOR FOUND SMALL AMOUNT OF PRODUCT IN TANK INTERSTITIAL. REMOVED PRODUCT AND WILL CONTINUE TO MONITOR. BBxjÂdÂ^;ÂÂDxjxjÂxj Ã8Xþÿþÿþÿþÿþÿþÿ@SENT CP LETTER ON 8/8/2006. BB PASSING PER CTI KIRK ST. PETER. xjÂdÂ^6ÂÂDxjxjÂþÿÃ$HFþÿþÿþÿþÿþÿþÿ:TANK 4 STILL OUT OF SERVICE. COMPLIANCE VISIT NEEDED. BBxjÂdà 0ÂÂDxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿ"DAILY INVENTORY NOT RECONCILED. BBxjÂd ÃAb xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âd ÃXbÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿž11/6/2007 RECEIVED MASS MAILING NOV OWNER CALLED TO ASK ABOUT ANNUAL INSPECTION REQUIREMENTS. PREVIOUSLY USED GAFTEK, GAVE HER THEIR CONTACT INFORMATION. -LWxjÂd Â5 ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿ^5/15/07 CTI DAVIS REPLACED 2 ELLDS WITH MLLDS; CTI BUBAR REPLACED DSL SPILL BUCKET WITH 15 GALxjÂd Â9ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd Â>9ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdÂ2>ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdÂ?%ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdÂ?ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdÂ?4ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÃK/ xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdÂJ=ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÃ!FÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÃXG xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÂ%5ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÃ\ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÃ[ ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âdà ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÂBEÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÃ)TÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÂO xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÂ7/ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdÃZPÂÁxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdÃÂÁxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd  ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd!Ã)ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd"ÃbNÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd#ÃJ?ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd$Ãb]ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd%Ã`9ÂÂdxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd&Â)M xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd'Ã[ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âd(Ã7ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd)Ã5ÂÁ$xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd*Â. ÂÂ)xjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Âd+Â$&ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿ:LEGASSE REPLACED TANK 8 SPILL BUCKET AND DROP TUBE 12/6/06xjÂd,Â$ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd-Ã:OÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd.Â&ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd/Â9ÂÂ!xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd0Â3ÂÂXxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd1 ÂÂAxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd2Ã"ÂÂXxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd3ÃPÂÂXxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd4Â0ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd5ÃSÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd6Ã*ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd7à !ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd8ÃÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd9Ã0ÂÂTxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd:Â1)ÂÂAxjxjÂ<xjÃ$&!þÿþÿþÿþÿþÿþÿþÿxjÂd;Ã0ÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd<ÂXÂÂ)xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd=ÃS0ÂÂ!xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd>à 9ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd?ÂI^ xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂd@ÃH'ÂÂ!xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdAà QÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿCP UPGRADE. BBxjÂdB xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdCÃÂÂ!xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdDÂUÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdEÂUÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdFÂIb xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdGÃ6b xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÂdHÂJ`ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdIÂLÂÂAxjxjÂxjþÿþÿþÿþÿþÿþÿþÿKTANK #2 IS DIESEL TANK AT BUS GARAGE. NOT DOING SIA. NEEDS SITE VISIT. BBxjÂdJÂ#ÂÂ$xjxjÂxjà þÿþÿþÿþÿþÿþÿþÿxjÂdKÂX'ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdLÂ(ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdMÂ&ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdNÂ)ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ&BOTH TANKS PLANNED FOR REMOVAL IN 8/07xjÂdOÂ2YÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdPÂD5ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdRÂ9ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdSÂW?ÂÂ>xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdTÂW;ÂÂ>xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdUÂW:ÂÂ>xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdVÂ41ÂÂ`xjxjÂþÿÃGþÿþÿþÿþÿþÿþÿþÿxjÂdWÂ4*ÂÂ`xjxjÂxj þÿþÿþÿþÿþÿþÿþÿ}SENT CP LETTER ON 8/8/2006. CP RETEST ON 9/18/2006 FAILED (-0.45 VOLTS). BB 10/25/06 ANODES INSTALLED BY CTI WAYNE GIFFORD MLxjÂdXÂ;ÂÂ`xjxjÂxj ÃAMþÿþÿþÿþÿþÿþÿ32 ANODES INSTALLED 10/26/06 BY CTI WAYNE GIFFORD MLxjÂdYÂ*;ÂÁ"xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ2DAVID LAPIERRE INSPECTED TANK #16 ON 6/13/2006. BBxjÂdZÂ$ÂÂJxjxjÂxjÃV<þÿþÿþÿþÿþÿþÿ,CP TESTED BY STEVE PERRAULT ON 6/28/2006. BBxjÂd[Â'SÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿpUPGRADE REGISTRATION SUBMITTED 1/9/07 FOR EXISTING LEAK DETECTION SYSTEM TO BE REPLACED WITH OMNTEC BY CTI DODGExjÂd\Ã9ÂÂxjxjÂxj ÃA_þÿþÿþÿþÿþÿþÿþÿxj Âd]Ã<0ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxj Âd^Ã*EÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxjÂd_ ÂÂxjxjÂxj Ã:þÿþÿþÿþÿþÿþÿ&INSPECTION UPDATE DATED 10/17/2006. BBxjÂd`Ã`PÂÂxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxj ÂdaÂW<ÂÂ>xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÂdbÃ\%ÂÂKxjxjÂWxiÃ.þÿþÿþÿþÿþÿþÿTREPLACED SPILL BUCKET ON 6/27/2006. CURRENT INSPECTION REPORT NOT YET SUBMITTED. BBxiÂddÃ+ÂÂTxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿ9RECORDED ON SAME FORM WITH #12234. CP -1.11, -0.99, -1.01xjÃÃ\%ÂÂKxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿ4OWNER REPORTS PASSING INSPECTION UPDATE WILL FOLLOW.xjÃÂWÂÂxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿgUPDATE DONE 8/16/06, NO CP TEST FOR TANK 7 SO NOT COMPLETE ENOUGH TO CONSTITUTE FULL INITIAL INSPECTIONxj ÃÃbTÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿNSEE REG # 8625 FOR ANNUAL INSPECTION FORM. UPDATED 8/16/06 ON FORM FOR #19783xj ÃÃ]4ÂÂTxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ_ÂÂZxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjàÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ.%ÂÂUxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà*ÂÂLxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂW@ÂÂ>xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂW9ÂÂ>xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂW=ÂÂ>xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Ã5!ÂÂxjxjÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â,*ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂN.ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂN%ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ,ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ+ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃAÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂN0ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ"ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjàÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjàÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjàÂÂ`xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ&ÂÂ`xjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÁTÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÁUÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ#AÂÂAxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ]#ÂÂAxjxjÂ<xjÃHYþÿþÿþÿþÿþÿþÿV7/25/07 COPI CTI LEGASSE REPLACED WIRES TO PROBES AND INSTALLED 2-15 GAL SPILL BUCKETSxjà à DÂÂ_xjxjÂ<xjÄL(+þÿþÿþÿþÿþÿþÿþÿxjÃ!ÂE ÂÂxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã"ÃaÂÂTxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ#Ãa ÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ$Â2FÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ%ÃÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ&Ã#ÂÂDxjxjÂxjÃNþÿþÿþÿþÿþÿþÿNPROBLEM WITH DAILY INVENTORY OVER/SHORTS GEATER THAN 1% DUE TO LOW THRUPUT. BBxjÃ'Â0ÂÂ:xjxjÂWxjÃ/:þÿþÿþÿþÿþÿþÿE12/1/06 COPI - CTI SIMARD INSTALLED 2 APT SUMPS AND 2 VR SUMP SENSORSxjÃ(Ã\1ÂÂTxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ)Â5ÂÂTxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ*Â1^ÂÂUxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã+ÂYÂÂUxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã,ÂYÂÂUxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã-ÂQ4ÂÂUxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã.ÂQ0ÂÂUxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã/Â]bÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ0Â2ÂÂUxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã1Â1]ÂÂUxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã2ÂXFÂÂUxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã3Â^ÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ4Â3UÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ5ÂYAÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ6Â2TÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ7Â]JÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ8Â]JÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ9Â]`ÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ:Â]FÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ;Â]EÂÂ]xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ<ÂQ1ÂÂUxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã=Â2ÂÂ]xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ>ÂYÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ?Â]UÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ@Â]TÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃAÂYÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃBÂXCÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃCÃSOÂÂXxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ=11/13/07 UPGRADE REGN FOR CTI COUTURE TO REPLACE SPILL BUCKETxjÃDÂ^ÂÂ]xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃEÂY ÂÂ]xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃFÂ]ZÂÂ]xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃGÂ]RÂÂ]xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃHÂ]OÂÂ]xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃIÂQ7ÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃJÂYÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃKÂY3ÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃLÂ3XÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃMÂY?ÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃNÂY)ÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃOÂY-ÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃPÂ]KÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃQÂ1_ÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃRÂLÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃSÂYÂÂ]xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃTÂ^?ÂÂUxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃUÃ?ÂÂBxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃV ÂÂBxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃWÂ;:ÂÂSxjxjÂWþÿþÿþÿþÿþÿþÿþÿþÿ”CANNOT ACCESS INTERSTITIAL SENSORS TO REMOVE AND TEST. KEITH DOYEN CALLED ON 10/02/2006. TANKS TO BE REMOVED THIS FALL BY COUNTY ENVIRONMENTAL. BBxjÃXÃ*ÂÂSxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃYÃÂÂSxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃZ ÂÂSxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã[Ã3PÂÂSxjxjÂWxj Ãþÿþÿþÿþÿþÿþÿþÿxj Ã\Â6ÂÂSxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿXKIRK ST. PETER CALLED ON 7/18/2007, HE HAS BEEN WORKING ON THE FACILITIES ANNUAL INSPECTION. THERE IS A SENSOR OUT AND NOW IT LOOKS LIKE THERE MIGHT BE A WIRING PROBLEM. KIRK THINKS HE CAN FIX IT BY THE END OF THIS WEEK. ASKED IF WE WOULD DELAY SEND AN NOV, BECAUSE HE WILL HAVE THE ANNUAL INSPECTION INTO THE DEPARTMENT AS SOON AS POSSIBLE.xjÃ]Â"EÂÂSxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ^ÂGÂÂSxjxjÂWxj ÂA.þÿþÿþÿþÿþÿþÿþÿxj Ã_Ã6ÂÂSxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ`ÂQÂÂSxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃaÃU;ÂÂSxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃbÃ6ÂÂSxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃcÂ1aÂÂTxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃdÂ8ÂÂTxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ;ÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂQÂÂSxjxj ÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂXcÂÂUxjxj ÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂY5ÂÂUxjxj ÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ]NÂÂ]xjxj ÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ.ÂÂxjxj ÂWxjþÿþÿþÿþÿþÿþÿþÿ2FAILURES REPAIRED PER CTI JEFF EATON AND IRA DODGExjÃÃW_ÂÂxjxj ÂWxjþÿþÿþÿþÿþÿþÿþÿ(FAILURE REPAIRS MADE PER CTI JEFF EATON.xjÃÂ,ÂÂ_xjxj Â<xjÃ>EEþÿþÿþÿþÿþÿþÿþÿxjà à JÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÃÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â[,ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â\ ÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿ„7/5/07 UPGRADE REGN FOR CTI CARVER TO REPAIR/REPLACE SPILL BUCKET, REPLACE CONCRETE PAD AND SUMP COVER AND POSSIBLY REPAIR VENT PIPExj à Ã"CÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃÂÂ^xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂS:ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃà NÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ãà EÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂXKÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ>ÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂJÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃU5ÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂUÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ãà HÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ21ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂTdÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ\ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ\ÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂE8ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ\&ÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃSÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ!ÃJ=ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ"Ã8ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ#ÃVJÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ$ÂS?ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ%ÂT`ÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã&Â\#ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ'ÂE6ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ(ÃGKÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ)Â\ ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ*ÂEGÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ+Â\ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ,Ã?ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ-ÂT_ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ.Ã1KÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ/à ?ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ0à KÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ1Â\ ÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã2à @ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ3ÃGÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ4ÃCÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã5ÃQ'ÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã6ÂTYÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ7ÃRÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ8à LÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ9ÂTIÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã:à :ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ;ÂTSÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ<Ã<ÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã=Â[*ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ>ÃO_ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ?ÃXÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã@ÂXPÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃAÂXNÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃBÂ[!ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃCà OÂÂ^xjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃDÂ\$ÂÂ^xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃEÂÂÂbxjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃFÃ` ÂÂ:xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃGÂ$?ÂÂxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃHÂ"ÂÁ$xjxj Á_xjþÿþÿþÿþÿþÿþÿþÿNEW FACILITY INSTALL.xjÃIÃ!7ÂÂ:xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃJÂYMÂÂ;xj xj Â<xjÃQ*AþÿþÿþÿþÿþÿþÿþÿxjÃKÂY^ÂÂ;xj xj Â<xjÃG]%þÿþÿþÿþÿþÿþÿþÿxjÃLÃd ÂÂ;xj xj Â<xjÃYUCþÿþÿþÿþÿþÿþÿþÿxjÃMÂYKÂÂ;xj xj Â<xjÃS7þÿþÿþÿþÿþÿþÿþÿxjÃNÃd2ÂÂ;xj xj Â<xjÄO`(þÿþÿþÿþÿþÿþÿþÿxjÃOÃ3ÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃPÂYRÂÂ;xj xj Â<xjÃ8 þÿþÿþÿþÿþÿþÿþÿxjÃQÃGÂÂ;xj xj Â<xjÃX=þÿþÿþÿþÿþÿþÿþÿxjÃRà N xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃSÃP` xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃTÃ[ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃUÂ8F xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃVÂ?  xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃWÂ(3 xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃXÂCP xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃYÃ]S xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃZÂS- xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ[ÂS) xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ\ÂS+ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ]ÂGE xj xj Â<xjÃ?þÿþÿþÿþÿþÿþÿþÿxjÃ^Ã@ ÂÂDxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ_ÃV ÂÂDxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã`ÁBÂÂ`xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿ)SPILL BUCKET REPLACEMENT ON 5/22/2006. BBxjÃaÂ]^ÂÂ]xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃbÂPÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃcÃA>ÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿSSIMARDS ALSO SUBMITTED ADDITIONAL ANNUAL INSPECTION REPORT DATED MARCH 31, 2005. BBxjÃdÃ($ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ&ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂZ/ÂÂXxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂY ÂÂ]xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ]]ÂÂ]xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂQ.ÂÂ]xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂYHÂÂZxjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ45 xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ@ÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â1ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂF,ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Ã.ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â@ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â@ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃÂÂ_xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjàBÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂOÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ(YÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ#.ÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ3ZÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂXÂÂXxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ7)ÂÂxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ`ÂÂ)xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂNEÂÂHxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂX^ÂÂxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ\+ÂÂSxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ$_ÂÂTxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà;ÂÂ`xjxj Â<xjÃEþÿþÿþÿþÿþÿþÿþÿxjÃÂ&aÂÂ_xjxj Â<xjÃb/UþÿþÿþÿþÿþÿþÿþÿxjÃÂ^ xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ1 xjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÃMÂÂxj xj Â(þÿþÿþÿþÿþÿþÿþÿþÿ*TANKS PLANNED FOR REMOVAL IN NOVEMBER 2007xjÃ!ÂSTÂÁ"xj xj ÂWþÿþÿþÿþÿþÿþÿþÿþÿÅ10/31/06 UPDATE OF INTERSTIAL MONITORING SYSTEM. NOW PASSES PER CTI JEFF EATON. NO INFORMATION ON COPPER PIPING, 1997 INSTALL SO SHOULD BE SLEEVED AND SPACERS. NOT PASSING AT THIS TIME. TRxjÃ"ÃUÂÁ"xj xj ÂWþÿþÿþÿþÿþÿþÿþÿþÿ°TOO MUCH WATER TO TEST 4' IN SUMP, NOT IN ALARM. OVERFIL PREVENTION SECTION NOT FILLED OUT COMPLETELY. INTERSTITIAL MONITORING WORKING NOW. 10/31/2006 PER CTI JEFF EATON.xjÃ#ÃXÂÂ_xj xj ÂWxj Ä+ þÿþÿþÿþÿþÿþÿPCTI ED GEORGE INSTALLED NEW 61SO DROP TUBES ON TANKS 1-1, 2-1, 3-1 ON 10/6/06 MLxjÃ$Â\ÂÂ_xj xj ÂWþÿþÿþÿþÿþÿþÿþÿþÿ¼CTI ACTUALLY DEAN DRISKO. UPGRADE REGISTRATION SUBMITTED 1/10/07 FOR CTI COUTURE TO REPLACE INTERSTITIAL MONITORING SYSTEM, INTERSTITIAL PROBE, PIPING SUMP AND PROBE, AND REPAIR VENT PIPExjÃ%ÃJAÂÂKxjxj ÂWxj þÿþÿþÿþÿþÿþÿþÿ! OVERFILL PRESENT?: NOT REQUIRED.xj Ã&ÂB\ÂÂKxj xj ÂWxjþÿþÿþÿþÿþÿþÿþÿCTI ACTUALLY KEN LEGASSE NO WATER IN SUMPS OR INTERSTITIAL SPACE?: PUMPED WATER FROM ALL PIPING SUMPS. LOOKS LIKE WATER IS GETTING INTO THE PUMP BOXES AND RUNNING THROUGH SECONDARY TO PIPING SUMPS. SPILL BUCKETS LIQUID TIGHT?: SPILL BUCKETS ARE RUSTED, BUT STILL WATER TIGHT.xjÃ'Ã.M xj xj ÂWxjþÿþÿþÿþÿþÿþÿþÿ|TANK 3: VAPOR RECOVERY ADAPTER BROKEN ON SNL TANK, REPLACED. SENSORS ARE PROPERLY PLACED?: LOWERED SENSOR TO FLOOR OF SUMP.xjÃ(Â[3ÂÁxj xj ÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ)Ã-]ÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ*Â[J xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ+Â[5ÂÁxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ,Â[8ÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ-ÃK1 xj xj ÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxj Ã.Â[FÂÂxj xj Âxjþÿþÿþÿþÿþÿþÿþÿ*OVER/SHORT GREATER THAN 1% ON RNL TANK. BBxjÃ/Â[N xj xj Âxjþÿþÿþÿþÿþÿþÿþÿ*OVER/SHORT GREATER THAN 1% ON SNL TANK. BBxjÃ0Â[5ÂÁxj xj ÂWxjþÿþÿþÿþÿþÿþÿþÿ± VAPOR RECOVERY POPPET CAP AND GASKET IN GOOD CONDITION?: REPLACED VAPOR CAP ON 6-1 SNL AS MANHOLE LID TOUCHES PLASTIC CAP. REPLACED WITH A LOW PROFILE CAP PER CTI MIKE ARBOUR.xjÃ1Â[< xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ3Â5 ÂÁ$xj xj ÂWxj Ä#1þÿþÿþÿþÿþÿþÿ[ SPILL BUCKETS CLEAN?: CLEANED ALL SPILL BUCKETS PASSING ATG REPORTS SENT IN 9/15/2006. BBxjÃ4Â&ÂÂ)xj xj ÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxjÃ5ÂWÂÂ)xj xj ÂWxj þÿþÿþÿþÿþÿþÿþÿ NO WATER IN SUMPS OR INTERSTITIAL SPACE?: SUMP HAD SOME WATER, CLEANED OUT. LID GASKET BAD REPLACED. SPILL BUCKETS CLEAN?: FOUND FULL OF WATER CLEANED OUT.xjÃ6ÃK2 xj xj ÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã7à =ÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿŒLETTER RECEIVED AUGUST 22, 2007 REQUESTING AN EXTENSION OF TIME TO REMAIN OUT OF SERVICE. FACILITY WENT OUT OF SERVICE IN JANUARY 2007. TRxjÃ8ÃGFÂÁ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ9Â_ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ;Ãa2ÂÂTxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ<Â5ÂÂYxj xj Â<xjÃAþÿþÿþÿþÿþÿþÿþÿxjÃ=ÃK8ÂÂYxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ> ÂÁ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ?Ã(ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ@ÂYÂÂZxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃAÂYÂÂ]xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃBÂQ6ÂÂZxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃCÂQ5ÂÂ]xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃDÂ15ÂÂ]xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃEÂQMÂÂ]xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃFÂ]cÂÂZxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃGÂ^ÂÂZxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃHÃd9ÂÂXxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃIÂ"ÂÂXxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃJÂ7ÂÂxj xj Â<xjÄJNþÿþÿþÿþÿþÿþÿþÿxjÃKÃEYÂÂYxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃLÃ:YÂÂTxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿ“UPGRADE REGISTRATION FOR JOHN SIMS TO REPAIR DAMAGED COPPER SUPPLY LINE FROM UST TO DAY TANK, INCLUDING NEW LEAK SENSOR AND ALARM PANEL IN MAY 2007xjÃMÃIMÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃNÃ1ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃOà ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃPÂ$=ÂÂKxj xj Â<xjÃ0S6þÿþÿþÿþÿþÿþÿþÿxjÃQÂ2ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃRà ÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃSÂ6&ÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃTÂCSÂÂ\xj xj Â<xjà Hþÿþÿþÿþÿþÿþÿ'REPLACED SPILL BUCKETS ON 7/14/2006. BBxjÃUÂVÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃVÃÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃWÂVÂÂ\xj xj Â<xjÃ=þÿþÿþÿþÿþÿþÿþÿxjÃXÂdÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃYÂZÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃZÃRÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ[Â_ÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ\ÂYÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ&Â6BÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã'Ã3"ÂÂSxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã(Ã3!ÂÂSxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã)Ã3&ÂÂSxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã*Ã3%ÂÂSxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã+Ã3'ÂÂSxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã,ÃBÂÂSxj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿÕOVERFILL TO BE REPAIRED BY SEPT 07. MANUALLY MEASURING IN INTERIM. 5/07 LETTER -DMCL 8/15/07 COPI FOR CTI ST.PETER INSTALLATION ON WASTE OIL TANK OF VR TLS 350 FOR PIPING MONITORING AND ELECTRONIC OVERFILL ALARMxj Ã-Â+ÂÂxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿªOFFSET FILL OF WASTE OIL TANK MUST BE DOUBLE WALLED AND INTO A SUMP THAT IS MONITORED. PRIOR INSPECTION BY DEPARTMENT STAFF FOUND PROBLEM REGARDING THE FILL PIPE AS WELL.xjÃ.ÃHÂÂKxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã/Â'ÂÂKxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã0Ã5+ÂÂKxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã1Ã/YÂÂKxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã2Â'ÂÂKxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã3Â'ÂÂKxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã4Ã@ ÂÂKxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã5Â6>ÂÂ!xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã6ÃNOÂÂ\xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿWTANK REMAINS OUT OF SERVICE. WRITTEN APPROVAL OF EXTENDED OOS STATUS PROVIDED 1/26/04.xj Ã7ÂOEÂÂxjxj Á`xj þÿþÿþÿþÿþÿþÿþÿìINSPECTION IS ONLY FOR TANKS 4 AND 5 BOTH OF WHCIH ARE OUT OF SERVICE. LETTER REQUESTING AN EXTENSION OF TIME FOR KEEPING OUT OF SERVICE, ADDITIONAL 12 MONTH PERIOD ALLOWED, ORIGINALLY OOS 7/2004 ALLOWING TO REMAIN OOS UNTIL 7/2007. TRxj Ã9Ã_]ÂÂ)xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ/CRASH VALVE WAS WEEPING AND HAS BEEN REPAIRED. xj Ã:Â$ÂÂ!xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ*ALL WORKING AT THIS TIME PER CTI MULLINS. xj Ã;Ã5"ÂÁxj xj Á`xkþÿþÿþÿþÿþÿþÿþÿpVR 350 INSTALLED 2/21/07 BY CTI MULLINS CTI BUBAR RAISED CRASH VALVES AND REPLACED SPILL BUCKET LIDS ON 3/22/07xjà Â1&ÂÂxjxjÂxj Ã;*Vþÿþÿþÿþÿþÿþÿ?CP FAIL LETTER 12/19/06 -ML ANODES ADDED BY SIMARD ON 12/18/06xjÃ<ÂÂÂ)xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ8BUBAR INSTALLED NEW STP SUMPS AND V/R TLS 350 ON 11/1/06xjÃ=Ã5 xj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxjÃ@ÂQÂÁ xj xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃAÃ6ÂÂTxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃBÂ4ÂÂ4xj xj Á`xj à b`þÿþÿþÿþÿþÿþÿþÿxj ÃCÂÂÂ$xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃDÂA0ÂÂ$xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃEÃ%LÂÂxjxj Á`þÿþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.29, -1.07xjÃF bÂÂ\xjxj Á`xj þÿþÿþÿþÿþÿþÿþÿ>MONITORING WELLS ALSO CLEAN, LOG IS FOR INTERSTIAL SPACE ONLY.xj ÃGÂP)ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃHÂÂÂYxjxj Á`xjÃþÿþÿþÿþÿþÿþÿþÿxjÃIÃ.ÂÁ xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿINSPECTION INDICATES TANKS 7-1, 8-1, 9-1, AND STATES 6-1 AND 10-1 BOTH REMOVED IN 7/06. OUR RECORDS SHOW TANKS 6-1, 8-1, AND 9-1 AS THE ACTIVE TANKS WITH 7-1 AND 10-1 REMOVED IN 7/06. IN PART THERE MAY HAVE BEEN SOME CONFUSION BASED ON WHAT THE TANKS CONTAIN FOR PRODUCT. TRxjÃJÃ!GÂÁxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃKÂ4QÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿxCP READINGS- TANK 2: -.857, -.86, -.862 TANK 3: -.94, -.94, -.92 TANK 4: -1.05, -1.03, -1.03 TANK 5: -.877, -.879, -.929xj ÃLÂ=TÂÁ$xj xj ÂþÿÃ2XUþÿþÿþÿþÿþÿþÿ-JIM BENNEDIX CALLED ON 3/16/2007. RECEIVED MASS MAILING NOV. PROBLEMS HAVE BEEN CORRECTED AND A NEW ANNUAL INSPECTION HAS BEEN COMPLETED BY GR ADAMS. JIM WILL CONTACT GR ADAMS AND HAVE INSPECTION REPORT SUBMITTED TO DEP. BB JIM BENNEDIX CALLED 11/28/2007. CP FAILED AGAIN - WORKING WITH GAFTEK. BBxj ÃMÂ@2ÂÁxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿ44/3/07 COPI - CTI LEGASSE JR "SLEEVED" COPPER PIPINGxj ÃNÃ#cÂÂxj xj Âxj Ã[þÿþÿþÿþÿþÿþÿþÿxj ÃOÃZLÂÂKxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃPÃ1ÂÁ$xj xj Âxj Ã5U þÿþÿþÿþÿþÿþÿþÿxj ÃQÂKXÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃRÃ. ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃSÃÂÂUxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃTà ÂÂUxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ?11/9/09-REGISTRATION REC'D FOR CTI LEGASSE TO REPLACE PIPING-PHxj ÃVÃ!TÂÂUxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃWÂN xj xj Âxj Ã(=þÿþÿþÿþÿþÿþÿþÿxj ÃX 1 xj xj Âxj þÿþÿþÿþÿþÿþÿþÿzNO SPILL CONTAINMENT; POSSIBLE VENT WHISTLE INACCESSIBLE. 1990 INSTALL - NOT REQUIRED. TANK READING: -.855, -.928, -.979xj ÃY dÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿôSPILL BUCKETS PRESENT?: NO SPILL PREVENTION FOR REMOTE FILL DAVID BROCHU (SCHOOL DEPT, GROUNDS) WILL WORK WITH MIKE LEWIS TO GET REMOTE FILL INTO COMPLIANCE OR PLUG WITH CONCRETE AND USE DROP FILL. 12/27/06 -ML TANK READING: -.98, -1.0, -1.08xj ÃZÂ& xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ" TANK READING: -.856, -.868, -.969xj Ã[Â2ÂÂbxj xj Âxj à 5þÿþÿþÿþÿþÿþÿþÿxj Ã\ÂKÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ„ MONTORING CONSOLE IS FULLY OPERATIONAL?: REPAIRED ALARM NO WATER IN SUMPS OR INTERSTITIAL SPACE?: WATER INFILTRATION TO PIPING SUMPxj Ã]ÂNÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿI TANK READING: READINGS TAKEN 7/26/06 BY MIKE LEWIS -1.5, -1.629, -1.714xj Ã^ÂOÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿDTANK BOTTOM CONTAINS 2.75" WATER. CTI RECOMMENDED IMMEDIATE REMOVAL.xj Ã_ ÂÂXxj xj Âxj þÿþÿþÿþÿþÿþÿþÿZ COPPER LINES HAVE SPACERS?: LINES NOT ISOLATED OR SEPARATED. 1989 INSTALL - NOT REQUIRED.xj Ã`Â#JÂÂXxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃaÂ.ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃbÂ.ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ›12/14/2007 AARON THORNDIKE CALLED TO FACILITY DUE TO OMNTEC ALARM. PIPING PROBE OUT. WILL REPLACE ON MONDAY. WILL DUE ANNUAL INSPECTION SINCE IT IS DUE.xj ÃcÂ1  xj xj Âxk þÿþÿþÿþÿþÿþÿþÿþÿxj ÃdÂ8 xj xj Âxk þÿþÿþÿþÿþÿþÿþÿ•CTI LEWIS REPLACED VR INDICATOR LAMPS, REMOVED DEBRIS FROM PIPING SUMP TANK BOTTOM CONTAINS 2" WATER COPPER SUCTION/RETURN LINES ISOLATED 4/11/2007.xj ÃÂE xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂR_ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿˆ VENT WHISTLE CHECKED AND WORKING PROPERLY?: 1986 INSTALL, NOT REQUIRED. COPPER LINES HAVE SPACERS?: 1986 INSTALL, SPACERS NOT REQUIRED.xj ÃÃ'ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃÂÂ;xj xj Âxj þÿþÿþÿþÿþÿþÿþÿFCP READINGS TANK 3: -.998, -1.007, -.989 TANK 4: -1.009, -1.006, -.993xj ÃÃDÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ3ÂÂXxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ5IÂÂXxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ8ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿs1989 INSTALL - NO OVERFILL, NO SPACERS - NOT REQUIRED. CTI THORNDIKE REPLACED TANK INTERSTITIAL SENSOR AND WIRING.xj à Ã;NÂÂXxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ® SPILL BUCKETS PRESENT?: SPILL BUCKET REQUIRED FOR REMOTE FILL. SCHOOL DEPT. NOTIFIED THEY MUST CAP REMOTE FILL OR INSTALL BUCKET. DROP FILL CURRENTLY IN USE. 12/27/06 -MLxj à Â;ÂÂKxj xj Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi à ÁCÂÂ)xj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ7OFFSET FILL HAS BUCKET. 2" PRODUCT REMOVED FROM BUCKET.xj à ÂDÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ REPLACED RS MLLD IN 8-2 WITH VMIxj ÃÂG@ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂGBÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂKPÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂZ ÂÁxj xj Âxkþÿþÿþÿþÿþÿþÿþÿ[ TANK READING: TANK 9 READINGS: -.589, -.521, -.592 ANODES REPLACED 5/4/07, READING -1.203xj ÃÃAÂÂ$xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ&ÂÂ)xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ#ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ>\ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿJ3/30/07 COPI - CTI LEGASSE JR INSTALLED VEEDER ROOT AND 5-GAL SPILL BUCKETxjÃÃ?ÂÂYxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ãà QÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿTANKS OOS. LIZA SENT *NEW OWNER* CHANGE OF OWNERSHIP AND OOS FORM. DOCUMENTS NOT SUBMITTED AS OF 12/28/06. DALE ST. LOUIS REQUEST UST REMOVAL INFORMATION. ON 4/13/2007 SENT REMOVAL NOTICE, REMOVAL INSTRUCTIONS, INSTALLERS LIST, AND SITE ASSESSORS LIST. LETTER IN FILE. -LWxj ÃÃ(ÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ: ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ[ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂ:AÂÂXxj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿã2ND TANK AT SITE IS FOR WATER STORAGE, NO INSPECTION REQUIREMENT. TANK IS AN AUGUST 1991 INSTALL AND PIPING DIDN'T HAVE TO HAVE SPACERS. 9/5/07 COPI - CTI LEWIS OVERSAW MANUFACTURER REPAIR OF SUMP LID. UPGRADE TO PASSING AI.xjÃà ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃà ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃà ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Ã.H xj xj Á`xjÃGþÿþÿþÿþÿþÿþÿþÿxjÃ!ÃÂÂKxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã"Â!ÂÁ$xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã#Â?,ÂÂxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj Ã%ÂPYÂÂ)xj xj Âxj Ã-+þÿþÿþÿþÿþÿþÿþÿxj Ã& ' xkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã'Â"PÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.96, -.94, -.90xj Ã(ÂSBÂÁ$xkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ4ÂÁ xj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿTANK 3 IS TRANSFERED TO A DIFFERENT REGISTRATION. TANK 4 IS THE ONLY TANK AT THIS LOCATION, TANK READING: -.797, -.798 AREA IS ALL PAVED AND RIGHT NEXT TO THE BUILDING. CP FAIL LETTER 12/19/06 -ML SUPERINTENDENT SCHEDULED RETEST AND POSSIBLE ANODE UPGRADE FOR SPRING 2007 -MLxj Ã)Ã%AÂÂUxj xkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã*Ã3WÂÂ:xkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã+ÂOEÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿ,10/9/06 INSPECTION FOR ALL TANKS AT FACILITYxj Ã,Ã]ÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿdREPLACED TANK 2-1 TANK INTERSTITIAL SENSOR REMOVED WATER FROM TANK 1-1 SUMP REPLACED LLD ON TANK 1-1xj ÃÃ`3ÂÂxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿEALL SUMPS WERE FULL OF WATER AND GASOLINE DUE TO SERIOUSLY DEGRADED ENTRY BOOTS OR COLLAR GASKETS. PROPOSAL HAS BEEN SENT TO OWNER FOR REPAIRS NOTIFIED BUTCH AND JON WOODARD AT DEP. AL 12/11/06 CTI DODGE PUT FIBERGLASS WHERE SUMPS GO TOGETHER 8/29/07 CTI HERSEY CHECKED TANKTOP COMPONENTS ONLY FOR POTENTIAL BUYER -ML & TRxjÃ-Â4 ÂÂ)xkxkÂxj þÿþÿþÿþÿþÿþÿþÿ­ VENT WITHIN 8 FT OF FILL?: WHISTLE 15' FROM FILL. 8/91 INSTALL - NO DEP OVERFILL REQUIREMENT, VENT MUST BE PLACED SO VAPORS DO NOT CAUSE A DANGER PER 1986 VERSION OF CH691xj Ã/Ã2ÂÁxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã0à FÂÂYxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã1Ãa(ÂÂ)xkxkÂxj þÿþÿþÿþÿþÿþÿþÿiBUBAR REPLACED FAILING F.E.P. LLD WITH VM1 6/27/07 UPGRADE REGN FOR CTI ARBOUR TO REPAIR FG SUCTION LINExj Ã2ÃZÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã3Ã7ÂÂ)xkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã4ÃGFÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿGCP READINGS TANK 1: -1.033, -.929, -.892 TANK 2: -1.019, -.898, -.989 xj Ã5Â68ÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã6Â@`ÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxjÃ7Â/;ÂÂxj xkÂ7xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã8Â)ÂÁ xkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã9Ã%>ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ-TANK 1 SPILL BUCKET REPLACED BY SIMARD 1/2/07xkÃ:ÂLÂÂSxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã;ÂHÂÂSxkxkÂxj þÿþÿþÿþÿþÿþÿþÿÍOOS APPROVED UNTIL 3/30/08, RTS OR REMOVE BY 6/30/08 -ML LEONARD KELLY CONTACTED DEP ON BEHALF OF ED 2/27/08. WANTS TO RTS, BUT FACILITY TOO BURIED TO INSPECT. 4/24/08 CTY ENV TO DO AI, VACUUM TEST. -MLxj Ã<ÂÂÂSxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã=ÂÂÂSxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã>Â^2ÂÂSxkxkÂxk þÿþÿþÿþÿþÿþÿþÿú1/8/07 CP FAIL LETTER. OWNER PLANS TO HAVE PIPING REMOVED IN SPRING, AT SAME TIME DOING OTHER FACILITY UPGRADES. 5/17/07 NOI & UPGRADE REGN FOR PIPING REPLACEMENT. - ML TANKS 4,5,6 PIPING REPLACED 6/11/07; TANK 7 REMOVED 6/4/07 UPGRADE AI TO PASSxj Ã?à QÂÂSxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ9OVERFILL AND SPILL PREVENTION NOT REQUIRED <1100 GALLONS.xj Ã@à RÂÂSxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ9OVERFILL AND SPILL PREVENTION NOT REQUIRED <1100 GALLONS.xj ÃAà SÂÂSxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ9OVERFILL AND SPILL PREVENTION NOT REQUIRED <1100 GALLONS.xj ÃBà TÂÂSxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ9OVERFILL AND SPILL PREVENTION NOT REQUIRED <1100 GALLONS.xj ÃCà UÂÂSxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ9OVERFILL AND SPILL PREVENTION NOT REQUIRED <1100 GALLONS.xj ÃDà VÂÂSxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ$$ÂÂ!xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿ[TANK #9 IS A VAPOR RECOVERY TANK. IT DOES NOT HAVE A HIGH LEVEL ALARM. ON 7/18 TOLD GR ADAMS INC. THAT THIS TANK DOES NEED TO HAVE A HIGH LEVEL ALARM INSTALLED. INTERSTITIAL MONITOR IS WORKING BUT WILL BE REPLACED PER CTI JOHN MULLINS. AL INSPECTION UPDATE 7/20/2006. TANK DID HAVE HIGH LEVEL ALARM. IT WAS MISSED DURING INITIAL INSPECTION. BBxjÃÂÂÁxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿFAILING INSPECTION BECAUSE OF INABILITY TO ACCESS PIPING SUMP DUE TO LID BEING ICED IN. REPLACED VR ADAPTOR ON RNL TANK PER CTI MIKE ARBOUR. ALxj ÃÂAUÂÁxjxjÂWþÿþÿþÿþÿþÿþÿþÿþÿÉREPROGRAMMED VEEDER ROOT TO ALLOW HIGH LEVEL ALARM TO OPERATE, PER CTI MIKE ARBOUR. AL INSPECTION UPDATE 6/9/2006. DAILY INVENTORY STILL FAILS. BB 5/9/07 UPGRADE REGN TO REPLACE SPILL BUCKET ON TANK 1xjÃÂ]BÂÂ]xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ!VÂÂDxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿ‡TANKS # 6 AND 7 PRODUCT LINES GO THROUGH A CONCRETE SUMP THAT HAS APPROX. 10" OF WATER IN IT. THE CONCRETE SUMP APPEARS TO BE A SEPTIC TANK WITH A ROUND CONCRETE COVER THAT IS NOT WATER TIGHT. IT DOES HAVE A SUMP SENSOR IN CONCRETE TANK BUT IS MOUNTED HIGH ENOUGH THAT NO ALARM SOUNDING EVEN WITH 10" OF WATER INSIDE. INSTALLED NEW LEAK DETECTORS ON TANKS #7 AND 8 PER CTI JOHN JOHNSON. ALxjÃÂYZÂÂ]xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂQPÂÂ]xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ9QÂÂ\xjxjÂWxjþÿþÿþÿþÿþÿþÿþÿŠCATHODICALLY PROTECTED VENT PIPE READING IS A FAIL, -0.713,-0.698,-0.689. NO OIL IN SUMPS OR INTERSTITIAL SPACE?: CONTAINS ABOUT A CUP OF FUEL, REMOVED AND CLEANED. FUEL SOURCE UNKNOWN, PRIMARY SUCTION/RETURN STEEL PIPING SEVERELY CORRODED INSIDE PIPING SUMP DUE TO WATER INFILTRATION. RECOMMENDED REPAIR OR REPLACEMENT. NOTIFIED MICHEAL GARRITY, SACO SCHOOL DEPT. AND TIM RECTOR 5/18/06. ALxjÃÂ"^ÂÂxjxjÂWþÿþÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ]%ÂÂxjxjÂWþÿþÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ:ÂÂxjxjÂWþÿþÿþÿþÿþÿþÿþÿþÿL6/21/06 UPDATE SHOWS PASSING FLAPPER, NO CORRECTION FOR INTERSTITIAL FAILURExj Ãà <ÂÂxjxjÂWþÿþÿþÿþÿþÿþÿþÿþÿT NO WATER IN SUMPS OR INTERSTITIAL SPACE?: TRACE AMOUNT OF WATER FROM CONDENSATION .xjÃÂ_YÂÂTxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxjÃà =ÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿ)INSPECTION UPDATE RECEIVED BY OEU 3/19/07xjÃ!Ã]TÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿ)INSPECTION UPDATE RECEIVED BY OEU 3/19/07xjÃ$Â'ÂÂAxjxjÂWxjÃTþÿþÿþÿþÿþÿþÿþÿxjÃ%Â5ÂÂ!xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ&Ãa\ÂÂxjxjÂWxkþÿþÿþÿþÿþÿþÿþÿØOVERFILL AND PIPING SUMP SENSOR FAILURES CORRECTED 3/1/07 BY CTI DENNIS DAVIS SPACERS TO BE INSTALLED AFTER SCHOOL GETS OUT CTI KENNETH LEGASSE: INSTALLED SPACING ON COPPER LINES FROM BOILER ROOM TO TANK, 5/22/2007.xjÃ*ÃÂÂ)xjxjÂ(xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã+ÂOÂÂHxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿÈTANK HAS BEEN OUT OF SERVICE SINCE LATE 2003. INSPECTIONS NOT PERFORMED DUE TO BELIEF THAT TANK HAD BEEN REMOVED. WILL CONTINUE TO PERFORM ANNUAL OUT OF SERVICE INSPECTIONS UNTIL TANK IS REMOVED. ALxj Ã,Â^aÂÁxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ-ÂÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿA CERTIFICATE OF PROPER INSTALLATION WAS SUBMITTED TO THE DEPARTMENT ON JULY 10, 2006 WHICH MEETS THE REQUIREMENTS TO RESOLVE THE FAILING COMPONENTS ON THE 4/26/2006 ANNUAL INSPECTION. THE WORK WAS COMPLETED ON 7/5/2006. THE FAILING 2006 INSPECTION WILL BE CHANGED TO A PASS. LW xjÃ.Â_@ÂÂDxjxjÂxj ÃUþÿþÿþÿþÿþÿþÿþÿxjÃ/ÃVOÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxjÃ0Ã4ÂÂxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ1ÂLKÂÂXxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ,OWNERSHIP TRANSFERRED TO TOWN OF WILTON 7/07xjÃ2ÃN[ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿaTHE INSPECTION DATE AND THE RECEIVED DATE ARE SWITCHED. THE INSPECTION DATE SHOULD BE 6/27/2006.xjÃ3ÃYbÂÂ^xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ)CTI KANE REPLACED SPILL BUCKET LID 5/1/06xjÃ4Â\ ÂÂ^xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ+INCORRECT INSPECTION DATE SEE 2006 4/7/2006xjÃ5à FÂÂ^xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿÐDUE TO HIGH REPAIR COSTS, VERIZON IS GOING TO UPGRADE PIPING AT THE FACILITY NO LATER THAN MAY 15, 2007. SEE ATTACHED E-MAIL TO ANNUAL INSPECTION IN FILE. OK BY TED SCHARF PIPING REPLACED W/DW FLEX 5/29/07xjÃ6Â-ÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿBCP UPGRADE ON 7/17/2006. BB PASSING CP TANK #1 -1.42, -1.25, -1.28xjÃ7Ã>CÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ3PASSING CP TANK #1 -1.032 PASSING CP TANK #2 -0.867xj Ã8Â?QÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ:7/31/08 COPI - CTI SIMARD INSTALLED SPILL BUCKET ON TANK 5xjÃ9Â?ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ:ÃD"ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ;Â7ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ<Â/ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ=Â?ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ>Â?ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ?Ã[ ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ@à LÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃAÂ9!ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃBÂCÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃCÂA^ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿgLESS THAN 1" OF PRODUCT IN EACH TANK, BECAUSE SITE IS OUT OF SERVICE. PASSING CP -0.99, -1.034, -0.934xjÃDÂ@PÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃE ÂÂTxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿbSUMP FULL OF WATER NO TIE DOWN BULT ON SUMP LID. TOTAL CONTAINMENT SUMP WILL NEED TO BE REPLACED.xj ÃFÂÂÂ;xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃGÂ3<ÂÂTxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃHÂÂÂTxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃIÃ_ÂÂDxjxjÂWþÿÃ414þÿþÿþÿþÿþÿþÿqON INSPECTION UPDATE NO FURTHER INFORMATION ABOUT REMOVING 1 1/2" OF SLUDGE AND WATER IN TANK #1 WHICH IS OOS. ALxj ÃJÃN[ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ±ANNUAL THRUPUT 2005 329507 PASSING CP FOR TANK #1 -0.921 PASSING CP FOR TANK #2 -0.871 SYSTEM IN ALARM AT TIME OF INSPECTION-PROBE OUT- REPLACED PROBE FOR TANK #2 RESET SYSTEM.xjÃKÂ-\ÂÂYxjxjÂxk þÿþÿþÿþÿþÿþÿþÿ•PASSING CP TANK #5 -1.01, -.99, -1.14 PASSING CP TANK #4 -1.10, -0.95, -1.14 PASSING CP TANK #6 -1.01, -0.97, -1.05 TANKS 4, 5, 6 REMOVED 10/16/07xjÃLÂ^  xjxjÂxj Ã:+þÿþÿþÿþÿþÿþÿPRODUCT IN INTERSTITIAL SPACE OF TANK #7. CN BROWN TO DRAIN TANK AND REMOVE. CP TESTED BY LARRY MCALLISTER. BB FAILING TANKS REMOVED 10/24/06xj ÃMÃ3ÂÂTxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃNÂ$*ÂÁ$xj xjÂWxjÃDÂSA xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxjÃ?ÂTc xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ@Â=G xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ§PER CTI DAVID BEAUMONT, ALL PROBLEMS REPAIRED/REPLACED. NEW 15 GALLON SPILL BUCKETS INSTALLED, ONE OVERFILL REPAIRED, ONE OVERFILL REPLACED, FACILITY NOW PASSING. TRxj ÃAà ÂÂ!xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃBÃPC xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃCÂ"PÂÂ!xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃDÂKÂÂ!xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃEÃ3SÂÁxj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿŒCTI MULLINS REPLACED SPILL BUCKET ON TANK 4 ON 4/26/07 BECAUSE WAS NOT SET AT DESIRED HEIGHT C&C WILL REPLACE FILL CAPS WEEK OF 5/14/07 -MLxjÃFÂÂÁxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃGÂ-XÂÂ)xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃHÃ:T xj xj Âxjþÿþÿþÿþÿþÿþÿþÿ;INSTALLED INTERSTITIAL MONITORING SYSTEM AND CP UPGRADE. BBxjÃIÃ` xj xj Âþÿþÿþÿþÿþÿþÿþÿþÿ–INSPECTOR NOTED WEEPS AT DISPENSERS. BB CONTACTED TOM GUERETT REGARDING DISPENSER WEEP. TOM TO FOLLOW UP ON DISPENSER WEEPS WITH ME AND RESPONSE. BBxjÃJÂLÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃLÂH:ÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃMÂ(ÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃNÂÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃOÃ5'ÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃPÃÂÂxj xj Âxj Ã$þÿþÿþÿþÿþÿþÿþÿxjÃQÃ!*ÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃRÃÂÂxj xj Â<xjÃLþÿþÿþÿþÿþÿþÿþÿxjÃSÃ#1ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿ RETENTION OF OOS WASTE OIL TANK UNTIL REMOVAL OF ACTIVE TANKS APPROVED IN 2000 BY TED SCHARF (3/7/00 LETTER IN FILE) ALL TANKS TO BE REMOVED BY END OF 2007 -MLxjÃTà )ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃUÃSÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃVÃ+HÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃWà dÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃXÂ.ÂÂ!xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃYà K xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃZÃ< xj xj Â(xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã[ÃJ;ÂÂIxj xjÂxj þÿþÿþÿþÿþÿþÿþÿÏPCA ENGINEERING ADDED ANODES TO ALL 3 TANKS ON 10/4/06 PER CTI JOHN JOHNSON PASSING READINGS TAKEN 10/16/06 BY JOHN JOHNSON TANK 1: -1.27, -1.19, -1.44 TANK 2: -1.43, -1.36, -1.52 TANK 3: -1.43, -1.5, -1.58xj Ã\ÃÂÂMxj xjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã]ÂGLÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ^ÂGKÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ_ÂAÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ`ÃQÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃaÂ$KÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ<UPGRADING PIPING IN 2008 TO APT DW FLEX COMPATIBLE W/ETHANOLxjÃbÂÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃcÂ.9ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃdÂ.8ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ.6ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ.7ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ1 xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ_[ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿV/R TLS 350 INSTALLED 2/6/07xjÃÂ^ ÂÂ]xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ?ÂÂ]xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂÂÂ]xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÃFbÂÂ]xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjà Ã`?ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â9ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â^\ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃQÂÂRxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃY ÂÂRxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂZÂÂRxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃEÂÂRxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂC.ÂÂRxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ/ÂÂRxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ9OÂÂHxjxjÂxj þÿþÿþÿþÿþÿþÿþÿsTANK ANNULAR SPACE SENSOR CORRODED IN TANK-UNABLE TO REMOVE AND INSPECT (RECOMMEND REPAIR). PIPING SUMP NOT LIQUID TIGHT (RECOMMEND REPLACEMENT). PIPING SUMP SENSOR FAULTY (REPAIRED). SPILL BUCKET BOTTOM FAULTY- NOT LIQUID TIGHT (RECOMMEND REPLACMENT). CERTIFICATE OF PROPER INSTALLATION DATED 9/1/2006 SUBMITTED TO THE DEPARTMENT. ALL FAILING A.I. COMPONENTS FIXED.xjÃÃdJÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ6ÂÂHxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃdSÂÂHxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃRÂÂXxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃW=ÂÂXxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂT ÂÂXxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃà NÂÂXxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃVNÂÂXxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂ7IÂÂHxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿs08/04/2006 REMOVED LIQUID FROM ANNULAR SPACE INTO ON-SITE CONTAINER (APPROX. 1.5 GALLONS). ANNULAR SPACE RECHARGED WITH 4'' OF LIQUID IN 15 MINUTES, PUMPED ANNULAR SPACE SECOND TIME, WAITED 15 MINUTES AND ANNULAR SPACE HAD RECHARGED AGAIN TO 4'' OF LIQUID. TANK IS DETERMINED TO HAVE PURGE IN INNER WALL. (RECOMMEND REPAIR OR REPLACEMENT)( NOTIFIED TIM RECTOR, MEDEP).xjÃÂRaÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÂÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ!Á&ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ"Ã%7ÂÂKxjxjÂxlþÿþÿþÿþÿþÿþÿþÿgCP READINGS: -.505, -.486, -.479 11/29/06 2ND FAIL LETTER. REMOVE BY 5/31/07. -ML UST REMOVED 1-3-08xjÃ#Á<ÂÂ:xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ$ÂÂÂKxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ% ÂÂKxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ&Â*ÂÂKxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã'Â/>ÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ(ÂRÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã)ÃFÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã*Â5ÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã+Â1+ÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã-ÃÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã.Ã,ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã/Ã,ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ2CP PIPING FOR TANK #6 PASSED WITH A -.95 VOLTS. LWxj Ã0Ã,#ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã1ÂÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ2ÃTOÂÂ!xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã3Â7FÂÁ$xjxjÂxkþÿþÿþÿþÿþÿþÿþÿþÿxjÃ4Â&ÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ5ÂIWÂÂ)xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxj Ã6Ã6 xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ8Ã0ÂÂ!xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã9Â>ÂÂxj xjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã:ÃUÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿWVENT PIPING CATHODIC PROTECTION READING -.855 VOLTS (TANK #5) AND -.858 VOLTS (TANK #6)xjÃ;ÂbJÂÂ)xjxjÂxdþÿþÿþÿþÿþÿþÿþÿþÿxdÃ<à ÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ=Â8ÂÂ)xjxjÂxj þÿþÿþÿþÿþÿþÿþÿ_VENT PIPING CATHODIC PROTECTION -.857 VOLTS TANK #5 LIDS REPAIRED 10/4/06 PER CTI DON BUBAR MLxjÃ>ÂÂÂ)xjxjÂxj þÿþÿþÿþÿþÿþÿþÿxCTI DAVID BEAUMONT RETESTED CP SYSTEM ON 11/1/06 READINGS - TANK 1: -1.296 TANK 2: -1.113 TANK 3: -1.091 TANK 4: -1.014xjÃ?Ã3ÂÁxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ@ÂAÂÁxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿ"SPOKE WITH MARK BOSSE RE: CP PROTECTION ON 3 TANKS. KIRK ST PETER WILL BE DOING THE GEOPROBE INSTALLATION OF NEW ANODES IN SPRING OF 2007, I INDICATED THIS WAS ACCEPTABLE UNDER THE CIRCUMSTANCES. TR 12/1/06 8/17/07 UPGRADE REGN FOR CTI LEGASSE JR TO REPLACE SPILL BUCKETS ON TANKS 9 & 10xjÃAÃ!ÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃBÃ;ÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃCÂ[ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃDÁ ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿYVENT PIPING READING FOR 6-1 IS -1.278 VOLTS, 7-1 IS -1.278 VOLTS, AND 7-2 IS 1.278 VOLTS.xjÃEÃ` ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃFÂ.ÂÂbxjxjÂxjÄQ3þÿþÿþÿþÿþÿþÿþÿxjÃGÃ<ÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃHÃRÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃIÂ3MÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃJÂQSÂÂ)xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxjÃKÃKÂÂ)xjxjÂxkþÿþÿþÿþÿþÿþÿþÿ_VENT PIPE CATHODIC PROTECTION READING -.538 VOLTS FOR TANK 7 AND 8. ALL VENTS HOOKED TOGETHER.xjÃOÃ=ÂÂ)xjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxjÃPÃ4ÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃQÃ*ÂÂ)xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxjÃRÃ3UÂÂ)xjxjÂxj þÿþÿþÿþÿþÿþÿþÿfVENT PIPES ARE FIBERGLASS. BB BUBAR DID AI 8/21/07 - INCOMPLETE, RETURNED TO OWNER. UNREGISTERED ATG.xjÃSÃLÂÁ$xjxjÂxjÄB_þÿþÿþÿþÿþÿþÿþÿxjÃTà ÂÂ!xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃUÂ6\ÂÂ!xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃVÂ1HÂÂ)xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃWÃ@_ÂÂ)xjxjÂxj þÿþÿþÿþÿþÿþÿþÿICP TESTED 9/07 BY STPETER, ADDED ANODE TO TANK 2. COPI DATED 9/12/07 -MLxj ÃXÃCcÂÂ)xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxjÃYÃ_*ÂÂRxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃZÂ$ÂÁ"xjxjÂxj ÃM`\þÿþÿþÿþÿþÿþÿþÿxjÃ[Â(ÂÂTxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ\Â.ÂÂKxjxjÂxjÃ+ccþÿþÿþÿþÿþÿþÿþÿxjÃ]Ã>ÂÂLxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã^ÃZÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã_Ã_bÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ`à ]ÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃaÃ48ÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃbÂ;NÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ4 ANODES ADDED TO TANK 6 BY CTI SCOTT CYR ON 11/27/06xjÃcÃ)ÂÂTxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃdÁÂÂ\xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿ*TANKS 4 & 5 PLANNED FOR REMOVAL ON 4/30/07xjàSÂÂ!xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂZ(ÂÂxjxjÂxjÄGVþÿþÿþÿþÿþÿþÿþÿxjÃÂ%AÂÂxjxjÂxjÃcT2þÿþÿþÿþÿþÿþÿþÿxjàÂÂxjxjÂxjÃ* þÿþÿþÿþÿþÿþÿþÿxjÃÂd5ÂÂ:xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ/-ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ//ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿMCP UPGRADE SCHEDULED. BB CTI MARK WINSLOW PERFORMED ANODE UPGRADE 9/26/06 MLxj ÃÃ/1ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã/3ÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃZOÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÃSÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ CP RETEST. BBxjà Â9 xjxjÂxj þÿþÿþÿþÿþÿþÿþÿrCP READINGS AFTER ANODES ADDED TANK 6: -1.32, -1.38, -1.38 TANK 7: -1.15, -1.26, -1.12 TANK 8: -1.03, -1.03, -0.95xj ÃÃ.ÂÂYxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ¢SENT CP LETTER 8/30/2006. BB PIPING REPLACED WITH DW FLEX PIPE (APT) ON 11/17/06; VENT PIPES STILL CP STEEL. OOS TANK ADJACENT TO ACTIVE TANKS; PROPERLY OOS. MLxjÃÂ_PÂÂ]xjxjÂxj Ã#Wþÿþÿþÿþÿþÿþÿþÿxj ÃÂMÂÂ]xjxjÂxj Ã,þÿþÿþÿþÿþÿþÿANODES INSTALLED ON TANK 4xj ÃÃ[ÂÁxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃG$ÂÂKxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂN^ÂÂKxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂOÂÂKxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ6ÂÂKxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂOÂÂKxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂAcÂÂKxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂOÂÂKxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂ[ÂÂKxjxjÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ,)ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂA ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂX8ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿACP ON RISER PIPE ONLY. TESTED BY MICHAEL LEWIS AND PASSED -.871.xjÃÃWdÂÂ]xjxjÂxjÄKþÿþÿþÿþÿþÿþÿþÿxjÃÂVHÂÂ]xjxjÂxjÃ94@þÿþÿþÿþÿþÿþÿþÿxjÃÃ5?ÂÂ]xjxjÂxjÃ9T.þÿþÿþÿþÿþÿþÿþÿxjà ÂÂÂVxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ!à @ÂÂXxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ"Â*ÂÂbxjxjÂxjÃ%[þÿþÿþÿþÿþÿþÿERIC ELLIOTT ALSO ON INSPECTIONxjÃ#Â&ÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ)ÂFÂÂ`xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ*Ã^*ÂÂ`xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ+à ÂÂKxjxjÂxjÃ3F"þÿþÿþÿþÿþÿþÿþÿxjÃ,ÃU6ÂÂKxjxjÂxjÃMGþÿþÿþÿþÿþÿþÿþÿxjÃ-Ã]ÂÂxjxjÂxjÃ3þÿþÿþÿþÿþÿþÿþÿxjÃ.ÃTHÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ/Ã- ÂÂIxjxjÂxjÃY]þÿþÿþÿþÿþÿþÿþÿxjÃ0ÂZ9ÂÂIxjxjÂxjà þÿþÿþÿþÿþÿþÿþÿxjÃ1ÂQGÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ2Ãb?ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ3Â#ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ4Â/ÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ5ÂCÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ6ÂAÂÂ\xjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ7ÂZ-ÂÂUxj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿyANODES ADDED TO TANK 12 BY CTI ELWIN SCOTT ON 11/27/06; BISKUPIAK TESTED TANK 12. NO RETEST FOR TANK 15, STILL FAILING. xjÃ8ÃCÂÁ$xjxj Âxj þÿþÿþÿþÿþÿþÿþÿÄFAILURES FOUND ON 6/22/06 WERE CORRECTED ON 6/23/06 AND BOTH A COMPLETE FAILING AI AND A COMPLETE PASSING AI WERE SUBMITTED TOGETHER. 10/10/06 COPI - CTI DENNIS DAVIS REPLACED MANHOLE ON TANK 6xjÃ9ÃYÂÂRxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ:ÂGÂÂRxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ;ÁÂÂRxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ<Ã<ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ=Â!MÂÂUxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ>Â[ÂÂ\xg xj Â<xjÃ`þÿþÿþÿþÿþÿþÿþÿxjÃ?Âb  xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ@ ÂÂLxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃA xj xj Â<xjÃK1 þÿþÿþÿþÿþÿþÿþÿxjÃBÃ''ÂÂ]xj xj Â<xjÃQQ5þÿþÿþÿþÿþÿþÿþÿxjÃCÂAÂÂ]xj xj Â<xjÃD 8þÿþÿþÿþÿþÿþÿþÿxjÃDÂ2ÂÂ]xj xj Â<xjÃ*C0þÿþÿþÿþÿþÿþÿþÿxjÃFÂZ*ÂÂ]xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃGÂMAÂÂ]xj xj Â<xjÃ"[2þÿþÿþÿþÿþÿþÿþÿxjÃHÂÂÁ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃIÂMÂÁ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃLÂÂÁ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃMÂXÂÁ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃNÂ;*ÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃOÃ9dÂÂXxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃPÂÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃQÂ[ÂÂ\xj xj Â<xjÃ`þÿþÿþÿþÿþÿþÿþÿxjÃRÂ#=ÂÂxj xj Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃSÂ'1ÂÂXxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃTÂ5@ÂÂXxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃUÂÂÂ\xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃVÃ(FÂÂbxj xj Â<xjÃ&S5þÿþÿþÿþÿþÿþÿ-.862 CP TEST PASSING.xjÃWÂIÂÂLxjxj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃXÃÂÂ4xj xj Â<xjÄ+I.þÿþÿþÿþÿþÿþÿþÿxjÃYÃ)ÂÂSxj xj Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃZÃ-ÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ[Â.ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã\Â*\ÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿCP UPGRADE. BBxj Ã]Â&ÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ^Ã-aÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ_ÂGHÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ`ÂGDÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃaÂÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃbÂÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃcÃZ ÂÂUxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃdÂJ"ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂWOÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Ãd*ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â@ZÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à à :ÂÂSxj xj Â<xj Ã' 0þÿþÿþÿþÿþÿþÿþÿxj à Ã\ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂFÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã6:ÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÃOÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â!ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â0ÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÁNÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã@ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã>ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã?ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã;ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã<ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã4ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂXÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂQÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃÂÂKxj xj Âxi þÿþÿþÿþÿþÿþÿþÿþÿxi à Ã9ÂÂYxj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà Ã.ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ0NORMAM LABERGE AT CUTLER BASE (207) 259-8282. BBxjà ÂX/ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â>ÂÂxj xj Á`xj Ãþÿþÿþÿþÿþÿþÿþÿxj à Ã&JÂÂxj xj Á`xj Ã(3þÿþÿþÿþÿþÿþÿþÿxj à ÃXÂÂAxj xj Á`xjÃ9&þÿþÿþÿþÿþÿþÿþÿxjà Ã05ÂÂYxj xj Á`xj Ã:Q_þÿþÿþÿþÿþÿþÿþÿxj à ÂOÂÂ]xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ±FACILITY IS OUT OF SERVICE. CN BROWN TRYING TO LEASE FACILITY. KEVIN MOORE WILL SEND LETTER ASKING TO KEEP OOS. WARNED REQUEST MAY BE DENIED AND TANKS ORDERED OUT. 1/10/07 MLxj à Ã3ÂÂ]xj xj Á`xj ÃE;Kþÿþÿþÿþÿþÿþÿþÿxj à Â9:ÂÂXxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃMÂÂUxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjà !ÃH%ÂÂUxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj à "Ã>ÂÂ)xj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà #ÂÂÂ_xj xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi à $Ãc&ÂÂUxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj à %ÃNÂÂ:xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à & TÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿYINSPECTION REPORT INDICATED SNL CHAMBER CURRENTLY O-O-S AT THIS TIME DUE TO LOW SALES. BBxjà 'à -ÂÂ_xj xj ÂxkþÿþÿþÿþÿþÿþÿþÿPA.I. INCORRECTLY ENTERED UNDER WRONG FACILITY NUMBER. SEE FACILITY REG. # 1402.xjà (ÂÂÂ_xj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà )Â`ÂÂ_xj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà *ÃU xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ0ANNUAL INSPECTION DATE WAS ACTUALLY 9/6/2005. BBxj à +ÂGÂÂUxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ,Ã*ÂÂUxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ- TANK READING: ANODES ADDED TO TANKS TO PASS.xj à -ÂXÂÁxj xj Â7þÿþÿþÿþÿþÿþÿþÿþÿ*#23: BOTH TANK AND PIPING SUMP IN POOR CONDITION, FAILED INSPECTION. CU PIPING: CHECK VALVE IMPROPRLY LOCATED ON SUCTION SIDE OF OIL LINE IN SUMP AREA; MUST BE REMOVED AND INSTALLED IN BOILER ROOM AT FILTER. NEEDS UPGRADE OF ALL SYSTEMS. -- DMCL TANK TOP UPGRADE REGISTRATION SUBMITTED 1/4/07xjà .Ã5ÂÂHxj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà /Á%ÂÂLxj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi à 0Ã;ÂÂAxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà 1ÂTÂÂXxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà 2Â92ÂÂXxj xj Â<xj Ã>[þÿþÿþÿþÿþÿþÿþÿxj à 3ÃDÂÂxj xj Â<xj ÄþÿþÿþÿþÿþÿþÿT8/29/07 CTI SEAN HERSEY CHECKED ONLY TANKTOP COMPONENTS FOR POTENTIAL BUYER -ML & TRxj à 4Â$>ÂÂKxj xj Â<xjÃ3U3þÿþÿþÿþÿþÿþÿþÿxjà 5ÃGÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 6ÂÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 7à /ÂÂLxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 8Â_BÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 9 ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à :ÂCÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿg9/13/07 STPETER ADDED ANODE AND TESTED CP -ML 9/13/07 COPI - CTI BUBAR ISNTALLED SPILL BUCKET ON TANK 8xjà ;Â2ÂÁxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà <Â>SÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à =Ã'"ÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà >Ã^!ÂÂ!xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ?ÂB0 xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à @ U xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à AÃ>ÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à BÃCF xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à CÂ=ÂÁxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿkCP READINGS: TANK 5 -1.007 TANK 6 -1.017 9/25/07 COPI - CTI GEORGE INSTALLED 15 GAL SPILL BUCKET ON TANK 5xjà DÂVÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à EÂ_ÂÁxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà FÂZ&ÂÁxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà GÃ!ÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà HÂ$QÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà IÃ5KÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿ06/1/07 CTI MULLINS INSTALLED 15 GAL SPILL BUCKETxj à JÃ5 xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à KÃ\&ÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà LÂUÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà MÃVÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà NÃ`&ÂÂdxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà OÂG5ÂÂ!xj xj Â<xjÄM=þÿþÿþÿþÿþÿþÿþÿxjà PÃGÂÂ!xj xj Â<xjÃ_Rþÿþÿþÿþÿþÿþÿþÿxjà QÂD*ÂÁ$xj xj Â<xjÃGQþÿþÿþÿþÿþÿþÿMUPGRADE REGN SUBMITTED 4/2/07 TO REPLACE SPILL BUCKET, OVERFILL AND FILL PIPExjà RÃJ<ÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà SÃZEÂÂ!xj xj Â<þÿþÿþÿþÿþÿþÿþÿþÿMNOT A VALID INSPECTON DUE TO NO BUILDING. ENTERED IMPROPERLY DUE TO POOR FORMxj à TÂ[ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà UÂO`ÂÂxj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà VÃG"ÂÂLxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à WÃÂÂxj xj Âxj ÄQ:þÿþÿþÿþÿþÿþÿþÿxj à XÂ$4ÂÂbxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à YÂ5aÂÁ$xj xj Âxi Ä& þÿþÿþÿþÿþÿþÿþÿxi à ZÂ^ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ$OUT OF SERVICE INSPECTION REPORT. BBxj à [ ÂÂSxj xj Âxi Ã!>þÿþÿþÿþÿþÿþÿþÿxi à \ÃdÂÂ)xj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà ]ÃAÂÂ\xj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿBINSPECTOR NOTED COPPER LINES APPEAR NOT TO BE PROPERLY SLEEVED. BBxj à ^ÂCÂÂ^xj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà _Ã4PÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à aÂÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à cÂSCÂÂAxj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà dÂ%*ÂÂAxj xj ÂxjÃ/$ þÿþÿþÿþÿþÿþÿþÿxjà Ã` ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à à ÂÂ]xj xj Â<xj Ã7E þÿþÿþÿþÿþÿþÿþÿxj à Ã]$ÂÂ]xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â>PÂÂ]xj xj Â<xj ÃJ!þÿþÿþÿþÿþÿþÿþÿxj à ÂWIÂÂ`xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â.ÂÂAxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂPÂÂLxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Ãb xj xj Â<xj Ã-DþÿþÿþÿþÿþÿþÿNEW FACILITY IN 2007 SO NO INSPECTION FOR 2007. OVERDUE FOR 2008 AND THEY GOT AN NOV. CURRENT OWNER IS DAUGHTER OF PRIOR OWNER, PRIOR OWNER PASSED AWAY EARLEIR IN 2008 AND SHE TOOK CARE OF THE GAS FACILITY. DAUGHTER WILL LCALL JOHN SIMS AND GET AN INSPECTION DONE ASAP. TR 11/4/08xj à Ã'ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â">ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â/4ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Á>ÂÂKxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà  ÂÂXxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã.FÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à  ÂÂXxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂV(ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿG8/18/10-NOITR REC'D FOR UNNAMED CONTRACTOR TO REMOVE TANK AND PIPING-PHxj à Ã5ÂÂ]xj xj Â<xj Ã8&þÿþÿþÿþÿþÿþÿþÿxj à  DÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃV[ÂÂXxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂcÂÂXxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃTÂÂ\xj xj Â<xj Ã_Dþÿþÿþÿþÿþÿþÿþÿxj à ÃR+ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â"^ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â.+ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿc7/23/08 EVELYN OSGOOD, HEAD CUSTODIAN, SAYS CARVER DID AI ON 7/8/08. WILL SEND COPY OF REPORT. -MLxj à Ã9 xj xj Â<xjÃVþÿþÿþÿþÿþÿþÿþÿxjà Ã1 ÂÂ:xj xj Â<xjÃ7W(þÿþÿþÿþÿþÿþÿþÿxjà Ã5\ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â$OÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà  ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿ;FACILITY FOR SALE, REMOVAL OF TANK CONTEMPLATED -ML 7/24/07xjà !ÂUÂÂTxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà "ÃÂÁYxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à #ÃBÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà $Â- ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à %Ãa>ÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà &ÂMÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 'ÃCÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à (Ã6ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à )ÂM,ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à *ÃcÂÂxj xj Â<xjÄXþÿþÿþÿþÿþÿþÿþÿxjà +Ã_aÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ,ÃY^ÂÂxj xj Â<xjÃ(= þÿþÿþÿþÿþÿþÿþÿxjà -ÂQQÂÂxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà .ÂE`ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à /Ã,<ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 0ÂcÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 1Âc ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 2à GÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 3 'ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 4ÃW#ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 5ÂSÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 6Ã&ÂÁ xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà 7Â@ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 8Â. ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 9Â.ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à :Â28ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ;Â.ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à <ÂN*ÂÂKxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à =Â^ÂÂxj xj Âxj Ã-MIþÿþÿþÿþÿþÿþÿ CP RETESTxj à >ÂXÂÂxj xj Âxj Ã- ZþÿþÿþÿþÿþÿþÿGCP FAIL LETTER 12/19/06. AI UPDATE COMPLETED 9/19/06 FAXED 12/21/06 -MLxj à ?Â^ÂÂXxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ2CTI MIKE LEWIS PERFORMED ANODE UPGRADE 10/23/06 MLxj à @ÃEÂÂxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿ SENT CP LETTER ON 10/06/2006. BBxj à AÂ5ÂÂxj xj Âþÿà 0þÿþÿþÿþÿþÿþÿ;SENT CP LETTER ON 10/02/2006. BB TANKS TO BE REMOVED 12/07xj à BÃ^ÂÂxj xj Âxk þÿþÿþÿþÿþÿþÿþÿ'8/17/2010 SPOKE WITH JOE BOSSE ABOUT EVIDENCE OF A LEAK. ALSO LEAK JOE KNOW WE DIDN'T GET THE 2009 AI. JOE SAID HE WOULD RESEND IT. -LW TANKS REMOVED 11/6/07 BY CTI CARVER 5/9/07 AI UPDATE RETESTED CP: TANK 1 -.684, -.861, -1.113 TANK 2 -.865, -.906, -1.264 SENT CP LETTER ON 10/02/2006. BBxjà CÃD ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ$OUT OF SERVICE INSPECTION REPORT. BBxj à DÂÂÂdxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à E %ÂÂTxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à FÁZÂÂYxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à GÂ^:ÂÂSxj xj Â<xj Ä AZþÿþÿþÿþÿþÿþÿþÿxj à HÃ4XÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à I ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à JÂÃ@ÂÂXxj xj Âxj Ãþÿþÿþÿþÿþÿþÿ SPILL BUCKETS CLEAN?: WATER REMOVED FILL CAP AND GASKET IN GOOD CONDITION?: TANKS 4&5 CAPS NOT LIQUID TIGHT - REPLACED; TANK 4 ADAPTER REPLACEDxj à ?ÃTVÂÂXxj xj Âxj þÿþÿþÿþÿþÿþÿþÿÍSPILL BUCKET AND FILL CAP REPLACED. 15 GAL BUCKET INSTALLED BY CTI MIKE LEWIS DROP TUBE CORRODED TO RISER PIPE, UNABLE TO REMOVE - REPLACEMENT RECOMMENDED. COPPER LINES PROPERLY SLEEVED?: LINES ISOLATEDxj à @ $ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿLCOPPER LINES NOT SEPARATED - 10/89 INSTALL NOT REQUIRED. FILL CAP REPLACED.xj à AÂO ÂÂ\xj xj Âxj ÂT6þÿþÿþÿþÿþÿþÿêDISPENSER SUMPS: LIDS TOO SMALL, SENSORS NOT SECURED, DISPENSER 1 SUMP WATER REMOVED. REPLACED FILL CAP AND EXTRACTOR VALVE CAP; INSTALLED PROBE RISER GUIDES CTI COUTURE INSTALLED 2 OPW FG DISPENSER SUMPS IN NEW FUELING ISLAND 7/2/07xj à BÂOÂÂ\xj xj Âþÿþÿþÿþÿþÿþÿþÿþÿ(REPLACED TANK ANNULAR SPACE SENSOR COPPER LINES NOT SEPARATED - 7/90 INSTALL NOT REQUIRED SPILL BUCKETS CLEAN?: DEBRIS REMOVED SPILL BUCKETS LIQUID TIGHT?: SPILL BUCKET REPLACED CTI COUTURE INSTALLED HI-LEVEL ALARM, 15 GAL SPILL BUCKET, 3/4" S/R ENVIRON DW FLEX LINES, 2" FG VENT PIPE ON 7/20/07xj à CÂOÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿZFILL CAP REPLACED TANK BOTTOM CONTAINS 3/8" WATER SPILL BUCKETS CLEAN?: WATER/FUEL REMOVEDxj à DÂOÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à EÂQGÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ5FILL CAP REPLACED SPILL BUCKETS CLEAN?: WATER REMOVEDxj à FÃ-ÂÁxj xj Âxk þÿþÿþÿþÿþÿþÿþÿ•TANK 7-1 15000 RNL IS PLANNED FOR REMOVAL AS OF 9/06. INSPECTION INDICATES FAILURE DUE TO OIL AND WATER IN INTERSTITIAL SPACE. TANK 7 REMOVED 6/13/07xjà GÃ4OÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿôFACILITY OUT OF SERVICE RECOGNIZED IN CORRESPONDENCE ON FILE BETWEEN DEP, OWNER, AND ATTORNEY FACILITY INITIALLY FAILED DUE TO MONITORING WELLS NOT BEING CHECKED; HOWEVER, ALL TANKS ARE PUMPED OUT, SO MONITORING WELLS ARE N/A. DMCL 3/29/2007 xj à HÂRDÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ià ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à JÃOÂÂ!xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà K ÂÂ!xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Là ÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à MÂ=SÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à NÃ;*ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿ™11/26/08-SCOTTY FROM SIMARDS CALLED AND SAID AI WOULD BE DONE 12/2/08-PH 7/8/08 COPI - CTI SIMARD INSTALLED 2 APT DISPENSER SUMP W/OMNTEC LU2 MONITORINGxj à OÃHÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà PÃÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à QÃ"ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à RÂÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à SÃÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à TÃRAÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à UÃ[ÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à VÃRTÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à WÃRDÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à XÃSJÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à YÂ/ZÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ZÃRCÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à [Ã4ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à \Ã(7ÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ]ÂZ$ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ^ÃT ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à _ ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿ3CTI GEORGE INSTALLED VEEDER-ROOT TLS 350 ON 3/21/07xj à aÂUEÂÁxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà bÂ#bÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà cÂ=4ÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà dÂS ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â0aÂÂ;xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.911, -.916xj à ÂB$ÂÁxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj à ÂEÂÁ$xj xj Âxj Ã_ 7þÿþÿþÿþÿþÿþÿOPIPING LEAK DETECTION FOR TANK 10 - CONNECTED BY SYPHON BAR TO PROVIDE SUCTION xj à  BÂÁxj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿÔLETTER SENT 10/20/06: CP FAILURE, NO PIPING SPACERS, REQUEST 2006 MONITORING WELL LOGS. 12/15/06 RECEIVED LOGS OF MONTHLY MONITORING FOR 4 MONTHS. -ML SPACERS AND ANODES INSTALLED BY CTI LEGASSE JR ON 4/2/07 -MLxj à Ã_ ÂÁ$xj xj Âxj ÃSPWþÿþÿþÿþÿþÿþÿH SPILL BUCKET LID IN GOOD CONDITION?: REPLACED TANK 2-1 SPILL BUCKET LIDxj à Ã]ÂÂbxj xj Âxj Ãþÿþÿþÿþÿþÿþÿþÿxj à Â0cÂÂ;xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã^UÂÂ;xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â.ÂÂbxj xj Âxj Ã)1þÿþÿþÿþÿþÿþÿ4 SPILL BUCKETS CLEAN?: REMOVED WATER FROM 7-1 BUCKETxj à Â4.ÂÂ;xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã.EÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ"PIPING REPLACEMENT COMPLETED 10/07xj à  +ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ5 TANK READING: TANK 5: -.94, -.97; TANK 6: -.94, -.93xj à ÂJÂÂ)xj xj Âxjþÿþÿþÿþÿþÿþÿþÿ:7/89 INSTALL NO SPACERS, NOT REQUIRED. NO LEAK DETECTION.xjà Ã#ÂÁxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj à ÃÂÂ)xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿË SENSORS ARE FUNCTIONING PROPERLY?: REPAIRED WIRE CONNECTION TO MAKE SENSOR WORK SPILL BUCKETS CLEAN?: CLEANED OUT 8/22/07 CTI BUBAR REPLACED FITTING ON VENT RISER AFTER CAR IMAPCT. COPI DATED 7/30/07.xjà ÂWÂÂ)xj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÃRBÂÂ!xj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj à Â7;ÂÂ!xj xj Âxj þÿþÿþÿþÿþÿþÿþÿr SENSORS ARE PROPERLY PLACED?: TANK 3 HAS NO SUMP SENSOR - SUCTION SYPHON LLD PRESENT?: SYPHON BAR FOR TANKS 3 & 4xj à Â$!ÂÁ$xj xj Âxj ÄYYHþÿþÿþÿþÿþÿþÿéLLD SLOW TO ACTIVATE BUT FUNCTIONING PER CTI DENNIS DAVIS SENSORS ARE FUNCTIONING PROPERLY?: REPLACED 6-1 SUMP SENSOR AUTO SHUT OFF / FLAPPER CHECKED AND WORKING PROPERLY: TANK 6 FLAPPER CORRODED SPILL BUCKETS CLEAN?: CTI CLEANED OUTxj à ÃNÂÂ)xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿCTI CLEANED OUT SPILL BUCKETxjà à (ÂÂ'xjxj Â7xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Ã?/ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃBÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿg COPPER LINES PROPERLY SLEEVED?: CTI BUBAR INSTALLED SLEEVES 9/7/06 SPILL BUCKETS CLEAN?: REMOVED WATERxj à ÂFVÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã-EÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ×INTERSTITIAL MONITORS - TANK 6 SERVED BY VEEDER ROOT ILS 250, TANK 7 SERVED BY FAILING OMNTEC ELU-2 TANK 7 SUMP SENSOR DOES NOT TRIGGER CONSOLE. SUMP TAKES ON WATER. REPAIRS & CORRECTIONS MADE BY BUBAR ON 11/27/06xj à Ã`aÂÂbxj xj Â<xj Ã`)9þÿþÿþÿþÿþÿþÿþÿxj à Â$'ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂKÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à !Â-ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à "Ã$:ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à #Â:$ÂÂ*xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à $Ã0BÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à %Â^,ÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 'ÃJ:ÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à (ÃJ9ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à )Â-ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à *Â1ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à +ÂBÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ,Â3EÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à -ÃbÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à . ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 0ÂÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 1Â7ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 2Â^ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿ6ARBOUR REPLACED TANK 5 INTERSTITIAL SENSOR ON 11/15/06xj à 3ÂIÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 4ÃÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿV/R TLS 350 INSTALLED 2/26/07xj à 5ÂAÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 6ÃHÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 7Ã;ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 8Ã_ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 9Âb@ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à :Ã\#ÂÁxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ;Â#=ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à <ÂZ+ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿ&INSPECTION UPDATE BY CTI DARREN RICKERxj à =Â%MÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à > XÂÂ)xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà ?ÃÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à @Â%ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à AÂM'ÂÂ*xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à BÂ_ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à CÂ9ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à DÂÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à EÃ1ÂÂ)xj xj ÂxjþÿþÿþÿþÿþÿþÿþÿSYSTEM SET UP TO SHUT OFF TURBINES IF SUMP ALARM GOES OFF; LLD NOT REQUIRED. SENSORS ARE FUNCTIONING PROPERLY?: CTI JOHN PAINE RESET CONSOLE AND TESTED SENSOR 7/17/06 ELECTRONIC HIGH LEVEL ALARM CHECKED AND WORKING PROPERLY?: NOT IN USE LLD PRESENT?: NOT REQUIRED; SENSOR TURNS OFF PUMPxjà FÂÂÂ)xj xj Âxkþÿþÿþÿþÿþÿþÿþÿ2GOT COPIES OF RECONCILED DAILY INVENTORY MAY 2007.xj à GÂÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à HÂCÂÁxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿd6/13/07 UPGRADE REGN FOR CTI LEGASSE JR TO REPLACE PIPING WITH FG SUCTION, SPILL BUCKETS, DROP TUBESxj à IÂ%ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿrCP TEST 9/27/06 TANK 4 -.934, TANK 6 -.900 CTI ARBOUR RETESTED ON 10/25/06 TANK 4 -.87 TANK 5 -.857 TANK 6 -.864 xj à JÂ-ÂÂGxj xj Âxk þÿþÿþÿþÿþÿþÿþÿ#SPACERS TO BE INSTALLED IN 4/07 -MLxj à KÂ/ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿJ COPPER LINES HAVE SPACERS?: NO SPACERS. 7/91 INSTALL SPACERS NOT REQUIREDxj à LÂ5+ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿD COPPER LINES HAVE SPACERS?: NO SPACERS. 11/90 INSTALL NOT REQUIRED.xj à MÂ@\ÂÂ)xj xj ÂxkþÿþÿþÿþÿþÿþÿþÿoCTI BEAUMONT REPLACED 4-3 BUCKET WITH 15 GAL, REPLACED 4-2 BUCKET WITH 5 GAL DUE TO PROXIMITY OF ADJACENT RISERxj à NÂ8XÂÂxjxj Âxj þÿþÿþÿþÿþÿþÿþÿ\CTI DON BUBAR INSTALLED NEW MANWAYS, REPAIRED SUMPS, AND EXTENDED BALL FLOATS ON TANKS 5,6,7xjà OÂB,ÂÂ)xj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj à PÂE^ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ5OVERFILL PREVENTION SHOULD BE ELECTRONIC, NOT FLAPPERxj à QÂO'ÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ@ COPPER LINES HAVE SPACERS?: CTI BUBAR INSTALLED SPACERS 9/13/06xj à RÂB_ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ5 LESS THAN 1" OF PRODUCT: 3" OF PRODUCT IN OOS TANK 3xj à SÂO(ÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ3 COPPER LINES PROPERLY SLEEVED?: SLEEVING INSTALLEDxj à UÂ^ ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿÅ10/10/06 READINGS CP TANK 6: -.572, -.58 CP TANK 7: -.681, -.706 CP TANK 8: -.884, -.974 11/10/06 READINGS AFTER ANODES ADDED TO TANKS 6,7,8 TANK 6: -1.32 TANK 7: -1.44 TANK 8: -1.23 TANK 9: -1.25xj à VÂOTÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à WÃ9ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à XÂ_ÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿm10/10/06 BUBAR INSPECTION - BUBAR SEALED HOLE IN SUMP WITH SILICONE AND INSTALLED J-BOX COVER ON TANK 7-1 - PASSING 0.1 GPH TEST IN PAST 30 DAYS?: NO SNAP TAPS ON TANK 10, PASSED MONITOR TESTS 11/11/06 ARBOUR UPDATE - MOUNTED SENSOR TO CONDUIT IN SUMP - TANK 10 LLD NEEDS NEW TRANSDUCER 11/20/06 RICKER UPDATE - INTERSTITIAL SENSOR TESTS OK - TANK 10 LLD TESTS OKxj à Yà ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à Zà 8ÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxjà [ÃÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à \ÃUÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à ]ÃVÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ10/3/06 INPSECTION UPDATE BY R.FAULKINGHAM PASSED ATGS INVENTORY RECORDS RECONCILED MONTHLY?: TANK 7 THROUGHPUT ERROR; USE ATGSxj à ^Ã!ÂÁxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj à _Ã!OÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ4 SPILL BUCKETS CLEAN?: 7-1 PRODUCT IN BUCKET REMOVEDxj à `Ã!QÂÂ)xj xj Âxkþÿþÿþÿþÿþÿþÿþÿ^CTI DON BUBAR: REPLACED OLD PNEUMERACATOR MONITOR WITH USE V/R ILS 350 AND SENSOR AND TESTED. xj à bÃ-XÂÂGxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj à cÃ=3ÂÂ)xj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj à dÃA_ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿENEW TLS 350 INSTALLED BY LEGASSE 10/24/06 TANK READING: -.991, -.996xj à ÃCH xj xj Âxk þÿþÿþÿþÿþÿþÿþÿPCTI POLLEY REPLACED ACCESS CAPS TO INTERSTITIAL SENSORS AND ALL LAMPS IN MONITORxj à Â0AÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à à WÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿCP TANK 1: -1.371, -1.467 CP TANK 2: -1.612, -1.704 CP TANK 3: -1.641, -1.471 TANKS SHOULD BE PULLED IN 2007 PER 38 MRSA 564(5)xj à ÃPÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃS1ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃQÂÁxj xj Âxjþÿþÿþÿþÿþÿþÿþÿþÿxjà ÃMÂÁxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ' TANK READING: IMPRESSED CURRENT SYSTEMxj à Ã\$ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ.NOW PASSING WITH UPGRADE PER CTI MIKE ARBOUR. xj à Ã^ ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã,ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã$ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂB?ÂÁRxj xj Â<xj ÃQþÿþÿþÿþÿþÿþÿþÿxj à Â7ÂÂbxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂB$ÂÂbxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿ@CTI ARBOUR REPLACED BURNT BULBS IN MONITORING CONSOLE ON 10/9/06xj à ÂAÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â7ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃFÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à  aÂÂYxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à  xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã&_ÂÂxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ãc<ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â*7ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã*DÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã@ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿlGENERATOR TANK. SHOULD HAVE BEEN RETROFITTED WITH LEAK DETECTION. JOSH NOW WORKING ON A BID. 12/4/2007 TEDxj à ÃdGÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã(ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à à "ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à !Ã%ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à "à ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à #Â<ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à $à )ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à %ÃaÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à &Ã+ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 'à ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à (ÃÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à )ÃWOÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à *ÃaLÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à +à ÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿP COPPER LINES PROPERLY SLEEVED?: CTI DON BUBAR INSTALLED SLEEVES ON LINES 9/7/06xj à ,ÃÂÁ$xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ LLD PRESENT?: TANK 2 SYPHONxj à -Ã9ÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿP COPPER LINES PROPERLY SLEEVED?: CTI DON BUBAR INSTALLED SLEEVES ON LINES 9/8/06xj à .Ã,3ÂÂRxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿiANNUAL INSPECTION FAXED TO STORE DURING UST INSPECTION. 5/13/08 OWNER IS PUTTING FACILITY UP FOR SALE. xjà /Â*ÂÂxj xj Âxj Ã< þÿþÿþÿþÿþÿþÿ0SUBMITTED PASSING SIA FOR TANK #2 ON 10/16/2006.xjà 0 ÂÁxj xj Âxk þÿþÿþÿþÿþÿþÿþÿž TANK READING: -1.216, -1.204 CTI ARBOUR REPLACED OMNTEC CONSOLE AND RETESTED SENSORS ON 11/27/06 PIPING BEING REPLACED SPRING OF 2007 LETTER IN FILE. TR xjà 1Â'ÂÂbxj xj Âxj Ã+dþÿþÿþÿþÿþÿþÿþÿxj à 2Â9AÂÂRxj xj Á_xj þÿþÿþÿþÿþÿþÿþÿ.INSPECTION DONE AFTER UST INSPECTION WITH EPA.xj à 3 ÂÂ`xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à 4Ã(ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿMSUBMITTED PASSING ANNUAL INSPECTION ON-SITE DURING UST COMPLIANCE INSPECTION.xj à 5Ãc\ÂÂxj xj Â7xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 6Â5ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à 7 !ÂÂxj xj Â7xj þÿþÿþÿþÿþÿþÿþÿþÿxj à 9ÂAMÂÂ\xj xj Âxj ÄbVþÿþÿþÿþÿþÿþÿƒ LLD PRESENT?: REGISTRATION INDICATES SUCTION SYSTEM FOR BOTH CHAMBERS OF TANK 3 UPGRADE REGISTRATION TO INSTALL OMNTEC OEL 8000IIxj à :ÂGÂÂ\xj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿCP FAIL LETTER SENT 11/7/06 MLxj à ;ÂO5ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à <ÃKÂÂDxj xj ÂþÿÃD[HþÿþÿþÿþÿþÿþÿÕCP READINGS- TANK 1: -.899, -.875, -.891 TANK 2: -.855, -.853, -.920 TANK 3: -.835, -.818, -.845 (CP FAIL LETTER 11/7/06, REPAIR OR REMOVE BY 4/11/07 ML) TAKEN OOS - TOLD MUST STILL REPAIR TANK 4: -1.01, -.971, -1.05 TANK 5: -1.08, -1.09, -1.11 NO OIL IN SUMPS OR INTERSTITIAL SPACE?: LLD WEEP REPAIRED IN TANK 2 SUMP. 4/25/07 UPDATE CP READINGS -.814, -.804, -.875 - STILL FAILING 9/20/07 COPI - CTI JOHNSON OVERSAW PCA ENGINEERING INSTALLATION OF ANODES ON ALL TANKSxj à =Â&ÂÂ:xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ?Â'ÂÂAxj xj Â<xjÃbHþÿþÿþÿþÿþÿþÿþÿxjà @ÂQÂÁ4xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à BÂVÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à CÃÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà DÃ\RÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà E &ÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà FÃ/ÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà GÂVÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà HÂD1ÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà IÂ&OÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà JÃ[ÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà KÃÂÂRxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà LÃNQÂÂRxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à MÃZ)ÂÂDxj xj Â<xj ÃI#þÿþÿþÿþÿþÿþÿþÿxj à NÃÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à OÂLÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à PÂJÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Q `ÂÂHxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à RÃPÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à SÃ3ZÂÂXxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à TÃ3YÂÂXxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à UÃ3\ÂÂXxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à VÃ3[ÂÂXxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à WÃ@`ÂÂXxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà XÃ4ÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à YÃ@ÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ZÂ5-ÂÂ\xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à [Ã,ÂÂ\xj xj ÂþÿÃ3þÿþÿþÿþÿþÿþÿþÿxj à \Ã6ÂÂYxj xj Â(xj þÿþÿþÿþÿþÿþÿþÿb10/24/08-INTENT TO ABANDON RECIEVED, CTI WILSON TO PULL TANK-PH FIXED LID, SENT IN PICTURES. -ACFxj à ]Ã^ÂÂDxj xj ÂþÿÃ<þÿþÿþÿþÿþÿþÿþÿxj à ^Ã`ÂÂ`xj xj ÂþÿÃþÿþÿþÿþÿþÿþÿþÿxj à _Ã/+ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿeCP READINGS TANK 1: -.975, -1.152, -1.135 TANK 2: -.977, -1.028, -1.017 TANK 3: -1.09, -1.158, -1.043xj à `Â3ÂÂSxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à aÂQ+ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à bÃ5;ÂÂKxj xj Â(xjà \Iþÿþÿþÿþÿþÿþÿþÿxjà cÂÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ© NO WATER IN SUMPS OR INTERSTITIAL SPACE?: WATER INFILTRATION AT LID. WATER REMOVED FROM SUMP. SUMP MANHOLE SEVERELY CORRODED; REPLACEMENT RECOMMENDED BY CTI THORNDIKE.xj Ã!Â+?ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿyTANK SERVES EMERGENCY GENERATOR. NO WATER IN SUMPS OR INTERSTITIAL SPACE?: WATER REMOVED FROM SUMP; INFILTRATION AT LID.xj Ã"Â.(ÂÁ xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã$Â:(ÂÁ xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã%Â@ xj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿPLANNED FOR REMOVAL IN MAY 07xj Ã&ÂM=ÂÂxj xj ÂþÿÃ>3þÿþÿþÿþÿþÿþÿMUPGRADE REGN FOR SENSOR REPLACEMENT AND REPLACE SUMP COVERS SUBMITTED 3/29/07xj Ã'ÂR@ÂÂHxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ/NO PIPING SPACERS. 1986 INSTALL - NOT REQUIRED.xj Ã(Â[ ÂÂbxj xj Âxj Ã,$þÿþÿþÿþÿþÿþÿþÿxj Ã)ÂbOÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿRTHORNDIKE REPLACED TANK MONITOR INDICATOR LAMPS AND FILL CAP AT TIME OF INSPECTIONxj Ã*ÃGÂÂRxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ+CTI BOSSE REPLACED FEPETRO LLD WITH VMI LLDxj Ã+à :ÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ3 TANK READING: CTI SIMARD INSTALLED ANODES 11/13/06xj Ã,ÃÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã-ÃÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿDCTI SIMARD INSTALLED 15GAL SPILL BUCKET AND 61SO FLAPPER ON 11/13/06xj Ã.ÂDBÂÂKxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã/ÂJÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã0ÂY8ÂÂ]xj xj Â<xd þÿþÿþÿþÿþÿþÿþÿþÿxd Ã1ÂZ)ÂÂ]xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã2à ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã3Ã!ÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã4Ã!ÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã5Ã%BÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã6Ã'2ÂÂ]xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã7Ã.NÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ`DAMAGED DISPENSER HOSE; REPLACEMENT RECOMMENDED BY THORNDIKE SPILL BUCKETS CLEAN?: WATER REMOVEDxj Ã8Ã5ÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã9Ã5)ÂÂ:xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã:Ã5EÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã;ÃH&ÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã<Ã\-ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ‰TANK SERVES BOILER ONLY; NOT CONNECTED TO A GENERATOR SENSORS ARE FUNCTIONING PROPERLY?: REPLACED TANKGARD WITH NEW VEEDER ROOT TLS-300Cxj Ã=ÃÂÁ xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã>ÃaÂÂUxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã?Ã)ÂÂSxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿq3/16/07 PHONE CONVERSATION W/BB. TANK REMOVAL GOING OUT TO BID. TANKS TO BE REMOVED SUMMER 2007, SENT FORMS -MLxj Ã@à ÂÂSxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.95,-1.00xjÃAÃ3QÂÂLxj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxjÃBÃ]ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ¤INTALLED EPOXY BAGS AROUND WIRING CONNECTIONS FOR INTERSTITIAL AND SUMP SENSORS REPAIRED SEALED PIPING TEST BOOTS SO THAT LIQUID WOULD DRAIN TO SUMP IN CASE OF LEAKxj ÃCÂbÂÂ)xj xj Âxkþÿþÿþÿþÿþÿþÿþÿ/DEFICIENCIES CORRECTED BY CTI JON PAINE 3/23/07xj ÃD OÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃEÂEÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿS NO WATER IN SUMPS OR INTERSTITIAL SPACE?: PUMPED WATER FROM INTERSTITIAL AND SUMPSxj ÃFÂ@ÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ_CP FAIL LETTER 12/1/06 -ML TANK READING: NO WIRE, TESTED OFF BOTTOM RESTED 12/10/06 - PASSINGxj ÃG ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃH 7ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃIÂ>ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃJ ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃKÂ-ÂÂGxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃLÂ6ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃMÃ5<ÂÂxj xj Á`þÿÃM3þÿþÿþÿþÿþÿþÿ–ALL SPILL BUCKETS WERE REPLACED WITH 15 GALLON BUCKETS. TANKS 1 AND 3 PASSED DAILY INVENTORY, TANK 2 DID NOT, CHECK NUMBER WAS 47 TANK WAS SHORT 118. xjÃOà #ÂÂTxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ&COPPER LINES ARE INDIVIDUALLY SLEEVED.xj ÃPÂX0ÂÂ*xj xj Â<þÿþÿþÿþÿþÿþÿþÿþÿiCTI P. THOMPSON ON 9/25/08 RETURNED AND SUBMITTED FAILING INSPECTION BECAUSE OF NO OVERFILL PROTECTION PHxj ÃQÃc xj xj Â<xjþÿþÿþÿþÿþÿþÿþÿ>7/17/07 UPGRADE REGN FOR CTI DODGE TO PERFORM TANK TOP UPGRADExjÃRÃFÂÂGxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃSÃ\IÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃTÃ`bÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃUÃ$ÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃVÃ@ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃWÂ#ÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃXÂRÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃYÂÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃZ ÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ[Â!ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã\ 1ÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ] 5ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã^ÂÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã_ÂRÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ`ÂSÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃaÂDÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ãb cÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃcÃ_ÂÂMxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃdÃcÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ(ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ãà %ÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃà %ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ@ÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃ#ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ)ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ.*ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ;\ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Ã;]ÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃXÂÂSxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂÂÂSxj xj Â<xjþÿþÿþÿþÿþÿþÿþÿþÿxjà Â5bÂÂdxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃQ:ÂÂ\xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÃQ;ÂÂ\xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÂ5DÂÂ\xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÂ5EÂÂ\xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÂ- ÂÂ\xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿøTANKS HAVE BEEN SHUT DOWN WHILE TANK TOP UP UPGRADE IS BEING DONE. WILL BE BACK OPERATIONAL JUNE 21, 2007 OR SO PER MIKE LEWIS. CHRIS WILSON IS DOING UPGRADE. -TR 6/18/07 6/25/07 UPGRADE REGN FOR CTI WILSON TO INSTALL 2 NEW DISPENSER SUMPSxi ÃÂ4PÂÂ\xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÂ4BÂÂ\xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÂ-ÂÂ\xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÂ-#ÂÂ\xj xj Â<xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÂ86ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂ1ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿuRON BABCOCK CALLED ON 11/13/2008 REGARDING NOV MASS MAILING. SIMARDS DID AI LAST YEAR; SIMARDS TO SEND IN AGAIN. -LWxj ÃÃ2ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ>ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿ°CALL FROM OPERATOR (MIKE). SIA FAILED FOR INSUFFICIENT DATA. FACILITY STAFF HAVE BEEN RETRAINED ON HOW TO TAKE DAILY INVENTORY AND WILL HAVE NEW SIA COMPLETED. 2/13/2007. BBxj ÃÂ2IÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂ31ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ"ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂLXÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃE@ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ&HÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â^bÂÂKxj xj Á`xj à Jþÿþÿþÿþÿþÿþÿþÿxj ÃbÂSVÂÁ"xjxjÂWxj þÿþÿþÿþÿþÿþÿþÿ¬SCHEDULED TO DO REPAIRS IN MID JULY 2006. PASSING INSPECTION AT THIS TIME PER CTI JEFF EATON, REPAIRS MADE TO OVERFILL AND ELECTRONIC CONSOLE. TR xjÃ!Â4YÂÂ\xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ–CRASH VALVES REMAIN LOW BUT STILL PASSING INSPECTION AS THEY ARE BEING ADDRESSED IN TPA PLAN TO UPGRADE FACILITIES. PIPING TO BE UPGRADED IN MARCH/APRIL 2007, INC NEW DISPENSER PANS AND SPILL BUCKETS TELEPHONE CALL 6/18/2007 FROM MIKE LEWIS, FACILITY IS COMING BACK ON LINE 6/19/07. HASN'T BEEN OUT OF SERVICE, REDOING TANK TOP UP UPGRADE ONLY. CHRIS WILSON IS SENDING IN UPGRADE PAPERWORK. TRxi Ã"Â4CÂÂ\xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ0REPAIRS MADE AND NOW PASSING PER CTI MIKE LEWIS.xi Ã#Â-ÂÂ\xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ NOW PASSING PER CTI MIKE LEWIS. xi Ã$Â+ÂÂ:xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.2, -1.2xjÃ%Ã`2ÂÁ"xj xj Á`xj Ä4þÿþÿþÿþÿþÿþÿþÿxj Ã&àxj xj Á`xj Ã"Xþÿþÿþÿþÿþÿþÿ-CP TESTING PERFORMED BY CTI LARRY MCALLISTER.xj Ã'Â$8ÂÂ4xj xj Á`xj ÃAþÿþÿþÿþÿþÿþÿþÿxj Ã(ÂT3ÂÂ4xj xj Á`xj Ã8Lþÿþÿþÿþÿþÿþÿþÿxj Ã)ÂV] xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã*Â"ÂÂHxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã+ÂV7ÂÂ\xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã,Ã:FÂÂXxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ SAME COMMENTS AS 2006 INSPECTIONxj Ã-ÂV3ÂÂ\xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã/Â;RÂÂxj xj Á`xk þÿþÿþÿþÿþÿþÿþÿ¤TANK 7 OOS FOR 3 YEARS, TANK 8 STILL IN USE FOR HEATING OIL. BOTH TANKS BUFFHIDE. NOV WITH REMOVAL DEADLINE 1/31/07. ML AI FAILURES CORRECTED BY REMOVING TANKS 7&8xj Ã0ÃGÂÂ+xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã1Â!ÂÂKxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ2Ã]ÂÂXxj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿIUPGRADE REGN SUBMITTED 3/30/07 TO INSTALL NEW PIPING SUMP LID AND MANHOLExj Ã3Â1ÂÂxj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿÃTANK TO BE REMOVED NO LATER THAN FALL 2009 PER 12/4/06 LETTER FROM SUPERINTENDENT. MSAD 3 WARNED THAT NONCOMPLIANCE FOR CATHODIC PROTECTION WOULD AFFECT FUND COVERAGE IF NEEDED UPON REMOVAL. MLxj Ã4Ãa-ÂÂLxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã5ÃFÂÂSxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj Ã6Â(ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã7Â1!ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ4CTI DARREN RICKER REPAIRED V-R MLLD AND CRASH VALVESxj Ã8ÂBÂÁxj xj ÂxkþÿþÿþÿþÿþÿþÿþÿMINSPECTION UPDATE: REPLACED SEAL ON BOTH SUMPS AND PROPERLY PLACED COVER ON.xj Ã:ÂGXÂÁxj xj Âxkþÿþÿþÿþÿþÿþÿþÿ¬ANODE UPGRADE FOR TANKS 1,2,10 COMPLETED 1/10/07 ML UPDATE SUBMITTED FOR FLAPPER REPLACEMENT AND DAILY INVENTORY. TANKS 8 AND 9 CUMULATIVE STILL GREATER THAN 1% OF SALES.xj Ã;Â)ÂÂ\xj xj Á`xj Ãþÿþÿþÿþÿþÿþÿþÿxj Ã<ÃZXÂÂHxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã=Ã*PÂÂ\xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã>Â0*ÂÂXxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿfPRE 1991 INSTALL NO OVERFILL REQUIRED....... TANK READING: -.975, -1.10 4/19/06 MIKE LEWIS CTIxjÃ?Â0)ÂÂXxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿIPASSING FACILITY, TANK IS 1989 INSTALL OVERFILL AND SPACERS NOT REQUIRED.xjÃ@Â:FÂÂXxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿ[HEATING OIL TANK SW FIBERGLASS 1981 INSTALL, GOOD UNTIL 2011? INSTALL DATE MAY BE ESTIMATE.xjÃAÂQ\ÂÂXxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿxTANK IS A 1986 INSTALL, SPACERS NOT REQUIRED, OVERFILL OIL AND SOLID FUEL BOARD REQUIRES VENT ALARM, NO ACCESS TO CHECK.xjÃBÂ0$ÂÂXxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿ+NO CHANGE IN ISSUES FROM PRIOR INSPECTIONS.xjÃCÂ0'ÂÂXxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿ8NO ACCESS TO POSSIBLE OVERFILL, NO SPACERS. 1986 INSTALLxjÃDÂ8ÂÂHxjxj Á`xk þÿþÿþÿþÿþÿþÿþÿ1993 TANK INSTALL.xi ÃEÂ1 ÂÂHxjxj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃFÂ1/ÂÂHxjxj Á`þÿþÿþÿþÿþÿþÿþÿþÿ’TANKS SHOW 1993 INSTALL, ACTIVE IN 1997 OR 1998. TANK #4 IS OOS ACCORDING TO INSPECTION. NEITHER TANK HAS SPACERS ON COPPER LINE. TANK 4 REMOVED xi ÃGÂÂÂHxjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃHÂ-ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃIÂ-ÂÂHxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃJÂ-#ÂÂXxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃKÂ4BÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃLÂ4CÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿN AUTO SHUT OFF / FLAPPER CHECKED AND WORKING PROPERLY: TANK 8 FLAPPER REPLACEDxj ÃMÂ4PÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ" TANK READING: -1.12, -1.05, -1.10xj ÃNÃ^ÂÁxj xj Âxkþÿþÿþÿþÿþÿþÿþÿþÿxj ÃOÃSÂÂxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxj ÃPÃÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿC TANK READING: DRY SOIL HAD TO BE WATERED TO OBTAIN PASSING READINGxj ÃQÃcÂÂ\xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃRÂ6$ÂÂ\xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃSÃS-ÂÂ\xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃTÃ@ÂÂ\xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿ? TANK READING: -1.14, -1.21 PERFORMED BY MIKE LEWIS CTI 4/20/06xjÃUÂ6ÂÂ\xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃVÂN ÂÂ\xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿ4 TANK READING: -.852, -.875 MIKE LEWIS CTI 4/25/06xjÃWÃ%ÂÂxj xj ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃXÃ1 ÂÂxj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxjÃYÂ$EÂÂIxj xj Á`xj ÃB\Cþÿþÿþÿþÿþÿþÿþÿxj ÃZÃ4ZÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã[ÃQ:ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã\ÃQ;ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã]Ã#ÂÂIxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ^ÃW"ÂÁ$xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ«CTI DAVIS REPLACED BULB IN VR, REMOVED WATER FROM TANK 1 & 3 SUMPS, REMOVED WATER FROM DIESEL DISPENSER SUMP, REMOVED DIRT FROM ALL SPILL BUCKETS, ADJUSTED MLLD FOR TANK 3xj Ã_ÂM>ÂÂIxj xj Á`xj Ä þÿþÿþÿþÿþÿþÿ1TANK 7 FAILED ATG DUE TO LOW THROUGHPUT. CONTACT BEING MADE TO GET CURRENT INFORMATION. TANK READING: ALL TANKS TESTED AT THREE POINT & READINGS ARE LOGGED. ATG RESULTS PASSING AT .20 AND .10 ON 9/30/06, TANK WAS OVER 60% FULL (4,000 GALLON TANK HAD STARTING VOLUME OF 2938.7 GALLONS OR 74% FULL) TRxjÃ`Â>ÂÂIxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃaÃ!ÂÂIxj xj Á`xjÄ #þÿþÿþÿþÿþÿþÿþÿxjÃbÃOÂÂIxj xj Á`xjÄ1@3þÿþÿþÿþÿþÿþÿþÿxjÃcÂQ#ÂÂIxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃdÂ?  xj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ~STEVE JEWELL CALLED 11/8/2007 GAFTEK IS COMING OUT TO FACILITY NEXT WEEK. WILL SNE DIN ANNUAL INSPECTION AS SOON AS POSSIBLE.xjÃÂaNÂÂxj xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÂ3 ÂÂxj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxi ÃÂaOÂÂxj xj Á`xi þÿþÿþÿþÿþÿþÿþÿþÿxi ÃÃ"8ÂÂDxj xj Á`þÿÃ@\Mþÿþÿþÿþÿþÿþÿþÿxj ÃÃ$ÂÁ xj xj Âxj ÃOHþÿþÿþÿþÿþÿþÿcCP READINGS: TANK 1 -1.276, -1.289, -1.246 PIPING -.937 TANK 2 -1.274, -1.324, -1.317 PIPING -.937 xj ÃÂ*ÂÂKxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ:10/30/08-OWNER SENT LETTER SAYING AI WILL BE IN SHORTLY-PHxj àÂÂxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ/ÂÂIxj xj Á`xj Ä þÿþÿþÿþÿþÿþÿþÿxj à à ÂÂIxj xj Á`xj Ä bþÿþÿþÿþÿþÿþÿþÿxj à  bÂÂYxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.06, -1.07xj à ÃDÂÁ xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿE9/21/09-NOITA FOR CTI CORMIER TO REMOVE TANKS, AND COUNTY TO DO SA-PHxj à Ã!ÂÂKxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÃJ@ÂÂYxj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.91, -.96xj ÃÂ;(ÂÂxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿM1990 INSTALL, NO SPACERS, NO OVERFILL <1,100 GALLON TANK, NO SPILL BUCKETS. xjÃÂKÂÂYxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂ_!ÂÂUxj xj Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxj Ãà ÂÂKxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃEJÂÂ`xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿX COPPER LINES HAVE SPACERS?: 6/90 INSTALL SPACERS NOT REQUIRED. TANK READING: -.89, -.95xj ÃÃ?ÂÂxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿ‰CTI SIMARD INSTALLED NEW PIPING SUMP, ADDITIONAL SENSORS, NEW MONITORING SYSTEM, NEW SPILL BUCKET, & NEW COATED COPPER PIPING ON 12/19/06xj ÃÂRÂÁ xj xj Âxj þÿþÿþÿþÿþÿþÿþÿCP RETESTED ON 11/27/06xj Ãà IÂÁ=xj xj Âxj Ã? þÿþÿþÿþÿþÿþÿþÿxj ÃÃ4ÂÂxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿERROR IN ENTRY. xj ÃÃ4ÂÂLxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂÂÂ_xj xj Á`xjÃ]DþÿþÿþÿþÿþÿþÿþÿxjÃÂAaÂÁxj xj Á`xjþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.862,-.855xjÃÃc xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÂNU xjxj Á`þÿþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.02, -1.02xjÃÃ, xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.07,-1.07xjÃÂd xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃÃZ: xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjà  xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ!ÃSA xjxj Á`þÿþÿþÿþÿþÿþÿþÿþÿ@SUMPS ARE NOT LIQUID TIGHT AND SHOW EVIDENCE OF WATER INTRUSION.xjÃ" W xjxj Á`xjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ#à ÂÂSxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã$Ã3$ÂÂSxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã%Ã3(ÂÂSxj xj Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂ[3ÂÁ$xk xkÂxkÄþÿþÿþÿþÿþÿþÿ#ANNULAR SPACE SENSOR WOULD NOT CLEAR- REPLACED IT. CLEANED SUMPS AND DISPENSER PAN. REPLACED BALL FLOAT 6-1, BALL WAS FULL OF FUEL. CLEANED SPILL BUCKETS. REPLACED CRASH VALVE TOP AND NIPPLES UNDER 1&2; SLIGH WEEP CORRECTED. -MLG 10/26/07 COPI - CTI LEGASSE JR INSTALLED 15 GAL SPILL BUCKETxkÃÂ[BÂÁ$xk xkÂxkÄ[þÿþÿþÿþÿþÿþÿ×INSTALLED NEW SENSOR IN 6-1 INTERSTITIAL. CLEANED SPILL BUCKETS. LEAK DETECTOR WORKED WELL. 5-1 REPLACED DROP TUBE DUE TO BEING TOO SHORT. -MLG 6/16/08 UPGRADE REGN FOR CTI DAVIS TO REPLACE RNL & SNL SPILL BUCKETSxkÃÃ.MÂÁ$xk xkÂxkÄ)þÿþÿþÿþÿþÿþÿ¶FEB SALES: REGULAR- 103070 +/- -1024, PASS; PREMIUM- 5932 +/- 37, PASS. LOWERED ONE SENSOR TO BOTTOM OF SUMP. REPLACED BALL FLOATS WITH SPRING TYPE 16". REPLACED 2 VAPOR CAPS. -MLGxkÃÂ[>ÂÁ$xk xkÂxkÄ +!þÿþÿþÿþÿþÿþÿqLOWERED SENSORS IN 5-1 AND 6-1. PAINTED SPILL BUCKET COVERS. STAINING AT FILTERS, METERS AND SOME UNIONS. -MLGxkÃÂ[?ÂÁ$xk xkÂxkÄ3þÿþÿþÿþÿþÿþÿwLOWERED SENSOR IN PIPING SUMP AND 5-1 ANNULAR. CLEANED AND PAINTED SPILL BUCKETS. REPLACED VAPOR CAPS 4-1 & 5-1. -MLGxkÃÃUÂÁ$xkxkÂxkÄ 3þÿþÿþÿþÿþÿþÿoCLEANED SPILL BUCKETS- A LOT OF MUD IN THEM. VAPOR SPILL BUCKETS ARE WATER TIGHT STYLE- ALL CLEANED OUT. -MLGxkÃÂ[<ÂÁ$xkxkÂxkÄ[þÿþÿþÿþÿþÿþÿ^VEEDER ROOT WAS IN ALARM- REPAIRED AND REPLACED ON SENSOR. REPLACED ALL THREE LID- OPW. -MLGxkÃÂ[8ÂÁ$xkxkÂxkÃLþÿþÿþÿþÿþÿþÿHPULLED NEW STRUNG FOR 4-1 AND 6-1 INTERSTITAL. REPLACED SENSOR 4-1 AND RESET GROMMET PLUG IN 4-1 AND 6-1. 6-1 IN SUMP ROCK GUARD HAD PULLED FROM PIPING- REPAIRED AND RECLAMPED. CLEANED AND PAINTED SPILL BUCKETS. -MLG CTI DENNIS DAVIS: PULLED NEW STRING IN INTERSTITIAL LOCATED INTERSTITIAL SENSORS AT PROPER LOCATION IN TANK.xkÃÂ[LÂÁ$xkxkÂxkÄGþÿþÿþÿþÿþÿþÿRCLEANED AND PAINTED SPILL BUCKETS. REPLACED SPILL BUCKET LID ON 4-1 PREMIUM. -MLGxkÃÂ[KÂÁ$xkxkÂxkÃ[þÿþÿþÿþÿþÿþÿMARCH SALES: REGULAR-78755 +/- -257, PASS; PREMIUM- 2276 +/- -41, FAIL. WORK ORDER # 2798918 TO REPAIR PROBE FEB 7, 2007; PROBE 3 WAS OUT- PULLED NEW IRES, OKAY. REPLACED VAPOR CAP AND ADAPTER ON 1-1. -MLG SPOKE WITH TED SCHARF IN REGARDS TO LOW THROUGHPUT.xk ÃÃKÂÁ$xkxkÂxkÃ3þÿþÿþÿþÿþÿþÿ¶MARCH SALES: REGULAR- 37872 +/- 25, PASS; PREMIUM- 744 +/- 19, FAIL. REPLACED EXISTING GAUGE STICK. CLEANED SPILL BUCKETS. -MLG SPOKE WITH TED SCHARF IN REGARDS TO LOW THROUGHPUT.xk ÃÂ[0ÂÁ$xkxkÂxkÄþÿþÿþÿþÿþÿþÿQTANK 1-1 AND 2-1 SYPHONED TOGETHER. FEB SALES: REGULAR- 82422 +/- 506, PASS; PREMIUM 3540 +/- -48, FAIL. REPLACED SPINDLE HOLDING PAPER IN CONSOLE. REPLACED BALL FLOAT 3-1: BROKEN WELD HOLDING BALL IN. LLDS WORKED WELL, PREMIUM LOOKS NEW. REPLACED VAPOR ADAPTER AND FILL CAP ON 2-1. -MLG SPOKE WITH TIM RECTOR REGARDING LOW THROUGHPUT.xkÃÂ]$ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ<UNDERGROUND PIPING ASSOCIATED WITH AST INSPECTED AS WELL. BBxkÃÃR\ÂÂLxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ REMOVED APPROXIMATELY TWO QUARTS OF WATER FROM PIPING SUMP. CLEANED DIRT FROM AROUND SUMP LID. REMOVED APPROXIMATELY ONE QUART OF WATER FROM SPILL BUCKET. -MLGxkÃÂ(ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿÄREPLACED PROBE AND NEW WIRES TO SUMP PROBE. SPILL BUCKET DIRTY AND SOME LIQUID- CLEANED OUT AND TOLD OPERATOR. REPAIRED SUMP PROBE WIRES AND REPLACED SUMP PROBE. -MLG TANK READING: .94, .94, .94xkÃÂ3LÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ´PIPING SUMP FULL OF ICE 6/27/07 UPGRADE REGN FOR CTI BUBAR TO REPLACE ATG 7/10/07 COPI - CTI ARBOUR INSTALLED TLS 350 7/27/07 CTI DAVIS INSPECTION UDPATE - REMOVED WATER FROM SUMPxkà ÂH:ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿpYEARLY REPORTS ON FILE. CLEANED JUNK AND LIQUID FROM #1 AND #2 SPILL BUCKETS. -MLG TANK READING: .87, .87, .87xkÃ!Â3IÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ|OOS TANK 4 FILL PIPE NOT LOCKED; COVER OVER MANWAY WHERE PUMP REMOVED? CLEAN HARBORS PUMPED OUT TANK 4 6/27/07 UPGRADE REGN FOR CTI BUBAR TO REMOVE REMOTE FILL, INSTALL SPILL BUCKET ON 2" SCULLY FILL, REPLACE VENT, INSTALL NEW 61F STOP OVERFILL, REPLACE ATG W/NEW VEEDER-ROOT 7/10/07 COPI - CTI GEORGE INSTALLED FG VENT TO W/IN 8' OF FILL, NEW VENT WHISTLE ON TANK 3, VR TLS 350xkÃ"ÃRÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿøOPERATORS HAVE ONLY BEEN AT LOCATION A SHORT TIME-UNABLE TO LOCATE BAILER-NO WEEKLY LOG AVAILABLE. 3" OF WATER IN SUMP, SYSTEM IN ALARM-ALSO HIGH LEVEL ALARM FUEL 4" UP RISER PIPE-OVERFILL DROP TUBE REMOVED- UNABLE TO LOCATE. OVERFILL VALVE HAD BEEN REMOVED FROM #1 TANK. WAS LOCATED ADJACENT TO BUILDING AND REPLACED. FLAPPER VALVE MISSING FROM TANK 2, WAS IN PLACE 10/11/04. 4" OF OIL UP FILL PIPE- ALARM SYSTEM IN HIGH LEVEL ALARM. -MLG FACILITY IS PASSING DURING UST INSPECTION 5/14/07 TR.xj Ã#Â?8ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿçALL STP SUMPS NEED NEW LIDS AND HOLD DOWN KITS INSTALLED. 35" TC LIDS- CLEANED OUT WATER. CLEANED OUT ALL SPILL BUCKETS. TOP OF 12" MANHOLE BROKEN-WILL NEED TO BE REPLACED. -MLG CTI GARY KANE: INSTALLED NEW 14" MANWAY AND COVER.xkÃ%Â]aÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&ÂXcÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'Â]bÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(Â]ZÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%Ã(ÂÂIxj xjÂþÿþÿþÿþÿþÿþÿþÿþÿeSPOKE TO BRIAN MCLAUGHLIN ABOUT UST COMPLIANCE INSPECTION NOV. NOV FOR FAILED A.I. (FOR DAILY INVENTORY) AND STORE NOT REPORTING OVER AND SHORTS GREATER THAN 1% TO DEP. TOLD BRIAN DEP'S MAIN CONCERN IS THAT OVER AND SHORT GREATER THAN 1% ARE REPORTED. TOLD BRIAN IF THE STORE REPORTS OVER AND SHORTS GREATER THAN 1% THE NOV WILL BE CONSIDERED RESOLVED. xj Ã) /ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿCTANK OOS PLANNED FOR REMOVAL. ALSO RECEIVED INSPECTION ON ASTS. BBxk Ã*ÂC]ÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ6CLEANED OUT SPILL BUCKETS. DIESEL NEEDS 2'' VENT CAP.xk Ã+Ã3RÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ,Ã(YÂÂ_xk xkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ-Ã4ÂÂ_xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã.ÂVÂÂ\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ«SPILL BUCKET CONTAINS FUEL/WATER/DEBRIS (REMOVED AND CLEANED)(RECOMMEND SPILL BUCKET BE KEPT FREE OF ALL LIQUIDS/DEBRIS AT ALL TIMES) FILL CAP NOT LIQUID TIGHT (REPLACED).xk Ã/ÂZÂÂ\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿEPIPING SUMP CONTAINS SMALL AMOUNT OF WATER-LESS THAN 50ML (REMOVED AND CLEANED). WATER LIKELY CONDENSATION. FILL CAP NOT LIQUID TIGHT (REPLACED) PETROMETER EXTERNAL OVERFILL ALARM INDICATOR FAULY (REPLACED) SPILL BUCKET CONTAINS SMALL AMOUNT OF FUEL (REMOVED AND CLEANED) TANK BOTTOM CONTAINS 1.5'' WATER (RECOMMEND REMOVAL)xk Ã0ÃRÂÂ\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ­FILL CAP NOT LIQUID TIGHT (REPLACED) SPILL BUCKET CONTAINS SMALL AMOUNT OF FUEL (REMOVED AND CLEANED)(RECOMMEND SPILL BUCKET BE KEPT FREE OF ALL LIQUID /DEBRIS AT ALL TIMES)xk Ã1ÂYÂÂ\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿCP TANK READING: -1.36 TANK ANNUAL SPACE SENSOR FAULTY (REPLACED) FILL CAP NOT LIQUID TIGHT (REPLACED) SPILL BUCKETS CONTAIN WATER/FUEL (REMOVED AND CLEANED) (RECOMMEND SPILL BUCKET BE KEPT FREE OF ALL LIQUIDS/DEBRIS AT ALL TIMES) TANK BOTTOM CONTAINS 1.5'' WATER (RECOMMEND REMOVAL)xk Ã2Â_ÂÂ\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿíTANK ANNULAR SPACE SENSOR FAULTY (REPLACED) FILL CAP NOT LIQUID TIGHT (REPLACED) TANK BOTTOM CONTAINS .5'' WATER (RECOMMEND REMOVAL) FILL CAP ADAPTER FAULTY - NOT LIQUID TIGHT (REPLACED) **CP PIPING MUST BE TESTED OR VERIFY MATERIAL!!**xk Ã3ÂCSÂÂ\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ4TANKS 4-1 & 4-2 SPILL BUCKETS CONTAIN FUEL (REMOVED AND CLEANED(RECOMMENND SPILL BUCKETS BE KEPT FREE OF ALL LIQUID/DEBRIS AT ALL TIMES) TANK 4-1- TANK BOTTOM CONTAINS .5'' WATER (RECOMMEND REMOVAL) TANK 4-2- TANK BOTTOM CONTAINS .25'' WATER (RECOMMEND REMOVAL) VAPOR RECOVERY CAP NOT LIQUID TIGHT (REPLACED)xk Ã4ÃÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿÃPIPING SUMP CONTAINS SMALL AMOUNT OF WATER- LESS THAN ONE GALLON (REMOVED AND CLEANED) WATER INFILTRATION APPEARS AT LID- LID GASKET BROKEN (REPLACED GASKET) FILL CAP NOT LIQUID TIGHT (REPLACED)xkÃ5ÂVÂÂ\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ¿TANKS 7, 8, AND 9- FILL CAPS NOT LIQUID TIGHT (REPLACED) SPILL BUCKETS CONTAIN WATER/FUEL/DEBRIS (REMOVED AND CLEANED)(RECOMMEND SPILL BUCKETS BE KEPT FRE OF ALL LIQUIDS/DEBRIS AT ALL TIMES)xk Ã6Â*RÂÂ\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿPIPING SUMP CONTAINS SMALL AMOUNT OF FUEL- LESS THAN 50ML (REMOVED AND CLEANED) FUELD SOURCE APPEARS TO BE FROM UNION IN VENT PIPING- POSSIBLY A PREVIOUS OVERFILL (TIGHTENED UNION)( NOTIFIED TIM RECTOR, MEDEP, 6/12/2007) SPILL BUCKET CONTAINS WATER (REMOVED AND CLEANED)(RECOMMEND SPILL BUCKET BE KEPT FREE OF ALL LIQUID/DEBRIS AT ALL TIMES) VENT WHISTLE HARD-PIPED INTO VENT PIPING- UNABLE TO REMOVE AND INSPECT (RECOMMEND WHISTLE BE MADE AVAILABLE FOR INSPECTION) SECOND COMPLETE PASSING INSPECTION DATED 6/30/07 RECEIVED 11/16/07xk Ã7ÂdÂÂ\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ‰REMOVED AND CLEANED GAUGING PROBE TO FACILITATE PROPER OPERATION. PLEASE SEE ATTACHED TEST REPORT. FILL CAP NOT LIQUID TIGHT (REPLACED)xk Ã<Ã\RÂÂRxi xkÂxi þÿþÿþÿþÿþÿþÿþÿWNOT ABLE TO ACCESS DIESEL INTERSTITIAL. DATE INSPECTED WAS 8/8/2005-INCORRECTLY ENTEREDxi Ã=ÂRÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ>ÂFÂÂ`xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ?Ã&ÂÂ`xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ@ÃcVÂÂ`xkxkÂxkÃ$ AþÿþÿþÿþÿþÿþÿþÿxkÃAÃ9 xkxkÂxkÃ. þÿþÿþÿþÿþÿþÿþÿxkÃB ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃC ÂÂxkxkÂxkÃ:þÿþÿþÿþÿþÿþÿc TANK READING: TANK 5-1: -.86, -.89, -.88; TANK 3-1: -.95, -1.03, -1.07; TANK 2-1: -.96, -.95, -.95xkÃDÂÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃEÃ"ÂÂxk xkÂxkþÿþÿþÿþÿþÿþÿþÿÇPIPING SUMP HAD WATER IN IT. NOTIFIED TIM RECTOR OF DEP AND OWNER. SCHEDULED PUMPOUT OF WATER. NO SIGN OF WATER INFILTRATION FROM ENTRY BOOTS OR GASKET. APPEARS TO HAVE COME FROM A LOOSE PLUG. -MLGxkÃFÂÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃG ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃHÃ:JÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿF TANK READING: TANK 1-1: -.87, -.9, -.88; TANK 2-1: -1.14, -.98, -1.01xkÃIÃ*EÂÂxkxkÂxkÃ3þÿþÿþÿþÿþÿþÿ TANK READING: -.87, -.85, -.91xkÃJÃbSÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ0REMOVED WATER FROM GASOLINE SPILL BUCKET. -MLGxkÃKÃbTÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ;12/20/07 COPI - CTI THOMPSON REPAIRED AOSMITH FRP VENT LINExkÃLÂWÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃMÂE ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.98, -1.01, -.97xkÃNÂCP xkxkÂxkÃX3þÿþÿþÿþÿþÿþÿþÿxkÃOÂ1aÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÃ`PÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿPAPPEARS TO HAVE SPACERS WITHIN THE SLEEVE. -MLG TANK READING: -.98, -1.01, -.99xk ÃQÂ8ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃRÂR9ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Â_AÂ+ÂÂxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ4CTI BISKUPIAK ADDED ANODES TO TANKS 4 & 5 ON 6/19/07xjÃSÂ28ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ'OVERFILL IS AN F-STOP SET AT 90%. -MLGxk ÃTÂ.ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃUÂ.ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ'OVERFILL IS AN F STOP SET AT 90%. -MLGxk ÃVÂ. ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃWÂ^ÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃXÃJ?ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ?TANK 4-1 FUEL OIL VENT WHISTLE IS UNACCESSABLE TO CHECK. -MLGxk ÃYÃbNÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿªHAD TO REPLACE TO ASSY ON 101BG FOR DEISEL AND SUPER TO PASS. PUJMPS 1 AND 4 REGULAR METERS LEAKING-NEED TO BE REPLACED. -MLG REPLACED WEEPING METERS AND RECALIBRATED.xk Ã[ÂY)ÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ\Â3XÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ]ÂY3ÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ^Â3UÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ_Â$ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ?TANK 4-1 UNLEADED SUMP LID CRACKED. 38" BLUE F.G. TOTAL CONT.- DIESEL SUMP COMPROMISED- 1' CUT ON TOP OF SUMP RISER. NEEDED TO REPLACE INTERSTITAL BRINE SENSOR ON REGULAR TANK 4-1. DIESEL AND SUPER 101 BG COVER ASSY'S NO GOOD. NOT LIQUID TIGHT. -MLG SPILL BUCKET TOPS REPLACED, TANK 4 SUMP COVER LID REPLACED. DSL TANK SUMP STILL NEEDS REPAIR PER 9/20/07 AI UPDATE. 10/2/07 FAIL LTR -ML 10/17/07 UPGRADE REGN FOR CTI MULLINS TO REPLACE ALL SUMP COVERS 10/26/07 INSPECTION UPDATE - CTI MULLINS REPAIRED TOP OF SUMP LID THAT WAS CUT, INSTALLED NEW LID ON SUMP (10/26/07 COPI)xk Ã`ÂYÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃaÂQ7ÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃbÃ]4ÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃcÂY?ÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃdÂ1_ÂÂZxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ]KÂÂZxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂXFÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkàÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂWPÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃG"ÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂIÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃFÂ`þÿþÿþÿþÿþÿþÿç MONTORING CONSOLE IS FULLY OPERATIONAL?: REPLACED BLOWN BULBS SENSORS ARE FUNCTIONING PROPERLY?: REPAIRED JUNCTION BOX FOR SENSOR AUTO SHUT OFF / FLAPPER CHECKED AND WORKING PROPERLY: REPLACED SHORT BALL FLOATS WITH FLAPPER VALVESxk ÃaÃ-ÂÁ$xkxkÂxj Ã8þÿþÿþÿþÿþÿþÿþÿxj ÃbÃ+ÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿSSYSTEM WAS IN ALARM AT TIME OF INSPECTION. REPAIRED WIRING CONNECTION AT TANK END.xj ÃdÃ?ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ?ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿý10/28/08-CTI EATON CALLED TO SAY WATER WAS PUMPED OUT, HE'LL RETURN TOMORROW, THEN CHECK AFTER A COUPLE OF WEEKS. -PH 9/30/08-CTI COUTURE CALLED TO REPORT 28" WATER IN INTERSTICE DUE TO BADLY BROKEN RISER-HE WILL CALL BACK WHEN REPAIR GETS SCHEDULED PHxkÃÃSUÂÂ:xkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ"7ÂÂDxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿZTANKS 4,5,6 OOS SINCE 11/06. LESS THAN 1" PRODUCT. SWITCHED TO ATG - UPDATE TO PASSING AIxj ÃÂ*R xkxkÂxj þÿþÿþÿþÿþÿþÿþÿ3FAILING INSPECTION CONDUCTED 9/16/06 UPDATE 10/3/06xj ÃÂ%HÂÁ$xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂ7XÂÂxkxkÂxk ÃGþÿþÿþÿþÿþÿþÿþÿxk à ÂX ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk à ÂOÂÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ<9/12/07 COPI - CTI BISKUPIAK INSTALLED NEW MANHOLE OVER SUMPxk à ÂS xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ36/15/07 COPI - CTI COUTURE REPLACED 3 SPILL BUCKETSxkà ÂCOÂÂ!xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ& ÂÁ xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ7TANK REMOVED AUGUST 2007, CONFIRMATION FORM PENDING -MLxk ÃÃÂÂLxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjà%ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ3 SPILL BUCKETS CLEAN?: 5-1 BUCKET REPLACED W/15 GALxkÃÂ,ÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂ^ÂÂxkxkÂxlþÿþÿþÿþÿþÿþÿþÿiINITIAL INSPECTION 6/26/2006- UNABLE TO TEST LEAK DETECTION SYSTEM-RETURNED 7/5/2006 TO TEST LEAK DETECTION- OPERATOR HAD ELECTRICIAN SUPPLY POWER TO LEAK DETECTOR CONSOLE. FOUND TANK #9 TO BE IN ALARM WITH SEVERAL INCHES OF PRODUCT IN THE INTERSTITIAL SPACE. REPORTED TO DAN DAVIS DEP RESPONDING. LOOK AT NOTES IN EVIDENCE OF A LEAK. TANK 9 REMOVED 2/22/08xjÃÂ'ÂÁ$xkxkÂxlÃ$þÿþÿþÿþÿþÿþÿðCP FAIL LETTER RETURNED UNCLAIMED. CALLED OWNER 2/27/07. BELIEVES FAILING BECAUSE TESTED FROZEN GROUND. MUST RETEST ASAP WHEN UNFROZEN AND REPAIR IF FAILS AGAIN. RESEND FAIL LETTER. -ML 5/5/08 COPI - CTI BUBAR ADDED ANODES, TESTED TANKSxkÃÂCÂÂ!xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ3QÂÂLxkxkÁ`þÿþÿþÿþÿþÿþÿþÿþÿ6FACILITY CONTINUES TO FAIL FOR GROUNDWATER MONITORING.xkÃÂbÂÂ!xkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿ&500 GALLON JACKETED TANK. OFFSET FILL.xkÃÂ"PÂÂ!xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ(ÂÂZxj xkÁ`xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃAÂÂ4xj xkÁ`xkÃFF'þÿþÿþÿþÿþÿþÿTANKS REMOVED 1/25/07xj ÃÂB[ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿL COPPER LINES PROPERLY SLEEVED?: SUCTION AND RETURN LINES SLEEVED SEPARATELYxkÃÃ%@ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ*OMNTEC MOTHER BOARD REPAIRED BY MANUFACTURER REPLACED TANK 2 GAUGING PROBE NO MANHOLE AT VAPOR RECOVERY 5/18/07 UPGRADE REGN FOR CTI LETELLIER TO INSTALL DISPENSER SUMPS AND SENSORS FOR TANKS 1 & 2 (SYPHON) CP READINGS: TANK 1 -.869, -.955, -.914 TANK 2 -.936, -.896, -.941 TANK 3 -.88, -.983, -.87xkÃÃZ ÂÂHxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ#DROP TUBES REMOVED BY CTI SCOTT FOR FAILURE TO PAY FOR FACILITY SERVICING. CTI SCOTT SAYS STORE CLOSED SINCE NOV 06 -ML OWNER DECEASED, ESTATE REP UNRESPONSIVE. 1/30/08 HAMAPES (SUPPLIER) PLANNING TO ACQUIRE PROPERTY. REMOVING FLUIDS FROM TANK, INSTALLING DROP TUBE, WILL DO OOS AI. -MLxk ÃÃ,ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ?ÂÂHxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿUNABLE TO TEST CATHODIC PROTECTION DUE TO FROZEN GROUND-POSSIBLY VENT/RISER PIPING ONLY (WILL TEST IN SPRING). FILL CAP AND ADAPTER NOT LIQUID TIGHT (REPLACED). SPILL BUCKET CONTAINS FROZEN SAND/DEBRIS (REMOVED AND CLEANED)(RECOMMENDED SPILL BUCKET BE KEPT FREE OF ALL DEBRIS/LIQUIDS AT ALL TIMES). FLAPPER TYPE OVERFILL DEVICE NOT RECOMMENDED FOR PRESSURE OFF-LOADS (RECOMMEND INSTALLING ELECTRONIC OVERFILL PROTECTION). NO ACCESS TO PIPING AT TANK TOP-PIPING APPEARS TO BE SLEEVED AND ISOLATED AT BOILER ROOM.xkÃÂ;ÂÁ xk xk Âxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â;ÂÁ xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!ÃbXÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ"ÂÂÂXxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#ÂLÂÂRxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ"1 FLAPPER REPLACED, OTHER ACCESSEDxj Ã$ ÂÂBxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ9NO CP TEST DUE TO FROZEN GROUND. WILL TEST IN SPRING 07.xk Ã%ÂÂÂ!xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&Â+V xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'Â.@ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(ÃP xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿjWATER IN PIPING SUMP. STEEL FRAME RUSTED OUT. PIPING SENSOR NOT FUNCTIONING. REPAIR LETTER 2/20/07 -MLxkÃ)Ã?ÂÂBxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*Ãd xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ+Ã# xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ,Ã9 xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ18"+ WATER IN PIPING SUMPxkÃ-Ã< xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ.ÃJ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ/ÃF, xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ0ÃS6 xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ¹PIPING SUMP FULL OF WATER. POWER TO SENSOR WAS DISCONNECTED. CALL FROM CHRIS WILSON 3/19 RE: FAILING INSPECTION, NEW PIPING AND SUMPS BEING INSTALLED BY LES WILSON AND SONS. TRxkÃ1à ZÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿANODES ADDED. xkÃ2Âc^ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ3ÃQ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿENO LEAK DETECTION FOR TANK (89 INSTALL). OMNTEC LU1 FOR PIPING SUMP.xkÃ4Ã; xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿa1/2" COPPER LINE IN SAME SLEEVE AS 2" STEEL PIPE. STEEL PIPE NOT BEING USED. BRINE INTERSTITIALxkÃ5Ã5 xkxkÂxkþÿþÿþÿþÿþÿþÿþÿPIPING DW FG OR 2" STEEL IN FG?xkÃ6Ã= xkxkÂxkþÿþÿþÿþÿþÿþÿþÿXINSPECTION FORM SAYS 10K TANK. REGISTRATION INFO LOOKS PHOTOCOPIED FROM PREVIOUS YEAR. xkÃ7Ã=_ xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿHCOPPER LINES NOT SPACED OR SLEEVED. 1989 INSTALL, SPACERS NOT REQUIRED.xkÃ9ÃSÂÂ:xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã:Â;ÂÂ:xkxkÂxk þÿþÿþÿþÿþÿþÿþÿQCLEAN OUT TRACE WATER FROM INTERSTITIAL, REQUIRED SENSOR TO BE REPAIRED-NO ALARM.xk Ã;ÂWC xkxkÂxkþÿþÿþÿþÿþÿþÿþÿp2 SETS OF COPPER LINES FEEDING 2 BURNERS. ONE SET PROPERLY SLEEVED/SEPARATED, OTHER IS NOT. 8/89 INSTALL - OK. xkÃ<ÃB xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ=à ÂÁxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã>Â>ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ?à :ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ< SPILL BUCKETS CLEAN?: ICE REMOVED; BUCKETS SHOULD BE RAISEDxkÃ@à VÂÁ$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃAÂd(ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃB ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ5 SPILL BUCKETS CLEAN?: REMOVED ICE; SHOULD BE RAISED.xkÃCÃK,ÂÂ!xkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿ NOW PASSING PER CTI KEN LEGASSE.xj ÃDÂ1ÂÂTxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃE SÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ$SW PIPING, SUCTION SYSTEM - NO SUMPSxkÃFÃZPÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃGÂU=ÂÂ!xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃHÃ/W xkxkÂxkþÿþÿþÿþÿþÿþÿþÿiTANK TAKEN OUT-OF-SERVICE FEB 2007. PRODUCT TO BE REMOVED IN SPRING; ATG IN USE AND OPERATING PROPERLY. xkÃIÂÂÂKxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿÚINTERSTITIAL MONITORING: NO PAPER, AUDIBLE ALARM UNPLUGGED, WRONG DATE. HAVE TO REMOVE WIRING TO TEST SUMP SENSORS, TOP OF SENSORS HAD WATER INSIDE NEAR WIRING. SUMP COVERS NOT LIQUID TIGHT SIMARD INSPECTING 6/1/07xj ÃJÂFÂÂKxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃKÂ$ÂÂ!xkxkÂxkÃ^_þÿþÿþÿþÿþÿþÿþÿxkÃLÃ] ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃMÂÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃNÃ]ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃOÂAÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÂ%-ÂÂ4xkxkÂxkÃ)þÿþÿþÿþÿþÿþÿŸINSPECTION ALSO SIGNED BY ERIC ELLIOTT WATER REMOVED FROM TANK 5 INTERSTICE - DAVID HOWE VACUUM TESTED 4/25/07 - PASS CP READINGS: TANK 4 -.951 TANK 5 -1.102xkÃQ ÂÂTxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃRÃ/ÂÂxk xk ÂxkÃþÿþÿþÿþÿþÿþÿþÿxkÃSÂTaÂÂ!xk xk ÂxkÄ /þÿþÿþÿþÿþÿþÿþÿxkÃTÂ$ÂÂ!xkxkÂxk Ã. Oþÿþÿþÿþÿþÿþÿ6-1 SMALL TANK FLAPPER STARTING TO CORRODE. STILL WORKING PROPERLY. LET IRVING KNOW SUGGESTED CHANGING OUT. 10/17/07 UPGRADE REGN FOR CTI MULLINS TO REPAIR SEAM/CONDUIT/PIPING ENTRIES ON ALL TANKS 10/23/07 COPI - CTI MULLINS INSTALLED 3 NEW SUMP LIDS, HYDRO TESTED SUMPS, ALL PASSEDxk ÃUÂ76ÂÂ!xkxkÂxkÃ'þÿþÿþÿþÿþÿþÿþÿxkÃVÃX xj xkÂþÿþÿþÿþÿþÿþÿþÿþÿÖ9/12/2007 TANK WAS INCORRECTLY ENTERED AS REMOVED. TANK #1 IS STILL ACTIVE AND THE DEPARTMENT CONFIRMED THE TANK HAS NOT BEEN REMOVED, PER DEPARTMENT INSPECTION AND THE ANNUAL INSPECTION PERFORMED BY JOHN MULLINS.xj ÃWÂX  xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿSENT FAILING AI LETTER 3/16/07xk ÃXÂGÂÂ:xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ¥NO CP TEST DUE TO FROZEN GROUND. FAILING CP WARNING LETTER 3/16/07. FAILED TESTING 5/21/07. FAILING CP LETTER 7/6/07 -ML DAMAGED REMOTE FILL PIPE REPAIRED 3/27/07xkÃYÃÂÂ)xk xkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃZÂ0ÂÂxk xkÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxj Ã[Â'ÂÂUxk xkÁ`xkþÿþÿþÿþÿþÿþÿþÿÃREC'D INSPECTION ELECTRONICALLY FROM SIMARD AND SONS. THEY CONTINUE TO SEND THEM THROUGH WITHOUT A SIGNATURE, NOTIFY AGAIN THAT WE WILL WANT THEM TO BE SIGNED. TR ACCEPTING AT THIS TIME. xkÃ\Â$ÂÂ!xkxkÂxkÄ;2þÿþÿþÿþÿþÿþÿþÿxkÃ]Â$ÂÂ!xkxkÂxkÃb(+þÿþÿþÿþÿþÿþÿþÿxkÃ^ÂVÂÁ xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã(Â0ÂÂ\xjxjÂxj þÿþÿþÿþÿþÿþÿþÿšT.J. BALLEW FROM YORK SCHOOL DEPT. CALLED ON 3/19/2007. THEY HAD WORK DONE TO THEIR FACILITY, BUT THE DEPT. HAS NOT RECEIVED AND UPDATED INSPECTION FORM.xjÂ]4Ã83ÂÂKxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿÆSENT CP LETTER ON 03/10/2006. BB 9/14/06 CALL FROM OWNER IN NC(?) SEASONAL RESIDENCE. HE IS HAVING THE TANK REMOVED IN A COUPLE YEARS. CP WAS RETESTED AND PASSED BUT HE HASN'T SEEN THE RESULTS YET. TR OWNER CALLED ON 3/19/2007. FAXING IN UPDATE. FAILS WERE FIXED, EXCEPT FOR THE PIPING (NOT SLEEVED OR SEPARATED). GOING TO PULL THE TANK BY THE NEXT HEATING SEASON, IF NOT PULLED GOING TO PUT THE TANK OOS. SENT THE OWNER AN OOS FORM. -LWxjÃ_Ã0&ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ)Ã6 ÂÂxjxjÂWxj þÿþÿþÿþÿþÿþÿþÿ¥ SPILL BUCKETS CLEAN?: HAD 3-M PADS IN IT, REMOVED AND CLEANED. TANK 3 PIPING - SUBMITTED NOTICE OF INTENT TO REMOVE 10/20/06 PIPING NOW PASSING PER IRA DODGE CTI.xjÃ`ÂEMÂÂUxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃaÃ_ÂÂUxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃbÁ(ÂÂUxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃcà ÂÂUxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃdÂK[ÂÂUxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ`'ÂÂ)xkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿ1/22/09-GARY BELAFLEUR CALLED, TO SAY HE IS CLOSING ON THIS FACILITY SOON. INFORMATION OUT TO HIM-PH 11/6/08-LETTER FROM OWNER INDICATING FACILITY HAS NOT BEEN USED SINCE 9/30/08-BEING FORECLOSED ON, AUCTIONED SOON 10/07 PIPING REPLACEMENT DUE TO DAMAGE FROM CAR HITTING PUMPxkÃÂ^aÂÂ)xkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃÂÂXxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ2à 5ÂÂ)xj xj ÂWþÿþÿþÿþÿþÿþÿþÿþÿôVENT PIPED TOGETHER HAS VAPOR ADAPTOR OWNER CALLED 3/16/07 RE FAILING AI NOTICE. TANK OOS & EMPTY SINCE SUMMER 06. WILL SUBMIT EXTENSION REQUEST AND OOS FORM. DOES NOT WANT TO CORRECT FAILURE. OOS RECEIVED 3/22/07; NO EXTENSION REQUEST. -MLxjàÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ<ÂÂTxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÃAbÂÂ!xkxkÂxk þÿþÿþÿþÿþÿþÿþÿÒ10/22/08 DEBRA CALDWELL CALLED TO LET DEP KNOW SHE WILL BE GETTING AN AI DONE NEXT WEEK. DYSARTS IS SETTING IT UP FOR HER. WILL ALSO NEED TO DO A PRECISION TEST BEFORE RETURNING TO SERVICE. FACILITY OOS. -LWxk ÃÂbÂÂxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿlOWNER, RICKY DAIGLE, HAS CONTACTED INSPECTOR TO GET PROBLEM CORRECTED AND NEW INSPECTION DONE. 3/27/07 TRxjÃÂFÂÂKxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj à ÂRÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â!MÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿi BALL FLOAT CHECKED AND WORKING PROPERLY?: FLAPPER INSTALLED TO REPLACE INACCESSIBLE BALL FLOAT ON TANK 3xkà Â6ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ¿SIMARD REPLACED SUMP ENTRY BOOTS, REPAIRED CRASH VALVE ON DISPENSER #10, REPLACED PROBE CAP ON TANK 5-2 10/10/07 COPI - CTI MULLINS REPLACED SUMPS AND SPILL BUCKETS ON TANKS 4-1, 5-1 AND 5-2xkà Â'ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂV ÂÂKxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂV#ÂÂKxkxkÂxj þÿþÿþÿþÿþÿþÿþÿ&CLEANED 2'' OF WATER FROM PIPING SUMP.xj ÃÂV$ÂÂKxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÂÂÂxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ‚REPLACED SUMP PROBE AND CORRODED WIRING. ALL SYSTEMS FUNCTIONS PROPERLY. PIPING REPLACEMENT PLANNED FOR BOTH TANKS IN APRIL 2007xjÂ]cÂD/ÂÂKxj xj Á`xjÃ)þÿþÿþÿþÿþÿþÿðPASSING INSPECTION UPDATE RECEIVED 5/31/2006. CTI PAUL BROWN REPAIRED TANK 8 INTERSTITIAL MONITOR WIRING AND REPLACED TANK 7 FILL CAP ON 6/15/06 CTI PAUL THOMPSON TO REPLACE MONITORING SYSTEM WITH OMNTEC OEL 8000II PER UPGRADE REGN 3/7/07xjÃÂ.=ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿREPLACED FILL BOX COVER.xkÃÂ@^ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂJ"ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿREPLACED SENSOR FOR TANK 5xkÃà ÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿyCTI GEORGE INSTALLED NEW PIPING SUMPS, UPGRADED MONITORING SYSTEM TO TLS 350, INSTALLED FLAPPERS, RAISED ALL CRASH VALVESxj ÃÃÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ_PÂÂ]xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ãà NÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂV!ÂÂKxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ/SENSOR REPAIRED. MODEL RS 10B O.C. WET SYSTEM.xj ÃÂPTÂÂHxkxkÂþÿÃ+.7þÿþÿþÿþÿþÿþÿXSHUTDOWN ORDER SENT OUT ON 2/4/2009. FAILURE TO SUBMIT AI AND SIA FOR MULTIPLE YEARS. -LW GAUGING STICK MISSING PLASTIC TIP (RECOMMENDED REPLACING STICK) TANKS 6,7-MONITORING WELL 1, 2, 3-NO APPARENT SHEEN OR ODOR OBSERVED. TANKS 6, 7-MONITOR WELL 4, 5, 6- UNABLE TO OPEN TANK 5- MONITOR WELLS 1, 2, 3, 4- NO APPARENT SHEEN OR ODOR OBERVED. TANKS 1, 5, 6, 7- DAILY INVENTORY NOT WITHIN 1% TANKS 1, 5, 6, 7- SPILL BUCKETS CONTAIN WATER/DEBRIS (REMOVED AND CLEANED)(RECOMMENDED SPILL BUCKETS BE KEPT FREE OF ALL LIQUIDS/DEBRIS AT ALL TIMES) TANK 7- FILL CAP NOT LIQUID TIGHT-GASKET MISSING (REPLACED CAP) TANK 5- TANK BOTTON CONTAINS .5'' WATER-OWNER TO REMOVE WATER. TANK 1-DROP TUBE ENDS 8'' FROM TANK BOTTOM-MUST BE WITHIN 6'' (RECOMMEND DROP TUBE REPLACEMENT) TANK 6- DROP TUBE ENDS 7'' FROM TANK BOTTOM. TANK 7- DROP TUBE ENDS 10'' FROM TANK BOTTOM.xkÃÂTÂÂxkxkÂxkÃþÿþÿþÿþÿþÿþÿþÿxkÃÂ"9ÂÂxkxkÂxkÃO"þÿþÿþÿþÿþÿþÿ/CLEANED DIRT AND WATER OUT OF GAS SPILL BUCKET.xkÃÂJÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ-ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ>`ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂU&ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿÜCOULD NOT INSPECT BALL FLOATS ON HEATING OIL TANKS BECAUSE WATER TABLE TOO HIGH TO REMOVE VENT PIPES SCOTTY CALLED, WATER STILL TOO HIGH TO INSPECT DUE TO HIGH RAIN EVENTS RECENTLY, WILL RECHECK EARLY MAY. TRxkÃ!Ã:P xk xk Âxk þÿþÿþÿþÿþÿþÿþÿTANK READING: -.97, -.93, -1.07 MORIARITY PLANNING TO REMOVE TANK BY 6/07. TOO MUCH OF A HASSLE. HAS FORMS, WILL NOTIFY DEP IN ADVANCE. -ML 10/16 TRIED TO ORDER FUEL DELIVERY, J&S WON'T DELIVER. 10/17 MORIARITY SAYS WILL REMOVE ASAP, MAILED FORMS AGAIN -ML TANK REMOVED 11/23/07xjÃ"Ã! xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ” TANK READING: GROUND FROZEN. -.71, -.89, -.821 WILL RETURN AFTER THAW TO RETEST 4/10/07 CP FAIL LTR -ML 11/28/08 COPI, CTI HASKELL INSTALL ANODESxkÃ#ÃÂÂ!xk xk ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ$à UÂÂ:xkxk Âxj Ã<3þÿþÿþÿþÿþÿþÿþÿxj Ã%Â/=ÂÂ)xk xk Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã&ÃMÂÂUxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ SCULLY FILLxkÃ'Ã/ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(Ã5!ÂÂxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ'REMOVED OIL SORBENTS FROM SPILL BUCKET.xkÃ)Ã.ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿbVENT WHISTLE IS LOCATED UNDER THE DOUBLE TAP BUSHING FOR THE VENT LINE LOCATED IN THE PIPING SUMP.xkÃ*Ã79ÂÂxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ?TRACE AMOUNTS OF CONDENSATION IN PIPING SUMP-REMOVED WITH RAGS.xkÃ+ 2ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿETWO LIGHTS ARE NOT WORKING ON THE PANEL. WILL HAVE TO REPLACE BULBS.xkÃ,Ã6 ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿØTRACE AMOUNTS OF WATER IN TRANSITION SUMP-REMOVED WITH RAGS. NO COPY OF PREVIOUS INSPECTION AVAILABLE AT FACILITY-ADVISED OWNER TO KEEP A COPY ON FILE AT THE FACILITY. APT DOUBLE WALL PIPING FOR SUCTION AND RETURN.xkÃ.ÃK1ÂÂ)xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ/Â7ÂÂ!xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ0à ZÂÂ)xk xk Âxj þÿþÿþÿþÿþÿþÿþÿCHAMBER #1 IS O-O-Sxj Ã1ÂU"ÂÂ)xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ5*NO STAGE 1 VAPOR RECOVERY *PRODUCT PIPING SUSPECT BBxjÃ2Ã9ÂÁ$xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ9STP SET TO RUN CONTINUOUSLY. LLD CAN NOT PERFORM TEST. BBxjÃ3à 6ÂÂ)xk xk Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã4 AÂÂGxk xk Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã5à >ÂÁxk xk Âxj þÿþÿþÿþÿþÿþÿþÿ#INSPECTION UPDATE ON 11/28/2006. BBxj Ã6ÂD*ÂÂUxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿgTANK 7 SPILL BUCKET REPLACED 3/30/07 3/26/08 COPI - CTI BISKUPIAK INSTALLED SPILL BUCKETS ON TANKS 8&9xkÃ7à ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ8Ã)ÂÂTxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ #23 SUCTION SYSTEM, HAS NO SUMP.xk Ã9Â@ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ2ALSO HAS 2'' OFFSET SKULLY CLEANED OUT SOME WATER.xkÃ:à ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ 2'' SKULLYxkÃ;ÃdÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ$ALL FILLS ARE INSIDE CONTAINED AREA.xkÃ<Ã45ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ=ÃT"ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ2INSPECTOR WAS DAVID BEAUMONT NOT DONALD BUBAR. -LWxk Ã>Â&ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ+INSPECTOR WAS TONY COUTURE NOT DONALD BUBARxk Ã?Ã!ÂÂXxkxkÂxk þÿþÿþÿþÿþÿþÿþÿPRODUCT PIPE READING: -.872 -LWxk Ã@à ÂÂHxkxkÂxk þÿþÿþÿþÿþÿþÿþÿbPIPING SUMP CONTAINS 1.5 GALLONS WATER- NOT ENOUGH LIQUID TO PUT SENSOR INTO ALARM [REMOVED AND CLEANED] NOTIFIED MIKE NORTON, FACILITY MANAGER AND TIM RECTOR, MEDEP, 4/12/2007. SPILL BUCKET CONTAINS WATER/FUEL [REMOVED AND CLEANED][RECOMMEND SPILL BUCKET BE KEPT FREE OF ALL LIQUIDS/DEBRIS AT ALL TIMES]. FILL CAP FAULTY-NOT LIQUID TIGHT [REPLACED].xk ÃAÂOÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃBÂUÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃC ÂÂTxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃDÂ]ÂÂxk xkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃEÁ4ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃFÂXÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ«5/1/07 CTI COUTURE INSTALLED ON TANK 3 - SUCTION PUMP, 1/2" COPPER PIPING IN PVC, OMNTEC LU-3 FOR TANK AND PIPING SUMP, ELECTRONIC OVERFILL ALARM, AND 15 GAL SPILL BUCKETxkÃGÂ?ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿTANK 6-2 LITTLE WATER IN SUMPxkÃHÂG.ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿCLEANED OUT SPILL BUCKETSxkÃIÂI^ÂÂ!xkxkÂxkþÿþÿþÿþÿþÿþÿþÿCP READINGS: -.88. -.90, -.91xkÃKÃYbÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿFAILURES CORRECTED BY CTI KANExkÃLÃ[ ÂÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk à ÃVÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ„ SPILL BUCKETS CLEAN?: FULL OF WATER & OIL - CLEANED OUT 5/25/07 COPI FOR CTI BROWN - REPLACED PIPING SUMPS ON TANKS 3, 4, 5-1, 5-2xj ÃMÂ$%ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃNÂAÂÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃOÂF1ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿLEFT NEW STICK.xkÃPÂ7'ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃQÂ.ÂÂbxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ³CP TANK READINGS: -1.099, -.956, -1.020 SECOND INSPECTOR DAVID HOWE. REPLACED SENSOR IN TANK 8-1/2 INTERSTITIAL. CLEANED FILL BOXES. CTI HOWE INSTALLED FRP VENT PIPING 6/22/07xk ÃRÂ.ÂÂ4xkxkÂxk à 1þÿþÿþÿþÿþÿþÿERIC ELLIOTT ASSISTED.xk ÃSÃ.ÂÂKxkxkÂxk Ã+þÿþÿþÿþÿþÿþÿþÿxk ÃTà QÂÂ!xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃUÂAaÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃVÂ[ÂÂ)xkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃWÂBÂÂXxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿªWATER US ENTERING IN FROM SECONDARY PIPING ON VENT LINES AND FUEL LINES AND FILLING THE PIPING SUMPS ON BOTH 20,000 GALLON OIL TANKS. TANK TOP UP SCHEDULED FOR MAY 2007.xk Ã?Â26ÂÂ\xj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿR8/13/07 COPI CTI LEWIS INSTALLED 15 GAL SPILL BUCKET CORRECT INSPECTION TO PASSINGxj Ã>Â0ÂÂ\xj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿ|FACILITY MGR ERNIE SAYS SPACERS INSTALLED SOON AFTER INSPECTION. HE WILL HAVE INSPECTOR SEND UPDATE TO CORRECT. -4/30/07 MLxj ÃZÂE]ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ)REMOVED WATER AND DIRT FROM SPILL BUCKET.xkÃ[Ã="ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ\Â$ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿe5/2/07 AI FAIL LETTER -ML CTI PAINE: DISABLED 2ND STP, ONLY 1 STP AND 1 LLD ON THE LINE NOW, 5/3/07.xk Ã]Â=6ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿBALL FLOATS FOR OVERFILLxkÃ^ ;ÂÂ`xkxkÂxkà ERþÿþÿþÿþÿþÿþÿþÿxkÃ_Â&ÂÂ`xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ`Â3KÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿÄ5/2/07 AI FAIL LETTER -ML 6/27/07 UPGRADE REGN FOR CTI BUBAR TO REPLACE ATG W/NEW VEEDER-ROOT 7/26/07 CTI DAVIS INSPECTION UPDATE - BALL FLOAT PASSING 7/10/07 COPI - CTI ARBOUR INSTALLED TLS 350xkÃaÂ8OÂÂ`xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃbÂ=/ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿCAI FAIL LETTER 5/2/07 -ML CTI DON BUBAR: LOWERED ALL CRASH VALVES.xkÃcÂ>9ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃdÂB ÂÁ"xkxkÂxkþÿþÿþÿþÿþÿþÿþÿF6/23/08 COPI - CTI SIMARD INSTALLED NEW 3" ENVIRON GROMET (ENTRY BOOT)xkÃÂBaÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂPNÂÂ`xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂ\ÂÂXxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿSCOPI: CTI COUTURE INSTALLED ILS 350, APT PIPING SUMP AND 2" VENT WHISTLE ON 4/27/07xkÃÂVÂÂ!xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ.AI FAIL LETTER 5/2/07 -ML TANK REMOVED 6/6/07xkÃÃPÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿÿTANK 4 WOULD NOT ALARM WHEN FLOAT SET AT 90% AND 100%. CONTROLLER WOULD NOT ACCEPT SECURITY CODE TO CONFIRM IF OVERFILL IS SET. OWNER WILL LOOK FOR PROPER CODE. 5/2/07 AI FAIL LETTER -ML CTI JON PAINE: RETESTED REMOTE HIGH LEVEL ALARM, ALL TESTED OK. xkÃÃ(ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ=TÂÂ`xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ# TANK READING: -1.134, -1.38, -1.46xk ÃÃ?KÂÂ`xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Ã?LÂÂ`xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Ã_-ÂÂ`xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk à Ã`ÂÂ`xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â/cÂÂ`xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ¦TANK SWITCHED FROM #2 TO DIESEL. OVERFILL NOT PROPERLY RETROFITTED FOR MOTOR FUEL (USING WHISTLE). DAILY INVENTORY INADEQUATE; DOING WEEKLY GROUNDWATER MONITORING. xk à Â,ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ$-ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ.AI FAIL LETTER 5/3/07 -ML TANK REMOVED 7/11/07xkÃÃWÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂL$ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂdbÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿvCP FAIL LETTER, REPAIR/REMOVE DEADLINE STILL 7/31/07 -ML CTI BISKUPIAK ADDED ANODES 8/6/07. UPDATE TO PASSING -1.256xkÃÃ/\ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂRYÂÂxkxkÂxkÃ[þÿþÿþÿþÿþÿþÿ²TANK #3 FAILS TO MEET THE 1% OVER/SHORTS BY ONLY .33 GALLONS. THERE WERE ABORDENT PADS INSIDE OF THE DISPENSER UNDER THE LETERING UNITS. I DID NOT OBSERVE FRESH DRIPS OR LEAKS.xkÃÂ$HÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿNO ACTIVITY IN TANKS.xkÃÃ`ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂCÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿE1/17/08 COPI - CTI BUBAR REPLACED 15 GAL SPILL BUCKET DAMAGED BY PLOWxkàÂÁ"xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ]"ÂÂ`xkxkÂxkÄVþÿþÿþÿþÿþÿþÿþÿxkÃÂcÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ8XÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ9ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ`ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃQÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿKFOUND IN ALARM, INTERSTITIAL SPACE WIRE CUT IN HALF. REPAIRED AND CHECKED.xkÃÂFÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Ã9ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Ã]ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ"à ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#ÂN]ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$ÂL`ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂÂÂ\xjxjÂxkþÿþÿþÿþÿþÿþÿþÿ4CP FAIL LETTER 12/19/06 -ML RETESTED TO PASS 4/23/07xjÃ'ÃT xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -.945, -.949, -.991xkÃ(Ã+, xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ)ÃV3 xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -.948, -1.01, -1.00xkÃ*ÃV4 xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -.983, -1.17, -1.19xkÃ+ÃR7ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿZTANK SERVES BUILDING AND GENERATOR = FEDERALLY REGULATED TANK READING: -1.00, -1.18, -1.19xkÃ,ÂQ"ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿTTANK 6 PRESSURIZED LINE SHOULD HAVE POSITIVE SHUT-OFF DEVICE CONNECTED TO SUMP PROBExkÃ-ÃÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ.Ã\*ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ@MIKE LEWIS TESTED CP ON 5/1/07 TANK READING: -.935, -.957, -.952xkÃ/à SÂÂ\xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ„TANK NOT IN USE. CONTAINS 8" FUEL, 1" WATER. PIPING DISCONNECTED. 5/21/07 LETTER FROM OWNER STATES TANK PUMPED DOWN TO <1" ON 5/18xkÃ0Â^ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã2ÂEUÂÂZxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ3Ã&ÂÁxk xkÂxk þÿþÿþÿþÿþÿþÿþÿ% TANK READING: -1.038, -1.035, -1.028 AI FAIL LETTER 5/8/07 (TANK 4 INSPECTION NOT RECD UNTIL 5/7) 11/8/07 UPGRADE REGN FOR CTI ARBOUR TO INSTALL NEW APT SUMP AND SENSOR 11/19/07 COPI - CTI ARBOUR INSTALLED NEW CONDUIT, WIRE AND SENSORS TO EXISTING ILS 250, CONCRETE TANK PAD AND STREET BOXESxj Ã4ÃIÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ:ÂYÂÂAxjxj Â<xjþÿþÿþÿþÿþÿþÿþÿBCTI THOMPSON REPLACED VR CONSOLE AND PIPING SUMP SENSOR ON 5/14/07xjÃ5ÂÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ6 ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ7Â3TÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã8Ã/ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ.REMOVED SOME WATER FROM SUMP; CAME IN FROM TOPxk Ã9à ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ¢MONITORING CONSOLE KEY PAD NOT WORKING, WON'T ALLOW TO CLEAR ALARMS AI FAIL LETTER 5/8/07 -ML CTI GUAY: REPLACED KEYPAD AND TESTED SENSOR, ORDERED PARTS 5/14/07xkÃ:ÂY'ÂÂ]xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ;ÂXCÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ<Â2ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ=Ã]5ÂÂXxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ9Ã(* xj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿwTANK 1 FAILED CP RETEST ON 8/9/2006 (-0.586 VOLTS). BB SENT CP LETTER ON 8/31/2006 REQUING REMOVE/REPAIR BY 4/1/07. BB xjÃ>ÂbAÂÂTxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ?ÂÂÂTxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ@ÂÂÂTxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃAÂ.YÂÂTxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃBÃZYÂÂ!xkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃCÂB\ÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃDÂdÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃEÂ)ÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿREC'D CALL FROM D. BEAUMONT-HE CAN CERTIFY THAT LINES ARE SLEEVED. HE EXPOSED THEM A FEW YEARS BACK TO CHECK, AND THEY ARE SLEEVED. HE WILL SEND IN AI UPDATE-PH 11/26/08 AI CAME IN SAYING IT COULD NOT BE DETERMINED WHETHER THE PIPING IS SLEEVED-INCOMPLETE LETTER OUT 1/13/09-PH xkÃFÃCbÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃGÂU3ÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿROOS FACILITY: QUESTION # 71 PRODUCT PIPING CAPPED? PUMPS AND MANWAYS SECURE? NOxkÃHÃYÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃIÂARÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃJÃ[5ÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃK ÂÁ xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ16/2/08 COPI - CTI BEAUMONT INSTALLED SPILL BUCKETxkÃLÃ_`ÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃMÂÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿÏTANK # 9: COULD NOT GET PIPING SUMP SENSOR TO ALARM, MADE REPAIRS. REQUESTED EXTENSION TO REMAIN OOS GREATER THAN 12 MONTHS. PREMISSION GRANTED UNTIL 3/27/2009. IF NOT RETURNED TO SERVICE BY THEN REMOVE.xkÃNÃYÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ\ AUTO SHUT OFF / FLAPPER CHECKED AND WORKING PROPERLY: REPLACED TANK 2 FLAPPER AND DROP TUBExkÃOÂÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÂ0ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃQÂ`ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃRÃ*=ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃSÂcÂÂbxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ0TIGHTENED UNION ON REGULAR UNDER DISPENSER #1/2.xk ÃTÂdÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃUÂÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃVÂPÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃXÂ$GÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃWÂ#ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ(CHANGED ALL 3 BULBS IN VEEDER ROOT HEAD.xkÃYÂ$4ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿsCHANGED PIPING SUMP SENSOR. CHANGED INTERSTITIAL SENSOR . RAN NEW WIRING FROM BUILDING TO TANK. DIESEL TANK ONLY.xkÃZÂ*ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ[Â* ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ2CHANGED WRAP AROUND SENSOR ON DIESEL INTERSTITIAL.xkÃ\Â>ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿB11/9/07 COPI - CTI BISKUPIAK INSTALLED AMERON FIBERGLASS VENT LINExkÃ]Â$?ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ^Â*"ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ%CHIPPED ICE OUT OF BOTH FILL BUCKETS.xkÃ_Â?ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ`Â*&ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃaÃK ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃbÂ*(ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃcÂ3ÂÂbxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃdÂ=BÂÂbxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃNVÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂT#ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ_ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ_ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ_ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ\DISPENSER 7/8 HAS MANY WEEPS GOING ON UNDER IT. WAYNE SERVICES CHANGED GASKETS. ALL FIXED.xkÃÂ_ ÂÂbxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂaPÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂaQÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÃYÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÃAÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà à ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿTPUMPED 3 GALLONS OUT OF THE REGULAR MASTER PIPING. CHIPPED ICE OUT OF SPILL BUCKET.xkÃÃ.ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ.ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃà ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ=DISPENSER # 1/2 & 3/4 HAVE GASKETS WEEPING IN REGULAR METERS.xkÃÃ6ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ!ICE CHIPPED OUT OF SPILL BUCKETS.xkÃà ÂÂbxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂ9ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ- ÂÂAxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ©SHOULD BE 2006 INSPECTION YEAR, ENTERED INCORRECTLY. NEW OWNERSHIP, NEW OWNER WAS NOT INFORMED HE HAD TO RECONCILE. THRUPUT NOT AVAILABLE DUE TO CHANGE OF OWNERSHIP.xjÃÂ/ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂ2ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ2 ÂÂ]xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂ6\ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂLÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂYÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂY%ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂ]TÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ1ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃà ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂ+ZÂÂRxkxkÂxkþÿþÿþÿþÿþÿþÿþÿnRECIEVED ANNUAL INSPECTION VIA FAX. REMOVED RAINWATER FROM SUMP AND INTERSTITIAL SPACE PER JOSEPH BOSSE. -MLGxkà  ?ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿNTANK 4-1 HAS COPPER PIPING. TANK 6-1 HAS FLEXIBLE DOUBLE WALLED PIPING. -MLGxkÃ! >ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ"Ã(ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#Â3;ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ"PIPING SUMP SENSOR REPLACED. -MLGxkÃ$Â7$ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ+REPLACED PIPING SUMP SENSOR TANK 7-1. -MLGxkÃ%Â$ÂÂ`xkxkÂxk ÃS bþÿþÿþÿþÿþÿþÿŠ1/15/2008 WIRING ON INTERSTITIAL FOR TANK 9 BROKE. I OKED WEEKLY MANUAL MONITORING UNTIL REPAIRED APROX MAY 1, 2008 LETTER IN FILE TEDxk Ã&ÃbbÂÁ"xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ=DISPENSER HAD WATER IN SUMP, PUMPED OUT, WAS IN ALARM. -MLG xk Ã'Â.ÂÁ"xkxkÂxk ÃMZYþÿþÿþÿþÿþÿþÿþÿxk Ã(ÂÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿVCTI COUTURE REPLACED SPILL BUCKET 6/18/07 ANNUAL INSPECTION UPDATE 6/18/2007 PASSING.xkÃ)ÃÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿÒTANK STORES OILY WASTE WATER. SUMP FULL OF WATER. CTI JEFFERY EATON: OWNER HAD SUMP AND TANK PUMPED OUT. VERIFIED NO ADDITIONAL LEAKS FROM GROUNDWATER. APPEARS TO HAVE COME FROM LID NOT BEING SECURED PROPERLY.xkÃ* xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ+ÂL  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -1.04, -1.01, -1.06xkÃ,ÂD xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ-Â.V xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.88, -.96, -.91xkÃ.Ã:Y xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ/ÂNÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ»CTI TONY COUTURE: TESTED SECONDARY WITH VACUUM TEST, DID NOT PASS. DUG UP RISER PIPE, PUT A TEST ON THE TANK DIRECTLY AND IT PASSED. INSTALLED A NEW RISER PIPE, RETESTED IT AND IT PASSED.xk Ã0ÃB xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -1.09, -1.09, -1.09xkÃ1àxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ2à  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ3à  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ4àxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ5ÂN.ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ,PIPING SUMP FULL OF WATER AT TIME OF INSPECTION. NOTIFIED TIM RECTOR OF DEP TANK DIVISION. REMOVED WATER FROM SUMP, APPEARS TO BE COMING FROM IN THE TOP. RESEALED LID WITH SEALANT. CHECKING INTO REPLACEMENT LID AND GASKET ASSEMBLY. 7/10/08 REGN FOR CTI DODGE TO REPLACE SUMP, PIPING AND SPILL BUCKETxk Ã6ÂN0ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã7ÂN%ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã8ÃAÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã9Ã]%ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ:à >ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ;ÃaAÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ<Ã]TÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ=à <ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ}1/4/08 COPI - CTI DAVIS DISCONNECTED BROKEN VENT, RAN VENT RISER STRAIGHT UP OUT OF TANK. OLD VENT TO BE REMOVED IN SPRING. xkÃ>à ;ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ?à =ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ@Ã:ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃAÂÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃBÃd ÂÂ;xkxkÂxkþÿþÿþÿþÿþÿþÿþÿÅCLEANED PRODUCT FROM DISPENSER SUMP AND PUMP SUMP FROM LEAKING METERING UNIT IN DISPENSER. HAD GAFTEK REPLACE METERING UNITS ON ALL REGULAR DISPENSERS. (SEE UST COMPLIANCE INSPECTION DATED 4/2007)xkÃCÃMÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃEÃ+ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃFÃ\ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ(CLEARED SOME WATER OUT OF SPILL BUCKETS.xkÃGÂWÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿe#28 LENGTHENED FLOAT TO PROPER LENGTH. HAD TO REPLACE VAPOR ADAPTOR. CLEANED OUT SPILL BUCKETS. -MLGxk ÃHÂIÂÂ)xkxkÂxkÄ3þÿþÿþÿþÿþÿþÿ¨FLAPPER DROP TUBES HAD BEEN EXTENDED TO REACH 95% SHUT OFF. CLEANED OUT SPILL BUCKETS. SINGLE VAPOR HOOK UP POINT. REPLACED BRASS ADAPTERS AND CAPS ON BOTH FILLS. -MLGxkÃIÂHÂÂ)xkxkÂxkÄ þÿþÿþÿþÿþÿþÿŠREPLACED TOP LIGHT. HYDRO TESTED TANK 8-1. CLEANED ALL SPILL BUCKETS. LOCATION HAS TWO VAPOR HOOK-UPS. REPLACED ALL THREE FILL CAPS. -MLGxkÃJÂ$ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿmREPLACED TANK 8-1 VAPOR ADAPTER. -MLG 7/17/07 COPI - CTI MULLINS REPLACED SPILL BUCKET AND FLAPPER ON TANK 8xkÃKÂ-JÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃLÂIHÂÁ$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ\REPLACED POWER BULB, LOWERED SENSOR IN 1, 2, AND 8-2. CLEANED SUMPS AND SPILL BUCKETS. -MLGxkÃMÂ?2ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿHPIPING IN QUESTION. MUST VERIFY PIPING TYPE. IN CONTACT WITH OWNER. BBxkÃNà PÂÂ)xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxjÃOÃ$ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÃ(ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃQÃcÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃRÃK2ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ°PIPING SUMP HAD WATER IN IT AND AROUND LID SEAL, IT WAS CLEANED OUT. SPILL BUCKETS HAD OIL AND WATER CLEANED OUT OF THEM. BOTH 1" RIGID STEEL PIPERS ARE IN ONE 4" SLEEVE. -MLGxkÃSÃT%ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ›PIPING SUMP HAD SOME WATER, CLEANED OUT AND AROUND LID GASKET. SOME WATER IN SPILL BUCKETS CLEANED OUT. -MLG 4/3/08 COPI - CTI DAVIS REPLACED SPILL BUCKETxkÃTÂOÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃUÃaÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ½WATER IN SUMPS-LID CRACKED, NEEDS REPLACEMENT. CTI GARY KANE 5/7/07: REPLACED COVER AND GASKETS. SPRAYED WD-40 ON LID KITS, OK NOW ON TANK 1-1. INSTALLED GASKET ON TANK 5-1, SUMPS NOW DRY.xkÃVÂÂÂ`xkxkÂxj þÿþÿþÿþÿþÿþÿþÿyCP READINGS TANK 6 -1.068, -.998, -.982 TANK 7 -.914, -.909, -.90 TANK 8 -1.125, -.997, -.921 TANK 9 -1.129, -.914, -.979xj ÃWÂWÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃXÂ)MÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ CLEANED OUT SPILL BUCKETS. -MLGxkÃYÂ>ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ3MISTAKE MADE, ACTUAL INSPECTOR WAS IRA DODGE. -MLGxkÃZÂ?ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ[ÂBÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ\Â=ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: .91, .90, .92xkÃ]Ã4@ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: .91, .89, .90xkÃ^à FÂÂYxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ TANK READING: 1.10, 1.11, 1.11xk Ã_ÃUEÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ` ?ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ&THIS TANK HAS REMOTE FILL PIPE. -MLGxkÃaÂLMÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃb )ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿSUCTION SYSTEM, NO SUMP. -MLGxkÃcÂLLÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃd AÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿaFILL CAP AND ADAPTER REPLACED FOR NOT BEING LIQUID TIGHT. WATER REMOVED FROM SPILL BUCKETS. -MLGxkÃÃP]ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿRREMOVED WATER AND FUEL FROM SPILL BUCKETS. -MLG TANK READING: -.853, -.894, -.918xkÃÂZ<ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿƒFILL CAP REPLACED DUE TO NOT BEING LIQUID TIGHT. WATER AND FUEL REMOVED FROM SPILL BUCKETS. -MLG TANK READING: -.984, -.970, -.998xkÃÂ9PÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ…REPLACED FILL CAP DUE TO IT NOT BEING LIQUID TIGHT. REMOVED WATER AND FUEL FROM SPILL BUCKET. -MLG TANK READING: -1.32, -1.29, -1.11xkÃÃXÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿjFILL CAPS FOR ALL TANKS REPLACED DUE TO NOT BEING LIQUID TIGHT. REMOVED WATER AND FUEL FROM SPILL BUCKETS. SPILL BUCKET FOR TANK 5 HAS A DAMAGED LID, REPLACEMENT WAS RECOMMENDED. EROSION IS OCCURRING UNDER TANK MAT FOR TANK 7, CAUSING WEIGHT TO SHIFT ONTO FILL AND INTERSTITIAL RISTERS, APPLYING BACKFILL TO PREVENT POSSIBLE DAMAGE TO TANK WAS RECOMMENDED. -MLGxkÃÃ!ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ‰FILL CAP WAS REPLACED DUE TO NOT BEING LIQUID TIGHT. GAUGING PROBE WAS REMOVED AND CLEANED IN ORDER TO FACILITATE PROPER OPERATION. -MLGxkÃÂNEÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ¦FUEL AND DEBRIS REMOVED FROM SPILL BUCKETS. COPPER SUCTION/RETURN LINES NOT ISOLATED BY SPACERS, SO IT WAS RECOMMENDED THAT THEY BE INSTALLED TO PROTECT PIPING. -MLGxkÃÃbYÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂaGÂÂXxkxkÂxkÃþÿþÿþÿþÿþÿþÿ¯FILL CAPS REPLACED DUE TO NOT BEING LIQUID TIGHT. LIQUID REMOVED FROM SPILL BUCKETS. BOTTOM OF TANK 1, CHAMBER 2 CONTAINED 3' OF WATER, WHICH WAS RECOMMENDED BE REMOVED. -MLGxkà ÂD2ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿøREPLACED FILL CAP DUE TO IT NOT BEING LIQUID TIGHT. TANK BOTTOM CONTAINS .25" OF WATER. TANK LOCATION NOT ACCESSIBLE TO TANKER, SO IT WAS RECOMMENDED THAT OVERFILL DEVICE BE CHANGED TO A VENT WHISTLE OR ELECTRONIC TO FACILITATE PUMP DELIVERY. -MLGxkà ÂOÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂY ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ–REPLACED TANK ANULAR SPACE SENSOR. PIPING SUMP CONTAINS SOME WATER-LESS THAN 200 ML. CLEANED LID AND SURROUNDING AREA TO FACILITATE PROPER SEAL. -MLGxkà Â?1ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ¡CLEANED OUT WATER IN THE BOTTOM OF TANK 7 WHICH HAD COME IN FROM THE TOP. SPILL BUCKETS FOR TANKS 7 AND 8 WERE CLEANED OUT; THEY ARE RUSTY BUT STILL SOLID. -MLGxkà Ã6bÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿÂCLEANED OUT SPILL BUCKETS. NO STAGE I VAPOR RECOVERY. -MLG CTI GARY KANE: TALKED TO MITCH BROWN, AND THE FACILITY DOES NOT EXCEED 10,000 GAL THROUGHPUT, SO STAGE I VAPOR RECOVERY NOT REQUIRED.xkÃÂ\@ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ2ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃK/ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ4CLEANED OUT SOME WATER FROM THE SPILL BUCKETS. -MLGxkÃÃPÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿØCLEANED OUT SPILL BUCKETS. CLEANED SMALL AMOUNT OF WATER FROM A FEW DISPENSER SUMPS. NOTE: TANK 5-1 DW/BRINE FILLED TANK, BUT THEY ARE RUNING CSLD ON IT, N/A. -MLG 4/11/08 COPI - CTI GEORGE INSTALLED 1 SPILL BUCKETxkÃÂM ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ$ ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿãTANK 3-1 SUMP SENSOR NEED NEW BRACKET INSTALLED. REMOVED WATER FROM 4-2 TANK SUMP-NEEDS REPLACEMENT LID KIT. REMOVED ALL WATER FROM SUMPS AND SPILL BUCKETS. TANK 4-1 NEEDS NEW SPILL BUCKET LID. CTI GARY KANE: THE SUMPS ARE IN LIQUID TIGHT CONDITION BUT THE HOLD DOWN BOLTS THAT KEEP IT ON WERE BENT AND BROKEN SO HE NOTED THAT SO I COULD CALL THE OWNER AND LET HIM KNOW HE SHOULD HAVE THEM REPLACE. WE DID REPLACE THEM WHEN JON PAINE RETURNED TO INSTALL A NEW OPW 101BG LID ASSEMBLYxkÃÃb]ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ`9ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ86/12/08 COPI - CTI SIMARD INSTALLED SPILL BUCKET FOR RNLxkÃÂ0ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ] ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂQOÂÂXxkxkÂxk þÿþÿþÿþÿþÿþÿþÿšSUMPS NOT IN LIQUID TIGHT CONDITION. -MLG CTI TONY COUTURE: DUE TO THE FACT THAT A SPLIT HAD BEEN FOUND IN THE COUPLING ON A REVISITATION TO THE SITE AFTER THE FAILING INSPECTION, A NEW COUPLING WAS PUT ON AFTER THE WATER HAD BEEN PUMPED OUT. AFTERWARDS, ANOTHER TEST WAS DONE ON THE INTERSTITIAL SPACE, WHICH HELD FOR 4 HOURS AND PASSED, 5/10/2007. 2/20/08 COPI - CTI COUTURE INSTALLED 15 GAL SPILL BUCKETxkÃÃ$$ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿTANK 9-1 IS A VAPOR RECOVERY SYSTEM, NOT M&D; TANK IS HOOKED TO VEEDER ROOT SYSTEM AT LOADING RACK. 9-1 HAS TURBINE, BUT USED FOR RETURNING RECOVERY TO TANK WHEN NEEDED. NO LLD, ALL PIPING ABOVEGROUND.-MLG 7/21/08 COPI - CTI KANE INSTALLED OMNTEC LU3 FOR TANK & PIPE MONITORINGxk ÃÃ$ÂÂ`xkxkÂxkà þÿþÿþÿþÿþÿþÿF TANK READING: TANK 1: -1.31, -1.3, -1.29; TANK 2: -1.21, -1.29, -1.23xkÃÂ8ÂÂ`xkxkÂxkÃ=&þÿþÿþÿþÿþÿþÿþÿxkÃÃ7AÂÂ`xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ4ÂÂ`xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ_WIRE TO THE TANK SEEMS TO HAVE A BAD CONNECTION. USED THE TANK BOTTOM FOR THE CP READING. -MLGxkÃÃ.ÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿh TANK READING: TANK 6-1: -1.5, -1.41, -1.43; TANK 8-1: -1.51, -1.48, -1.44; TANK 9-1: -1.57, -1.5, -1.55xkÃÂXÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ\7/23/08 UPGRADE REGN - CTI BURT LEVESQUE INSTALLED RISER ON SECOND INTERSTITIAL ACCESS POINTxkÃ!Ã\@ÂÁ xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"ÁBÂÂ`xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#ÃYÂÂXxkxkÂxk þÿþÿþÿþÿþÿþÿþÿHAS REMOTE FILL. -MLGxk Ã$ÂGGÂÁ xkxkÂxk þÿþÿþÿþÿþÿþÿþÿw TANK READING: TANK 1: -.911, -1.09, -1.001; TANK 2: -.881, -.855, -.9 **TANK 2: TEST CP PIPING OR VERIFY MATERIAL!!**xk Ã%Ã\AÂÁ xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&Ã[ ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿqSTP SUMP LID HELD DOWN WITH WEIGHTS-SUMP DRY AND TIGHT. SPILL BUCKETS HAD ALL WATER AND DIRT CLEANED OUT OF THEM.xkÃ'Â?%ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ–6-2 STP SUMP HAD SOME WATER, CAME IN FROM TOP AROUND LID-WAS CLEANED AND LID RESEALED. ALL SPILL BUCKETS WERE CLEANED OUT. ONLY 1 VAPOR ADAPTOR. -MLGxkÃ(Ã$^ÂÂ]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ)Â<ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ1TANK 5-1 IS SUCTION PUMP AND THERE IS NO SUMP SENSOR. JUNCTION BOX AND PIPING ON 4-2 PROBE WAS REPLACED AND SUMP SENSOR WAS RECOVERED AND SEALED AND IT IS NOW OKAY. 4-1 LEAK DETECTOR WITH VMI WAS CHANGED, TESTED, AND PASSED. PUMP 5-1 IS A SUCTION PUMP- NIPPLE IS SECORED AND THERE IS NO CRASH VALVE. -MLGxkÃ*ÂOÂÂ]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ|7/23/08 NOT RTS YET. NOTIFIED JODY THAT MUST SUBMIT PASSING AI & PT AND RECEIVE WRITTEN PERMISSION FROM DEP BEFORE RTS. -MLxkÃ+Â9QÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿXSPILL BUCKET WAS CLEANED OUT. FILL CAP WAS REPLACED DUE TO NOT BEING LIQUID TIGHT. -MLGxkÃ,Ã9IÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿ& TANK READING: TESTED BY KIRK ST.PETERxj Ã-Ã]7ÂÂPxj xkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ.Ã]8ÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ/Ã]9ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã0Ã];ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã1Ã]<ÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITY; OOSxjÃ2Ã]=ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã3Ã]>ÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ4Ã]?ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITY; OOSxj Ã5Ã^5ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITY; OOSxj Ã6Ã`)ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITY; OOSxj Ã7Ã`*ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã8Ã`,ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã9Ã`-ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿ;CHANGED BULBS IN CONSOLE. REMOVED WATER FROM PIPING SUMP. xj Ã:Ã`.ÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿREPLACED PRINTERxjÃ;Ã`/ÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃ<Ã`0ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã=Ã'ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã>Ã@ÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã?ÃAÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITY; OOSxj Ã@ÃBÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃAÃCÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿ8NO POWER TO FACILITY; OOS REMOVED WATER FROM PIPING SUMPxj ÃBÃDÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITY; OOS xj ÃCÃEÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITY; OOSxjÃDÃFÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃEÃGÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃFÃHÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃGÃIÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃHÃKÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃIÃJÂÂPxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃJÃÂÂPxkxkÂxjþÿþÿþÿþÿþÿþÿþÿ.REPLACED FLASHER UNIT ON TANK 2 OVERFILL ALARMxjÃKÃ"ÂÂPxkxkÂxkþÿþÿþÿþÿþÿþÿþÿöINSPECTION DATES RANGE FROM 7/7/06 - 9/29/06. KIRK ST.PETER INSPECTED CP. NO POWER/OOS: TANKS 378, 382, 383, 409, 401, 412, 413, 414, 415 OOS FORM TO BE SUBMITTED FOR TANK 415 -ML REMOVED WATER FROM TANK 396, 403 7/07 CP READINGS ON MEL'S DESKxkÃMÂ]JÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃNÂ]cÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃOÂ]CÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÂ]FÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃQÂ]`ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃRÂ2ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÂVÂbÂÂKxi xi ÂxhþÿþÿþÿþÿþÿþÿþÿÒDENNIS RODERICK CALLED BACK ON 2/21/2007, CONTRACTED SIMMARDS & SONS TO COMPLETE A.I. THIS MONTH. -LW WATER DISCOVERED IN INTERSTITIAL DURING INSPECTION ON 5/29/07; WILL BE REMOVED WHEN OWNER PAYS FOR WORK. -MLxhÃSÃH'ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿÿREMOVED 1/2" WATER FROM TANK 3-1 ALSO 1" OF WATER FROM TANK 2-1. BALLFLOAT COULD NOT BE REMOVED FROM TANK 2-1, BUT A FLAPPER DROP TUBE WAS INSTALLED AT 95%. WATER PUMPED FROM ALL SPILL BUCKETS NOTE PASSING CP RESULTS 1-1: -.94, 2-1: -.866, 3-1: -.987 xkÃTÂ^ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿACTIVE ON 7/1/1987 -MLGxkÃUÂ]dÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK 10 ACTIVE ON 4-1-1988 -MLGxkÃVÂY=ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃWÂLÂÂ]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃXÂLÂÂ]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃYÂYDÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃZÂQ/ÂÂ]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ[ÂYÂÂ]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ\ÂYÂÂ]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ]Â]NÂÂ]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ^Ã0ÂÂ]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ_Ã;ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿyDISPENSERS 3 & 4 HAD UNLEADED METER LEAKING, WHICH WAS A LEAK THAT COULDN'T BE STOPPED, SO THE DISPENSER WAS BAGGED OUT OF ORDER UNTIL THE LEAK COULD BE FIXED. ACTUAL INSPECTION DATE IS APRIL 23, 2007 NOT MAY. REPAIRS MADE AND FACILITY PASSES. -MLG ORIGINAL INSPECTION WAS 4/23/07, NOT 5/23/07. PASS DATE 4/30/07, NOT 5/30/07 . CTI NICK GUAY: REPLACED METER AT PUMP 3/4.xkÃ`Â@SÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿá10/17/11 CALL FROM CIANBRO CORP IN PITTSFIELD. FACILITIES MANAGER CALLED TO INDICATE THEY HAD AN INTEREST IN POSSIBLY PURCHASING AND REMOVING THIS PROPERTY. HIS QUESTION WAS WHAT WAS THE POTENTIAL LIABILITY. I INIDCATED THAT WE HAVE BEEN TRYING TO GET THIS FACILITY OUT FOR A WHILE, WHICH HE KNEW FROM TALKING WITH LIZA IN THE PAST. I SUGGESTED THAT IF THIS WAS THE ONLY FACILITY THEY OWNED DEDUCTIBLE IS A BASE $2,500 AND THAT IT SHOULD BE ARGUED THAT THEY ARE REMOVING AND NOT REPLACING THE PLACE, ACTUALLY TEARING IT DOWN CLEANING UP AND CREATING A PARKING LOT. TR FACILITY BEING AUCTIONED OFF ON 2/27/2009. TANK REQUIRED TO BE REMOVED. -LW 2/27/2009 NO ONE BID ON PROPERTY. BANK ABANDONED IT'S INTEREST, WENT BACK TO THE ESTATE OF JUNE BOWDEN (ACCORDING TO AUCTION COMPANY). -LW ALL SPILL BUCKETS CLEANED OUT DURING INSPECTION. DISPENSER 3/4 HAD SOME WATER IN THE SUMP, WHICH WAS CLEANED OUT DURING THE INSPECTION. 1,100,00 GALLONS OF GASOLINE THROUGHPUT IN 2006 YEAR. -MLGxk ÃaÂWÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿžSPILL BUCKETS FULL OF WATER, CLEANED OUT DURING INSPECTION. PIPING SUMP HAD WATER, WHICH WAS CLEANED OUT. CHECKED THE TOP, LEAK WAS FOUND, LID RESEALED. -MLGxkÃbÃ(*ÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ}9/17/08-FAILING AI-CP IS FIXED BUT STILL FAIL DI FOR +- WILL INSPECT SOON BILL CARVER HAS REPLACED ANODES ON TANK 1= 1.167 BILL CARVER WILL ADD ANODE IN SPRING; WON'T BE DONE BY 4/1/07 DEADLINE SET BY BB. -ML DOUGHERTY TESTED 6/19/07 - TANK 1 -0.75, TANK 2 -0.897 7/23/08 COPI - CTI CARVER ADDED ANODES TO RNK TANK. WILL PERFORM FOLLOWUP CP TESTING AND FULL AI IN 6 WEEKS. -MLxkÃcÂÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃdÃ7UÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: .864, .862, .862xkàÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂSZÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂRMÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkàÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ)TÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ2SPILL BUCKETS CLEANED OUT DURING INSPECTION. -MLGxk ÃÂUÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ#33-34-35 TANK 5-1 IN M&D TANK HAS WHISTLE OVERFILL, AND 2" SPILL BUCKET WITH SKULLY FILL, WILL NEED TO BE REPLACED, AND FLAPPER INSTALLED. #29 UNABLE TO REMOVE DROP TUBE WITHOUT DESTROYING. -MLG 7/17/07 UPDATE AND COPI BY CTI MULLINS - REPLACED SNL SPILL BUCKET AND FLAPPERxkÃÃU.ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ3<ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿQOUTSIDE PNEUMERCATOR LG-1001 HI-LEVEL ALARM BOX REPLACED DURING INSPECTION. -MLGxkà Ã/ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂAÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÃA>ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ35/23/08 COPI - CTI BISKUPIAK INSTALLED SPILL BUCKETxkÃÃ"ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ`ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ3PIPING IS DOUBLEWALL FLEX PIPING APT-XP-1005C -MLGxkÃÃ05ÂÂYxkxkÂxkÃ<8XþÿþÿþÿþÿþÿþÿþÿxkÃÂB$ÂÁ$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ^DISPENSOR PUMPS CLEANED OF WATER, SPILL BUCKETS CLEANED, FILL CAP FOR TANK 4-1 REPLACED. -MLGxkÃÂÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ= TANK READING: TANK 5-1: .91, .9, .91; TANK 6-1: .9, .91, .92xkÃÂ;WÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: 1.05, 1.02, 1.03xkÃÃ5ÂÂYxkxkÂxkÃ%Xþÿþÿþÿþÿþÿþÿ1SPILL BUCKET COVERS ON 2-2 AND 1-1 CHANGED. -MLGxkÃÁ]ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ%61S0 (BROKEN FLAPPER) REPLACED. -MLGxkÃÂ,ÂÂ_xkxkÂxkþÿþÿþÿþÿþÿþÿþÿMTANK INTERSTITIALS ARE BRINE FILLED. DEBRIS FROM SPILL BUCKETS REMOVED. -MLGxkÃÂ&aÂÂ_xkxkÂxkþÿþÿþÿþÿþÿþÿþÿTBRINE FILLED INTERSTITIALS ON ALL TANKS. SUMP SENSOR ON PREMIUM TANK REPLACED. -MLGxkÃÂRSÂÂ_xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ/COMMON VAPOR ADAPTOR FOR ALL THREE TANKS. -MLGxkÃÂ)ÂÂ_xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ‘CTI DENNIS DAVIS: CLEANED AND PAINTED ALL SPILL BUCKETS ON 5/23/07. DAMAGED VAPOR ADAPTOR ON REGULAR TANK WAS REPLACED-POPPET GASKET TORN. -MLGxkÃÂ8ÂÂ_xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ”SPILL BUCKETS ON REGULAR AND PREMIUM CONTAIN SEVERAL INCHES OF WATER/PRODUCT. -MLG CTI DENNIS DAVIS: CLEANED AND PAINTED SPILL BUCKETS ON 5/23/07.xkÃÂ7ÂÁ$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ‹2 BULBS IN VEEDER ROOT REPLACED. SUMPS CLEANED AS NEEDED. SPILL BUCKETS CLEANED AS NEEDED. 9-1 AND 10-1 LINE LEAK DETECTORS REPLACED. -MLGxkÃÂ+ÂÂ_xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ¨WATER IN REGULAR SUMP. REGULAR PRODUCT LINE SECONDARY CONTAINMENT SENSOR WAS NOT AT PROPER HEIGHT. LOWERED TO CORRECT HEIGHT. SENSOR IN ALARM FROM WATER. WATER IN DISPENSOR PAN. BRINE FILLED INTERSTITIALS. -MLG CTI DENNIS DAVIS: REMOVED WATER FROM REGULAR SUMP. REMOVED WATER FROM DISPENSOR PAN. NOTE, SENSORS ARE LOCATED IN TRANSITION LINE BETWEEN DISPENSOR AND SUMPS-WOULD SUGGEST SENSORS ALSO BE INSTALLED IN STP SUMPS.xkÃÂ^BÂÂ_xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ BRINE FILLED INTERSTITIALS. NOT ABLE TO REMOVE REGULAR DROP TUBE TO INSPECT FLAPPER HEIGHT AND OPERATION. -MLG CTI DENNIS DAVIS: NEW INSTALLATION-TOTAL HEIGHT 137, DROP TUBE 133 1/2 OK; RISE 46; FLAPPER 50 1/2 PASS. 4/11/08 UPGRAD REGN FOR CTI GEORGE TO INSTALL STAGE II VAPOR RECOVERYxkà ÃQYÂÂ_xkxkÂxkþÿþÿþÿþÿþÿþÿþÿBRINE FILLED INTERSTITIALS. WATER IN DISPENSOR PAN #3/4, AND 5/6. MIIMAL AMOUNT OF WATER IN #1/2. -MLG CTI DENNIS DAVIS: INITIAL INSPECTION FAILED INTERSTITIAL MONITORING BECAUSE OF WATER IN DISPENSER PANS. CLEANED ALL THREE PANS AND SPILL BUCKETS. CLEANED AND PAINTED SPILL BUCKETS.xkÃ!Â(ÂÂ_xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ)POWER LIGHT IS BURNT OUT ON VEEDER ROOT CONSOLE. VAPOR RECOVERY MANHOLE LID IS BROKEN. VAPOR ADAPTOR IS SHARED BY REGULAR AND PREMIUM TANKS. -MLG CTI DENNIS DAVIS: REPLACED VAPOR LID AND PAINTED IT. REPLACED POWER LIGHT ON VEEDER ROOT CONSOLE. ALSO REPLACED TOP BULB AS IT WAS BURNT OUT AS WELL.xkÃ"ÂY ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ9/28/07 PIPING REPLACEDxkÃ#Â]GÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$ÂY\ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%ÂYÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&Â]BÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'ÂY_ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(ÂQPÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*ÁYÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: .98, .97, .99xkÃ+Á^ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: .98, .98, .97xkÃ,ÁHÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: .97, .96, .98xkÃ-Á\ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: 1.04, 1.03, 1.01xkÃ.Ã%;ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ/Â&ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: 1.06, 1.02, 1.03xkÃ0ÂbÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: 1.01, 1.01, 1.02xkÃ1ÂF_ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿD TANK READING: .91, .9, .92 **TEST CP PIPING OR VERIFY MATERIAL!!**xkÃ2ÂYRÂÂ;xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ#THROUGHPUT FOR 2007 IS 575231 -MLGxkÃ3ÂYKÂÂ;xkxkÂxkÃVXþÿþÿþÿþÿþÿþÿþÿxkÃ4ÂÂÂ;xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ~PROBE REPLACED DUE TO THE FACT THAT IT WOULD NOT ALARM. -MLG 9/10/08 UPGRADE REGN FOR CTI GEORGE TO INSTALL FLAPPER DROP TUBExkÃ5Ã`FÂÂ;xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã6Ã-ÂÂ;xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã7ÂIÂÂ;xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã8ÃGÂÂ;xkxkÂxkÃ]SþÿþÿþÿþÿþÿþÿþÿxkÃ9Ã\1ÂÂ;xkxkÂxkþÿþÿþÿþÿþÿþÿþÿINSPECTOR ACTUALLY BOB TRASKxkÃ:Â5ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ;Â7ÂÁ$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿÑNEEDS ACKNOWLEDGMENT BULB 100V 15 MIL AMP FOR #AHBA. SPILL BUCKETS CLEANED DURING INSPECTION. FIL CAP REPLACED ON 6-1. OLD STAINING ON METERS AND PIPING. DROP TUBE ON DIESEL IS SHORT. NO DROP TUBE ON KEROSENE.xkÃ<Ã2ÂÂ\xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿSOME WATER WAS REMOVED FROM PIPING SUMP. EXCESS SAND/DEBRIS WAS REMOVED AT LID AREA TO FACILITATE PROPER LID SEAL, SINCE SOME WATER INFILTRATION APPEARED AT THE LID. TANK MONITOR UNRELIABLE-INTERMITENT WARNING STATE. POSSIBLY FAULTY WIRING AND/OR MONITOR. WIRING IS NOT MANUFACTURER RECOMMENDED SHIELDED CABLE. IT IS RECOMMENDED THAT THE WIRING BE REPLACED WITH NEW SHIELDED CABLE. REPLACED FILL CAP DUE TO THE FACT THAT IT WAS NOT LIQUID TIGHT. -MLG TANK READING: -1.279, -1.203, -1.065 1/9/08 MIKE LEWIS ATTEMPTED TO CORRECT PROBLEM BY REPLACING CONSOLE. SENSOR OK, CONSOLE OK, PROBLEM DEFINITELY WITH WIRING. WIRING FROZEN INTO CONDUIT, WILL REPLACE WIRING IN SPRING. OPERATOR TO CHECK PIPING SUMP WEEKLY AND KEEP LOG UNTIL REPAIR COMPLETED. REPAIR MUST BE COMPLETED BY 5/1. -MLxkÃ=ÃVÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿREPLACED FILL CAPS ON ALL TANKS DUE TO NOT BEING LIQUID TIGHT. REMOVED AND CLEANED WATER AND FUEL FROM SPILL BUCKETS. TANK 1: TANK BOTTOM CONTAINS .5" OF WATER; TANK 2-1: REMOVED AND REPLACED FILL CAP ADAPTER DUE TO THE FACT THAT IT WAS CORRODED TO THE RISER PIPE; TANK 2-2: FILL CAP ADAPTER REPLACED DUE TO NOT BEING LIQUID TIGHT. DIESEL HOSE HAS BEEN FLATTENED, RECOMMENDED REPLACEMENT. ELECTRICAL CONDUIT DAMAGED, RECOMMENDED REPAIR. TANK READING: TANK 1: -.878, -.885, -1.012; SPLIT TANK 2: -.879, -.947, -.963xkÃ>Ã>4ÂÂHxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ¬WHISTLE HARD-PIPED IN PIPING-UNABLE TO REMOVE AND INSPECT (RECOMMENDED REMOVAL AND INSPECTION). REMOVED .25" WATER FROM TANK BOTTOM. -MLG TANK READING: -1.13, -1.06, -1.12xkÃ?ÃÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ^COPPER/SUCTION RETURN LINES ARE SLEEVED BUT DO NOT APPEAR TO BE ISOLATED AT BOILER ROOM. -MLGxkÃ@Â3ZÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ®REPLACED FILL CAPS ON TANKS DUE TO NOT BEING LIQUID TIGHT. REMOVED WATER FROM TANK 4-1 SPILL BUCKET. REMOVED WATER FROM AND CLEANED DISPENSER PAN UNDER SUPER DISPENSER. -MLGxkÃAÂ#.ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿREMOVED WATER/DEBRIS FROM TANK CLEANING PORT AND PIPING ACCESS. REPLACED FILL CAP AND ADAPTER DUE TO NOT BEING LIQUID TIGHT. UNABLE TO REMOVE VENT WHISTLE SINCE IT WAS HARD-PIPED IN PIPING. REMOVED WATER FROM SPILL BUCKET. COPPER SUCTION/RETURN LINES NOT ISOLATED. -MLGxkÃBÃ2 ÂÂ\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿâREPLACED PIPING SENSOR DUE TO IT BEING FAULTY. REMOVED LESS THAN ONE GALLON OF WATER FROM DISPENSER SUMP. WATER INFILTRATION APPEARS BETWEEN TOP OF CONCRETE AND BOTTOM OF DISPENSER-RECOMMENDED CAULKING. REPLACED FILL CAP DUE TO NOT BEING LIQUID TIGHT. REMOVED DEBRIS FROM SPILL BUCKET. RECOMMENDED REMOVAL OF 1.25" OF WATER IN THE TANK BOTTOM. STAGE 1 VAPOR RECOVERY NOT REQUIRED-LESS THAN 10,000 GALLONS PER MNTH OR 50,000 GALS PER YEAR PUMPED. -MLG TANK READING: -.976, -1, -1.13xkÃCÂ9ÂÁxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿEFLAPPER DROP TUBE STUCK IN FILL PIPE AND COULD NOT BE REMOVED. -MLG 6/28/07 UPGRADE REGN FOR CTI BUBAR TO REPLACE FILL PIPE, OVERFILL AND REPAIR SPILL BUCKET -- REVOKE: GAFTEK DID NOT GET JOB 7/16/07 COPI - MULLINS REPLACED FLAPPER 7/16/07 UPGRADE REGN FOR CTI MULLINS TO REPLACE SPILL BUCKET AND DROP TUBE ON RNL SLAVE TANKxkÃDÂ$,ÂÁ$xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿºREPLACED 2 BLOWN BULBS IN VEEDER ROOT CONSOLE. LOWERED SENSOR IN 6-2 SUMP. BRINE SOLUTION ALL ANNULAR SPACES. LENGTHENED LOWER SECTION OF 6-1 DROP TUBE. CLEANED ALL SPILL BUCKETS. -MLG xkÃEÂQMÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃFÂ2ÂÂ]xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃGÂ^ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃHÂY[ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃIÂY#ÂÂ]xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃJÂXDÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃKÂLÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃLÂ]UÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃMÂYÂÂ]xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃNÂ]LÂÂ]xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃOÂQ0ÂÂ]xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÂYÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿèCOPPER S&R LINES FEED FURNACE; DW FLEX PIPING TO DISPENSER. SPACERS INSTALLED. UPDATED TO PASSING 7/25/07 PER INSPECTION UPDATE DATED 6/27/07 BY TIM SOUCY, REPLACED ONE LINE WITH A COATED LINE, NOW PASSING. TRxkÃQÂ12ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃR /ÂÂDxk xk Âxkþÿþÿþÿþÿþÿþÿþÿd TANK READING: TANK 5: -1.33, -1.35, -1.39; TANK 6: -1.46, -1.39, -1.36; TANK 7: -1.48, -1.45, -1.38xkÃSÃ5\ xkxk Âxk þÿþÿþÿþÿþÿþÿþÿ#DISPENSERS HAVE BEEN REMOVED. -MLGxk ÃTÂJ xkxk Âxkþÿþÿþÿþÿþÿþÿþÿd TANK READING: TANK 4: -1.06, -1.04, -1.06; TANK 5: -1.15, -1.16, -1.15; TANK 6: -1.16, -1.15, -1.15xkÃUÂD xkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃVÃW xkxk ÂxkÃ[þÿþÿþÿþÿþÿþÿö8/2/10-NOITR REC'D, CTI KANE WILL PULL TANKS, TODD COFFIN TO DO SA-PH 11/5/08-LETTER FROM THE LAWYER OF THE ESTATE OF DECEASED OWNER. LAWYER RECIEVED AI NOV. ESTATE IS INSOLVENT. IF BUYER IS FOUND, THEY WILL BE TOLD TO CONTACT DEP ABOUT TANKS-PHxkÃWÁK xkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃXÂ18 xkxk Âxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.87xkÃYÂ#) xkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃZÃV xkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ[ÃJAÂÂKxkxk Âþÿþÿþÿþÿþÿþÿþÿþÿ‘06/07/11: OPERATOR - TOM SEVERANCE, 780-3050. -WP SHOULD HAVE SENSOR IN PIPING SUMP-PRESSURIZED RETURN LINE. NO OVERFILL PROTECTION VISIBLE. MLGxkÃ\Â$=ÂÂKxkxk ÂxkÃ'KþÿþÿþÿþÿþÿþÿþÿxkÃ]ÃW'ÂÂxkxk ÂþÿÃKaEþÿþÿþÿþÿþÿþÿºUNABLE TO REMOVE SUMP COVER FROM TANK 1-SEVERAL INCHES OF ICE OVER IT. UNABLE TO CHECK TANK 2 INTERSTITIAL PROBE, MANWAY FULL OF ICE. TANK 2 PIPING SUMP PROBE IS DAMAGED-NOT FUNCTIONING. SUMP HAS SEVERAL INCHES OF WATER IN IT. LEAK DETECTOR CONSOLE- VEEDER ROOT ILS 250- IS A 4 CHANNEL UNIT. THERE ARE 5 PROBES WIRED INTO IT. THE UNLEADED AND SUPER PIPING SUMP PROBES SHARE A CHANNEL; THE PROBES RESPOND INTERMITTENTLY. BALL FLOAT IN TANK 1-1 HAS NO REMOVAL PIN SO CANNOT INSPECT-UNABLE TO REMOVE VAPOR RECOVERY POPPETTT TO INSPECT TANK 1-2 BALL FLOAT, SOIL FROZEN AROUND FITTING. BALL FLOAT IN TANK 2-1 IS ONLY 13", SHOUDL BE 15". METERS DRIPPING ON #1 UNLEADED DISPENSER AND #5 DIESEL PUMP. -MLGxkÃ^ÃÂÂKxkxk ÂxkÂ6[þÿþÿþÿþÿþÿþÿþÿxkÃ_ÂB'ÂÂXxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ`ÂCÂÁ"xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿLORRIE FROM THE TOWN OFFICE CALLED ON 11/11/2008, HAVING AI DONE NEXT WEEK. WADLEIGH'S HAD BEEN DOING ANNUAL INSPECTION FOR CUSTOMERS, BUT IS NO LONGER PROVIDING THAT SERVICE SINCE DEAD RIVER BOUGHT OUT WADLEIGHS. GOING TO FAX IT IN ASAP. -LW LID TO BUCKET SEAL BROKEN 8" TANK READING: -1.21, -1.19, -1.25 8/21/07 COPI - CTI GIFFORD INSTALLED 5 GAL SPILL BUCKET. ONLY 11" BET CENTER OF FILL PIPE AND CENTER OF INTERSTITIAL RISER, TANK BURIAL DEPTH WOULDN'T ALLOW SUFFICIENT UNDER CLEARANCE FOR DEEPER BUCKET.xkÃ'Â? xjxjÂxjþÿþÿþÿþÿþÿþÿþÿ#62 DISPENSER CHECKED FOR WEEPS AND LEAKS? FAIL RNL METER ON PUMP #1 LEAKING AROUND SHAFT. METER REPLACED BY CTI KANE ON 6/21/06xjÃaÃ/]ÂÁ"xkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃbÂUÂÂ!xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃcÂZ/ÂÂ!xkxk Âxkþÿþÿþÿþÿþÿþÿþÿ"INSPECTOR ACTUALLY ANTHONY COUTURExkÃdÂX^ÂÂ!xkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃYÂÂRxkxk Âxkþÿþÿþÿþÿþÿþÿþÿ¥DROP TUBE DIFFICULT TO REMOVE, HAD TO USE SLIDE HAMMER DUE TO CORROSION. SUCTION/RETURN STEEL FIXTURE INTO TANK BADLY CORRODED. STEEL CAP NEEDS TO BE REPLACED. -MLGxkÃÂDÂÂRxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃQÂÂRxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃÂÂXxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ;ÂÂXxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃà =ÂÂ)xk xk ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃà $ÂÂSxk xk Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃÃ5# xk xk Âxj Ã9%þÿþÿþÿþÿþÿþÿþÿxj à ÃU)ÂÂxkxk Âxkþÿþÿþÿþÿþÿþÿþÿ SIT HAS A SUCTION SYSTEM. DOUBLE WALL PIPING AND SUMPS INSTALLED IN CASE SITE CHANGED TO PRESSURE SYSTEM. NOT REQUIRED AT THIS TIME. NO SENSORS IN SUMPS. -MLG xkà Â%; xk xk Âxj à cSþÿþÿþÿþÿþÿþÿþÿxj à Â^ÂÂUxk xk Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à à SÂÂ)xk xk Âxj þÿþÿþÿþÿþÿþÿþÿ*INSPECTION DATE IS ACTUALLY 11/21/2005. BBxj à ÃaÂÂ)xk xk ÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjÃà 'ÂÂ\xk xk Âxj þÿþÿþÿþÿþÿþÿþÿSHOULD BE A 2007 INSPECTION. BBxj ÃÂ-ÂÂ)xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ[HAD OIL IN BOTTOM OF PIPING SUMP APPROX. 3/8" ON DEEP SIDE TO 0" IN MIDDLE OF SUMP-CALLED IN OIL TRUCK TO FILL TANK AND CHECK FOR LEAK-FORMAL LEAK IN 4" NIPPLE STAND, OFF FOR 3/4" IRON SUCTION AND RETURN LINE- A SLAG HOLE AT WELDED JOINT. 2-3/4" DIAMETER COPPER LINES INSIDE OF 1-2" DIAMETER FIBERGLASS PIPE. CANNOT SEE OR FEEL FOR SPACERS. -MLG SPOKE WITH JIM HOPLER, THEY INTEND TO MAKE REPAIRS BUT NEED SOME TIME. WE TALKED ABOUT GOING ABOVE GROUND. COULD BE MORE FLEXABLE WITH THAT. TED PIPING REPLACED 8/23/07, UPGRADE TO PASS AI 8/23/07 COPI - CTI SIMS INSTALLED ENVIRON GEO FLEX PLUS PIPINGxkÃÂBEÂÁxk xk Âxk þÿþÿþÿþÿþÿþÿþÿL#20 OMNTEC ELP21LU2 HAS RED INDICATOR LIGHT OUT ON INTERSTITIAL SPACE. -MLGxkÃÃ]ÂÂxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃà b xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂQ.ÂÂ]xkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃaRÂÂLxk xk Âxk þÿþÿþÿþÿþÿþÿþÿÄAPPROXIMATELY TWO GALLONS OF WATER REMOVED FROM TANK 4-1 SUMP. DIRT CLEANED FROM OUTSIDE RIM OF SUMPS SO WATER WILL DRAIN AWAY FROM LID AND GASKET. CLEANED DIRT AND SALT FROM SPILL BUCKETS. -MLGxk Ã'à ÂÂ\xjxjÂxkþÿþÿþÿþÿþÿþÿþÿWCTI AARON THORNDIKE: COPPER SUCTION/RETURN LINES ISOLATED BY SPACERS ON DATE INDICATED.xjÃÂMÂÂXxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ7REPLACED FILL CAP AND 4" EXTRACTOR VALVE CAP, DUE TO NOT BEING LIQUID TIGHT. REMOVED AND RECOMMENDED THAT WATER AND DEBRIS BE KEPT OUT OF SPILL BUCKETS. STAGE 1 VAPOR RECOVERY NOT REQUIRED ON TANK-LESS THAN 10,000 GALLONS PER ANY MONTH AND LESS THAN 50,000 GAL PER YEAR PUMPED. TANK READING: -1.58, -1.29, -1.36xkÃÂXÂÂXxk xk Âxkþÿþÿþÿþÿþÿþÿþÿb7/16/08 COPI - CTI MIKE LEWIS REPLACED SPILL BUCKET TANK 5-REMOVED LESS THAN ONE GALLON OF WATER FROM PIPING SUMP; CLEANED LID GASKET AND SURROUNDING AREA TO FACILITATE PROPER LID SEAL. REPAIRED CONNECTIONS ON TANK ANNULAR SPACE SENSOR WIRING, DUE TO THEM BEING FAULTY. TANK 7- TANK ANNULAR SPACE CONTAINED EXCESS BRINE SOLUTION, WHICH WAS REMOVED. REMOVED AND CLEANED GAUGING PROBE TO FACILITATE PROPER OPERATION. TANKS 5 & 7- REPLACED FILL CAPS DUE TO FAULTY CAPS AND ADAPTERS. TANKS 5, 6, 7- REMOVED WATER FROM SPILL BUCKETS. TANK 6- TANK BOTTOM CONTAINS .5" WATER, WHICH WAS RECOMMENDED FOR REMOVAL. -MLGxkÃÃBÂÂ\xk xk ÂxkÃ=þÿþÿþÿþÿþÿþÿDTANKS 4, 5, 6 - REPLACED FILL CAPS DUE TO NOT BEING LIQUID TIGHT. TANK 4 - REMOVED WATER/FUEL FROM SPILL BUCKETS; RECOMMENDED KEEPING CLEAN AND DRY. TANKS 5 & 6- REPLACED VAPOR RECOVERY CAPS DUE TO NOT BEING LIQUID TIGHT. -MLG TANK READING: TANK 4: -1.1, -1.03, -1.08; TANK 5: -1.03, -1.07, -1.07; TANK 6: -1.03, -1.09, -1xkÃÂ6&ÂÂ\xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ_REMOVED WATER FROM AND CLEANED PIPING SUMP, WHICH HAD CONTAINED A SMALL AMOUNT OF WATER, POSSIBLY FROM CONDENSATION. REMOVED EXCESS SAND/DEBRIS FROM PIPNG SUMP MANHOLE. REMOVED AND CLEANED WATER FROM SPILL BUCKETS, RECOMMENDED KEEPING CLEAN AND DRY. REMOVED AND CLEANED SMALL AMOUNT OF WATER FROM DISPENSER PAN. -MLG TANK READING: -1.03, -1.07, -1.02xkÃÃAÂÂTxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂSSÂÂ`xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃUÂÂ`xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ7COULD NOT REMOVE COVER TO CHECK HIGH LEVEL ALARM. -MLGxkÃÂSVÂÂ`xk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿLSUMP PROBE HAS BEEN REMOVED. DON'T KNOW WHO DID IT OR WHY IT WAS DONE. -MLGxkÃÂSTÂÂ`xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ=BAD WIRE FROM SUMP TO INSIDE. WIRING NEEDS REPLACEMENT. -MLGxkÃÃS0ÂÂ)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿÄSUMPS HAD WATER IN THEM/ DISPENSER SUMPS DRY. LOOKS AS THOUGH VENT PIPING HAD SECONDARY CONTAINMENT COMING IN FROM THERE. REPLACED SENSOR IN 1-2 SUMP. 1-2 SUMP LID CRACKED 35" TC. ALL SPILL BUCKETS CLEANED OUT. FILL COLLAR REPLACED ON 1-3. -MLG 10/17/07 UPGRADE REGN FOR CTI MULLINS TO REPLACE ALL SUMP COVERS SPOKE W/RODNEY FROM PETROSERVICE, THEY ARE ON SITE MAKING REPAIRS TO THE SYSTEM, BOOTING THE VENT PIPE TO TRY TO KEEP WATER OUT OF THE SUMP, ALSO INSTALLING NEW COVERS. IF THIS CURE DOESN'T WORK IRVING MAY CLOSE FACILITY, IT IS UNLIKELY THEY WILL DO A TANK TOP UP UPGRADE DUE TO LOW VOLUME FACILITY. 10/25/07 TR 10/25/07 COPI - CTI MULLINS SEALED ALL SUMPS, PUT 3 NEW LIDS ON SUMPSxkà Â:$ÂÂ)xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Â7ÂÂ)xk xk ÂxkÃ"3þÿþÿþÿþÿþÿþÿ¸5/10/07 COPI - CTI LEGASSE JR REPLACED SNL DROP TUBE & RISER, REPLACED SPILL BUCKET SALES: DIESEL 2598 +/- -26 PASS, LOW THROUGHPUT; BLEND 50964 +/- -92 PASS. THIS LOCATION HAS CSLD SOFTWARE INSTALLED. REPLACED BLOWN POWER BULB IN MONITORING CONSOLE. AS SUMPS HAVE DIRT BOTTOMS, VEEDER ROOT IS USED ONLY FOR PROBES AND OVERFILL ALARMS. CLEANED SPILL BUCKETS. TANK 7-1 HAD ELECTRONIC AS WELL AS DROP TUBE. SINGLE WALL FIBERGLASS PIPE WITH FLEXORS AT BOTH ENDS-FLEXORS ARE NOT COATED AND ARE IN CONTACT WITH SOIL. PER PHONE CALL TO DEP, THIS IS STILL A PASS. ONE VAPOR ATTACHMENT POINT. DISPENSERS 7&8 CRASH VALVE ANCHOR WAS NOT ATTACHED TO CRASH VALVE-REPAIRED. CRASH VALVE HEIGHT MARGINAL. -MLGxkÃ"Ã7ÂÂXxk xk Âxkþÿþÿþÿþÿþÿþÿþÿß9/29/10-NOITR REC'D FOR CTI BEAUMONT TO REMOVE TANKS AND PIPING AND FESSENDEN TO DO SA-PH 8/9/10-KAREN THORNDIKE CALLED, THEY ARE NOW PLANNING TO PULL TANKS AND PIPING, THEY ARE WORKING WITH DYSARTS TO MAKE ARRANGEMENTS-PHxkÃ#à 1ÂÁ"xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿH11/10/08-CTI MULLINS DID AI-FAILED FOR WHISTLE THAT IS NOT ACCESSABLE-PHxkÃ$Ã$_ÂÂTxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%ÂIbÂÂ)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ¥5/1/08-FAILING AI FOR GUAGE STICK-PH NO ONE AVAILABLE FOR COPIES OF SIA REPORT. CLEANED WATER OUT OF 5-1 SPILL BUCKET. -MLG TANK READING: TANK 5-1: -1.01, -1, -.97xk Ã&à ÂÂXxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ´REMOVED WATER/FUEL FROM SPILL BUCKETS. TANK HAS REMOTE FILL-NO SPILL CONTAINMENT AT REMOTE FILL, RECOMMENDED WALL-MOUNTED OR FREE-STANDING SPILL CONTAINMENT WITH LOCKING LID. -MLGxkÃ'ÂY ÂÂ]xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ( bÂÂYxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: .89, .9, .91xkÃ) aÂÂYxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*ÃEJÂÁ"xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ²INSPECTION SAYS FAIL DUE TO NO SPACERS BETWEEN COPPER PIPING, BUT SYSTEM WAS INSTALLED BEFORE SPACERS WERE REQUIRED IN 1991, SO IT PASSES. -MLG TANK READING: -.962, -.951, -.892xkÃ+Â@`ÂÂ)xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ@SUMPS TOO FULL OF WATER TO FIND OUT WHERE ALL THE WATER IS COMING FROM. LID ON 5-3 SUMP IS CRACKED. DISPENSER SUMP ALSO HAS SOME WATER. ALL SPILL BUCKETS FULL OF WATER AND DIRT. -MLG CTI JON PAINE: REPLACED LEAKING METER ON #6 DIESEL AND CLEANED FUEL AND WATER FROM DISPENSER PUMP. CLEANED ALL SPILL BUCKETS AND SUMPS.xk Ã,Â*NÂÁ$xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿB2/22/10-LONG FORM REC'D FOR REPLACEMENT AND INSTALLATION OF NEW APT PIPING ON K1 TANK ONLY-CTI GREENWOOD TO DO WORK PH 2/9/09-CTI RENAUD FAILED TANK 10-NOT SURE WHY (TURNS OUT IT WAS A MISTAKE, THE TANK SHOULD HAVE BEEN PASSING)-PH; ATG CHECKED BUT NO PRINT OUT SUPPLIED-PH 11/17/08-LONG FORM RECIEVED TO MANIFOLD REGULAR TANKS TOGETHER, INSTALL SUMP ON ONE OF TWO REGULAR TANKS, WITH NEW STP AND PLLD, WITH CHECK VALVE INSTALLED ON SLAVE TANK-PH SALES APRIL: BLEND- 37005 +/- 193, PASS; DIESEL- 1330 +/- 9, PASS; KERO- 3142 +/- 32, FAIL; MARCH KERO- 2662 +/- 28, FAIL; BLENDED- 37005 +/- 193, PASS. SUMPS LOOK VERY GOOD. CLEANED SPILL BUCKETS. ACKNOWLEDGE PUMP 13 OUT-SYSTEM WORKS OKAY. MIX AND MATCH WITH LINE LEAK DETECTORS. FILTER LEAKING UNDER 5&6, SO IT WAS CHANGED. REMOTE ACCESS TO PROGRAMMING WAS OFF-REPROGRAMMED FOR CORRECT LINE LENGTH. CATHODIC PROTECTION, TEST SPOT PROBE RISER -1.17, FILL PIPE -.89, TEST LEAD -.94 -MLG TANK READING: TANK 6-1: -1, -.99, -1; TANK 7-1: -1.3, -1.08, -1.1; TANK 8-1: -.96, -.93, -.99; TANK 9-1: -.98, -.99, -1.16; TANK 10-1: -1.17, -.89, -.94xkÃ-ÃÂÁ$xk xk ÂxkÄYaþÿþÿþÿþÿþÿþÿ?SALES MAY: 6-1 PREMIUM- 11893 +/- 38, PASS; 7-1 UNLEADED- 134815 +/- 347, PASS; 8-1 DIESEL- 4468 +/- 6, PASS. HAS CSLD ALL SHOW PASS BUT NOT USING FOR RELEASE DETECTION. ONLY DIESEL HAS A SUMP THAT IS WATER TIGHT AND TIED INTO VEEDER ROOT, OTHERS HAVE DIRT BOTTOMS. REMOVED BOOT OVER DOUBLE WALL PIPE SO PRODUCT WOULD FLOW TO 8-1 SUMP IF IN THE LINE. BALL WAS MISSING IN 7-1 BALL FLOAT, SO IT WAS REPLACED AND REPAIRED. CLEANED AND PAINTED SPILL BUCKETS. REPLACED MAIN HOLE LID ON 7-1 VAPOR MAN HOLE OPW 104-12. ALL CRASH VALVES WERE TOO LOW, SO CORRECTED VALVE HEIGHT. -MLGxkÃ.Â[7ÂÁ$xkxk ÂxkÄþÿþÿþÿþÿþÿþÿÙMIDDLE SUMP SENSOR WAS NOT POSITIONED CORRECTLY (TOO HIGH), SO IT WAS SET TO BOTTOM OF THE TANK. CLEANED AND PAINTED ALL SPILL BUCKETS. REPLACED VAPOR CAP 5-1. REPLACED VAPOR ADAPTOR 5-1. REPLACED FILL CAP 6-1. -MLG xkÃ/Â[OÂÁ$xkxk ÂxkÄ%þÿþÿþÿþÿþÿþÿ¤SALES: REGULAR- 106778 +/- 272, PASS; PREMIUM- 2542 +/- 7, PASS. GOOD PAPERWORK ON FILE. CLEANED SPILL BUCKETS. REPLACED FILL CAP 1-1. OLD STAINING ON METERS. -MLGxkÃ0Â[@ÂÁ$xkxk ÂxkÄ)þÿþÿþÿþÿþÿþÿ<LOWERED TWO SUMP SENSORS TO BOTTOM OF SUMPS, 6-1 AND 7-1. REPLACED MONITORING CAP FOR INTERSTITIAL 7-1. REPLACED BALL ON BALL FLOAT-IT WAS FULL OF GAS. CLEANED AND PAINTED SPILL BUCKETS. 7-1 VAPOR ADAPTER REPLACED. 6-1 GASKET UNDER VAPOR ADAPTOR REPLACED. OLD STAINING ON METERS AND UNION UNDER DISPENSERS 5&6. -MLGxkÃ1Â[EÂÁ$xkxk ÂxkÄ 3þÿþÿþÿþÿþÿþÿéAPRIL SALES: REGULAR- 88263 +/- 30, PASS; PREMIUM- 5973 +/- 8, PASS. CLEANED & VACUUMED CONSTRUCTION DEBRIS OUT OF SUMPS. 1 ELECTRICAL CONDUIT OPEN WITH EXPOSED WIRES-CUT AND TAPED WIRES, SEALED CONDUIT. OLD STAINING ON METERS. -MLGxkÃ2Â3ÂÂXxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ3ÂRFÂÁ$xkxk Âxk ÃVþÿþÿþÿþÿþÿþÿ–FEB SALES: REGULAR- 68685 +/- 279, PASS; PREMIUM- 1964 +/- 18, PASS.LOWERED PREMIUM SUMP SENSOR 3" TO BOTTOM OF TANK 1-1. CLEANED SPILL BUCKETS. -MLGxk Ã4Â[/ÂÁ$xkxk ÂxkþÿþÿþÿþÿþÿþÿþÿòJANUARY SALES: REULAR- 176098 +/- -324, PASS; PREMIUM- 6973 +/- -28, PASS. REPLACED MISSING PIPE CLAMPS ON CONDUIT 1-1 SUMP AND LARGE CLAMP 2-1. MINOR STAINS ON CRASH VALVES. YEARLY THROUGHPUT NOT ON SITE, MONTHLY THROUGHPUT 183,00 GAL. -MLGxkÃ5Â[MÂÁ$xkxk Âxk Ã[þÿþÿþÿþÿþÿþÿŠMARCH SALES: REGULAR- 72984 +/- -157, PASS; PREMIUM- 1790 +/- 15, PASS. CLEANED SPILL BUCKETS. REPLACED CAP AND ADAPTER ON TANK 3-1. -MLGxk Ã6Â[9ÂÁ$xkxk ÂxkÄ[þÿþÿþÿþÿþÿþÿ~REPLACED TANK MONITORING CAP ON TANK 4-1. CLEANED AND PAINTED SPILL BUCKETS AND COVERS. OLD STAINS ON METERS AND PIPING. -MLGxkÃ7Â[GÂÁ$xkxk Âxk ÄþÿþÿþÿþÿþÿþÿœMARCH SALES: REGULAR- 79300 +/- 259, PASS; PREMIUM- 1846 +/- 6, PASS. CLEANED SPILL BUCKETS. REPLACED VAPOR CAP-UNIONS WET BUT NOT WEEPING OR LEAKING. -MLGxk Ã8Â[1ÂÁ$xkxk Âxk ÃCþÿþÿþÿþÿþÿþÿ´INVENTORY FOR 2008 IS ALL MESSED UP-IN CONTACT WITH GLIDDEN PH JAN SALES: REGULAR- 54399 +/- 226, PASS; PREMIUM- 1516 +/- 4, PASS. MARCH SALES: REGULAR- 57964 +/- -7270, FAIL; PREMIUM- 1523 +/- 54, LOW THROUGHPUT. BOOKEEPING ERRORS. NEED A NEW GAUGE STICK. LEFT VOICEMAIL FOR DEP INSPECTOR LIZA WOODWARD. TANK 2-1 SENSOR WAS TOO HIGH, SO LOWERED TO BOTTOM OF SUMP. BALL FLOATS CAME OUT WITH DIFFICULTY. VAPOR CAP ON 3-1 WAS HITTING COVER, SO IT WAS LOWERED. FILTERS HAVEN'T BEEN CHANGED SINCE 2003. REPLACED FILL CAP 2-1. CTI DENNIS DAVIS: MADE SEVERAL TRIPS TO LOCATION TRYING TO STRAIGHTEN OUT SIA. MAY SALES: REGULAR- 81216 +/- 283; PREMIUM- 1303 +/- 51; BLEND- 82519 +/- 334; OK. -MLGxk Ã9Â[FÂÁ$xkxk Âxk ÄLþÿþÿþÿþÿþÿþÿ×FEB SALES: REGULAR- 146707 +/- -8, PASS; PREMIUM- 7406 +/- 10, PASS. REMOVED WATER FROM 2-1 AND 3-1, CONTACTED DEP. CLEANED FUEL AND WATER FROM 1-1 BUCKET. CLEANED ALL SPILL BUCKETS. REPLACED FILL CAP ON 3-1. -MLGxk Ã:Â[HÂÁ$xkxk ÂxkÄ3þÿþÿþÿþÿþÿþÿuMARCH SALES: REGULAR- 121171 +/- 203, PASS; PREMIUM- 6854 +/- 14, PASS. REPLACED 2-1 104A VAPOR MANHOLE COVERS. -MLGxkÃ;Â[JÂÁ$xkxk ÂxkÄþÿþÿþÿþÿþÿþÿ»THERE IS A TRANSITION SUMP BETWEEN TANKS AND ISLAND W/SENSOR-ALL LOOKED VERY GOOD AND WORKED WELL. CLEANED ALL SPILL BUCKETS. INSTALLED SNAP TAP CONNECTOR ON REGULAR LINE TO TEST LLD; PREMIUM LINE ALREADY HAD ONE. REPLACED CAP AND COVER ON 6-1 VAPOR RECOVERY: 1-EBW COVER. -MLG 2/28/08 UPGRADE REGN FOR CTI LEGASSE TO REPLACE "5 GAL VAPOR SPILL DAMAGED BY PLOW" 3/3/08 COPI - CTI LEGASSE SR INSTALLED EBW 5 GAL SPILL BUCKET FOR VAPOR RECOVERYxkÃ<ÃÂÁ$xkxk ÂxkÃ]3þÿþÿþÿþÿþÿþÿ§MARCH SALES: REGULAR- 74837 +/- 94, PASS; PREMIUM SALES- 2483 +/- 15, PASS. PAINTED SPILL BUCKET COVERS. REPLACED VAPOR ADAPTOR ON 7-1, REPLACED FILL CAP ON 5-1. -MLGxkÃ=ÂR[ÂÁ$xkxk ÂxkÄþÿþÿþÿþÿþÿþÿ½MARCH SALES: REGULAR- 122847 +/- 214, PASS; PREMIUM- 5857 +/- 35, PASS. CLEANED SPILL BUCKETS. INSTALLED SNAP TAP CONNECTOR FOR REGULAR UNDER DISPENSER 11&12; PREMIUM ALREADY HAD ONE. -MLGxkÃ>Â[CÂÁ$xkxk ÂxkÄ[þÿþÿþÿþÿþÿþÿqREPLACED VAPOR CAP AND ADAPTER FOR 3-1. REPLACED VAPOR RECOVERY LID ON 5-1. MINOR STAINING ON MOST METERS. -MLGxkÃ?ÃÂÁ$xkxk ÂxkÃLþÿþÿþÿþÿþÿþÿïLOWERED SENSORS TO TANK SUMP BOTTOM IN 5-1 AND 6-1. REPLACED SENSOR IN 4-1 SUMP, IT WAS FOR A STEEL TANK. INTERSTITIAL SENSOR IN 6-1 WAS LABELED AS A SUMP SENSOR CONNECTED IT. CLEANED AND PAINTED SPILL BUCKETS. REPLACED FILL CAP 5-1. -MLGxkÃ@ÃLÂÁ$xkxk Âxk Ä þÿþÿþÿþÿþÿþÿÑNEW GAUGE STICK. MARCH SALES: REGULAR- 81907 +/- 34. PIN HOLE FOR VENT RUSTED IN ON 4-1, SO REDRILLED IT OUT. LOTS OF WET LEAVES IN SPILL BUCKETS, CLEANED THEM OUT. OLD STAINS ON CRASH VALVES AND METERS. -MLGxk ÃAÂ[6ÂÁ$xkxk ÂxkÃdþÿþÿþÿþÿþÿþÿ¢REMOVED SMALL AMOUNT OF WATER FROM 4-1 AND 6-1 SUMP- BOTH WERE IN ALARM. CLEANED SPILL BUCKET BUT DID NOT PAINT THEM DUE TO RAIN. REPLACED VAPOR CAP ON 6-1. -MLGxkÃBÂ[:ÂÁ$xkxk ÂxkÃIQþÿþÿþÿþÿþÿþÿÍTHERE ARE DISPENSER PAN SUMP SENSORS (2) FOR EACH DISPENSER- EVERYTHING WORKED WELL. CLEANED AND PAINTED SPILL BUCKETS. CLEANED SUMPS. REPLACED 1611AU VAPOR ADAPTER ON 5-1. REPLACED VAPOR CAP ON 5-1. -MLGxkÃCÃÂÁ$xkxk ÂxkÄþÿþÿþÿþÿþÿþÿ§FEB SALES: REGULAR- 220473 +/- -604; PREMIUM- 9547 +/- 4. 1-1 AND 1-2 SIPHONED TOGETHER. LEAK DETECTOR WORKED WELL. REPLACED VAPOR ADAPTER AND VAPOR CAP ON 1-1. -MLGxkÃDÂ[-ÂÁ$xkxk ÂxkÄ þÿþÿþÿþÿþÿþÿáMARCH SALES: REGULAR- 162588 +/- 219, PASS; PREMIUM- 5246 +/- -24, PASS; TANK 1-1 AND 1-2 SYPHONED TOGEHTER. REPLACED FILL COVER ON 3-1. LEAK DETECTORS WORKED WELL. REPLACED VAPOR MANHOLE COVERS 104A-12" ON 1-1 AND 2-1. -MLGxkÃEÂ$/ÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃFÃd9ÂÂXxk xkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃGÃ3)ÂÁ"xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿžNO BAILER PRESENT, NO MONITORING LOG, NO WATER IN MONITORING WELL, AND WELLS NOT MARKED OR SECURE. UNABLE TO GET INTO BASEMENT TO INSPECT COPPER PIPING. -MLGxk ÃHÂB xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃIÂ# xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃJÃ]S xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃKÃbV xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃLÃ5 xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃMÂ>D xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.93, -.93, -.93xkÃN Â xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ(-1.01 TANK READING: -1.06, -1.01, -1.04xkÃOÃ^K xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÃ:R xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃQÂ&) xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -1.11, -1.03, -1.07xkÃRÂcI xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.01, -1.03, -1xkÃSÂ3 xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃTÂ3 xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ¶12/2/08-COPI REC'D FOR CTI MULLINS TO INSTALL NEW CONSOLE-OMNTEC, AND ADJUSTED WHISTLE AND MADE INTERSTITIAL ACCESSABLE AT GRADE-PH SCULLY FILL. -MLG TANK READING: -.85, -.86, -.85xkÃUÂV] xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃVÂ\L xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿbOPERATOR STATES TANK WILL BE REMOVED-THEY ARE SWITCHING TO NATURAL GAS. -MLG NOI RECEIVED 6/26/07xkÃW xkxkÂxkÃ3þÿþÿþÿþÿþÿþÿÉ7/16/10-NOITR REC'D FOR CTI SIMS TO SUPERVISE REMOVAL OF REMOVAL, FESSENDEN TO DO SA-PH SUCTION SYSTEM. TANK READING: TANK 5-1: -.94, -1.01, -.93; TANK 6-1: -.91, -.9, -.92; TANK 7-1: -.91, -.92, -.91xkÃXÂQ5ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$ÃH]ÂÂKxjxjÂxkþÿþÿþÿþÿþÿþÿþÿ¦CP FAIL LETTER 12/19/06 -ML INSPECTION UPDATE BY LETELLIER 5/21/07 CP FAILED AGAIN -.64; DRY CONDITIONS. CTI HOWE & ELLIOTT RETESTED 6/6/07 AFTER WATERING -.859. -MLxjÃYÂ^?ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃZÃR0ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ[ÃW_ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ,TANK 1 SPILL BUCKET WAS FULL OF WATER. -MLGxkÃ\Ã/SÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ] 10/11/07 COPI - CTI DAVIS INSTALLED TLS350 - 3 INTERSTITIAL SENSORS, 3 SUMP SENSORS, CONSOLExkÃ]Â]MÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã^Â]OÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã_Â2ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã`Ã@ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ^ TANK READING: TANK 1-1: -1.02, -1.01, -1.02; TANK 2-1: -.9, -.9, -.9; TANK 2-2: -.9, -.9, -.9xkÃaÃH  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃbàxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -1.06, -1.05, -1.06xkÃcÂ!D xkxkÂxkÂC+þÿþÿþÿþÿþÿþÿ TANK READING: -.93, -.9, -.91xkÃdÃ= xkxkÂxkÃ#þÿþÿþÿþÿþÿþÿSUCTION SYSTEM.xkÃÂAU xkxkÂxk Ä þÿþÿþÿþÿþÿþÿ5/14/07 COPI - CTI SIMS REPLACED RNL SPILL BUCKET FAILING TANKS REMOVED 11/1/07 APRIL SALES: REGULAR- 49948 +/- -296, PASS; SUPER- 5020 +/- -72, FAIL; PLUS- 4287 +/- -23, PASS; DIESEL- 4585 +/- 105, FAIL. REPLACED NEW GAUGE STICK. REPLACED POWER BULB (SEVERAL OTHER BLOWN BULBS ON TOP OF CONSOLE). DIESEL SENSOR WAS SET 1 FOOT HIGH. DIESEL SUMP TAKING ON WATER THROUGH ELECTRICAL CONDUIT. REGULAR DROP TUBE 7 1/2" FROM BOTTOM. WATER IN DISPENSER PANS. 4" PLASTIC PLUG IN TANK SUMPS- SHOULD BE STEEL. -MLG CTI DAVIS REPLACED DROP TUBE 7/26/07xk ÃÂÂÂUxk xkÂxkþÿþÿþÿþÿþÿþÿþÿLCTI BISKUPIAK INSTALLED 2-15 GAL SPILL BUCKETS 6/25/07 TO CORRECT FAILURE. xkÃÃXJÂÂUxk xkÂxkþÿþÿþÿþÿþÿþÿþÿPREMOVED 30 GALLONS AND REPORTED GASOLINE IN SUPER SUMP. LEAK APPEARED TO BE COMING FROM OLD PLLD'S- REMOVED AND INSTALLED MLLD'S AND STRAIGHT PIPE. REMOVED ALL OLD PLLD'S AND INSTALLED NEW MLLD'S REGULAR AND SUPER AS 2 LEAK DETECTORS EACH. ADJUSTED RE-PRESSURIZATION VALVE WHICH WAS CAUSING A BYPASS IN THE LEAK DETECTION PROCESS. -MLGxkÃÂGHÂÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ‹NO SPACERS ON COPPER PIPING, NO LID ON SPILL BUCKET. -MLG CTI BISKUPIAK INSTALLED SPACERS AND REPLACED SPILL BUCKET LID 9/5/07 (AI UPDATE)xkÃÃ-aÂÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿoPIPING SUMP FILLED WITH WATER. NO SPACERS ON COPPER LINES. -MLG CLEANED OUT SUMP, INSTALLED COATED COPPER LINExkÃà ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ]SENSORS WERE PROGRAMMED WRONG- CORRECTED AND REMOVED 20 GALLONS OF WATER FROM THE SUMP. -MLGxkÃÂGKÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂbÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ30 GALLONS OF WATER IN SUMP AND WATER INTERSTITIAL ALSO. REMOVED WATER AND CLEARED ALARM, BUT THERE IS ABOUT 3' OF WATER IN INTERSTITAL. NO SPACERS ON COPPER PIPING. -MLG 8/14/07 UPDATE - REMOVED 5 GAL WATER FROM INTERSTITIAL AND RESET ALARM. SPACERS NOT REQUIRED, 7/91 INSTALL. -MLxkà ÂGLÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà  CÂÂxkxkÂxkÃ62Jþÿþÿþÿþÿþÿþÿþÿxkà ÂAÂÂxkxkÂxkÃ5U>þÿþÿþÿþÿþÿþÿþÿxkà Â@ÂÂxkxkÂxkÃ:þÿþÿþÿþÿþÿþÿþÿxkÃÂ[5ÂÁ$xkxkÂxkÄþÿþÿþÿþÿþÿþÿpLOADED PAPER IN VEEDER ROOT. REPLACED VAPOR CAP AND ADAPTER 5-1. OLD STAINING AT UNIONS UNDER DISPENSERS. -MLGxkÃ!DÃ.J ÂLxk xk Âxk þÿþÿþÿþÿþÿþÿþÿpCALLED TO SITE BECAUSE OF ALARM. REMOVED 4 OZ WATER FROM INTERSTICE, REINSTALLED SENSOR AND TESTED OK. ILS-300xk Ã!EÃ- ÂLxk xk Âxk þÿþÿþÿþÿþÿþÿþÿKREMOVED APPROX 2 QUARTS WATER FROM INTERSTITIAL AND REPLACED SENSOR. LU-2 xk Ã!FÃa( Â!xk xk Âxk þÿþÿþÿþÿþÿþÿþÿk6/26/07 COPI - CTI ARBOUR REPLACED BELL AND MALE FITTING INSIDE PIPING SUMP WITH FLEX AND 90 TO REPAIR LEAKxk Ã!GàÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!HàÂxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿÆTANK 2 SYPHON COULD NOT TEST LLD BECAUSE ONLY 5" PRODUCT IN TANK. OWNER PETER PERRY SAYS FACILITY UNUSED SINCE MID-JULY 07, RESUMING USE 10/1 AND CTI SCHEDULED TO RETURN TO TEST LLD AT THAT TIME -MLxk Ã!IÂA Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿÃINSTALLED 15 GAL SPILL BUCKETS ON TANKS 9 & 10 (8/20/07 COPI) CP READINGS: T6 -.86, -.89, -.92 T7 -.87, -.92, -.97 T8 -.89, -.9, -.95 T9 -.89, -.96, -.94 T10 -.86, -.87, -.95 T11 -.87, -.92, -.94xkÃ!JÂQQ Âxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿŠTANK 9 HAS LU1LF FOR HIGH LEVEL ALARM LOCATED OUTSIDE OF BUILDING PASSING UPDATE 9/6/07. COPI FOR INSTALL 15 GAL SPILL BUCKET ON TANK 7.xkÃ!KÃ' Âxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿºUSES WATER PASTE AND STICK TO CHECK. TANK 3 NO WATER IN WELLS; HAS LOG BUT CAN ONLY CHECK IN SPRING OR AFTER LOTS OF RAIN. 10/16/07 REGN FOR CTI LEGASSE TO REPLACE TANK 4 COPPER PIPINGxkÃ!LÁI Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿi9/5/07 COPI - CTI LEGASSE INSTALLED 15 GAL SPILL BUCKETS ON TANKS 6 & 7 PASSING INSPECTION UPDATE 9/6/07xkÃ!MÂK Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿïDSL INTERSTITIAL SENSOR NOT WORKING WASTE OIL GOES INTO A DRAIN W/DW ENVIROFLEX PIPE AND MONITORING. 9/12/07 UPDATE: EXCAVATED CONDUIT TO INTERSTITIAL SENSOR. REPLACED SECTION OF CONDUIT & PULLED NEW WIRES. REWIRED SYSTEM AND TESTED OK.xkÃ!Nà  Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!OÂ- Â)xk xk ÂxlþÿþÿþÿþÿþÿþÿþÿŒCP READINGS TAKEN FROM INTERSTITIAL RISER (-.691), BOTTOM OF TANK MIDDLE (-.491), BOTTOM OF TANK OPPOSITE END (-.491) 9/26/07 CP FAIL LTR -ML 10/16/07 RETEST FAILED -0.554 11/1/07 CP REPAIR/REPLACE BY 4/30/08 -ML 4/22/08 UPGRADE REGN FOR CTI ARBOUR TO INSTALL ANODES 5/6/08 ST.PETER DUG DOWN TO TANK TOP, DISCOVERED JACKETED TANK. FILE MATERIALS SUPPORT. INCORRECTLY ENTERED IN DATABASE AS CP.xk Ã!PÃ= Áxk xk Âxk þÿþÿþÿþÿþÿþÿþÿPUMPED WATER OUT OF ALL PIPING SUMPS AND TANK 6 RNL INTERSTICE WHILE ON SITE COULD NOT REMOVE BALL FLOATS ON TANKS 6&8. REMOVED AND PASSED 9/21/07 (CTI BUBAR AI UPDATE) CP READINGS: T6 -1, -1.01, -1.02 T7 -1.03, -1, -.99 T8 -.94, -.88, -.91 T9 -.96, -.92, -.96xkÃ!QÃ6+ Á$xk xk Âxk þÿþÿþÿþÿþÿþÿþÿTJUNE INVENTORY: DSL 48314 OVER 210; OFF-ROAD DSL 318 SHORT 124; RNL 19076 OVER 278. RNL DISPENSER 5 CRASH VALVE TOO LOW. PUMP WAS CONVERTED AND PIPING CHANGED SINCE LAST INSPECTION. CP READINGS: T1 -.79, -.77, -.84 T2 -.67, -.67, -.83 T3 -.84, -.84, -.86 AI/CP FAIL LETTER 9/26/07 -ML CTI ST.PETER INSTALLED ANODES VIA GEOPROBE 10/23/07xk Ã!RÃ_] Áxk xk Âxk þÿþÿþÿþÿþÿþÿþÿÃOPW 104-A 12" STEEL COVER FOR DSL INTERSTITIAL SPACE IS BROKEN, NEEDS REPLACEMENT RNL SPILL BUCKET OPW THREAD-ON STYLE - LID 14" OUTSIDE DIA, STEEL LID BROKEN, ABOUT 1/3 OF PLOW RING IS MISSING RNL BALL FLOAT HAS PIN HOLE IN BALL 9/26/07 AI FAIL LTR -ML 10/18/07 UPGRADE REGN FOR CTI BUBAR TO INSTALL SPILL BUCKET, BALL FLOAT 10/19/07 COPI - CTI BUBAR INSTALLED RNL SPILL BUCKET 10/19/07 UPDATE BALL FLOAT REPLACED 11/2/07 UPDATE SUMP SENSOR REPLACEDxkÃ!SÃN Á$xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿCLEANED OUT SPILL BUCKETxkÃ!Tà  Áxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!U Â Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!VÃ" Áxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ\9/26/07 AI FAIL LTR -ML INSPECTION UPDATE NOW SHOWS AS PASSING PER NICK GUAY, CTI. TRxk Ã!WàÂZxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ-TANK HAS BOTH FLAPPER AND ELECTRONIC OVERFILLxk Ã!XÃ# ÂZxk xk Âxk þÿþÿþÿþÿþÿþÿþÿoOMNTEC SUMP #2 SENSOR NOT WORKING, ALARM LIGHT OUT INCON TANK LEVEL PROBE SERVICE ALARM 9/26/07 FAIL LTR -ML 10/17/07 DAVID BRACKETT CALLED TO LET DEPARTMENT KNOW THEY HAVE TONY FROM PRECISION TANKS COMING OUT TO FIX SENSOR. I TOLD DAVID TO MAKE SURE HE GETS AN UPDATED INSPECTION REPORT AND TO SEND US A COPY. 11/12/07 AI UPDATE - CTI LEGASSE JR REPLACED SENSORSxk Ã!YÂ5( Â)xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿCLEANED OUT SPILL BUCKETxkÃ!ZÂO  Â)xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ–1" STEEL LINE FROM TANK TO VAULTED PUMPING STATION, WHICH HAS 1" DW FLEX LINES FEEDING INDIVIDUAL UNITS W/3/8" COPPER LINES IN RACEWAYS IN CONCRETE. xkÃ![Â! Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ&RNL TANK OUT OF SERVICE SINCE 12/13/06xk Ã!]Ã* Â)xk xk ÂxlþÿþÿþÿþÿþÿþÿþÿRING AROUND COVER ON TANK 1 BROKEN CP READINGS: T1 -.911, -.905, -.902 T2 -.852, -.861, -.861 T3 -.889, -.966, -.985 TANKS 1-3 REMOVED 1/17/08xkÃ!`Â$AÂÂRxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ9/17/09- CALL FROM OWNER, HE WAS INCORRECTLY TOLD BY DOGGET THAT THEIR NEW TANKS DID NOT NEED TO BE TESTED ANNUALLY, BECAUSE THEY WERE DOUBLE WALLED AND MONITORED. HE WILL HAVE THEM INSPECTED SHORTLY-PH TANKS 2, 3, 4 REMOVED 8/07, NEW TANK 5 INSTALLED 9/07xkÃ!b ÂXxk xk Âxk þÿþÿþÿþÿþÿþÿþÿMCLEANED OUT SPILL BUCKET, REPLACED FILL CAP TANK READING: -1.07, -1.12, -1.06xk Ã!cÃ9d ÂXxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ,REPLACED FILL CAP, NO SPACERS (NOT REQUIRED)xk Ã!dÃ-  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿREPLACED VR INDICATOR LAMPS TANK 9 PIPING SUMP ENTRY BOOT NOT LIQUID TIGHT TANK 9 SUMP CONTAINED SMALL AMOUNT OF FUEL (REMOVED). FUEL SOURCE APPEARS AT PIPING CONNECTIONS AT STP HEAD AND FLEX CONNECTORS - REPAIRED. 9/26/07 AI FAIL LTR -ML NOW PASSING PER CTI AARON THORNDIKE. TRxkÃ"Âd5ÂÂKxk xk Á`xkÃN þÿþÿþÿþÿþÿþÿþÿxkÃ"Ã8 ÂÂUxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÂdcÃ#ÂÂTxjxjÂWxjþÿþÿþÿþÿþÿþÿþÿTANK 15 RECORDED ON SEPARATE FORM ALL NOW PASSING PER CTI BOB TRASK. REPAIRS MADE TO INTERSTITIAL MONITORING AND ELECTRONIC OVERFILL SYSTEM. -TR 10/6/07 COPI - CTI COUTURE INSTALLED APT-XP 1.5" DW FLEX PIPING, OMNTEC LU-2, PIPING SUMP AND DSL DISPENSER SUMPxjÃ"ÃdJ  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ3CLEANED OUT SPILL BUCKET, REPLACED SPILL BUCKET LIDxk Ã" Â  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿYCLEANED OUT SPILL BUCKET, REPLACED FILL CAP TANK CONTAINS 1/2" WATER, RECOMMENDED REMOVALxk Ã"Ã]  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ`NEW FG PIPING SUMP INSTALLED BY MFR 8/07 CLEANED OUT SPILL BUCKET, REPLACED FILL CAP AND ADAPTERxk Ã"Ã- ÂÂ`xk xk ÂxkÃB^þÿþÿþÿþÿþÿþÿþÿxkÃ" Â26 Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã" ÃA Â\xk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿðCOPPER S/R LINES APPEAR TO BE BARE COPPER AI/CP FAIL LTR 9/28/07 -ML TANK READING: -.763, -.734, -.723 INSTALLED ASTS, UST OOS AS OF 1/08. WILL REMOVE UST BY JUNE 2008. NOTIFIED THAT FACILITY OUT OF COMPLIANCE UNTIL REMOVAL COMPLETE. -MLxk Ã" Â0 Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿÀSUMP CONTAINED LITTLE WATER (NOT ENOUGH TO ALARM) - REMOVED. WATER INFILTRATION AROUND LID DUE TO SAND/DEBRIS IN MANWAY - REMOVED AND SEALED LID. REPLACED FILL CAP, CLEANED OUT SPILL BUCKETxk Ã" Â;* Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã" ÂT Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿfREMOTE FILL W/FREE-STADING SPILL BUCKET. PETROMETER OVERFILL ALARM, FAULTY INDICATOR LIGHT REPLACED. xk Ã"Ã@` Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ¢VERY SMALL AMOUNT OF WATER IN TANK INTERSTICE, NOT IN ALARM - RESIDUAL FROM PREVIOUS WATER INTRUSION AT WIRE GRIP. REPLACED FILL CAP, CLEANED OUT SPILL BUCKET. xk Ã"Â92 Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿsREPLACED FILL CAPS, REMOVED AND CLEANED GAUGING PROBES, REPLACED 1-1 COAX FILL ADAPTER. CLEANED OUT SPILL BUCKETS.xk Ã"Â'1 Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"Â0A Á$xk xk Âxk þÿþÿþÿþÿþÿþÿþÿd9/26/07 AI FAIL LTR -ML REVIEW OF THE 2004 INSPECTION SHOWS THAT CTI BUBAR WAS PRESENT DURING A FILL AND THE WHISTLE BOTH WORKED AND WAS AT THE PROPER HEIGHT. SPOKE WITH THE MAINTENCE PERSON AND HE INDICATES IT IS STILL FUNCTIONING PROPERLY. THEY WILL HAVE GAFTEK QUOTE THEM TO CREATE ACCESS TO WHISTLE AND BUDGET IT FOR NEXT YEAR AND GET THE WORK DONE THEN. I APPROVED THIS CORRECTIVE ACTION. TR 10/4/07 10/11/07 UPGRADE REGN FOR CTI ARBOUR TO REPLACE VENT WHISTLE AND RISER; 12/3/07 UPGRADE REGN FOR CTI BUBAR TO DO WORK 12/18/07 COPI - CTI BUBAR INSTALLED NEW VENT WHISTLE AND ACCESSxk Ã"  xk xk Á`xk ÃK%Jþÿþÿþÿþÿþÿþÿþÿxk Ã"Ã]$ Â]xk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ"Ã3 Â]xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã" % Áxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿXCTI OBTAINED CP READINGS -0.91, -0.89, -0.88. COPI ON FILE FOR PERMATANK JACKETED TANK.xkÃ" Á$xk xk Âxk þÿþÿþÿþÿþÿþÿþÿŽCLEANED OUT SPILL BUCKET NEW DISPENSER - SUCTION LOOKS LIKE NEW ANODE RECENTLY INSTALLED; READING FROM TEST POINT INSIDE ANNULAR SPACE MANHOLExk Ã"Ã5<ÂÂxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿMAY 2007 DI: T1 13903 PUMPED, 93 SHORT T2 6538 PUMPED, 19 SHORT T3 DSL 1471 PUMPED, 19 SHORT - FAIL 10/2/07 AI FAIL LTR -ML 10/11/07 INSTRUCTED OWNER TO CALL DEP EACH TIME O/S >1%. BECAUSE LOW THRUPUT ISSUE, IF DO CONSISTENTLY WILL CHANGE INSPECTION TO PASS. -MLxkÃ"Ã\8 Âxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ*SPACERS INSTALLED - UPDATE TO PASS 8/20/07xkÃ"Ã9 Á$xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ46 LINES IN 2 RUNS WITH SLEEVES AND COVERED W/1" HOSExk Ã"Â: ÂRxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"ÂC Âxk xk ÂxlþÿþÿþÿþÿþÿþÿþÿâNO MONTHLY LOG AVAILABLE FOR IMPRESSED CURRENT CP FAIL LETTER, SUBMIT LOG AND TEST RESULTS BY 11/2/07 -ML 11/26/07 AI UPDATE FROM CTI BUBAR, CP -1.072, REPLACED BULBS IN MONITORING CONSOLE LOG RECEIVED 1/25/08, UPDATE TO PASSxkÃ"Â4* Â`xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"Â41 Â`xk xk Âxk à R0þÿþÿþÿþÿþÿþÿþÿxk Ã" ÂB_ Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ"!ÃV[ ÂXxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿM10/19/07 COPI - CTI WILSON REPLACED SUMP TOP, INSTALLED APT 1" DW FLEX PIPINGxk Ã"#Â,d ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿÒOVERFILL REMAINS VENT WHISTLE. THE DEPARTMENT HAS DECLINED TO ENFORCE AT THIS LOCATION AGAINST THE OWNER. THE TANK IS 2000 GALLON, 2, 1000 GALLON CHAMBERS FILLED BY A PUMP OFF DELIVERY TO A TIGHT 2" FILL. TRxk Ã"$   xk xk Â<xkÃ!MXþÿþÿþÿþÿþÿþÿþÿxkÃ"%   xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"4Âc ÂXxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿqBAD INTERSTITIAL SENSOR. -TR 10/9/07 COPI - CTI LEWIS INSTALLED OMNTEC LU-2 NOW PASSING PER CTI THORNDIKE. TRxk Ã":Ã3' ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"<Ã3% Â\xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"=Ã3( ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã">Ã3" ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"?Ã3! ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"@Ã3& ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"AÃ3$ ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"Bà  ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"CÃ# ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"DÃ5Z ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"E  ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"FÁ: ÂSxk xk Â<xk Ãþÿþÿþÿþÿþÿþÿþÿxk Ã"G  ÂSxk xk Â<xkà [dþÿþÿþÿþÿþÿþÿþÿxkÃ"HÂX ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"IÂQ ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"JÃ( ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"K D ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"LÂ# ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"MÃ@ ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"NÃO ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"OÃ! ÂSxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"P # ÂHxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"QÃTV ÂHxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"RÃ@ ÂHxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"S $ ÂHxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"UÂQG ÂHxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"V D Â\xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"W Â\xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"XÃT Â\xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"YÃ.F Â\xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"ZÂ$ÂÂRxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿZ6/15/09-INTENT TO ABANDON REC'D FOR CTI MULLINS TO REMOVE TANK AND PIPING, URS TO DO SA PHxkÃ"[Á ÂXxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿŠOILY WATER IN INTERSTICE OF JACKETED TANK. CTI FAILED TO REPORT. OMNTEC WAS IN ALARM WHEN CTI ARRIVED TO DO INSPECTION. TR NOW PASSING.xk Ã"\à CÂÂUxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk à `ÂÂÂ)xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿYPHONE CALL 10/4/07 FROM FACILITIES MAINTENCE PERSON FOR SAD 48. INSPECTION FAILED DUE TO LEVEL PROBE (FOR INVENTORY PURPOSES) WAS NOT OPERATING CORRECTLY. TANK IS DW AND ALL OTHER PROBES WORK CORRECTLY, LEVEL PROBE IS FOR CONVIENCE OF THE SCHOOL, THEY WILL STICK TANK WEEKLY INSTEAD AND GET THE PROBE REPLACED IN 2008 BUDGET YEAR. TRxj ÃÃ4YÂÂ`xkxkÂþÿà Uþÿþÿþÿþÿþÿþÿ§4/2/10-COPI REC'D FOR CTI SIMARD TO REPLACE BOTH SPILL BUCKETS WITH 15 GAL-PH 10/4/2009 ONLY RECIEVED SIA FOR TANK 1-2. -LW TANK READING: TANK 1: -1.04, -.899, -.947xkÃÂRÂÂLxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk à ÂT4ÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂW ÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂWÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂWÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â1)ÂÂ`xkxkÂxk Ã%X1þÿþÿþÿþÿþÿþÿþÿxk ÃÂWÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ]6ÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ!ÂÂ`xkxkÂxk ÃV8þÿþÿþÿþÿþÿþÿþÿxk ÃÂW!ÂÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ9ÂÂ`xkxkÂxk Ãabþÿþÿþÿþÿþÿþÿþÿxk ÃÃ%<ÂÂLxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂÂÂxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÃ,PÂÂxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk à0ÂÂxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÃ7ÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿû5/31/2007 TANK # 3 FAILED SIA REQUIRED RETEST OF SIA (ALONG WITH TANK #1 AND #2) TANK 3'S #1 AND #2 WERE PRECISION TESTED. NEED TO FOLLOW UP WITH IRVING REGARDING TANK #3. -LW #33 AND #34 VENT BURIED IN PARKING LOT. NO ACCESS TO VENT WHISTLE. -MLGxkÃÂ$&ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ.CTI GEORGE REPLACED FLAPPER 6/21/07 -- PASSINGxkÃÂGNÂÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ89/3/07 COPI - CTI BISKUPIAK INSTALLED COATED COPPER LINExkàÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkàÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿPASS PER CTI BISKUPIAK. TRxkÃÂGÂÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ99/10/07 COPI - CTI BISKUPIAK INSTALLED COATED COPPER LINExkà ÂAÂÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ99/12/07 COPI - CTI BISKUPIAK INSTALLED COATED COPPER LINExkÃ!ÃAPÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿMFACILITY DOES NOT MEET VOLUME REQUIREMENTS FOR STAGE I VAPOR RECOVERY. -MLGxj Ã"ÃÂÂxkxkÂxkÃ!3þÿþÿþÿþÿþÿþÿ FIRST VISIT- MONTHLY REPORTS INCOMPLETE. RETURNED 2 WEEKS LATER- REPORTS UPDATED AND ON FILE IN OFFICE. NEW SPILL BUCKETS ON 1, 2-1, AND 2-2. -MLG TANK READING: TANK 1-1: .87, .87, .87; TANK 2-1: 1.06, 1.06, 1.06; TANK 2-2: 1.06, 1.06, 1.06; TANK 3-1: 1.2, 1, 1.24xkÃ#ÃSÂÂxkxkÂxkÃ)þÿþÿþÿþÿþÿþÿþÿxkÃ$ ÂÂxkxkÂxkÃ23þÿþÿþÿþÿþÿþÿ¼INITIAL INSPECTION FOUND BAD PROBES AND PROBE WIRES. REPLACED PROBES AND WIRING AND CONNECTIONS. 1-1 UNLEADED DIRTY AND SOME LIQUID. V/R FITTING FOUND BROKEN ON 1-2 SUPER, REPLACED. -MLGxkÃ%ÂLÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.89, -.89, -.89xkÃ&Ã5'ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿILINES IN PVC PIPE ENTERING BOILER ROOM. -MLG TANK READING: .94, .87, .94xkÃ'ÂX/ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿINTERSTITIAL PROBE NOT WORKING-CHANGED PROBE AND WIRING. SPILL BUCKET DIRTY-CLEANED AND PAINTED. VENT CAP BROKEN-REPLACED. -MLGxkÃ(ÃaÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: 1.08, 1.08, 1.08xkÃ)ÂXÂÂxkxkÂxkà 3þÿþÿþÿþÿþÿþÿ¤ANNUAL TEST RESULTS ON FILE FROM PION ENTERPRISES. NEW GASKET ON UNLEADED 4" FILL CAP ADAPTOR. NEAT AND CLEAN-FILTERS CHANGED ANNUALLY. -MLG CP TESTED 8/7/07 -.92xkÃ*ÂM=ÂÂxkxkÂxkÃJþÿþÿþÿþÿþÿþÿPIPNG SUMP COVERS REPLACED 5/2007. DIRT AND DEBRIS IN BOTH SPILL BUCKETS! -MLG 10/10/07 LEGASSE SR RESPONDED TO SENSOR OUT CALL. PROBE IS PITTED, INTERSTICE IS DRY. SENSOR HAS FUEL ODOR THOUGH. WILL PULL VACUUM ON INTERSTICE. -ML 5/22/07 COPI - CTI SAVAGE INSTALLED 2 TC SUMP COVERSxkÃ+ÂF,ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ-Ã^ÂÂTxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã.Ã:OÂÁxkxkÂxk þÿþÿþÿþÿþÿþÿþÿÚ6/25/07 AI FAIL LETTER -ML 8/10/07 BUBAR UPDATE - REPLACED COLLARS AND SEALS ON TANKS 2&3 SPILL BUCKETS, REPLACED COVER ON TANK 4 SPILL BUCKET 9/21/07 KANE UPDATE - REPLACED POWER SUPPLY BOARD ON TLS 350, HORN WORKINGxkÃ/à PÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã0Ã&ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã1ÃÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ2ÃQQÂÂTxkxkÂ<xlþÿþÿþÿþÿþÿþÿþÿPHxkÃ3Ã"ÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ4Â0ÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ5ÃSÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ6ÃÂÂTxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã7ÃPÂÂTxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã8Ã*ÂÂTxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã9ÃPÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ:Â,QÂÂYxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã;Ã9ÂÂYxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿ TANK READING: 1.00xkÃ<ÃEYÂÂYxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã=ÃK8ÂÂYxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã>Â\ÂÂYxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã?ÃMÂÂYxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã@ÃWÂÂYxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃAÂ]0ÂÂYxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃBÃDÂÂYxkxkÂ<xkÃBþÿþÿþÿþÿþÿþÿþÿxkÃCÃJHÂÂYxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃDÃT#ÂÂ`xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃEÂ*;ÂÂ`xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃFÃc xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃG W xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃHÃKC xkxkÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃIÃ, xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃJÃ.H xkxkÂ<xkÃQþÿþÿþÿþÿþÿþÿþÿxkÃKà Y xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃLÂÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃMÃUÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃNÃF/ÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃOÂ5ÂÁxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPà 5ÂÁ$xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃQÂÂÂ)xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃRÃ1ÂÂ)xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃSÃXGÂÂ)xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃTÂSAÂÂdxkxkÂ<xkÃ6Pþÿþÿþÿþÿþÿþÿ\5/23/08 COPI - CTI ST.PETER INSTALLER NEW TLS350 PLUS, BRINE SENSORS AND PIIPNG SUMP SENSORSxkÃUÃZÂÂUxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃVà !ÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃWÂ1ÂÂXxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃXÂYHÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃYÂ]^ÂÂxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃZÂ^ÂÂzzxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã[ÂY-ÂÂxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã\Â3WÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ]ÂYAÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ^Â]DÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ_Â15ÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ`ÂQ6ÂÂZxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃaÂYÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃbÂQ4ÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃcÂ1^ÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃdÃR=ÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ*9 xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÃ0ÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ>ÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿJREPLACED VENT VALVE AND VENT VALVE CAP. REPLACE FILL CAP ON REGULAR. -MLGxkÃÃNÂÂKxkxkÂxkþÿþÿþÿþÿþÿþÿþÿŒRECOMMEND SEPARATE SLEEVES FOR EACH LINE. -MLG ANN FROM ECOMAINE CALLED ON 7/1/2008 ANNUAL INSPECTION BEING DONE ASAP. WILL SEND IN. -LWxkÃÂ@/ÂÂTxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂSVÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ›9/4/2008 AARON THRONDIKE CALLED TO REPRT WATER IN PIPING SUMP. BAD WIRING NEED TO REPLACE. AT SOME POINT THE PIPING SUMP PROBE WAS REMOVED; REINSTALLING.xkÃÂSTÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ6NÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Ã%LÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿûTANK READING: -1.07, -1.03, -1.04 6/23/08 JEFF EATON PERFORMING INSPECTION, OWNER DOESN'T UNDERSTAND WHY GOT SIA NOV WHEN USING ATG FOR 5 YEARS. ATG NOT REGISTERED W/DEP. EXPLAINED WHAT NEED TO REGISTER, JEFF WILL WORK W/OWNER TO GET SUBMITTED. -MLxkà Â5 ÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ!SALES MAY: REGULAR- 94403 +/- 1380, PASS; PREMIUM- 4434 +/- 22, PASS; DIESEL- 110990 +/- 260, PASS. #38 9-1 REPLACED BG101 LID ASSEMBLY- FILL CAP 4" AND STREET BOX COVER. -MLG 7/23/07 CTI KANE SUBMITTED INSPECTION UPDATE CORRECTING INSPECTION FOR LEAK DETECTION -- CSLD PASSING EACH MONTHxkà Â[4ÂÁ$xkxkÂxkÄ6 þÿþÿþÿþÿþÿþÿ€MARCH SALES: REGULAR- 84182 +/- -53, PASS; PREMIUM- 3057 +/- -4, PASS. SUMP LIDS ARE LIQUID TIGHT, BUT SUMPS DO HOLD LIQUID IN AND CAUSE ALARM TO ACTIVIATE AS REQUIRED- ONE NEW TOP WESTERN FIBERGLASS ON ORDER. CLEANED AND PAINTED SPILL BUCKETS. REPLACED BALL FLOAT IN REGULAR TANK- BALL WAS MISSING. REPLACED VAPOR CAP ON 1-1. CTI DENNIS DAVIS: INSTALLED STP SUMP COVER ON 2-1. -MLGxkà à <ÂÁxkxkÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj à Â[=ÂÁ$xkxkÂxk Äþÿþÿþÿþÿþÿþÿ15-1 INTERSTITIAL MONITOR STUCK IN TANK, COULD NOT BE REMOVED TO TEST. CLEANED SPILL BUCKETS. OLD LEAK AT VAPOR VAC CONNECTION- UNION SHOWS OLD WEEPING. NEEDS A UNION ON ELECTRICAL FOR VAPOR VAC MOTOR ON DISPENSER #6. -MLG CTI DENNIS DAVIS: 5-1 INTERSTITIAL SENSOR REPLACED WITH NEW ONE- TESTED, PASSED.xkÃÃ-]ÂÁ$xkxkÂxkÃ[þÿþÿþÿþÿþÿþÿ(INTERSTITIAL MONITOR NEEDS POWER PLUG IN. SENSORS STUCK IN TANK. RECHECK 5-1 AND 6-1 INTERSTITIAL. REPLACED FLAPPER DROP TUBE IN 5-1. CLEANED AND PAINTED SPILL BUCKETS. DISPENSER PANS VERY RUSTY. -MLG CTI DENNIS DAVIS: REPLACED STUCK SENSOR-REPROGRAMMED CONSOLE, CONSOLE NOW FULLY OPERATIONAL.xkÃÂ[AÂÁ$xkxkÂxkÄ)þÿþÿþÿþÿþÿþÿTLOWERED SENSOR 4-1 AND 5-1. INTERSTITIAL SENSOR EXTREMELY TOUCHY. CLAMP MISSING FROM ROCK GUARD 6-1, REPLACED. CLAMP FALLEN OFF ROCK GUARD BOOT FITTING 5-1, TIGHTENED IT BACK ON. 5-1 SPILL BUCKET ROTTED OUT, NEEDS REPLACEMENT. CLEANED AND PAINTED SPILL BUCKETS. NO TEST POINT FOR LINE LEAK DETECTORS. ATTACHED THEN REMOVED SNAP TAP CONNECTOR AT DISPENSERS. REPLACED VAPOR CAP 4-1. PAINTED VAPOR COVERS. REMOVED WATER FROM DISPENSER PANS. -MLG CTI DENNIS DAVIS: REPLACED SPILL BUCKET ON MAY 14, 2007. CERTIFICATION OF PROPER INSTALL SENT TO DEP ON MAY 30TH, COPY ATTACHED TO INSPECTION UPDATE. xkÃà ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿÇNO ELECTRONIC MONITORING ON TANK. QUOTED CUSTOMER NEW OMNTEC FOR INTERSTITIAL MONITORING. REMOTE FILL 5' AWAY FROM BUILDING. -MLG 9/14/07 COPI - CTI SIMARD INSTALLED OMNTEC LU1. UPGRADE TO PASSING.xkÃÂ_!ÂÂ'xkxkÂxkþÿþÿþÿþÿþÿþÿþÿœBAD SENSOR IN REGULAR SUMP. WATER IN PLUS SUMP NEEDS TO BE PUMPED OUT. -MLG CTI SCOTT CYR: REPAIRS TO SENSOR WIRING TO REG T7. PUMPED OUT SUMPS AS NEEDED.xkÃÂ9ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ$TRACE AMOUNT OF WATER IN SUMP. -MLGxkÃÂNU xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ›NO PHYSICAL ACCESS TO CHECK DEPTH OF VENT WHISTLE. DOESN'T APPEAR TO BE SLEEVED PIPING. PLANNED REMOVAL OF TANK IN 2007. -MLG TANK READING: -.99, -1, -.99xkÃÂÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ†RAY GIANDREA CALLED ON 10/27/2008 SAID HE SENT IN HIS ANNUAL INSPECTION DATED 5/2008. TOLD HIM IT IS NOT ENTERED, SO HE IS GOING TO SEND IN ANOTHER ONE. TOLD HIM TO PUT IT TO PAT'S ATTENTION. -LW NOT ENOUGH INFO ON RNL TANK 2-07 REPORTS US TANK WAS OUT ON 5/23/2007 TO ERPFORM TANKN TIGHTNESS TEST. BOTH TANKS PASSED. RNL NO LEAD TANKS, NO LONGER SIPHONED TOGETHER. SHOULD PASS SIA'S.xkÃÂ8XÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿúALL SUMPS HAD WATER/LEAKING AROUND WHERE FIBERGLASS SIDES AND TOPS CONNECT, WILL NEED TO BE CLEANED AND REFIBERGLASSED. ALSO WHERE RISER ATTACHED TO TANKS. CLEANED WATER OUT OF SPILL BUCKETS. -MLG 12/21/07 COPI - CTI GEORGE REPLACED ALL PIPING SUMPSxkÃÂ?ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ«ALL TANK READING TAKIN OFF VEEDER ROOT TLS 350 DAILY AND SENT TO W.O.C.- NO RECORDS KEPT ON SITE. CLEANED WATER OUT OF SPILL BUCKETS. -MLG PROVIDED DI PAPERWORK TO DEP.xkÃà QÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿëCLEANED OUT ALL SPILL BUCKETS-REMOVED EXISTING SWIVEL FILL ADAPTER AND REPLACED WITH SHORTER FILL ADAPTER AND NEW CAP AS COVER WAS HITTING AND BROKE FILL CAP. -MLG TANK READING: TANK 1: -.893, -.899, -.862; TANK 2: -.899, -.894, -.91xkÃÂW:ÂÂ>xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂW;ÂÂ>xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃà (ÂÂ'xkxkÂxkÄHþÿþÿþÿþÿþÿþÿ9LLDS AND LINES TESTED ON 6/21/07 BY TYRCE TESTERS. -MLGxkÃÂW<ÂÂ>xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂW?ÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂW=ÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂW9ÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!ÂW>ÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ"ÂW@ÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#Â(?ÂÂ'xkxkÂxkÃ2Rþÿþÿþÿþÿþÿþÿ¼VEEDER ROOT IS WORKING PROPERLY BUT JUNCTION BOXES IN SUMPS, INNERWELL AND ATG ARE ROTTED. WILL BE REPLACED ON 6/28/07 BY TYRCE (MYSELF) AND SWANN'S ELECTRIC. REGULAR INNERWALL WAS IN ALARM. BAILED BRINE DOWN TO PROPER LEVEL. ADAPTER CAN'T SCREW ONTO RISER DUE TO COROSION. NOTIFIED TED SCHARF ABOUT REPAIRS. PUMPED SPILL BUCKETS OUT INTO TANK. LINES AND LEAK DETECTORS TESTED ON 6/26/07 BY TYREE TESTING WHILE I (SCOTT CYR) WAS ON SITE. -MLGxkÃ$Â1 xkxkÂ<xkÃK?=þÿþÿþÿþÿþÿþÿþÿxkÃ&Â"ÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'ÂMÂÂbxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ)Ãa2ÂÂTxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*ÃGÂÂ\xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ+Â5EÂÂHxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿs6/21/07 COPI - CTI LETELLIER INSTALLED DISPENSER SUMPS W/PROBES, VAULTS, S/S VALVES IN VAULTS, 15 GAL SPILL BUCKETSxkÃ,ÂG[ÂÂ9xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ-Ãc4ÂÂ9xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã.Ã`\ÂÂ9xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ/ÃW1ÂÂ9xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã0Â$IÂÂ9xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿ@4/15/08 UPGRADE REGN FOR CTI CURTIS TO REPLACE ALL SPILL BUCKETSxk Ã1Ãa'ÂÂ9xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã2ÂH ÂÂTxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿ TANK READING: .992xk Ã3ÃPÂÂ'xkxkÂþÿÄ+cþÿþÿþÿþÿþÿþÿÞSITE NOT DOING DAILY INVENTORY. ALL THREE SUMPS HAVE WATER AND ARE IN ALARM. CALLED FOR PUMP OUT. SPILL BUCKETS HAVE WATER. WIL PUMP OUT WITH SUMPS. LINES AND LEAK DETECTORS TESTED BY TYREE TESTING ON 6/25/07 WHILE I (SCOTT CYR) WAS ONSITE. NEED DRY BREAK FOR T10-2 PREMIUM. -MLG CTI SCOTT CYR: SUMPS AND SPILL BUCKETS PUMPED ON 6/25/07, NOW CLEAN AND DRY. DAILY INVENTORY RECORDS FROM PREVIOUS MONTH DONE IMPROPERLY, SO STILL FAILS. STILL NEED DRY BREAK FOR PREMIUM-ON ORDER.xkÃ4ÂÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ5Â\$ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ6à FÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ7à OÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ8à ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ9Â[!ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã:ÂXNÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ;ÂXPÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã<ÃXÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã=ÃO_ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ>Â[*ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã?Ã<ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã@ÂTSÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃAà :ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃBÂ\ ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃCÂTIÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃDà LÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃEÃRÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃFÃ--ÂÂ'xkxkÂxkÃa.5þÿþÿþÿþÿþÿþÿ…BROKEN DRAINS ON EACH TANK SPILL BUCKET. CTI CYR REPLACED 8/17/07 WITH 5 GAL POMECO DUAL PORT BUCKETS W/FILL AND VAPOR 14" ON CENTERxkÃGÂTYÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃHÃQ'ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃIÃCÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃJÃGÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃKà @ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃLÂ\ ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃMà KÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃNà ?ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃOÃ1KÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÂT_ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃQÃ?ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃRÂ\ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃSÂEGÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃTÂ\ ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃUÂ(AÂÂ'xkxkÂxkÃ];þÿþÿþÿþÿþÿþÿó9-1 HEATING OIL HAS NO SPILL BUCKET AND A 2" RISER AND CAP. COPPER PIPING ON 9-1 IS NOT ACCESSIBLE FOR INSPECTION. FAILURE DUE TO CP TESTING NOT DONE. -MLG CTI CYR INSTALLED ANODES ON TANK 9 (NO UPGRADE REGN OR COPI). ALL PASSING 8/16/07 -MLxkÃVÃGKÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃWÂE6ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃXÂ\#ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃYÂT`ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃZÂS?ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ[ÃVJÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã\Ã-,ÂÂ'xkxkÂxkÄ þÿþÿþÿþÿþÿþÿQFAILURE DUE TO NO CP TESTING. SCHEDULED FOR FIRST OF JULY. -MLG PASSED CP 8/6/07xkÃ]Ã8ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã^ÃJ=ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ_ÃSÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ`Â\&ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃaÂTdÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃbÂ\ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃcÂ\ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃdÃ-'ÂÂ'xkxkÂxkÃ$ ?þÿþÿþÿþÿþÿþÿ~CAN'T CHECK OR TEST ATG'S- TANKS PUMPED OUT. FAILURE DUE TO NO CP TESTING. SCHEDULED FOR FIRST OF JULY. -MLG PASSED CP 8/6/07xkÃÂE8ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ21ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÃÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃà HÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃU5ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂUÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂJÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk à Ã-*ÂÂ'xkxkÂxkÄ/dXþÿþÿþÿþÿþÿþÿ¥FAILURE DUE TO NO CP TESTING -MLG CTI CYR, W/PCA ENGINEERING, REPAIRED NEGATIVE CABLE FOR RNL AND DSL TANKS AND REPLACED ANODE HEADER FOR NORTH END OF RNL TANK -MLxkà à NÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk à à EÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂXKÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà Ã>ÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂXRÂÂ^xkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÃ"CÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂS:ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ[ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ-+ÂÂ'xkxkÂxkÄ.!þÿþÿþÿþÿþÿþÿÆ8-1 HAS 8" OF WATER. NOTIFIED FOR PUMP OUT. ALSO, NO CP TEST AS OF YET.-MLG CTI SCOTT CYR: AS OF 6/5/07, WATER PUMPED OUT OF 8-1 SUMP. CTI CYR, W/PCA ENGINEERING, REPLACED ANODE HEADER FOR TANK 8xkÃà JÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ[,ÂÂ^xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ4SÂÂ'xkxkÂxkÄA þÿþÿþÿþÿþÿþÿ±LINES AND LEAK DETECTORS TESTED ON 6/21/07 BY TYREE TESTING WITH MYSELF (SCOTT CYR) PRESENT. FAILED DUE TO CP NOT BEING DONE. SCHEDULED FOR FIRST OF JULY. -MLG PASSED CP 8/6/07xkÃÃTÂÂ'xkxkÂxkÃ%8Bþÿþÿþÿþÿþÿþÿ¦LINES AND LEAK DETECORS TESTED ON 6/26/07 BY TYREE TESTING WHILE I (SCOTT CYR) WAS ON SITE. FAILURE DUE TO CP NOT TESTED. SCHEDULED FOR JULY 1. -MLG PASSED CP 8/6/07xkÃÃ!ÂÂ'xkxkÂxkÄS:þÿþÿþÿþÿþÿþÿJFAILURE DUE TO NO CP TESTING. SCHEDULED FOR JULY 1. -MLG PASSED CP 8/6/07xkÃÃ.IÂÂ'xkxkÂxkÃX =þÿþÿþÿþÿþÿþÿŠCP FAIL. NOT TESTED YET. -MLG INSPECTION UPDATE SAYS CTI CYR REPLACED ANODE ON TANK 3 (NO UPGRADE REGN OR COPI). ALL PASSING 8/16/07 -MLxkÃÃ>ÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿGREPLACED VENT VALVE AND VENT VALVE CAP. REPLACED FILL CAP ON RNL. -MLGxkÃÃ(=ÂÂ;xkxkÂxk Ã>QþÿþÿþÿþÿþÿþÿšSPILL BUCKET REPLACED. FACILITY UPGRADE FORM COMPLETED. -MLG 8/13/07 UPGRADE REGN FOR CTI ROBINSON TO INSTALL VR STAND ALONE SUMP SENSORS FOR ALL 4 TANKSxk ÃÂ'ÂÂ_xkxkÂxkþÿþÿþÿþÿþÿþÿþÿREGULAR TANK STP SUMP LID DOES NOT COME OFF. COULD NOT CONFIRM OPERATION OR PLACEMENT OF SUMP SENSOR. COULD NOT CONFIRM REGULAR STP SUMP IS DRY. REMOVED DEBRIS FROM SPILL BUCKETS. -MLG CTI DENNIS DAVIS: REMOVED STP LID TO CHECK SUMP AND SENSOR, ALL OK. TESTED, FINE. xkÃÂ?"ÂÂ)xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿbDAILY INVENTORY KEPT OFF SITE. 7/2/2007 WEBBER TO FAX. HAVE NOT RECEIVED FAX OF DAILY INVENTORY.xkÃÃS6ÂÂ:xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂcÂÁ"xkxkÂ<xkÃ=þÿþÿþÿþÿþÿþÿþÿxkÃ!Ã]ÂÂXxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ"ÂS+ xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#ÂS) xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$ÂS- xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%ÂY5ÂÂZxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&ÂYZÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'Â]_ÂÂ]xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(ÂY:ÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ)Â]IÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*Â]VÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ+à  ÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ,ÂLAÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ-Â4 ÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ.ÂD,ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ@ALSO RECEIVED PASSING INSPECTION REPORT DATED 6/18/07 ON AST. BBxkÃ/ÃXEÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿC10/15/07 RELOCATING VENT WHISTLE. TANK READING: -.91, -.98, -1xkÃ0 OÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.87, -.89, -.92xkÃ1Â0ÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿt1/6/09-NOI TO ABANDON BOTH TANKS, PORTLAND PUMP TO DO WORK, REMOVAL SCHEDULED FOR 2/13/09-PH COULD NOT REMOVE VENT WHISTLES FOR INSPECTIONS ON BOTH TANKS. TANK 4-1 SPILL BUCKET COVER HAS BEEN REMOVED AND A PIPE HAS BEEN INSTALLED IN IT TO ABOUT 2' ABOVE GRADE MUST REMOVE PIPE FROM SPILL BUCKET. -MLG TANK READING: TANK 3-1: -.89, -.91, -.87; TANK 4-1: -.87, -.89, -.89xkÃ2 ÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿK8/19/08 UPGRADE REGN FOR CTI BEAUMONT TO REPLACE SPILL BUCKETS & ATG RISERSxkÃ3Â4ÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ4Â4ÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ79/12/08 UPGRADE REGN FOR CTI BEAUMONT TO INSTALL ANODESxkÃ5Â9+ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ6ÃP` xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ7ÂGE xkxkÂxkÃ=þÿþÿþÿþÿþÿþÿ[ TANK READING: TANK 1: -1.01, -.93, -.89; TANK 2: -.9, -.87, -.91; TANK 3: -1.1, -.99, -.98xkÃ8Â?  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ9Â8F xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ:Ã[ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ;Ã[ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿSCULLY FILL. -MLGxkÃ<Â(3 xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ=Ã6N xkxkÂxkÂþÿþÿþÿþÿþÿþÿþÿxkÃ>à ] xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã? Â xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã@ÂP> xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃAà  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿŽSUCTION SYSTEM. TANK READING: TANK 5: -1.11, -1.13, -1.11; TANK 6: -1.01, -.98, -.98 CTI SIMS INSTALLED PNEUMERCATOR LS 1002 AND SPILL BUCKETxkÃBÃR xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃCà N xkxkÂxkþÿþÿþÿþÿþÿþÿþÿSCULLY FILL. -MLGxkÃDÂ$ÂÂxkxkÂxkÃ_H'þÿþÿþÿþÿþÿþÿãCLEANED OUT ALL SPILL BUCKETS. ON TANK 5-1, THE LEAK DETECTOR FAILED BUT WAS REPLACED WITH THE SAME MODEL LEAK DETECTOR, THEN PASSED THE TEST. -MLG TANK READING: TANK 5: -1.27, -1.2; TANK 6: -1.44, -1.43; TANK 7: -1.45, -1.42xkÃEÂ7*ÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿpNOTE: ALTHOUGH GENTILE HALL IS THE SAME FACILITY, IT HAS A DIFFERENT REGISTRATION NUMBER, WHICH IS #20994. -MLGxkÃFà _ÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ™NOTE: WHILE GENTILE HALL IS PART OF THE UMPI FACILITY, IT HAS IT'S OWN REGISTRATION NUMBER. THE REGISTRATION FOR THE REST OF THE FACILITY IS #5441. -MLGxkÃGÃ6ÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿNBRINE E 10 1/4" FOR TANK 1 BLDG 100. BRINE E 6 1/2" FOR TANK 2 BLDG 101. -MLGxkÃHÃU;ÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿfINTERSTITIAL SENSOR WIRE WAS CHAFED- CUT AND SPLICED WIRES IN ORDER TO OBTAIN PROPER OPERATION. -MLG xkÃIÂOÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ(INSTALLED NEW INTERSTITIAL SENSOR. -MLGxkÃJÂQÂÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃKÃILÂÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃLÃLÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ3REPLACED FILL CAP ADAPTER ON FLAPPER VALVE. -MLG xkÃMÃÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃNÃUXÂÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃOÂ"$ÂÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÃÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃQÃc(ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃRÃ<0ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿçCP READINGS TANK 4 -.78, -.79. -.81 TANK 5 -.77, -.78, -.81 AI FAIL/CP FAIL LETTER 7/6/07 -ML 12/19/07 COPI - CTI DODGE INSTALLED ANODES ON GAS & DSL TANKS 12/19/07 INSPECTION UPDATE FROM CTI EATON SAYS ANODES ADDED, CP NOW PASSINGxk ÃSÃD3ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ‘INTERSTITIAL ALARM LIGHT CAME ON. NO AUDIBLE ALARM. PIPING SUMP SENSOR UNDER WATER. NO LIGHT, NO AUDIBLE ALARM. MADE REPAIRS (NEW SENSORS). -MLGxkÃTÂ3ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃU ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃVà ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃWà ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃXà ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃYÂKÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿB TANK READING: 1.04, 1.02, 1.03 INSPECTOR WAS ACTUALLY IRA DODGE.xkÃZÂbRÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ[ÃQUÂÂYxkxkÂxkÃRþÿþÿþÿþÿþÿþÿ‘PUMPED WATER OUT OF SUMPS. -MLG 7/21/08 UPGRADE REGN FOR CTI HERSEY TO REPLACE SPILL BUCKETS, INTL MANWAYS, CONCRETE PAD. NOT REPLACING SUMPS. xkÃ\ÂLÂÂYxkxkÂxkÃ1Zþÿþÿþÿþÿþÿþÿ TANK READING: 1.06, 1.05, 1.08xkÃ]à ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ;REMOVED WATER FROM SUMPS. -MLG TANK READING: 1, 1.01, .97xkÃ^Ã\)ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ REMOVED WATER FROM SUMPS. -MLGxkÃ_Ã[ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ,CLEANED OUT WATER FROM SPILL BUCKETS. -MLGxk Ã`Â1cÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ…INTERSTITIAL RISER ONLY 1 1/2" DIAMETER AND SENSORS COME OUT HARD. RECOMMENDED SMALLER SENSORS. CHANGED REGULAR LEAK DETECTOR. -MLGxkÃaÂ_YÂÂTxkxkÂxl þÿþÿþÿþÿþÿþÿþÿ&AI/CP FAIL NOV 7/9/07 -ML TANK REMOVEDxkÃbÂ+ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ©REGULAR BALL FLOAT COULD NOT BE REMOVED. INSTALLED FLAPPER. -MLG TANK READING: TANK 4: -1.057, -.961, -.914; TANK 5: -.954, -.87, -.924; TANK 6: -1.246, -1.219, -1.255xkÃcÂ?ÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿÚAN INSPECTION HAD BEEN PERFORMED ON 4/11/07 BY CTI DON BUBAR WHEN THE TANKS WERE OOS. TANKS HAD BEEN OOS FOR THREE TO FOUR MONTHS PRIOR TO 7/11/07 ACCORDING TO WEBBER OIL. WENT BACK INTO SERVICE SOMETIME IN JUNE. -MLGxkÃdÃÂÁxkxkÂxk þÿþÿþÿþÿþÿþÿþÿëCTI MARKED INSPECTION AS FAIL BEC VR HIGH LEVEL ALARM NOT WORKING. FLAPPER PRESENT & FUNCTIONING, SO PASSES FOR OVERFILL. NOT USING ATG FOR LEAK DETECTION. -ML 6/7/07 INSPECTION UPDATE FROM CTI PAINE - REPLACED OVERFILL ALARM SYSTEMxk ÃÃU ÂÂ)xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿjUNABLE TO REMOVE DROP TUBE 2-1. 101 BGS WITH ALUMINUM LIDS 15 GALLON- ALL NEED NEW LIDS IN LATCHES. -MLGxkÃÂTcÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿyCLEANED OUT ALL SPILL BUCKETS. -MLG 8/22/08 CTI HERSEY REPORTS AI PENDING. HAD TO RETEST ELLDS, EVERYTHING PASSING. -MLxkÃÂIWÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿALL SPILL BUCKETS RUSTY. 7-1 RUSTED OUT. -MLG COPI - CTI BUBAR REPLACED SPILL BUCKETS ON 5-1, 5-2, 7-1 AND 7-2 ON 7/10/07. UPGRADE TO PASSINGxkÃÂ[;ÂÁ$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ†VAPOR RECOVERY: 2 VAPOR ADAPTERS FOR 3 TANKS. 7/21/07 COPI - CTI DAVIS INSTALLED SPILL BUCKETS, 2 VAPOR ADAPTERS, 3 NEW SUMP ROUNDSxkÃÃRÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ.ÂÂYxkxkÂxkþÿþÿþÿþÿþÿþÿþÿüCLEANED SMALL AMOUNTS OF WATER FROM ALL SUMPS. BALL FLOAT ON TANK 7-1 DIESEL NEEDS TO BE REPLACED. OPW 53 VML3 IS THE PART NUMBER. TANK 7-1 DIESEL NEEDS NEW LINE LEAK DETECTOR. PE PETRO STP MLD HCD 3" FOR DIESEL PRODUCTS. -MLG 6/27/07 UPGRADE TO PASSxkà*ÂÂLxkxk Âxkþÿþÿþÿþÿþÿþÿþÿ28/27/09-REGISTRATION REC'D FOR CTI WINCHESTER TO REPLACE PRIMARY PIPING ON TANK 70 PH TANK 63 CONSOLE KEY PAD BROKEN. S&R LINE ELBOWS BADLY RUSTED. TANK 60 COPPER PIPING HAS BEEN REPLACED W/DW FLEX AI FAIL LETTER 7/9/07 -ML CTI LAWRENCE WINCHESTER, JR.: CONSOLE WAS REPLACED AND TESTED ON JUNE 23, 2007.xkÃÂBÂÂxkxk ÂþÿþÿþÿþÿþÿþÿþÿþÿPETROMETER INTERSTITIAL MONITORING SYSTEM - COPPER LINES TO SENSORS; SENSORS CANNOT BE REMOVED TO INSPECT. AI/CP FAIL LETTER 7/9/07 -ML 7/16/07 UPGRADE REGN FOR CTI GORDON TO REPLACE INTERSTITIAL MONITORING SYSTEM; OMNTEC LU-1 INSTALLED 7/26/07 9LB ANODE ADDED 7/26/07 -1.20 VOLTSxkà à JÂÂTxkxk Âxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÃJGÂÂ]xkxk Âxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÃaÂÂTxkxk Âxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â^ xk xk ÂxkÃ1Eþÿþÿþÿþÿþÿþÿ;CP TEST DONE BY LAIRRY MCALLISTER LC #228, ON 7/5/07. -MLGxkà Â!ÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂZ?ÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂJÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ_ÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃR#ÂÁ xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ(REPLACED SUMP SENSOR ON SNL SUMP. -MLGxkÃÃÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ3ÂÁ xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ& ÂYxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: 1.23, 1.22, 1.35xkÃÃCYÂÂYxk xk Âxkà Uþÿþÿþÿþÿþÿþÿ TANK READING: 1.03, 1.02, 1xkÃÃJÂÂYxk xk ÂþÿÃ0þÿþÿþÿþÿþÿþÿÀ1/31/11-CALL FROM LYNN, SHE GOT SIA NOV, AND WILL BE DOING SIA FOR REG. TANK-PH TANK READING: TANK 4: 1.08, 1.06, 1.05; TANK 5: 1.06, 1.05, 1; TANK 6: 1.04, 1.06, 1.05; TANK 7: .95, .98, 1.01xkÃ-Ã5/ÂÂUxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ?WATER TABLE ABOVE SUMPS; SUMPS NOT LIQUID TIGHT. WATER CONTINUOUSLY ENTERS SUMPS. 7/9/07 UPGRADE REGN FOR CTI ROY & SCATES TO OVERSEE SEALING OF SUMP ENTRY BOOTS. PETROLEUM ENGINEERING (MA) DOING WORK. TOLD THEM WATER TABLE & SUMP TOP PROBLEM, NOT ENTRY BOOTS. -ML 2/12/08 COPI - CTI ROY OVERSAW SEELING ENTRY BOOTSxkÃà bÂÂxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿOUNABLE TO VERIFY IF DROP TUBES IN PLACE. MUST PROVIDE ACCESS TO DROP TUBES. BBxkÃÂYÂÂZxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂYÂÂ]xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂÂÁxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ]#33 #34 VENT BURIED UNDER DRIVEWAY, CANNOT ACCESS WHISTLE. 36-40 HAS REMOTE FILL PIPE. -MLGxk ÃÂKPÂÁxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ^#33 AND 34 TANK WHISTLE IS BURIED IN PARKING LOT- NOT ACCESSIBLE. 36-40 HAS REMOTE FILL. -MLGxk àÁxk xk Âxk þÿþÿþÿþÿþÿþÿþÿFAILING TANKS REMOVEDxkÃà K Áxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ8@ÂÂTxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃMÂÂxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ,FAILING CP TANK PLANNED FOR REMOVAL IN 11/07xkà Ã&JÂÂxk xk ÂxkÃ+3þÿþÿþÿþÿþÿþÿCLEANED OUT SPILL BUCKETS.xkÃ!à dÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿICLEANED OUT SPILL BUCKETS. DISPENSER #1 NEEDS NEW HOSE AND NOZZLE. -MLGxkÃ"Ã+HÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#à )ÂÂxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ6CRATERED SPILL BUCKET LID- SHOULD STILL BE OKAY. -MLGxkÃ$Â;ÂÁ"xk xk ÂxkÃFaEþÿþÿþÿþÿþÿþÿ`REPLACED WIRE FROM THE TANK TO THE CONTROL. **MUST TEST TANK 5 CP PIPING OR VERIFY MATERIAL!!**xkÃ%ÂÂÂxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.93, -.93, -.93xkÃ&Â-ÂÁ"xk xk ÂxkÃ=.bþÿþÿþÿþÿþÿþÿ’DIESEL TANK FAILED TO ALARM, PROBE IS GOOD-TEST AT BOARD AND WORKED FINE. REPLACED THE OMNTEC CABLE FROM THE TANK TO THE CONTROL PANEL. 6/29/2007xk Ã'à ÂÂ:xk xk Â(xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(Â%+ Â\xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿREMOVED SMALL AMOUNT OF WATER (LESS THAN 200 ML) FROM PIPING SUMP; WATER INFILTRATION APEARS AT LID- REMOVED EXCESSIVE SAND/DEBRIS AT LID AREA TO FACILITATE PROPER SEAL. NO SPILL CONTAINMENT AT REMOTE FILL, RECOMMEND WALL-MOUNTED SPILL CONTAINMENT WITH LOCKING LID BE INSTALLED. -MLGxkÃ)Â%1 Â\xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ[REPLACED FILL CAP AND ADAPTER DUE TO BEING FAULTY. -MLG TANK READING: -1.71, -1.14, -1.13xkÃ*Â%4 Â\xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ¤REMOVED SMALL AMOUNT OF WATER (LESS THAN 100 ML, LIKELY CONDENSATION) FROM PIPING SUMP. REMOTE FILL WITH SPILL CONTAINMENT. -MLG TANK READING: -1.11, -.991, -1.03xkÃ+Â%, Â\xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ¿NO SPILL CONTAINMENT AT REMOTE FILL- RECOMMENDED WALL-MOUNTED SPILL CONTAINMENT WITH LOCKING LID. TANK BOTTOM CONTAINS .25" WATER- RECOMMENDED REMOVAL. -MLG TANK READING: -1.1, -1.08, -1.09xkÃ,Â% Â\xk xk ÂxkÃWcþÿþÿþÿþÿþÿþÿnTANKS 6 & 7, REPLACED FILL CAPS DUE TO NOT BEING LIQUID TIGHT. REMOVED WATER FROM DIESEL DISPENSER PAN. -MLGxkÃ1ÂLZÂÂUxk xk Âxk þÿþÿþÿþÿþÿþÿþÿÑ5/26/10-NOITR REC'D FOR CTI BARTON TO REMOVE TANKS AND PIPING, DON ROBBINS TO DO SA-PH NOV REQUIRING REMOVAL OF USTS DATED 12/11/2009. SEE UST INSPECTION FOR NOTES. -LW CHANGED TANK # 2 INTERSTITIAL SENSOR.xk Ã5ÃbÂÂ:xk xk ÂxkÃE/Dþÿþÿþÿþÿþÿþÿ‰SPLIT 1 INTERSTITIAL. RNL SUMP HAD BROKEN HAND HOLD- REPAIRED WITH CAULK. ABOUT 3'' WATER PUMPED OUT. REPLACED COVER ON SUPER TO PASS.xkÃ-Â5DÂÂHxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿÚREMOVED WATER/DEBRIS FROM ALL PIPING SUMPS TO DRUM FOR DISPOSAL. PIPNG SUMP LID GASKETS FAULTY, REPAIRED AND NOTIFIED TED SHARF (DEP) AND JOHN BRANSCOM (MTA). TANKS 13, 14, 15- PIPING SUMPS NOT LIQUID TIGHT, RECOMMENDED REPAIR OR REPLACEMENT. TANK 12- REPLACED PIPING SUMP SENSOR DUE TO FAULT. REPAIRED FAULTY PIPING SUMP LID GASKET ON TANK 15. REMOVED AND GLEANED GAUGING PROBES ON ALL TANKS TO FACILITATE PROPER OPERATION. REPLACED FILL CAPS THAT WERE NOT LIQUID TIGHT. CLEANED ALL SPILL BUCKETS. REPLACED FAULTY FILL CAP ADAPTERS ON TANKS 11, 13, 14. REPAIRED FAULTY FLAPPER DEVICE ON TANK 14. REPAIRED BELOW GRADE SPILL BUCKET LID THAT WAS RESTING ON FILL CAP OF TANK 12. REPLACED FAULTY LINE LEAK DETECTORS. REPLACED VAPOR RECOVERY CAPS THAT WERE NOT LIQUID TIGHT ON TANKS 11, 12, 13. DISPENSER 15/16-LEAK AT METER SEALS, REPAIRED BY PORTLAND PUMP, NOTIFIED PAULA OF CN BROWN AND TED SCHARF, DEP. -MLG SUMPS CLEANED OUT, LID GASKETS REPLACED, WATER INTRUSION REPAIRED ON 8/2/07 6/21/07 COPI - CTI LETELLIER INSTALLED DISPENSER SUMPS W/PROBES, S/S VALVES IN VAULTS, REPLACED SPILL BUCKET ON RNL TANK 11 10/15/07 UPGRADE REGN FOR CTI LETELLIER TO ALTER STAGE II PIPING FOR VAPOR TRAP. POSSIBLE MINOR CHANGES TO COPPER LINE FOR VACUUM.xkÃ.à  Â\xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿREPLACED FILL CAPS DUE TO NOT BEING LIQUID TIGHT. CLEANED SPILL BUCKETS. IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM INSTALLED 6/29/07. -MLG TANK READING: TANK 9: -1.06, -1.11, -1; TANK 10: -1.16, -1.24, -1.1 6/29/07 COPI - CTI WILSON INSTALLED IMPRESSED CURRENT SYSTEMxkÃ/Â^6ÂÂDxk xk Âxk Ã&2þÿþÿþÿþÿþÿþÿ{TANK #4 HAD BEEN OUT OF SERVICE SINCE 11/04. INSPECTION UPDATE DONE ON 11/27/06, WHEN ACTUALLY HAD LESS THAN 1" PRODUCT. STILL HAS LESS THAN 1" PRODUCT. -MLG TANK READING: TANK 4: -1.06, -1.1, -1.16; TANK 5: -.852, -.906, -.959; TANK 6: -.985, -1.04, -1.13; TANK 7: -.866, -.936, -1.01; TANK 8: -.914, -.95, -1.05 PRODUCT PIPE READING: TANK 7: -1.12, -.972; TANK 8: -1.24, -.99xk Ã0Ã!VÂÂDxk xk ÂxkÃE5&þÿþÿþÿþÿþÿþÿ€CTI ST.PETER TO REMOVE PRODUCT PIPING FROM INTERMEDIATE SUMP FROM TANKS 6&7 TO DISPENSERS TO ACCESS CONTAMINATED SOIL IN JULY 07xkÃ3Â^3ÂÂDxk xk Âxk Ã(`þÿþÿþÿþÿþÿþÿþÿxk Ã4Ã@ ÂÂDxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿnSHORT GREATER THAN 1% ON DAILY INVENTORY. REPLACED WEEP WHERE PUMP PIPING CONNECTS TO METER-TESTED, OK. -MLGxkÃ6Ã#ÂÂDxk xk ÂþÿÃIþÿþÿþÿþÿþÿþÿzOVER GREATER THAN 1% ON DAILY INVENTORY. VAPOR RECOVERY ADAPTOR IS LYING ON GRASS NEAR WHERE... (SEE NOTES, UNCLEAR) -MLGxkÃ7Ã_ÂÂDxk xk ÂxkÃ;EWþÿþÿþÿþÿþÿþÿøCLEANED WATER AND RAGS OUT OF SPILL BUCKETS. -MLG TANK READING: TANK 1: -1.006, -1.020, -.913; TANK 2: -1.045, -1.08, -1.061; TANK 3: -.967, -1.058, -.962; TANK 4: -.945, -.985, -.892; TANK 5:-.959, -1.099, -1.125; TANK 6: -1.083, -1.019, -1.014xkÃ8Â-PÂÂIxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ9Ã^#ÂÂIxk xk ÂþÿÃMþÿþÿþÿþÿþÿþÿåTANK 1 REGULAR UNLEADED INTERSTITIAL SENSOR NOT WORKING, SWAPPED SENSORS TO VERIFY, WIRING WAS OK. INTERSTITIAL TANK IS DRY AND SENSOR WILL BE REPLACED. TANK 1 SPILL BUCKET TOP WAS BROKEN AND SPILL BUCKETS WERE VERY RUSTY. -MLGxkÃ:Â_@ÂÂIxk xk Âxkà ( þÿþÿþÿþÿþÿþÿþÿxkÃ;à ÂÂIxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ! TANK READING: -.879, -.856, -.86xkÃ<Ã+GÂÂIxk xk ÂxkÄ>^þÿþÿþÿþÿþÿþÿ{TANK 1 SPILL BUCKET- BOTTOM RING BROKEN. TANK 1 LLD FAILED WHEN SIMULATED 3GPH AT 10 PSI WAS PERFORMED. REPLACED GASKET ON TANK 2 FILL ADAPTER. -MLG TANK READING: TANK 1: -1.19, -1.256, -1.24; TANK 2: -1.225, -1.27, -1.26; TANK 3: -1.22, -1.375, -1.42; TANK 4: -1.045, -1.156, -1.31 CTI JOHN JOHNSON: NEW 15 GAL SPILL BUCKET INSTALLED FOR TANK 1, NEW LLD INSTALLED FOR TANK 1.xkÃ=Â96ÂÂIxk xk ÂþÿÃIc`þÿþÿþÿþÿþÿþÿçTANK 11 AND 12 STP SUMPS HAD APPROXIMATELY 10 GALLONS OF WATER IN EACH WHICH WAS PUMPED OUT. TANKS 11 AND 12 LLD FAILED 3GPH LEAK @ 10 PSI DURING TESTING. REPLACED FILL ADAPTER GASKET ON TANK 12. -MLG 7/24/07 AP/CP FAIL LETTER -MLxkÃ>ÃV ÂÂDxk xk ÂxkÄ,JþÿþÿþÿþÿþÿþÿSDIESEL STP SUMP ELECTRICAL BULKHEAD (ENTRY BOUT) FITTING CRACKED. DISP # 5, 6, 7, 8, 9, 10 SUMP ELECTRICAL BULKHEAD (ENTRY BOOT) FITTING CRACKED. DISP 1&2, 5&6 TIGHTENED UNION TO CURE WEEP. DISP 13&14 TIGHTENED BOLTS ON METER COVER TO CURE WEEP. -MLG 7/16/2007 REPAIRED BULK HEAD FITTINGS ON DIESEL STP SUMP AND DISP 5, 6, 7, 8, 9, 10.xkÃ?Ã'ÂÂIxk xk ÂxkÃ"Zþÿþÿþÿþÿþÿþÿ]TIGHTENED UNION ON DISP #2&3 TO FIX SLOW WEEP. ALSO INSPECTED TANK 3, WHICH IS AN AST. -MLGxkÃ@ÂJ=ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃAÁUÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃBÁTÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃCÂ^   xk xk Âxk þÿþÿþÿþÿþÿþÿþÿKPIPING SUMP SENSORS HERE NOT PROPERLY LOCATED SO THEY WERE ADJUSTED. -MLGxk ÃDÃ%ÂÂ)xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþTANKS 1 AND 2 ARE OUT OF SERVICE, TAKEN OUT 6/2006. MONITOR HAS SENSOR #4 READING UNRELIABLE. THERE IS NO SENSOR #4. CANNOT CLEAR MONITOR FOR SENSOR #4. ALL INTERSTITIAL MONITORS WORKING OK. DISPENSER 3&4 IS OUT OF SERICE. PUMP LOCKED AND WRAPPED. -MLGxkÃ$Â5 ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ‹THERE WAS SOME OLD WATER IN TANK 10 SUMP-REMOVED- BELIEVE IT CAME IN FROM THE LID AS IT WAS DIFFICULT TO GET COVER BACK ON DUE TO SHAPE OF SUMP TOP. CLEANED SPILL BUCKETS- TANK 11 SPILL BUCKET IS BROKEN AT GRADE- IS SCHEDULED FOR REPLACEMENT. RECOMMENDING REPLACING ELECTRONIC LEAK DETECTORS. TIGHTENED UP SEVERAL UNIONS UNDER DISPENSERS- ALSO ON DIESEL DISPENSER- TIGHTENED UP ALL BOLTS ON METER AS THERE WERE MANY WEEPS. ALSO PUMPED OUT WATER AND WATER AND DIESEL FROM UNDER ALL DISPENSERS. -MLG CTI DON BUBAR: REPLACED DIESEL SPILL BUCKET WITH 15 GALLON. REPLACED 2 ELECTRONIC WITH 2 MECHANICAL LEAK DETECTOR AND RETESTED ALL 3, AND THEY PASSED.xkÃFÂO5 Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿðREMOVED 2" OF WATER FROM ANNULAR SPACE. WATER INFILATRATION APPEARS AT RISER CAP- ONLY HAND TIGHT, APPLIED PIPE DOPE AND TIGHTENED, NOTIFIED TIM RECTOR. PERFORMED A PASSING VACUUM TEST AT TANK ANNULAR SPACE. CHAMBER ONE CONTAINS .5" WATER, RECOMMENDED REMOVAL. CHAMBER 2 CONTAINS .25" OF WATER, RECOMMENDED REMOVAL. FILL ADAPTER CORRODED TO RISER PIPE- CUT OFF AND REMOVED. NO HOSE BREAKAWAYS AT DISPENSER HOSES, RECOMMENDED BREAKAWAYS BE INSTALLED TO PREVENT POSSIBLE DAMAGE TO DISPENSER. -MLGxk ÃGÃ1  Á$xk xk Âxk þÿþÿþÿþÿþÿþÿþÿõHAD TO REMOVE SPILL BUCKETS TO CHECK FLAPPER DROP TUBES. REPLACED FILL CAP AND ADAPTER 5-1. REPLACED FILL GASKET. OLD STAINING ON UNION- TIGHTENED UNION ON 9&10. HAD TO REMOVE SPILL BUCKETS TO CHECK DROP TUBES- ABOVE GROUND SPILL BUCKETS. -MLGxk ÃHÂ\  Â^xk xkÂxk þÿþÿþÿþÿþÿþÿþÿ^7/7/07 COPI FOR CTI CARVER INSTALLATION OF 15 GAL SPILL BUCKET AND 2" SW FG AMERON VENT PIPINGxk ÃIÃ_*ÂÂRxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃMÂÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ7 SENSORS ARE FUNCTIONING PROPERLY?: PETROMETER MODEL 20xkÃJÃÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿÄTANK 6-1 HAS ABOVEGROUND SPILL BUCKET. SOME CONFUSION WITH TANK 6-1: WAS THOUGHT TO BE TRANSFERRED TO ANOTHER OWNER, BUT THIS WAS UNTRUE. IT WAS INSPECTED 7/11/07, TWO MONTHS AFTER TANK 5-1. -MLGxkÃKÂ?4ÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿzOOS- PRODUCT PIPING STILL HOOKED TO PUMPS- TANKS VENTED. NO LOCK ON FILL PIPE- AND MORE THAN 1" OF PRODUCT IN TANKS. -MLGxkÃLÂ?ÂÂ)xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿbFUEL OIL 5" OF PRODUCT- SITE MAY BE HEATING BUILDING. ACTUAL DATE OF INSPECTION WAS 5/18/07. -MLGxk ÃNÂ(/ Á xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃOÃc<ÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃPÃ,< Á xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃRÂcXÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ@7/17/07 COPI - CTI BEAUMONT INSTALLED OMNTEC ELEC OVERFILL ALARMxkÃSÂÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃTÂMÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿHREPAIRED ELECTRICAL CONNECTIONS OF INTERSTITIAL MONITORING DEVICE. -MLGxkÃUà 0ÂÂDxkxkÂxkþÿþÿþÿþÿþÿþÿþÿˆTANKS OOS. TANK READING: TANK 6: -1.16, -1.1, -1.09; TANK 7: -1.18, -1.2, -1.17; TANK 8: -1.19, -1.2, -1.16; TANK 9: -1.19, -1.19, -1.17xkÃVÂ#b Á$xkxkÂxk à þÿþÿþÿþÿþÿþÿ6/5/09 TEL. CALL FROM DAVE BEAUMONT, TANKS HAVE BEEN REMOVED, PAPERWORK FORTHCOMING. TR 4/13/09-NOI TO ABANDON REC'D-CTI BEAUMONT TO SUPERVISE PULL, AND FESSENDEN TO DO SA PH SALES JUNE: SUPER SALES- 317 +/- 3, PASS; REGULAR SALES- 8463 +/- -11, PASS. PAINTED LIDS ON SPILL BUCKETS. REPLACED LID ON 2-1 PREMIUM. REPLACED VAPOR CAP AND ADAPTER ON 2-1. REPLACED FILL CAP ON 1-1. -MLG 6/13/08 FACILITY BEING TAKEN OOS. DISPENSER REMOVED AND ISLAND, LINES CAPPED. TANK AND LINES NOT BEING REMOVED AT THIS TIME PER JOHN MULLINS, CTI. -TRxk ÃWÂYMÂÂ;xk xkÂxkÃRPþÿþÿþÿþÿþÿþÿþÿxkÃXÃ&ÂÂ;xk xkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃYà ÂÂ;xk xkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃZÃ+ ÂÂ;xk xkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã[ÂY^ÂÂ;xk xkÂxk ÃI; þÿþÿþÿþÿþÿþÿþÿxk Ã\ÂÂÂ;xk xkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã]Ã` ÂÂ:xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ^Â@ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿRHAD TO REPLACE 1-LS-ASC PIPING SUMP SENSOR, EXISTING SENSOR WOULD NOT WORK. -MLGxkÃ_Â@ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: .868, .865, .866xkÃ`Â@ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃaÂ@ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ TANK READING: .861, .88, .883xkÃbÃ.ÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃcÂ/Q Â!xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ãdà  ÂLxkxkÂxkþÿþÿþÿþÿþÿþÿþÿPCLEANED DIRT FROM AROUND PIPING SUMP LID. COVER WAS UNABLE TO SEAL TIGHT. -MLGxkÃÃ]- ÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂI ÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÃ`"ÂÂRxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ&REPLACED VAPOR RECOVERY ADAPTER. -MLGxk ÃÂ_ÂÂTxkxkÂxkþÿþÿþÿþÿþÿþÿþÿŸ8/28/08 BANK OWNED, SHORT SALE CLOSING 9/25 TO JON BEAUPRE (OWNER OF AYOTTES REG #2230). LETTER TO BEAUPRE EXPLAINING WORK NEEDED AT FACILITY, OOS REQMTS. -MLxkÃÃÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ5ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ&ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ§OLD PETROMETER WAS NOT WORKING- SPOKE TO TED SCHARF, HE GAVE US THE OK TO INSTALL NEW CONSOLE 6/29/07. -MLG CTI SIMARD INSTALLED ILS-250 FOR TANK MONITORING ON 7/5/07xkà Ã\SÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Ã.XÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â.%ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ95/28/08 COPI - CTI SIMARD INSTALLED SPILL BUCKET ON SUPERxkà Ã!ÂÂHxkxkÂxkþÿþÿþÿþÿþÿþÿþÿX TANK READING: TANK 1: -.86, -.9, -.89; TANK 2: -.9, -.87, -.9; TANK 3: -.98, -.94, -.96xkà à ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ# TANK READING: -1.44, -1.332, -1.11xkÃÃIMÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ$ TANK READING: -1.035, -1.01, -1.031xkÃÃ1ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -1.032, -.928, -.98xkÃÂ<  ÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿoCHANGED MONITORING SYSTEM TO OMNTEC LU-2. INSPECTOR ACTUALLY IRA DODGE. -MLG TANK READING: -1.06, -1.04, -1.06xk ÃÃ# ÂYxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ5CHANGED LOCKING RING AND GASKET ON SUMP COVER. -MLGxk ÃÂS ÂYxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ:RECEIVED PASSING AST INSPECTION REPORT DATED 6/19/2007. BBxk ÃÃ`( Â`xkxkÂxk à ]þÿþÿþÿþÿþÿþÿ6REPAIRED WIRE CONNECTIONS AT THE UNLEADED TANK. -MLGxk ÃÃG Â+xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÃ0ÂÂxkxkÂxkÃ9 þÿþÿþÿþÿþÿþÿ.REPLACED FAULTY SENSOR BOARD IN TLS 350. -MLGxkÃÂd< xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃMÃJÂÂ\xjxjÂWxj þÿþÿþÿþÿþÿþÿþÿýFILL CAP NOT LIQUID TIGHT REPLACED PER CTI AARON THORNDIKE. MONTORING CONSOLE IS FULLY OPERATIONAL?: PETROMETER 20 TYPE T MONITOR FAULTY. INSTALLED A VEEDED ROOT ILS 350 AND VEEDER ROOT STEEL TANK SENSOR AND ASSOCIATED WIRING PER CTI AARON THORNDIKE. xj ÃÂ+SÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿžSUMP HAD SEVERAL INCHES OF WATER IN IT- LEAK DETECTION SYSTEM IN ALARM. CLEANED SUMP, REPLACED PROBE, RESEET SYSTEM. -MLG TANK READING: -.977. -1.02, -1.096xkÃÂUÂÂ)xkxkÂxkÃWQþÿþÿþÿþÿþÿþÿlSYSTEM SUMP HAD SOME WATER-CLEANED OUT AND RESEALED LID. HAS 3- 1 1/2 HP TURBINES. 2- 3/4 HP TURBINES. -MLGxkÃÃK Á$xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ=ONE INTERSTITIAL SENSOR FOR TANK 7 (LOCATED AT ISLAND). ONE TANK INTERSTITIAL SENSOR FOR BOTH COMPARTMENTS OF TANK 8- 2 SUMP SENSOR. HOLES IN SPILL BUCKET 7-1 AND 7-3. CLEANED AND PAINTED SPILL BUCKETS. REPLACED BRASS ADAPTER ON 8-1 SPILL BUCKET AS IT HAD FUEL IN IT FROM WARPED ADAPTER. REPLACED GASKET AND 4" FUEL COVER ON 8-2. REPLACED 8-1 LLD. REPLACED GASKET IN BRASS ADAPTER FOR 7-3. CRASH VALVE 1" INSTEAD OF 1/2" LOW ON DISPENSER 9&10. SHANED VAPOR POINT. REPLACED VAPOR ADAPTER AND CAP ON 8-1. REPLACED FILL CAP ON 8-1. MINOR STAINING ON METERS AND UNIONS. -MLGxk ÃÂ. ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ<CRASH VALVES ARE HIGH, DISPENSER MOUNTED OUT ON DOCK. -MLGxkÃÂ5ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿOCLEANED WATER AND DIRT OUT OF SPILL BUCKETS. HAS 2-3/4 HP R.J. TURBINES. -MLGxkÃÃ+ Â;xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -.901, -.911, -.906xkÃà G Â;xkxkÂxkþÿþÿþÿþÿþÿþÿþÿc TANK READING: TANK 6: -.92, -.933, -.928; TANK 7: -.913, -.916, -.907; TANK 8: -.901, -.926, -.918xkÃÃd2 Â;xkxkÂxkÄDU'þÿþÿþÿþÿþÿþÿCLEANED WATER FROM DIESEL DIPSENSER SUMP. LEAKS IN AROUND DISPENSER. UNIT NOT UNDER CANOPY. REPLACED FILL CAP ON ONE TANK. -MLG xkÃÂ% Â4xkxkÂxk Ã?þÿþÿþÿþÿþÿþÿþÿxk à Ã`a Â4xkxkÂxkÄ!6þÿþÿþÿþÿþÿþÿþÿxkÃ!Â. ÂbxkxkÂxk Ã%\þÿþÿþÿþÿþÿþÿþÿxk Ã"Ã.ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿDAPPARENTLY A NEW TANK WAS INSTALLED IN 2005 AFTER THE OLD ONE WAS REMOVED. THE DEP HAD NO RECORD OF CERTIFICATE OF PROPER INSTALLATION OR REGISTRATION. CALLED SIMARDS AND SCOTTIE FAXED A COPY OF THE REGISTRATION, WHICH IS NOW IN THE FOLDER. SCOTTIE SAID HE WILL CONTINUE TO LOOK THROUGH THE FILE FOR OTHER INFORMATION. -MLGxk Ã#ÂB ÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$ÃL ÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%ÃQ* ÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&à ]ÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'Â! ÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿH6/5/09-NOITA REC'D FOR JR BOUCHER & SONS TO PULL ALL TANKS AND PIPING PHxkÃ(Ã3T ÂSxkxkÂxkÃ)þÿþÿþÿþÿþÿþÿþÿxkÃ) 1 ÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*Â&ÂÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ+Â"EÂÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ,Ã\+ÂÂSxkxkÂxkà þÿþÿþÿþÿþÿþÿþÿxkÃ- ÂÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ. ÂÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿz7/21/08 REGN FOR CTI HERSEY TO REMOVE EXISTING PIPING, INSTALL DW FLEX W/CONT MONITORING AND NEW TANK TOP INC SPILL BUCKETxkÃ/ Â ÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ0 Â ÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ7/21/08 REGISTRATION FOR CTI HERSEY TO REMOVE EXISTING PIPING, INSTALL DW FLEX W/CONT MONITORING, NEW TANK TOP INC SPILL BUCKETxkÃ1 a Â\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ{MONITOR WELLS 1&2- NO APPARENT SHEEN OR ODOR OBSERVED. NEW FACILITY OPERATOR- LOG SHEET UNAVAILABLE (PROVIDED NEW LOG SHEET AND INSTRUCTIONS FOR USE). REPLACED FILL CAP DUE TO NOT BEING LIQUID TIGHT. REMOVED WATER/DEBRIS FROM SPILL BUCKET. NO OVERFILL DEVICE FOUND ON TANK- POSSIBLE WHISTLE. RECOMMENDED VERIFICATION OR INSTALLATION OF INSPECTABLE FORM OF OVERFILL DEVICE. -MLGxk Ã2 _ Â\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿMONITOR WELLS 1&2- NO APPARENT SHEEN OR ODOR OBSERVED. NEW FACILITY OPERATOR- LOG SHEET UNAVAILABLE (PROVIDED NEW LOG SHEET AND INSTRUCTIONS FOR USE). REPLACED FILL CAP DUE TO NOT BEING LIQUID TIGHT. REMOVED WATER FROM SPILL BUCKETS. TANK BOTTOM CONTAINS 1.25" OF WATER, RECOMMENDED REMOVAL. NO OVERFILL DEVICE FOUND ON TANK- POSSIBLE WHISTLE. RECOMMENDED VERIFICATION OR INSTALLATION OR INSPECTABLE FORM OF OVERFILL DEVICE. -MLG 12/19/07 COPI - CTI LEWIS REPLACED DAMAGED SPILL BUCKET W/5 GAL BUCKET DUE TO SHALLOW BURIAL DEPTH OF TANKxk Ã3 b Â\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿsMONITOR WELLS 1&2- NO APPARENT SHEEN OR ODOR OBSERVED. NEW FACILITY OPERATOR- LOG SHEET UNAVAILABLE (PROVIDED NEW LOG SHEET AND INSTRUCTIONS FOR USE). REPLACED FILL CAP DUE TO NOT BEING LIQUID TIGHT. REMOVED FUEL FROM SPILL BUCKET. NO OVERFILL DEVICE FOUND ON TANK- POSSIBLE WHISTLE. RECOMMENDED VERIFICATION OR INSTALLATION OF INSPECTABLE FORM OF OVERFILL DEVICE. -MLGxk Ã4 ` Â\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ\MONITOR WELLS 1&2- NO APPARENT SHEEN. NEW FACILITY OPERATOR- LOG SHEET UNAVAILABLE (PROVIDED WITH LOG AND INSTRUCTIONS ON USE). REPLACED FILL CAP DUE TO NOT BEING LIQUID TIGHT. REMOVED WATER FROM SPILL BUCKET. NO OVERFILL DEVICE FOUND ON TANK- POSSIBLE WHISTLE. RECOMMENDED VERIFICATION OR INSTALLATION OF INSPECTABLE FORM OF OVERFILL DEVICE. -MLGxk Ã5Ã+I Â\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿæTANKS 1,2,3 REPLACED FILL CAPS DUE TO NOT BEING LIQUID TIGHT. REMOVED WATER/DEBRIS FROM SPILL BUCKETS. TANK 1- TANK BOTTOM CONTAINS .5" OF WTER, TANK 3- TANK BOTTOM CONTAINS 1" OF WATER. RECOMMEND REMOVAL OF WATER FOR BOTH. -MLGxk Ã6Â4Y Â\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ–ALL TANKS- REMOVED EXCESSIVE SAND/BACKFILL MATERIAL FROM ANNULAR SPACE AND PIPING SUMP MANHOLES TO FACILITATE PROPER LID SEALS. TANK 9- TANK BOTTOM CONTAINS APPROXIMATELY 1.5" OF WATER, RECOMMENDED REMOVAL. TANKS 11 & 12- CUT OFF VAPOR RECOVERY ADAPTERS AND REPLACED DUE TO THE FACT THAT THEY WERE CORRODED TO THE RISER PIPES. REPLACED TANK 11 VAPOR RECOVERY CAP LID DUE TO NOT BEING LIQUID TIGHT. -MLG xk Ã7Â-  Â\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿãALL TANKS- REMOVED DRUMS AND CLEANED DUE TO SMALL AMOUNT OF WATER BEING IN PIPING SUMPS. WATER INFILTRATION APPEARS AT ELECTRICAL CONDUIT UNIONS; APPLIED SEALANT BUT UNABLE TO REPAIR PROPERLY AT THIS TIME DUE TO HIGH WATER TABLE. RECOMMEND REPAIR ONCE WATER TABLE IS LOWER. NOTIFIED JOHN BRANSCOM, MTA AND LIZA WOODWARD, MEDEP. TANK 11- GAUGING PROBE PROGRAMMING FAULTY AT TANK MONITOR (REPAIRED). REPLACED GAUGING PROBE CONNECTOR. ALL TANKS FILL CAPS REPLACED DUE TO NOT BEING LIQUID TIGHT. TANKD 11- TANK BOTTOM CONTAINS APPROXIMATELY 1.5" OF WATER- RECOMMENDED REMOVAL. REPLACED FILL CAP ADAPTER DUE TO NOT BEING LIQUID TIGHT. REMOVED WATER/DEBRIS/FUEL FROM SPILL BUCKETS. TANKS 8,9,10- REPLACED VAPOR RECOVERY CAP DUE TO NOT BEING LIQUID TIGHT. -MLG ON JULY 23, 2007 MIKE LEWIS CALLED TO CONFIRM THAT HE HAS CHECKED THE PIPING SUMP ON FRIDAY AND TODAY AND FOUND THAT THE WATER HAS NOT RETURNED. BELIEVED WATER INTURSION PROBLEM IS FIXED. -LW 7/17/07 CTI WILSON INSTALLED 2 DISPENSER SUMPSxkÃ8ÃY ÂÂRxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ9ÂU ÂRxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ@ TANK READING: TANK 3: -.91, -.85, -.87; TANK 4: -.95, -.98, -.9xkÃ:ÂU ÂRxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿgBOTH TANKS PASSED CP LAST YEAR. VERY DRY SOIL WHEN TEST WAS PERFORMED. -MLG 7/24/07 CP FAIL LETTER -MLxkÃ;ÂU ÂRxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ REPLAECED CAP ON TANK 6-2. REPLACED POPPET ON TANKS 2-1 & 6-1. WEEPS UNDER DIESEL PUMP. -MLG CP FAIL LETTER 7/24/07 -ML LETTER DATED 1/15/08. TANK 2 IS OOS PENDING REMOVAL. PER GREENLAW IT IS LOCKED AND CAPPED AND DISCONNECTED. REMOVAL TO TAKE PLACE SPRING 2008. TRxkÃ<Ã)ÂÂRxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ=à 5ÂÂRxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ>ÃXA ÂxkxkÂxkÃ)þÿþÿþÿþÿþÿþÿ SMALL CHIP IN SUPER COVER. -MLGxkÃ?ÂÂÂRxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ@ÂU"ÂÂRxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃAÃX? ÁxkxkÂxk þÿþÿþÿþÿþÿþÿþÿe#45- CRAGGED OUT VMI WITH VMI AND RETEST LINE LEAK DETECTOR. STILL WILL NOT HOLD IN LEAK MODE. -MLGxkÃBÂ6ÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿMCTI KIRK ST. PETER INSTALLED NEW SENSOR IN #2 F.O. INTERSTITIAL SPACE. -MLGxkÃC  ÂxkxkÂxkÃIþÿþÿþÿþÿþÿþÿþÿxkÃDÂFÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿNEEDS SITE VISIT. BBxkÃEÂ*  xkxkÂxk Ã?Cþÿþÿþÿþÿþÿþÿþÿxk ÃF  ÂLxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃHÂP ÂKxkxkÂxk ÃþÿþÿþÿþÿþÿþÿNEW SUMPS ON TANK TOP.xk Ã.Â-;ÂÂ)xkxkÂxj þÿþÿþÿþÿþÿþÿþÿ|VENT PIPE FAILED CP - OKAY 5/07 REGISTRATION - TANKTOP UPGRADE PLANNED FOR TANK 4 7/07 NOI - TANK 4 NOW PLANNED FOR REMOVALxj à &ÂbdÂÂ!xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj ÃIÂ7ÂÂxkxkÂxkÄ3þÿþÿþÿþÿþÿþÿEMCO WHEATON LEAK SENSOR JRxkÃJÂE ÂLxkxkÂþÿÃ&ESþÿþÿþÿþÿþÿþÿYCALL FROM CLINT DUVAL BECAUSE HE GOT THE SIA NOV. I TOLD HIM BECAUSE HIS TANKS ARE STILL OOS THE NOV DID NOT APPLY. BUT THE TANKS DO NEED TO BE REMOVED DUE TO BEING PAST THE OOS TIME LIMIT. HE KNEW THEY NEEDED TO BE REMOVED BUT SAID HE DOES NOT HAVE THE MONEY. I REFERED HIM TO FAME FOR A LOAN. 3/28/2012 TED 7/25/07 AI FAIL & OOS LETTER -MLxk ÃKÃKÂÁxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃLÂ?,ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&Â-LÂÂHxjxjÂþÿÃLþÿþÿþÿþÿþÿþÿ'AFTER COMPLIANCE INSPECTION ON 7/24/2007, FACILITY OWNER HAD MIKE LEWIS FAX OVER CP TEST ( ALTHOUGH NOT PART OF CORRECTION ACTION IN NOV ISSUED), ANNUAL INSPECTION IS TO TAKE PLACE NEXT MONTH. TANK READINGS WERE: TANK #3: -1.01 AND TANK #4: -1.09. WILL ENTER THEM WHEN I GET THE COMPLETED A.I.xj ÃNÃ5 Á$xkxkÂxk Ã`7AþÿþÿþÿþÿþÿþÿßBRINE SOLUTION IN ANNULAR SPACE- NO SUMPS. PREMIUM FLAPPER DOES NOT WORK PROPERLY. HOLE IN BOTTOM OF REGULAR SPILL BUCKET. PREMIUM LEAK DETECTION DID NOT DETECT 3GPH LEAK. REPLACED VAPOR CAP ON 2-1. REPLACED VAPOR CAP WITH LOW PROFILE VAPOR CAP ON 4-1. STAINING ON SOME UNIONS UNDER DISPENSER- CLEANED. REPLACED BOLTS HOLDING CRASH VALVE FOR PLUS UNDER DISPENSER 3&4. THEY WERE TOO LONG AND NOT PROPERLY HOLDING CRASH VALVES. -MLG 11/1/07 COPI - CTI BUBAR REPLACED SPILL BUCKETxk ÃOÂA  Â4xkxkÂxkÃ@þÿþÿþÿþÿþÿþÿþÿxkÃPÂ* Â4xkxkÂxkÃ3`þÿþÿþÿþÿþÿþÿOREPLACED SPILL BUCKET LID ON TANK 10. REMOVED WATER FROM ALL FILL BOXES. -MLGxkÃQÂ'\ÂÂ4xkxkÂxkþÿþÿþÿþÿþÿþÿþÿGMAINTENANCE KEEPS RECORD OF INTERSTITIAL INSPECTION ON COMPUTER. -MLG xkÃRÃ5N Â4xkxkÂxkÃ"aþÿþÿþÿþÿþÿþÿþÿxkÃSÂ4 Â4xkxkÂxkÃþÿþÿþÿþÿþÿþÿþÿxkÃTÂAB Â)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ58/8/07 COPI CTI MULLINS REPLACED FLAPPER ON TANK 10-1xk ÃUÂ( ÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿiOIL LINES ARE DISCONNECTED WHILE WAITING FOR NEW FURNACE. SENSORS ALL TESTED AND ARE WORKING FINE. -MLGxkÃV Â)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃWÂÂÂMxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃXÃ&\ ÂxkxkÂxkÃ)þÿþÿþÿþÿþÿþÿJREMOVED WATER FROM SPILL BUCKETS. ADJUSTED STAGE 1 ADAPTER ON SUPER TANK.xkà TÂXBÂÂ)xj xj ÂxkþÿþÿþÿþÿþÿþÿþÿrREPLACED VAPOR ADAPTER FOR TANK 8-1 NOT USING ATG AS THEIR LEAK DETECTION METHOD. USING DAILY INVENTORY AND SIA.xj à Â^ ÂÂAxjxjÂþÿÃ98Jþÿþÿþÿþÿþÿþÿ12/21/06 OWNER WAS WAITING FOR DRISKO TO GET LICENSE BACK TO REPLACE SPILL BUCKETS. RECOMMENDED OWNER CONTACT DRISKO REGARDING $ ALREADY PAID DOWN FOR WORK AND DRISKO'S ABILITY TO DO WORK. -ML 8/8/07 INCOMPLETE AI, ON MEL'S DESK 8/9/07 COPI - CTI GIFFORD REPLACED SPILL BUCKETSxjÃ[Â%*ÂÂRxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ 9/2/09-NOITA FOR REMOVAL OF TANKS BEING REPLACED-PH 6/9/09-REGISTRATION FOR CTI BOSSE SR. TO INSTALL NEW TANK, SPLIT 4000 AND 11000 PH CP FAIL LETTER 8/6/07 -ML CP READINGS: TANK 3 -.45, -.6, -.6 TANK 4 -.62, -.65, -.75 TANK 5 -.56, -.73, -.8 TANK 6 -.66, -.72, -.75xkÃ\ÂSCÂÂRxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ{4/30/09-NOTICE OF INTENT TO ABANDON ALL TANKS, CTI BARTON TO DO REMOVAL, DON ROBBINS TO DO SA PH CP FAIL LETTER 8/6/07 -MLxkÃ]ÂÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿaAUDIBLE ALARM NOT WORKING; SUMP SENSOR NOT WORKING AI FAIL LETTER 8/6/07 -ML OWNER CALLED AND LEFT MESSAGE 8/8/2007, SAID HE GOT THE DEPARTMENT'S FAIL LETTER. ORDERED THE PROBE, AND WILL BE INSTALLED ONCE IT ARRIVES. WANTED TO MAKE SURE DEPARTMENT KNEW HE WAS WORKING ON IT, BUT IT MIGHT TAKE A COUPLE OF MORE WEEKS, THEN THE 30 DAY REQUIREMENT. -LWxkÃ^ÃJ; ÂIxkxkÂxk ÃAþÿþÿþÿþÿþÿþÿþÿxk Ã_àÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿu8/14/07 COPI - CTI MULLINS INSTALLED 5 GALL SPILL BUCKET; CLOSE PROXIMITY TO ADJACENT MANHOLE. UPGRADE TO PASSING AIxkÃ`ÃU6ÂÂKxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ%GAS DISP 7/8, DSL DISP 1/2 - CRASH VALVES TOO LOW, ANCHOR NEEDS TO BE @ 90DEGREES TO BOX; DSL DISPS 3/4 AND 5/6 ANCHOR NEEDS TO BE @ 90DEGREES. ALL DISPENSERS NEED TO BE ANCHORED. POPPET VALVE SHOWING AGE 8/6/07 AI FAIL LETTER -ML ALL REPAIRS MADE, NOW PASSING PER CTI LETTELIER. TRxk ÃaÃ.ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿjTANKS 481, 482, 491 SUMPS FULL OF WATER, ONE CONDUIT LEAK. PUMPED OUT, RESECURED LIDS 5/8/07 TANKS 482, 484, 491 RETEST TO PASS CP; TANK 481 STILL FAILING ASTS: 498, 499, 500 PASSED ANNUAL PIPING INSPECTION DATED 4/26/07. EATON REPLACED VENT WHISTLE ON 498-2 ON 6/15/07 BB 12/20/07 COPI - CTI DODGE INSTALLED ANODES ON TANK 481 READINGS -1.21, -1.03, -1.28xkÃbÂ5 ÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ±REMOVED WATER FROM 4 PIPING SUMPS HEATING OIL HAS 4" RISER REDUCED TO 2" SCULLY FILL 5/25/07 COPI - CTI LEGASSE JR INSTALLED 4" FILL PIPE W/NEW 5-GAL SPILL BUCKET AND FLAPPER.xkÃc ] ÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃdÃ3PÂÂSxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÃ! ÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿOOS PERIOD EXTENSION APPROVED UNTIL 7/2008 7/8/08 RAY LEMAY CALLED - PT PASSED, REPORT ON ITS WAY. DISPENSERS MUST BE REPLACED. APPROVED OOS UNTIL 9/1/08. 8/1/08 DISPENSERS ORDERED, WILL FAX PT RESULTS. CAN AI BE DONE WHILE STILL OOS? YES, MUST DO AND SUBMIT WITHIN NEXT 30 DAYS. -MLxk ÂdQÃNÂÂUxjxjÂxjþÿþÿþÿþÿþÿþÿþÿþÿxjàÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿØMONTHLY INVENTORY WAS OFF + 152. 1% IS 75 GALLONS. CALIBRATION WAS UNDER ADJUSTED TO 0. SITE WILL MONITOR. (DURING COMPLIANCE INSPECTION TOLD OWNER NEEDS TO RECONCILE MONTHLY -LW) PUMPED WATER FROM SPILL BUCKET.xk ÃÂU Â\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿÆNO SPACERS REMOVED <1 GAL WATER FROM PIPING SUMP AND CLEANED OUT AROUND LID REPLACED FILL CAP FAILING AI LETTER 8/8/07 -ML 8/1/08 COPI FOR CTI LEWIS TO REPLACE SUMP REDUCER AND LID-REC'D 1/5/09-PHxkàÂ\xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ NO SHEEN OR ODOR IN MONITORING WELLS; RECOMMENDED ATG AND ELLDS REPLACED FILL CAPS CP READINGS: TANK 6 -.98, -.998, -1 TANK 7 -1.02, -1.05, -1.05 FAILING AI LETTER 8/8/07 -ML 3/26/08 UPGRAD REGN FOR CTI WILSON TO INSTALL CSLD ATG AND CONVERT TO SUCTION PIPING SYSTEMSxkÃÂ*ÂÂxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ$TANKS 1+4 APRIL 07 38844 GAL, 607 OVER; MAY 39664 GAL, -523 SHORT TANK 3 APRIL 07 2193 GAL, 268 OVER; MAY 2203 GAL, -225 SHORT 1" MISSING FROM END OF GAUGE STICK 8/13/07 AI FAIL LETTER REITERATE REMOVAL DATE. OWNER ALREADY INFORMED BY DMCL OF REMOVAL REQUIREMENT, NO EXTENSION ALLOWED. -MLxkÃÃcÂÂxk xk ÂxkÄcVþÿþÿþÿþÿþÿþÿ OMNTEC LU2xkÃÃTH ÂYxkxk ÂxkÃ7þÿþÿþÿþÿþÿþÿLEAK SENSOR JR/OMNTEC LU-2xkÃÂb Âxk xk ÂxkÃ!cbþÿþÿþÿþÿþÿþÿ¨INSTALLED NEW SUMP LIDS- RESEALED CONDUIT. 9/9/08 UPGRADE REGN FOR CTI CORMIER TO REPLACE PREM VENT PIPE AND REPAIR DSL SUCTION PUMP IF NEEDED (LOSING PRIME OVERNIGHT)xkà ÂA- Â\xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ7 TANK READING: -.917, -.997, -.907 TESTED BY MIKE LEWISxkà ÃS- Â\xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ%REMOVED FUEL/DEBRIS FROM SPILL BUCKETxkà ÂÃD$ Â4xkxkÂxkÄ^7þÿþÿþÿþÿþÿþÿ:OTHER INSPECTOR ERIC ELLIOT TANK 1 REPLACED VAPOR POPPET.xkÃ?ÂOA Â4xkxkÂxkÃDþÿþÿþÿþÿþÿþÿ) TANK READING: HAD TO ADD WATER TO TANKS.xkÃ@ÂN  Â\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿßTANK CP READINGS: -.851, -.911, -.875 PER MIKE LEWIS FILL CAP NOT LIQUID TIGHT (REPLACED) TANK BOTTOM CONTAINS 1'' WATER (RECOMMEND REMOVAL) FACILITY PUMPS LESS THAN 10,000 GALLON PER MONTHS, AND LESS THAN 50,000 PER YEAR.xk ÃAÂ:F ÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿFILL CAP DAMAGED (REPLACED)xkÃBÃO Â4xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxkÃCÂ#[ ÂZxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ^WE FOUND 2 LEAK DETECTORS THAT DID NOT PASS, WE HAVE A TECH SCHEDULED TO REPLACE AND RETEST. REPLACED LLD ON PREMIUM TANK. TANK # 12-1 REPLACED 6150 AUTO SHUT OFF/FLAPPER WHILE ON SITE. 8/29/07 CTI DAVIS UPDATE TO PASS - LEAK DETECTORS SET UP AS MASTER SLAVE WITH FEPETRO SMART CONTROLLER. COPI - CTI BUBAR INSTALLED SPILL BUCKET ON HO TANK 5/3/07xkÃDà  ÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃEÂS  Â)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ#CLEANED OUT DIRT FROM SPILL BUCKET.xkÃFÃP Â)xkxkÂþÿþÿþÿþÿþÿþÿþÿþÿLFAIL LETTER SENT OCTOBER 10, 2007. GARY MOULTON, FACILITIES MANAGER FOR BUCKSPORT SCHOOLS CALLED 10/19/07. HE HAS GOTTEN IN TOUCH WITH ADAMS IN BBANGOR TO COME LOOK AT THE PROBLEM. ALSO FLAPPER INSTALLED ON TANK FOR OVERFILL. TR 9/18/07 COPI - CTI LEGASSE JR INSTALLED FLAPPER CP TANK READING: -.855 HAS TC PIPING SUMP, TWO PIECE WHERE TOP BOLTS TO BOTTOM LEAKING AROUND BOOTS, BOLTS ALL RUSTED AWAY. ALARM LIGHT OUT ON PIPING SUMP SENSOR. SUMPS ARE NOT IN LIQUID TIGHT CONDITION. VENT MORE THAN 8 FEET APPROX. 25'. HAS WAVER FROM DEP. CLEANED OUT BUCKETS INSTALLED NEW CAP.xkÃGÂ#@ ÂZxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿ9TANKS 1 & 2 (JET A) SHARE FILL PIPE, CONTROLLED BY VALVESxkÃHÃH Â)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿÓCLEANED DIRT OUT OF SPILL BUCKETS. ALSO HAS PRENUMACATOR OVER FILL ALARM. TEST WORKS NOT ABLE TO PULL PROBE. 9/18/07 COPI - CTI LEGASSE JR REMOVED 4" FILL, REPLACED W/SCH 40, REPLACED FLAPPER AND SPILL BUCKETxkÃIÃ`  Â)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿNPIPING SUMP HAD SOME WATER CLEANED OUTM, TOP LID LOOSE. CLEANED AND RESEALED.xkÃJÂUE Â)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ.CLEANED OUT DIRT AND WATER FROM SPILL BUCKETS.xkÃKÂ1H Â)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ¯5/5/09-UPGRADE REG. REC'D. FOR CTI'S BUBAR AND LEGASSE SR. TO REPLACE SPILL BUCKET PH VERY LOW THRU PUT. IN HOUSE USE ONLY. LEFT NEW TANK STICK. CLEANED OUT A LITTLE WATERxk ÃLÃ3S Â)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿTANK 1 & 2 SYPHON CONNECTIONxk ÃMÃ<  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ½KENNETH LEGASSE JR. PERFORMED A.I. NOT SR. PUMPED 3/4'' OF WATER FROM INTERSTITIAL. CHANGED BAD BELL SENSOR. ALL FUNCTIONS NORMAL NOW. ALSO, PUMPED SMALL AMOUNT OF WATER FROM YARD SUMP.xkÃNÂKX ÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃOÂ3:  xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ×KENNETH LEGASSE JR. PERFORMED A.I. NOT SR. PUMPED 40 GALLONS OF WATER FROM YARD SUMP. SUCTION/ RETURN LINES SEPARATED BY SPACERS? COPPER LINES ARE SECONDARILY CONTAINED IN 4'' PVC PIPE AND MONITORED IN YARD SUMP.xk ÃPÃCF  xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ'REPLACED BAD INTERSTITIAL BRINE SENSOR.xk ÃQÂ"P ÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃRÂG, Â\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿM1986 INSTALL, NO MONITORING WELLS SO NO OVERFILL AND SPILL BUCKETS REQUIRED. xkÃSÃ^I ÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ$PUMPED WATER FROM ALL SPILL BUCKETS.xkÃTÂ0 Á$xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ“REPLACED FLAPPER DRUPTUBE 5-2, 5-3. CLEANED ALL SPILL BUCKETS- A LOT OF DEBRIS IN THEM- PAINTED COVERS. REPLACED BRASS ADAPTER AND FILL CAP 5-2.xk ÃUÃ-E Á$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿãREPLACED SUMP SENSOR 6-2 REPLACED SUMP SENSOR 7-1 REPLACED LID 6-3- CLEANED OUT DIESEL SPILL BUCKET. CORRECTED DROP TUBE LENGTH 6-1 DIESEL CRASH VALVE HAS BEEN APPROVED BY DEP TO BE A LITTLE HIGH ACCORDING TO GAFTEK RECORDS.xkÃV Á$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ×CONSOLE NEEDED REPAIRS- DID SO- TESTED OUT OK. SPILL BUCKETS ABOVEGROUND LEVEL. REPLACED VAPOR ADAPTER AND CAP 1-1 REPLACED FILL CAP 2-1 VAPOR RECOVERY CAP AND ADAPTER ON DIESEL THOUGH NOT REQUIRED OR BEING USED.xkÃWÂ^, ÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃX Â]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃYÃ_ÂÂxkxkÂxjþÿþÿþÿþÿþÿþÿþÿ"RECD DURING 8/10/07 DEP INSPECTIONxjÃZÂOT ÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ&ELECTRONIC ALARM OUTSIDE BETWEEN PUMPSxkÃ[Â? Â]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ\Â^  Â]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ^à = Â)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ_  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÃG Â\xkxkÂxk þÿþÿþÿþÿþÿþÿþÿŠTANK TOP, MONITORING AND PIPING UNGRADE PERFORMED BY LES WILSON AND SON, 7/10/2007. TANK BOTTOM CONTAINS .5'' WATER (RECOMMEND REMOVAL) xk à Â9O Â\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ¦REMOVED AND CLEANED GAUGING PROBED TO FACILITATE PROPER OPERATION. FILL CAP NOT LIQUID TIGHT. (REPLACED) 4'' EXTRACTOR VALVE CAP FAULTY- NOT LIQUID TIGHT (REPLACED)xkà Ã5 Â\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ3NO APPARENT SHEEN OR ODOR OBSERVED AT MONITOR WELL.xkà  Â ÂUxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿ'NEW SHIELDED CABLE RUN FOR SENSORS. TRxkà  ÂÂUxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿCSUMP FULL OF WATER, REMOVED AND NEW LID AND GASKET INSTALLED. TRxkà ÃQ ÂUxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÃD" ÂUxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿýINSPECTION INDICATES FAILED DUE TO NO SPACER. TANK WAS INSTALLED IN 1990 (?) ACCORDING TO DATABASE, SPACER NOT MANDATORY. SPOKE W/SCOTTIE 12/19/07. TANK IS CONNECTED TO A GENERATOR, ALSO COPPER PIPING WILL BE REPLACED OR SPACERS INSTALLED IN SPRING 2008 AFTER THAW. TR FACILITY ADDED TO INSPECTION LIST DUE TO PROBABILITY IT IS DIESEL NOT #2, MOTOR FUEL CONNECTED TO A GENERATOR. TR 12/10/07 REGN FOR CTI BISKUPIAK TO REPLACE COPPER LINES W/DW FLEX, INSTALL SUMP W/SENSOR. REGN SAYS GENERATOR FACILITY.xkà Â39ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿlSEVERAL INCHES OF WATER IN TRANSITION SUMP @ TIME OF INSPECTION- REMOVED WATER, CLEANED PROBE, RESET SYSTEM.xkà ÃBNÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â. ÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â2 ÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ2REMOVED WATER FROM PIPING SUMP ON TANKS 5-2 & 5-3.xkà ÂT3 ÂbxkxkÂxkÃF LþÿþÿþÿþÿþÿþÿDAVID HOWE OTHER INSPECTOR.xkà Á& Â\xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÃVN Â\xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà Ã6 Â\xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà àÂ!xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà ÂO\ ÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ—FAILING CP LETTER 8/27/07 -ML 9/21/07 COPI - CTI BISKUPIAK INSTALLED ANODES ON ALL 3 TANKS 9/26/07 INSPECTION UPDATE, NOW PASSING. TRxkà ÂM Â]xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ?CP READINGS: TANK 4 -1.024, -1.033, -.97 TANK 5 -.969, -.87, -1xkà Ã_[  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkà Ã!  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿPOMNTEC LU-3 GENERATOR SELF CONTAINED - NOT SERVED BY UST PER DAVID CROXFORD -MLxkà ÂZ(  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿTLS-350xkà Â0) ÂXxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â0' ÂXxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà Â0$ ÂXxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà !ÂQ\ ÂXxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk à "à L ÂUxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà $ÃÂÂUxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà %Ã($ ÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà &Â2 Â)xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà 'Ã"ÂÂ)xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà (Â-X Â)xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà )Ã"9 ÂZxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà *Ã& ÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà +àÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ,à @ ÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà -Â& ÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà .Â& ÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà / ÂKxkxkÂ<xk Ã)þÿþÿþÿþÿþÿþÿ?5/9/08 REGISTRATION TO ADD ON TO PIPING FOR NEW ISLAND AND PUMPxk à 0Ã! ÂKxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk à 1ÃVO ÂUxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà 2ÂP ÂUxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿŠ6/19/07 UPGRADE REGN FOR CTI BISKUPIAK TO PULL 1 COPPER LINE AND REPLACE WITH FLEXIBLE LINE. NO DIGGING; LINE WILL BE PULLED THROUGH. -MLxkà 3Ã, ÂUxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà 4ÂaE ÂUxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà 5Â2CÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà 6Ã- ÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà 7ÁC ÂZxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà 8ÂE ÂxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk à 9Â$  Â)xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà :à @ Â)xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ;Ã_ ÂxkxkÂ<xk þÿþÿþÿþÿþÿþÿþÿþÿxk à <Â$\  xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà =ÂC' xkxkÂ<xj þÿþÿþÿþÿþÿþÿþÿþÿxj à >ÃZÂÂxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkà ?Ã48ÂÂxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkà @ÂB ÂXxk xkÁ`xkþÿþÿþÿþÿþÿþÿþÿ[TANK TOP UP UPGRADE/REPLACEMENT. NEW SUMPS AND PIPING PER INSPECTION FROM TONY COUTURE. NOTE INSPECTION INDICATES IT IS AN INSPECTION UPDATE BUT IT WAS ALSO A FULL INSPECTION DONE AFTER JULY 1, 2007 SO ENTERED AS A NEW INSPECTION. TR 6/20/07 COPI (RECD 9/11/07) - CTI COUTURE INSTALLED 2" APT DWFLEX PIPE, APT SUMPS, AND SPILL BUCKETS ON TANKS 7&8xkà AÂ9:ÂÂTxkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿþÿxkà BÂRa ÂXxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿ@OOS EXTENSION GRANTED TIL 10/1/08, TANK PLANNED FOR REMOVAL. -MLxkà CÃdS Â\xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà DÂ5@ Â\xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà EÃ,) Â\xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà FÂC Â\xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà GÂ0 Â\xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà Hà / ÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà IÃ"  ÂRxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿµ9/3/08 JO BOSSE REPORTS FACILITY OOS, ONSITE TO DO AI, CHAMBERS ONLY PUMPED DOWN BY DISPENSERS BUT OWNER CONTINUING TO OPERATE ELEC LEAK DETECTION AND CHECKING CONSOLE WEEKLY. -ML xkà JÂ-% ÂRxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿš2/15/12-ATT. A REC'D FROM CTI SIMARD WHO REPLACED YELLOW PIPE, NO DEGRADATION, NO EOPL-PH 2/15/12 COPI PIPING REPLACEMENT ON TKS 6-1,6-2 ,CTI SIMARD. JMDxkà KÃ1 ÂRxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà LÃB4ÂÂRxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà MÃ4 ÂLxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà N P  xkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà OÃ& ÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ'CP ON PRODUCT PIPING PASSED (-0.857) BBxkà PÂM] Â)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk à QÂ5^ ÂZxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ/BALL FLOAT ON SUCTION SYSTEMS. LOW 8/30/07 -MLxkà R + ÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿfONE DISPENSER REMOVED, PIPING CAPPED OFF CP READINGS: TANK 5 -.94, -.97, -.93 TANK 6 -.93, -.91, -.95xk à SÃJ: ÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ/REMOVED WATER FROM PIPING SUMP AND SPILL BUCKETxk à TàÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿTMS 2000 PNEUMERCATORxkà UÂ& Á$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿJ11/25/08-INTENT TO ABANDON, CTI GEORGE-PH 10/1/08 KENDALL HUGGINS CALLED TO ASK ABOUT REMOVAL REQUIREMENTS. CP READINGS TANK 8 -.89, -.89, -.9 TANK 9 -.88, -.87, -.98 DI TANK 8 6/07 3723 THRU, 28 OVER; TANK 9 3708 THRU, 27 OVER UNREGISTERED TANK DISCOVERED 9/07 AFTER HANGAR DEMOLITION. WILL REGISTER AND REMOVE. -ML 9/19/07xkà VÂ& ÂKxkxkÂxkþÿþÿþÿþÿþÿþÿþÿWPER PREVIOUS AI'S, STP SUMPS HAVE BRAVO BOXES W/FLOAT SWITCHES THAT SHUT DOWN PUMPS -MLxkà WÂA Â\xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ:REMOVED FUEL & DEBRIS FROM SPILL BUCKET; REPLACED FILL CAPxkà X ÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ0CP TESTED BY MIKE LEWIS CLEANED OUT SPILL BUCKETxkà ZÃQ ÂZxkxkÂxk þÿþÿþÿþÿþÿþÿþÿYREMOVED WATER FROM TANK SUMPS 2, 3, 4 AI FAIL LETTER 8/30/07 -ML PASSING UPDATE 9/14/07xkà [Â>\ ÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿàDISP 7/8 - 5" WATER W/SHEEN, SENSOR NONFUNCTIONAL DUE TO EXTENDED SUBMERSION CARVER NOTES UL TANKS HAVE BEEN JOINED W/SYPHON, 2" FG LINE W/SEVERAL STEEL FITTINGS, SOME FITTINGS IN CONTACT WITH SOIL. NEW SPILL BUCKET 5 GAL.xkà \Ã"ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿƒALL SUMPS UNSEALABLE. CONDUIT BOOTS ARE RIPPED. CLEAN WATER OUT OF SPILL BUCKETS. DISPENSER 7/8 HAD WATER IN SUMP. CLEANED OUT.xkà ]Â< xkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿOVERRFILL HORN NEEDS NEW RINGxkà ^Ã3O  xkxkÁ`xkþÿþÿþÿþÿþÿþÿþÿ#1988 INSTALL, SPACERS NOT REQUIRED.xkà _Ã# xkxkÁ`þÿþÿþÿþÿþÿþÿþÿþÿ;OFFSET LOOSE FILL NO SPILL BUCKET. NO OVERFILL PREVENTION. xk à `Ã- xkxkÁ`þÿþÿþÿþÿþÿþÿþÿþÿW3/3/11-COPI REC'D FOR CTI LEWIS TO INSTALL MORRISON BROS. PRESSURIZED OVERFILL VALVE-PHxkà aà + xkxkÁ`þÿþÿþÿþÿþÿþÿþÿþÿþÿxkÂ\ Ãb\ÂÂ)xi xj Á`xi þÿþÿþÿþÿþÿþÿþÿÎ8/1/08 DEB CALLED IN RESPONSE TO LEGISLATIVE INFO MASS MAILING. SAYS SHE WILL SUBMIT RETURN TO SERVICE PAPERWORK. ASKED HER IF HAD DONE AI - PHONE BREAKING UP. -ML DISCUSSED AND SENT OWNER A CHANGE OF OWNERSHIP FORM ON 4/13/2007. ALSO INFORMED OF ANNUAL INSPECTION REQUIREMENT. FACILITY IS PROPERLY OUT OF SERVICE, TANKS PUMPED OUT AND SECURED. NOTE THAT THE CTI LISTED THE FOLLOWING FAILING ITEMS: STP SUMP LID TANK 1-1 CRACKED, NEEDS TO BE REPLACED. 1" OF ICE IN THE BOTTOM OF THE SUMP. SPILL BUCKETS ARE DIRTY, FULL OF ICE, TOP RINGS BROKEN OFF AND MISSING, RECOMMENDED THAT SPILL BUCKETS BE REPLACED. CRASH VALVES ARE CLOSED, ELECTRONICS ARE OPERATIONAL. FACILITY IS FOR SALE CURRENTLY. TIMOTHY RECTORxi à bÂP  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿvINCON SHOWS PROBE OUT FOR ATG LEAKING SWIVELS AND NOZZLE ON DISPENSER REPLACED PUMPED OUT DIESEL SUMP AND SPILL BUCKETxk à cà Z Â)xk xk ÂxkÃ=þÿþÿþÿþÿþÿþÿþÿxkà dÂ# Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ! Á xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Ã!OÂÁ$xk xk ÂxkÃUþÿþÿþÿþÿþÿþÿþÿxkÃ!Â&(ÂÁ4xk xk Âxk Ã'Uþÿþÿþÿþÿþÿþÿþÿxk Ã!ÃXÂÂ)xk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!ÃTO ÂUxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!Ã^! ÂUxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!ÂGB Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Â7F Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ! Â7 Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ! Â-O Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ! Ã\# ÂZxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Â?4 Á$xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Â8 ÂZxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!ÃU Â)xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!ÃA Â$xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ! X Â)xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!ÃaL Á$xk xk Â<xkÃ)þÿþÿþÿþÿþÿþÿXUPGRADE REGISTRATION FOR CTI GEORGE TO REPLACE BOTH SPILL BUCKETS ON SPLIT TANK 10/14/08xkÃ!à  Â\xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ! Â\xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Ã\E Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!Â2 Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Ã] Âbxk xk Â<xk Ãþÿþÿþÿþÿþÿþÿþÿxk Ã!ÂLK ÂXxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!ÂQ# ÂIxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Â> ÂIxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!Ã! ÂIxk xk Â<xkÄ^PþÿþÿþÿþÿþÿþÿþÿxkÃ!ÃO ÂIxk xk Â<xkÄ"[\þÿþÿþÿþÿþÿþÿþÿxkÃ! ÂZ9 ÂIxk xk Â<xkÃ\þÿþÿþÿþÿþÿþÿþÿxkÃ!!ÃB ÂSxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿX4/3/08 NO WATER INTRUSION PROBLEM - OIL WATER SEPARATOR SKIMMER MALFUNCTION CORRECTED. xkÃ!"Ã< ÂSxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!#Ã4 ÂSxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!$Ã> ÂSxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!%Ã@ ÂSxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!&Ã? ÂSxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!'Ã; ÂSxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!(ÃW  ÂSxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!)Â>P Â]xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!*ÂH] Â)xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!, Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!- Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!.Â9! Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!/Â>S Â)xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!0Â1' ÂUxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!1Â7 Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!2Ã!G Áxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã!4Ã(= Â;xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ]INSTALLED VEEDER-ROOT STAND ALONE SUMP SENSORS. RAISED CRASH VALVES PER MANUFACTURERS SPECS.xkÃ!5Â/4ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!6àÁ$xk xk ÂxkÃ/=FþÿþÿþÿþÿþÿþÿàAPRIL 2010 RECEIVED MULTIPLE PHONE CALLS FROM THE TOWN OF ACTON REGARDING FACILITY. FACILITY HAS RECIEVED A NOV FOR REMOVAL. -LW NOV FOR REMOVAL DATED 12/10/2009. -LW SPOKE WITH TOM CASHIN AS A CONCERN CITIZEN NOT ON BEHALF OF THE TOWN. -LW 1/30/08 PER TOM KEESHAN(SP?) A TOWN OFFICIAL, THE FACILITY HAS BEEN CLOSED PERHAPS SINCE THE 1ST OF JANUARY 2008. MULTIPLE SPILLS OVER THE YEARS AND THEY HAVEN'T COMPLIED WITH THE REPORTING REQUIREMENTS THE TOWN PLANNERS GAVE THEM WHEN THEY ALLOWED THE PLACE TO BE BUILT. KEESHAN (SP?) PHONE #636-3582. TR ADDITIONAL INSPECTION NOTES BELOW---------------------------------------------->>>>>>>>>> REMOVED WATER FROM THE SUMP AND DISPENSER SUMPS. THERE ARE SENSOR IN DISPENSER PANS BUT THEY ARE NOT TIED INTO CONSOLE. (CONTACTED DEP TED SCHARF 8/3/07). CLEANED SPILL BUCKETS. REPLACED LID ON 2-1. LINE LEAK DETECTORS WORK WELL. 1-2 REPLACED VAPOR CAP. 1-2 REPLACED LID. CLEANED UNDER DISPENSERS- WATER IN PANS.xkÃ$ÂWÂÂ]xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ³TANK TOP UPGRADE CONDUCTED NOV-DEC 2006. STORE TO RE-OPEN IN JANUARY 2007. PARTIAL PIPING REPLACEMENT DID NOT TRIGGER RETROFIT REQUIREMENT TO INSTALL PROBES IN DISPENSER SUMP.xj Ã!7Â3/ Á xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿILS-350xkÃ!8ÂbJ Â)xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ>TANK 6 WIRES TO INTERSTICE BROKEN, PULLED OUT APPROX 10FT AT TANK BACK TO BUILDING SPILL BUCKETS CLEAN?: REMOVED DIRT & WATER 9/24/07 AI FAIL LETTER -ML ONLY INTERSTITIAL MONITORING TO TANK 6 NONFUNCTIONAL. ATG WORKING. APPROVED USE OF DAILY INVENTORY AND PT/SIA TEMPORARILY UNTIL WIRING IS REPLACED IN SPRING. -MLxkÃEÃQÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿUPDATED TO PASSING. TANK 3 REMOVED 8/24/07 TANK 3 UNCOVERED SPILL BUCKET FLOATING ON RISER. NO GAS PUMPED SINCE AT LEAST OCTOBER 2006. 1/8/07 SENT OWNER LETTER W/OOS FORM. -ML CP READINGS TANK 1: -.897, -.877, -.867 TANK 2: -.965, -.927, -.887 TANK 3: -.985, -.977, -.912xj Ã!9ÂÂÂ`xkxk Â<xkÃ!04þÿþÿþÿþÿþÿþÿþÿxkÃ!:Â7)ÂÂxkxk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!;ÃÂÂxkxk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!<Ã/6ÂÂxkxk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!=ÂL'ÂÂxkxk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ!>ÂL(ÂÂxkxk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkà bÂ3%ÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj à `ÂPJÂÂ\xj xj Âxj þÿþÿþÿþÿþÿþÿþÿuTELEPHONE CALL FROM MIKE LEWIS 9/24/07. COPPER LINES TO THE CHURCH FROM THE TANK WHICH SERVES THE SCHOOL, HAVE BEEN DISCONTINUED. HE IS GOING TO BLOW THEM OUT AND THEN THEY WILL REMOVE THE LINES AND THE SUMP WHEN THE DRIVEWAY/PARKING AREA ARE RESURFACED IN THE NEXT COUPLE OF YEARS. TR CONTINUED BELOW. COPPER LINES IN QUESTION. SHOULD INSPECT. BBxj Ã.Ã;+ÂÂ\xj xj Á`xj þÿþÿþÿþÿþÿþÿþÿm9/24/07 UPGRADE REGN FOR CTI COUTURE TO INSTALL 5 NEW SUCTION PUMP DISPENSERS W/SUMPS AND NEW FUELING ISLANDSxj Ã!?à ]ÂÂUxkxk Âxkþÿþÿþÿþÿþÿþÿþÿ±PIPING FULLY CONTAINED IN CONCRETE VAULT FROM TANKTOP TO BUILDING (BLUEPRINTS IN FILE); VAULT IS ACCESSIBLE FOR VISUAL INSPECTION OF PIPING ON ALL SIDES. NO CP TEST ON PIPING. xkÃ!@Ã@ Â\xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿLCP READINGS: -1.22, -1.08, -1.14 REPLACED FILL CAP; CLEANED OUT SPILL BUCKETxkÃ!AÂ0* Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ*CP READINGS BY CTI LEWIS: -1.06, -1, -1.07xk Ã!BÂ<8 Â\xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ€CP READINGS BY CTI LEWIS: -1.03, -1, -.935 INSITU RS3 BATTERY-OPERATED TANK MONITOR REPLACED FILL CAP 1" WATER IN BOTTOM OF TANKxkÃ!CÂ+ ÂSxk xk Âxk þÿþÿþÿþÿþÿþÿþÿMANUAL INTERSTITIAL MONITORINGxk Ã*$ÃJ ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*%ÃK ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿgLESS THAN 1/2" PRODUCT IN TANK 1/4/08 LIGHTBOWN SAYS NOT OOS, JUST LOW FUEL AT TIME OF INSPECTION. -MLxkÃ*&àÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿX8250W SPILL BUCKET DAMAGED WINTER 2006 BY SNOW PLOW. REPLACED W/15 GAL BUCKET BY CTI. xkÃ*'Ã" ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ,TANK 387 SUPPOSEDLY SOLD TO MOHAVE PROPERTY MANAGEMENT ON 2/08-WILL FOLLOW UP WITH THEM-PH TANKS 403, 387, 396 INSPECTED SEPT 2007, ALL OTHERS IN JULY 2007 403 & 387 MAY HAVE STEEL PIPING? CP? NOTIFIED LIGHTBOWN & ST.PETER TO CHECK. TANK AT BLDG 7801 TO BE TRANSFERRED TO MICMACS IN EARLY 2008. -MLxk Ã*(àÂxk xk Á`xlþÿþÿþÿþÿþÿþÿþÿ}3/7/08 CTI GEORGE INSTALLED VENT WHISTLE (WITH ACCESS) AND TMS 3000 PNEUMERCATOR TO SHUT DOWN STP IF SUMP SENSOR DETECTS LEAKxk Ã*)ÃG$  xk xk Â7xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã**ÂN^  xk xk Â7xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*+ÂO  xk xk Â7xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*,Ã6  xk xk Â7xk þÿþÿþÿþÿþÿþÿþÿ1CTI IS SCOT LETELLIER, NOT FRED ANDERSON -- DMCLxk Ã*-ÂO ÂKxk xk Â7xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*.ÂAc  xk xk Â7xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*/ÂO ÂKxk xk Â7xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*0Â9 Âxk xlÂþÿþÿþÿþÿþÿþÿþÿþÿ}COPPER PIPING DIRECT BURIED. CTI TOLD OWNER WOULD NEED TO BE REPLACED. OWNER PLANNING TO REMOVE TANK IN SPRING INSTEAD. -MLxkÃ8ÂYUÂÂTxkxkÂxk þÿþÿþÿþÿþÿþÿþÿŠTANKS 9 &12 MONITORING INOPERATIONAL WATER ENTERING TANKS 10, 11, 12 PIPING SUMPS THROUGH LIDS TANKS 10, 11, 12 OVERFILL ALARMS INSIDE ON TLS350 BUT NOT OUTSIDE TANK 12 OUT OF SERVICE CTI TRASK DID AI UPDATE FOR TANKS 8&9 ON 2/9/07. 5/10/07 COPI - CTI INSTALLED LU-2 SYSTEM W/INTERSTITIAL AND SUMP SENSOR AND REPLACED BALL FLOAT ON TANK 9 CTI LEWIS REPROGRAMMED VR FOR TANKS 10,11,12 ON 9/24/07 - SYSTEM FULLY FUNCTIONAL. WILL SEND AI UPDATE AFTER SUMPS ARE REPLACED AND SPILL BUCKETS INSTALLED. 10/24/07 UPGRADE REGN FOR CTI WILSON TO REPLACE PIPING SUMPS 12/11/07 ALL WORK COMPLETED, TANK 12 WILL RTS, PAPERWORK PENDING -ML 12/19/07 UPDATE FOR TANKS 8 & 9 - CTI SIROIS, LIDS NOT TOUCHING FILL RISERS 12/6/07 INSPECTION UPDATE FROM CTI MICHAEL LEWIS, ALL SYSTEMS NOW PASSING EITHER BY REPAIR OR REPLACEMENT. REC'D UPDATE - 12/26/07 TR 12/12/07 COPI - CTI COUTURE INSTALLED FLAPPER ON TANK 9xk Ã*1ÂE Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ" TANK READING: MIKE LEWIS 11/28/07xk Ã*2ÂN Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ/ TANK READING: -1.13, -1.20 MIKE LEWIS 4/10/07?xk Ã*3ÂO Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ·SPILL BUCKET LID DAMAGED BUT STILL LIQUID TIGHT. BUCKET CONTAINS FUEL AND ICE. TANK BOTTOM HAS 2.75" OF WATER IN IT, REMOVAL RECOMMENDED. REPLACED PETROMETER OVERFILL ALARM LIGHT. TRxk Ã*4ÂK Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ“REPLACED ANNULAR SENSOR AND RISER CAP. SMALL AMOUNT OF WATER IN PIPING SUMP AND SPILL BUCKET. TANK BOTTOM HAS 1" OF WATER, REMOVAL RECOMMENDED. TRxk Ã*5ÃZX ÂXxk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ"FAULTY GUAGING PROBE REPAIRED. TRxk Ã*6Ã8 Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ‚OVERFILL AND SPACERS ARE STILL BEING RECOMMENDED BY CTI THORNDIKE. THEY ARE NOT REQUIRED DUE TO THE AGE OF THE INSTALL, 1989. TRxk Ã*7ÂR_ Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿÂOVERFILL WHISTLE IS HARD PIPED IN THE VENT LINE AND CAN NOT BE REMOVED TO BE CHECKED. NO SPACERS ON COPPER LINES, NOT REQUIRED DUE TO AGE OF THE TANK. CTI RECOMMENDED REPAIRS TO BOTH ITEMS. TRxk Ã*8Â. Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿSPILL BUCKET HAD ICE IN IT. TRxk Ã*9Â. Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿtPIPING SUMP SENSOR REPLACED. TANK HAS ABOUT 2.5" OF WATER IN IT. TR TANK READING: -.856, -.891 MIKE LEWIS 4/18/07xk Ã*:Ã;+ Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*;Â& Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ£OLDER INSTALL. NO SPILL CONTAINMANET AT REMOTE FILL, VENT WHISTLE IS HARD PIPED, NO ACCESS PER CTI THORNDIKE. TR TANK READING: -.944, -.953 CTI MIKE LEWIS 4/4/07xk Ã*< d Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿSREPLACED PUMPING SUMP SENSOR. TR TANK READING: -1.02, -1.04 CTI MIKE LEWIS 4/4/07xk Ã*= 1 Â\xk xlÂþÿþÿþÿþÿþÿþÿþÿþÿ;CP FAIL LETTER 1/4/08 -ML TANK READING: -.805, -.878, -.902xk Ã*>Â5D Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿúSOME MINOR REPAIRS MADE AT SITE DURING INSPECTION. 1 ANNULAR SENSOR REPLACED, CN BROWN HAD A TECHNICIAN REPAIR WEEPS AT DIESEL METERS. TR 12/19/07 COPI - CTI LETELLIER MODIFIED VAPOR TRAPS (SW FG PIPING) AND INSTALLED COPPER TUBING FOR VAPOR SIPHONxk Ã*?Â5E Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿJSOME REPAIRS MADE DURING INSPECTION. SEVERAL ANNULAR SENSORS REPLACED. TRxk Ã*@Â-  Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿMULTIPLE REPAIRS MADE DURING THE SITE VISIT. SEVERAL ITEMS REPORTED TO DEP AS EVIDENCE OF A POSSIBLE LEAK. LINE LEAK DETECTORS REPLACED. TRxk Ã*AÂ4Y Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*BÂ4P Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ0 TANK READING: -1.03, -1.09 MIKE LEWIS 4/17/07xk Ã*CÂ-# Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ~NO SENSORS IN PIPING SUMPS, CTI RECOMMENDED THEY INSTALLTHEM. DROP TUBE FLAPPER NOT OPERATING PROPERLY, REPAIRED PER CTI. TR xk Ã*DÃQ: Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*EÂ4B Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*FÃQ; Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ]CTI RECOMMENDED THAT THE ANNULAR SPACE JUNCTION BOX BE REPLACED DUE TO SEVERE CORROSION. TRxk Ã*GÂ- Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ¢ANNULAR SENSOR JUNCTION BOX IS CORRODED, CTI RECOMMENDED REPAIR REPLACEMENT. ALSO NO SPACERS ON COPPER LINES, 1989 INSTALL NOT REQUIRED, RECOMMENDED BY CTI. TRxk Ã*HÂ- Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ¦MULTIPLE MAINTENANCE ITEMS DEALT WITH BY CTI DURING THE INSPECTION. WEEPS AT DISPENSERS DEALT WITH BY CN BROWN STAFF, FLAPPER PROBLEMS AND LLD REPLACEMENT BY CTI. TRxk Ã*IÂ4C Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿMULTIPLE MAINTENANCE ITEMS DEALT WITH DURING THE INSPECTION INCLUDING BUT NOT LIMITED TO REPLACEMENT OF LLD, LID GASKET, GAUGUING PROBE COVERS, SPILL BUCKET LID, & VAPOR RECOVERY CAPS. ALSO WEEPS AT METERS, PIPING, AND LLD IN ONE SUMP. REPORTED TO DEP. TRxk Ã*JÂ1/ Â\xk xlÁ`xlþÿþÿþÿþÿþÿþÿþÿ€COPPER PIPING ISOLATORS INSTALLED. VENT PIPE ISSUE BEING ADDRESSED IN SPRING 2008. TR VENT RELOCATED 4/30/08 CTI A. THORNDIKE-PHxk Ã*KÃ*P Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*Là G Â\xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿ$****NOTE****** ACTUAL INSPECTOR WAS LARRY WINCHESTER. DATA ENTRY ERROR. TANK HAS NOT BEEN IN USE SINCE 10/1/07. THE CURRENT TENANTS ARE USING PROPANE FOR HEATING RATHER THAN OIL. SPOKE WITH STEPHEN BOLDUC 1/7/08 ABOUT KEEPING TANK OOS FOR 12 MONTHS, MORE ONLY WITH WRITTEN PERMISSION. TRxlÃ*MàÁ xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿðTANK 1 IS RNL, 2 IS PREMIUM, AND 3 IS DIESEL. CHANGED OUT DROP TUBES FROM DIESEL TO RNL TO REPAIR FAULTY ONE ON RNL. INTIALLY FAILING INSPECTION DUE TO STICK. CALLED THE OWNER TO VERIFY IF STICK HAS BEEN REPLACED, IT HAS AS OF 1/8/08. TRxk Ã*OÂbO Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ>ATG RESULTS ATTACHED, PASSING AT .10 GPH TEST ON 12/10/07. TRxk Ã*PÃ5I Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*QÂ#J Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ«PIPING SUMP CONTAINED WATER REPORTED TO DEP. REMOVE SAND BUILDUP TO FACILITATE LID SEALING BETTER. TANK CONTAINED 1.25" OF WATER, REMOVAL RECOMMNEDED BY CTI THORNDIKE. TRxk Ã*RÃ3 Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿÌANNULAR SENSOR JUNCTION BOX DAMAGED REPLACEMENT RECOMMENDED. TANK CONTAIN 1.25" OF WATER REMOVAL RECOMMENDED. COPPER LINES NOT ISOLATED, 1988 INSTALL NOT REQUIRED. CTI THORNDIKE RECOMMENDED ISOLATION. TRxk Ã*SÂ?  ÂZxlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿËOWNER CALLED 8/25/2008 TO DISCUSS AMERON FG PIPING INSTALLED PRIOR TO 1988. AMERON STATING PIPING MANUFACTURED PRIOR TO 1988 IS NOT COMPATABLE WITH ETHANOL BLENDED FUELS. -LW REC'D UPDATE 3/26/2008 TRxk Ã*T  Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿzCTI THORNDIKE RECOMMENDED SPACERS ON COPPER LINES, NOT REQUIRED. TANK CONTAINS 2.25" OF WATER CTI RECOMMENDED REMOVAL. TRxk Ã*UÃ;N Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ¦CALL FROM JULIE WAKSON THEY WILL BE CALLING PMI TO HAVE INSPECTION DONE. 10/5/2010 TED MONITORING WELLS CHECKED AND NO VISIBLE SHEEN OR SMELL PER CTI THORNDIKE. TRxk Ã*VÃ' Â\xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ{MINOR HOUSEKEEPING PROBLEMS ONLY. RECOMMENDED BREAKAWAYS ON HOSES AND REMOVAL OF .5" WATER IN THE OFF ROAD DIESEL TANK. TRxk Ã*WÂDB ÂKxk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*XÂ:- ÂxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ*Yà Z ÂxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿ…SCULLY FILL. DRIVE IS ABLE TO HEAR FILL THOUGHT HE VENT PIPE IS ACTUALLY ABOUT 12' AWAY. WHISTLE IS WITHIN 8' PER CTI LEGASSE JR. TRxlÃ*Z ' ÁxlxlÁ`þÿþÿþÿþÿþÿþÿþÿþÿ;1/16/09-COPI REC'D- CTI HOWE TO SEPERATE VENT LINES, AS ONE OF THE TANKS IS BEING CONVERTED TO DIESEL-PH COPPER NO SPACERS, 1989 INSTALL NOT REQUIRED. HEATING OIL TANK <1100 GALLONS NO ACCESS TO VENT WHISTLE. TR 8/26/08 UPGRADE REGN FOR CTI BROWN TO REPLACE INTL SENSOR FOR HO TANK 9 9/8/08 NOI FOR TANK 9 REMOVALxk Ã*[Â]R ÂxlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*\à & Á$xk xlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*]ÃG& ÂKxk xl Á_xkÃOFþÿþÿþÿþÿþÿþÿN12/15/08-COPI, CTI P. BROWN, INSTALL NEW TRANSITION SUMP ON THE DIESEL TANK-PHxkÃ*_Ã, Âxl xl Âþÿþÿþÿþÿþÿþÿþÿþÿ+CP PIPING -0.732 CP FAIL LETTER 1/11/08 -MLxkÃ*`Â[ ÂxlxlÂxk à FþÿþÿþÿþÿþÿþÿSUCTION SYSTEMxk Ã*aÃS$ ÂKxl xlÂþÿþÿþÿþÿþÿþÿþÿþÿ*AI/CP FAIL LETTER 1/14/08 -ML CALL 9/14/09 FROM DOROTHY HILLOCK, TANK WAS REMOVED MAY 6, 2009 BY A RICH BAKER. NO NOTICE TO DEP NO REMOVAL NOTICE, NO REMOVAL CONFIRMATION. TOLD HER TO SEND LETTER WITH INFORMATION ABOUT REMOVAL WHO, WHEN, WHERE ETC. FOR ADDITION TO THE FILE. TRxk Ã*bàÂKxl xlÁ`xk þÿþÿþÿþÿþÿþÿþÿ—SEE NOTES ON INSPECTION AND COVER LETTER FROM OWNER/OPERATOR. FACILITY IS ON THE INSPECTION LIST FOR 2008 SEASON. ONLY 1 CP READING AND TANK IS SW? TRxk Ã*cÂQ Á xlxlÂxk þÿþÿþÿþÿþÿþÿþÿQ6/9/09-COPI REC'D FOR CTI BEAUMONT TO REPLACE PREMIUM AND DIESEL SPILL BUCKETS-PHxk Ã*dÂ? Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿó1/18/2008 SENT OWNER LETTER TO HAVE DELIVERIES AND OVERFILL PREVENTION WORK IN ACCORDANCE WITH CHAPTER 691. SEE INSTALLER NOTES BELOW.-LW FLAPPER TYPE OVERFILL DEVICE NOT RECOMMENDED FOR PRESSURE OFF-LOADS (RECOMMEND INSTALLATION OF ELECTRONIC OVERFILL) FILL CAP NOT LIQUID TIGHT (REPLACED) SPILL BCUKETS CONTAINS WATER (REMOVAED AND CLEANED)(RECOMMEND SPILL BUCKET BE KEPT FREE OF ALL LIQUIDS/DEBRIS AT ALL TIMES) COPPER SUCTION AND RETURN LINES APPEAR TO BE SLEEVED AND ISOLATED AT BIOLER ROOM.xlÃ+à  ÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿaNEW OWNER JANICE WARREN IS SENDING IN CHANGE OF OWNERSHIP FORM. SENT HER PLAIN TALK. 1/11/08 -MLxk Ã+ÂW Â]xl xlÁ`þÿþÿþÿþÿþÿþÿþÿþÿr10/20/08 REGISTRATION FOR TWO NEW TANKS TO BE INSTALLED BY PORTLAND PUMP-PH NO NOTES ON FAILING COMPONENT. ALSO NOT REPORTED TO DEP AS EVIDENCE OF A POSSIBLE LEAK. TR 5/30/08-TALKED TO KEVIN MOORE AFTER MULTIPLE DIESEL SUMP ALARM LOGS-GROUND WATER IS COMING INTO SUMP THRU CONDUIT BOOT. ONCE GROUND WATER DROPS THIS SUMMER, LEAK WILL BE FIXED. HE WILL INFORM US... PHxk Ã+à $ ÂMxlxlÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã+Ã9 ÂKxlxlÂxk þÿþÿþÿþÿþÿþÿþÿ®NO PROGRAMMING IN MONITORING SYSTEM, HAD TO REPROGRAM EVERYTHING ON INCON TS1000 INCLUDING ELEC OVERFILL. OVERFILL - REPLACED PROBE AND HORN, DAMAGED BY LIGHTNING STRIKE. xk Ã+à  ÂNxlxlÂxk þÿþÿþÿþÿþÿþÿþÿ*OOS INSPECTION PASSING, OOS SINCE 12/20/07xk Ã+Â5 ÂxlxlÂþÿÃþÿþÿþÿþÿþÿþÿþÿxl Ã+ÂGU Á$xlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã+ ÂB0 ÂxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿÎ33" WATER REMOVED FROM INTERSTICE ON 8/7/07, WATER AGAIN IN INTERSTICE 12/31/07, 8" WATER ON 1/17/08 1/18/08 AI FAIL LETTER. OWNER (CHERYL WHALEN) CLAIMS SHE CONTACTED GAFTEK TO INVESTIGATE AND CORRECT -MLxlÃ+ à D ÂLxlxlÂþÿà -Wþÿþÿþÿþÿþÿþÿþÿxk Ã+ Âc ÂZxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã!aà =ÂÂRxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ4OOS, APPROX 5" OF PRODUCT LEFT IN TANKS. ELECTRONIC MONITORING ON TANK STILL OPERATING, TESTS OK. PER 9/25/07 PHONE CONV, J.BOSSE WILL PUT LOCK ON FILLS AND DISPENSER NOZZLES AND TRIP CRASH VALVES. -ML 1/17/08 CALL FROM NEW OWNER WANTS TO OPEN NEXT WEEK, NO PRECISION TEST DONE. HE CLAIMS THAT IT ISN'T REQUIRED. REVIEW OF LETTER TO DOYLE SHOWS IT WAS REQUIRED PER THE LETTER. ALSO CURRENT INSPECTION. LETTER COPY IN FILE DATED 10/29/07 SIGNED TR. NEW OWNER JAMES DYLAN(?) IS NOT HAPPY BECAUSE DOYLE SAID NOT NEEDED ONLY INSPECTION REQUIRED. TRxkÃ+ Â7? ÂSxlxlÂþÿà 7]þÿþÿþÿþÿþÿþÿþÿxk Ã+ à $ Â`xk xlÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã+Ã4W ÂxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ<AST INSPECTION - UST INSPECTION HAD ALREADY BEEN ENTERED. BBxk Ã+Â= Á xk xlÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã+Â. Â)xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ PIPING MUST BE REPLACED BY 2011.xk Ã+Â[ ÂZxlxlÂþÿÃQ þÿþÿþÿþÿþÿþÿþÿxk Ã+à xlxlÁ`xlÃ,\*þÿþÿþÿþÿþÿþÿ©SITE VIST DURING WINTER AND THE GROUND WAS FROZEN. UNABLE TO PERFORM CP TEST AT SITE. WILL UPDATE IN SPRINGTIME. -TR 1/24/08 CP FAIL LETTER -ML 4/7/08 CP RETEST TO PASSxlÃ7Â7.ÂÂ!xjxjÂxj þÿþÿþÿþÿþÿþÿþÿv11/5/07 COPI - CTI BISKUPIAK INSTALLED 15 GAL SPILL BUCKET TANK 6-1 AND REPLACED SUMP SENSORS WITH SINGLE FLOAT SENSORxj Ã"]Â-L Â\xk xk ÂþÿÃþÿþÿþÿþÿþÿþÿòNO APPARENT PETROLEUM ODOR OR SHEEN OBSERVED. SPILL BUCKET NOT LIQUID TIGHT (RECOMMEND REPLACEMENT) TANK BOTTOM CONTAINS APPROXIMATELY 1/8'' WATER (RECOMMEND REMOVAL) TANK 4- TANK BOTTOM CONTAINS APPROXIMATELY 3'' WATER (RECOMMEND REMOVAL) xkÃ"^ÂN Â!xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ"_Â[ÂÂKxk xk Âxj þÿþÿþÿþÿþÿþÿþÿÍCLEANED OUT 1.5" WATER FROM RNL SUMP, TC COVER NOT TIGHT. CLEANED OUT 3" WATER/DIRT FROM OC WHITE SUMP (WHICH TANK?), COVER ON MANWAY NEEDS REPLACEMENT. DISPENSERS NOT ANCHORED. ONE COPPER LINE ON #2 TANKxj Ã"`ÃN ÂKxk xk Âxk þÿþÿþÿþÿþÿþÿþÿPNEUMERCATOR TMS 1000xk Ã"a ÂKxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ$COPPER S/R LINES IN SEPARATE SLEEVESxk Ã"bÂX  xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿFULL AI ILS 250IxkÃ"cÃ*ÂÂSxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ.ST PETER INSTALLED COAXIAL DROP TUBE W/FLAPPERxkÃ"dÂ%A  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#ÂÂÂLxk xk Âxk þÿþÿþÿþÿþÿþÿþÿEFLEX PIPING ON TANK 4 - INSTALLED AT SAME TIME AS ELEM SCHOOL (#2427)xk Ã#Â# Â\xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ”REPLACED DAMAGED TANK INTERSTITIAL SENSOR AND CORD GRIP ASSEMBLY REPLACED FILL CAPS CLEANED SPILL BUCKETS CP TESTED BY CTI LEWIS -.971, -.859, -.916xkÃ#ÂA  Â\xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿgTANK INTERSTITIAL MANHOLE WAS SINKING, COVER RESTING ON RISER CAP. RAISED MANWAY AND RECOMMENDED CONCRETE PADS FOR SUPPORT. REPAIRED DAMAGED TANK ANNUAL SPACE SENSOR WIRING. REMOVED 200ML WATER FROM PIPING SUMP, INFILTRATION AT LID. CLEANED GASKET AND AROUND LID FOR PROPER SEAL. REPLACED FAULTY PETROMETER OVERFILL ALARM LAMP TANK READING: -.981, -1, -1.01xkÃ#Ã4 Âxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ'REPLACED DEFECTIVE ANNULAR SPACE SENSORxkÃ#à  Â]xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿOCP READINGS: T6 -.936, -.943, -.864 T7 -.929, -.9, -.925 T8 -.955, -.916, -.875xkÃ#ÂB^ Â4xk xk ÂþÿÃbþÿþÿþÿþÿþÿþÿ4UNABLE TO OBTAIN CP READINGS DUE TO EXTREME DRY SOILxkÃ#ÂV&ÂÂKxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ€COULD NOT REMOVE ANNULAR SENSOR TO TEST. PORTLAND PUMP WILL CORRECT DURING FALL 2007 INSPECTION, PER 8/30/07 LETTER FROM TOWN. xj Ã#Ã!7ÂÂKxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿlFOUND 19" GASOLINE IN TANK INTERSTICE. PUMPED OUT AND RETURNED. CTI TOLD OWNER TO CALL DEP. TANK PUMPED DOWN AS MUCH AS POSSIBLE TO VEHICLES. PLANNING TO REMOVE BEFORE WINTER; AST PERMIT FROM CITY PENDING. WOODY SAWTELLE INSTRUCTED TO SUBMIT OOS FORM ASAP; TOLD SHOULD HAVE CONTACTED RESPONSE, DOES NOT KNOW IF SOMEONE ELSE FROM COMPANY DID SO. 10/5/07 -MLxkÃ# Ã5" Á$xk xk Âxk þÿþÿþÿþÿþÿþÿþÿáALARM BULB BLOWN. BOARD APPEARS TO NEED TO BE REPLACED. AI SAYS "LIGHTS FIXED BY OTHERS." CLEANED SPILL BUCKETS UPDATE TO PASS 9/7/07 - CTI KANE GOT CALL FOR LIGHTS STILL NOT WORKING, CHANGED OUT KEYBOARD AND WORKS OK NOWxkÃ# Ã` Á$xk xk ÂþÿÃ.C"þÿþÿþÿþÿþÿþÿXCRASH VALVES APPROX 1" TOO HIGH IN DISPENSERS 3/4, 5/6, 9/10 AI/CP FAIL LTR 10/5/07 -ML xkÃ# ÂC Á$xk xk Âxk Ä1[þÿþÿþÿþÿþÿþÿýCRASH VALVES FOR ALL GAS DISPENSERS MORE THAN 1/2" BELOW SHEAR POINT, ALTHOUGH WELL ANCHORED 7-1 REPLACED VAPOR ADAPTER, 7-2 REPLACED VAPOR CAP CLEANED ALL SPILL BUCKETS, REPLACED 7-3 LID ASSEMBLY AI FAIL LETTER 10/5/07 -ML 11/5/07 BUBAR UPDATE TO PASSxkÃ# Â+ ÂUxk xk Âxk þÿþÿþÿþÿþÿþÿþÿCAI FAIL LETTER 10/9/07 -ML OPERATOR CALLED TO SAY SIMARD & SONS CONTRACTED TO REPLACE SPILL BUCKET AND ONE OF COPPER LINES IN NOVEMBER. PAPERWORK ON ITS WAY. WARNED THAT WILL GET MASS MAILING NOV, REPAIRS AND PASSING UPDATE WILL RESOLVE VIOLATIONS. -ML 12/5/07 COPI - CTI SCOTT REPLACED SPILL BUCKET, 5 GAL ONLY WOULD FITxk Ã#ÂC Á$xk xk Âxk Ã)O þÿþÿþÿþÿþÿþÿCLEANED SUMPS AND SPILL BUCKETS EXTENDED TANK 6 DROP TUBE TIGHTENED FITTING ON CRASH VALVE FOR DISPENSER 3/4 HOLE IN BOTTOM OF TANK 8 SPILL BUCKET UPGRADE TO PASSING: 9/13/07 STPETER ADDED ANODE AND TESTED CP -.94 -ML 9/13/07 COPI - CTI BUBAR ISNTALLED SPILL BUCKET ON TANK 8xkÃ#ÃU Á$xk xk Âxk à QþÿþÿþÿþÿþÿþÿOCHANGED BALL FLOAT ON TANK 7 CLEANED SPILL BUCKETS REPLACED TANK 7 VAPOR ADAPTER AND VAPOR CAP REPAIR MINOR WEEP ON DISPENSER 1 CRASH VALVES TOO LOW BY 1/2" 10/9/07 AI FAIL LETTER -ML 9/14/07 INSPECTION UDPATE RECD 10/15/07 5/7/08 COPI - CTI BROWN REPLACED SPILL BUCKET AND VAPOR MANHOLE, OFFSET VAPOR RISER TO ACCOMODATE SPILL BUCKETxk Ã#ÂX  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ™7/8/09 COPI REC'D FOR CTI BISSON TO ADD ANODES TO ALL TANKS PH 11/24/08-ELWIN SCOTT CALLED TO SAY THEY FAILED CP, WILL RETEST IN SPRING (EARLY APRIL)-PHxk Ã#à 8 Á$xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿwPRODUCT CHANGED TO DIESEL AND OFF-ROAD DIESEL. CONSOLE NEEDS TO BE REPROGRAMMED. CRASH VALVES LOWER THAN ALLOWED UPGRADE TO PASSING: 11/14/06 UPDATE FROM CTI BUBAR - RAISED CRASH VALVES SO 3/4" BELOW SHEAR POINT, COULDN'T GET ANY HIGHER. ACCEPTED AS PASS. 8/22/07 CTI PAINE PROGRAMMED CONSOLE TO MATCH SENSORS AND PROGRAMMED TO AUDIO ALARM AND PRINT AN ALARM CONDITION.xk Ã#Ã\, ÂLxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ(UPDATE TO PASS: REPLACED SENSORS 8/24/07xk Ã# ÂSxk xk ÂxkÃHQþÿþÿþÿþÿþÿþÿþÿxkÃ#à : ÂSxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿíPER CTI: "PREMIUM SALES ARE VERY LOW. DID MATH CHECK AND COULD NOT FIND ANY PROBLEMS. INSTRUCTED OWNERS TO SEND COUNTY ENV NEW MONTHLY INVENTORY RECONCILIATIONS AS THEY ARE GENERATED." 10/9/07 AI FAIL LETTER, SUBMIT 2 MO INVENTORY -MLxkÃ#Ã-  ÂIxk xk ÂxkÃG4!þÿþÿþÿþÿþÿþÿƒTANK 2 JUNE SALES 398.3, OVER 42 TIP MISSING FROM GAUGE STICK 8/1/07 UPDATE TO PASS 7/15/09-AI REC'D FAILING FOR SUPER TANK DI-PHxkÃ#ÃbW Áxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ¶INDICATOR LIGHTS DON'T WORK EVEN W/NEW BULBS. ISSUES W/KEYBOARD AND DISPLAY, NEEDS NEW PRINTER. 8/7/07 UPDATE TO PASS - CTI FAULKINGHAM REPLACED COMPONENTS IN CONSOLE, ALL WORKING.xkÃ#Â^  xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ`RETEST OCCURING 10/9/07 1/21/08 COPI - CTI BISKUPIAK ADDED ANODES, NEW READINGS NOT RECEIVED YETxk Ã#EÂ11/14/07 COPI - CTI CHAMBERLAIN INSTALLED 15 GAL BUCKET ON K-1xkÃ#/ÂMA Â]xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#0Â1  xk xk Â<xkÃ<)þÿþÿþÿþÿþÿþÿþÿxkÃ#1ÂAW  xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#2ÃWd Â]xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#3ÂA Â]xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#4Ã5? Â]xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#5Ã'' Â]xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#6Â1&  xk xk Â<xkÃ<(þÿþÿþÿþÿþÿþÿþÿxkÃ#7àÂYxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#8ÁZ ÂYxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#9Â' ÂYxkxk Â<xkÃ-.þÿþÿþÿþÿþÿþÿþÿxkÃ#;Â\J Â;xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#<Â0a Â;xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#=Ã^U Â;xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#>Â0c Â;xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#?Â4. Â;xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#@ÂV%ÂÂKxk xk Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã#AÂVÂÂKxk xk Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã#BÂXÂÂcxk xk Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã#CÂ< ÂZxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿóONLY OOS ANNUAL INSPECTION. USTS HAVE BEEN OOS SINCE 8/2006 ACCORDING TO AI. SYSTEM HAS BEEN OUT OF SERVICE GREATER THAN 6 MONTHS, FILL PIPES ARE NOT LOCKED, LINES ARE NOT CAPPED. SYSTEM HAS NO POWER. RNL HAS 2'', AND PNL HAS 2'' IN TANKS.xkÃ#DÂVÂÂcxk xk Â<xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã#GÂYTÂÂ;xk xk Âxk Ã!^=þÿþÿþÿþÿþÿþÿþÿxk Ã#HÃ3 Â!xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ'TWO DIESEL TANKS NOT YET REGISTERED. BBxkÃ#IÃCc Â)xkxk Âþÿþÿþÿþÿþÿþÿþÿþÿ>VENT WHISTLE IS 25' AWAY FROM FILL. CLEANED OUT SPILL BUCKET.xkÃ#JÃ9 ÂRxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#Kà % Â)xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿBPIPING VERIFIED BY CTI TO BE FIBERGLASS. WILL UPDATE DATABASE. BBxkÃ#LÂO ÂXxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿaREMAINS OOS AND PLANNED FOR REMOVAL WHEN THE "PORTABLE" CLASSROOM IS REMOVED.SEE PRIOR NOTES. TRxk Ã#MÃ& ÂRxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#NÃ> ÂLxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#OÂAM Â\xk xk Â<xk ÄQ5Qþÿþÿþÿþÿþÿþÿþÿxk Ã#P ` ÂXxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#QÂJ Â\xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#RÃP Â\xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#SÂO  ÂXxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#TÂO ÂXxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#UÂO ÂXxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#VÃc ÂXxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#WàÁxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#XÂ$O Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#YÂO ÂXxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk à 8Â&AÂÂRxj xj Âþÿþÿþÿþÿþÿþÿþÿþÿ)SEE EVIDENCE OF A LEAK REPORT THIS DATE. xjÂ_ÂÂÂxjxjÁ`þÿþÿþÿþÿþÿþÿþÿþÿ?FACILITY UPGRADE REGISTRATION FOR PIPING SPACER INSTALL SUBMITTED ON 12/27/06 10/1/07 UPGRADE REGN FOR CTI CARVER TO REPLACE PIPING. LETTER FROM CARVER ENCLOSED W/REGN STATES PIPE LEAK FOUND DURING 8/29/07 AI. LEAK COLLECTED IN TRANSITION SUMP. LEAK REPAIRED, BUT SCHOOL AGREED TO REPLACE TO AVOID FUTURE ISSUES. -MLxj Ã#ZàÁYxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#[Ã< ÂKxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ FLAPPER FOR OVERFILL PROTECTION.xkÃ#\Ã5K Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ¤ CRASH VALVES AT CORRECT HEIGHT: RIGHT AT 1/2" BELOW CONCRETE COPI - CTI MULLINS REPLACED TANK 2 SPILL BUCKET 6/1/07 (CTI ARBOUR REPLACED TANK 2 BUCKET 5/10/06) NOW PASSING PER CTI MIKE ARBOUR REPLACED SPILL BUCKET AND DROP TUBE WITH 61-SO. TR NOTE: CTI BUBAR INSTALLED 61-SO'S SEVERAL YEARS AGO, ONE NOW FAILING, CP WAS SUPPOSED TO BE DONE IN 2005/6? CP RETEST BY ST.PETER PASSED 10/25/07xk Ã#]ÃJ< Á$xk xk Á`xkþÿþÿþÿþÿþÿþÿþÿø11/12/08-UPGRADE REG TO INSTALL 2 X .75" FLEX PIPING AFTER REMOVING COPPER, CTI GEORGE-PH THIS IS A MOTOR FUEL FACILITY DUE TO GENERATOR. MUST RETROFIT LEGAL OVERFILL DEVICE AND BE ABLE TO CHECK IT. TR 10/25/07 COPI - CTI DAVIS INSTALLED FLAPPERxkà Ã?ÂÂUxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿ±10/12/07 BISKUPIAK RESPONDED TO CALL REGARDING GURGLING VENT PIPE DURING DELIVERY. VENT LINE FAILED TO HOLD PRESSURE, BELIEVES BOW IN PIPE COLLECTED WATER - TO BE REPLACED. -MLxj Ã#^ÂN* ÂKxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#_à # ÂTxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã#`ÂA Â!xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ SMALL AMOUNT OF WATER IN SUMPS. VACCUMED UP AND TESTED ALL SENSORS. ALL OKAY. OLD 1990 SUMPS, TOLD OWNER SHE SHOULD CONSIDER CHANGING SUMPS TO NEW ONES IN FUTURE. ALSO VENTS ARE CLOSED TO POWER LINES. SHOULD RAISE UP ABOVE. TIGHTENED UP WEEPS UNDER DISPENSERS.xk Ã#aÂ! Âxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿƒ2" OF WATER IN PIPING SUMP. PROBE BURNED OUT, INTERSTIAL PROBE ALSO NOT FUNCTIONAL, BOTH REPLACED AT INSPECTION, WORKING FINE. TRxkÃ#bÃGV Âxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ#c I Âxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿ—SPACERS INSTALLED ON LINES. LINES ARE BEING REPLACED AS THE BOILER TECH FEELS THEY ARE KINKED OR OBSTRUCTED. TR 10/1/07 REGN FOR REPLACEMENT OF PIPINGxkÃ#d Âxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ0SYSTEM HAS 2 PIPING SUMPS - LOWER SUMP HAD 12 GALLONS OF OIL/WATER IN IT. SYSTEM WAS IN ALARM, REPORTED TO BOB WHITTIER OF ME DEP. PIPING IS TO BE REPLACED. CLEANED SUMP, RESET SYSTEM 0 INTERSTICE HAD WATER IN IT, CLEANED AND RESET SYSTEM. SPILL BUCKET FULL OF OIL/WATER - CLEANED. LEFT OIL/WATER FROM SUMP AND SPILL BUCKET IN DRUM ON SITE, SCHOOL TO HANDLE DISPOSAL. PIPING FROM TANK AT TANK SUMP TO MIDDLE SUMP IS SLEEVED BUT NOT SEPERATED (?) - PIPING FROM MIDDLE SUMP TO BOILER ROOM IS PLASTIC AND SEPERATED IN BOILER ROOM. ALL PIPING IS SCHEDULED TO BE REPLACED. - TR 10/1/07 UPGRADE REGN FOR CTI CARVER TO REPLACE PIPING. LETTER FROM CARVER ENCLOSED W/REGN STATES PIPE LEAK FOUND DURING 8/29/07 AI. LEAK COLLECTED IN TRANSITION SUMP. LEAK REPAIRED, BUT SCHOOL AGREED TO REPLACE TO AVOID FUTURE ISSUES. -MLxkÃ$ Âxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿ]PIPING SUMP HAD 3" OF WATER IN IT. SYSTEM WAS IN ALARM. CLEANED OUT AND RESET THE ALARM. TRxkÃ$Â$8 Âxk xk Á`xk Ã+5þÿþÿþÿþÿþÿþÿc10/28/08-COPI FROM CTI REDMOND, INSTALLED ELLD'S THAT CONNECTS TO INCON TS-L3000, WHICH IS A "LEARNING" CONSOLE-PH NOTE: ******* 2 INSPECTORS INVOLVED AT SITE, DARRELL DALLAIRE AND DAVID HOWE ******* INSPECTION IS UNDATED BUT REPORTS WERE GENERATED AND ORIGINALS ATTACHED TO THE REPORT SHOW A DATE OF 10/10/07 FOR THE LLD'S AND 9/22/07 FOR THE ATG. TRxk Ã$ ÂUxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$Ã\$ Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ$WEEPS UNDER BOTH DISPENSERS AT METERxk Ã$Ãb ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk à ÂA`ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿt10/12/07 INSPECTION UPDATE FROM GARY KANE RE: CP ON TANK 8 PASSING AT -1.02. NO INSPECTION ENTERED YET? TRxj Ã$Ã`b Á$xk xk Â<xk Ã?þÿþÿþÿþÿþÿþÿþÿxk Ã$Â7 Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$ Â% Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿu 12/10/08-RECIEVED UPGRADE REGISTRATION FOR CTI LEGASSE JR. TO INSTALL SPILL BUCKETS AND NEW WHISTLE ON @2 TANK-PH xk Ã$ Â+ Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿdNO SPACERS, 1985 INSTALL. SIMARD INDICATES REMOVED SOIL AND FOUND COPPER LINES IN PVC SLEEVING. TRxk Ã$ Ã_ Â)xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$ Â[ ÂZxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$ ÃbP Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$ Â)xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$Ã:  ÂZxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$Ã4 ÂZxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$Â_ Á$xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$àÁ$xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$à W ÂZxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$ÂZ$ ÂZxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$Ã# ÂIxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$ÃK ÂDxk xk Â<xk ÃHR$þÿþÿþÿþÿþÿþÿþÿxk Ã$Ã^ ÂDxk xk Â<xk ÃA7þÿþÿþÿþÿþÿþÿþÿxk Ã$Ã[ ÂDxk xk Â<xk Ã0-Aþÿþÿþÿþÿþÿþÿþÿxk Ã$Ã/ ÂIxk xk Â<xk Ä< þÿþÿþÿþÿþÿþÿþÿxk Ã$Ã!Q Â)xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$ÃV ÂZxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$ÃV Â)xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$Â4 Â!xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿyTANK 4 IS OOS AND IS LOCATED AT THE OLD HOSPITAL FACILITY, TANK 5 IS AT THE NEW FACILITY AND IS JUST OVER A YEAR OLD. TRxk Ã$àÂ!xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$Ã- Â!xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿUTANK HAS BOTH A FLAPPER AND A HIGH LEVEL ALARM, BOTH TESTED AND BOTH OPERATIONAL. TRxk Ã$ ÂÃ/+ ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ"ATG RESULTS ATTACHED, PASSING. TRxk Ã$?Â3E ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ"ATG PASSING PRINTOUT ATTACHED. TRxk Ã$@Â^ ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$AàÂZxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$BÃ9 Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$CÂY Â!xk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿÖOFFSET FILL LINES HARD PIPED TO TANKS. COULD NOT VERIFY IF DROP TUBES IN PLACE. INSTALLATION DATE ON TANKS AND PIPING IN QUESTION. TRIED TO GET IN TOUCH WITH OWNER REGARDING INSTALLATION DATE WITHOUT SUCCESS. BBxk Ã$DÂ2E ÂRxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$EÂ&O ÂRxk xk Âxkþÿþÿþÿþÿþÿþÿþÿx7/11/08 UPGRADE REGN FOR CTI SIMARD TO REPLACE SPILL BUCKET 8/25/08 COPI - CTI SIMARD FIXED EXISTING SPILL BUCKET FLANGExkÃ$FÃ/ ÂRxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ>REMOVED WATER FROM NL SUMP. REPORTED TO TED SCHARF 7/25/2007.xkÃ$GàÂRxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$HÂXE ÂRxk xk Âxk þÿþÿþÿþÿþÿþÿþÿCOULDN'T REMOVE BALL FLOATS, BUT CHECKED PREVIOUS YEARS AND PASSED. WOULD RECOMMEND REMOVING BALL FLOATS AND INSTALLING 61-SO. CTI BISKUPIAK STATES "NO PROBLEMS REMOVING BALL FLOATS". CHECKED AND ALL 3 PASS. PASSING INSPECTION VIA UPDATE. TRxkÃ$I & ÂRxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$JÂD1 ÂRxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ¶REMOVED WATER FROM BOTH SUMPS. REPORTED TO TED SCHARF 7/25/2007. WOULD RECOMMEND REMOVING BALL FLOATS AND INSTALLING 61-SO OVERFILL. COULD NOT REMOVE BALL FLOATS DUE TO CORROSION.xkÃ$KÂ&M ÂRxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$LÂ&A ÂRxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$MÂV ÂRxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ˜BUILDING REMOVED ALONG WITH LEAK DETECTION EQUIPMENT. PUMPS/FILLS UNSECURED. VENTS LAYING ON GROUND AND PARTIALLY EXPOSED FLEX CONNECTORS UNPROTECTED.xkÃ$NÃ\R ÂRxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ$P Á$xk xk Á`xkÃ$þÿþÿþÿþÿþÿþÿþÿxkÃ$QÂB Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿhTANK IS A SPLIT TANK BUT HAS TWO RISERS AND SENSORS FOR INTERSTICE? TR NOW PASSING PER CTI JON PAINE. xk Ã$RÃ! ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿuINSPECTION INDICATES MONITORING WELLS NOW BEING MONITORED PROPERLY WITH A WEEKLY LOG AND BAILER PRESENT ON SITE. TRxk Ã$SÃS Á$xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$TÃCH ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$UÂV  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿPIPING IS D/W FLEX AND IS MONITORED BY AN OMNTEC LU-1 WITH THE SENSOR LOCATED IN THE BOILER ROOM SINCE THE PIPING SLOPES IN THAT DIRECTION. TRxk Ã$VÂX  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$WÂV% Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿACTUALLY KEN SR. NOT JR. TRxk Ã$XÂV  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$YÂV  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$ZÂV&  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿJNO INFORMATION REGARDING PRIOR YEAR INSPECTION WHICH STATED COULDN'T REMOVE PROBE OF INTERSTICE. PER LETTER FROM TOWN 8/30/07 PORTLAND PUMP WOULD MAKE REPAIR DURING INSPECTION. INSPECTION PERFORMED BY KEN LEGASSE SR OF ADAMS PETROLEUM. UNCLEAR IF REPAIR WAS ACTUALLY MADE TO THE FACILITY AND IF PROBE WAS ACTUALLY PULLED. TRxk Ã$[Â5 Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$\Â[  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$]  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$^ÂAE ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã9ÂEÂÂGxj xj Âxj þÿþÿþÿþÿþÿþÿþÿ)GAFTEK WORK ORDER DATED 9/10/2007 SHOW DON BUBAR DID AN ANNUAL INSPECTION THAT FAILED DUE TO LACK O FACCESS TO VENT WHISTLE. THE VFW WILL BE GETTING THIS REPAIRED BUT DUE TO THE COST IT IS LIKELY THAT IT WON'T HAPPEN UNTIL SPRING 2008. THE WORK ORDER HAS BEEN FILED INTHE REG FILE. TRxj Ã$_ÂV!  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$`ÂV   xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$aÃ[ ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$bà  ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã$cÂ"J ÂKxk xk Âxk ÃL3þÿþÿþÿþÿþÿþÿþÿxk Ã$dÃ. Âxk xk Â7þÿþÿþÿþÿþÿþÿþÿþÿŽ9/25/08-NOTICE OF INTENT TO ABANDON RECIEVED, EST. REMOVAL DATE-11/28/08-PH JE TO REPLACE SUMP ENTRY BOOT. TANK STILL HAS 12" PRODUCT. DMCLxk Ã%  ÂKxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%ÂXEÂÂRxk xk Âxjþÿþÿþÿþÿþÿþÿþÿr7/11/08 UPGRADE REGN FOR CTI SIMARD TO REPLACE SPILL BUCKET 8/25/08 COPI - CTI SIMARD FIXED EXISTING BUCKET FLANGExjÃ%Â&MÂÂRxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ>SPILL BUCKETS WILL NEED TO BE REPLACED BEFORE NEXT INSPECTION.xkÃ%Â7 ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%ÂW Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã% Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã"Ã6ÂÂ)xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ„8/24/07 INSPECTION UPDATE FROM GARY KANE, LIP SEALS IN WAYNE METERS HAD TO BE REPLACED DUE TO WEEPING. ALL OK PER CTI KANE. TRxkÃ% ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿaNO ACCESS TO WHISTLE ON HEATING OIL TANK. TANK IS <1,100, AND INSTALLED IN 1988. NOW PASSING. TRxk Ã%Ã]#  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿÚ7/8/2008 BUILDING HIT AND ELECTRONICS NOT WORKING PROPERLY PER KEN SR. INSURANCE CLAIM. MAY TAKE A MONTH TO GET MONEY TO REPAIR. TOLD FACILITY NEEDS TO CONDUCT DAILY INVENTORY. -LW NOW PASSING PER CTI LEGASSE. TRxkÃ% Âc  Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã% ÃH Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã% ÂGX Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ"ALL SPILL BUCKETS CLEANED OUT. TRxk Ã%  7 Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ,AI FAIL FOR CP 10/22/08- LETTER OUT 12/30/08xk Ã% Âb Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿBULK FACILITY. xk Ã%Ã9 Âxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%Â= Á$xk xk Á`xk Ã. !þÿþÿþÿþÿþÿþÿ<10/23/08 COPI RECIEVED FOR UPGRADE FROM OMNTEC TO ILS-350-PHxkÃ%ÂXB Â)xk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿºRECORDS NOT COMPLETELY FILLED OUT FOR DAILY INVENTORY, OVER/SHORT NOT FILLED IN, OWNER SAYS RNL'S NOT ALWAYS WITHIN THE 1%. TANK STICK BAD/OWNER USES V/R READINGS. ALL PER CTI BUBAR. TRxk Ã%Ã\I ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ˜10/8/08-RECIEVED REGISTRATION FOR NEW PIPING AND POSSIBLY NEW SUMPS-CTI MULLINS PH CTI PAUL THOMPSON INDICATES THE FOLLOWING: ARRIVED ON SITE SUMP SENSOR 1-2 IN ALARM, SENSOR NOT WORKING, CLEANED SENSOR FOUND AND REPAIRED BROKEN WIRE. INTERSTITIAL SPACE SENSOR NOT WORKING RED LIGHT NOT WORKING GREEN POWER LIGHT NOT WORKING, -TR 11/12/07 UPDATE - REPLACED INTERSTITIAL SENSOR, POWER LIGHT AND ALARM LIGHTxk Ã%ÂaO Âxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿŒPIPING SUMP SENSOR IN ALARM, 3" OF WATER IN SUMP, REMOVED AND RESET ALARM. REPLACED 15 GALLON SPILL BUCKET, PIPING AT LOCATION IS FLEX. TRxkÃ%Â3  Âxkxk Âxkþÿþÿþÿþÿþÿþÿþÿ%REPLACED RIM AND LID ON SPILL BUCKET.xkÃ%ÂaN Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿREPLACED LID ON SPILL BUCKET.xkÃ%Âd  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.85, -.87, -.8 CORRECTED INSPECTION TO FAIL FOR CP, ASKED INSPECTOR TO SUBMIT CORRECTED FRONT PAGE. CP FAIL LETTER 10/29/07 -MLxk Ã%à I Âxk xk Âxk Ã=þÿþÿþÿþÿþÿþÿþÿxk Ã%ÃP Âxk xk Âxk Ãþÿþÿþÿþÿþÿþÿþÿxk Ã%ÂY" Âxk xk ÂþÿÃ)þÿþÿþÿþÿþÿþÿ-COULD NOT VERIFY IF DROP TUBE WAS PRESENT. BBxk Ã%ÃFÂÂxk xk Âxj þÿþÿþÿþÿþÿþÿþÿ„THE JUNCTION BOXES FOR THE INTERSTITIAL PROBES ARE BOTH CORRODED AWAY, LEAVING THE WIRING SPLICES EXPOSED. THEY SHOULD BE REPLACED.xj Ã%Ã@_ Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ( NOW PASSING PER KIRK ST PETER CTI. TRxkÃ%  Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%Ã; Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%Â5+ Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%ÂQ+ Áxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%!à ] Â'xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿVREPLACED SENSOR ON REG. TANK INNERWALL. OK. REPLACED OVERFILL FLAPPER ON DIESEL TANK.xkÃ%"ÃW'  xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿSWATER REMOVED FROM DIESEL SUMP. WATER ENTERING AROUND DISP[ENSER AND RUNNING BACK THROUGH SECONDARY TO THE SUMP ACCORDING TO CTI LEGASSE. UNABLE TO REMOVE SNL BFV, DIESEL BFV SET AT 14 1/2 " SHOULD BE 19" . SPILL BUCKETS HAD MIX IN THEM, REMOVED. DROP TUBES TOO SHORT. ALL REPAIRS MADE PER CTI KEN LEGASSE, SR. TRxkÃ%$ÂRI ÂRxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%%àÂRxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%'Ã! ÂRxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%(ÂRK ÂRxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%) Á$xk xk Á_þÿþÿþÿþÿþÿþÿþÿþÿVSPOKE WITH MARK AT MAIETTA ABOUT THE PROBLEMS. THEY ARE DECIDING HOW TO MORE FORWARD.xk Ã%*ÂR ÂSxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%+Ã@ Á$xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿSSYSTEM LOOKS VERY GOOD, EVERYTHING CLEAN AND DRY AND WORKED WELL PER CTI DAVIS. TRxk Ã%,à xk xk Á`xk Ä$Iþÿþÿþÿþÿþÿþÿ3 TANK READING: LARRY MCALLISTER DID THE CP TESTING.xk Ã%-ÂVH Â]xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%.  Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ$NOW PASSING PER CTI FAULKINGHAM. TRxk Ã%/ ÂSxk xk Âxk þÿþÿþÿþÿþÿþÿþÿEOMNTEC LU-6 CLEANED ALL OPTICAL SENSORS, REPLACED MALFUNCTIONING MLLDxk Ã%0Ã0B Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ`FAILING AI FOR CP-10/15/08-LETTER OUT 10/30/08 OWNER CALLED 1/21/09-WILL TEST AGAIN IN SPRING-PHxk Ã%1Ã`! ÂSxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%2 O Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿp SENSORS ARE PROPERLY PLACED?: 6-1 SENSOR NOT OPERATING WORKING PROPERLY AND NOW PASSING PER CTI NICK GUAY. TRxk Ã%3Ã3U Â)xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ5LEAKING DSL PUMP REPAIRED, SUMP CLEANED OUT CLEANED OUT SPILL BUCKETS REPAIRED WEEP IN DISPENSER 5/6, CLEANED DISP SUMP ATG INSTALLED BUT NOT REGISTERED AS LEAK DETECTION. OWNER SENT FORMS TO REGISTER 10/28 BUT CAN'T USE BECAUSE DON'T HAVE ELLDS. TOLD OWNER TO KEEP DOING DI AND SIA, OR INSTALL ELLDS. -MLxkÃ%4Â:A ÂHxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%5Â> Â)xk xk Á`xlþÿþÿþÿþÿþÿþÿþÿWTANK IS A OCTOBER 1991 INSTALL. THERE IS NO ACCESS TO THE OVERFILL DEVICE CURRENTLY, IT IS A VENT WHISTLE. FAILING INSPECTION. BUBAR ALSO REPLACED A SUMP SENSOR WHEN ON SITE. TR SPOKE WITH ELANA PHILLIPS @ 947-0324. THEY ARE IN TOUCH WITH GAFTEK AND SEVERAL OTHER COMPANIES TO GET THE WORK DONE, THEY WOULD LIKE TO USE THEIR OWN PEOPLE TO DO THE DIGGING IF POSSIBLE. THEY ALSO WOULD APPRECIATE A LITTLE BIT OF TIME TO RAISE THE MONEY AND ALLOW THE GROUND TO THAW SOME, I ALLOWED THEM UNTIL APRIL 2008 TO MAKE THE REPAIRS. TR 4/21/08 COPI - CTI GEORGE INSTALLED VENT WHISTLE WITH GRADE ACCESSxk Ã%6ÂM> ÂIxk xk Á`xk Ãc&]þÿþÿþÿþÿþÿþÿkTIGHTEN UNIONS ON DISPENSERS 3&4,7&8. REGULAR UNLEADED. WEEPS APPEARED TO STOP, WILL CHECK AGAIN IN A WEEK.xkÃ%7ÃÂÂxk xk Á_xk Ã+Zþÿþÿþÿþÿþÿþÿ RECIVED LATExk Ã%8ÃB Á$xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿHSPILL BUCKETS CLEANED BY CTI DAVIS. LEAK DETECTOR PNEUMERCATOR E-700-Ixk Ã%9 Á$xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ}2 SUMPS DW FRP PIPING. VR ILS-350. TEST POINT INSIDE INTERSTIAL MANHOLE AND DIRECTLY OUTSIDE CONCRETE PAD. PER CTI DAVIS. TRxk Ã%:ÃF Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ)PNEUMERCATOR LU-1000 PER CTI BUBAR. TRxk Ã%;à  Á$xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿLPNEUMACATOR ADE-70. REPLACED GASKET ON BRASS FILL ADAPTOR. PER CTI DAVIS TRxk Ã%<à JÂÂxkxk Á`xjþÿþÿþÿþÿþÿþÿþÿÈINSPECTION PERFORMED BY DUANE BURTON LISTS TANK AS #49-1 @ AUGUSTA HALL, UNIVERSITY OF MAINE SYSTEM. TANK HAS BEEN TRANSFERRED TO PENQUIS CAP. DATE THIS INSPECTION WAS PROVIDED TO DEP IS UNKNOWN. TRxjÃ%=ÂS ÂSxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿ(PASSING UST TANK INSPECTION ENTERED. TRxkÃ%>Ã_  xj xk Á_xk þÿþÿþÿþÿþÿþÿþÿmINSTALLED NEW LEAK SENSOR AND CONTROL PANEL FOR INTERIOR PIPING SUMP. SIMS SUBMITTED UPGRADE REGN, NO COPI. xk Ã%?Â0 Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk à Zà ÂÂYxj xj Â7xjþÿþÿþÿþÿþÿþÿþÿìOWNER CALLED 10/5/2007 SAID TANKS REMOVED. IN SYSTEM AS PLANNED FOR REMOVAL. TOLD OWNER NEED REMOVAL CONFIRMATION CARD. HE SAID FRANK W. FROM RESPONSE HAD IT. I TOLD HIM TO CONTACT FRANK AND GET A COPY TO JOHN DUNLAP IN AUGUSTA. -LWxjÃ%@Â9 ÂCxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿÐTANK IS OUT OF SERVICE, DATE NOT LISTED. FURGE NOTES "TANK TO BE REMOVED IN THE SPRING OF 2008". LESS THAN 10,000 GALLONS OF FUEL PUMPED ANNUALLY. TANK PASSES BOTH AS ACTIVE AND AS OOS ARE ALL BEING MET. TRxk Ã"ÂPJ Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ:COPPER PIPING IN PIPING ACCESS HAS BEEN TERMINATED SPILL BUCKET RIM DISCONNECTED BY PLOW, RECOMMENDED REPLACEMENT REPLACED FILL CAP TANK READING: -1.08, -1.04, -.925 UPDATE TO PASS: 10/2/07 COPI - CTI LEWIS REPLACED SPILL BUCKET LETTER IN FILE FROM PMS, INC TO CHURCH INDICATING PIPING MAY REMAIN IN PLACE CURRENTLY BUT, WHEN YARD IS REPAVED OR OTHER WORK DONE IN THE AREA, PIPING MUST BE PROPERLY REMOVED. THIS FOLLOWS A DISCUSSION WITH STAFF REGARDING REMOVAL. PIPING IS COPPER FOR HEATING OIL AND IS BURIED IN A PAVED YARD AREA AT THE CHURCH AND SCHOOL. TRxk Ã%Aà * Âxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿwINSPECTION DATE WAS 6/16/07, RECEIVED 11/5/07 1/24/08 CP FAIL LETTER -ML 5/22/08 COPI - CTI BISKUPIAK INSTALLED ANODESxk ÃÃ#PÂÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿ99/25/07 COPI - CTI BISKUPIAK INSTALLED COATED COPPER LINExkÃÃ!*ÂÂxkxkÂþÿþÿþÿþÿþÿþÿþÿþÿÑNOT RECONCILING DAILY INVENTORY, CLEANED OUT SPILL BUCKETS, TANK 4 VENT PIPE BROKEN CP READINGS: TANK 1 -1.02, -1.02, -1.02 TANK 2 -1, -1, -1 TANK 3 -1.04, -1.04, -1.04 TANK 4 -1.18, -1.04, -1.04 DID NOT CP TEST PIPING AI FAIL LETTER 6/25/07 -ML PROPERLY RECONCILED DI FOR 8/07 & 9/07 RECD 10/11/07. ALL PASSED EXCEPT TANK 3 IN 9/07 - 667 GAL PUMPED, 14 OVER. 11/5 LEGASSE SR TRYING TO CP TEST PIPING, COULD NOT ISOLATE, FOUND FRP LINE TO ONE OF DSL DISPENSERS. xkÃ%BÂ=  ÂKxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ'INTENT TO ABANDON REG RECIEVED 10/10/08xk ÃaÂ0ÂÂxjxjÂxl þÿþÿþÿþÿþÿþÿþÿ[10/31/08 AI WAS DONE WITHOUT CP TEST #'S. LETTER TO OWNER 12/31/08-1/15/09-CTI SAVAGE CALLED AND EXPLAINED THAT HE WAS UNDER THE IMPRESSION THAT THE TANK WAS JACKETED, NOT CP, AND WILL DO CP TEST IN SPRING AFTER THAW-PH 10/30/07 REGN FOR PIPING, SUMP, MONITOR, OVERFILL, SPILL BUCKET REPLACEMENT BY CTI LETELLIER 3/13/08 DW FLEX PIPING INSTALLEDxjÃ%CÂG5ÂÂ!xk xk ÂxkÃd,þÿþÿþÿþÿþÿþÿhTANK 6-1 (RNL CHAMBER) SIPHONS TO TANK 5-1 10/30/07 COPI - CTI BUBAR INSTALLED 2 - 15 GAL SPILL BUCKETSxkÃ%DÂ2W Âxk xk Â7xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%EÂ? ÂSxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ=NOI RECEIVED 1/9/08. APPROVED OOS EXTENSION UNTIL 6/1/08. -MLxk Ã%FÃ"EÂÂ!xk xk ÂxkÄ:>þÿþÿþÿþÿþÿþÿþÿxkÃ%GÂ70ÂÂ)xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%HÃ[ Â:xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ„SW FG TANK WITH MONITORING ON THE PIPING ONLY. FILL BOX IS ABOVE GROUND. ONLY ONE OF THE TWOLINES IS BEING USED FOR THE FURNACE. TRxk Ã%IÂA\ Âbxk xk Á`xk ÃDQ;þÿþÿþÿþÿþÿþÿTALSO ON SITE DURING INSPECTION, CTI DAVID HOWE. BOTH SIGNED THE INSPECTION FORM. TRxk Ã%Jà xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ?UPGRADE REG. FOR CTI BUBAR TO INSTALL SPACERS ON COPPER LINES xkÃ%KÂ5- Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%LÃ@ Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿN1989 TANK INSTALL. COPPER DOES NOT HAVE SPACERS, NOT REQUIRED AT THE TIME. TRxk Ã%MÂ#ÂÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%NÃWEÂÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%OàÂKxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Âa&Â7ÂÂYxjxjÂxjþÿþÿþÿþÿþÿþÿþÿ 11/5/2007 FRANK KEANAN HAD ANNUAL INSPECTION DONE IN 2007. WILL CONTACT COMPANY TO GET A COPY OF ANNUAL INSECTION. TOLD THEM LETTER GIVES THEM 30 DAYS TO SUBMIT ANNUAL INSPECTION. 11/6/2007 J.A. EATON DID AI INSPECTION CLAIMS SENT IT INTO THE DEP. WILL RESUBMIT.xjÃ%PÃ4 Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ 1988 INSTALLxk Ã%QàÂ\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%RÃJÂÂXxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%SÂTHÂÂXxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%TÂT?ÂÂXxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%UÂL Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Â_&ÃcWÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿž11/7/2007 LEWIS ROBICHAU (FORMER OWNER) CALLED TO INFORM DEP THAT HE SOLD TO PROPERTY TO DANA ORR IN 6/2006. MR. ROBICHAU HAS RECEIVED TWO MASS MAILING NOVS AND BOTH TIMES MR. ROBICHAU HAS INFORM THE NEW OWNER THAT HE NEEDS TO UPDATE THE DEPARTMENT'S RECORDS AND MOST RECENTLY SHOWED THE OWNER THE MASS MAILING NOV FOR FAILURE TO SUBMIT ANNUAL INSPECTION. HE ALSO LET THE NEW OWNER KNOW HE USES MIKE SIMARD. -LWxjÃ7Â/6ÂÂ!xjxjÂ<xkþÿþÿþÿþÿþÿþÿþÿ7SUSAN WOODMAN CALLED ON 11/8/2007 THOUGHT INSPECTION UPDATE DONE IN 3/2007 WAS A FULL INSPECTION, BUT WAS NOT. GOING TO CALL AND SCHEDULE ANOTHER INSPECTION. CTI ARBOUR REPLACED SPILL BUCKETS ON TANKS 5 & 7 WITH 5 GAL DUE TO PROXIMITY TO VAPOR RECOVERY RISER. ALSO REPLACED FLAPPER DROP TUBES ON TANKS 5 & 7.xjÃ%VÃPÂÂ^xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã%WÃQPÂÂTxk xk Âxk þÿþÿþÿþÿþÿþÿþÿiLINES SPACED - UNKNOWN. TRASK SAID SEPARATED AS FAR AS COULD SEE, PVC SLEEVE SEALED INSIDE BUILDING. -MLxk ÂZJÃ`4ÂÂKxi xi Âxiþÿþÿþÿþÿþÿþÿþÿp11/7/07 UPGRADE REGN FOR CTI COUTURE TO INSTALL NEW PIPING SUMP "TO REPLACE SUMP GETTING WATER IN IT CONSTANTLY"xiÃ%XÃÂÂxk xk Á`xkÄ2QþÿþÿþÿþÿþÿþÿþÿxkÃ%YÂ1]ÂÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%ZÂQ1ÂÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%[Â]]ÂÂ]xk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%\Â]RÂÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿ'SOME SURFACE WATER REMOVED FROM SUMPS. xkÃ%]Â]EÂÂ]xk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%^ÂYEÂÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%_Â2TÂÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%`ÂÂÂVxkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%aÃJ9ÂÁxkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%bÃR+ÂÂ)xkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%cÃ:YÂÂXxkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ%dÂ^\ÂÂxkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&Â"^ÂÂxkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&ÂSSÂÂxkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&Â68ÂÂxkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&Â5 ÂYxk xk Âxk ÃVþÿþÿþÿþÿþÿþÿ®9/20/11 CALL FROM TIM WOOD WITH MAPLETON OIL, POSIBBLY INTERESTED IN BUYING. WANTED TO KNOW COMPLINCE HISTORY AND IF IT COULD BE PUT BACK IN TO SERVICE. I CALLED HIM BACK AFTER CHECKING TANKS AND TALKING WITH DIANA. IT HAS BEEN OOS FOR TO LONG WITHOUT AI BEING DONE TO BE ALLOWED TO GO BACK INTO SERVICE. NEEDS TO BE REMOVED. TED 9/13 /11 VISITED SITE 9/13 REMAINS CLOSED, OOS AND TANK IS ZIP TIED LOCKED, ALSO FOR SALE FOR $50,000. 9/16/11 CALL FROM DAVE WRIGHT AT DYSARTS, SOMEONE CONTACTED HIM ABOUT MAYBE BUYING & RETURNING TO SERVICE. I TOLD DAVE, NO WAY OOS SINCE 2008, NO INSP SINCE 2007, JACKETED TANK OF TYPE WHICH WE HAVE SEEN FAILURES OF WITH E-10 FUEL. TR 3/10/2011 LETTER SENT TO OWNER ALLOWING FACLITY TO RETURN TO SERVICE IF AI DONE, P TEST BY MAY 31, 2011 TED 5/14/09-IRA NEVER DID WORK, MAYBE COUNTY-PH 3/9/2009 NEW OWNER, IRA TO DO INSPECTION AND VAC TEST ON TANK. OWNER TO SEND IN CHANGE ON OWNERSHIP. TEDxk Ã!_Â/ÂÂRxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿfLU-1 INSPECTION UPDATE DATED 9/26/2007 SENT IN ON 10/26/2007 WITH ONLY INTERSTITIAL MONITORING PAGE.xkÃ&Âd xkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&Ã^*ÂÂ`xkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&ÃK ÂÂYxkxk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&Ãb[ÂÁ$xk xk Âxk þÿþÿþÿþÿþÿþÿþÿtREPLACED POWER BULB ON TLS 350 CLEANED SPILL BUCKETS TIGHTENED SCREWS ON FLAPPERS REPLACED VAPOR CAPS ON 2-2 AND 3-1xk Ã& Â)ÂÂ\xkxk Á`xkÃ3þÿþÿþÿþÿþÿþÿþÿxkÃ& Â"PÂÂ^xkxk Á`þÿþÿþÿþÿþÿþÿþÿþÿNO CP PROVIDED. xk Ã& ÂCÂÂ^xkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ& Ã+ xkxk Á`þÿþÿþÿþÿþÿþÿþÿþÿREMOVAL OR UPGRADE IS PLANNED.xk Ã& à J ÂLxkxk Á`þÿþÿþÿþÿþÿþÿþÿþÿûTANK LINE CAN ACT AS SYPHON IF A LEAK DEVELOPED IN THE BOILER ROOM DUE TO HEIGHT OF TANK VS. BOILER ROOM.WINCHESTER CITED CONCERN FOR LACK OF ANTISIPHON AT TANK. ALSO SUCTION RETURN LINES ARE FERRO NOT FLARE FITTED AT TANK TOP AS REQUIRED BY CODE. TRxkÃ&ÃU  ÂMxk xk Âxk þÿþÿþÿþÿþÿþÿþÿYINSTALLED NEW SPILL BUCKETS FOR ALL 3 TANKS AND INSTALLED NEW FLAPPER VALVE FOR TANK 2-1.xk Ã&  Á$xk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ0REPAIRS BEING MADE TO BRING INTO COMPLIANCE. TRxkÃ&ÃaÂÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&Ã! Âxkxk Á`xkÂ-þÿþÿþÿþÿþÿþÿ8FAILING DAILY INVENTORY ON BOTH TANKS. SALES OF DIESEL ARE UNDER 2,000 GALLONS PER MONTH, GASOLINE IS UNDER 500 GALLONS PER MONTH FOR SUBMITTED MONTHS OF PAPERWORK. LOW THRU PUT MAY BE TO BLAME FOR THE FAILING 1% TR UPDATE TO PASSING, SIA IS PASSING AND LOW THRU PUT HAS BEEN A CHRONIC PROBLEM AT THIS SITE. xkÃ&à KÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿCRECEIVED ORIGINAL AI 9/17/2007. RECEIVED REVISED AI ON 11/14/2007.xkÃ&à DÂÂxk xk ÂxkÄ/,þÿþÿþÿþÿþÿþÿCRECEIVED ORIGINAL AI 9/17/2007. RECEIVED REVISED AI ON 11/14/2007.xkÃ&ÃXÂÂxk xk ÂxkÄ!<+þÿþÿþÿþÿþÿþÿCRECEIVED ORIGINAL AI 9/17/2007. RECEIVED REVISED AI ON 11/14/2007.xkÃ& ÂXxkxk Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&à < Â)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ-ACTUAL DATE OF INSPECTION WAS 10/01/2007. BB xk Ã&ÂX8 Â\xkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&Â^b ÂKxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿçFACILITY OWNER CALLED ON 8/12/08 AND LEFT MESSAGE. FACILITY OWNER CALLED ON 8/13/08. WILL BE SENDING IN OOS FORM AND AN EXTENSION OF TIME TO REMAIN OUT OF SERVICE REQUEST. -LW EXTENSION TO REMAIN OOS GRANTED UNTIL 8/31/2009- LW xkÃ&Ã!*  xk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿCP READINGS: TANK 1 -1.55, -1.53, -1.52; PIPING -.944, -1.126 TANK 2 -1.146, -1.044, -1.043; PIPING -.872, -1.07 TANK 3 -1.288, -1.057, -1.037; PIPING -1.015, -1.169, -.79 (RETESTED: DSL PIPING FAILED AGAIN 11/6/07) CP FAIL LETTER REPAIR/REPLACE 11/15/07 -ML xk Ã&ÂK Â;xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&Â$> ÂKxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&Ã?/ Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&à ' Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&Â* ÂKxkxk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&Â#= Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã& ÃI Á$xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿREMOVED WATER FROM SUMPS, REPAIRED 8-2 ENTRY BOOT CLEANED SPILL BUCKETS REPLACED 8-1 LLD REPLACED 8-2 MANHOLE LID OLD STAINING AT 5/6 DISPENSERxkÃ&!Â_B Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&"Â7; Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿr9/30/08-UPGRADE REGISTRATION RECIEVED-CTI SIMARD TO INSTALL 15 GAL. SPILL BUCKET ON ONE OF THE 3 6000 GAL TANKS PHxk Ã&#Ã`ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&$Â=S Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&%Â7ÂÂxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ;6/16/08 COPI - CTI DODGE ADDED ANODES, NO READINGS PROVIDEDxkÃ&&Â$! Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿvREPLACED RNL BUCKET COVER, REMOVED PRODUCT FROM ALL BUCKETS 8/28/08 UPGRADE REGN FOR CTI GEORGE TO REPLACE RNL BUCKETxk Ã&'ÂE Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&(Ã_  Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&) Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&*ÂSB  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿáPUMPED 6" WATER FROM DSL INTERSTICE, COMING IN FROM CAP? REPLACED SENSOR AND REMOVED WATER FROM DSL SUMP REPLACED WO INTERSTICE SENSOR REMOVED WATER FROM DSL SPILL BUCKET 5/20/08 UPGRADE REGN FOR CTI DAVIS TO REPLACE SUMP. xk Ã&+ U Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ/VR ILS-350 ELECTRONIC MONITORING OF 4 GWM WELLSxk Ã&,Â6 Áxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÂcÂ2PÂÂSxjxjÂþÿþÿþÿþÿþÿþÿþÿþÿLNEW OWNERS. KIRK ST PETER IS ASSISTING THEM WITH DAILY INVENTORY ISSUES. BBxjÃ&-Ã(7 Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&.ÃWO Â)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&/ÂE Â)xk xk ÂxlþÿþÿþÿþÿþÿþÿþÿÒ11/15/07 AI FAIL LETTER, SEND 2 MO GWM LOGS BY 2/15/08 -ML LOGS FROM 11/06-11/07 RECD 11/28/07. WATER PRESENT IN WELL ONLY IN SPRING. 4/28/08 COPI - CTI MULLINS INSTALLED NEW VENT WHISTLE IN 2" AMERON PIPE xk Ã&0ÂQ Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&1 Â)xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&2Â@ Â)xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&3ÂPY Â)xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&4Â$' Á$xk xk Â<xk Ãþÿþÿþÿþÿþÿþÿþÿxk Ã&5ÂU Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&6Ã^ Â)xk xk Â<xk þÿþÿþÿþÿþÿþÿþÿ09/08/10: DON BUBAR WORKING W/ POTENTIAL BUYER. FAC NEVER TAKEN PROPERLY OOS. BUYER WANTS TO REMOVE THE TANKS. ONE FED REGULATED AND ONE NOT. WILL COORD W/ JOHN DUNLAP THE REMOVAL PAPERWORK. -WP 09/28/2010 DAVID ELLSWORTH, CFO OF LESEA. CALLED, FACILITY IS BEING SOLD. TRxk Ã&7Ã* Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿ¤10/14/09-REGISTRATION FOR NEW TANK AND PIPING TO REPLACE OLD TANKS, CTI LETELLIER TO DO INSTALL-PH 9/10/09-NOITA FOR CTI LETELLIER TO REMOVE ALL TANKS AND PIPING-PHxk Ã&8à  Â)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿæAPPROX 1.5 GAL GAS IN 6-1 SUMP 7-1 SUMP FULL TO TOP W/WATER REPLACED 7-1 INTERSTITIAL SENSOR CTI GEORGE FOUND CRACK IN BRASS FITTING ON TOP OF TANK 6 LD, REPLACED. ALSO REPLACED RIPPED ENTRY BOOT. TANK 7 WATER ENTERED FROM LID.xk Ã&9à Q Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&:Ã.E Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&;ÃS8 Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&<ÂD Â)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&=ÂB% Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿDREMOVED PRODUCT FROM SPILL BUCKETS VENT PIPE ONLY 2" ABOVE ROOF LINExk ÃÂ7/ÂÂ)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿZSUMPS HAVE SOME WATER. 11-1 INTERSTITIAL NOT WORKING. DISPENSER SUMPS ALSO HAVE SOME WATER. -MLG CTI PAINE CORRECTED INTERSTITIAL SENSOR FAILURE ONLY ON 6/4/07 -ML 10/17/07 UPGRADE REGN FOR CTI MULLINS TO REPLACE SUMP COVERS 10/24/07 INSPECTION UPDATE - CTI MULLINS REPAIRED ALL SUMPS, MADE LIQUID TIGHT, HYDRO TESTED ALL PASSED (10/24/07 COPI)xkÃ&>ÃL Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&?Ã"7 ÂDxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&@àÂDxk xk Âxk Ã+B7þÿþÿþÿþÿþÿþÿ>TIGHTENED UNION ON DISP # 9 & 10 TO CURE STAIN ON SHEAR VALVE.xk Ã&AÃY  ÂDxk xk Âxk Ä13þÿþÿþÿþÿþÿþÿ0DATE OF INSPECTION IS 10/23/2007 NOT 11/16/2007.xk Ã&BÃZ) ÂDxk xk Âxk ÃR. þÿþÿþÿþÿþÿþÿþÿxk Ã&CÃBÂÂxk xk Âxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã!^ÃR ÂZxk xk Âxk þÿþÿþÿþÿþÿþÿþÿæWATER REMOVED FROM ALL 4 PIPING SUMPS DURING INSPECTION. SENSOR FOR PREMIUM SUMP WILL NOT CLEAR THE ALARM. 9/26/07 AI FAIL LTR -ML 11/8/07 INSPECTION UPDATE - CTI ST PETER PUMPED WATER OUT OF SUMP, REPLACED SENSOR IN PREMIUM SUMPxkÃ&DÂFÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&Eà   xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&FÃZ:  xk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&GÂC!  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ<SPILL BUCKET LID NOT TOUCHING FILL RISER?: ABOVE GRADE BUCKET, NO TRAFFIC LOAD AI FAIL LETTER 11/16/07 -ML 12/5/07 COPI - CTI HASKELL INSTALLED VENT WHISTLE W/ACCESS, REPLACED COPPER LINES AND SUMP, INSTALLED OMNTEC LU-2 INSPECTION UPDATE FROM TED HASKELL DATED 12/13/07 SHOWING PASSING INSPECTION. TR.xk Ã&HÃX Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&JÃÂÂxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ+TANK # 5 PASSED CP TESTING (-0.96 VOLTS) BBxkà ÃÂÁxkxkÂxj þÿþÿþÿþÿþÿþÿþÿ¡BALL FLOATS ON SUCTION SYSTEM 11/27/07 SPOKE WITH NEW OWNER BOB SCHNEBLY - WORKING WITH DYSARTS TO REOPEN FACILITY. WILL HAVE FULL AI AND PT DONE. -ML SPOKE W/ELWIN SMART 10/24/07. FACILITY IS CLOSED AND FOR SALE, NOT "OFFICALLY OR CORRECTLY OOS" BUT NOT IN USE. WILL NEED TO REPLACE BALL FLOAT VENTS, INSPECT, AND PRECISION TEST BEFORE COMING BACK INTO SERVICE. EXPLAINED ALL TO MR. SMART. TRxj Ã&KÃ+ ÂLxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&LÃ`2 Âbxk xk Âxk ÄUþÿþÿþÿþÿþÿþÿ#REPLACED SENSOR IN RNL PIPING SUMP.xk Ã&M ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿSTANK 3 IS CURRENTLY OOS SINCE 11/2/06. IT IS THE MID GRADE TANK PER CTI ST. PETER. xk Ã&NÃc ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&OÃX ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&P 5 ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&QÂR ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&RÂD ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&SÃ) ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&TÂ! ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&VÂ2P ÂSxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿŸBEKKA KOROSKI RECEIVED A PHONE CALL FROM THE PRIOR OWNER. NEW OWNER IS TRACY LABRECK. ACCORDING TO TOWN OFFICE TITLE WAS TRANSFERED IN 10/2006. FACILITY IS NOW CALLED T & A VARIETY. NEW OWNERS? DI HAS BEEN AN ONGOING ISSUE AT THIS FACILITY. SPILL BUCKETS ON 5 & 7 REPLACED. TR 11/15/2007 KIRK ST PETER CALLED TO LET DEP KNOW FACILITY HAS NEW OWNERS AND THEY ARE NOT DOING DI PROPERLY. CHERYL ST PETER WAS MEETING WITH CURRENT OWNERS TODAY TO SHOW HOW TO DO IT. KIRK FAILED THE AI FOR DAILY INVENTORY AND I TOLD KIRK TO TELL THE NEW OWNERS TO SUBMIT A MONTHS WORTH OF DI, TO SHOW DEP IT IS BEING DONE PROPERLY. EMAILED KIRK A CHANGE OF OWNERSHIP FORM FOR THEM. -LWxk Ã&WÂADÂÂ;xk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&YÃ6ÂÂTxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿ\HAS REMOTE ABOVEGROUND 2" SCULLY FAST FILL WITH A DOUBLE WALLED FILL PIPE PER CTI TRASK. TRxkÃ&ZÃ4 Â`xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿhREMOVED APPROX. 30 GALLONS WATER FROM DIESEL SUMP COULDN'T LOCATE SOURCE. WILL RECHECK IN 2-3 WEEKS. TRxk Ã&[ÃF Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿTHE JUNCTION BOXES FOR THE INTERSTITIAL SENSORS ARE BOTH COMPLETELY CORREDED AWAY. LEAVING THE WIRES SPLICES AND CONDUIT ENDS EXPOSED. THESE SHOULD BE REPLACED - SENSOR DAMAGED BUT FUNCTIONAL IN SUPER. BOTH SPILL BUCKETS HAD 2-3'' WATER IN THEM. SHOULD BE KEPT CLEAN AND DRY.xk Ã&\ÃB Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&]Â-  Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã&^ ; ÂKxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿ–INSPECTION ENTERED IN ERROR, IT IS ON AN OLD FORM, 2006 VERSION. ALSO CTI HAD WRONG LOCATION LISTED. LEAVING AS A PASSING INSPECTION AT THIS TIME. TRxkÃ&`Â!ÂÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ&aÃ+ÂÂXxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿŽCTI INSPECTED THE COATING ON THE TANK. THE TANK HAS BEEN OVERHEATED TO MAKE THE #6 FUEL FLOW BETTER. REGULAR TEMP INTHE TANK WAS 200 - 220F PER CTI COUTURE, TANK MEANT TO OPERATE AT 150F MAX. EXTERIOR COATING HAS BEEN DESTROYED. TANK IS GOING OUT OF SERVICE AND THEY WILL BE USING AST'S ALREADY ON SITE FOR FUEL. TANK WILL BE REMOVED IN SPRING 2008. THE TANK IS ACTUALLY IN A CONTAINMENT VAULT. TRxk Ã&bÃ#ÂÂXxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿæFOUND OILY SOIL AND DEBRIS AT DIESEL DISPENSER. SOURCE OF PROBLEM IS LEAKING FILTERS, REPLACED SAME. ALSO REMEDIATION WORK AND SITE ASSESSMENT PERFORMED AND PROVIDED TO THE DEPARTMENT, IN THE FILE. FACILITY IS NOW CLEANED UP. TRxk Ã&cÃS1 Áxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ&ALL PASSING NOW PER CTI JON PAINE. TRxk Ã&dÃdLÂÂbxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿŠCTI INDICATES NO SPACERS ON COPPER LINES. TANK WAS A 1998 INSTALL, SPACERS ARE REQUIRED. FAILING INSPECTION W/LETTER TO OWNER AND CTI. TRxkÃ'ÃE Âxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ¨CP REPAIR/REMOVE LETTER 11/28/07 -ML SPOKE WITH BRIAN LAPLANTE WORKING WITH CTI TED HASKELL. THEY WILL BE REMOVING THIS TANK IN JANUARY 2008. 12/27/07 TRxk Ã'Â81ÂÂKxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'ÃD Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'ÂOLÂÂ;xk xk Á`xkÃ^?þÿþÿþÿþÿþÿþÿþÿxkÃ'Âb   xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'Ã8 Âxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'Ã8 Âxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'Ã8 Âxk xk Á`xlþÿþÿþÿþÿþÿþÿþÿT1/4/2008 CALLED TO GET ADDITIONAL NUMBERS FOR INSTALLERS THAT COULD MAKE THE REPAIR.xkÃ' Â(ÂÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ' Â,) ÂXxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿÕWORK ORDER IN FILE AND SIGNED PURCHASE ORDER IN REG #13050 FILE TO PERFORM WORK TO BRING THE FACILITY INTO COMPLIANCE. TR 1/30/08 UPGRADE REGN FOR CTI COUTURE TO REPLACE PIPING AND PIPING SUMPxk Ã' Â,* ÂXxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã' Âxk xk Âxk Ä7UþÿþÿþÿþÿþÿþÿÆ5/5/08 CUTTING INTO EXISTING PIPING NOT UL TESTED, OPW WON'T WARRANTY WORK ON ENVIRON PIPING - MUST REPLACE ENTIRE LINE, CAN'T JUST CUT OUT BAD PART AND ATTACH NEW OPW PIPING IN TRANSITION SUMP. -MLxk Ã'Ã60 Âxk xk Âxk Ãdaþÿþÿþÿþÿþÿþÿþÿxk Ã'Ã#4 Âxk xk Âxk Ä/aþÿþÿþÿþÿþÿþÿþÿxk Ã'ÂA Âxk xk Âxk ÃLGþÿþÿþÿþÿþÿþÿÀ12/13/10-COPI REC'D FOR CTI ANDERSON TO INSTALL NEW 15 GAL BUCKET ON TANK 5-PH 10/13/09-2008 AI WAS DONE, BUT WAS INCOMPLETE BECAUSE THERE WAS TOO LITTLE FUEL IN TANKS TO RUN CSLD TESTS. A PRECISION TEST WAS PERFORMED, AND ALL TANKS PASSED. PH TALKED TO D. TAPLEY AT NOURIA, AND THEY ARE HAVING A 2010 AI PERFORMED SOON, AND WILL EITHER ENSURE THERE IS ENOUGH FUEL FOR CSLD, OR DO DI/SIA. GOING FORWARD, THEY WILL PICK ONE OF THESE TWO OPTIONS. PHxk ÃGÃIÂÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ=SECONDARILY CONTAINED PIPING IS NOT MONITORED FOR LEAKS; SUMPS DO NOT HAVE SENSORS. OWNER NOTIFIED OF VIOLATION. -ML 7/07 LEGASSE INSPECTED AND IMPROPERLY PASSED, INSPECTION SAYS LD NOT REQUIRED. 10/07 LETTER TO LEGASSE REQUIRING CORRECTION. -ML 12/19/07 COPI - CTI ARBOUR INSTALLED OMNTEC ELU1 ON EACH PIPING SUMPxkÃ'ÂA` Â*xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'ÂZ) Â]xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'à % Á xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'Â6B Á xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'Â;d Á xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'Ã<ÂÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÂcÃ%JÂÂAxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿrJIM STASZEWSKI CALLED ON 11/28/2007 TO LET DEP KNOW HE HAS CONTRACTED SIMARDS TO COMPLETE ANNUAL INSPECTION AFTER RECEIVING MASS MAILING NOV. IN THE PAST DEAN DRISKO HAD DONE ANNUAL INSPECTIONS, AND HAD CALLED OWNER TO DO INSPECTION, BUT DID NOT SHOW UP. OWNER LOOK ON DEP WEBSITE AND DETERMINED MR. DRISKO NO LONGER WAS CERTIFIED SINCE HIS NAME WAS NOT ON THE LIST. xjÃ'Ã9ÂÂxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿR12" OF GAS IN TANK INTERSTITIAL , TANK #9, TANK HAS BEEN REMOVED FROM SERVICE. TRxkÃ'àÂLxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'Â6$ Â\xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'Â6 Â\xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'Ã.'ÂÂ_xk xk Á`xkþÿþÿþÿþÿþÿþÿþÿPER CTI DENNIS DAVIS, UPDATE IS DATED "MAY" NO ADDITIONAL INFORMATION DATE WISE. INDICATES SOMEONE HAD ADDED A HUB RISER TO THE 4-1 FLAPPER MAKING IT TOO SHORT AND NOT AT 95% SHUT OFF. REMOVED SAME. REPL;ACED FLAPPER DROP TUBE IN 5-1. REPLACED LID ON 5-1 AND PAINTED IT RED. TRxkÃ'ÂGRÂÂxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ…11/25/08-INTENT TO ABANDON FORM-PH COPPER LINES NOT SLEEVED THIS WAS REQUIRED. SPACERS ARE NOT REQUIRED DUE TO DATE OF INSTALL. TRxkÃ' Â>ÂÂxk xk Á`xkà þÿþÿþÿþÿþÿþÿþÿxkÃ'!Â5 ÂKxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÂaÃNÂÂRxjxjÂxjþÿþÿþÿþÿþÿþÿþÿÈ11/29/07 AI DONE BY JO BOSSE, FAILED BECAUSE BALL FLOATS FROZEN IN. WILL RETURN TO REMOVE AND REPLACE WITH FLAPPERS. OWNER KNOWS FAILURE MUST BE CORRECTED, HAS ALREADY CONTRACTED FOR CORRECTION. -MLxjÃ'"Â2T Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'#ÂRD Âxk xk Á`xlþÿþÿþÿþÿþÿþÿþÿ5OMNTEC ELP LU2. MONITOR LIGHT FOR SUMP STAYING IN ALARM MODE, CANNOT RESET. SUSPECTED FAILURE DUE TO LIGHTENING STRIKE. WILL DO MORE DIAGNOSTICS PER CTI "BURNER BOB" CORMIER TR SENT CONSOLE TO OMNTEC FOR REPAIRS. TEST BUTTON WAS REPLACED AS A PRECAUTION. REINSTALLED WITH NEW PROBE SYSTEM FUNCTIONING 100%.xk Ã'$Ã, Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿh10/30/08-COPI FOR INSTALL OF VR-TLS 350 WITH CSLD-CTI WILSON-PH CONTINUING ONGOING ISSUES WITH DAILY INVENTORY. TANKS ARE SW FG 1985 INSTALL. FAILING INVENTORY FOR YEARS NOW, FACILITY NEEDS DEP SITE VISIT FOR PROPER DI LESSONS. NOTE: SIA PASSES ANNUALLY. TR STICK REPLACED, INVENTORY PROPERLY RECONCILED. PASSING PER CTI THORNDIKE. TRxk Ã'%Ã3\ Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'&Ã3[ Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã''Ã3Z Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'(Ã3Y Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'*Â4 ÂRxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'+ÂV7 Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã',ÁD Â!xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ@DRIVE BY ON 9/11/2008 SHOWS FACILITY TO BE CLOSED, DISPENSERS BAGGED. TR *** INSPECTION NOTES FROM 11/29/2007 BELOW **** ALL SUMPS HAD WATER IN THEM AND HAVE TORN BOOTIES AROUND ELECTRICAL. ALL SUMPS ARE IN NEED OF REPAIR. RNL WAS ACTING UP. REPLACED WITH NEW LEAK DETECTOR. CRAIG MACDONALD CELL #299-6941 TRxk ÃQÃ8ÂÂAxjxjÂWxj à Xþÿþÿþÿþÿþÿþÿ410/3/2007 SPOKE WITH HEATHER CONSERNING AI. DEAN DID ONE IN FEB 2007. I CHECKED AND HE WAS NOT CERTIFIED AT THAT TIME. SO NEED A CURRENT ONE NOW. SITE IS FOR SALE. TED 11/29/07 CTI DENNIS DAVIS CALLED. HE IS THERE DOING AN INSPECTION, MULTIPLE PROBLEMS FOUND, FACILITY WILL NOT PASS. TRxjÃ'-ÂV3 Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'.ÃWÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'/Â2YÂÂxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ’6/25/09-COPI REC'D FOR CTI BISSON TO ADD ANODES TO TANKS PH 11/30/07 CP FAIL LETTER -ML 1/3/08 REPLY FROM ATTORNEY - OWNERS WILL RETEST IN SPRINGxkÃ'0Ã!]ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'1ÃUQ Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ£9/17/09-TALKED TO OWNER. HE DID HAVE 2009 INSPECTION DONE, AND APPARENTLY HAD PAYMENT ISSUES. HE IS SETTLED UP NOW, AND SIMARD WILL BE SENDING IN REPORT SHORTLY-PHxk Ã'2ÂX)ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'3ÂHÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'4ÂX'ÂÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿC9/7/07 COPI - CTI SIMARD INSTALLED ANODES AI UPDATE CP READING -.90xkÃ'5ÂX$ÂÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿC9/5/07 COPI - CTI SIMARD INSTALLED ANODES AI UPDATE CP READING -1.1xkÃ'7Â?ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿUSPILL BUCKETS VERY RUSTY AND GASKET IN SUPER BUCKET IT TORN, BUT THEY ALL HOLD LIQUIDxkÃ'8ÂGFÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'9ÂK ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ':ÃBÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿNALL SUMPS WERE FULL OF WATER. REMOVED WATER, MONITORING SYSTEM FUNCTIONING. xkÃ'<Â2HÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'=Â2FÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'>Â2DÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'?Â2GÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'@Á-ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'AÂPÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'BÂR]ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃKÂGÂÂxj xj ÂxjÃ5þÿþÿþÿþÿþÿþÿ˜7/16/10-NOITR REC'D FOR DOGGET TO REMOVE TANKS AND PIPING AND DON ROBBINS TO DO SA, THIS IS AN ARRA REMOVAL-PH KASELIS SENT NEW OWNERS ARTHUR/BRENDA STILPHEN CHANGE OF OWNERSHIP FORM 7/10/07 11/30/07 ARTHUR STILPHEN CALLED THIS DATE AND IS GETTING AN INSPECTION DONE ASAP. FABIAN OIL IS HIS SUPPLIER. HE KNOWS HE IS MISSING THE DEADLINE FOR INSPECTION. I INDICATED MAJOR PROBLEM IS AGE OF TANKS. TRxjÃ'CÃÂÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'DÃa ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'EÃ+ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'FÃXDÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿBALL FLOATS ON SUCTION SYSTEMxkÃ'GÂÂÂYxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'Hà % ÂKxk xk Âxk Ãþÿþÿþÿþÿþÿþÿ)CTI NOTED THRUPUT RECORDS NOT ON SITE. BBxk Ã'IÃ] Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿVWATER IN SUMP FROM AROUND LID. CLEANED AREA OUT AND WORKED ON BETTER SEAT FOR LID. TRxk Ã'JÃ#@ Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿDREPLACED FLAPPER AND PIPING SUMP SENSOR PER CTI AARON THORNDIKE. TRxk Ã'KÂ+= Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'LÃ\- Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'MÂ+> Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'NÂ+3 Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'OÂ+0 Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿèLOCATION OF FACILITY IS OFF BROWN STREET IN WESTBROOK. THERE IS A CHURCH AND ANOTHER UNIDENTIFIED BUILDING WHERE THE VENT PIPE IS CONNECTED. ALSO THERE IS PARKING AREA OFF BROWN STREET, IT APPEARS TEH TANK IS INTHE PARKING LOT. TRxk à Ã^)ÂÂ*xjxjÂxjþÿþÿþÿþÿþÿþÿþÿt11/30/07 OWNER SPOKE WITH TED AND IS TAKING FACILITY OOS. STORE IS CLOSED AT THIS TIME. STILL NEEDS INSPECTION. TRxjÃ'PÃ[  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ>11/16/09-NOITA REC'D FOR CTI BARTON TO REMOVE TANKS 1 AND 2 PHxk ÃNÂX*ÂÂxj xj Á`þÿà +þÿþÿþÿþÿþÿþÿCHAMBER 5-3 FOUND TO HAVE 53" OF WATER IN IT. NO INVENTORY RECORDS. GLEN WALL, DEP RESPONSE, HAS SPOKEN WITH THE OWNERS. 11/30/07 UPGRADE REGN FOR CTI LEGASSE JR TO DIG UP TOP OF TANK AND FIND SOURCE OF WATER INTRUSION. WORK NOT COMPLETED. OWNER REFUSES TO MAKE ADDITIONAL REPAIRS.xjÃ'RÂ3% Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ,9/20/07 COPI - CTI SIMARD INSTALLED 2 ANODESxk Ã'SÂ*\ Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'TÃc& Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ'UÃd* Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'VÂG Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'WÃ^  Áxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'Xà F Áxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ33/12/08 COPI - CTI BEAUMONT INSTALLED SPILL BUCKETSxk Ã,Â&ÂÂUxjxjÂxj þÿþÿþÿþÿþÿþÿþÿ›CATHODIC PROTECTING READING -.90 VOLTS 8/29/07 UPDATE (NO INITIAL?) FOR COPPER PIPING - SUCTION LINE ONLY, RETURN LINE DISCONNECTED. UPDATE SENT TO FILE. xj Ã'YÃG Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'ZÃ4P Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'[Ã4X Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ(HAS BOTH ELECTRONIC AND FLAPPER OVERFILLxk Ã'\ÂJ" Âxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ']ÂO` Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'^Ã' Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'_Â_ Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ9ACTUAL DATE THESE TANKS RETURNED TO SERVICE WAS 6/3/08-PAPERWORK WAS IN ORDER, BUT IT NEVER WAS ENTERED FOR SOME REASON. TANKS WERE OOS FOR LESS THAN 3 MO. SO NO PRECISION TEST WAS DONE-PH 10/7/08-COPI FOR BELOW RECIEVED-PH 9/30/08-UPGRADE REGISTRATION TO REPAIR SPILL BUCKETS-WORK TO BE DONE BY CTI LETELLIER PHxk Ã'`Â1 Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'aÂ^  Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'bÂT2 Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã'cÃH% Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ'1990 INSTALL, SPACERS NOT REQUIRED. TRxk Ã'dÃdG Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿGUPGRADE REG. FOR CTI GRANT TO INSTALL NEW SUMP MANHOLES ON ALL TANKS-PHxk Ã(Ã% Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿGUPGRADE REG. FOR CTI GRANT TO INSTALL NEW SUMP MANHOLES ON ALL TANKS-PHxk Ã(Â@Z Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã( Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(à  Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(ÃT  Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(ÂGDÂÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿAI UPDATE 9/14/07xkÃ(Ã- Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã( ÂR@ Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿTANK IS A 1986 INSTALL DW FIBERGLASS. HAS INTERSTITIAL MONITORING, OVERFILL IS UNKOWN, POSSIBLY A WHISTLE, THERE WAS NO REQUIREMENT AT TIME OF INSTALLATION. FACILITY HAS AN OFFSET FILL ON THE SIDE OF THE BUILDING, TANK HAS BEEN "OVERFILLED" IN THE PAST AS EVIDENCED BY STAINING ON THE WALL OF THE BUILDING. CTI THORNDIKE RECOMMENDED THAT SPILL CONTAINMENT BOX BE ADDED TO FILL PIPE AND OVERFILL DEVICE BE INSTALLED ALONG WITH SPACERS ON PIPING. NONE OF THESE ITEMS ARE REQUIRED UNDER THE RULE IN EXISTENCE AT THE TIME OF INSTALLATION. TR xk Ã( Ã[ÂÂRxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿf2008 INSPECTION YEAR HEATING OIL DISPENSER CRASH VALVE NEEDS TO BE REPLACED AI FAIL LETTER 12/4/07 -MLxk Ã( ÂZ+ Âxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿL**PIPING TO LOADING RACK IS CP - MUST TEST!!. PIPING TO DISPENSERS IS FRP**xk Ã( Â+? Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ©GAUGING PROBE IS DIRECTLY WIRED TO THE TANK MONITOR AND CAN'T BE REMOVED TO CHECK. CTI THORNDIKE RECOMMENDED REPAIR SO THAT IT COULD BE CLEANED AND CHECKED ANNUALLY. TRxk Ã( Ã[ Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ?9/16/07 AI UPDATE FROM CTI GUAY - REPLACED METER ON PUMP 6 DSL.xkÃ(Â=G Á xkxk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ( ' Á xkxk Á`xkþÿþÿþÿþÿþÿþÿþÿ'REPLACED INTERSTITIAL SENSOR, CRACKED. xkÃ(Â& Âxkxk Á`xkþÿþÿþÿþÿþÿþÿþÿYHAS A TANK READING OF -.90 CP? BUT THIS IS NOT A CP TANK? RETURN LINE DISCONNECTED. TRxkÃ(Ã,# Âxkxk Á`xkþÿþÿþÿþÿþÿþÿþÿqSIMARD INDICATES FAILING INSPECTION DUE TO NO SPACERS ON COPPER LINES, 1987 INSTALL SO SPACERS NOT REQUIRED. TRxkÃ(ÃNQÂÂRxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(Â1@ ÂXxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃZÂ> ÂUxkxkÂxk þÿþÿþÿþÿþÿþÿþÿTIN ALARM WHEN CTI ARRIVED AARON THORNDIKE CALLED 12/5/07 SPACERS INSTALLED. TRxkÃ(Á%ÂÂLxk xk Á`xj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã(Á% ÂLxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(à  ÂXxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(Ã%5 Âxk xk Âxk ÄF. þÿþÿþÿþÿþÿþÿgREGISTRATION RECIEVED 9/30/08 FOR 2 NEW AST'S WITH UNDERGROUND PIPING TO BE INSTALLED BY CTI CARVER. PHxk Ã(ÃF ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ}NO SPACERS REQUIRED, 1990 INSTALL. INSTALLED NEW 15 GALLON SPILL BUCKET AND NEW FLAPPER FOR OVERFILL. PER CTI ST. PETER. TRxk Ã(  ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿICONVERTED TO CSLD THIS YEAR PER CTI BOSSE?? NOT REGISTERED WITH DEP. TRxk Ã(ÃQ Âxk xk Â7xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(ÃO Âxk xk Âxk Ä/aþÿþÿþÿþÿþÿþÿR4/8/08 COPI - CTI REDMOND REPLACED FLAPPER, INSTALLED NEW SPILL BUCKET ON TANK 1-3xk Ã(ÁÂÂXxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(Â^: ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ]TANK 7 IS OOS DUE TO DISCHARGE TO INTERSTICE. SEE EVIDENCE OF A LEAK NOTES FROM 9/20/07. TRxk Ã( c ÂMxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã( ÂL ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(!Â5a Âxk xk Âxl þÿþÿþÿþÿþÿþÿþÿ“CP FAIL LETTER 12/6/07 -ML PASSED CP INSPECTION TEST, -.896 ON 4/10/08 -PH 10/9/08-FAILING AI RECIEVED FOR CP ON TANK 8-.623- FAIL LETTER SENT- PHxk Ã(" Â)xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã(#Â> Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ7REPLACED BAD OMNTEC OVERFILL PRISM SENSOR AND TESTED OKxkÃ(%Ã;] ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(&Ã:M Â!xk xk Âxk þÿþÿþÿþÿþÿþÿþÿn1,000 HEATING OIL TANK INSTALLED IN 1989, HAS NO MONITORING WELLS - OVERFILL AND SPILL BUCKET NOT REQUIRED -MLxk Ã('à W  xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã((Ã!FÂÂ)xk xk Âxkþÿþÿþÿþÿþÿþÿþÿ1BALL FLOATS ON SUCTION SYSTEM, LETTER 12/6/07 -MLxkÃ()Ã;\ ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿc8/22/08 CTI HERSEY REPORTS CP PIPING FAILING, OWNER WILL REMOVE TANK IN OCT AFTER HARVEST ENDS. -MLxk Ã(*Â^2 ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿäTANK 7 OOS SINCE 6/11/07, PUMPED DOWN AND SECURED, STILL HAS PASSING CP. NOTE: TANK 7 WAS NEVER REMOVED DUE TO LOCATION IN TANK FIELD. TR TANK READING: TANK 7 OOS -1.10 PIPING WAS REMOVED BUT TANK LEFT IN PLACE IN 2007? -MLxk Ã(+Ã] Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(-ÃW" Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ96/5/08 COPI - CTI SIMARD INSTALLED SPILL BUCKET ON TANK 3xk Ã(.Ã#c Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(/Ã_ Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(0ÂG ÂZxk xk Âxk þÿþÿþÿþÿþÿþÿþÿREPLACED INTERSTITIAL RISER CAPxk Ã(1ÃF Â)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿqSPILL BUCKET NEEDS NEW COVER AND WATER CLEANED OUT AI FAIL LETTER 12/6/07 -ML NOW PASSING PER CTI GARY KANE. TRxk Ã(2Â^, Â)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(3Â(ÂÂTxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(4ÃQÂÂXxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(5Ã8 Á$xk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿÌ4/16/09-COPI FROM CTI LEGASSE SR. : REPAIRED SENSOR WIRING ON ALL TANKS, REPLACE FLAPPER ON TANK 1, REPLACE SOME PART OF FILL RISER ON TANK 2-2, AND REPLACE OF REPAIR SPILL BUCKETS ON TANKS 1 AND 2-2 PH FACILITY HAS PIPING SUMPS AND DISPENSER SUMPS WITH PROBES EVEN THOUGH SUCTION PIPING. TANK 2 INTERSTITIAL DOES NOT GO INTO ALARM. FLAPPER ON TANK 1 WILL NOT OPEN PROPERLY. CLEANED ALL SPILL BUCKETS. TANK 2-1 DROP TUBE PRESSED AGAINST TANK BOTTOM, VAPOR ADAPTER EXTREMELY RUSTED, VAPOR CAPS AND FILL CAPS NEED TO BE REPLACED 12/6/07 AI FAIL LETTER -ML 2/5/08 COUTURE REPAIRED FLAPPER, REPLACED CAPS, WILL SEND AI UPD. CALLED OWNER - MUST DO DI UNTIL INT'L MONITORING REPAIRED, FAXED FORM & INSTRUCTIONS. -MLxk Ã(6Â7. Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ2SUMPS ONLY HAVE VAPOR SENSORS, CANNOT DETECT WATER ALL SPILL BUCKETS CONTAINED PRODUCT/WATER BUCKET FOR 6-1 SUNK INTO CONCRETE IN TRAFFIC AREA. COULD LEAD TO FILL RISER BEING PUSHED INTO FIBERGLASS TANK. 11/5/07 CTI BISKUPIAK INSTALLED FLOAT SENSORS AND (TANK 6-1) INSTALLED 15 GAL SPILL BUCKET W/MANHOLExkÃ(7Â' ÂHxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(8Â=R ÂKxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ‡CALL FROM JEFF BUXTON AT FPW DEPT. THEY ARE WORKING WITH PORTLAND PUMP TO RESOLVE ISSUES. 1/11/07. PHONE MESSAGE. TRxkÃ(:ÂE>ÂÂxk xk Á`xkÃþÿþÿþÿþÿþÿþÿþÿxkÃ(;ÃXÂÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿREC'D 11/7/07 TRxkÃ(<Ã^$ Âxk xk Á`xk ÃV-JþÿþÿþÿþÿþÿþÿŒ4/14/08 DEVIN TAPLEY REPORTED MALFUNCTIONING WATER SENSOR ON OMNTEC OEL 8000. OPERATOR HAS BEEN STICKING TANK FOR WATER WHEN ALARMS - NO WATER IN TANK. UNIT WILL BE REMOVED BY ADAMS&FOGG, REPAIRED BY OMNTEC, REINSTALLED BY ADAMS&FOGG ALL WITHIN 7 DAYS. WHILE UNIT IS REMOVED, TAPLEY WILL PERSONALLY MANUALLY MONITOR ENTIRE SYSTEM DAILY AND MAINTAIN LOG. GAVE HIM OK FOR 7 DAY PERIOD MAX. -MLxk Ã(=ÂZ ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(>à & ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(?Ã%Z ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(@Â%V ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(AÃd ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(BÂG ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(CÁ ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(DÃG# ÂRxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ*WATER IN SPILL BUCKETS AND INTERSTICE. TRxk Ã(EÃC ÂRxk xk Á`xlþÿþÿþÿþÿþÿþÿþÿ/PER CTI JOESPH BOSSE NOW PASSING FACILITY. TRxk Ã(FÂQ Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(GÂ)D ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(HÃB Â)xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ8PNEUMERCATOR TYPE T NOT ACCESSIBLE AT TANKTOP, CANNOT CONFIRM PROPER FUNCTIONING. TEST BUTTON AND ALARM DO WORK. 12/6/07 AI FAIL LETTER -ML OWNER TIM & AMY ESTABROOK CONTRACTED GAFTEK TO REPLACE MONITORING SYSTEM, WILL DO WORK IN SPRING. OK'D, BUT WARNED STILL IN VIOLATION UNTIL WORK COMPLETED. -ML 12/27/07xk Ã(IÂEB ÂRxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿÑSUMMARY INDICATES SPILL BUCKET PROBLEM ON 10-2, NOT INDICATED IN THE INSPECTION ITSELF. TR 1/3/08 DSL DISP STILL WEEPING AT TIME OF 11/07 INSPECTION. 3/19/08 PORT PUMP INSTALLED NEW DISP, AI ON ITS WAY. -MLxk Ã(JÃN ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ]11/29/07 AI DONE BY JO BOSSE, FAILED BECAUSE BALL FLOATS FROZEN IN. WILL RETURN TO REMOVE AND REPLACE WITH FLAPPERS. OWNER KNOWS FAILURE MUST BE CORRECTED, HAS ALREADY CONTRACTED FOR CORRECTION. -ML INSPECTION ENTERED, 12/6/07 NO LETTER SENT FOR FAIL. TR 61-SO 'S INSTALLED IN TANK CHAMBERS 2-1 & 2-2 12/10/2007 PER CTI J BOSSE. TRxk Ã(KÂ%7  xk xk Á`xlÄ Sþÿþÿþÿþÿþÿþÿ9REPAIRED PER CTI JON PAINE. TR 1/30/08xk Ã(LÃ_ ÂMxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(Mà  ÂSxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ(NÂ) Á xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Â\ÂÂÁ xj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿM12/7/2007SENT BACK AI DATED 11/21/2007- INCOMPLETE: INTERSTITIAL SECTION NOT SUBMITTED. TANK #4 STILL REQUIRED TO HAVE AI EVEN THOUGH OOS. TANK #4 HAS FAILING CP. OPERATOR HAS PROPERLY TAKEN IT OUT OF SERVICE. REMOVAL WOULD OF TANK #4 MIGHT DAMAGE TANK #3. OPERATOR WOULD LIKE TO LEAVE TANK #4 O-O-S UNTIL TANK #3 IS REMOVED. BBxi Ã(OÂ"% Á xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(PÃ.* ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(QÃQ1 Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(RÃc Á xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(SÂ; Á xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿMCTI BEAUMONT TO REPLACE PIPING-REG AND INTENT TO ABANDON RECIEVED 10/27/08-PHxk Ã(TÃO Á xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ,1989 TANK INSTALL SPACERS NOT REQUIRED. TRxk Ã(UÂ$E ÂDxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ FACILITY IS OUT OF SERVICE. TRxk Ã(Và B Á xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã(WÂG Á xk xk Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã(Xà > Áxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(Yà 1 Âxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã(ZÃ5# Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã([Ã" Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(\à A Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(]Ã& Âxk xk Âxlþÿþÿþÿþÿþÿþÿþÿ11/31/08 COPI - CTI BISKUPIAK INSTALLED DROP TUBESxk Ã(^ÃDd Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(_Â]E ÂZxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(`Ã"8 ÂDxk xk Á`xk Ã<)þÿþÿþÿþÿþÿþÿþÿxk Ã(aà  ÂIxk xk Á`xk ÄWPþÿþÿþÿþÿþÿþÿ/12/14/07 COPI - CTI JOHNSON RELOCATED VENT PIPExk Ã(bà  Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(cà  Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã(dÃa ÂHxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)Ã2 Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)Â86 Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)Ã> Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)à ) Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)Â" Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ\PIPING SUMP DOES NOT APPEAR TO BE LIQUID TIGHT. NO LIQUID IN PIPING SUMP AT TIME OF INSPECTION (RECOMMEND CLOSELY MONITORING FOR WATER IN PIPING SUMP. RECOMMEND CONCRETE PAD BE INSTALLED AT PIPING SUMP LOCATION AND SEALANT/FIBERGLASS RESIN BE APPLIED TO JOINTS INSIDE PIPING SUMP TO PREVENT WATER INTRUSION.) FILL CAP NOT LIQUID TIGHT (REPLACED)xk Ã)Ã3 Â\xk xk Âxk þÿþÿþÿþÿþÿþÿþÿ©FILL CAP NOT LIQUID TIGHT (REPLACED) SPILL BUCKET CONTAINS FUEL AND WATER (REMOVED AND CLEANED)( RECOMMEND SPILL BUCKET BE KEPT FREE OF ALL LIQUIDS/DEBRIS AT ALL TIMES)xk Ã)Â5b Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã) àÂxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã) à " Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã) Ã+ Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã) ÂJ Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã) Ã! Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã) Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)Ã! Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)ÃH& Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)à L Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)ÃF- Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿÊ10/24/08-OR SO, CTI DATED INSPECTION IN THE FUTURE-FAILED FACILITY FOR OIL IN SUMP-TALKED TO SUPERINTENDANT, AND SENT HIM A INSTALLER LIST SO HE CAN HAVE SOMEONE WHO KNOWS WHAT DAY IT IS FIX THE SUMP-PHxk Ã)Â2 ÂZxk xk Á`xk Ã5þÿþÿþÿþÿþÿþÿ TANK READING: -1.11xk Ã)ÂX Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)ÃW^ Â;xk xk Á_xk þÿþÿþÿþÿþÿþÿþÿsREPLACED INTERSTICAL LEAK DETECTOR -.918, -.923, -921 MONTORING CONSOLE IS FULLY OPERATIONAL?: REPLACED WITH OMNTECxk Ã)àÂxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿi TANK READING: -.73, -.75, -.73 CP FAIL LETTER 12/11/07 -ML 4/21/08 COPI - CTI BISKUPIAK INSTALLED ANODESxk Ã)ÃZ Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)ÂFV Á$xk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿÆNO ACCESS TO VENT WHISTLE. REGISTRATION INDICATES ELECTRONIC OVERFILL, THAT IS NOT MENTIONED IN THE INSPECTION. TR ELECTRONIC HIGH LEVEL ALARM CHECKED AND WORKING PROPERLY?: UNKNOWN ON INSPECTION.xk Ã)Â%;  xk xk Âxk Ãc]þÿþÿþÿþÿþÿþÿ!ONLY INSPECTED GASOLINE TANKS. BBxk Ã) Á$xk xk Á`xlþÿþÿþÿþÿþÿþÿþÿ#NOW PASSING PER CTI GARY KANE. TR xk Ã)ÃO Âbxk xk Âxk ÃBþÿþÿþÿþÿþÿþÿþÿxk Ã)Ã2 Â$xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)à  Âxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿSPILL BUCKET IS 3 GALLON PLUS BUT IS INSTALLED ABOVE GROUND. FILL IS SCULLY FITTING, PUMP OFF DELIVERY. ALLOWING SPILL BUCKET AT 3+ GALLONS. TRxk Ã)Â^ Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã) 3 Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã) Ã4W Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿUST'S ONLY. TRxk Ã)!à  Âxk xk Á`xlþÿþÿþÿþÿþÿþÿþÿK1/30/08 COPI - CTI BISKUPIAK REPLACED RETURN COPPER LINE WITH COATED COPPERxk Ã)"ÃTX Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)#Ã@ Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ1TANK IS A 1989 INSTALL, NO SPACERS REQUIRED. TR xk Ã)$ ÂYxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)%Ã.N Â\xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)&Â1! Á$xk xk Á`xk Ä=%þÿþÿþÿþÿþÿþÿþÿxk Ã)'ÃGF Áxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)(ÂB ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã))ÂZ  Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ=NOW PASSING PER CTI BUBAR. TRxk Ã)*ÂN& Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿxTANK IS 550 GALLON HEATING OIL INSTALLED IN 1989. THE OWNER INDICATES THERE IS NO OVERFILL DEVICE ON THE TANK, DEP DIDN'T REQUIRE ONE WHEN THE TANK WAS INSTALLED THOUGH THE OIL AND SOLID FUEL BOARD MIGHT HAVE. ORIGINAL INSPECTION, 11/26/07 BY DON BUBAR FAILED, SUBSEQUENT AMMENDMENT BY GARY KANE PASSED ON 12/10/07 DUE TO LACK OF REQUIREMENT FOR OVERFILL. TRxk Ã)+Â# Â$xk xk Á`xkà 8þÿþÿþÿþÿþÿþÿþÿxkÃ),ÂA0 Â$xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)- Â$xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã).Ã`4 ÂKxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿp11/7/07 UPGRADE REGN FOR CTI COUTURE TO INSTALL NEW PIPING SUMP "TO REPLACE SUMP GETTING WATER IN IT CONSTANTLY"xk Ã)/ÃN  Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ"PASSING NOW PER CTI BISKUPIAK. TRxkÃ)0 ÂÂxk xk Á`xk þÿþÿþÿþÿþÿþÿM12/15/2008 OWNER CALLED USEING FOR PERSONAL USE. ANNUAL DONE IN JUNE WILL SEND IN. MAY REMOVE NEXT YEAR DUE TO COSTS. TED NOTE: DEP STAFF WERE ON SITE IN SEPTEMBER 2007, FACILITY WAS CLOSED AND ALL FILLS LOCKED UP. MAY NEED TO CONSIDER FACILITY OOS, THOUGH THE FAMILY STILL OWNS AND OPERATES IT? VERY LITTLE THOUGHPUT ANNUALLY. TRxkÃ)1àÂxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)2Ã%A Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)3à D Âxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿ-NEW SUMP SENSOR INSTALLED PER CTI SIMARD. TRxkÃ)4àÂxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ)5ÃE@ Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)6ÂLX Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)7Ã&H Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)8Â=T Áxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ.INSPECTOR PAUL THOMPSON L-2 SENSOR IN ALARM FOR TANK 10 INTERSTICE. 22" OF WATER, PUMPED OUT. CTI DAVIS REMOVED RISER CAP AND RE-DOPED. 12/10/07 VAC TEST OF INTERSTICE HELD 21" VACUUM 4 DAYS CP FAIL LETTER 12/13/07 -ML 5/22/08 UPGRADE REGN FOR CTI DAVIS TO OVERSEE PCA ENGINEERING INSTALL OF ANODESxk Ã)9Ã!T Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã):Â31 Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿRETURN LINE NOT BEING USED.xk Ã);Â2I Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)<Ã_ Áxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ12/11/08-EMAIL FROM G. KANE, PROBLEMS HAVE BEEN FIXED AND INSPECTION HAVE BEEN DONE, BUT NEW SUMP SENSORS ARE ON ORDER, THEY WILL SEND AI WHEN THEY ARRIVE AND ARE INSTALLED-PH MULTIPLE FAILS. MUST INSPECT THIS FACILITY IN 2008. CRASH VALVES 1" TO 2" BELOW GRADE ON GASOLINE SYSTEM, ON DIESEL SATELLITES VALVES ARE BELOW GRADE. 2-2 (K-1) PROBE OUT, MISSING FLOAT. RNL, SNL, & DIESEL HAVE WATER ISSUES IN SUMPS. RNL HAS MISSING YELLOW APT SCREW ON COVER. SNL HAS COVER BUT DOESN'T SEAL, FULL OF WATER TO THE TOP. DIESEL HAS ENVIRON 32" LID WITH RIPPED GASKET AND WATER IN SUMP. DIESEL HAS OIL IN SUMP. ALL SUMPS HAVE WATER IN THEM. ALL PER CTI ARBOUR. NOTE EVIDENCE OF A LEAK CALLED IN 11/29/07 BY DENNIS DAVIS. TR FILL CAP AND GASKET IN GOOD CONDITION?: REPLACED FILL CAP ON 2-2 (K-1 CHAMBER)xk Ã)=Ã`3 ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿáWATER PUMPED OUT OF SUMPS AND BOOTS RESEALED. TR 9/12/08 REGN IS ACTUALLY FOR INSTALLATION OF NEW DISPENSERS, DISP SUMPS, DISP PAD, TANK PAD, PIPING AND TANK TOP EQUIPMENT. EXISTING USTS TO REMAIN, NO CHANGES TO DIESEL. -MLxk Ã)>Â< Âxk xk Á`xl þÿþÿþÿþÿþÿþÿþÿuSPACERS REQUIRED. PAUL COLLINS, ASD, CALLED 1/3/08, THEY WILL REPAIR THIS IN THE SPRING. TR 9/15/08 PIPING REPLACEDxk Ã)?Ã%B Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)@Ãa Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)AàÂxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿCRASH VALVES TOO LOW. 12/31 OWNER CALLED AND SAID AL DOGGETT REPAIRED LAST WEEK. WE SHOULD GET PAPERWORK FROM DOGGETT. TED PER TODD LAVALLE, CTI NOW ALL PASSING. TR 1/15/2007 LISA FROM FACILITY CALLED TO CONFIRM DEP HAD RECEIVED UPDATED INSPECTION. -LWxk Ã)BÂ: Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿZOPERATORS ARE MONITORING WATER IN INTERSTICE OF TANK 3-1, 3-2 WHICH IS NOT IN SERVICE. TRxk Ã)Cà : Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)DÃ? Âxk xk Á`xlþÿþÿþÿþÿþÿþÿþÿºPER CTI BISKUPIAK, BLEED BACK AMOUNT TO HIGH TO DETECT LEAK. TR 5/16/08 COPI - CTI BISKUPIAK INSTALLED VMI ELLD AND REPAIRED FG VENT LINE INSPECTION UPDATE INDICATES NEW LLD PASSES PHxk Ã)EÃD ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)FÃ`? ÂZxk xk Á`xlþÿþÿþÿþÿþÿþÿþÿµSPILL BUCKET NEEDS REPLACEMENT AND MUST BE REPLACED WITH EXISTING SIZE? TANK READING: -.92, -.94 3/17/08-SPILL BUCKET REPLACED COPPER LINES PROPERLY SPACED BY CTI P. THOMPSON PH xk Ã)Gà KÂÂ)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)HÂP Â)xk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã)IàÂ)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿTREPLACED BULB IN MONITOR. CLEANED WATER OUT OF SPILL BUCKETS. PER CTI DON BUBAR. TRxk Ã)J  Áxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)KÃSO ÂXxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿyNOTE: INSPECTION INDICATES "INSPECTION UPDATE" WE DO NOT HAVE AN ORIGINAL INSPECTION AND THIS INSPECTION IS COMPLETE. SPILL BUCKET FAILED ORIGINALLY AND HAS BEEN REPLACED BY CTI COUTURE W/ 15 GALLON BUCKET. COPPER PIPING WAS NOT INSPECTED DUE TO NO ACCESS TO THE BOILER ROOM. SPACERS UNKNOWN. PASSING INSPECTION. TR 12/12/07 COPI - CTI COUTURE INSTALLED 15 GAL SPILL BUCKETxk Ã)LÂ%?ÂÂxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)MàÂZxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)OÃG ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ INSPECTION FAILED PER CTI J BOSSE DUE TO DIRTY SPILL BUCKETS. NO OTHER PROBLEMS CITED AND SPILL BUCKETS PASSED OTHERWISE. THERE IS NO WRITTEN EXPLANTION OR COMMENTS ON THE INSPECTION FORM. PASSING INSPECTION. TR 1/8/08-CTI J. BOSSE PASSED INSPECTION. AFTER THE FACTxk Ã)PÃA ÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)QÂ>c Â;xk xk Á`xk Â=þÿþÿþÿþÿþÿþÿþÿxk Ã)RÂ>  ÂLxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)SÃ5 Âxk xk ÂxlþÿþÿþÿþÿþÿþÿþÿOCP FAIL LETTER 12/17/07 ML 2/6/08 COPI - CTI BISKUPIAK INSTALLED ANODES, -1.271xk Ã)TÃX Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿÊNOTE: DEP EXEMPTED THIS FACILITY REGARDING THE WHISTLE FOR OVERFILL ON THE 500 GALLON SUPER NO LEAD CHAMBER. THERE IS ONLY A 2" BUNG ON THIS CHAMBER. LETTER IN FILE AND ATTACHED TO THIS INSPECTION. TRxk Ã)UÂ%X Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿßTHERE IS AN EXTRA SPILL BUCKET AND RISER ON THE DIESEL TANK THAT SERVED NO OBVIOUS PURPOSE. DISPENSER AREA: SOME STAINS. NO OBVIOUS WEEPS. DIESEL TANK 3-2 OUT OF SERVICE ON 11/13/2007. MANIFOLD TANK NO PRODUCT. PIPING.xk Ã)V T Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿCHAMBER 4-2 IS OUT OF SERVICE AND HAS BEEN . THE INSPECTION FAILED FOR THE LINE LEAK DETECTOR ON THIS CHAMBER NOT WORKING. IT WAS NOT ABLE TO BE TESTED DUE TO NO PRODUCT IN THE CHAMBER. THE CHAMBER MAY NOT BE PROPERLY OUT OF SERVICE THOUGH WE HAVE KNOWN IT WASN'T IN USE SINCE 2006 OR EARLIER DUE TO EXTREMELY LOW THROUGHPUT. THERE IS AN INDICATION IN THE INSPECTION THAT THE CHAMBER NOT IN USE HAS NEWER LLD SO IT SHOULD(?) MAY(?) WORK IF THE CHAMBER IS EVER USED AGAIN. PASSING THE INSPECTION AFTER ENTERING THE FAIL. TRxk Ã)YÂFÂÂKxkxk ÂxkþÿþÿþÿþÿþÿþÿþÿxCALLED ON 10/27/2008 TO LET US KNOW THAT HE HAD INSPECTION COMPLETED, BUT DID NOT SEND IT IN. TOLD HIM ISSUE WILL BE RESOLVED ONCE WE RECEIVE A PASSING 2008 ANNUAL INSPECTION. -LW PRODUCT PIPING INSTALLED 1989, OFFSET FILL PIPING INSTALLED 2001. PRE-91 HEATING OIL HAD TO HAVE OVERFILL OR SPILL BUCKET, THIS FACILITY HAS SPILL BUCKETS, SO OK NOT TO CHECK VENT WHISTLE. -MLxkÃ)ZÃ$ ÂKxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃEÁ ÂÂ]xj xj Â<xjÃ1FþÿþÿþÿþÿþÿþÿÜMR. MATHIEU IS GOING TO BE MAILING IN A REQUEST FOR PREMISSION TO REMAIN TEMP. OOS UNTIL FABIAN OIL DECIDES IF THEY ARE GOING TO LEASE THE FACILITY. IF FABIAN OIL DOES NOT LEASE THE FACILITY MR. MATHIEU TO ATTEMPT TO HAVE HIS DAUGHTER OPERATE THE FACILITY. -LW RECEIVED REQUEST TO REMAIN TEMP. OOS. STIPULATED APRROVAL GRANTED. WHICH INCLUDES SUBMIT AI BY 1/31/2008, PRECISION TEST BEFORE RETURNING TO SERVICE, AND MUST RETURN TO SERVICE BY 5/31/2007, OR REMOVE USTS. -LW xjÃ)[ Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ„2/11/09-OWNER WILL HAVE SIA DONE AND WILL SUBMIT-PH CP PIPING READING: TANK #4=-.917, TANK #5=-.909, TANK #6=-.908, TANK #7= -.908 xk Ã(ÃÂÂAxj xjÂWxjÃ>þÿþÿþÿþÿþÿþÿþRON (OWNER) CALLED ON 12/18/2007 (PH # 685-3800) TO LET US KNOW HE HAS HIS AI SCHEDULED FOR TOMORROW. DEAN DRISKO TOLD THE OWNER HE COULD DO IT FOR HIM, SO HE WAS WAITING ON HIM, BUT NOW KNOWS DRISKO CANNOT DO THE WORK ON UST. WILL SEND IT IN ASAP. -LWxjÃ)\Â7, Âxk xk ÂþÿÃþÿþÿþÿþÿþÿþÿNO VAPOR RECOVERY PRESENTxk Ã)]à  Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)^Ãd* ÂZxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ-ALSO REPLACED DIESEL INTERSTITIAL SENSOR. TRxk Ã)_Ã! ÂKxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ 1987 INSTALL.xk Ã)`ÂE` Âxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿUNABLE TO TEST CP DUE TO FROZEN GROUND, FAILING INSPECTION FOR THAT REASON ONLY. TR TANK READING: FROZEN GROUND UNABLE TO TEST AT THIS TIME.xk Ã)aàÂxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ»PER CTI LEGASSE, FACILITY CLOSED SINCE FEBRUARY 2007. HOWEVER NOT PROPERLY OUT OF SERVICE, ALL TANKS CONTAIN MORE THAN 1" OF PRODUCT, OUMOS ARE STILL CONNECTED, FILLS ARE NOT LOCKED. TRxk Ã)bÂG@ Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã)c Á$xk xk Âxk Ãþÿþÿþÿþÿþÿþÿ'CLEANED SPILL BUCKETS REPLACED FILL CAPxk Ã)d ÂXxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ»CTI COUTURE RETURNED AFTER FINDING WATER IN THE INTERSTICE. HE DUG DOWN THE INTERSTITIAL RISER AND FOUND THAT THE PVC RISER WAS BROKEN, HE REPLACED THE RISER AND REDID THE VACUM TEST, THE INTERSTICE STILL WILL NOT HOLD A VACUM. SPECULATION IS THAT THE TANK JACKET HAS FAILED AS A RESULT OF BEING OVERHEATED ON THIS #6 OIL TANK. JACKET CAN NOT BE REPAIRED. LETTER TO NEW OWNERS W/COPY TO CITY OF WATERVILLE, TO REMOVE TANK AS IT IS FAILING. TRxk Ã*à  Âxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿaNEW OWNER JANICE WARREN IS SENDING IN CHANGE OF OWNERSHIP FORM. SENT HER PLAIN TALK. 1/11/08 -MLxk Ã*Ã$& ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿPPER CTI KIRK ST PETER, FACILITY IS NOW DOING DI CORRECTLY AND IT IS PASSING. TRxk Ã*àÂxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ35/23/08 COPI - CTI BISKUPIAK INSTALLED SPILL BUCKETxk Ã*Â. Âxkxk Âþÿþÿþÿþÿþÿþÿþÿþÿ~EACH COMPARTMENT HAS 5'' OF PRODUCT. NEEDS VAPOR CAP, NEEDS TO BE PUMPED OUT, COULD NOT REMOVE EVERTIGHTS TO CHECK DROPTUBE.xkÃ*Â4Q Á$xk xk ÂþÿÃ!)þÿþÿþÿþÿþÿþÿAI/CP FAIL LETTER 12/27/07 -MLxk Ã*à ' Â\xk xk Âxlþÿþÿþÿþÿþÿþÿþÿþÿxk Ã*Ã9I ÂPxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿKTANK COMPLETELY EMPTY. INTERSTICE FULL OF WATER, APPEARS PIPING JOINT AT TOP OF TANK BROKEN. TANK READING: CP TESTED BY KIRK ST.PETER PROPERTY CONTROLLED BY BUREAU OF INDIAN AFFAIRS, TO BE TRANSFERRED TO MICMACS EARLY 2008. LDA SAYS MICMACS HAVE BEEN UNWILLING TO SUBMIT CHANGE OF OWNERSHIP INFO DESPITE SEVERAL REQUESTS. -MLxk Ã* Ã]7 ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ* Ã]8 ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ* Ã]9 ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã* Ã]; ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ* Ã]< ÂPxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ;LESS THAN 1/4" PRODUCT IN TANK, SUMPS AND INTERSTICE DRY. xkÃ*Ã]= ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*Ã]> ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*Ã]? ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITYxk Ã*Ã^5 ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITYxkÃ*Ã`) ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿTANK HAS APPROX 1/2" PRODUCTxk Ã*Ã`* ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*Ã`, ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*Ã`- ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*Ã`. ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿƒREPLACED WATER FLOAT ON PROBE. MONITOR SHOWED WATER IN TANK. STICK READINGS SHOWED NO WATER. NEW WATER FLOAT CORRECTED PROBLEM. xkÃ*Ã`/ ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*Ã`0 ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*Ã' ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*Ã@ ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*ÃA ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITYxk Ã*ÃB ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*ÃC ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿNO POWER TO FACILITYxk Ã*ÃD ÂPxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ0APPROX 1/4" PRODUCT IN TANK NO POWER TO FACILITYxkÃ*ÃE ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ]NO POWER TO FACILITY. MANUALLY CHECKED SUMPS AND INTERSTITIAL LESS THAN 1/4" PRODUCT IN TANKxk Ã* ÃF ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*!ÃG ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã*"ÃH ÂPxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ*#ÃI ÂPxk xk Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã2Sà 5 Â[!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿŽFLAPPER NOT SET CORRECTLY FOR 95% SHUT OFF PH NOW REPOARED AND SET AT 95% PER LETTER FROM DAVID CROXFORD @ PORTLAND PUMP. TR 11/3/08xlÃ2TÂ.9 ÂUxlxlÂxkþÿþÿþÿþÿþÿþÿþÿPHxkÃ2UÂ.6 ÂUxlxlÂxkþÿþÿþÿþÿþÿþÿþÿPHxkÃ2VÂ.8 ÂUxlxlÂxkþÿþÿþÿþÿþÿþÿþÿPHxkÃ2WÂ.7 ÂUxlxlÂxkþÿþÿþÿþÿþÿþÿþÿPHxkÃ2XàÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2YÂ2H ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ<UPGRADE REG FOR CTI SIMARD TO REPLACE BOTH SPILL BUCKETS PHxl Ã2ZÃa  ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ„9/25/09-NOITA AND REGISTRATION REC'D FOR CTI SIMARD TO REPLACE YELLOW PIPE WITH NEW APT PIPING PRESUMABLY USING ATTATCHMENT A PH PHxlÃ2[ÁB ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2\Â+ ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã2]Ã%J ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ=REMOVED 10 GAL. WATER FROM 4-1 INSTALLED NEW CONSOLE LAMPS PHxlÃ2^ÃS0 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿOUT OF SERVICE PHxlÃ2_Â]b ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2`ÂYH ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2aÂQM ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2bÂY# ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ¢3/2/09-COPI CTI SIROIS REPLACED SPLIT VENT LINE ON GAS TANK THAT WAS ALLOWING WATER INTO THE TANK, 5 GALLON SPILL BUCKET REPLACED WITH 15 GAL. AT SAME TIME-PH PHxl Ã2cÃL Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2dÃK Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿ9PH 4/6/08 COPI - CTI LEGASSE JR REPLACED 3 SPILL BUCKETSxlÃ3Â[E Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿGTANK2 VMI LLD REPLACED WITH RED JACKET, TESTED, PASSED-CTI E. GEORGE PHxlÃ3Â[K Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿSPILL BUCKET CLEANED OUT PHxlÃ3Â[M Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ3Â[0 Á$xlxlÂxlÄþÿþÿþÿþÿþÿþÿxTANK 3-1 FILL COVER RESTING ON FILL CAP, REPLACED WITH LOW PROFILE CAP 1-1 REPLACED VAPOR MANHOLE COVER AND FILL CAP PHxlÃ3Â[/ Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ¼DAILY INVENTORY IS PRIMARY LEAK DETECTION, BUT THEY ALSO HAVE CSLD, AND THAT CHECKED OUT AS WELL ALL SPILL BUCKETS CLEANED PH 7/25/08 COPI - CTI LEGASSE SR REPLACED 3 SUMP TOPS & MANHOLESxlÃ3Ã.M Á$xlxlÂxlÄ!83þÿþÿþÿþÿþÿþÿ€MARCH SALES: REG. 106117 +-: +186-OK PREM. 2809 +- :+123-OK BLEND 108926 +-: +309 OK REPLACED 2-1 VAPOR ADAPTOR-CTI D. DAVIS PHxlÃ3ÃbX Á xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã!\à 9ÂÂ)xk xk Âxk þÿþÿþÿþÿþÿþÿþÿªCLEANED OUT SPILL BUCKETS CP FAIL LTR 9/26/07 -ML CTI ST.PETER INSTALLED ANODES VIA GEOPROBE 10/25/07 6/26/08 CALL FROM TOM @RH FOSTER. PREMIUM AND MID GRADE TANKS FAILED CP IN SPITE OF NEW ANODES IN THE PAST YEAR. THEY WILL SEND IN FAILING AI AND ARE REMOVING TANKS FROM SERVICE AND REMOVING ALL PRODUCT. ELECTRONICS CONTINUE TO BE ACTIVE AND THEY WILL CONSIDER THEIR OPTIONS FOR THE SITE. TRxkÃ3ÂYT Â;xlxlÂxlÃ"5 þÿþÿþÿþÿþÿþÿþÿxlÃ3 Â; Á xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ#NO VISIBLE SPACERS, 1990 INSTALL PHxl Ã3 Ã_ Á xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã3 Âd Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿL6/4/09-COPI REC'D FOR CTI BEAUMONT TO ADD 3 18 POUND ANODES TO TANK 4 PH PHxlÃ3 ÂAR Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ+8-1 SUMP SENSOR REPLACED-CTI D. BEAUMONT PHxlÃ3 Â*7 Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ3Ã=^ ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿcINTENT TO ABANDON NOTICE RECIEVED-CTI SIMARD TO REMOVE TANKS, ST. GERMAIN TO DO SA-10/26/08 OOS PHxlÃ3Â1 ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ3Ã0 ÂXxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3Â9+ ÂTxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ';Â>;ÂÂxk xk ÂxkþÿþÿþÿþÿþÿþÿþÿÏ7/1/2008 FACILITY IS GOING TO RETURN TO SERVICE FOR A SHORT PERIOD OF TIME. REQUIRING VACUUM TEST ON TANK AND SUBMITTIAL OF A RETURN TO SERVICE FORM. SPOKE WITH SCOTTIE FROM SIMARDS REGARDING FACILITY. -LWxkÃ3Ã-- Â'xlxlÂxlÃ]%þÿþÿþÿþÿþÿþÿPHxlÃ3ÃP Â'xlxlÂxlÄ9<þÿþÿþÿþÿþÿþÿPHxlÃ3Ã-+ Â'xlxlÂxlÄ ZþÿþÿþÿþÿþÿþÿPHxlÃ3Ã! Â'xlxlÂxlÄVXþÿþÿþÿþÿþÿþÿ111/6/08-NOTICE OF INTENT TO ABANDON TANK 1-PH PHxlÃ3Ã.I Â'xlxlÂxl Ä!`LþÿþÿþÿþÿþÿþÿPHxl Ã3ÃT Â'xlxlÂxlÃ(>-þÿþÿþÿþÿþÿþÿPHxlÃ3Ã-' Â'xlxlÂxlþÿþÿþÿþÿþÿþÿþÿÜPH 10/14/08 PER TELEPHONE CALL FROM SCOTT CYR, TYREE, ALL TANKS ARE OUT OF THE GROUND NOW AND THEY ARE GOING TO DO SOME ADDITIONAL CLEANUP AT THE SITE TO REMOVE SOME DIRTY DIRT. TR xlÃ3Â(A Â'xlxlÂxl Ã`7?þÿþÿþÿþÿþÿþÿ11/10/08-HEATING OIL TANK HAS BEEN REMOVED-NOW PASSING-PH COPPER PIPING ON TANK 9 NOT INSPECTED DUE TO LACK OF ACCESSABILITY PH 9/3/08 CTI CYR TO REPLACE COPPER PIPING. DOESN'T KNOW IF SLEEVED, IS JUST GOING TO REPLACE INSTEAD OF EXPLORATORY DIGGING. -MLxlÃ3à ( Â'xlxlÂxlÄL@þÿþÿþÿþÿþÿþÿK2/19/09-COPI FOR CTI CYR TO INSTALL VR TLS350 AND ADD ATG'S TO THE TANK PHxlÃ3Â(? Â'xlxlÂxlÄàÁ$xlxlÂxl þÿþÿþÿþÿþÿþÿþÿSPILL BUCKET CLEANED PHxl Ã3@Â[B Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ˜COPI RECIEVED FOR SPILL BUCKET INSTALLATION-PH 6-1 INTERSTICE SENSOR FISHED OUT, TESTED AND RESET 5-1 AND 7-1 SPILL BUCKETS REPLACED BY CTI D. DAVIS PHxlÃ3AÂ]J Â]xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3BÃ\1 ÂTxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3CÂ5 ÂTxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3DÂ^ ÂZxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3EÂXD ÂZxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3FÂ^ ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3GÂY: ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3HÂQ1 ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3IÂQ0 ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3JÂ]I ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3KÂ]V ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3LÂY= ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3MÂ_Y ÂXxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3NÃF/ ÂXxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3OÃR= ÂXxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3PÃ) ÂXxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3QÂD5 ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3RÃR\ ÂLxlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3Sà  Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿ:SAME OWNER HAS ANOTHER FACILITY REG #9327. TR 10/31/08xlÃ3UÂ0 Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3Wà  Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3XÂ_ Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3YÃ. Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3ZÃ. Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3[ Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3\Â*" Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3]Â_ Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3^Âc Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3_Â=B Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3`ÂaQ Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3aà  Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3bÂ* Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3cÃY Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã3dÂ*& Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Ã6 Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ')Ã:F Â\xk xk Á`xlþÿþÿþÿþÿþÿþÿþÿŒGENERATOR TANK, MOTOR FUEL. -TR 3/6/08 CTI LEWIS WATCHED FILL. VENT WHISTLE SLIGHTLY TOO SHORT, HARDPIPIED INTO TANK MANWAY. WILL FIX WHEN GROUND THAWS. GENERATOR WILL BE SWITCHED TO PROPANE AND UG PIPING WILL BE REMOVED. LEWIS WILL SUBMIT PAPERWORK. -ML 7/7/08 LEWIS WILL FIX WHISTLE AND INSTALL VENT LINE DIRECTLY VERTICAL OUT OF TANK TOP (SLOPE ISSUE IF INSTALL T AND RUN TO BLDG). GENERATOR LINE TO BE DISCONNECTED AND CAPPED. -ML 7/31/08 LEWIS INSTALLED NEW WHISTLE IN NEW VENT LINE COMING DIRECTLY OUT OF TANKTOP. (COPI 7/28/08) OWNER WILL CONTACT W/GENERATOR PLAN. -ML 8/1/08 UPGRADE REGN FOR CTI LEWIS TO MOVE VENT LINE, REPLACE WHISTLExk à Ã6ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿÕ6/14/08 REGN FOR CTI BEAUMONT TO SPREAD DISPENSERS OUT, REPLACE DISPENSER PIPING (LEAVING PIPING FROM TANK INTACT), INSTALL DISP SUMPS & SENSORS 8/15/08 REGN FOR CTI BEAUMONT TO INSTALL MANIFOLD BET 6K &4K POCKETSxj Ã4Â# Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Â*( Á=xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã4ÃA Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Â_ Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Â` Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4  Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4 Â3 Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4 Â_  Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4 ÃG ÂNxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4 Â3 ÂXxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Â3 Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+ÂR ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿÔ11/02/09: JOHN FERRAIOLO CALLED REF NOV RCVD. MENTIONED FACILITY SHUT DOWN JUN '08; TANK WAS EMPTIED. HE WAS TOLD TO SUBMIT OOS FORM, DO THE AI AND SUBMIT EXTENSION REQUEST FOR OOS. -WP CTI JO BOSSE REMOVED WATER FROM PIPING SECONDARY AND INSTALLED MICRO SENSOR IN SECONDARY ELBOW INSIDE BUILDING, CONNECTED TO LU-3. SUMP HAS BEEN DRY FOR WEEKS. TANK READING: -.94, -.88, -.89 7/23/08 COPI - CTI BARTON INSTALLED DW FLEX PIPING W/OMNTEC SENSOR IN TRANSITION SUMP.xlÃ(Â$MÂÂxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ SUMP LIDS ARE NOT BOLTED, THERE IS NO DRAINAGE, AND MANWAYS ARE TOO SMALL TO MAKE REPAIRS AI FAI LETTER 12/4/07 -ML 12/6/07 STEVE DONOVAN SAYS SIMARD WILL BE REPLACING LIDS IN NEXT 2 WKS AND WILL SEND AI UPDATE SHOWING CORRECTIONS -ML 1/18/08 SIMARDS WILL REPLACE FLAPPER NEXT WEEK. CONTRACTED TO BREAK OUT CONCRETE AROUND SUMPS AND PUT IN 40" ROUNDS - WORK TO BE DONE IN SPRING. -ML 4/30/2008 WORK TO START WEEK OF MAY 12 TS 5/19/08 ELWIN SCOTT SAYS WORK COMPLETED - NEW 48" ROUNDS, GRAVEL AROUND SUMPS, SUMP COVERS. -MLxkÃ+ÂV$ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxk Ã+Ã7V ÂOxk xlÂxk þÿþÿþÿþÿþÿþÿþÿbCTI LARRY WINCHESTER PERFORMED HYDRASTATIC LINE TEST AS PART OF ANNUAL INSPECTION REQUIREMENTS. BBxk Ã%ÃQ Á$xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿSPILL BUCKET VERY RUSTY, CLEANED AND HYDRO TESTED, NO LEAK PER CTI DAVIS. NO STAGE 1 VR DUE TO LOW THROUGH PUT, UNDER 10,000 ANNUALLY. TANK READING: CP TESTED AT FILL AND AT CP TEST PORT, BOTH READINGS -.92 CORRECTED AND NOW PASSING PER CTI DENNIS DAVIS. TRxk Ã+ÂVb ÂZxlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿNSUCTION SYSTEM WITH CRASH VALVES INSTALLED. NOW PASSING PER CTI THOMPSON. TRxk à >Á*ÂÂRxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿù12/07 PHIL NEWCOME CALLED SEMARD REPLACED PIPING 3/07 MAY HAVE DONE AN INSPECTION IF SO WILL GET IT TO US. OTHERWISE WILL HAVE ONE DONE NOW. TED INSPECTION DONE BY SIMARDS WEEK OF 1/14-18/08 TO BRING INTO COMPLIANCE. UNABLE TO CHECK ONE LINES LEAK DETECTION DUE TO FROZEN FITTINGS ETC. NO APPARENT PROBLEMS. SUGGESTED THEY RETURN IN MARCH/APRIL/MAY AND DO A COMPLETE INSPECTION AT THAT TIME TO BRING INTO A WARM WEATHER CYCLE SO THERE WON'T BE AN ISSUE IN THE FUTURE. ALL INFO PER PHIL NEWCOMBE. TRxj Ã+à = ÂxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+ÂB?ÂÁRxlxlÁ`xk Ã)þÿþÿþÿþÿþÿþÿþÿxk Ã+ÃXb Â)xlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã+à S Â)xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã+ÃT  ÂZxlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂ[NÂÁ$xkxkÂxkÃ3þÿþÿþÿþÿþÿþÿÔREPLACED GAUGE STICK. FEB SALES: REGULAR- 37300 +/- 218, PASS; PREMIUM - 473 +/- 9, FAIL. 2-1 HAS A FLAPPER, 1-1 AND 3-1 ARE BALL FLOATS. TWO TRIPS TO TEST LLDS: FIRST VISIT THEY WERE OUT OF FUEL, APRIL 16TH, BOTH WORKED WELL. REPLACED DROP TUBE ON 3-1 ORIGINAL WAS TOO SHORT. REPLACED VAPOR CAP AND ADAPTOR FOR 1-1. -MLG 2/1/08 FACILITY CLOSED FOR <1 WEEK. LOOKING FOR NEW OPERATOR, EXPECT TO REOPEN W/IN 3 MONTHS. WILL SEND OOS FORM IF GET CLOSE TO 3 MONTHS. -MLxkÃ+Â6> Â!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ9COPI REC'D, CTI BEAUMONT REPLACED PIPE SUMPS, SPILL BUCKETS AND "TRAFFIC PAD" PH INTERSTITIAL HAD FROST BUILD-UP 1.5 WATER ON BOTTOM. VACCUMED OUT. OWNER WILL MONITOR. TESTED SENSOR O.K. CALLED DEP AND NOTIFIED. 5/1/08 UPGRADE REGN FOR CTI ?? TO REPLACE CONCRETE TANK PAD, BOTH PIPING SUMP AND SPILL BUCKETSxlÂZ- @ÂÂxi xi Âxiþÿþÿþÿþÿþÿþÿþÿ±NEW OWNER (ED GREENROSE) IN 2006. WARNED OF OVERDUE AI AND NEED TO NOTIFY DEPT OF OWNERSHIP CHANGE. SENT FORMS 3/26/07 -ML GREENROSE SOLD FACILITY IN FEBRUARY 2008. NEVER DID ANY COMPLIANCE, NO CHANGE OF OWNER, NO INSPECTION. NEW OWNER IS GETTING BILL CARVER TO INSPECT. GREENROSE CLOSED STORE IN JANUARY 2008. REOPENING FEBRUARY 2008. JOHN DUNLAP IS SENDING PAPERWORK TO NEW OWNER FOR COMPLETION. 2/4/08 TJRxiÃ+ Â/= Á$xk xlÂxk þÿþÿþÿþÿþÿþÿþÿ_11/19/08-REGISTRATION REC'D FOR CTI SIMARD TO REPLACE PIPING-PH PIPING IS STEEL INSIDE PVC. BBxk Ã+!Â/6 Â)xlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã+"Ã0 Á xlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿNREPLACED SPILL BUCKET WITH NEW 15 GALLON BUCKET DUE TO OLD BUCKET RUSTING OUT.xk Ã*àÁxk xk Á`xlþÿþÿþÿþÿþÿþÿþÿw1/4/2008 SENT FAILING LETTER. -LW 3/28/08 CTI MULLINS INSTALLED VENT WHISTLE, OMNTEC LU2 W/SENSORS, 5 GAL SPILL BUCKETxk Ã+#ÃcW ÂbxlxlÁ`xlÃVþÿþÿþÿþÿþÿþÿ\SMALL AMOUNT OF ICE IN THE BOTTOM OF THE "PUMP SUMP" WILL BE CLEANED OUT IN THE SPRING. TRxlÃ+$Ãc Á$xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã+%Â2O ÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã+&à  ÂMxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ]PIPING IS SLEEVED STEEL - TO BE REPLACED IN SPRING OF 2008. BB PIPING REPLACED 5/20/2008. BBxk Ã+'ÃK) Á xl xl Âxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã' Â,, ÂXxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ2TANK IS 1990 INSTALL. SPACERS NOT REQUIRED. TR WORK ORDER IN FILE AND SIGNED PURCHASE ORDER IN FILE #13050 TO PERFORM WORK TO BRING INTO COMPLIANCE. TR 1/30/08 UPGRAD REGN FOR CTI COUTURE TO REPLACE COPPER PIPING, SUMP ENTRY BOOTS, SUMP LID, AND INSTALL LU-1 FOR ELECTRONIC OVERFILLxk Ã' Ã3 ÂXxk xk Á`þÿþÿþÿþÿþÿþÿþÿþÿ´WORK ORDER AND SIGNED PURCHASE ORDER IN FILE FOR UPGRADE WORK TO BE DONE IN 2008. TR 1/30/08 UPGRADE REGN FOR CTI COUTURE TO REPLACE PIPING SUMP AND FLEX PIPINGxk Ã+(Â/Z ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ,4/19/09-CTI TRASK DID AI, FAILED 33,34,35 FOR VARIOUS ISSUES, THEY ARE GETTING QUOTES TO REPAIR-PH TANK 35 INTERSTITIAL SENSOR NEEDS TO BE REPLACED. INFORMED BECHTOLD MUST DO MANUAL MONITORING OF INTERSTICE UNTIL REPAIR IS COMPLETED. -ML 2/25/08 LEGASSE SR REPLACED INTERSTITIAL SENSOR, TESTED OKxlÃ++à  Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+,à  Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+.ÃZ  Âbxl xlÂxlþÿþÿþÿþÿþÿþÿþÿ¡OOS INSPECTION. MAPES DRAINED TANK, INSTALLED FLAPPER. 2/21/08 COPI - CTI HOWE AND ELLIOTT INSTALLED FLAPPER OOS EXTENSION UNTIL 11/18/08 (LETTER TO MAPES) -MLxlÃ+/  ÂxlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿNEW OWNER APPARENTLY, NO CHANGE OF OWNERSHIP FILED. CONTACTING NEW OWNER AND ASKING FOR OWNERSHIP PAPERWORK AND NAME CHANGE INFORMATION. TRxk Ã+0à 1 ÂXxlxlÂxk à Gþÿþÿþÿþÿþÿþÿþÿxk àÂÂXxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ>11/5/07 COPI - CTI COUTURE INSTALLED 1" S/R APT-XP FLEX PIPINGxkÃ+1à  Â)xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿ:COPI RECIEVED 10/3/08-CTI HAZEL FIXED DAMAGED VENT PIPE PHxl Ã+2ÃJ ÂxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+3Ã,  xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿ‚HAS ABOVEGROUND OFFSET FILL WITH SPILL BOX. ELECTRONIC OVERFILL PROBE REPLACED AND WORKING PROPERLY NOW. FLEX PIPING (ENVIRON) TRxlÂ_'Ã=^ÂÂxjxjÂ<xjþÿþÿþÿþÿþÿþÿþÿ2/22/08 JOHN RIVEAU OF SEWALL CALLED TO FIND OUT HOW TO RTS. INFORMED HIM MUST GYTO BEC OOS >12 MO AND NO EXTENSION REQUEST. FAXED 6/06 OOS FORM TO PHILLIP SEWALL, PHILLIP WILL SEND LETTER ASKING FOR EXTENSION. TOLD HIM NOT LIKELY TO APPROVE, ESP SINCE NO AI SINCE 4/06. -MLxjÃ+4Â&a ÂxlxlÂxlÃUE_þÿþÿþÿþÿþÿþÿþÿxlÃ+5Ã%' ÂXxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxk Ã+6à xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ²FULL FACILITY INSPECTION PRECISION TESTED ON 3/20/2008 PASSED. LINES TESTED AS FUCTION OF THE TANK (OKAY PER DEP). PIPING TO BE REPLACED AND SUMPS INSTALLED SUMMER 2008. -MLxlÃ+7ÂSXÂÂKxlxlÂxj þÿþÿþÿþÿþÿþÿþÿþÿxj Ã+8ÂSXÂÂKxlxlÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk à aÃ'ÂÁxj xj Âxj þÿþÿþÿþÿþÿþÿþÿSUMP GASKETS REPLACED xj Ã+9Ã' ÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿjCOPI - WINSLOW PERFORMED FULL TANK-TOP UP - PIPING, STP, MONITORING SYSTEM AND ATG, SPILL BUCKET, OVERFILLxk Ã+:Ã%?ÂÂ:xlxlÂxkÃ9RþÿþÿþÿþÿþÿþÿþÿxkÃ+;Â` ÂXxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿgTANK 5 - 36" WATER IN INTERSTITIAL, ALARM NOT WORKING. CTI COUTURE TOLD SUPERINTENDENT MUST PUMP OUT TANK AND PLAN FOR REMOVAL. TANK 7 - MONITORING SYSTEM NOT OPERATIONAL, SUMP LID IS CRACKED CP READINGS: TANK 5 -.894, -.892, -.891 TANK 7 -.91, -.911, -.911 4/1/08 - SUPT WHITE WILL SEND OOS FORM FOR TANK 5, WILL GET ELECTRONICS CONNECTED FOR TANK 7. -MLxk Ã+=Ã?' ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+>à K ÂxlxlÂxlÃPX7þÿþÿþÿþÿþÿþÿþÿxlÂFIÃ]ÂÂxixiÁ`xi Ã=þÿþÿþÿþÿþÿþÿ 3/3/08 OIL SUPPLIER CALLED ON BEHALF OF OWNER. SAYS CLOSED SINCE 12/31/07. TOLD MUST DO AI, SUBMIT OOS FORM, PAY ANNUAL FEES. -ML TANK READING: -.93 THREE READINGS 10/12 SPOKE WITH OWNER HE SAID HE HAD A 2006 INSPECTIONS AND ADAMS AND FOGG WAS DOING A NEW ONE. TEDxi Ã+@ÂK  xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ.WHERE GETTING CP READINGS ON HO TANK FROM? -MLxlÃ+AÂ4  xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿTANK 4 OOS PASSxlÂ^ÂT*ÂÂUxjxjÂ(xjþÿþÿþÿþÿþÿþÿþÿ¯3/10/08 - JOSH INSPECTED 4/2/07. INITIAL FAILED FOR SENSORS, SENSORS REPLACED. PASSING AI ON ITS WAY. -ML FACILITY CONTACTS ARE TED SIDELINGER, OR JIM LINDVILLE @ 783-8733xjÃ(ÂaH Á$xk xk ÂþÿÃ(V3þÿþÿþÿþÿþÿþÿè12/4/2009 SEE ENFORCEMENT TAB. SDO HAS BEEN DRAFTED AND SIGNED. -LW 7/14/09-FAILING AI. EVERYTHING CP (PIPING AND TANKS) FAILING READINGS, BADLY, VERY LOW PH NOV REMOVAL DATED 3/12/2009 FOR TANKS AND PIPING. -LW 1/3/08 CP REPAIR/REPLACE BY 5/27/08 -ML CP FAIL - READINGS FROM INSIDE TANKS FAIL TANK 7 -.59, PIPING -.72 TANK 8 -.62, PIPING -.72 TANK 9 -.63, PIPING -.63 12/12/07 RETEST BY CTI BISKUPIAK TANK 7 -.619, PIPING -.595 TANK 8 -.715, PIPING -.595 TANK 9 -.676, PIPING -.595xk Ã"TÂ^ ÂXxk xk Â<xk þÿþÿþÿþÿþÿþÿþÿR3/12/08 PER CTI MIKE LEWIS, PIPING IS INSULATED STEEL INSIDE CONCRETE TRENCH. -MLxk Ã+BÂX  Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿMIKE SIMARD ON SITE, REPORTS TANK HAS PETROMETER THAT CAN NOT BE FULLY INSPECTED FOR PROPER OPERATION. DISCUSSED MAY 27, 2008 PETROMETER POLICY WHICH REQUIRES CTI TO FAIL AN A.I. WHERE THIS EQUIPMENT IS PRESENT. MIKE INDICATED THAT THE A.I. WILL BE FAILING. DMCL JULY 15, 2009xlÃ+CÃ_ Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+DÂEY Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿ*PIPIING IS APT FLEX PIPING NOT COPPER. TRxlÃ+EÃ` Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+FÂ.@ Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+GÃ#A Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿFIBERGLASS PIPING PER CTI.xlÃ+HÂP[ Âxl xl Á`þÿþÿþÿþÿþÿþÿþÿþÿ­9/29/08-NOTICE OF INTENT TO ABANDON COPPER PIPING, AND REGISTRATION FOR NEW COPPER LINES RECIEVED, CTI BISKUPIAK PH SPACERS MISSING ON COPPER LINES, TANK INSTALLED IN 1999.xlÃ+IÂA Áxl xl Á`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã+JàÂxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿûEXTENSIVE SITE REWORK INCLUDING ACCESS TO VENT WHISTLE, NEW LEAK DETECTOR, PNEUMERCATOR TLS 3000. PERMISSION FOR LEAK DETECTION APPROVED BY TED SCHARF ACCORDING TO THE INSPECTION FORM. JOHN DUNLAP ALLOWED EXISTING 3 GALLON SPILL BUCKET TO REMAIN. TRxlÃ+KÂ6 Âxl xlÁ`xlþÿþÿþÿþÿþÿþÿþÿ]12/19/08-COPI REC'D FOR CTI SCOTT TO REPLACE ALL 3 SUMPS, NEW SPILL BUCKETS AND DROP TUBES-PHxlà N 5ÂÂKxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿ6/6/07 INCOMPLETE AI FAILED FOR SUMP NOT WATERTIGHT. PP TO SEND REVISION 9/25 AND 1/18. INCOMPLETE LETTER AND RETURNED TO OWNER 3/18/08. -MLxj Ã+LÂF ÂKxlxlÂxk þÿþÿþÿþÿþÿþÿþÿyNO ACCESS TO INTERSTITIAL AT TANK TOP. 1988 INSTALL, ENF DISCRETION TO NOT FAIL FOR NO MANUAL MONITORING OF INTERSTICE. xk ÃDÃ,ÂÂxkxkÂxk þÿþÿþÿþÿþÿþÿþÿuEATON INSPECTING AS IF DW TANK, PREVIOUS INSPECTORS DID NOT. ORIG REGN SAYS SW. EATON NOT RETURNING CALLS 3/08. -MLxk Ã+MÂO ÂxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿX1/21/09-CALL FROM SIMARD, THEY WENT OUT TO DO AI, AND THEY HAVE MOVED ALL THEIR SNOW ONTO TANK-TOP. NOT TOO CLEVER. JAMIE (SIMARDS) WANTED TO KNOW IF THERE WAS SOME SORT OF EXTENSION UNTIL SPRING. TOLD HER NO, AND THAT IF THEIR AI IS LATE, THEY WILL BE OUT OF COMPLIANCE UNTIL WE GET IT IN. SHE WILL TELL THEM TO MOVE SNOW SO IT CAN BE DONE. PHxlÃ+NÂK[ ÂxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ+O Â Â)xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿtUPGRADE AT FACILITY RECENTLY REPLACED DISPENSER ISLANDS. NO DISPENSER SUMPS - TED SCHARF SAID TO FAIL. TR OWNER SUBMITTED INVOICE OF WORK COMPLETED - PIPING WAS NOT DISTURBED, FLEX CONNECTORS AND CRASH VALVES DISCONNECTED FROM DISPENSERS TO REPLACE DISPENSERS AND CONCRETE ONLY. SEEL SAYS NO SUMPS NEEDED. DEP INSPECTION - NO APPARENT PIPING WORK, NO SUMPS NEEDED. -MLxl Ã+PÃK/ Â)xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã+QÂW Â)xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã+R  Â!xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿ,3/11/08 COPI - CTI MULLINS INSTALLED FLAPPERxlÃ+SÃJ  xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿÇPIPING SUMP CONTAINS 4" OF WATER. ELECTRICITY TO SENSOR SHUT OFF. TURN ON MONITORING SYSTEM AND TESTED PROBE WHICH IS GOOD. TR PER CHRIS WILSON, CTI SYSTEM IS NOW PASSING AND SUMPS ARE CLEAN. TRxl Ã+TÃ'  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿREPLACED SPILL BUCKET COVERxlÃ+UÃ-  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ&CLEANED WATER FROM TANK 3 SPILL BUCKETxlÃ+VÃd Â)xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿ5SHORT DROP TUBE REPLACED WITH ADEQUATE ONE 4/3/08 -PHxl Ã+WÃd  xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã+Xà ÂÁ xlxlÂxj þÿþÿþÿþÿþÿþÿþÿ©JOE BOSSE #381 MET DELIVERY TRUCK TO CHECK WHISTLE. OKAY. TANK READING: .96, .98, 1.01 6/22/06 COPI (RECD 3/24/08) - CTI PAUL BOSSE ADDED ANODES, REPLACED SPILL BUCKETxj Ã+Yà  ÂRxlxlÂxk þÿþÿþÿþÿþÿþÿþÿ§12/10/2008 JOE BOSSE CALLED COULD NOT GET CP READING; FROZEN. TOLD HIM TO SEND IT IN AS FAILING AND THEY'LL HAVE 180 TO RETEST IT. -LW TANK READING: .98, 1.01, 1.04xk Ã+ZÃ-N ÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã+[Ã0& Á$xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿ>REPLACED SOME CAPS AND COVERS OTHERWISE IN GOOD CONDITION. TRxlÃ+\Ã? ÂBxlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿLCTI C. WILSON APPEARS TO HAVE REINSPECTED FACILITY ON 4/9/08-SAME RESULTS PHxl Ã+]àÂ)xlxlÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk ÃÂÂÁ$xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ)2/27/08 CTI LEGASSE SR INSTALLED 2 DSL SATELLITE DISPENSERS W/SUMP AND PROBES. EXISTING DSL DISP HAD SUMP, ADDED PROBE. MONTORING CONSOLE IS FULLY OPERATIONAL?: REPLACED BLOWN BULBS NO WATER IN SUMPS OR INTERSTITIAL SPACE?: WATER REMOVED FROM 7-2 AND 7-3 SUMPS SPILL BUCKETS CLEAN?: REMOVED ICExkÃ+^Â3T Á$xlxlÁ`xl ÃIþÿþÿþÿþÿþÿþÿþÿxl Ã+`Â1 ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿÊ#1 FUEL TANK INTERSTITIAL SENSOR NOT WORKING. #2 DIESEL TANK REMOTE ALARM LIGHT IS WORKING BELL IS NOT. ALARM BELL DOES NOT WORK ON OUTSIDE OVERFILL ALARM, ONLY LIGHT WORKS. ALARMS REPLACED 4/14/08-PHxlÃ+a S ÂXxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿ~INTERSTICE CONTAINED 7 INCHES OF WATER. REMOVED AND VACUM TESTED INTERSTITIAL SPACE, 4 HOURS AT 10 INCHES OF VACUM PASSED. TRxlÃ+bÃ' ÂbxlxlÁ`xlà KZþÿþÿþÿþÿþÿþÿWWATER IN SPILL BUCKETS REMOVED. ALSO ADDED NEW GASKETS TO FILL AND VAPOR RECOVERY CAPS.xlÃ+cÂM Â[!xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿ2 TANK READING: TANK 8 OOS ALL TANKS BEING REMOVED.xlÃ+dà N ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,Á ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,Á4 Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ"CLEANED WATER OUT OF SPILL BUCKET.xlÃ, Â ÂUxlxlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã,Â^ Â)xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿ,ALL SPILL BUCKETS DIRTY AND CLEANED OUT. TRxl Ã,Â$ Á$xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,ÃF,  xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,  ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,Â' ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿOPRODUCT IN RNL SUMP FROM RECENT REPAIR REMOVED: LINE PRESURE TESTED AND PASSED.xl Ã, Â76 Â[!xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿHSPILL BUCKETS CLEANED OUT. ALSO ICE CHIPPED OUT TO GAIN ACCESS TO SUMPS.xlÃ, Ã& Á xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿñ9/28/10-NOITR REC'D FOR CTI BEAUMONT TO REMOVE TANK, FESSENDEN TO DO SA-PH ******9/28/2010******* THIS TANK HAS BEEN OUT OF SERVICE SINCE MID/LATE 2009. ACCORDING TO THE OWNER. DAVE BEAUMONT TOOK IT OUT OF SERVICE AND THOUGHT ABOUT REMOVING IT BUT WAS CONCERNED ABOUT TIMING. TANK IS LOCATED ON A PENISULA IN THE LAKE AND "FLOATS" WHEN THE LAKE LEVEL IS HIGH. DRAW DOWN ENDS 10/15 SO WATER LEVELS WILL COMMENCE RISING AT THAT TIME. HE WANTS TO GET THE TANK PULLED. TRxlÃ, ÂK Á xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ, ÂG5 Â[!xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿM3/13/09-UPGRADE REG. FOR CTI GEORGE TO INSTALL NEW SPILL BUCKET ON TANK #7 PHxlÃ, Â@^ ÂUxlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã,Á* ÂUxlxlÁ`þÿþÿþÿþÿþÿþÿþÿþÿ56/6/08 SIMARDS INSPECTED. 3 SUMPS: 1) MIKE INSTALLED S/R FLEX IN 2007, 2) S/R COPPER, 3) PRESSURIZED COPPER CONNECTED TO STP. MLLD FOR PIPING IN SUMP 3 CANNOT FUNCTION BECAUSE RED JACKET RELAY KEEPS STP RUNNING ALL THE TIME. OWNER WILL REMOVE STP AND REPLACE WITH SUCTION SYSTEM BY END OF SUMMER 2008. -MLxlÃ, S ÂxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,àÂxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,Â1 Âxlxl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,Â7 Â!xlxl Á`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã,ÂB[ Â!xlxl Á`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã,à : Â!xlxl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,Â3I Â)xlxl Á`xl þÿþÿþÿþÿþÿþÿþÿ57/16/09-COPI FOR CTI LEGASSE TO REPLACE FILL RISER PHxl Ã2Â^;ÂÂDxk xk ÂþÿÃNc=þÿþÿþÿþÿþÿþÿßSIA FAILED- PRECISION TEST REQUIRED. 9/17/2007 NOT GOING TO REQUIRE SUCTION LINE TO BE ISOLATED IF ATG IS REGISTERED AS FACILITIES FORM OF LEAK DETECTION. JOHN JOHNSON IS GOING TO RECOMMEND REGISTERING ATG. OVER/SHORT GREATER THAN 1% ON TANKS 1, 3, 4. TANK 5 PROBE FAILED, NOT READING PROPERLY, MUST BE REPLACED. -MLG TANK READING: TANK 1: -1.08, -1.05, -1.06; TANK 2: -1.08, -1.04, -1.02; TANK 3: -1.12, -1.06, -1.03; TANK 4: -1.1, -1.05, -1.08; TANK 5: -1.23, -1.16, -1.18xk Ã,Â7 ÂNxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,Â7 ÂNxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ6SPILL BUCKET: PUMPED OUT WASTE WATER INTO DRUM ON-SITExlÃ,Â7 ÂNxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿWATER IN DIESEL STP PUMPxlÃ,ÂB$ ÂNxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ»WATER FOUND IN TANK #3 STP SUMP AND INTERSTITIAL. NO DISP. SUMP MONITORING AT THIS SITE. 7/15/08-CTI ARTHUR JOHNSON PUMPED OUT SUMP AND INTERSTITIAL OF TANK 3 REPLACED INT. RISER CAP PHxlÃ, ÂNxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿlWORK IN PROGRESS TO REPAIR INTERSTITIALS. SITE IS RUNNING CLSD IN COMBINATION WITH INTERSTITIAL MONITORING.xlÃ,Â$ Á$xlxl Á`xlþÿþÿþÿþÿþÿþÿþÿ¡1/13/09-UPGRADE REG. FOR CTI GEORGE TO REPLACE ATG WITH VR ILS 350 -ATTACHMENT A REC'D, CTI GAFF REMOVED PIPING-SIGNS OF STRETCHING, BUT NO EVIDENCE OF A LEAK-PHxlà Ã@ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃÂ_ÂÂbxkxkÂxkþÿþÿþÿþÿþÿþÿþÿŽREQUESTED EXTENSION TO REMAIN OOS GREATER THAN 12 MONTHS. PREMISSION GRANTED UNTIL 3/27/2009. IF NOT RETURNED TO SERVICE BY THEN REMOVE UST.xkÃ, ÃX Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã,!ÃT% Á$xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿ—INTERSTICE BRINE FILLED, SENSOR WAS HIGH AND HAS BEEN RESET CORRECTLY. REPLACED 4" FILL CAP. FLEX PIPING. TR NOW PASSING PER CTI DENNIS DAVIS. TRxl Ã,"ÃK2 Á$xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿ«OMNTEC ELP-2142 WORKED WELL. CLEANED OUT SPILL BUCKET.PIPING IS STEEL IN SECONDARY CONTAINMENT. NOTE ON INSPECTION SAYS OKAYED BY LIZA WOODWARD, PIPING IS SOLID STEEL. TRxl Ã,#Ãc Á$xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿ2 PIPING SUMPS BOTH WITH SENSORS BUT, ONLY ONE CONTAINS ANY PIPING. FILL HAD ICE IN IT FORCING THE CAP UPWARD, CTI DAVIS RAN A BOLT THROUGH THE PADLOCK HOLE TO SECURE THE COVER. FLEX PIPING COMING OUT OF SUMP NEAREST TO THE BOILER ROOM, SECOND SUMP NO PIPING. TRxl Ã,$Ã\ Â)xlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,%Â3K Â)xlxlÁ`þÿþÿþÿþÿþÿþÿþÿþÿFACILITY USES A 2" SCULLY FILL, PUMP OFF DELIVERY, PRESSURIZED FILL. CTI BUBAR REMOVED BALL FLOAT STILL PRESENT AT SITE. PIPING SUMP HAD 2" OF WATER, NOT IN ALARM AS PROBE WAS SET 2" HIGH. WATER REMOVED AND PROBE PLACED ON BOTTOM. WATER CAME FROM THE TOP. FACILITY HAS AN OFFSET FILL W/5 GAL SPILL BUCKET....NOT BEING USED....2" SCULLY DIRECTLY ON TANK TOP USED FOR FILL. BUCKET WAS FULL OF ICE. TRxl Ã,&Â3L Â)xlxlÁ`xl þÿþÿþÿþÿþÿþÿþÿÃPIPING SUMP WAS FULL OF WATER, LOOSE FIT FIBERGLASS LID SO WATER COMES IN OVER THE TOP. CTI BUBAR RECOMMENDED INSTALLATION OF V/R AUDIBLE ALARM BECAUSE FACILITY HAS A NEW VR TLS 350 IN PLACE. TRxl Ã,'Â7X ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ,(ÂL ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã,)Â2 ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã,*ÂXc ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã,+ÂQ/ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿTANK #8 INSTALLED ON 5/1/90xlÃ,,Ã! Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿæPIPE SUMP CONTAINED WATER (EMPTIED) LID LEAKING, GASKET NOT SEATED. GREASED AND RESET EXCESS BRINE, REMOVED EXCESS FILL CAP REPLACED 4" EXTRACTOR VALVE REPLACED INSTALLER RECOMENDS FORMING CONCRETE PADS AROUND MANHOLES FOR SUPPORTxlÃ,-ÃX Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿFTANK #5- REMOVED WATER IN SUMP TANK #5- CLEANED OUT SUMP LID SEATING TANK #6- INTERSTITIAL SENSOR REPLACED TANK #6-REPLACED BROKEN SUMP LID HARDWARE TANK #7- REMOVED WATER FROM PIPING SUMP ALL 3 TANKS' FILL CAPS REPLACED TANK #5- REPLACED SPILL BUCKET LID TANK #5 NOT IN USE-RECOMMENDED THAT TANK STATUS BE CHANGED TO OOS. PHxl Ã,.à  ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ¹TANK #9-INTERSTITIAL SPACE SENSOR REPLACED TANKS 9 AND 10 FILL CAPS REPLACED CALIBRATED GUAGE PROBES TO MATCH STICK READINGS PH TANK READING: IMPRESSED CURRENT SYSTEM INSTALLED 6/29/07xlÃ,/ÂNE ÂHxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ{FILL CAP REPLACED THIS IS A "CLEAN FACILITY" COPPER SUCTION/RETURN LINES NOT ISOLATED-RECOMMENDED THAT THEY BE ISOLATED PHxl Ã,0ÂY  ÂHxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ\PIPING SUMP CONTAINED WHAT APPEARED TO BE CONDENSATION AND WAS CLEANED FILL CAP REPLACED PHxl Ã,1à  Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿìTANK ANNULAR SPACE RISER CORRODED AND REPLACED SMALL AMOUNT OF WATER (CONDENSATION) REMOVED FROM PIPING SUMP PIPING SUMP LID GASKET REPLACED FILL CAP REPLACED SPILL BUCKET CONTAINED WATER, WAS REMOVED 4" EXTRACTOR VALVE CAP REPLACED PHxl Ã,2Â+V  xl xlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã,3ÂG ÂKxl xlÂxlÃ@þÿþÿþÿþÿþÿþÿ÷TANK #5-GROUNDWATER MONITORING IS ELECTRONIC-MONITOR IS INCON TS1001 TANK #5 IS SINGLE WALLED OWENS CORNING FIBERGLASS WITH PIPING INSTALLED IN 1987, SINGLE RUNS SLEEVED IN PVC PH OWNER SUBMITTED ORIGINAL TANK PACKING LIST - TANK IS OC DW FG. -MLxlÃ,4 Â ÂBxl xlÂxl þÿþÿþÿþÿþÿþÿþÿgTANK #9 HAS 2 CHAMBERS, 1 3K GAS, 1 3K DIESEL THERE IS NO TANK #10 AS INDICATED ON 2008 INSPECTION FORMxl Ã,5ÃB  xl xlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã,6Ã=_  xl xlÂxlþÿþÿþÿþÿþÿþÿþÿaCOPPER LINES ARE BOTH UNSLEEVED AND UNSPACED AND ARE CURRENTLY CRIMPED-TANK INTALLED IN 1989 NO RIM OR PROTECTION FOR INTERSTITIAL SPACE RISER PH DEP INSP 7/25/08 3 SETS OF S/R LINES - EACH IN PVC CHASE. LINES COILED, NOT CRIMPED. 7/31/08 PHOTOS FROM MAINT SUP INSIDE BOILER ROOM - PVC CHASE THROUGH CONCRETE FLOOR -- PIPING SLEEVED ON BOTH ENDS. -MLxl Ã,8ÃP  xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ…PIPING SUMP HAD 18" OF WATER SUMP PROBE NOT WORKING SPILL BUCKETS NOT CLEAN OR LIQUID TIGHT PH CTI C.WILSON REPAIRED FAILURES 4/21/08xlÃ,9Ã5  xl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,:ÃF,  xl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,;Ã;  xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ¼1/2" COPPER LINE IN SAME SLEEVE AS UNUSED 2" STEEL LINE COPPER PIPING NOT PROPERLY SLEEVED PH INSP. DAN HARMON, ON 6/23/08 PASSED FACILITY AS THE STEEL AND COPPER LINES ARE SEPERATED. PHxlÃ,<Ã#  xl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,=ÃB ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,>ÂA ÂUxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã,?ÂD* ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,@ÂJ= Â[!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ0DIRT VACUUMED OUT FROM AROUND FLEX CONNECTORS PHxl Ã,AÂH Â[!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,BÂEM ÂUxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã,CÂ' ÂUxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã,DÃ[  ÂUxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã,EÂ? ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,Fà N ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,GÃ, ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ9CTI DON BUBAR INSTALLED DROP TUBES IN ALL THREE TANKS. BBxl Ã,HÂ@ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,Ià  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,J Â-xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ‰7/20/09-COPI REC'D FOR CTI BISSON TO REPLACE 4-1 SPILL BUCKET PH REPLACED VAPOR RECOVERY CAP ON TANK #4-1 REPLACED FILL CAP ON TANK #4-2xl Ã,KÃZP Â-xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã,LÂTa Á$xlxlÂxlÄcþÿþÿþÿþÿþÿþÿÒDIESEL DISPENSER 9/10 CRASH VALVE SET 1" TOO HIGH REPLACED MAN HOLE COVER REPLACED 1 FILL CAP CLEANED OUT ALL SPILL BUCKETS REPLACED LOCKING LID ON TANK #7 LLD SHUTS DOWN WHEN TESTED CRASH VALVE FIXED 4/7/08 PHxlÃ,MÂBa Á$xlxlÂxl ÃWþÿþÿþÿþÿþÿþÿlREPLACED ALL SUMP LIDS (FIBERLITE) CLEANED OUT SPILL BUCKETS REPLACED VAPOR RECOVERY ADAPTER AND CAP ON TANK #8 CLEANED UP OLD WEEPING AT UNION, PUMP #1/2 TANK #12 INTERSTITIAL ALARM WAS SOUNDING, WATER FROM RUNOFF GOT IN-PROBLEM FIXED AND ALARM TESTED AND PASSED REPLACED RISER AND BRASS ADAPTER ON TANK #10 CLEANED SPILL BUCKETS CLEANED OLD WEEPING FROM METER-PHxl Ã,NÃYb ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿÓALL 3 SPILL BUCKETS FULL OF WATER, SURFACE WATER OVER SUMP TOPS AT TIME OF INSPECTION. BECAUSE OF THIS, BALL FLOAT COULD NOT BE CHECKED WITHOUT LETTING WATER INTO TANK 1-2 SUMP SENSOR NOT WORKING-2 WIRE TYPE PH ON 4/7 AND 4/9 NICK GUAY AND GARY KANE PUMPED WATER FROM ALL SUMPS, REPLACED INTERSTITIAL SENSOR ON TANK 2, PUMPED WATER OUT OF ALL SPILL BUCKETS, CHECKED BALL FOAT, REPLACED METERS ON PUMPS 1/2 ; 5/6 AND 9/10 AND INSTALLED NEW O-RING ON DIESEL SOLENOID-PHxlÃ,OÃZY Â!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,P Â ÂXxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ%REPLACED INTERSTICE MONITOR SENSOR PHxl Ã,QÃ6b Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ-REPLACED FLAPPER ON 3-2 CLEANED SPILL BUCKETSxl Ã,RÃ) ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,SÂ$  Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã,TÂI^ Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ(SPILL BUCKETS RUSTY BUT LIQUID TIGHT -PHxl Ã,UÂb Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿQTANK HAS AN OFFSET FILL COPPER LINES ARE SLEVED IN PVC AND BEGIN IN SMALL SUMP-PHxl Ã,VÂU Â!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,W Â!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿVERY ACCURATE INVENTORY KEPT THEY DO NOT DISPENSE MUCH SUPER ONE REGULAR TANK GETS USED MORE THAN THE OTHER SUPER SPILL BUCKET COVER REPLACED-PHxlÃ,XÃ0 Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿhTANK HAS 2" SCULLY FITTING FILL WITH VENT BESIDE THE WHISTLE. THE WHISTLE WORKS, BUT IS NOT ACCESABLE-PHxl Ã,YÂW Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ<CLEANED WATER OUT OF #7 SPILL BUCKET REPLACED #7 FILL CAP-PHxl Ã,ZÃ45 ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ=REPLACED 5-1 BALL FLOAT REPLACED METER ON DIESEL DISPENSER-PHxl Ã,[ÂC Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ–TANK #2 IS A SIPHON SYSTEM AND IS NOW MANIFOLDED WITH TANK #1 AND BOTH CONTAIN REGULAR GASOLINE FLAPPERS ARE EBW TYPE ALL SPILL BUCKETS CLEANED OUT-PHxlÃ,\Â$ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,]Â]L ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,^ÂY  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ2SUCTION/RETURN LINES NOT SPACED-INSTALL IN 1986-PHxlÃ,_Â]O ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ4SUCTION/RETURN LINES NOT SPACED, INSTALLED 7/1/88-PHxlÃ,`Â]G ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,aÂ]] ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,bÂL ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPH xlÃ,cÂ2 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ,dÂ1] ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-ÂY ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-Â^? ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-ÂY ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ6SUCTION/RETURN LINES NOT SPACED-INSTALLED ON 4/1/89-PHxl Ã-ÂQ. ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-Ã$ Â!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ-Â, Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ-Ã< ÂBxlxlÂxlþÿþÿþÿþÿþÿþÿþÿDCONSOLE NOT WORKING ON 3/14/08, FIXED BY CTI C. WILSON ON 4/21/08-PHxlÃ-ÃQ ÂBxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ- Ã5N Â4xlxlÂxlÃ&5þÿþÿþÿþÿþÿþÿKREMOVED WATER FROM ALL GASOLINE SPILL BUCKETS REPLACED 4" CAP ON TANK #3-PHxlÃ- Ãa Â!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ- ÂT ÂxlxlÁ`xlÃþÿþÿþÿþÿþÿþÿþÿxlÃ- Ã[ ÂRxlxlÁ`xk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã- à I Â!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ8DISPENSER SUMP SENSOR REPLACED LEAK DETECTOR REPLACED-PHxlÃ-ÃM ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-Â$ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPH 8/1/08 UPGRADE REGN FOR CTI HAZEL TO REPLACE ALL SPILL BUCKETS, VAPOR RISER FOR TANK 1 8/18/08 COPI - CTI GEORGE REPLACED 3 SPILL BUCKETSxlÃ-ÃP ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-Â&]ÂÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿPHxk Ã-Ã+, Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿATANK #6- FILL CAP REPLACED SPILL BUCKET CLEANED CP TEST: -.905 TANK #7- FILL CAP REPLACED CP TEST: -.892 TANK #8- WATER CLEANED OUT OF SUMP WATER INFILTRATION NOTICED AT LID, CLEANED OUT SEAL AND NOTIFIED L. WOODWARD FILL CAP REPLACED CP TEST: -1.007 TANK #9- FILL CAP REPLACED SPILL BUCKET CLEANED OUT CP TEST: -1.099 PHxlÃ-Ã+, Â\xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxlÃ-ÃM Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ FILL CAP AND ADAPTER REPLACED-PHxlÃ-Ã\* Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ‘PIPING SUMP CLEANED OUT CLEANED LID SEAT AND RIM OF LID FILL CAP REPLACED CLEANED GUAGE STICK REPLACED SPILL BUCKET LID CLEANED OUT SPILL BUCKETxlÃ-Â' ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-ÂJ` ÂxlxlÂxlÃGþÿþÿþÿþÿþÿþÿyADJUSTED CRASH VALVE HEIGHT ON DISPENSER 1/2 CRASH VALVES AT CORRECT HEIGHT: DISPENSER 1/2 CRASH VALVE HEIGHT ADJUSTED-PHxlÃ-ÂU ÂXxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ INSPECTION IS A FAIL, AS IT CANNOT BE DETERMINED WHETHER THE SUCTION AND RETURN LINES ARE SPACED-1998 INSTALL PH 12/3/08 TONY COUTURE CALLED THIS DATE, THEY WILL BE REPLACING THE COPPER LINES WITH COATED COPPER LINES SOMETIME IN THE NEXT 3 WEEKS. TRxlÃ-Â( ÂTxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã-Â6N ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-Ã3 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ- ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ-INTERSTITIAL SENSOR RESET TO PROPER HEIGHT-PHxlÃ-à  ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ$REPLACED LS-ASC INTERSTICE SENSOR-PHxlÃ-à  ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-à  ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ- ÂYU Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ¿REPLACED ALL THREE TANKS' VEEDER ROOT INDICATOR LAMPS TANK #11 SUMP CLEANED OUT TANK #10 INTERSTICE SENSOR STRING REPLACED SPILL CONTAINMENTS FOR ALL TANKS ARE CONCRETE AT FUELING CABINETS-PHxl Ã-!à < ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿQVACUUM TEST ON INTERSTICE AT 10" FOR 2.5 HOURS WITH NO DROP IN VACUUM PER T.SHARFxlÃ-"ÂR ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿãTANK INSTALLED IN 1993 AND INPECTION INDICATED COPPER LINES ARE NOT SPACED-PH 6/3/08 REGISTRATION TO REPLACE COPPER LINE 7/1/08 CTI J. BISKUPIAK INSTALLED COATED COPPER LINES IN LEIU OF SPACERS-PH PASSING AI UPDATE RECIEVED-PHxlÃ-#Â.= ÂXxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ*REPLACED 1-LS-ASC SENSOR IN PIPING SUMP-PHxl Ã-%ÃX ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿz6/3/09-COPI REC'D FOR CTI LEGASSE JR. TO INSTALL NEW VENT LINE FOR DIESEL POCKET PH CLEANED OUT SPILL BUCKETS-PH 1/8/09-CTI LEGASSE SR. CALLED TO SAY THEIR PREMIUM POCKET IS NOW CONTAINING DIESEL. I TOLD HIM TO WRITE A DESCRIPTION OF THIS CHANGE IN THE NOTES ON THE AI, AND TO TELL THEM THE VENT LINES WILL HAVE TO BE SEPERATED-WILL FOLLOW UP WITH FACILITY ONCE AI COMES IN PHxlÃ-&ÃX ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-'ÂF1 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿV11/10/08-INTENT TO ABANDON BOTH TANKS RECIEVED-CTI HERSEY AND COUNTY TO DO WORK-PH PHxlÃ-(Ã; ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-)ÂI ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿTANKS HAVE SUCTION SYSTEM-PHxlÃ-*Âbd Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿSPILL BOX IS RUSTED, BUT STILL LIQUID TIGHT. WILL BE REPLACED-PH 7/10/07 UPGRADE REGN FOR CTI LEGASSE JR TO REPLACE SPILL BUCKETxlÃÂ2>ÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿÛ3-1 HAD 12-16" OF WATER IN PIPING SUMPS, 4-1 AND 5-1 HAD 2-3" OF WATER IN PIPING SUMPS. DISPENSER SUMPS HAVE SOME WATER. UNABLE TO TEST REGULAR PNL TANK-BROKEN CONDUIT, NO POWER. -MLG CTI GUAY PUMPED OUT SUMP, LOOKED FOR SOURCE OF WATER INTRUSION, TIGHTENED COVERS. INSPECTION UPDATE DATED 7/12/07 11/30/07 COPI - CTI BEAUMONT DISCONNECTED MANIFOLDED VENT AND INSTALL NEW SW FG VENT LINE FOR DSL 2/23/08 CTI BEAUMONT REPLACED TANK 3 SUMP, ENTRY BOOTS, "NEW ELECTRICAL" xkÃ-+ÃM Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-,Á< Â?xl xlÂxlÃ2þÿþÿþÿþÿþÿþÿPHxlÃ--ÂJ Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã-.Ã5! ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿgOWNER CALLED ON 12/5/08 TO VERIFY THAT THE TANK REGISTRATION BILL WAS FOR 2009, 2010, AND 2012. -LW PHxlÃ-/ 2 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ‹1/14/09-COPI, CTI DODGE REPLACED OLD VR CONSOLE WITH NEW OMNTEC OEL800011-PH CLEANED OUT SPILL BUCKET RAGGED OUT CONDENSATION FROM SUMP-PHxlÃ-0Ã. ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-1Ã79 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-2ÃB  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-3à   xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-4à xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-5à xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-6ÂJ  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-7Â% ÂbxlxlÂxlþÿþÿþÿþÿþÿþÿþÿz1/26/09-NOTICE OF INTENT TO ABANDON PIPING , CTI LETTELIER JR.-PH 1/22/09-UPGRADE REG REC'D FOR NEW PIPING AND SUMPS-PH PHxlÃ-8ÂB% Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-9Â"9 Â)xlxlÂxlÃRþÿþÿþÿþÿþÿþÿ˜10/1/09-COPI REC'D FOR CTI REDMOND TO INSTALL NEW SPILL BUCKET ON TANK 5 PH SOME SCALE IN GAS 5-1 SPILL BUCKET-PH ACTUAL INSPECTOR IS STEPHEN REDMOND.xlÃ-:Ã`  Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-;à K ÁxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxlÃ-<à C ÂUxlxlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã-=Â$/ ÁxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ->ÂL   xlxlÂxlþÿþÿþÿþÿþÿþÿþÿB12/15/2008 CALLED ABOUT SIA NOV. TOLD OWNER TO SUBMIT AT LEAST 30 DAYS WORTH OF DAILY INVENTORY TO A THIRD PARTY VENDOR (RECOMMENDED GIVING THIRD PARTY VENDOR A CALL TO MAKE SURE WHAT THEY NEEDED). TOLD OWNER MOST VENDORS WILL SEND THEIR CUSTOMERS TWO COPIES. TOLD HIM TO KEEP ONE AND SEND ONE INTO DEPARTEMNT. -LW PHxlÃ+<ÂOE ÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿÍ4/16/08 BILL CARVER OVERSAW HELIUM TEST. HELIUM DETECTED IN AREA OVER EXTRA BUNG. WILL DIG DOWN TO INVESTIGATE AND CORRECT. HIGH GROUNDWATER EXPECTED, MUST BE TESTED AND CONTAMINATED WATER PROPERLY COLLECTED. BREZINSKI ALSO TOLD OPERATOR ONSITE TO COLLECT GROUNDWATER AND NOT DISCHARGE. -ML 4/29/08 SMALL CRACK DISCOVERED IN OUTER TANK SHELL NEXT TO BACKUP INTERSTITIAL BUNG. MASS TANK REPAIRED OUTER SHELL 5/8/08. VACUUM TEST OVERSEEN BY CTI PRESNAL. -MLxk Ã-?Ã3) ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿhTANKS ARE INSIDE CONCRETE DIKE, THEN WERE BACKFILLED COPPER PIPING IS SLEEVED, NOT SPACED-'87 INSTALL-PHxlÃ-AÂLL ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-BÂQ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-Cà  ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-DÂ< ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-EÂbA ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-F ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-G ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ&PH ACTUAL INSPECTION DATE IS 4/28/08.xlÃ-HÂ.Y ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ&PH ACTUAL INSPECTION DATE IS 4/28/08.xlÃ-I ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ3INTERSTICE SENSOR REPLACED, 4/24/08, CTI COUTURE-PHxlÃ-J ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-K ? ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-LÂLM ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿCOVER INSTALLED ON FILLBOX-PHxlÃ-M ) ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿSUCTION SYSPEM, NO SUMP-PHxlÃ-NÂD  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-Oà   xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-Pà W  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-QÂ.( Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-RÂ& ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-SÂ%0 Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-TÃP Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-UÃ^) Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-WÂ& Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ%TOTOAL CONTAINMENT PIPING-.75 INCH-PHxlÃ-XÂ( Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ PIPING 1.5" TOTAL CONTAINMENT-PHxlÃ-YàÂ\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿxCLEANED AND REPAIRED SUMP GASKET REPLACED REMOTE OVERFILL ALARM IND. LAMP SPILL BUCKET CLEANED OUT FILL CAP REPLACED-PHxlÃ-ZÃR7 ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ˜SMALL AMT. WATER REMOVED FROM PIPE AND TRANSITION SUMP SUMP GASKET CLEANED SPILL BUCKET CLEANED FILL CAP REPLACED OMNTEC LU-1 OVERFILL ALARM REPLACED-PHxlÃ-[ÂZ< Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ8SPILL BUCKET CLEANED OF FUEL/DEBRIS FILL CAP REPLACED-PHxlÃ-\Ã2  Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿFDISPENSER SUMP WATER REMOVED FILL CAP REPLACED SPILL BUCKET CLEANED-PHxlÃ-]Â9P Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ9FILL CAP AND ADAPTER REPLACED SPILL BUCKET CLEANED OUT-PHxlÃ-^ÂD2 Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ SPILL BUCKET CLEANED OF WATER-PHxlÃ-_ÃK1 Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ™INTERSTICE SENSOR WAS REPLACED AS ORIGINAL DID NOT REACH BOTTOM VENT IS MORE THAN 8' FROM FILL, BUT WAS OK'D BY TR ON 4/22/08 SPILL BUCKET CLEANED OUT-PHxlÃ-`ÂF Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿTANK#8 FILL GASKET REPLACED-PHxlÃ-aÂ15 ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-bÂXC ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-cÂ]F ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ-dÂ]C ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.Ã'2 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.Â]` ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÂY8 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÂY ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.Â2  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÂY% ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÂQ6 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÂQNÂÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿPHxk Ã. Â%- Â4xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPINTENT TO ABANDON FORM RECIEVED 10/20/08-CTI REDMOND TO DO PIPING REMOVAL-PH PHxlÃ. Â?1 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ. Ã] ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ. Ã( ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ%PH ACTUAL INSPECTOR IS ROBERT TRASK.xlÃ. Â7$ ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿJREPLACED OVERFILL ALARM LIGHT TANK #8 REPLACED OVERFILL ALARM HORN TANK #9xlÃ.Â3; ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.Ã=  xlxlÂxlÃ>LþÿþÿþÿþÿþÿþÿPHxlÃ.Â/ Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÃXG Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿCLEANED OUT SPILL BUCKET-PHxlÃ.Â>` Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ%CLEANED WATER OUT OF SPILL BUCKETS-PHxlÃ.ÃU) Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿCLEANED OUT SPILL BUCKET-PH SPOKE WITH CARMEN AT TRANZON AUCTION PROPERTIES @ 775-4300. FACILITY IS CLOSED, NO IDEA EXACTLY WHEN BUT BASED ON ANNUAL INSPECTION INFORMATION CONSIDERING FACILITY TO BE OOS SINCE 6/1/08. TRxlÃ.Â!D  xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.à ]  xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.Ã@  xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.  xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.à xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÂD  xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÃH   xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÂB ÂTxlxl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.Ã` Â!xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÂU= Â!xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ÂG. Âxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ=DISPENSER 3/4-PREMIUM WEEPING, REPLACED METER-NOW PASSING PHxlÃ. Ã? ÂTxlxl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.! Â ÂTxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã."Ã\M Âxlxl Âþÿþÿþÿþÿþÿþÿþÿþÿi 11/6/2008 MRS. OLBRICHT CALLED REGARDING MASS MAILING NOV. DIDN'T KNOW SHE HAD A PROBLEM. I TOLD HER COPPER LINES ARE REQUIRED TO BE SLEEVED, BECAUSE COPPER LINES IN CONTACT WITH SOIL CAN CORRODE. SAID SHE WOULD KNOW IF SHE HAD A PROBLEM. I TOLD HER THE STATE OF MAINE TAKES PREVENTITIVE APPROACH AND SHE WILL HAVE TO DETERMINE IF THE LINES ARE SLEEVED. SHE SAID SHE CALLED ALMOST EVERYONE ON THE LIST AND NOBODY WILL DO RESIDENTIAL. LOST LIST OF CTI'S, MAILING HER ANOTHER ONE. -LW LISTED AS DOUBLE WALLED, MOST LIKELY ACTUALLY SINGLE WALLED CTI CLANCY UNABLE TO DETERMINE IF THE COPPER LINES ARE SLEEVED PHxlÃ.#Â+ Âxl xl ÂxlÃ0,þÿþÿþÿþÿþÿþÿþÿxlÃ.$Ã]5 ÂXxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.%ÂC Â)xl xl Âxlþÿþÿþÿþÿþÿþÿþÿq9/14/09-NOITA REC'D FOR ENPRO TO REMOVE TANKS, AND ST. GERMAIN TO DO SA, PULL IS EXPECTED TO HAPPEN 4/2010-PH PHxlÃ.&Ã5[ Â)xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿSREINSTALLED INTERSTICE MONITOR WIRE CONNECTIONS REMOVED WATER FROM SPILL BUCKETS-PHxlÃ.(Â< Â)xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿŒCLEANED WATER OUT OF $4-1 &4-2 SUMP AND RESEALED, ALARM TESTED AND FOUND TO WORK CLEANED OUT SPILL BUCKETS DISPENSER #5 IS DIESEL/SUCTION PHxlÃ.)àÂ)xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿxSMALL AMOUNT OF WATER REMOVED FROM PANS UNDER DISPENSER 7/8 WATER REMOVED FROM SPILL BUCKETS AND COVER FOR 4-2 REPLACED xlÃ.*ÃaR ÂLxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿCLEANED OUT SUMP LID SEAT PHxlÃ.+ÃQY Âxl xl ÂxlÃ`_;þÿþÿþÿþÿþÿþÿþÿxlÃ.,Â^B Âxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPNOTE: CHANGED OVERFILL PREVENTION IN TANKS FROM DROP TUBE TO BALL FLOAT PER A.I.xlÃ.-Ã.' Âxlxl ÂxlÃ.0,þÿþÿþÿþÿþÿþÿHPER ANNUAL INSPECTION CHANGE OVERFILL PREVENTION IN TANKS TO BALL FLOAT.xlÃ..Â, Âxlxl ÂxlÃ?#<þÿþÿþÿþÿþÿþÿ<CHANGED OVERFILL PREVENTION PER A.I. IN TANKS TO BALL FLOAT.xlÃ./Â8 Âxlxl ÂxlÃK,Rþÿþÿþÿþÿþÿþÿ;PER A.I. CHANGED OVERFILL PREVENTION TO BALL FLOAT IN TANKSxlÃ.0ÂN ÂXxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ”9/30/08-INTENT TO ABANDON OLD COPPER PIPING AND REGISTRATION FOR CTI SIMS TO INSTALL NEW FLEX. 2 WALL PIPING ON 2000 GAL TANK AT BELFAST HALL PH PHxlÃ.1Â$= ÂKxl xlÂxlÃ$#FþÿþÿþÿþÿþÿþÿPHxlÃ.2ÂEB ÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ11/18/09: PASSING AI RECEIVED, BUT TANK 8-1 IS STILL OFFICIALLY OOS. WP 09/29: BOB OULLETTE (OLD OWNER) CALLED. SOLD FACILITY 2 WEEKS AGO. WORKING WITH NEW OWNER TO GET AI DONE. ADVISED HIM OF 10/20/09 DEADLINE FOR OOS TANK TO RETURN TO SERVICE. WP NEW SUCTION DISPENSER INSTALLEDxlÃ.3Â]^ Â]xl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.4Â]a Â]xl xlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.5ÂY Â]xl xlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.6ÃV ÁKxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.7ÂAa ÁKxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.8ÂGE  xlxlÂxlÃþÿþÿþÿþÿþÿþÿPHxlÃ.9ÂV]  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.:   xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.;Â#  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.<ÂF Â`xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ2TANK #2 SUMP PROBE REPLACED BY CTI D. LAPIERRE PHxl Ã.=Ã> Á$xlxlÂxl þÿþÿþÿþÿþÿþÿþÿJCLEANED SPILL BUCKETS AND REPLACED LID ON 8-1 REPLACED FILL CAP ON 8-1 PHxl Ã.>ÂGF ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlà Ã!NÂÂUxkxkÁ`xlþÿþÿþÿþÿþÿþÿþÿ9/07 NOI & REGN TO REPLACE PIPING ON HEATING OIL TANKS CURRENT INSPECTION INDICATES THAT THE TANKS WERE INSTALLED IN 1991 AND 1992, WITH TANK 6 BEING INSTALLED IN 1992 AND REQUIRING SPACERS. THE OTHER 2 TANKS WERE INSTALLED IN APRIL 1991, PRIOR TO THE REQUIREMENT BEING MANDATORY. -TR 4/18/08 CTI J. BISKUPIAK REPLACED BARE COPPER LINES WITH SLEEVED COPPER LINES ON TANKS 5 AND 6 PHxkÃ.?Ãa< ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.@ÂR] ÂUxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.AàÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.BÂ$G ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.CÁ( ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.DÃ-N ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.EÂ? ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.FÂ$E ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ FACILITY STILL OUT OF SERVICE PHxlÃ.GÃ4 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ.HÂK, ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ.JÂ# ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.KÃW ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.LÂ' ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.MÃ5K ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.NÃ6+ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ<METER BOLTS TIGHTENED ON 1/2; 6/7; 8 AND WEEPS WIPED DOWN PHxlÃ.OÃY ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿTANK HAS REMOTE FILL PHxlÃ.PÂ9A ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ˜CLEANED OUT SPILL BUCKET, REPLACED FLAPPER PLAQUE AND FILL CAP/ ADAPTER SUCTION PUMPS IN DISPENSERS HAD SMALL LEAKS, REPAIRED BY ADAMS AND FOG-5/5/08 PHxlÃ.RÂ#. ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿßTANK CLEANING PORT AND PIPING ACCESS, AND SPILL BUCKET CLEANED OF WATER/DEBRIS FILL CAP REPLACED TANK BOTTOM HAS .25" OF WATER VENT WHISTLE HARD PIPED, UNABLE TO REMOVE AND INSPECT COPPER LINES NOT SPACED (1990 INSTALL) PHxlÃ.SÂ$- Â-xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ)Ã\. Â\xk xk Âxl þÿþÿþÿþÿþÿþÿþÿÅSENT FAILURE LETTER 12/11/2007. "IF EQUIPMENT MUST BE RETROFITTED TO CORRECT THE CAUSE OF THE FAILURE..." -LW PIPING SUMP CONTAINS WATER (REMOVED AND CLEANED)(NOTIFIED GARY ESCORSIO, WINDWARD GARDENS AND TIM RECTOR MEDEP, 11/5/2007) WATER INFILTRATION APPEARS AT LID- NOT LIQUID TIGHT (RECOMMEND SUMP TOP UPGRADE TO INSTALL LIQUID TIGHT PIPING SUMP LID) TANK ANNULAR SPACE SENSOR FAULTY (REPLACED) PIPING ACCESS CONTAINS WATER (REMOVED AND CLEANED) TANK ANNULAR SPACE CONTAINS WATER (REMOVED)(NOTIFIED GARY ESCORSIO, WINDWARD GARDENS AND TIM RECTOR, MEDEP, 11/5/2007) WATER INFILTRATION APPEARS AT TANK ANNUALR SPACE RISER CAP- NOT LIQUID TIGHT (INSTALLED LIQUID TIGHT CAP AND ADAPTER TO PREVENT WATER INTRUSION). COPPER SUCTION/RETURN LINES NOT ISOLATED (INSTALLED SPACERS TO PROTECT FROM POSSIBLE DAMAGE) 4/25/08 REGN TO REPLACE PIPING W/DW FLEX ***************** 5/12/08 PTI UPRADED COPPER PIPING TO DW FLEX LIQUID TIGHT PIPING SUMP TOP AND LID INSTALLED PH xk Ã.TÃP]  xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ†7/29/09-COPI REG FOR CTI LEWIS TO INSTALL NEW ANODES AROUND TANK PH CP READINGS: -.716, -.757, -.741 REMOVED WATER FROM SPILL BUCKETxlÃ.U A Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿŒREPLACED FAULTY SUMP SENSOR, REMOVED CONDENSATION ACCUMULATION FROM SUMP CLEANED OUT SPILL BUCKET REPLACED FAULTY ELECTRONIC OVERFILL DEVICExlÃ! Ã1 Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿ®4/16/08 FACILITY FOR SALE, STILL OPERATING -ML 5/30/08 COPI - CTI WILSON INSTALLED VR TLS300 W/CSLD, 2 SPILL BUCKETS NO ATG REGN WITH COPI FACILIT Y SOLD TO A2M ENERGY GROUPxkÃ"ÂP@ ÂSxk xk Âxkþÿþÿþÿþÿþÿþÿþÿ²CP READINGS: T5 -1.2, -1.1, -1.09 T6 -1.3, -1.15, -1.13 T7 -1.29, -1.09, -1.09 5/14/08 REGISTRATION TO INSTALL NEW ISLAND, NEW PIPING W/DISPENSER SUMPS AND CONTINUOUS MONITORINGxkÃ.VÂ39 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ.WÂ> ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.XÃ6 ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.YÁ^ ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.ZÂ? ÂYxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã.[Â-\ ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ_PH 5/6/08 COPI - CTI DODGE INSTALLED APT PIPING TO DSL "PUMP", OMNTEC TANK & PIPING MONITORINGxlÃ.\Ã6 Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ‡CTI BEAUMONT TO REPLACE YELLOW PIPE-PH 5-1,2 CLEANED WATER OUT OF SUMPS AND RESEATED COVERS DISPENSER SUMPS HAD .5" WATER, REMOVED PHxl Ã.]à = ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ)REMOVER CONDENSATION FROM PIPING SUMPS PHxl Ã.^Ã+ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ._ÂN0 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.`ÂN% ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.aÃA ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ/CLEANED OUT SPILL BUCKET, REPLACED HAND PUMP PHxlÃ.bÃ, ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ.cÃ, ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿXREMOVED CONDENSATION FROM TRANSITION SUMP CP TEST LEAD ON VENT RISERM TESTED AT -1.09 PHxlÃ.dà < ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿÚCLEANED OUT SPILL BUCKET PH WINTER 2007 CTI DAVIS DUG UP VENT AT TANK TOP BECAUSE OF WATER INTRUSION INTO TANK. NEW VENT LINE INSTALLED STRAIGHT OUT OF TANK WITH BARRICADES. 5/9/08 CTI DAVIS REMOVED OLD VENT PIPING.xlÃ/à ; ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/Ã]% ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/ÃaA ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ±5/5/09-CTI EATON CALLED TO SAY INSPECTION AND P. TEST WILL BE DONE 5/27/09. LATE BECAUSE THE OWNER WANTED P. TEST AND AI DONE AT SAME TIME.-PH REMOVED RAGS FROM SPILL BUCKET PHxlÃ/ÃM ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃYÃGÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿ~5/29/08 COPI - CTI GEORGE INSTALLED VEEDER ROOT, REPLACED SNL SUMP, INSTALLED RNL YARD SUMP, REPLACED RNL & DSL SPILL BUCKETS xk Ã/Ã%J ÂUxlxlÁ`xk Ã03þÿþÿþÿþÿþÿþÿZOWNER PROVIDED COPY OF THE ANNUAL INSPECTION DURING DEP INSPECTION ON 5/19/08 W/EPA STAFF.xk Ã/Â12 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ4SUCTION RETURN LINES NOT SPACED, INSTALLED IN '86 PHxlÃ/ÂY[ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/Â]c ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/ Â^ ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ;COPPER SUCTION AND RETURN LINES NOT SPACED, INTALLED '87 PHxl Ã/ Â]M ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ8COPPER SUCTION/RETURN LINES NOT SPACED, INSTALLED '88 PHxl Ã/ Â2 ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ8COPPER SUCTION/RETURN LINES NOT SPACED, INSTALLED '89 PHxl Ã/ ÂY ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿdCOPPER SUCTION RETURN LINES NOT SPACED, INSTALLED '88 PH 8/4/08 COPI - CTI SIROIS INSTALLED FLAPPERxl Ã/ Â2T ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã/ÂQ4 ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã/ÂY ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã/Â]_ ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã/Â2 ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã/Âc^  xl xlÂxl þÿþÿþÿþÿþÿþÿþÿ+PUMPED AND CLEANED OUT 2" WATER FROM 3-2 PHxl Ã/ÂWC  xl xlÂxlþÿþÿþÿþÿþÿþÿþÿoAI STATES THAT LINES ARE NOT PROPERLY SLEEVED, BUT OWNER SAYS THEY ARE IN PVC CHASE, WILL INSPECT TO BE SURE PHxl Ã/ C  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/Â@ Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿWPH WENT OOS 1/30/2008 REQUESTED EXTENSION OF TIME TO REMAIN OOS DATED 12/2008. GRANTED UNTIL 12/31/2009. -LW CALL FROM JD THOMAS INC. FACILITY WENT OOS ABOUT 2/1/08, NO PAPERWORK FILED WITH DEP. ALSO IT IS FOR SALE WITH POSSIBLE CLOSING 11/08. TOLD THEM TO FILE PAPERWORK AS REQUIRED BY LAW. TR 9/23/08xl Ã/ÂG ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/ÂC. ÂRxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã/Â+Z ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃJÂYÂÂ)xkxkÂxk þÿþÿþÿþÿþÿþÿþÿÑ5/22/08 SPOKE WITH DENNIS DAVIS. CRASH VALVES ARE SET AT ABOUT 3/4" ABOVE/BELOW THE ISLAND TOP. THEY ARE HARD PIPED WITH FG PIPING. THIS FACILITY IS DUE FOR REBUILDING IN THE NEAR FUTURE AS IT WAS DESTROYED BY FIRE, THE DISPENSERS AND TANKS ARE STILL OPERATIONAL AND THEY USUALLY PUMP GAS FOR PEOPLE THERE. WAIVED THE "WITHIN 1/2 INCH" REQUIREMENT TEMPORARILY FOR MAXIMUM OF 12 MONTHS. THEY WILL THEN NEED TO DIG AND REPAIR IF NOT DONE EARLIER. TRxk Ã/Ã( ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ@9/3/08-COPI REC'D, CTI DAVIS INSTALLED NEW SPILL BUCKET ON #2 OIL TANK-PH 2-1 VOLUME TOO LOW FOR SIA TANKS#1,2,3 BALLFLOATS REPLACED BY COAX FLAPPERS IN DROP TUBES REPLACED METER ON DISPENSER #2 PH INVENTORY FOR PAST 3 MONTHS SUBMITTED, MAY WITHIN 1%+- PH 8/21/08 UPGRADE REGN FOR CTI GEORGE TO REPLACE HO SPILL BUCKETxlÃ/ÃY Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ/REPLACED TANK #2 FILL CAP AND VAPOR RECOVERY PHxlÃ/Ã` ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ˜1-1 SPILL BUCKET LID REPLACED 1-1 FILL AND VAPOR RECOVERY CAPS REPLACED 1-2 FILL CAP REPLACED 1-1 LLD NOT TRIPPING, REPLACED CONTACTOR AND TESTS FINE PHxlÃ/ÂU ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ@REPLACED 6 LEAKING METERS IN DISPENSERS 3,6,11,15-CTI N. GUAY PHxlÃ/Â: ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ4PH 7/28/08 COPI - CTI BARTON INSTALLED SPILL BUCKETxlÃ/ ÂE^ ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ1PH A.I. INSPECTION DATE IS 4/3/08 NOT 5/27/2008.xlÃ/!Ã%Z ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/"Ã< Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/#ÂNU Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿªNOITR REC'D FOR DULAC ENTERPRISES TO REMOVE TANK 2-PH PH BALL FLOAT CHECKED AND WORKING PROPERLY? BALL FLOAT TESTED FOR 90% SHUT OFF ON 5/19/08 DURING FILLING, PASSED-PHxlÃ/$ÃS8 Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/%Ãa\ Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿH6-1 SPILL BUCKET CLEANED OUT-PH SPILL BUCKETS CLEAN?: 6-1 CLEANED OUT-PHxlÃ/& ? ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/' > ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ:PH 9/6/08 COPI - CTI COUTURE INSTALLED 15 GAL SPILL BUCKETxlÃ/(Â$, Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ=5-1 SPILL BUCKET CLEANED OUT 6-1 SPILL BUCKET LID REPLACED PHxlÃ/)Â1  ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/*Â8 ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ}3-1 VEEDER ROOT TLS 300 LAMPS FAULTY, REPLACED POWER ON LAMP FAULTY-RECOMMENDED REPLACEMENT 3-1 AND 4-1 FILL CAPS REPLACED PHxlÃ/+Ã>4 ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿZVENT WHISTLE HARD PIPED, UNABLE TO REMOVE AND INPECT-RECOMMENDED REMOVAL AND INSPECTION PHxlÃ/,à  ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿœTANK HAS 1.5" WATER-RECOMMENDED REMOVAL TANK HAS REMOTE FILL, NO CONTAINMENT AT FILL, RECOMENDED WALL MOUNT OR FREE STANDING CONTAINMENT WITH LOCKING LID PHxlÃ/-àÂXxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ†TANK HAS .25" WATER COPPER LINES SLEEVED, BUT DO NOT APPEAR TO BE SPACED AT BOILER HOUSE END-RECOMMENDED THEY BE SPACED-'86 INSTALL PHxl Ã/.Ã3 Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxlÃ//Â3Z Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿm4-1, 4-2 ANNULAR SENSOR FAULTY, REPLACED 4-1, 4-2 FILL CAPS REPLACED 4-1, 4-2 VAPOR RECOVERY CAPS REPLACED PHxlÃ/0à  Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ~4-1 SUMP HAD WATER, AND TOP COLLAR ON FRP SUMP WAS CRACKED DURING INITIAL INSPECTION 5/9/08 5/21/08 SUMP REPAIRED CTI BUBAR PHxlÃ/1Â6\ Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿÌWHISTLE ON 5-1 INACCESSABLE , CAUSING FAIL FOR OVERFILL PREVENTION PH ***************** AS TANK WAS INSTALLED IN 1987, WE CANNOT FORCE THEM TO CHANGE THE WHISTLE OUT, OR RESITUATE IT. ENTERED AS A PASS PHxl Ã/2ÂQ Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/3Â- Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿŽSUMP CLEANED OUT AND LID CLEANED AND REATTACHED DISPENSER SUMP HAS FLOAT AND CHAIN ATTACHED TO CRASH VALVE THAT CLOSES IS WATER ENTERS SUMP PHxlÃ/4Ã`4 ÂTxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÂR+Á@ÂÂxixiÂ6xi þÿþÿþÿþÿþÿþÿþÿ»OOS FORM SUBMITTED, BUILDING CURRENTLY FOR SALE. LEAK DETECTION FUNCTIONING, FILL PIPES LOCKED, VENT LINES OPEN. CHECK NOTES ON UST INSPECTION TAB DATED 5/27/08. TANK MUST BE REMOVED. TRxiÃ/5ÃQ ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/6Ã`" ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/7ÂQO ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/8Ã]  ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/9ÃBN ÂxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ¿NO INTERSTITIAL ACCESS. DW TANK. OWNER MUST GET ACCESS BEFORE TOO LATE IN SEASON TO DO WORK. CP TO BE RETESTED. -ML 7/28 MIKE MARTUNAS SAYS PLANNING TO REMOVE MID-AUGUST. SUBMITTING NOI. xlÃ/:Â0 ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/;Â$ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿJREPLACED FILL CAP AND ADAPTOR ON 7-1 REPLACED VAPOR RECOVERY BUCKET LID PHxlÃ/<ÂY Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿh11/17/08-INTENT TO ABANDON FORM RECIEVED, ALL TANKS-CTI THOMPSON, ACADIA TO DO SA PH 7-1 CLEANED OUT SPILL BUCKET, REPLACED BRASS ADAPTOR AND GASKET CRASH VALVES ON 1/2 AND 3/4 SET AT 1" ABOVE ISLAND SURFACE. T. RECTOR GAVE OK TO PASS THIS YEAR AS UPCOMING WORK INVOLVING DISPENSERS IS SCHEDULED PH @#@#@#@# SEE UST INSPECTION NOTE - OOS 10/16/08 @#@#@#@#@xlÃ/=Â1^ ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã/>ÂW ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ*PIPING SUMP FULL OF WATER-ALARM TRIPPED AND DEP CALLED TANK PROBE IS IN SUMP, UNDER WATER AND COULD NOT BE CHECKED AT THAT TIME SPILL BUCKET CLEANED OUT WEEPS FOUND ON DISPENSERS, TIGHTENED SCREWS AND PLACED PADS UNDER TO CATCH ANY MORE-REPORTED TO DEP PH WATER PUMPED OUT REPLACED LEAKING METER xl Ã/@Â5  Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/AÃK ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ/BÃ` Â)xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ>KEY BANK HAD TWO DIFFERENT INSPECTIONS DONE FOR SOME REASON-PHxlÃ/CÃb Â:xlxlÂxlÃ1*þÿþÿþÿþÿþÿþÿ2REMOVED SMALL AMOUNT OF SURFACE WATER FROM SUMP PHxlÃ/DÃUE ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/EÃ= ÂBxlxlÂxlþÿþÿþÿþÿþÿþÿþÿÍINSPECTION FORM SAYS 10,000, REGISTRATION SAYS 20,000, REGISTRATION APPEARS TO BE OLD PHOTOCOPY-WILL CHECK WITH OPERATOR PH TALKED TO TOM HAMILTON, HEAD OF FACILITIES-TANK IS IN FACT 20000 GALLON-6/3/08-PHxlÃ/FÂZ- ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿzTANKS 15 & 16 REMOVED 6/25/08 10/12/07 UPGRADE REGN FOR CTI BISKUPIAK TO REPLACE VENT BALLS ON TANKS 9, 10, 11 W/FLAPPERSxkÃ/GÂXF ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ÷6/1/09-UPGRADE REG FOR CTI SIROIS TO INSTALL NEW SUCTION LINE TO DISPENSER PH 2/2/09-COPI REC'D FOR FOLLOWING WORK-PH 1/9/09-INTENT TO ABANDON VENT LINE-WILL BE REPLACED, CTI SIROIS TO DO WORK 1/26/09-UPGRADE REG. REC'D TO REPLACE VENT LINE-PH PHxlÃ/HÂ]d ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/IÂYZ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/JÂQP ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/Kà F ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿCP READING= -1.05 PHxlÃ/M b ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/N a ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/O ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/QÂ- ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/RÂb ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/SÃK  ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/TÂ& ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/UÂ]$ ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/VÂ]0 ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/WÂ& ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/XÂ= ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/YÃW ÂxlxlÂ(xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã/ZÂ^ÂÂUxlxlÂ(xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ/[Ã]4 ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ/\ÂS ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ>PASSING UST AI ENTERED PH PASSING AST INSPECTION 5/15/2008. BBxlÃ/]Âd;ÂÂxlxlÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ/^Á] ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/_ÁH ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/`Á\ ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ)NàÂRxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ33/24/2009 RECIEIVED AI DATED 11/30/2008. MISSING ATG PRINT OUT. JOE BOSSE TO SEND IN. WILL ENTER AI INTO TANKS WHEN PRINTOUT IS RECIEVED. -LW CLAIMS TO BE USING AN ATG NOW FOR LEAK DETECTION. SLIP ATTACHED TO THE REPORT WITH PASSING RESULTS BUT STILL LISTED AS SIA. CSLD DATE IS 11/29/07, INSPECTION IS 11/28/07. TR 6/2/08 JO BOSSE CALLED RE: SIA NOV. CSLD HAS BEEN SET UP FOR 2 YEARS, TOLD TIM LAST YEAR. I TOLD HIM IT WAS NOT PROPERLY REGISTERED - JUST SENDING SLIP WITH AI ISN'T SUFFICIENT. WE MUST RECEIVE ATG REGISTRATION FORM AND SETUP REPORT. -MLxk Ã/aÁY ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ/bÃEY ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ(9Â]< ÂKxk xk ÂxlþÿþÿþÿþÿþÿþÿþÿANNULAR SENSOR SHORTING OUT TANK CP; MUST ISOLATE BEFORE RETEST 11/5 BERT CALLED TO NOTIFY ME THAT CP FAILED, TOLD HIM MUST RETEST TO PASS OR BE REPAIRED. -ML 5/27/08 OWNER SAYS PASSED RETEST, AI IN MAIL. -ML 5/16/08 PASSED AI PER CTI PAUL BROWN-CP:-.94 PHxk Ã/cÂT? Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿDROP TUBE REPLACED PHxlÃ/dÃJ Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0ÂTH Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0   xlxlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã0ÂS ÂKxlxlÂxl Ãþÿþÿþÿþÿþÿþÿ5OMNTEC CONNECTIONS FAULTY AND WERE REWIRED TO PASS PHxl Ã0Â?" ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿi7-1 LLD REPLACED TO PASS 6-1 AND 8-1 FILL CAPS REPLACED TO PASS K-1 DISPENSER SUCTION, NOT PRESSURIZED PHxlÃ0Ã[  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿÇ1-1 VAPOR RECOVERY ADAPTOR HAD TO BE CUT OFF TO CHECK BALL FLOAT, THEN REPLACED 1-1 FILL CAP REPLACED 6 OF 8 DISPENSER FILTERS WERE LEAKING AS THEY WERE NOT CHANGED IN OVER 4 YEARS-ALL 8 REPLACED PHxlÃ0  ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿÎEXISTING VEEDER ROOT CONSOLE WAS FOUND IN COMPLETE DISFUNCTIONAL DISPREPAIR. VEEDER ROOT OVERFILL ALARM ADDED AS WELL-CTI TRASK 5/22/08 COPI - CTI TRASK INSTALLED TLS 300C, TANK AND PIPING MONITORING PHxlÃ0 ÂRM ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0 Ã7U ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0   ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ#REPLACED 2 BULBS ON PNEUMERCATOR PHxlÃ0 ÂSBÂÁ$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ_SUMP REPLACED, LIGHT REPAIRED ON CONSOLE, CLEANED DSL SPILL BUCKET, REPAIRED DSL DISPENSER WEEPxlÃ0  ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ,REPLACED LAMP ON CONSOLE AND AUDIBLE HORN PHxlÃ0Â3< ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0àÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ†TANK 6-1 WAS INSPECTED AND PASSED 5/15/08 HAS AN ABOVE GROUND SPILL "BOX" PH TANK 5-1 AI 5/19/08 AND PASSED-AI INDICATES TANK 5-1 FACILITY NAME "HAYDEN HOUSE", PRESUMABLY NOT ASSOCIATED WITH "REED CENTER" VEEDER ROOT TLS-300 REPLACED WITH OMNTEC LU-3 WITH INTERSTICE MONITOR, HI LEVEL ALARM AND PETROMETER PUMP UPGRADE PH 5/23/08 COPI - CTI TRASK INSTALLED LU-4, TANK AND PIPING MONITORINGxlÃ0 ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ#REPLACED 2 BULBS ON PNEUMERCATOR PHxlÃ0ÂSZ ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ1REPLACED VEEDER ROOT SUMP SENSOR-CTI- R. TRASK PHxlÃÃ*ÂÂUxkxkÂxlþÿþÿþÿþÿþÿþÿþÿG6/18/08 COPI - CTI BISKUPIAK INSTALLED SPILL BUCKETS ON RNL, PREM, PLUSxk Ã0à ! ÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ0àÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ0Ãa( Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ+NEW TOTAL CONTAINMENT LID ON DIESEL SUMP-PHxl Ã0ÂQN Âxk xlÂxlÃ3þÿþÿþÿþÿþÿþÿPHxlÃ0ÂM  ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0Ã. ÂKxlxlÂxlÃAþÿþÿþÿþÿþÿþÿAPT FLEX PIPING ON 1-1 PHxlÃ0Â.  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0Â. ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0ÂR9 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0Ã. ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0Â28 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0Ã1 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0ÂGH ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0ÂGD ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0 ÂK  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0!Ã-a ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0"ÂGL ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0#ÂA ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0$ÂGK ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0%ÂG ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0&ÃD" ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0'ÃI ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0(Ã!] ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0)ÂP ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0*Âdb ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0+Ã#P ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿƒ7/28/09-COPI FOR CTI SIMARD WHO INSTALLED FLAPPER OVERFILL PH 2/4/09-COPI- CTI SIMARD INSTALLED NEW 15 GALLON SPILL BUCKET PH PHxlÃ0,ÂY ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0-Â]S ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0.ÂQ7 ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ!SOME WATER REMOVED FROM MANWAY PHxlÃ0/Â]D ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ00ÂGN ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿCURRENTLY OUT OF SERVICE-PHxlÃEÃ`&ÂÂ)xk xk Âxkþÿþÿþÿþÿþÿþÿþÿç6/4/08 TELEPHONE CALL FROM CHRIS WILSON CTI OF LES WILSON AND SONS. PRODUCT LINES ENCOUNTERED DURING BUILDING EXPANSION. THEY WERE INSTALLED CLOSER TO THE BUILDING THEN THOUGHT. THE NEW BUILDING FOOTING WILL HAVE AN ARCH OVER THE PIPING RUN AND THEY WILL NOT REPLACE THE PIPING. THE NEW BUILDING WILL HAVE SIGNAGE INDICATING BURIED GAS LINES UNDER THE CORNER AND CHRIS WILSON WILL SUBMIT A LETTER AND PHOTOS DOCUMENTING THE WORK TO ADD TO THE REGISTRATION FILE. TRxkÃ01Ã"A Á xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿCPIPING SCHEDULED FOR REPLACEMENT. BB PIPING REPLACED 10/17/2008. BBxl Ã*^Â' Á xk xl ÂþÿÃ!>þÿþÿþÿþÿþÿþÿHELECTRONIC MONITORING DISCONNECTED FOR REMODELING OF STORE. REINSTALLATION SCHEDULED FOR FIRST WARM ENOUGH DAY FOR EXCAVATION FOR CONNECTING UG CONDUIT. REMOVED APPROX 1 CUP WATER EACH FROM TANK 4 AND TANK 6 INTERSTICES. APPEARS TO BE ACCUMULATION OF CONDENSATION, WILL CONTINUE TO MONITOR. OWNER SUBMITTED INVOICE FOR GAUGE STICK AS PROOF OF PURCHASE -ML AI/CP FAIL LETTER 1/11/08 -ML 6/5/08 WALT LONGFELLOW CALLED - GIFFORD TESTED CP AS PASSING, INTERSTITIAL MONITORING SYSTEM WAS WORKING LAST WEEK BUT NOW ONE ZONE WON'T CLEAR. GIFFORD AND ELECTRICIAN CHECKING CONNECTIONS AND WIRING, PASSING AI PENDING. -ML 10/27/08 CALL FROM WALT LONGFELLOW, THEY ARE MISSING 225 GALLONS OF GAS, ALLEDGED TO HAVE BEEN STOLEN. TOLD HIM TO REPORT IT TO THE POLICE. NO OTHER ACTION BY DEP. OVERDUE FOR PASSING AI.. TJR 10/27/08xk Ã02Ã2 ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ”FILL CAP AND ADAPTER REPLACED SPILL BUCKET CLEANED OUT FAULTY SENSOR WIRING REPLACED 4/21/08 BY CTI M. LEWIS VEEDER ROOT CONSOLE FULLY FUNCTIONAL PHxlÃ03ÂE Âxl xlÂxl þÿþÿþÿþÿþÿþÿþÿxALL APPEARS TO BE A PASS, AND JEFF HAS BEEN NOTIFIED TO SEND IN COPPER PIPING PAGE TO COMPLETE THIS INSPECTION-6/6/08 PHxl Ã04Â^ ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ05àÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ06ÂY ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ07Â]U ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ08Â]K ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ09ÂY5 ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0:Ã_ ÂZxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ¡TANK #5-PAN UNDER PIPING IN BOILER ROOM WITH LIQUID SENSOR FILL CAP REPLACED FLAPPER NOT SET AT 95% CAPACITY-REPAIR RECOMENDED ELECTRONIC OVERFILL SENSOR REPLACED TANK HAD 2.5" WATER-RECOMMENDED REMOVAL TANK # 9- PAN UNDER PIPING IN BOILER ROOM WITH LIQUID SENSOR WIRING IN SUMP SEALED WITH EPOXY PACK FILL CAP REPLACED TANK HAS 2" WATER-RECOMMEND REMOVAL TANK #3- SMALL AMOUNT OF WATER REMOVED FROM PIPING SUMP PIPING SUMP SENSOR REPAIRED SUMP HAS DEEP CRACK IN BOTTOM, NOT ALL THE WAY THROUGH, STILL LIQUID TIGHT-RECOMMENDED REPAIR FILL CAP REPLACED TANK #7 FILL CAP REPLACED TANK #4- FILL CAP REPLACED MANWAYS AND SPILL BUCKETS IN GRASS AREA, RECOMENDED SLAB TANK #2- FILL CAP REPLACED PROBE WIRING BOX CORRODED-REPLACEMENT RECOMMENDED REMOVED AND CLEANED ATG PROBE PH TANK #5 HAS BOTH FLAPPER AND ELECTRONIC OVERFILL-FLAPPER NOT SET CORRECTLY, BUT ELECTRONIC IS FINE AND WILL SHUT OFF 5% BEFORE FLAPPER WOULD EVER CLOSE PHxlÃ0;ÃC ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0<ÃA> ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0=Â7/ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿCALL LINES TO BE REPLACED. ANNUAL WILL BE COMPLETED AFTER REPLACEMENT. TED 3/10/09-CTI GEORGE WILL BE DOING WORK ON SUPER PRODUCT LINE TO REPAIR BREACH-PH REPLACED TANK 9 BRINE SENSOR TANK 10 FLAPPER TUBE CAME OUT VERY HARD, BUT WAS CHECKED AND WAS FINE. WILL COME OUT HARD NEXT YEAR TOO TANK 10 VAPOR ADAPTOR REPLACED PHxlÃ0>Â2D ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0?Â2G ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0@ÂU& ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0AÂ$M ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0BÃb] ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0CÃXD ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0DàÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿL6/3/09-COPI REC'D FOR CTI BISSON TO REPLACE 7-1 AND 7-2 SPILL BUCKETS-PH PHxlÃ0EÃW ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0GÂ*  ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0HÃ. ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPRODUCT PIPE CP READING--.95 PHxlÃ0IÃ8  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ®7/21/09-UPGRADE REG. FOR CTI SIMARD TO REPLACE SPILL BUCKET ON DIESEL TANK, NOT SURE WHICH ONE PH 7/23/09-COPI FROM CTI SIMARD WHO REPLACED THE "FILL PIPE" ON TANK #1 PH PHxlÃ0JÂP ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0KÃ`& ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ!PH SEE PICTURES FILE ON H DRIVE FOR THIS FACILITY. PIPING RUNS UNDER THE CORNER OF THE BUILDING DUE TO EXPANSION. 6/11/08 TR PHOTOS OF THE INTERIOR BUILDING SIGNAGE INDICATING LINES UNDER THE CORNER OF THE BUILDING ARE IN THE FILE. TR 7/23/08xlÃ0LÂL$ ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0MÃ/\ ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0OÂ$% ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ‰BRINE SENSORS IN BOTH 4 AND 5 NOT INITIALLY WORKING, ONCE REWIRED ON 5/14/08, THEY TEST OK TANK #5 FLAPPER VALVE REPLACED-CTI N. GUAY PHxlÃ0PÃb[ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ REPLACED CONSOLE BULB TO PASS PHxlÃ0Q Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿiONE SENSOR FOR SUMP ALARM, SECOND SENSOR FOR OVERFILL ALARM WITH HORN OUTSIDE SPILL BUCKET CLEANED OUT PHxlÃ0RÂYA ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0SÂ3U ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0TÂY- ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0UÂY3 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0VÂY? ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0WÂ3X ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0XÂY) ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0YÂ3W ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0ZÂ1_ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0[ÂL ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0\Â]T ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0]ÃV  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã0^Ã5  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã0_ÃbV  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã0`Â#)  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ0aà xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã0bÃ:  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã0cÃ]S  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã1 ÂIxlxlÂxlà '+þÿþÿþÿþÿþÿþÿo6,7,8 FAILED DUE TO GREATER THAT 1% OVER/SHORT PRODUCT PIPE READINGS FOR 6,7,8,9: -.851, -.853, -.932, -.930 PHxlÃ1Ã] ÂXxl xl Á`xl þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.871, -.872xl Ã1Â6& Â\xl xl Á`xlþÿþÿþÿþÿþÿþÿþÿ?CP DONE BY MICHAEL LEWIS 4/10/08 TR TANK READING: -1.16, -1.06xlÃ1ÂM Â\xl xl Á`xlþÿþÿþÿþÿþÿþÿþÿ>CP TESTED BY MIKE LEWIS 4/11/08 TR TANK READING: -1.35, -1.26xlÃ#ÃY6 xjxjÂxj þÿþÿþÿþÿþÿþÿþÿÎ6/23/08 OWNER JOHN DECEASED, WIFE DIANNE AND SON LANCE OPERATING. LANCE CALLED TO GET DATE OF LAST AI, WILL HAVE DONE ASAP. -ML TELEPHONE CALL 6/9/08 FROM PROSPECTIVE BUYER. HE INDICATED THAT THE BANK WAS IN POSSESSION OF AN OLD (1 -3 YEARS AGO) PHASE I AND PHASE II SITE ASSESSMENT THAT FOUND CONTAMINATION. APPARENTLY THE CONTAMINATION WAS CLEANED UP BUT NO REPORT WAS MADE TO DEP. DISCHARGE WAS IN THE DIESEL DISPENSER AREA. TR 6/9/08xj Ã1 / ÂIxlxl Âxl Ã%I@þÿþÿþÿþÿþÿþÿPHxl Ã1Ã^# ÂIxlxl ÂxlÃ@LPþÿþÿþÿþÿþÿþÿPHxlÃ1Â96 ÂDxlxl ÂxlÃB þÿþÿþÿþÿþÿþÿ¥TANK READING: CP UPGRADE SCHEDULED FOR JUNE-CTI JOHN JOHNSON PH 6/13/08 COPI - CTI JOHNSON OVERSAW PCA ENGINEERING ADD ANODES 7/7/08 UPDATE AI W/PASSING CP READINGSxlÃ1 Â. ÂIxlxl ÂxlÃC)þÿþÿþÿþÿþÿþÿREPLACED #6 FLAPPER PHxlÃ1   Â!xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿZ10/22/08-INTENT TO ABANDON RECIVED, CTI MULLINS TO OVERSEE-PH CLEANED OUT SPILL BUCKET PHxlÃ1 ÂV Â!xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1 Ã9 ÂXxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1ÂF ÂXxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1Â` ÂXxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1ÃQ ÂXxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1Ã] ÂXxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1Ã9 ÂTxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1Âc ÂTxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1ÂN] ÂTxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1à  ÂTxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1ÂL` ÂTxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1Ã8X ÂTxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1ÂY' ÂZxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1ÂY_ ÂZxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1Â]B ÂZxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1Â]N ÂZxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ5PH 11/10/08-INTENT TO ABANDON RECIEVED-CTI SIROIS-PHxlÃ1ÃbW Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1ÃG Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿöCOPI REC'D 11/26/08-CTI GEORGE REPLACED DISPENSER SUMPS AND REPLACED PIPING LINES ONLY, NOT VENT OR VAPOR LINES ON ALL THREE TANKS-PH REMOVED WATER FROM UNDER DISPENSERS # 1/2, 3/4, 5/6, 9/10 REMOVED TEST DONUTS FROM PIPING UNDER 3 DISPENSERS PHxlÃ1 Â?4 Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿT#9-2 SUMP SENSOR REPLACED TANKS HAS STATION LISTED AS OOS, AI REFLECTS IN SERVICE PHxlÃ1!Ã1 Â-xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ%REPLACED FILL ADAPTOR-CTI J. PAINE PHxlÃ1"ÃR+ Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ)COPPER PIPING RUNS IN SEPERATE SLEEVES PHxlÃ1#ÃB Â\xl xl Á`xlþÿþÿþÿþÿþÿþÿþÿH TANK READING: BY MIKE LEWIS 4/11/08 THROUGHPUT 590,000 GALLONS IN 2007xlÃ1$Â" ÂHxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ1%ÃV4 Â\xl xl Á`xlþÿþÿþÿþÿþÿþÿþÿ3 TANK READING: -1.31, -1.33 BY MIKE LEWIS 4/11/08xlÃ1&ÂR ÂTxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1'Â; ÂXxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1(Ãd9 ÂXxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿD11/13/08-COPI RECIEVED, CTI COUTURE INSTALLED 15 GAL SPILL BUCKET-PHxlÃ1)ÃV3 Â\xl xl Á`xlþÿþÿþÿþÿþÿþÿþÿ1 TANK READING: MIKE LEWIS 4/11/08 -1.00, -1.07xlÃ1*ÂQ" ÂHxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ1+Â) Âxl xl Á`xlÃ[.OþÿþÿþÿþÿþÿþÿþÿxlÃ1,ÂRS Âxl xl Á`xlÃc7OþÿþÿþÿþÿþÿþÿþÿxlÃ(,ÃF Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ[6/11/08 CALL FROM MIKE SIMARD REGARDING 2 MONITORING WELLS ON SITE. THE CAP FOR ONE IS BROKEN/MISSING AND IS NOT REPLACEABLE (NO LONGER MADE). MIKE ASKED FOR AND I GAVE PERMISSION TO CAP MONITORING WELL WITH BROKEN COVER WITH CONCRETE SO IT WILL NO LONGER BE ACCESSABLE, SECOND WELL IS STILL THERE. TR xk Ã1-Â\@ Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ1.à D Â#xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ¼ACCORDING TO INSPECTOR METHOT, THEY WERE NOT ABLE TO REMOVE VAPOR RECOVERY BUCKET COVER ON TANK #3-WE WILL INSPECT PH CTI METHOT RETURNED TO FACILITY AND INSPECTED VAPOR RECOVERY-PASS PHxlÃ1/Ã9 Â!xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ‚WHEN CTI MULLINS ARRIVED, INTERSTITIAL WAS IN ALARM-CALLED T. RECTOR. ALARM SENSOR TURNED OUT TO BE FAULTY- REPLACED. AYSTEM OK PHxlÃ10 Â Â!xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ^PUMPED 2" WATER OUT OF SUMP- CALLED T.R., APPEARED TO HAVE COME IN FROM LID- SURFACE WATER. PHxlÃ11ÃO Â!xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ’PUMPED WATER OUT OF SUMPS, CALLED DEP. WATER INFILTRATION COMING IN THROUGH LID MOUNTING SCREWS. INSTALLED NEW O-RINGS, CAULKED INSIDE AND OUT. PHxlÃ12Â2 ÂZxl xl Âxlþÿþÿþÿþÿþÿþÿþÿu5/29/09-NOITA REC'D FOR CTI SIROIS TO PULL TANK #5 PH SOME SURFACE WATER REMOVED FROM MANWAY, DID NOT ENTER SUMP. PHxlÃ13ÂYE Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã14ÂL Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã15ÂY Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã16ÂY Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã17ÂQ5 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã18ÂY  Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ19Â]Z Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1:ÂYD Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1;ÃT" Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã1<ÃR# Á xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ1=Â=G Á xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿTANK 3-2 CONVERTED TO DIESEL.xlÃ1>Â(/ Á xl xl Âxlþÿþÿþÿþÿþÿþÿþÿp1/21/09-COPI REC'D, CTI BEAMOUNT REPLACED 6-1 SPILL BUCKET, AND REPAIR OR REPLACE STAGE I VR ON TANKS 4 AND 5 PHxlÃ1?ÂO Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ>INTENT TO ABANDON PIPING RECIEVED 10/20/08-NEW REG. FOR PIPING RECIEVED-CTI COUTURE TO DO REPLACEMENT-PH WATER REMOVED FROM PIPING SUMP, 1QT. WATER REMOVED FROM INTERSTITIAL, LOWERED INTERSTICE SENSOR TO BOTTOM OF TANK-CTI ARBOUR-4/24/08 5/15/08-CTI D. DAVIS REMOVED SOME SOIL FROM AROUND SUMP AND REPAIRED GASKET PHxlÃ1@Â@` Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ/10/1/08-REGISTRATION FOR PIPING REPLACEMENT ON TANK 1-S CHAMBER GAS TANK-CTI SIMARD TO DO WORK-30 DAY REMOVAL WAIVER FROM RESPONDER SHANNON PH TANK 5, NOT SURE WHICH CHAMBER, NEEDED NEW TOTAL CONTAINMENT SUMP LID (CRACKED)-CTI ARBOUR-5/19/08 32" TC LID REPLACED WITH 33" LID BY CTI D. DAVIS 5/30/08 PHxlÃ1AÂ? Áxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ…ALL 3 TANKS FAILED FOR DAILY INVENTORY-PH 6/17/08 WEBBER SUBMITTED INVENTORY FOR ALL 3 TANKS FOR MARCH AND APRIL-ALL WITHIN 1% +- PHxlÃ1Bà G Á xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ¬11/6/09-REGISTRATION REC'D FOR CTI BEAUMONT TO INSTALL NEW 1.75" APT PIPING INSIDE THE FAILED 2" THAT IS CURRENTLY PRESENT ON THE 4,000 GALLON GAS CHAMER OF THE TANK-PH PHxlÃ1CÃ3 Á xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1DÂ:( Á xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1EÂZ/ ÂXxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1FÁ ÂRxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã1GÂO Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ1Hà b  xl xl Á`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã1IÃ( Â!xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃÂQZÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿw2/28/08 TANKS 2 & 3 PATTERN OF LOW THRUPUT, O/S >1%. TOLD MGR ALICE HERRICK TO WARN OWNER THAT MUST CONTINUE TO REPORT, AND THAT REPEATED INSTANCES INDICATE NOT EFFECTIVE LEAK DETECTION METHOD FOR THOSE TANKS, NEED TO PLAN FOR INSTALLATION OF ATG. -ML 4/9/08 OWNER REPORTS NOT PUMPED GAS SINCE MID-MARCH FOR FINANCIAL REASONS. DON'T KNOW IF WILL RESUME BEFORE MID-JUNE. EXPLAINED OOS REQMTS; LETTER. 5/27/08 PLANS TO RESUME DISPENSING, WORKING OUT DEAL W/DISTRIBUTOR. -ML 6/18/08 DAVE WRIGHT OF DYSARTS CALLED TO NOTIFY WILL DELIVER FUEL TODAY. OWNER HAS AI SCHEDULED, DAVE WILL REMIND TO SEND IN INVENTORY DATA FOR SIA. -MLxkÃ1JÂ[; ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1LÃ! ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ"PRODUCT PIPING CP READING -.870 PHxlÃ1MÂ[6 Á$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ‰SPILL BUCKETS CLEANED CONTINUOUS INTERSTICE MONITORING IS PRIMARY LEAK DETECTION METHOD, BUT FACILITY DOES HAVE CSLD WHICH ALSO PASSED PHxlÃ1NÂ[7 Á$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ–CONSOLE IN ALARM WHEN CTI D. DAVIS ARRIVED, DEP NOTIFIED OF SUMP ALARM. WATER REMOVED, OPERATOR TOLD OF REPORTING REQUIREMENT SPILL BUCKETS CLEANED PHxlÃ1OàÁxl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1PÂ[: Á$xl xlÂxlÃF;Yþÿþÿþÿþÿþÿþÿ>NOW PUMPING E10 SOIL REMOVED FROM AROUND VAPOR REC. ADAPTOR PHxlÃ1QÂ[9 Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿSPILL BUCKETS CLEANED PHxlÃ1RàÁ$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ6PH 3/21/08 COPI - CTI LEGASSE JR REPLACED 42" MANHOLExlÃ1SÂ[5 Á$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿäFACILITY USES INTERSTICE MONITORING FOR LEAK DETECT. BUT HAS CSLD, BOTH WORKING WELL TANK 4 AND 5 INTERSTICE CAPS REPLACED REPLACED SUMP LID ON TANK 5-20" OPW FIBERLITE TANK 6 VAPOR RECOV. ADAPTOR SHORTENED TO NOT CONTACT LID PHxlÃ1TÂ[3 Á$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿæSPILL BUCKETS CLEANED TANK 5 INTERSTICE RISER CAP REPLACED PH 7/23/08 UPGRADE REGN FOR CTI LEGASSE JR TO INSTALL LARGER MANHOLE TO IMPROVE SUMP DRAINAGE 7/28/08 COPI - CTI LEGASSE JR REPLACED 18" MANHOLE OVER INTERSTITIAL SENSORxlÃ1UÂ[L Á$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ4TANK 5 FILL CAP REPLACED TANK 6 SUMP LID REPLACED PHxlÃ1VÂ[< Á$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ:CLEARED FALSE HIGH WATER ALARM. FLOAT WAS STUCK, FIXED. PHxlÃ1WÂ[> Á$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿFACILITY IS USING INTERSTICE MONITORING AS PRIMARY LEAK DETECTION, BUT ALSO HAS CSLD, BOTH PASSING SPILL BUCKETS WERE CLEANED, HAD "A LOT OF CRAP" IN THEM PHxlÃ1XÂ[? Á$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ¥REPLACED TANK 4 ANNULAR SPACE SENSOR PH 9/16/08-CTI LEGASSE-COPI-INSTALLED 3 NEW 42" MANHOLE LIDS AND RINGS, 3 NEW 15 GALLON SPILL BUCKETS AND 4 MONITORING WELLS PHxlÃ1YÂ[A Á$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ(SPILL BUCKETS CLEANED, COVERS PAINTED PHxlÃ1ZàÁ$xl xlÂxlþÿþÿþÿþÿþÿþÿþÿˆTANK 5 SUMP IN ALARM WHEN CTI D. DAVIS ARRIVED, NOTIFIED DEP, REMOVED WATER. REPLACED TANK 5 VAPOR RECOV. COVER CLEANED SPILL BUCKETS PHxlÃ1[àÂ[!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ|CTI P. THOMPSON STATES THAT TANK 6 IS PROPERLY OUT OF SERVICE. TANKS 7 AND 8 AND "IN SERVICE" BUT ARE PLANNED FOR REMOVAL PHxl Ã1\Â6/ ÂTxl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1]Ã^ ÂTxl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ1^Â. Âxl xlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã1_Âd<  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã1`ÂP>  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿMPH 8/18/08 COPI - CTI SIMS INSTALLED OMNTEC LU2 FOR TANK & PIPING MONITORINGxl Ã1aÂ>D  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã1bÂ&)  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã1cÃ^K  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã1dÃ:R  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã2ÃR  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã2Â18  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã2 P  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã2ÃP`  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã2à J ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2Ã8@ ÂTxl xlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2Â3  xl xlÂxl þÿþÿþÿþÿþÿþÿþÿa6/22/09-UPGRADE REG FOR CTI LAGASSE TO INSTALL NEW COPPER LINES, SLEEVED, NEW SUMP AND SENSOR. PHxl Ã2 ÃX Â#xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2 ÃH ÂKxlxlÂxk þÿþÿþÿþÿþÿþÿþÿPHxk Ã2 Â' ÂKxlxlÂxk þÿþÿþÿþÿþÿþÿþÿPHxk Ã2 Â' ÂKxlxlÂxkþÿþÿþÿþÿþÿþÿþÿPHxkÃ2Ã5+ ÂKxlxlÂxk þÿþÿþÿþÿþÿþÿþÿPHxk Ã2Ã/Y ÂKxlxlÂxk þÿþÿþÿþÿþÿþÿþÿPHxk Ã2Â' ÂKxlxlÂxk þÿþÿþÿþÿþÿþÿþÿPHxk Ã2Ã@  ÂKxlxlÂxk þÿþÿþÿþÿþÿþÿþÿPHxk Ã2Âb ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2Â.% ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2àÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2Â> ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2à / ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2Â/> ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2ÂEU ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2à * ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿI2/20/09-COPI REC'D, CTI SCOTT REPLACED SPILL BUCKET "OVERFILL MANHOLE" PHxlÃ2Ãa ÁxlxlÂxl þÿþÿþÿþÿþÿþÿþÿtINVENTORY RECORDS NOT ACCESABLE 5/28/08 CTI D. DAVIS REPLACED TANK 5-1 LLD 9/23/08-JUNE AND JULY DI RECIEVED-PASS PHxlÃ2Â9 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿÍ7/30/08-REMOVAL NOTICE RECIEVED FOR TANK #5- TANK 5, NO SLEEVING OR SPACING ON COPPER LINES, NO SUMP OR ACCESS TO LINES TANK 3 FILL CAPS REPLACED CUT OFF ADAPTOR ON TANK 2 TO REPLACE DROP TUBE-CTI GUAY PHxlÃ2Â.  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿÏALL 3 SUMPS HAD WATER IN THEM THAT WAS REMOVED. THE PIPING SUMP, UPHILL, WAS AT FAULT AS WATER WOULD FOLLOW SECONDARY PIPING DOWN TO DISPENSER SUMPS. SENSORS IN ALL THREE WERE LOWERED TO BOTTOM OF SUMPS. PH xlÃ2Ã&J ÂxlxlÂxlÃ!3þÿþÿþÿþÿþÿþÿrREPLACED TANK 1 ANNULAR SENSOR, TESTED CONSOLE-PASS OWNER MADE AWARE OF PAST LEAKAGE AROUND BOTTOM OF DISPENSER #4xlÃ2Â( Â#xl xlÂxlþÿþÿþÿþÿþÿþÿþÿçTHE AI IS NOT COMPLETE AS FACILITY HAS CONTINOUSLY MONITORED DOUBLE WALL PIPING, AND THAT SECTION OF THE FORM WAS BLANK. DID NOT CATCH THAT UNTIL ML POINTED IT OUT PH CTI DON METHOT HAS AMMENDED HIS AI AND EVERTHING NOW PASSES. PHxlÃ2 ÂB ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ2!ÂS)  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ)ÂB4ÂÂxkxkÂxkÃa þÿþÿþÿþÿþÿþÿþÿxkÃ2#ÂS-  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ2$Ã6 ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿXHAS REMOTE ABOVEGROUND 2" SCULLY FAST FILL WITH A DOUBLE WALLED FILL PIPE PER CTI TRASK.xlÃ2%Â1a ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2&Â8 ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2'Ã$_ ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2(ÂB' ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2)Ãa2 ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2*Ã(Y Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ REPLACED FILL CAP AND ADAPTOR PHxlÃ2+ÂV Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã2,àÂ\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿæREMOVED SMALL AMOUNT OF WATER FROM SUMP REMOVED SOME SOIL AROUND SUMP LID TO MAKE BETTER SEAL PH 6/27/08 COPI FOR CTI WILSON TO REPLACE EXISTING TANK MONITORING SYSTEM W/TLS 300C W/ELEC OVERFILL W/NEW INT. PROBE AND SUMP PROBE-PHxl Ã2-Ã, ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ 8/11/08-CTI GEORGE FIXED FLAPPERS AND REPLACED TANK 6 SPILL BUCKET LID-PH CTI GEORGE DUG DOWN UNDER DISPENSER TO ID PIPING - AOSMITH FIBERGLASS. BELIEVE 2 CP TEST LEADS GO TO TANK RISERS AND CONDUIT INSIDE DISPENSER. CTI BISKUPIAK & CTI GEORGE CHECKED CONTINUITY ON SYSTEM (EACH CTI CHECKED DIFFERENT ELEMENTS). SEE UST INSPECTION NOTES - DEP PERFORMED FULL SYSTEM CONTINUITY CHECK. HO RISERS FAILING FOR CP - NEED TO DETERMINE IF MASTIC COVERED, RECOMMEND REPLACING ONCE EXPOSED. -ML 8/12/08 CTI GEORGE REPLACING RISERS & FLAPPERS. -MLxlÃ2.Ã,# ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ20àÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ21Â!<ÂÂxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿŸINSPECTION YEAR 2006, AI RECEIVED 6/25/058. DAILY INVENTORY FOR GAS TANK INCOMPLETE (OR VERY LITTLE SOLD AND NO DELIVERIES). 62.7 GAL PUMPED, 13.7 GAL SHORT.xi Ã22ÂV Â\xl xlÂxl þÿþÿþÿþÿþÿþÿþÿ©10/6/10-NOITR AND REG. REC;D FOR CTI WILSON TO REPLACE PIPING PH REPLACED ALL TANKS' FILL CAPS CLEANED SPILL BUCKETS EXTRACTOR VALVE RISER CAP REPLACED-CTI THORNDIKE PHxl Ã23Âd Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ7FILL CAP REPLACED REMOVED AND CLEANED GAUGING PROBE PHxl Ã24ÂZ Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ9FILL CAP REPLACED 2" WATER IN TANK, RECOMENDED REMOVAL PHxl Ã25ÃR Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ)FILL CAP REPLACED SPILL BUCKET CLEANED PHxl Ã26ÂY Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPH TANK READING: CTI MIKE LEWISxl Ã27Â_ Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ1FILL CAP REPLACED PH TANK READING: CTI MIKE LEWISxl Ã28Ã5 ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ29Ã05 ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿWPH 7/15/08 UPGRADE REGN FOR CTI DODGE TO REPLACE CONCRETE SLAB AND RINGS OVER TANK TOPxlÃ2:Ã%; ÂYxlxlÂxlÃ@ZþÿþÿþÿþÿþÿþÿPHxlÃ2;Â,Q ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2<ÃK8 ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2=ÂcI  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã2>à N  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2?ÂS+  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2@Â?   xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2AÂCP  xlxlÂxlà þÿþÿþÿþÿþÿþÿPHxlÃ2BÂ8F  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2CÃ[  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2DÂ(3  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2EÂ5 Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿâVENT WHISTLE 23' FROM FILL. LETTER TO OWNER RECOMMENDING CORRECTION -ML REMOVED WATER FROM SUMPS, CLEARED AROUND LIDS, REPAIRED ELECTRICAL CONNECTION IN PREM SUMP CLEANED OUT SPILL BUCKET REMOVED 1 OF 2 COPPER LINES IN SLEEVExlÃ2GÃCc Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ™PIPING SUMP FULL OF WATER WHICH CAME FROM BOILER ROOM WHERE PIPE BREAK FLOODED LINE. CLEANED OUT AND RESET AND TESTED SENSOR CLEANED OUT SPILL BUCKET PHxlÃ2IÂS  Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2JÃH Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2KÃW^ Â;xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2LÂOL Â;xlxlÂxlÃ_S þÿþÿþÿþÿþÿþÿZLONG FORM RECIEVED TO REPLACE YELLOW PIPE ON GAS TANKS ONLY-CTI ROBINSON TO DO WORK-PH PHxlÃ2MàÂ;xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2Nà  Â;xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2Oà G Â;xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ2P Â;xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPPH 8/25/08 COPI - CTI ROBINSON INSTALLED DW FLEX PIPING AND REPAIRED INTL RISERxlÃ2QÃ(= Â;xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ_TANK 8 IS "OUT OF SERVICE", TANK 7 HAS PRODUCT IN INTERSTICE, ALL TANKS PLANNED FOR REMOVAL PHxlÃ2RÂI Â;xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ=1Â_ Á$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ]FIRST TRIP NO POWER TO VEEDER ROOT; SECOND TRIP POWER RESTPRED; TESTED OK. SENSOR FOR 6-1, 6-2 WAS 7'' OFF BOTTOM; I LOWERED IT. REMOVED WATER AND SLUDGE FROM ALL THREE SUMPS; SUMPS DO NOT HAVE SENSOR; NOT REQUIRED. REPAIRED DROP TUBE FROMTANK 6-1 COAXIAL. CLEANED ALL SPILL BUCKETS. REPLACED BRASS ADAPTOR. BROUGHT DROP TUBE TO PROPER HEIGHT.xl Ã=2Á: Â%xl xl Â<xl Ãþÿþÿþÿþÿþÿþÿþÿxl Ã=3  Â%xl xl Â<xl à þÿþÿþÿþÿþÿþÿ@8/26/09-COPI FOR CTI HERSEY TO INSTALL NEW A NEW SPILL BUCKET-PHxl Ã=4Ã( Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=5ÁN Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=6ÂX Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=7ÃF Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=8ÃU  ÂMxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=9Â# Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=:ÂR Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=; ÂMxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ=<Ã# Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã==ÂQ Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=>à  Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=?Â$  Âbxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ=@ÂAE ÂRxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ=AÂK Â)xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=BÁI Â)xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=CÂ> Â)xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=DÃB  xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=EÂFV  xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=F  xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=Gà   xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=HÂZ* Â]xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=IÂV  xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=J Â)xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=KÃ9 Â)xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=LÂ0A Â)xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=M Â)xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=NÃc& Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ=OÃ4P Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ=PÃT$ ÂUxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ=QÂY ÂTxl xl Âxl þÿþÿþÿþÿþÿþÿþÿREPLACED INTERSTICE SENSOR PHxl Ã=RÂC Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã=SàÂbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã=TÂ5+ Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã=UÃU Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ%TANK 6 SPILL BUCKET COVER REPLACED PHxl Ã=VÂ2 Âbxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ=WÃ]$ Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿU8/24/09-UPGRADE REG. REC'D FOR CTI LETELLIER TO INSTALL NEW SPILL BUCKETS ON TANKS 1 AND 2 PH TANK #3 SUMP, AND TANK 4-2 AND 4-3 SUMPS ARE CRACKED-ALL ARE SUCTION, INSTALL DATE OF 1995-ONLY RULES WERE MANUFACTURER SPECS WHICH ONLY REQUIRED SUCTION PIPING TO NOT BE IN CONTACT WITH SOIL, WHICH THESE ARE NOT-THEREFORE THIS CAN STILL PASS. PHxl Ã=XÃ` Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿÏPH 3/2009 POTENTIONAL BUYER CAME INTO DEP TO ASK SOME QUESTIONS ABOUT ANNUAL INSPECTIONS AND OVERALL UST REQUIREMENTS. GAVE HER A PLAIN TALK BOOKLET, CTI LIST, CHANGE OF OWNERSHIP FORM, AND A SPILL LOG. -LWxl Ã=Y Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿLFILL CAP AND ADAPTOR REPLACED 5" WATER IN TANK BOTTOM, RECOMENDED REMOVAL PHxl Ã=ZÃ.F Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã=[ÃT Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿaPIPING ACCESS COVER MISSING-RECOMEND REPLACEMENT 3-1,3-2 FILL CAPS REPLACED VAPOR CAP REPLACED PHxl Ã=\ÂPJ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿSCOPPER PIPING IN ACCESS HAS BEEN TERMINATED-REMOVAL RECOMENDED FILL CAP REPLACED PHxl Ã=]Â^ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã=^Ã] Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã=_ Â Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã=` Â Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã=aÂ0 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAPS REPLACED PHxl Ã=bÂ26 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã=cÃV[ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ`PIPING SUMP CONTAINED APPX. 1 GAL OF WATER-INFILTRATION FROM CONDUIT-SEALED FILL CAP REPLACED PHxl Ã=d D Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã>ÃdJ ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ#PETROMETER CONSOLE LAMP REPLACED PHxl Ã>Â;* Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ7SUMP LID HARDWARE FAULTY, REPLACED FILL CAP REPLACED PHxl Ã>Â92 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ8FILL CAPS REPLACED REMOVED AND CLEANED GUAGING PROBES PHxl Ã>ÂT Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ.REMOTE FILL WITH FREE STANDING SPILL BUCKET PHxl Ã>Ã4 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>ÂZ$ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>  Â ÂTxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã> ÂG4 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã> Ãd ÂRxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã> Â! Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿbINSPECTION YEAR IS ACTUALLY 2009 TANK 9 OOS WITH WAIVER TO REMAIN UNTIL OTHER TANKS ARE REMOVED PHxl Ã> Â7 Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>Â@ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿXWHISTLE IS PRESENT AND DOES WORK, BUT COULD NOT BE PHYSICALLY ACCESSED FOR INSPECTION PHxl Ã>Â0 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ¶FACILITY WAS WITHOUT LEAK DETECTION WHEN WE ARRIVED IN JULY FOR UTS INSP.-WATER MAIN BREAK FLOODED BOILER ROOM, AND KILLED CONSOLE. PMS REPLACED WITH A NEW CONSOLE AND SENT IN AI PHxl Ã>Â9A ÂRxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>ÃY^  xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿšDURING 6/4/2009 INSPECTION HE DISCOVERD THEY HAVE REGULAR AND DIESEL WITH ONE VENT. WILL INFORM OWNER NEED TO EITHER ADD A VENT OR HAVE ONLY GASOLINE TEDxl Ã>Ã"  ÂRxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã>Â7I Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã>ÃA Â[!xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿTHESE 2 TANKS HAVE BEEN MOVED FROM #14505 THIS IS THE HIGH FREQUENCY ARRAY, AND IS NOT GEOGRAPHICALLY NEAR THE OTHER TANKS THAT USED TO BE ALL UNDER 14505 9/26/08-PH TANK #23 CURRENTLY FAILS, THE NAVY IS WORKING ON THE PROBLEMS TANK #24 CURRENTLY PASSES AFTER UPDATE BY DENNIS DAVIS PH xlÃ>àÁ$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>Ã6 Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ@NEW ATG REGISTRATION INCLUDED, SET UP SEEMS TO NEED MORE INFO PHxl Ã>  Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ>Ã/3 Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.97, -1.02xlÃ>Ã/1 Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.95, -.98xlÃ>Ã/- Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ>Ã// Âxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿn6/11/09NOTICE OF INTENT TO ABANDON TANK REC'D, CTI MULLINS/ LEGASSE JR. TO PULL PH TANK READING: -1.02, -1.07xlÃ>ÃR Á$xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿàREPLACED ALL 3 ALARM BULBS IN CONSOLE 11-1 LOWERED SENSOR TO SUMP BOTTOM 11-1 REPLACED INTERSTITIAL CAP AND ADAPTOR 6" NIPPLE AND ADAPTOR ADDED TO 11-1 RISER TO MAKE FLAPPER SHUT OFF AT 90% 12-2 MLLD REPLACED AND TESTS OK PHxlÃ>Ã]? ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ;FACILITY OOS-NO POWER TO FACILITY-TANKS BELOW 1" PRODUCT PHxl Ã> ÃI ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>!Ã]= ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿREPLACED SPILL BUCKET LID PHxl Ã>"Ã@ ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>#ÃJ ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ,REPLACED FLASHER MODULE IN OVERFILL ALARM PHxl Ã>$Ã`/ ÂPxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>%Ã^  Â[!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿATANK 1-REPLACED INTERSTICE SNAKE SENSOR REPLACED LLD ON TANK 2 PHxl Ã>&Ã-E ÂUxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>(Â1+ ÂHxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>)Ã' ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>*Â$! ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿÑ10/13/09-REGISTRATION REC'D FOR REPLACEMENT PIPING BY CTI THOMPSON-PH 9/18/09-NOITA REC'D FOR CTI BROWN TO REMOVE PIPING ONLY-PH 9/12/08-COPI-CTI DAVIS INSTALLED NEW 15 GAL SPILL BUCKET ON REGULAR TANK-PH PHxl Ã>+Ã_  ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>,ÂE ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿW11/5/09-COPI REC'D FOR CTI BISKUPIAK TO INSTALL NEW SPILL BUCKET ON REGULAR TANK-PH PHxl Ã>-Â_B ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>.Â3% Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>/Ã5E Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿZ5/26/2009-REG FOR CTI SIMARD TO INSTALL 2 NEW TANKS, APPEARS TO BE A NEW OWNER, BUT NO CHANGE OF OWNERSHIP PAPERWORK RECIEVED YET, JOHN D. IS TRACKING-PH 12/1/08-NOTICE OF INTENT TO ABANDON ALL TANKS REC'D-CTI SCOTT TO DO WORK, SUMMIT TO DO SA PH TIM GOSS (OPERATOR) CALLED ON 1/16/2009 REGARDING MASS MAILING NOV. TANKS ARE PFR; BUT STILL OPERATING TWO TANKS, OTHER TWO WENT OOS IN NOVEMBER. TOLD HIM STILL NEEDED SIA ON ALL FOUR TANKS. TIM SAID SIA WILL BE A COUPLE WEEKS LATE. AS OF 3/20/2009 HAVE NOT RECEIVED. CALLED FACILITY TWO TIMES ON 3/23/2009 NO ANSWER AND VOICEMAIL BOX IS FULL. -LWxlÃ>0Ã? Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>1 Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>2Â7; Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>3Ã(7 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>4Ã< Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ¨REPLACED 4-1 LLD NEEDS NEW MANHOLE COVER 6-2-ON ORDER 6-1 DROP TUBE IS 2 INCHES TOO SHORT DUE TO ADAPTOR SOMEONE ADDED TO FILL-9/24/08 CTI GEORGE REPLACED DROP TUBE PH xlÃ>5ÂR Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>6à  Âbxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ3 Â_! Â'xlxlÂxl þÿþÿþÿþÿþÿþÿþÿiUPGRADE REGISTRATION WAS FILED, BUT NOW WORK ENDED UP NOT NEEDING BE DONE PH PH AND TR STOPPED BY THIS FACILITY WHILE INVESTIGATION WAS GOING ON...WATER WAS COMING FROM CANOPY, DOWN CENTER SUPPORT AND UNDER DISPENSER FRAME, INTO SUMP, THEN TRAVELING ALONG SECONDARY INTO PIPING SUMP, THEN FLOWING ALONG CONDUIT LINES TO OTHER SUMPS. DISPENSER FRAME SEALED AND WATER REMOVED. WATER IN ALL 3 PIPING SUMPS, COMING IN FROM SECONDARY PIPING PH 8/4/08 UPGRADE REGN FOR CTI BROWN TO EXCAVATE AROUND PIPING SUMPS TO DETERMINE SOURCE OF WATER INTRUSION & CORRECT. PORTLAND PUMP WILL BE ON SITE ON AUGUST 12TH. TR APPARENTLY WATER WAS COMING FROM FAULTY CANOPY DRAIN THAT DIRECTED WATER INTO DISPENSER SUMP INSTEAD OF AWAY FROM ISLAND. WATER WAS REMOVED FROM ALL 3 PIPING SUMPS AND DISPENSER SUMP, DISPENSER SEAL TO ISLAND WAS IMPROVED, AND PROBLEM SEEMS TO HAVE BEEN SOLVED PHxlÃ>7ÂO ÂKxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>8ÂAc ÂKxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>9ÂO ÂKxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>:Ã6 ÂKxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿrCTI LETELLIER WROTE "FOUND CONSOLE IN BY-PASS, THIS PANEL MUST REMAIN IN STAND-BY"-HE STILL PASSED THE FACILITY PHxlÃ>;ÂN^ ÂKxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ><ÃG$ ÂKxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>=Â\ ÂXxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>>Â+ Â;xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ910/5/10NOITR REC'D FOR REMOVAL OF HEATING OIL TANK-PH PHxl Ã>? Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>@ 5 ÂMxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>AÂ,d ÂMxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>BÂR ÂMxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>C c ÂMxl xl Âxl ÃþÿþÿþÿþÿþÿþÿPHxl Ã>DÂL ÂMxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>EÃ.* ÂMxl xl Âxl à þÿþÿþÿþÿþÿþÿPHxl Ã>F ÂMxl xl Âxl Ã#75þÿþÿþÿþÿþÿþÿPHxl Ã>GÂMA Âbxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>HÂ>P Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>IÃ\$ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿuDRIP UNDER DISPENSER HAS BEEN FIXED, AND ROUGHLY 2 YARDS OF OILED SOIL REMOVED CONSOLE AND SENSORS HAVE BEEN FIXED PHxl Ã,Â1 Âxl xl Âþÿþÿþÿþÿþÿþÿþÿþÿ47/10/10-REMOVAL CONFIRMATION-6/23/09-NOITA REC'D FOR TANK #2, MCGEE CONSTRUCTION TO PULL-PH 9/17/08 CTI CARVER DID ANOTHER AI-FAIL-CP READINGS -.706-PH-TANK IS SUPPOSED TO COME OUT 6/09 PIPING IS BLACK IRON SLEEVED IN FIBERGLASS, NOT SECONDARILY CONTAINED, NONCONFORMING. TANK READING: -.801, -.721, -.733xlÃ>JÃ+ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>KÂ3/ Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>MÂ, Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿD6/7/10-COPI REC'D FROM CTI BUBAR TO "REPLACED COLLAPSED FLEX"-PH PHxl Ã>NÃ^5 ÂPxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ%FACILITY POWER IS OFF PROPERLY OOS PHxlÃ>OÃC ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ$NO POWER TO FACILITY PROPERLY OOS PHxl Ã>PÃ`) ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ$NO POWER TO FACILITY PROPERLY OOS PHxl Ã>Q ÂSxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPTANK #5 INTERSTITIAL RISER REPAIRED, IT WAS ALLOWING WATER INTO ANNULAR SPACE PHxlÃ4Â1  xlxlÂ<xlÃHþÿþÿþÿþÿþÿþÿò9/17/09-REG. REC'D FOR CTI PAUL BROWN TO INSTALL 2 NEW TANKS AT FACILITY-PH 7/1/09-AI RECIEVED, TANK 9 FAILING DUE TO FAILED TANK. ALL TANKS BEING REPLACED IN THE FALL-PH 7/8/09-NOITA FOR CTI BROWN TO REMOVE TANKS AND MIKE WHITE TO DO SA PHxlÃ4Â^   xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4ÂbR ÂYxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Ã` ÂYxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4ÃD ÂYxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Ã# ÂYxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Ã.X ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Ã48 ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4ÃZ ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4àÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4ÂT4 ÁxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Ã5 ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4  ÂMxlxlÂ<xlÃCþÿþÿþÿþÿþÿþÿþÿxlÃ4à ] ÂMxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4 ÂSA ÂMxlxlÂ<xlÃ5"VþÿþÿþÿþÿþÿþÿþÿxlÃ4!àÂMxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4"ÂÂ[G Âxlxl Âxlþÿþÿþÿþÿþÿþÿþÿm#2 TANK WATER SENSOR MEASURING OVER 4" WATER, WHEN TANK WAS STUCK, THERE WAS NO WATER, FLOAT STUCK, RESET PHxlÃ4?Â[C Á$xlxl Âxl þÿþÿþÿþÿþÿþÿþÿi#3 SUMP CONTAINED WATER-REPORTED TO DEP-INTRUSION FROM LID WHERE SOIL WAS NOT ALLOWING TIGHT LID FITMENT. SOIL REMOVED, GASKET CLEANED AND REATTACHED TANK 3 AND 5 HAD VERY SMALL AMOUNT OF WATER IN ANNULAR SPACE-DEP NOTIFIED-PROBES HAD BEEN PULLED UP ABOVE WATER. SENSORS LOWERED AND SYSTEM RESET TANK 3 BALLFLOAT MISSING, OTHER 2 WERE DAMAGED-ALL 3 REPLACED PHxl Ã4@Â[H Á$xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿºSPILL BUCKETS CLEANED #2 SUMP LID HAD HOLE IN IT-REPLACED WATER IN SUMPS 2 AND 3-REPORTED TO T. SHARF-REMOVED WEEP ON DISPENSER 1, SUPER METER-TIGHTENED-NO ACCUMULATION IN DISP. SUMP PHxlÃ4AÂ[= Á$xlxl Âxlþÿþÿþÿþÿþÿþÿþÿ·#5 ANNULAR SNAKE SENSOR IN ALARM UPON ARRIVAL-SENSOR FOUND TO BE FAULTY, PARTLY DUE TO BAD GROUND-REPAIRED AND SENSOR REPLACED SPILL BUCKETS CLEANED TANK 5 VAPOR ADAPTOR REPLACED PHxlÃ4BÃU Á$xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿhWATER REMOVED FROM TRANSITION SUMP, PREVIOUSLY HAD NO LID-LID WAS ATTACHED SPILL BUCKETS CLEANED OUT PHxlÃ4CÂR[ Á$xlxl Âxlþÿþÿþÿþÿþÿþÿþÿ…TANK 1 INCORRECTLY SHOWING WATER IN TANK-RESET TANK 2 REPLACED BALL FLOATS SPILL BUCKETS CLEANED OUT TIME SET CORRECTLY ON CONSOLE PHxlÃ4DÂ[4 Á$xlxl Âxl þÿþÿþÿþÿþÿþÿþÿREPLACED ALL 3 SUMP LIDS PHxl Ã4EÂ[F Á$xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿVSTAGE 1 ADAPTOR CUT OFF TO CHECK BALL FLOAT, THEN REPLACED TANK 1 SUMP LID REPLACED PHxlÃ4FÂ[O Á$xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ4GÃ" Á$xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿÀSUMP LID ON TANK 3 REPLACED REPLACED VAPOR ADAPTOR AFTER CUTTING IT OFF TO CHECK BALL FLOAT PH 8/19/08 COPI - CTI LEGASSE JR INSTALLED 3 SPILL BUCKETS, REPLACED 3 DROP TUBES & 2 FILL ADAPTERSxlÃ4HÃ@ Á=xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿFACILITY IS PASSING AS OOS PHxlÃ4IÂ*  Á=xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ4J Á=xlxl Âxl þÿþÿþÿþÿþÿþÿþÿ#FACILITY PROPERLY OUT OF SERVICE PHxl Ã4KÂH  ÂXxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ4LÃ9  xlxl Âxlà -WþÿþÿþÿþÿþÿþÿPHxlÃ4MÂ^  xlxl ÂxlÄ(þÿþÿþÿþÿþÿþÿLARRY MCALLISTER DID CP TESTING TANK 7, REMOVED SMALL AMOUNT OF SURFACE WATER FROM SUMP, REINSTALLED LID CLEANED TANK 7 AND 9 SPILL BUCKET PHxlÃ4N / Â)xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4O 0 Â)xlxl Â<xdþÿþÿþÿþÿþÿþÿþÿþÿxdÃ4PÃY6 Â)xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4QÃc( Âbxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4RÃ/S Â[!xlxl Âxl þÿþÿþÿþÿþÿþÿþÿÄINITIAL FAIL: WATER PUMPED FROM PIPING SUMPS FAIL FOR FLAPPER BEING SET TO WRONG SHUTOFF LEVEL TANK 4 LLD REPLACED 11/18/08 CTI DAVIS RETURNED AND INSTALLED 3 NEW FLAPPERS/DROPTUBES SET AT 95% PHxlÃ4SÂ.M ÂYxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4TÂ^\ Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4UÂLA Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4WÂ9 Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿ76/8/09-NOITA FOR CTI EATON TO REMOVE TANK AND PIPING PHxlÃ4XÃ/ Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4Y ÂYxlxl Â<xlÃF2-þÿþÿþÿþÿþÿþÿþÿxlÃ4ZÃ- Â;xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4[ÂYM Â;xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿ_8/13/09-COPI REC'D FOR CTI ROBINSON TO INSTALL NEW INT. MONITORING SYSTEM FOR ON TANKS 7,8,9 PHxlÃ4\ÂAD Â;xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4]ÂE] Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4^Ã9 Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ4_ÃU; ÂMxl xlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã4`Âd; ÂUxl xlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã4aÂ?2 ÂxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ[NO ACCESS TO DROP-TUBES. GAFTEK VERIFIED PIPING MATERIAL TO BE SINGLE-WALLED FIBERGLASS. BBxlÃ4bÂ$* ÂUxlxlÂxkþÿþÿþÿþÿþÿþÿþÿùV/R SENSOR CONDUITS HAVE JUNCTION BOXES INSIDE & OUTSIDE THE SUMPS. THE ONES OUTSIDE THE SUMP ARE CORRODED/ ROTTED COMPLETELY THROUGH AND ARE ALLOWING WATER TO ENTER THE SUMP THROUGH THE OPEN CONDUIT. CHANGE REGULAR AND SUPER INTERSTITIAL SENSORS.xkÃÂÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ€AI SAYS OOS SINCE 7/04, PLANS TO REMOVE FALL 07 7/14/08 OWNER WILL REMOVE IN SEPTEMBER. TRYING TO GET LOAN TO COVER COSTS. -MLxkÃ4cà  Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã4dÃ\ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ3PIPING IS ABOVE GROUND. STEEL PIPED TO A DIKE AREA.xlÃ5Â%, Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -.106, -1.04, -1.06xlÃ5Â%4 Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ! TANK READING: -.90, -.958, -1.04xlÃ5Â%1 Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ! TANK READING: -1.08, -1.1, -1.12xlÃ5Â%+ Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5Â% Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5ÂO5 Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5 Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ46-1 CP: 1.00, -985, -971 7-1 CP: -.996, -1.01, -1.00xlÃ5  a Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ-MONITOR WELLS 1&2- NO APPARENT SHEEN OR ODOR OBSERVED. ANNULAR SPACE MANHOLE LID MISSING (REPLACED). REMOVED WATER/DEBRIS FROM SPILL BUCKET. NO OVERFILL DEVICE FOUND ON TANK- POSSIBLE WHISTLE. RECOMMENDED VERIFICATION OR INSTALLATION OF INSPECTABLE FORM OF OVERFILL DEVICE. TANK CONTAINED .25'' WATERxlÃ5  b Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿMONITOR WELLS 1&2- NO APPARENT SHEEN OR ODOR OBSERVED. MW1 RISER CAP DAMAGED (REPLACED) REMOVED WATER/DEBRIS FROM SPILL BUCKET. NO OVERFILL DEVICE FOUND ON TANK- POSSIBLE WHISTLE. RECOMMENDED VERIFICATION OR INSTALLATION OF INSPECTABLE FORM OF OVERFILL DEVICE. xlÃ5  a Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ-MONITOR WELLS 1&2- NO APPARENT SHEEN OR ODOR OBSERVED. ANNULAR SPACE MANHOLE LID MISSING (REPLACED). REMOVED WATER/DEBRIS FROM SPILL BUCKET. NO OVERFILL DEVICE FOUND ON TANK- POSSIBLE WHISTLE. RECOMMENDED VERIFICATION OR INSTALLATION OF INSPECTABLE FORM OF OVERFILL DEVICE. TANK CONTAINED .25'' WATERxlÃ5  _ Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿMONITOR WELLS 1&2- NO APPARENT SHEEN OR ODOR OBSERVED. REMOVED WATER FROM SPILL BUCKETS. TANK BOTTOM CONTAINS 1.25" OF WATER, RECOMMENDED REMOVAL. NO OVERFILL DEVICE FOUND ON TANK- POSSIBLE WHISTLE. RECOMMENDED VERIFICATION OR INSTALLATION OR INSPECTABLE FORM OF OVERFILL DEVICE.xlÃ5  ` Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿFMONITOR WELLS 1&2- NO APPARENT SHEEN. REPLACED FILL CAP DUE TO NOT BEING LIQUID TIGHT. REMOVED WATER FROM SPILL BUCKET. SPILL BUCKET LID DAMAGED- LID STILL LIQUID TIGHT RECOMMEND REPLACEMENT. NO OVERFILL DEVICE FOUND ON TANK- POSSIBLE WHISTLE. RECOMMENDED VERIFICATION OR INSTALLATION OF INSPECTABLE FORM OF OVERFILL DEVICE.xlÃ5Â'  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ$RECEIVED INSPECTION UPDATE DATED 8/5/08. REPLACED FLAPPER, BALL FLOATS REMOVED (8/5/08 COPI - DON BUBAR). 9/27/08 OWNER REPORTED PROBLEM WITH FUEL DELIVERY - FLAPPERS MALFUNCTIONING, VR NOT VENTING BACK INTO TRUCK. USED DROP TUBES INSTALLED 8/5/08. BUBAR CORRECTED 9/28, DELIVERY OK ON 9/28 TO PREM, RNL VR WORKING BUT FUEL SPITTING UP INTO VR HOSE. -ML CP READINGS: TANK 5 -0.88, TANK 6 -0.93 TANK 5 HAS BALL FLOAT PLUS COAXIAL DROP TUBE W/FLAPPER. FLAPPER SET TOO HIGH. INSPECTOR INCORRECTLY PASSED INSPECTION. 7/15/08 FAIL LETTER -ML xlÃ5Ã+I Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿTANKS 1,2,3 REPLACED FILL CAPS DUE TO NOT BEING TANK 1 ANNULAR SPACE RISER DAMAGED- NOT LIQUID TIGHT (REPLACED). TANK 1, 2, 3- FILL CAPS NOT LIQUID TIGHT (REPLACED) REMOVED WATER/DEBRIS FROM SPILL BUCKETS. TANK 1- TANK BOTTOM CONTAINS .25" OF WATER. RECOMMEND REMOVAL OF WATER. xlÃ5ÃZ: Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã5Â>; ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿINTENT TO ABANDON FORM RECIEVED FOR BOTH TANKS 10/20/08-WORK TO BE DONE BY CTI SIMARD PH FACILITY RETURNING TO SERVICE. PASSED VACUUM TEST.xlÃ5Â@ ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ# TANK READING: -.868, -.869, -.869xlÃ5Â@ ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5Â]R Â]xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5ÃQ* ÂMxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ77/6/09-NOITA REC'D FOR EARTHWORKS TO REMOVE TANK PH PHxlÃ5àÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5ÃW  ÂMxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5ÃL ÂMxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5Ã`! ÂMxlxlÂxlà a3þÿþÿþÿþÿþÿþÿPHxlÃ5ÂOT ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿSUCTION SYSTEM PHxlÃ5Ã! ÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5à  Â:xlxlÂ(xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5 Ãc  xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5"ÃR0 Â[!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5#Âd Á=xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ`5/28/09-RETURN TO SERVICE FORM SUBMITTED, EVERYTHING IS IN, SO THEY CAN RETURN TO SERVICE-PH PHxlÃ5$Â_ Á=xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5%ÃCY ÂYxlxlÂxlà þÿþÿþÿþÿþÿþÿ-.91 PHxlÃ5&ÂC!  xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿCP READINGS -.94 PHxlÃ5'Ã.H  xlxlÂ<xlÃGþÿþÿþÿþÿþÿþÿþÿxlÃ5(Â<  ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5)ÂK ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5*ÃW ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5+ÁZ ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5,Ã9 ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿŽ#6 OIL TANK WILL LIKELY REMAIN IN PLACE AS OOS PER DISCUSSIONS WITH NAT. STARCH COMPLIANCE MANAGER AND COUNTY ENVIRONMENTAL ENGINEERING PH PHxlÃ5-Â7 ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5.Âd  xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5/Â(  xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ50Ã& Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ51ÃCF Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ52Â3: Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ53Ã\8 Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ54Â^, Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ55à  Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ56Â7F  xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿE9/17/09-UPGRADE REG. FOR CTI BISSON TO REPAIR VR MANHOLE ON TANK 5-PHxlÃ57ÁU ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ58ÁT ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ59àÂ"xlxlÂxl ÄVSþÿþÿþÿþÿþÿþÿPHxl Ã5:ÃJG Â]xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5;ÂW! Áxl xlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5<ÂW Áxl xlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5=ÂW  Áxl xlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã5>ÃD3 Á=xlxlÂxlþÿþÿþÿþÿþÿþÿþÿwMANHOLE AND COVER REPLACED AND RE-CONCRETED SUMP PUMPED OUT, CLEANED AND SUMP SENSOR REPLACED ALL FUNTIONS PASS NOW PHxlÃ5@Ãa ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5AÂ( ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5BàÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ5INSPECTION DATE WAS ACTUALLY 5/7/08 THRUPUT 280000 PHxlÃ5CÂW Áxl xlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã5DÂW Áxl xlÂ<xl þÿþÿþÿþÿþÿþÿþÿH11/5/10: COPI RCVD FOR CTI BISKUPIAK TO REPLACE 15 GAL SPILL BUCKET. -WPxl Ã5EÂR Áxl xlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã5FÃ3R Áxl xlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã5GÂI Áxl xlÂ<xl þÿþÿþÿþÿþÿþÿþÿ0REPLACED 2 LAMPS ON CONSOLE REPLACED FILL CAP PHxl Ã5HÃ]6 Áxl xlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã5IÂH: ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5JÂKP Á$xl xlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ5KÂL ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5LÃ5' ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5MÂ> ÂxlxlÂxlÃþÿþÿþÿþÿþÿþÿOREPAIRED WIRE IN JUNCTION BOX IN SUMP THAT WAS CAUSING CONSOLE LIGHT TO FLICKERxlÃ5N ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5Oà d ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿREPLACED FILL CAP GASKET PHxlÃ5PÂX ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5QÂX/ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿŒREPLACED BLOWN BULB ON CONSOLE REPLACED SUMP SENSOR REPAIRED WIRE CONNECTIONS REPLACED BROKEN MONITORING WELL COVER CLEANED SPILL BUCKETS PHxlÃ5RÂ:$ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿMIKE ARBOUR WAS INSPECTOR PHxlÃ5SÂ( ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5TÂ1c ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã5Uà ] ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5VÃ"E ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ@DISPENSER 2, 5/6, 9/10 CRASH VALVES ADJUSTED BY DENNIS DAVIS PHxlÃ5WÂ! ÂSxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5XÂQ ÂSxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã5YÂ"$ ÂSxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ5Z ÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ6  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ6Ã" ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ6  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿˆFOUND WATER IN THE INTERSTITITAL SPACE OF TANK- SENSOR WAS NOT WORKING- NOTIFIIED DEP- REPLACED HORN BOARD AND SENSOR- PUMPED OUT WATER.xlÃ6!  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ6" ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ6#ÂO ÂMxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã6$ ; Â:xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6%Á Â:xlxlÂxlþÿþÿþÿþÿþÿþÿþÿCP READINGS -.91 PHxlÃ6&Â>S Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿlHAD TO CUT OFF VAPOR ADAPTOR TO CHECK BALL FLOAT-PASS REPLACED VAPOR CAP TIGHTENED SUPER FILTER ON PUMP 2 PHxlÃ6'ÂB_ Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ6TANK 2 PASSES, TANK 3 OOS SINCE 2002-WILL FOLLOW UP PHxlÃ6(ÃQ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿèNEW GUAGE STICK BEING SHIPPED TO SITE REPAIRED TANK 2 SUMP SENSOR DISPENSER SUMP SENSOR NOT PLACED PROPERLY, REMOVED WATER AND DROPPED TO BOTTOM REPLACED TANK 2 LLD REPLACED ALL VAPOR AND FILL CAPS TIGHTENED BOLTS ON DISPENSER #7 PHxlÃ6* Â#xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã6,Â/ ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ6-Â? ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ6.Ã[  ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿ€10/1/08 REGISTRATION FOR NEW PIPING ON TANK 1. WORK TO BE DONE BY CTI SIMARD-BOB SHANNON GAVE 30 DAY WAIVER ON PIPING REMOVAL PHxlÃ6/Â? ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ60ÂC ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ61ÂA ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ62ÂH ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ63 V ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ65Â2C ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿ¸4/3/09-NOTICE OF INTENT TO ABANDON PIPING AND OTHER ANCILLARY EQUIPMENT ON TANKS 6 AND 7 , AND REG. TO INSTALL DOUBLE WALL FLEX AND UPGRADE ALL OTHER TANK UP EQUIPMENT BY CTI BARTON PHxlÃ66à L ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ67 ÁxlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿTANKS 10 AND 11 SENSORS REWIRED-WORK DONE BY BOTH RICK HAZEL AND ED GEORGE TANK 8 CP READING: -1.099 TANK 9 CP READING -.887 PHxl Ã68Â^ ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ69 B Â)xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ6/19/09-NOITA REC'D FOR CTI MULLINS TO PULL TANKS PH CTI BUBAR FAILED DUE TO LACK OF WATER IN WELLS, THUS NO MONITORING LOG PRESENT JOHN ROBICHAUD (DISTRICT MAINTENANCE DIRECTOR) SAYS ALL DISTRICT TANKS WILL BE REMOVED SUMMER OF 2009 DUE TO CONVERSION TO LNG AND THE FACT TANKS ARE NEARING THE END OF THEIR LIFE THIS TANK HAS PASSING CP READINGS AND PASSED A PRECISION TEST W/IN THE LAST YEAR PHxlÃ6:Ã' Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿIAI INDICATES TANK HAS FLAPPER AND REMOTE ELECTRONIC OVERFILL INSTALLED PHxlÃ6;Ã' Â)xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ10338-NOITA REC'D FOR CTI MULLINS TO PULL TANKS PH LEAK DETECTION METHOD IS GROUNDWATER MONITORING-WELLS AROUND TANK #3 ARE DRY, AND LOGS ARE NOT BEING MAINTAINED JOHN ROBICHAUD, (MAINT. DIRECTOR FOR DISTRICT) SAYS TANKS WILL BE REMOVED SUMMER OF 2009 DUE TO CONVERSION TO LNG PHxlÃ6=Â& Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6>à @ Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6?ÂG ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿMSTEEL PIPING INSIDE CONCRETE CHASE THAT IS ACCESSABLE FOR MANUAL MONITOING PHxlÃ6AÂ<  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã6BÃ,  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6CÂ*9  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6DÃKC  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6Eà +  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ9CTI HASKELL INSTALLED BEW ANNULAR SPACE SENSOR 5/17/08 PHxlÃ6FàÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6GÃN Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6Hà K Á$xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ CTI DAVIS LOWERED ANNULAR SENSOR TO TANK BOTTOM REPLACED CAP AND ADAPTOR ON INTERSTITIAL RISER BALL FLOAT BASKETS WERE LENGTHENED REPLACED MANWAY LID ON 6-1 PHxl Ã6IÂUE Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿTANKS 4 AND 5 ARE SINGLE WALLED-TANK 4 WITHING +-1%; NO DIESEL SALES IN JUNE, WHEN DAILY INV. NUMBERS WERE RECONCILED FOR MARCH THEY WERE ABOVE 1% DUE TO LOW THRUPUT-TED SCHARF NOTIFIED TANK 6 DOUBLE WALLED AND SENSOR IS WORKING FINE HYDRO TESTED TANK 5 AS IT WAS DRY-PASS PHxlÃ6JÃ! ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6KÂ& ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6LÁ- ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6MÂX) ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6NÂ_@ ÂIxlxlÂ<xlÃUþÿþÿþÿþÿþÿþÿþÿxlÃ6OÃbb ÂIxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿŠ6/18/08 UPGRADE REGN FOR CTI JOHNSON TO REPLACE ATG & SENSORS 7/17/08 COPI - CTI JOHNSON INSTALLED OPW I SITE FOR TANK AND PIPE MONITORINGxlÃ6PÂ-P ÂIxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ6QÃ(F ÂbxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ?AI ARRIVED WITH OOS NOTIFICATION, APPEARS TO BE PROPERLY OOS PHxlÃ6R  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6SÃ' ÂIxlxlÂxlþÿþÿþÿþÿþÿþÿþÿSPH RECEIVED PASSING ANNUAL INSPECTION ON AST PIPING SAME DATE AS UST INSPECTION. BBxlÃ6TÂX' ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6UÃ`? ÁxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6VÂO  ÁxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã6WÂ-; Â*xlxlÂxlþÿþÿþÿþÿþÿþÿþÿŒ10/22/08-INTENT TO ABANDON RECIEVED, CTI MULLINS TO OVERSEE-PH THIS INSPECTION IS FOR 2009 SEASON, THEY WERE DELINQUENT LAST YEAR FILLS HAVE VENT PIPES COMING OUT OF THEM, SO LOCKING THEM IS NOT POSSIBLE. THE ORIGINAL VENTS HAVE BEEN CAPPED OFF AT THE TANK TOP TANK PIPING WAS PRESSURE TESTED AND PASSED ON 6/27/08 ACCORDING TO AI, TANK WAS PRECISION TESTED BY CCMI ON 7/17/08-CTI KANE ONSITE PHxlÃ6XÃ4 ÂNxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6YÃ!O Â-xlxlÂxlþÿþÿþÿþÿþÿþÿþÿSPILL BUCKETS CLEANED OUT PHxlÃ6ZÃK Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ&TANK 8 SUMP SENSOR IN ALARM WHEN CTI ARRIVED, NOTIFIED DEP, CLEANED OUT AND RESET CLEANED ALL SPILL BUCKETS TANK 7, CHAMBER 3 FLAPPER SET INCORRECTLY, RESET TO 95% REPLACED 7-3 SPILL BUCKET LID REPLACED FILL CAP ON 8-2 REPLACED LLD ON 8-2 REPLACED VAPOR ADAPTOR ON 8-2 AFTER CHECKING BALL FLOATxlÃ6[Ã=3 Â-xlxlÂxlþÿþÿþÿþÿþÿþÿþÿOOS INSPECTION PHxlÃ6\ÃI ÁxlxlÂxlþÿþÿþÿþÿþÿþÿþÿTHIS INSPECTION IS ACTUALLY FOR 2009 SEASON, THEY WERE DELINQUENT FOR LAST YEAR COPPER LINES INDIVIDUALLY SLEEVED IN PVC ON ALL TANKS PH 07/24/09 INCOMPLETE 07/14/09 AI SENT IN - NO EVAL OF VENT WHISTLE. REGGIE WILL FIND WAY TO INSPECT AND EVAL AND RESEND AI. WPxlÃ6]ÂK Â;xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ4/9/10-NOITR REC'D FOR AE ROBINSON TO REMOVE TANK AND PIPING-PH PASSING AI AFTER CTI B. ROBINSON REMOVED WATER FROM SUMP AND REPAIRED BOOT AROUND CONDUIT PROTRUSION TO ELIMINATE WATER INTRUSION-FIELD NOV ISSUED 7/8/08 BY PH SPURRED THIS REPAIR WATER REMOVED FROM SPILL BUCKET PHxlÃ6^ÂP ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿª12/8/09-NOITA REC'D FOR CTI GEORGE TO REMOVE TANK 1-PH MONITORING WELL LOG SUBMITTED FOR 5/5/08 - 6/30/08. PHOTO OF REPAIRED & CAPPED MONITORING WELL SUBMITTED 7/24/08.xlÃ6_Ã@  ÂIxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ@FAIL LETTER SENT TO LESLIE ANDERSON FOR OVER/SHORT GREATER 1% PHxlÃ6`ÂL ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6aÂD ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ6bÃd2 Â;xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã6cÃ`F Â;xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã6dÃ# ÂDxlxlÂxl Ã^þÿþÿþÿþÿþÿþÿPHxl Ã7Â` Â#xlxlÂxlÃ=þÿþÿþÿþÿþÿþÿ:6/23/09-AI RECIEVED MISSING THE PIPING INTERSTITIAL-PH PHxlÃ7Â[ Â#xlxlÂxl à þÿþÿþÿþÿþÿþÿPHxl Ã7ÂC Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ27/8/09-UPGRADE REG. FOR CTI GEORGE TO REPAIR OR REPLACE 7-2 SPILL BUCKET PH PREMIUM AND DIESEL SUMPS IN ALARM UPON ARRIVAL TED SCHARF NOTIFIED-PUMPED OUT, RESET ALL SPILL BUCKETS FULL OF WATER, CLEANED OUT REPLACED VAPOR ADAPTOR ON 7-1 OLD STAINING ON ALL DIESEL DISPENSERS AND A FEW OF THE GAS DISPENSERSxlÃ7Â* Â:xlxlÂxlÃ')þÿþÿþÿþÿþÿþÿPHxlÃ7Ã8 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ97/23/09-UPGRADE REG FOR CTI BUBAR TO REPLACE LEAK SENSOR JR. WITH OMNTEC LU-2 PH INTERSTICE HAS OVER 11" WATER-PUMPED OUT BUT SENSORS WOULD NOT CLEAR-REPORTED TO DEP ACCORDNING TO AI WATER REMOVED FROM SPILL BUCKETS PH WATER PUMPED OUT OF INTERSTICE, SENSOR RESET, TESTED, AND INTERSTICE STAYED DRY- 7/24/08 PHxlÃ7Ã8 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ+WATER REMOVED FROM SUMP AND SPILL BUCKET PHxlÃ7Ã8 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ7WATER REMOVED FROM TRANSITION SUMP AND SPILL BUCKET PHxlÃ7 ÂA ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿFILL PIPE FITTINGS CLEANEDxlÃ7  O Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ9SPILL BUCKET CLEANED NO ACCESS TO PIPING FROM TANK TOP PHxlÃ7 ÂE Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿQGW MONITORING WELLS ONSITE DRY-1989 INSTALL-TANK <1100 GAL. VENT PIPE CP -.862 PHxlÃ7 Ã4 ÂLxlxlÂxlþÿþÿþÿþÿþÿþÿþÿCLEANED SPILL BUCKET PHxlÃ7 Â2  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ7ÃY Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ7Ã[5 Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ7Â$M ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ0THIS IS AI #2 FOR THIS FACILITY, NOT SURE WHY PHxlÃ7Ã3 ÂxlxlÂxkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ7ÂX0 Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ’LOWERED SENSOR TO BOTTOM OF INTERSTITIAL INSTALLED FLAPPER TO REPLACE DUBIOUS VENT WHISTLE VENT IS NOW WITHIN 8' OF FILL SPILL BUCKET CLEANED OUT xlÃ7Â<8 Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -.956, -1.01, -1.03xlÃ7ÃG Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -1.08, -1.13, -1.12xlÃ7ÃD! Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -1.24, -1.25, -1.26xlÃ7ÂA- ÂHxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -.851, -.854, -.860xlÃ7Ã@ Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -1.05, -1.13, -1.17xlÃ7Â6 Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7ÃS- Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7Â6$ Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7Ãc Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7 Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7ÂÂb@ Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7?Ã- Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7@Ãa Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7AÂ$E Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7BÃ+ Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7CÃa- ÂLxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7DÂYK Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7EÃd  Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7FÂY^ Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿ210/21/09-CTI ROBINSON INSTALLED NEW OMNTEC LU-3 PHxlÃ7Gà  ÂxlxlÂ<xlÄþÿþÿþÿþÿþÿþÿþÿxlÃ7HÂ.7 ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7IÂ.6 ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7KÂ.9 ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7LÂO( Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7MÂO' Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7NÂ-J  xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7OàÂ)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7PÂ2> Á xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿ¬4/10/08 COPI - BEAUMONT INSTALLED NEW DSL LINE, APT SUMPS FOR RNL & DSL, DISP SUMP W/MONITOR UNDER DISP #2 5/7/08 COPI - BEAUMONT RAISED SPILL BUCKETS AND POURED NEW ISLANDxl Ã7QÂM' Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿÒTHIS SITE HAD DEP INSPECTION-IT APPEARS ALL FAILINGS HAVE BEEN ADDRESSED WATER REMOVED FROM SPILL BUCKET REMOTE 2" SCULLY FILL AGAINST BUILDING REMOVED AND CAPPED OFF GRAVEL REMOVED FROM AROUND COPPER LINES PHxlÃ7SÂO Â]xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ„PROPERLY OOS, CHAMBERLAIN CHECKED ALL COMPONENTS EXCEPT LLD BEC NO FUEL IN TANKS FIRST GEN ENVIROFLEX PIPING 7/23/08 NOT RTS YET. NOTIFIED JODY THAT MUST SUBMIT PASSING AI & PT AND RECEIVE WRITTEN PERMISSION FROM DEP BEFORE RTS. -ML 7/28/08 PT - INTL RISER FAILURE. UPGRADE REGN FOR CTI GEORGE TO REPAIR. WILL RETEST AFTER REPAIR. 8/15/08 COPI - CTI GEORGE REPLACED INTERSTITIAL RISERxlÃ7TÂ% ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7UÂ!< ÂxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿÚ10/16/09-NOITA REC'D FOR CTI CARVER TO REMOVE OLD TANKS, FESSENDEN TO DO SA-PH 2/26/09-UPGRADE REG. FOR CTI CARVER TO INSTALL INTERSTITIAL MONITORING ON BOTH TANKS-PH 9/18/08-CTI CARVER RETESTED CP, READINGS ARE AS FOLLOWS: TANK 3:-.943 TANK 4:-.965 PH REMOVED INTERSTITIAL RISER CAPS TO ALLOW MANUAL MONITORING. OPERATOR WILL BEGIN MONITORING & LOGGING. INTERSTICES DRY AT TIME OF INSPECTION. MONTHLY RECONCILIATION SHEETS NOT AVAILABLE AT TIME OF INSPECTION. MLxlÃ7VàÁ xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã7WàÁ xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7XÂZ? Á xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7YÂJ Á xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7\ Á xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7] Á xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿm7/23/08 COPI - CTI BEAUMONT REPLACED LEAK SENSOR JR W/VR ILS-350 CONSOLE & SENSORS FOR TANK & PIPE MONITORINGxlÃ7_Ã$ Â`xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7`Ã& Â`xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã7aÂ- Â`xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ7dÂF, ÂXxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8Ã.  Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8Â@2 Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8ÂKX Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8ÂGB Â)xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã8à  Â)xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã8 @ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ8Ã0 Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ8 ÂX*  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ†6/23/09-NOITA REC'D FOR GLEN JACOBS TO PULL HEATING OIL TANK, CTI CARVER WILL LIKELY BE ONSITE, GLENN WALL IS AVAILABLE TO DO 30 DAY WAIVER IF NECESSARY PH PLEASE NOTE: TANK 5-3 IS OUT OF SERVICE AND IS NOT ALLOWED TO BE BROUGHT INTO SERVICE DUE TO THE LENGTH OF TIME IT WAS OUT OF SERVICE IMPROPERLY. SEE REG. FILE FOR MORE DETAILS. -LW TANK 5-3 HAS 65 INCHES OF WATER. TANK #8-1 HAS 11 INCHES OF PRODUCT IN IT. PRODUCT LINES NEED TO BE CAPPED AND FILLS LOCKED. OIL LINES NOT ACCESSABLE AT TANK AND FLOOR BUILT OVER LINES AT BUILDING. OIL LINES NOT BEING USED. UNKNOWN IF TANK HAS VENT WHISTLE. NO OVERFILL. TANK INSTALLED ON 12/1/1988.xlÃ($ÃC Â!xk xk Âxlþÿþÿþÿþÿþÿþÿþÿú12/6/07 AI FAI LETTER -ML 12/14/07 CTI CHAPMAN CONTRACTED TO INSTALL 15 GAL SPILL BUCKETS W/NEW DROP TUBES AND FLAPPERS, REMOVE TANK 6 STP WITH FAILING LLD AND INSTALL SIPHON LINE INSTEAD. LLD FAILING BECAUSE STP NOT WORKING, THAT CHAMBER NOT IN USE, INTERSTITIAL MONITORING FOR PIPING IS FUNCTIONING. 1/3/08 CONSIDERING OTHER WORK (DISPENSER REPLACEMENT), GETTING ESTIMATES FROM DISTRIBUTORS. C&C WILL SEND PAPERWORK WHEN SOW IS FINALIZED. REMINDED OWNER THAT FACILITY IS IN VIOLATION AS OF 12/12/07 BECAUSE PAST 30 DAYS TO REPAIR. -ML 7/24/08 COPI - CTI MULLINS INSTALLED SIPHON LINE FROM 6-2 TO 6-1, STP FOR 6-2 DISCONTINUED. INSTALLED NEW VR SENSORS, REPAIRED ALL SUMPS, REPLACED ALL SPILL BUCKETS & DROP TUBES. REMOVED PLUS LINE (6-2) FROM SERVICE. xk Ã8 ÃcV Â`xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8 Â\ ÂYxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8  Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8 à  Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8ÂB Â%xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8à ] Â%xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8 Â%xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8à V Â%xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿSEE REG 20980.xlÃ8à S Â%xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿSEE REG 20980.xlÃ8à T Â%xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿkSEE REG 20980. 10/28/2010 NATE HERSEY PLANNING TO REPLACE REMOTE FILL AND TANK TOP SUMP IN 11/2010. DMCL xlÃ8Ã6: Â%xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8à  Â%xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8ÃZÂÂYxj xj ÂþÿþÿþÿþÿþÿþÿþÿþÿÚTANK 1 READING: -.99, -1.05, -1.01 INCOMPLETE ANNUAL SUBMITTED FOR 8/29/07 - TANKS 2,3,6,8 PASSED. OTHERS FAILED, ST.PETER BID FOR REPAIRS, NEVER HEARD BACK FROM OWNER. NOT SUBMITTING FAILING INSPECTION. 8/4/08 -MLxjÃ#  ÂUxk xk Âxk þÿþÿþÿþÿþÿþÿþÿä9/24/09-COPI FOR CTI SIMARD TO INSTALL 2 NEW 17 POUND ANODES-PH 10/5/07 CP FAIL LTR -ML PASSING PER CTI MIKE LEWIS. 8/4/08 CTI SIMARD STARTED AI, GOT -0.6 FOR TANK THEN WAS KICKED OFF PROPERTY. OWNER SAID AI ALREADY DONE. -MLxk Ã8Á[ ÂYxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8à  ÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ#Ã( ÂIxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿH7/22/09-REGISTRATION REC'D FOR CTI SIMARD TO INSTALL 3 NEW TANKS PH 6/29/09-NOITA REC'D FOR CTI JOHNSON TO PULL ALL TANKS-7/29/09 EXPECTED REMOVAL DATE PH 1/6/09-COPI FOR THE WORK MENTIONED BELOW 12/2/08-REGISTRATION RECIEVED FOR CTI SIMARD TO REMOVE SIPHON LINE BETWEEN 11 AND 12, REMOVE THE STP PIT FROM 11'S TANK TOP, AND RUN PIPING FROM 12 TO A TRANSITION SUMP THAT WOULD TIE THE LINE INTO THE EXISTING PIPING FROM THE ORIGINAL 11-12 SIPHON SETUP-PH 7/31/08 COPI - CTI JOHNSON INSTALLED SPILL BUCKET ON TANK 10 PREMIUM SALES IN JULY 2898.6, O/S 83. REPORTED TO DEP. CP READINGS: TANK 9 -.879, -.904, -.902, PIPING -1.097 TANK 10 -.851, -.852, -.902, PIPING -1.097 TANK 11 -.98, -.964, -.955, PIPING -1.11 TANK 12 -.914, -.912, -.902, PIPING -1.11 TANK 13 -.878, -.856, -.956, PIPING -.966 TANK 14 -.909, -.901, -.998, PIPING -.966xkÃ8à 8 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ{HAD TO REPLACE TANK 4-1 INTERSTITIAL CAP ADAPTER. OLD ON BROKEN. HAD TO LUBRICATE TANK 5-1 FLAPPER TO MAKE WORK PROPERLY.xlÃ8Ã[ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿºDIESEL FLAPPER BROKEN- NEEDS NEW DROP TUBE TO PASS REPLACE DSL DROP TUBE 7/10/2008. PUMP 1 AND 2 HAD TO REPLACE LEAKY FILTERS TO PASS PUMP 3 AND 4 TIGHTENED UNION ON SUPER LINE TO PASS.xlÃ8ÃH] ÂbxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8 ÃCb Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ! TANK READING: -.87, -.901, -.911xlÃ8!Ãc< Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8"Ã. Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8#ÂX Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿREPLACE INTERSTITIAL SENSOR.xlÃ8$Ã5L Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8%Ã_` Á xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8&Â1) Â`xlxlÂxlþÿþÿþÿþÿþÿþÿþÿµHAD PROBLEMS WITH THE TEST BUTTON ON THE MONITOR. TESTED PROBES AND THEY WORKED. TRIED TEST BUTTON AGAIN AND IT WAS WORKING. I STILL DON'T KNOW WHY IT DIDN'T WORK AT THE BEGININGxlÃ8'ÃU6 ÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPFILLS CLEAN AND DRY; GREAT JOB REPLACED VAPOR POPPET- OLD WORK OUT- NOT SEALINGxlÃ8(ÃNQ ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ_UNABLE TO TEST PLUS LLD BECAUSE THEY ARE NO LONGER SELLING THE PRODUCT AND CURRENTLY HAVE NONE.xlÃ8)à 4 ÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã8*Â$\  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8+ÃN  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8,Ã\9 ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿJNO NARRATIVE ON AI, BUT THIS SHOULD BRING THE FACILITY INTO COMPLIANCE PHxlÃ8-Ã]# ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿgVEEDER ROOT TLS-350 INSTALLED AT FACILITY TO REPLACE OLD CONSOLE DESTRROYED BY CAR ACCIDENT-CTI LEGASSExlÃ8.àÂRxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8/ÁK Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ80Ã]  ÂTxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ81Ã] ÂTxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ82Â=T ÂbxlxlÂ7xlþÿþÿþÿþÿþÿþÿþÿÿ09/15/11: DALE CHAPMAN SAYS TANK 10 PROPERLY OOS, REARRANGED PIPING COMPLETE FOR FACILITY TO STAY OPEN. AI IS COMPLETE AND PASSING. -WP 10/12/09-COPI FOR CTI BISKUPIAK TO REPLACE TANK 6 SPILL BUCKET-PH 7/16/09-COPI FOR CTI THOMPSON TO REMOVE STUCK DROP TUBE FROM RISER BY PULLING RISER TO REMOVE, AND REPLACE FLAPPER-AND REPLACE SPILL BUCKET-TANK 12 PH INSTERSTITIAL AND C.P. FOR TANK 10 FAILED WHEN INITAIL INSPECTION DONE ON AUG. 6; SENSOR REPLACED AND C.P. RETESTED WITH PASSING RESULTS ON AUGUST 7. DMCLxlÃ83Â0c Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ84Â0a Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ85Ã^U Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ86Â\J Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ87Â4. Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ88Ã+  Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ89ÂG ÂMxlxlÂ<xlÃ4þÿþÿþÿþÿþÿþÿþÿxlÃ8: 0 Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8; ÂMxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8<ÂP ÂLxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ8= Â Â%xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ8> Â Â%xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ8@ Â Â%xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ8AÃC Â!xlxl Âxlþÿþÿþÿþÿþÿþÿþÿ ALL SUMPS "REPAIRED" NEW SUMP SENSORS REMOVED OLD TURBINE FROM PLUS TANK (NOT BEING USED SINCE NOW IS SIPHON) AND CAPPED OFF REPLACED ALL SPILL BUSKETS ALL DROP TUBES REPLACED WITH COAX FLAPPERS DISPENSERS 1-4 ARE NOT BEING USED CURRENTLY AS THEY ARE BEING REPLACED-FLUSHED AND CAPPED PHxlÃ8B T Âxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ\6.75" OF PRODUCT REMOVED FROM 4-2 PN 7/29 LLD COULD NOT BE CHECKED-NO PRODUCT 4-2 SECURED PHxlÃ8CÂI Á xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ8DÂ8 Â`xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿLSUPER AND PLUS COVERS REPLACED NEW VAPOR RECOVERY CAP, NOT SURE WHAT TANK PHxlÃ8EàÂxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿGINTERSTITIAL SENSOR FOUND NOT TO BE WORKING-REPLACED, TESTED, PASSED PHxlÃ8FàÂ)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ³ELECTRONIC OVERFILL NOT BEING USED, AND WAS REMOVED DISCUSSION W/MELANIE CONCLUDED THAT SCHOOL COULD NTO GET PRESSURIZED DROPS-SCHOOL DEPT. WILL DISCUSS AND INFORM US OF STATUS PHxl Ã8GÂE Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ6-2 NOT BEING USED PHxl Ã8H Âxlxl ÂxlÃ)þÿþÿþÿþÿþÿþÿPHxlÃ8IÃ! Âxl xl ÂxlÂ0NþÿþÿþÿþÿþÿþÿVERY LOW THRUPUTxlÃ8JÃYb Â!xlxl Âxl þÿþÿþÿþÿþÿþÿþÿZAPPARENTLY FACILITY IS NOW OUT OF SERVICE SENDING LETTER TO HAVE OWNER SUBMIT PAPERWORK PHxl Ã8K Â Â%xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ8L Â Â%xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ8Mà % Â%xlxl ÂxlÃþÿþÿþÿþÿþÿþÿPHxlÃ8NÂ7 Â%xlxl ÂxlÃ/23þÿþÿþÿþÿþÿþÿPHxlÃ8OÃa Â%xlxl ÂxlÃþÿþÿþÿþÿþÿþÿPHxlÃ8PÃ3T Â%xlxl Âxlþÿþÿþÿþÿþÿþÿþÿy4/20/09-COPI REC'D, CTI HERSEY REPAIRED FIBERGLASS LINES DAMAGED BY CAR COLLISION. SITE ASSESSMENT WILL BE SUBMITTED PHxlÃ8QÂ5^ Âxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿREPLACED FILL CAP ON 3-1xlÃ8RÁ< Âxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ!REPLACED FILL CAPS AND VAPOR CAPSxlÃ8SÃ. Áxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ=REPAIRS MADE TO PASS: ALL BALL FLOATS REPLACED TO MEET 90% PHxlÃ8TÂM] Áxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿAREPLACED KEY PAD ON CONSOLE, ALARM, WARNING, AND BULBS TO PASS PHxlÃ8VÃ($ Âxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿVENT PIPE CP--.90 PHxlÃ8WÂX Â\xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8XÂ:F Â\xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8YÂ0) Â\xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8ZÂQ\ Â\xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8[Â0$ Â\xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8\Â0' Â\xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8]Â:A Â\xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8^Ã; Á$xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8_Ã"9 Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8`Â5 Á$xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿG12/4/08-INTENT TO ABANDON REC'D-CTI KANE TO DO WORK, ACADIA TO DO SA-PHxl Ã8aÃ4 Á$xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8bÃbN Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ8cÃÂÂxl xl Â<xkþÿþÿþÿþÿþÿþÿþÿþÿxkÃ8d  ÂUxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9à D Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿÐUPGRADE REGISTRATION RECIEVED10/2/08 FOR CTI SIMARD TO REPLACE SUMP COVER AND SURROUND PH JUNE CALLED ON 3/24/2009 TO LET DEP KNOW REPAIRS WILL BE MADE IN MID MAY 2009. HAVE TO WAIT UNTIL FROST IS GONE. -LWxlÃ9Ã" Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9Â< ÂXxlxl Âxl þÿþÿþÿþÿþÿþÿþÿ3PH VAC TEST COMPLETED TO RETURN TO SERVICE 6/18-PHxl Ã9Â` ÂXxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿT09/27/10: SCHOOL CALLED. RCVD NOV. REMINDED THEM OF AI REQUIREMENTS. WILL CALL TONY COUTURE ASAP. -WP 7-1 REPLACED SUMP SENSOR AND INTERSTITIAL SENSOR NEW TC SUMP COVER AND GASKET NEW FLAPPER DROP TUBE PH AI WAS INCOMPLETE - MISSING OOS TANK 5. 8/20/08 COUTURE WILL RETURN TO COMPLETE INSPECTION, NOTIFIED SUPERINTENDENT JERRY WHITE. -MLxlÃ9 ÂTxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ$REPLACED FAULTY INTERSTICE SENSOR PHxlÃ9ÂB  Â)xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9Â/Q Â!xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9Â/c Â)xlxl Âxlþÿþÿþÿþÿþÿþÿþÿq7/31/08 CTI BUBAR DETERMINED WHISTLE NOT WORKING 8/4/08CTI RETURNED AND REMOVED WHISTLE AND INSTALLED FLAPPER PHxlÃMÃ!ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿæSPILL BUCKETS: CLEANED OUT WATER 9/26/2007 CURRENT OPERATORS PUMPING TANKS DOWN TO LESS THAN 1'' PRODUCT. FACILITY WILL BE OOS. 9/14/2007 FACILITY OPERATOR IS NOT RENEWING LEASE (AS OF 10/31/2007) AND FACILITY WILL GO OOS, UNTIL NEXT TENANT. PRECISION TEST IS REQUIRED IF FACILITY GOES OOS SERVICE AND BROUGHT BACK INTO SERVICE. REQUIRING DAILY INVENTORY AND SIA BE SUBMITTED TO DEPARTMENT. -LW 8/1/08-FAILING AI INDICATES THE STORE IS UP FOR SALE AS WAS PREVIOUSLY THOUGHT. AI BY CTI BUBAR HAS POST-IT SAYING THE STORE HAD A FIRE, ACCORDING TO THE BANGOR DAILY NEWS THE STORE WAS PROBABLY A TOTAL LOSS. THE FAIL WAS FOR DAILY INVENTORY, WHICH IS LOGICAL DUE TO THE FACT THE STORE IS CLOSED. I WILL TRY TO TRACK DOWN OWNER/REALTOR... PHxkÃ9 ÂB ÂYxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9 Ãc ÂYxlxl Âxlà 5 þÿþÿþÿþÿþÿþÿPHxlÃ9 Â=4 Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9 à % Â)xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ=INCORRECTLY ENTERED. PLEASE SEE AI INSPECTION YEAR 2009. -LWxlÃ9 Ã! Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ;INCORRECTLY ENTERED. PLEASE SEE A.I. DATED 8/7/2008. -LW xl Ã9Â@\ Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ4CLEANED AROUND SUMP LIDS REMOVED WATER FROM SUMPS PHxl Ã9 ÂVxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿSPILL BUCKETS CLEANED OUT PHxlÃ9Ã! Â)xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9à % Â)xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã9 ] ÂMxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9Ã\) ÂYxlxl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã9 R ÂYxlxl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã9Ã& Â;xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9 1 ÂMxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9  ÂMxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9Â\ Â%xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9ÂP@ Â%xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9Ã* ÂUxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9 Áxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9Â#@ Â*xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9ÃJ? Âxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ8TANKS 1+2 INTERSTICE SENSORS REPLACED BY CTI D. DAVIS PHxlÃ9Â0* Â\xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿREMOTE FILL PHxlÃ9 Â%F Â\xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿÃREPAIRED FAULTY CONSOLE WIRING- CONSOLE IS NOT ON ITS OWN CIRCUIT, AND GETTING IT WIRED INTO ITS OWN PROTECTED CIRCUIT WAS RECOMENDED, AS WELL AS GETTING A TRUE EARTH GROUND INSTALLED 24" OF WATER REMOVED FROM ANNULAR SPACE OF TANK-WATER INTRUSION LIKELY FROM RISER CAP CONDUIT TO CONSOLE DAMAGED AND REPAIRS WERE RECOMENDED FILL CAP REPLACED SPILL BUCKET CLEANED OUT TANK HAS 1" WATER, RECOMENDED REMOVAL CP READING-TANK=-.864 PRODUCT PIPING -1.09 PHxlÃ9!ÃX? Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ/CTI DAVIS THINKS CONSOLE SHOULD ALARM INTO A ROOM THAT IS MORE ACESSABLE TO THE OPERATOR, CURRENTLY IT IS IN A BACK ROOM OF THE STORE WATER AND PRODUCT REMOVED FROM UNDER DISPENSER 3/4, AND LEAKING METER REPLACED CRASH VALVE HEIGHT ADJUSTED ON 3/4 BALL FLOAT ON TANK 1 REPLACED SPILL BUCKETS CLEANED PHxlÃ9"Ã7 Á$xlxlÂxl Ä þÿþÿþÿþÿþÿþÿÅ11/21/08-COPI REC'D 12/19/08 TO REPLACE SIPHON LINE BETWEEN TANK 4 AND 5-CTI E. SCOTT-PH DISPENSER 12/14 CRASH VALVE HEIGHT ADJUSTED, AND TEST PORT INSTALLED-CTI DAVIS REPLACED VR CAPON TANK 4 PHxl Ã9#Â[ Á$xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9$ÃF ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9%Â+ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ&U ÂSxk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ(NEW INTERSTITIAL SENSOR INSTALLED. TR xk Ã9&Â-O ÂbxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9' ÂbxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9(Â5( ÂbxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9) X ÂbxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9*à  Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿiAI INDICATED FAIL FOR CRASH VALVE BEING .25" OFF. AFTER CONFERRING WITH DIANA, WE'RE PASSING THIS ONE. PHxlÃ9+Â*  xlxlÂxlÃ=_ þÿþÿþÿþÿþÿþÿ)ANNULAR SPACE SENSOR LOWERED 1.5" FLAPPERS WERE 1.5" TOO HIGH DUE TO THE SPILL BUCKET UPGRADE LAST FALL WHICH WAS SPURRED BY THE BUCKETS BEING IN A LOW SPOT, AND CONSTANTLY BEING FULL OF RAIN WATER. REPAIRS MADE +- 1 WEEK AFTER INITIAL INSPECTION, AND PROPER SETTINGS WERE CONFIRMED ON 8/12/08 PHxlÃ9,ÃD$ ÂxlxlÂxl ÄJTþÿþÿþÿþÿþÿþÿPHxl Ã9-Â( ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9.Ãc ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9/Â>\ ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿ(REPLACED SENSOR IN 7/8 DISPENSER SUMP PHxl Ã90àÁ$xlxlÁ_xkÄþÿþÿþÿþÿþÿþÿOON SITE DURING UST INSPECTION. REQUESTED NEW ONE SINCE THIS ONE WAS A YEAR OLDxkÃ91Â/ ÂRxl xlÁ`xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã92ÂU ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ93Ã) ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ94ÂU ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ6/24/09-UPGRADE REG. FOR CTI BARTON TO INSTALL NEW ANODES FOR CP ON 4000 GALLON TANK PH 12/15/2008 EVELYN CALLED AND SAID SUBMITTED SIA IN 6/2008. IT WAS ATTACHED TO 8430 AND DID NOT GET ENTERED. FACILITY RECEIVED MASS MAILING SIA NOV. FACILITY IS ALL SET. SIA ENTERED. -LW PHxlÃ95ÂCO Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã97ÃW= Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã98ÃR Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã99à N Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9:ÂT  Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9;àÂ!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿDFACILITY USES CSLD TANK MONITORING, AND ALSO DOES DAILY INVENTORY PHxlÃ9<ÃJ: Â!xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ5PH COPI FROM CTI MULLINS TO REPLACE MANHOLE COVER-PHxl Ã9=Ã3P ÂSxlxlÂxlà þÿþÿþÿþÿþÿþÿKREPLACED OMNTEC MONITORING CONSOL REPLACED DIESEL DISPENSER SUMP PROBE PH xlÃ9>ÂN  ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿaFILL CAP NOT LIQUID TIGHT TANK CONTAINS 1" WATER-REMOVAL RECOMENDED THROUGHPUT LESS THAN 50000 PHxlÃ9?ÃVN ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿx*CTI WAS A. THORNDIKE* REMOVED LESS THAN 1 GAL WATER FROM PIPING SUMP-INFILTRATION APPEARS TO BE AT SUMP LID, REMOVED SILT/SOIL TO FACILITATE SEAL FILL CAP REPLACED CLEANED SPILL BUCKET TANK CONTAINS 1.5" WATER-REMOVAL RECOMENDED UNABLE TO TEST LLD INSIDE ELECTRICAL ROOM DUE TO LACK OF TEST PORT-RECOMENDED THAT TEST PERT BE INSTALLED BETWEEN ABOVE AND BELOW GROUND PIPING PHxlÃ9@Ã5 Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿDOES NOT APPEAR TO HAVE OVERFILL-RECOMENDED VENT WHISTLE BE INSTALLED, OR VERIFY THAT THERE ALREADY IS ONE PRESENT NO SPILL BUCKET ON REMOTE FILL-RECOMENDED ONE BE INSTALLED DOES NOT APPEAR TO HAVE SPACERS ON LINES-1985 INSTALL, NOT REQUIRED-RECOMENDED THERE BE SPACERS INSTALLED PHxl Ã9AÂ9O Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã9B Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã9CÃdS Â\xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ…TRANSITION SUMP CONTAINED SMALL AMOUNT OF DIESEL, LIZA WAS CALLED, CLEANED OUT BOTH FILL CAPS REPLACED VAPOR RECOVERY CAP REPLACED PHxl Ã9DÁ& Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿfFOR SOME REASON, JOE BOSSE DID AN INSPECTION ON 8/13 OF THE JET FUEL TANK-ALSO A PASS SMALL AMOUNT OF FUEL REMOVED FROM JET FUEL SUMP MANUFACTURER DOES NOT RECOMEND TSP GUAGING PROBES BE USED IN HEAVY OR HEATED OILS TANK 5 PIPING SUMP SENSOR REPLACED TANK 4 CONTAINED 1" WATER-RECOMEND REMOVAL TANKS 5,6,7 FILL CAPS REPLACED REMOVED AND CLEANED ATG PROBES PHxlÃ9E ÂxlxlÂxl Ã.þÿþÿþÿþÿþÿþÿPHxl Ã9F ÂxlxlÂxlÃþÿþÿþÿþÿþÿþÿPHxlÃ9GÃW' Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9HÃ.E Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9IÂX Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9JÂ9 Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿ‹SEAL PACKS INSTALLED ON 5-1, 5-2 PROBE WIRING 5-2 VAPOR CAP WITTING LID-FLIPPED LID OVER IN INTERIM, HAVING NEW LOW PRO CAP SENT TO SITE PHxl Ã9Kà Q Â!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9L ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9Mà S Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9NÂ7? ÂMxlxlÂþÿà 0þÿþÿþÿþÿþÿþÿD6/25/09-NOITA REC'D FOR CTI HERSEY TO REMOVE PIPING ON BOTH TANKS PHxlÃ9Oà U Â:xlxlÂxlÃ=WþÿþÿþÿþÿþÿþÿþÿxlÃ9PÃ9 ÂRxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9Q 3 ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9R ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ•10/6/09-COPI REC'D FOR CTI CARVER TO INSTALL FLAPPER ON REG. TANK-PH 9/23/09-PAVEMENT HAS BEEN REPAIRED PER OBSERVATION MADE BY CHRIS FOUNIER-PH PHxlÃ9SÂWO ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9TÂ0 ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9UÃA ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9VàÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9WÃ\# ÂbxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9XÂ& Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9YÂW ÂdxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ9ZÃ.@ ÂbxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9[ÂW@ ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9\ÂW> ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9]ÂW9 ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9^ÂW= ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9_ÂW? ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿCP READING: -.857 PHxl Ã9`ÂW< ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿCP READING: -.951 PHxl Ã9aÂW; ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã9cÃWE ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿÄTHIS FACILITY NEVER ACTUALLY CAME BACK INTO SERVICE 5/1/09, CN BROWN ENDED UP SUBMITTING REQUEST TO EXTEND OOS PERIOD. 4/27/09- REQUEST TO REMAIN OOS GRANTED UNTIL 3/31/2010-PH FACILITY IS OOS PHxl Ã9d Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:Ã\ Â%xlxlÂxlÃ"9þÿþÿþÿþÿþÿþÿPREWIRED INTERSTITIAL SENSORS ON BOTH TANKSREPLACED SPILL BUCKETS FOR TANK 3, 1+2xlÃ:Â^; ÂYxlxlÂxlÃ6Uþÿþÿþÿþÿþÿþÿ36/16/09-AI RECIEVED, FAILING FOR DI ON 1,4,5 PH PHxlÃ:Ã_ ÂYxlxlÂxlÃA$þÿþÿþÿþÿþÿþÿPHxlÃ:ÂZ9 ÂIxlxlÂxlÃHBþÿþÿþÿþÿþÿþÿPHxlÃ:ÂYR Â;xlxlÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã:Ã[ ÂRxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ: Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ: ÃGV Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:  I Â)xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ: Â> ÂIxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ: Ã! ÂIxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ: ÃO ÂIxlxlÂ<xlà QþÿþÿþÿþÿþÿþÿþÿxlÃ:Ã!V ÂYxlxlÂ<xlÃP*þÿþÿþÿþÿþÿþÿA7/2/09-COPI REC'D FOR CTI JOHNSON TO REPLACE ALL SPILL BUCKETS PHxlÃ:Â^6 ÂYxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:ÃJ; ÂIxlxlÂ<xlÃ]d8þÿþÿþÿþÿþÿþÿþÿxlÃ:ÃSO ÂTxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:Âd5 ÂKxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:Ã:K ÂRxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:Â>c Â;xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:ÃJ Â\xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿCP FAIL LETTER 8/21/08xlÃ:Â! Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿREWIRED PROBES PHxlÃ:ÂRY ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:Â) Â!xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ¦DEP INSPECTIONED SPURRED AI AND A GOOD AMOUNT OF WORK: SUMPS CLEANED OUT, OLD SILICONE CAULKING AROUND SUMP RETROFIT REMOVED AND PISCES SL-1100 USED TO RESEAL ALL 3 SPILL BUCKETS CLEANED ALL 3 DROP TUBED REPLACED AND SET CORRECTLY BOTH GAS LLD'S FAILED FIRST TEST, THEY WERE ADJUSTED, AND PASSED 2ND AND 3RD TESTS SUPER CHAMBER COAX TUBE SHREDDED-REPLACED TIGHTENED WEEPING FITTINGS ON CRASH VALVES ENFORCEMENT RESOLVED PHxlÃ:ÃXb Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿQCLEANED OUT ALL SUMPS-WATER INTRUSION COMING FROM DISPENSERS THROUGH SECONDARY PHxlÃ:à ) ÂxlxlÂþÿÄþÿþÿþÿþÿþÿþÿþÿxl Ã:à V ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿÔICE REMOVED FROM AROUND SUMP LID, WHEN OPENED, IT WAS DRY ADDED LENGTH TO INTERSTITIAL RISER TO BRING IT TO CORRECT LEVEL WITHIN INT. SPACE CHIPPED ICE OUT OF SPILL BUCKET PH 3/10/2008 AI DONE BY KL SR., NOT JR.xl Ã:ÃH' Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ‚TANKS 1 AND 3 FAILING INITIAL INSPECTION FOR INTERSTITIAL MONITORING, THEY WOULD NOT COME OUT OF ALARM, PROBLEM DETERMINED TO BE IN THE WIRING 6/24/08- CTI BUBAR REWIRED NEW SENSORS, AND SYSTEM NOW WORKS FINE PH 8/25/08 LEGASSE SR SAYS REPLACED ALL INTERSTITIAL WIRING. ALL ALARMS CLEARED EXCEPT SUPER SUMP SENSOR. SUMPS DRY. OWNER TAKING SUPER TANK OOS, EXPLAINED REQUIREMENTS. -MLxlÃ:ÃL Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:  ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ†ON 8/22 CTI D. DAVIS REPLACED INT. SENSOR ON TANK 6 VENT WHISTLE ON TANK 6 REPLACED TANK 5 WHISTLE LENGTHENED SPILL BUCKETS CLEANED PHxlÃ:àÂ:xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ: Ã^I ÂxlxlÂxlÃ=þÿþÿþÿþÿþÿþÿPHxlÃ:!Ã] ÂxlxlÂxlÃ=þÿþÿþÿþÿþÿþÿ1PH PASSING INSPECTION ON AST PIPING SAME DATE. BBxlÃ:"Ã^* ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿSCULLY FILL IN SPILL BUCKET PHxlÃ:#Ã]- ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿREPAIRED INTESTICE WIRING PHxlÃ:$ÂI ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:&ÃJ9  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã:'Â-  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã:(ÂB  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ°PH 9/3/08 OWNER VERY ILL, BUILDING VACANT 2 YEARS, HEATING SYSTEM STILL ACTIVE TO PROTECT SPRINKLER SYSTEM. RE AGENT DAVID HUGHES CHECKING PNEUMERCATOR WEEKLY FOR ALARMS. -MLxlÃ:)ÂGG  xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ'INSPECTOR WAS ACTUALLY DAVE BEAUMONT PHxlÃ:*Ã\@ Á xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã:+Ã\A Á xlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã:,Ã< ÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:-Ã" ÂbxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:.Â7. ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:/à G ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:0 Â ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:1 ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã:2Ã# ÂbxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ9WATER REMOVED FROM SUMPS, BOTH TRANSITION AND TANK TOP PHxlÃ:3àÂbxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:4Ã:Y ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ‚2/9/09-ADDITIONAL PIPING RUN TO BE INSTALLED THAT WILL FEED DAYTANK, TO GENERATOR-PH NEW PIPING SUMP AND NEW PIPING ALL A PASS PHxlÃ:5ÃG ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ©NOI TO ABANDON FOR REMAINING TWO TANKS, CTI CARVER AND MEKLIN EXCAVATING TO DO PULL, FESSENDEN TO DO SA PH FACILITY PASSES OOS AI TWO TANKS WILL BE REMOVED AT A TIME PHxlÃ:6ÂTc ÂMxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:7ÃS ÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:8ÃS6 ÂKxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:9Ã$ Â:xlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ::Âb ÁxlxlÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ:;Ã3 ÂTxlxlÂxlþÿþÿþÿþÿþÿþÿþÿESUPER TANK PIPING SUMP SENSOR REPLACED REPLACED BOTH FILL ADAPTORS PHxlÃ:<Â2 ÂbxlxlÂxlÃ$ þÿþÿþÿþÿþÿþÿPHxlÃ:=ÂA  ÂbxlxlÂxlÃ_þÿþÿþÿþÿþÿþÿ!11/10/2009 STEPHEN BREZINSKI DISCOVERED A BARE STEEL TANK IN THE BACK FILL OF THE FACILITY'S LOT. TOLD OWNER IT NEEDS TO BE REGISTERED AND REMOVED. BREZINSKI GAVE THEM A WAIVER AND WILL REGISTER IT AFTER THE FACT. -LW 10/6/09-NOITA REC'D FOR CTI LETELLIER TO REMOVE TANKS 1 AND 2-PH PHxlÃ:>Ãa> ÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿþÿxk Ã:?ÂCV ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:@ A Â!xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:Aà P ÂxlxlÂxl Ã[þÿþÿþÿþÿþÿþÿþÿxl Ã:B  Â:xlxlÂxl Ã1P2þÿþÿþÿþÿþÿþÿPHxl Ã:CÂ"J Â:xlxlÂxlÄ&=QþÿþÿþÿþÿþÿþÿPHxlÃ:DÂW: ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã:EÃ_] ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿe1-1 SPILL BUCKET COVER BROKEN AND HAS SUNK 3" BELOW CONCRETE SURFACE REPLACED BY CTI HAZEL 8/25/08 PHxlÃ:FÃ3U Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ{REPLACED 1-1 FILL CAP PH SUBMITTED ATG INFORMATION; BUT FACILITY DOES NOT HAVE ELLD'S; REGISTRATION RETURNED TO OWNER. -LWxlÃ:H Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿcTANK 4 FILL CAP REPLACED TANK 6 GUAGE PROBES CLEANED VR CAP REPLACED 7-1, 7-2 FILL CAPS REPLACED PHxlÃ:IÂA Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxlÃ:JÃ,) Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ„TANK CLEANING PORT? CONTAINED SOME WATER, REMOVED PIPING SUMP CLEANED OF CONDENSATION VR CONSOLE LIGHT REPLACED FILL CAP REPLACED PHxlÃ:KÂS Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿæ2010 AI WILL BE COMING IN AS A PASS, THEY HAVE A FEW ISSUES THAT WILL BE ADDRESSED NEXT YEAR-8/25/09-PH PIPING SUMP CLEANED OF CONDENSATION SUMP MANHOLE LID CRACKED, REPLACEMENT RECOMMENDED INTERSTICE CONTAINED WATER-WATER INTRUSION LIKELY FROM RISER CAP-DAMAGED CAP AND CORD GRIP REPLACED ALL TANKS FILL CAP'S REPLACED ALL THREE CHAMBERS CONTAIN SMALL AMOUNT OF WATER, RECOMMEND REMOVAL 4-2 VAPOR CAP REPLACED DISPENSERS 1 & 2 HAVE NO SWIVELS OR BREAK AWAYS, RECOMMEND INSTALLATION PHxlÃ:LÂ# Â\xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ]FILL CAPS REPLACED GAUGING PROBES NOT FUNCTIONING PER MANUFACTURERS SPECS-RECCOMEND REPAIR PHxlÃ:MÂ# Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:NÂ. Âbxlxl Â<xlÃG0þÿþÿþÿþÿþÿþÿþÿxlÃ:OÃ`1 Âbxlxl Â<xlÃ0?þÿþÿþÿþÿþÿþÿþÿxlÃ:PÂM Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿY12/15/10-COPI REC'D FOR CTI BISSON TO REPLACE OVERFILL VALVE WITH MORRISON BROS. VALVE-PHxlÃ:QÃ6 Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:RÂM, Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:SÃC Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:TÃ1 Â\xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:UÂX8 Â\xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:VÂ5@ Â\xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:WÂA  Â\xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:Xà  Â\xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:YÂ/ Â\xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:ZÂO` Âxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:[ÃQP ÂTxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:\ Â]xlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:]Ã! ÂRxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:^àÂRxdxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:_ÂRI ÂRxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:`Ã1 ÂRxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:aÃY  ÂRxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿâ12/16/09- ATTACHMENT A REC'D-5-1 HAD A LOT OF MOLD, AND A 4X4" AREA OF FLAKING; AND 5-2 HAD A LOT OF MOLD-PH 12/1/09-NOITA REC'D FOR CTI BARTON TO REMOVE FIRST GEN TC PIPING, AND NEW REGISTRATION FOR THE REPLACEMENT PIPING-PHxlÃ:bÂRK ÂRxlxl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ:cÃS ÂXxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿREPLACED PIPING SUMP SENSOR xlÃ:d  xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿKTANK 5 SPILL BUCKET REPLACED AS WELL AS DROP TUBE BY CTI LEGASSE 8/28/08 PHxlÃ;ÂE^  xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿNEW ANNULAR SENSOR INSTALLED PHxlÃ;ÂV! Â)xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿRSOME WATER INTRUSION INTO SUMP FROM LOOSE LID SURROUND CLEANED OUT AND RESEALED PHxlÃ;Â6B Â)xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ;REPLACED POWER LAMP ON CONSOLE REPLACED VAPOR CAP ON 4-2 PHxlÃ;àÂxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ”INITIALLY COULD NOT CLEAR ALARM CTI LEGASSE INSTALLED NEW SWITCH ON ELECTRONIC OVERFILL ALARM AND RETESTED-WORKED REPLACED LAMP ON OVERFILL ALARM PHxlÃ;à b Âxl xl ÂþÿÃ+þÿþÿþÿþÿþÿþÿþÿxlÃ;Â[ Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;ÂV& Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ; ÂX Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ; ÂV Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ; ÂV Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ; ÂV Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;   Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;ÂV# Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;ÂV  Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;ÂV% Â)xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Ã$:  xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿÞ5/29/09-POTENTIAL BUYER OF FACILITY CALLED, MARY GREENE, SHE HAS WORKED AT FACILITY FOR 15+- YEARS, AND IS NOW IN THE PROCESS OF BUYING IT. FACILITY IS UP TO DATE ON EVERYTHING, AND SHE IS BEING SENT LINKS TO PLAIN TALK PHxlÃ;à   xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Ã* ÂXxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;ÃG Â+xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;ÃP ÂXxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;ÃP ÂXxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;àÂXxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Â0 ÂXxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Ã" ÂXxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Ã0 ÂXxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ; Â+S Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;!Â/4 Âxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;"Â8 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ.5-1 SUMP SENSOR REPLACED VAPOR CAP REPLACED PHxl Ã;#ÂIb Âxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ‰7-1 TURBINE PUMP AND LLD REPLACED 5/30/08 INSPECTION RECIEVED AS FAIL FOR BAD GUAGE STICK, GOT RECEIPT OF NEW STICK 9/4/08-NOW PASSING PHxlÃ;&  Á xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿnNEW SPILL BUCKETS INSTALLED PH 8/25/08 COPI - CTI BEAUMONT INSTALLED 2 SPILL BUCKETS & RISERS FOR TANK PROBESxlÃ;'Â. Âbxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ¤PH 9/15/08 REGN FOR CTI HOWE TO CONVERT PLUS CHAMBER TO #2. WILL CAP PIPING INTO EXISTING DISPENSERS, INSTALL NEW PIPING TO NEW #2 DISPENSER ADJACENT TO K1 DISP. xlÃ;(Â. Âbxl xl ÂxlÃNbdþÿþÿþÿþÿþÿþÿPHxlÃ;)ÃN Â:xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿSUMP SENSOR REWIRED PHxlÃ;* Â:xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ;+Ã, Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã;,ÂG+ Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿRCTI CARVER'S AI FAILED DUE TO LACK OF SPACING-'86 INSTALL, SPACERS NOT REQUIRED PHxlÃ;-ÃQU ÂMxl xl Âxl þÿþÿþÿþÿþÿþÿþÿˆINSTALLED NEW FLAPPERS AND 15 GALLON SPILL BUCKETS PH 9/3/08 COPI - CTI HERSEY INSTALLED OPW 61-SO FLAPPERS AND FAIRFIELD SPILL BUCKETSxl Ã;.ÂXP Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;/Â0 ÂMxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã;0Â[* Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;1Â:M ÂLxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ;2Â%V ÂRxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ;3Ã]; ÂPxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ;4à O Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿREPLACED SPILL BUCKET COVERxl Ã;5Ã`. ÂPxlxl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã;6ÃR Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;7ÂTY Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;8ÂT_ Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;9ÃD ÂPxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿFACILITY OOS-TOO LONG, BUT IS IN MECHANICAL COMPLIANCE WATER REMOVED FROM SUMP POWER TO FACILITY IS OFF, <.25" WATER IN TANK PHxlÃ;:ÃF ÂPxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ.75" WATER IN TANK PHxlÃ;;ÃH ÂPxlxl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã;<Ã? Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;=ÂS? Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;>ÃX Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;?ÃP Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;@ÂTS Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;Aà L Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;BÃQ' Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;CÃ8 Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;DÃB ÂPxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ;EàÂ^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;FÂB0 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿnCP -1.065 OWNER POSTED SIGN INSTRUCTING DELIVERY DRIVER TO STAND NEAR WHISTLE, PIC OF SIGN IN FILE. OK'D -MLxl Ã;GàÂPxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ>2-1-REPLACED FLASHER UNIT ON OUTSIDE OVERFILL ALARM CONSOLE PHxlÃ;HÃK ÂPxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ;IÃ]8 ÂPxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ;JÃ]< ÂPxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ2FACILITY OOS-NO POWER TO CONSOLE/LEAK DETECTION PHxlÃ;KÃ]> ÂPxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ!REPLACED HORN ON OUTSIDE ALARM PHxlÃ;LÃG ÂPxlxl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã;MÃE ÂPxlxl Âxl þÿþÿþÿþÿþÿþÿþÿDFACILITY OOS, POWER OFF TO CONSOLE WATER REMOVED FROM PIPING SUMP PHxl Ã;OÃJ= Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;PÃ`0 ÂPxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ;RÂ\$ Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;SÂ\# Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Tà F Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Uà ? Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;VÃO_ Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;WÂE8 Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Xà K Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Yà E Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;Zà J Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;[à @ Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã;\ÂEG Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;]ÃS Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;^ÂXN Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;_Â\  Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;`àÂ^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;aÂ\  Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;bÂ\  Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ;cÂXK Â^xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã%&Ã6* ÂRxk xk Â<þÿþÿþÿþÿþÿþÿþÿþÿRCP FAIL LETTER 10/31/07 -ML 3/25/08 UPGRAGE REGN FOR CTI PAUL BOSSE TO INSTALL ANODES 8/18/08 JOE HAS DONE INSPECTION BUT CP IS STILL NOT DONE. I TOLD HIM INSPECTION IS NOT COMPLETE UNTIL CP HAS BEEN REPAIRED SINCE IT HAS BEEN ALMOST A YEAR FROM THE FAIL IN 07. TED 8/14/08 COPI - CTI BARTON INSTALLED ANODES; NO NEW READINGS SUBMITTEDxk Ã;dÂM Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã<Ã1  Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ™HAD TO REMOVE ABOVE GROUND SPILL BUCKET TO ACCESS DROP TUBES-REPLACED BRASS ADAPTORS 5-1 REPLACED LLD ADJUSTED CRASH VALVES ON DISPENSERS 1-8--8/29/08 PHxlÃ<ÂD Âbxl xl Âþÿþÿþÿþÿþÿþÿþÿþÿ³10/26/09-TANKS NOW OOS-PH RNL & SUPER SUMP ENTRY BOOTS TORN COULD NOT TEST PLUS LLD BECAUSE NO FUEL IN CHAMBER CRASH VALVES 3/4" TOO HIGH SUPER & PLUS CHAMBER HAS PVC VAPOR RISERxlÃ+_ÂR Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ»4/4/08 PCA ENGINEERING WILL INVESTIGATE CP FAILURE, TEST CURRENT DEMAND. -ML 8/29/08 AI UPDATE - ADDED 4 ANODES TO TANK 5, NEW READING -0.93. ADDED 1 ANODE TO TANK 6, NEW READING -1.01xlÃ<ÂU Âxlxl Âxl þÿþÿþÿþÿþÿþÿþÿkAI UPDATE REVIEVED 10/9/08-PASSING CP READINGS-TANK 3: -.86 TANK 4: -1.02 PH CP FAIL LETTER 9/9/08 -MLxlÃ<Â^3 ÂYxlxl ÂþÿÃ6UþÿþÿþÿþÿþÿþÿN10/27/08-COPI-RECIEVED FOR ANODE REPLACEMENT-CTI DODGE-PH-AWAITING AI UPDATE xlÃ<Â" Áxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ<  ÂCxl xl Âxl à +þÿþÿþÿþÿþÿþÿ;CTI FURGE CAPPED OFF SUCTION LINES AND TOOK PROPERLY OOS PHxl Ã<àÂxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<Ã! Â:xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ< ÂDB Â:xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ< Ã5< Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ< ÂcX Á xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ< ÂS Á xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ< Â! Á xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã<ÃW# Âxl xl Â<xl Äþÿþÿþÿþÿþÿþÿ12/1/09-NOITA REC'D FOR CTI GAFF TO REMOVE PIPING ON THE GAS TANKS (CHAMBERS), THEY ARE LEAVING THE DIESEL-12/3/09-REGISTRATION FOR CTI GAFF TO DO COMPLETE TANK TOP UPGRADE ON THE GAS TANKS(BOTH CHAMBERS), PIPING, SUMPS, AND MONITORING SYSTEM IS BEING REPLACED-PHxl Ã<ÂB\ Âxl xl Â<xl ÄþÿþÿþÿþÿþÿþÿI11/9/09-REGISTRATION REC'D FOR PIPING REPLACEMENT, CTI KANE TO INSTALL-PHxl Ã<Â5 Âxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã<ÃU Âbxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<Ã_b Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿa6/3/09-COPI FOR CTI CHAMBERLAIN TO INSTALL NEW OPW SO 61 SERIES FLAPPERS ON ALL TANKS/CHAMBERS PHxlÃ<ÃQ Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ< Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<ÃL ÂUxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<ÃPC Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<Ã^! Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<Ã5 ÂUxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã<ÃTO Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<Â?Q Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<Â& Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿÖ9/12/2008 OWNER CALLED TO ASK ABOUT OOS REQUIREMENTS AND ABANDONMENT. THINKING ABOUT PUTTING AST INSIDE. INFORMED HIM ABOUT THE REMOVAL REQUIREMENT, SO HE WILL BE KEEPING THE UST ACTIVE AND WILL NOT PUT IN A AST.xlÃ<Â@Z ÂUxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿJ5/1/09- INTENT TO REMOVE REC'D FOR CTI SCOTT TO REMOVE TANKS AND PIPING PHxl Ã<ÂJ" Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<ÂXE Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ<ÃZO Âxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã< Â9! Âxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃÂ\ Â^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlàÂ^xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ9/10/08 UPGRADE REGN FOR CTI BEAUMONT TO REPLACE SPILL BUCKETSxj ÃZÂWÂÂLxkxkÂxk þÿþÿþÿþÿþÿþÿþÿdAI FAIL LETTER 6/25/07 -ML REMOVED APPROXIMATELY ONE (1) QUART OF WATER FROM INTERSTITIAL SPACE. WATER CAME FROM AROUND COVER. REMOVED APPROIMATELY FIVE (5) GALLONS WATER FROM PIPING SUMP. 9/16/08 REGN FOR CTI WINCHESTER TO REPLACE PIPING SUMP, SPILL BUCKET, INSTALL NEW FLEX PIPING, REPAIR INT'L RISER PIPE, INSTALL "NEW STREET BOX MANWAY ACCESS BOXES"xkàÂ%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=Ã@ Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=ÂST Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿðSUMP CONTAINED WATER-NOTIFIED LW-WATER INTRUSION FROM CONDUIT-SEALED REPLACED SENSOR WIRING WITH SHIELDED CABLE TANK CONTAINS 4.25" WATER-RECOMENDED IMMEDIATE REOVAL-INTRUSION LIKELY AT OVERFILL SENSOR WHICH WAS ONLY HAND TIGHT-TIGHTENED PHxl Ã= Ã? Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=!Ã; Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿM9/18/09-UPGRADE REG. REC'D FOR CTI CTI ST. PETER TO INSTALL NEW VR TLS-350 PHxl Ã="ÃB Â%xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã=$ÂSV Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿÊSENSOR WIRING REPLACED SUMP CONTAINED WATER-LW NOTIFIED-INTRUSION AT CONDUIT-SEALED SUMP SENSOR PREVIOUSLY REMOVED-NEW ONE INSTALLED REPLACED ANNULAR SPACE SENSOR TANK HAS 1" WATER-REMOVAL RECOMENDED PHxl Ã=&Â1' ÂUxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ='ÂX ÂTxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã=(à G Á$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ-INSPECTION YEAR IS ACTUALLY 2009 STILL OOS PHxl Ã=)ÂC Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã=*Â-X Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ8/12/09-COPI FOR CTI THOMPSON TO REPLACE SPILL BUCKETS ON 5-2 AND 9, AND REPLACED FLAPPER ON 5-2 PH 5-1, 5-3 LLD'S NOT FUNCTIONING PROPERLY DUE TO EXCESSIVE HEAD PRESSURE-8/21/08 CTI'S DAVIS AND PAINE INSTALLED 3" CHECK VALVES AHEAD OF LLD'S AND RETESTED-WORKS FINE NOW PHxl Ã=+Ã[ Âbxl xl Âxlþÿþÿþÿþÿþÿþÿþÿr08/26/09: INCOMPLETE AI RCVD DATED 08/18/09. MISSING PIPING MONITORING FOR 3-1 & 3-2. WP 2-1 SUMP LID REPLACED PHxlÃ=,ÃWd Âbxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ”7/8/09-NOITA FOR CTI WINSLOW TO REMOVE PIPING AND SUMPS, MIKE WHITE TO DO SA, REGISTRATION REC'S FOR INSTALL OF NEW DOUBLE WALLED FLEX PIPING PH PHxlÃ=-Â2 Âbxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿL9/30/08-COPI RECIEVED FROM CTI GEORGE-NEW SUMP PROBES FOR ALL 3 TANKS PH PHxlÃ=.ÂAB Áxl xl Âxl þÿþÿþÿþÿþÿþÿþÿqLLD ON 10-1 REPLACED CRASH VALVES ON 13/14 RAISED BY CTI DAVIS-8/5/08 PH PASSING INSPECTION ON ASTS SAME DATE. BBxl Ã=/ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿk9/30/09-COPI FOR CTI ROBINSON TO INSTALL NEW SPILL BUCKET PH NEW DROP TUBE/FLAPPER INSTALLED-CTI GEORGE PHxl Ã=0ÃG" Á$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã=Â^2 Â%xl xl Â<xlÃþÿþÿþÿþÿþÿþÿA1/14/09-OWNER CONTACTED DEPARTMENTTO REPORT OVER AND SHORTS FOR DEC. GREATER THAN 1%. TREND ACTUALLY STARTED AT VERY END OF NOVEMBER. OBTAINED 6 MO. OF INVENTORY ON ALL TANKS, AND ORDERED A RUSH SIA ON ALL 3 TANKS. 1/16/09-FOUND OUT FACILITY RECIEVES PRESSURIZED DELIVERIES (ILLEGALLY) AND THE TRUCKS THAT DO THESE DELIVERIES METER AND ADJUST TO 60 F. AT POINT OF OFFLOAD INTO TANK. AS IT WAS ASSUMED GRAVITY DROPS WERE HAPPENING AT THE FACILITY, THIS INFO CHANGES OUR (T. SHARF AND MINE) VIEW OF THE INVENTORY SHORTS. AS THE OWNER WAS USING THE NET, ADJUSTED GALLONAGE AS HIS DELIVERY VALUE ON HIS DI, I ASKED HIM TO STICK BEFORE, AND AFTER DELIVERY, AND USE THAT NET VALUE AS THE DELIVERY VALUE FOR 30 DAYS, AND THEN HAVE AN SIA DONE ON THAT DATA. OUR THOUGHT IS THAT THIS WILL CLEAR UP THE ISSUE. IF NOT, WE WILL GO FROM THERE.-PHxlÃ0FÃXJ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ?PH 4/10/09-COPI FOR CTI GEORGE TO REPLACE "ATG WITH VR 350"-PHxlÃ6+Â@P ÂUxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿ<6/9/09/09-COPI REC'D FOR CTI GEORGE TO INSTALL VR 350 ATG-PHxlÃ70Â$* ÂUxlxlÂxlþÿþÿþÿþÿþÿþÿþÿmPH 5/8/09-UPGRADE REG. FOR CTI GEORGE TO REPLACE OLD ATG WITH VR TLS 350, AND INSTALL VR ELECTRONIC LLD'S-PHxlÃCU d Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿmSMALL AMOUNT OF WATER IN SUMP, REMOVED AND CLEANED LID SEAL AND REMOVED SILT AROUND SUMP REPLACED FILL CAP PHxmÃCV  Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿJFILL CAP REPLACED NO SPACERS, NOT REQUIRED, CTI RECOMENDED INSTALLATION PHxmÃCWÃ5I Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃCXÃ3 Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ¶ANNULAR SPACE JUNCTION BOX DAMAGED, CTI PASSED FACILITY. REPAIR WAS RECOMENDED FILL CAP REPLACED 1.5" WATER, RECOMENDED REMOVAL COPPER NOT SPACED, NOT REQUIRED, SPACING RECOMENDED PHxmÃCYÂ#J Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ¥REMOVED WATER FROM SUMP, CLEANED SEAL, REMOVED SILT, EXCESS MATERIAL AROUND SUMP TO FACILITATE DRAINAGE FILL CAP REPLACED TANK HAS 1.25" WATER, REMOVAL RECOMENDED PHxmÃCZÃ' Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ“REMOVED EXCESSICE SAND/ICE FROM INTERSTICE ACCESS MANHOLE FILL CAPS REPLACED DISPENSERS HAVE NO BREAK AWAY FITTINGS-RECOMENDED THEY BE INSTALLED PHxmÃC[ÂN Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ)OVERFILL WHISTLE ACCESS COVER REPLACED PHxmÃC\ÂK Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿM8/3/11-NOITR REC'D FOR RUCK PAVING TO REMOVE TANK #3-PH FILL CAP REPLACED PHxmÃC]àÂ)xl xmÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃC^ÂO Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿkSUMP SENSOR REPLACED FILL CAP REPLACED SPILL BUCKET LID REPLACED TANK HAS 2.75" WATER-RECOMENDED REMOVAL PHxmÃ4Ã. ÂZxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿ0**TANK 500 IS AN AST BUT THEY DO A UST INSPECTION FOR IT BECAUSE IT IS IN A CONCRETE VAULT INSIDE A WEAPONS STORAGE BUILDING MAKING REGULAR AST ACCESS IMPOSSIBLE** ALL TANKS PASS EXCEPT FOR 484, WHICH FAILED CP AFTER SECOND TEST. 1/12/09-COPI REC'D, CTI COUTURE INSTALLED 2X17 POUND ANODES TO TANK 484-AWAITING AI UPDATE-PH -1/22/09-CALL FROM DAVE VALLEY-ANODES INSTALLED ON 484 AND READINGS ARE GOOD, WILL BE SENDING IN AI UPDATE FOR THAT. THAT SAID, THEY ARE STILL GETTING PRESSURE DROPS, AND THEY HAVE A FLAPPER-THEY WILL BE DECIDING WHAT ROUTE TO TAKE. THIS TANK IS SUPPOSED TO BE REMOVED IN 1 YEAR. PH 6/17/09-UPGRADE REG. REC'D FOR CTI TRASK TO INSTALL ELECTRONIC OVERFILL ON TANKS 484 AND 487 AND REMOVE FLAPPER FROM BOTH TANKS PH INCLUDES BOTH AST AND UST INSPECTION REPORT. BB 7/11/08 CP FAIL LETTER -MLxlÃC_ÃAP ÂxmxmÂ7xl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃCaÂbO Â\xmxmÂxl þÿþÿþÿþÿþÿþÿþÿXATG PROBE CLEANED CONSOLE LIGHTS REPLACED FILL CAP REPLACED ATG .2 GAL/HR TEST PASSED PHxl ÃCbàÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿINSPECTION FORM (DUE TO AMOUNT OF POCKETS) GOES ONTO TWO FORMS. THE DISPENSER SECTION IS FILLED OUT, BUT IT IS ALL ON ONE PAGE PHxl Ã64Ã+ ÂxlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿ%TELPHONE CALL 1/23/09, SOMEONE IS CONSIDERING BUYING THIS PROPERTY. TOLD THE BROKER (MS. THEBARGE?) THAT WE RECOMMEND A PHASE I SITE ASSESSMENT, A CURRENT PASSING INSPECTION, AND POSSIBLY THE BANK WOULD WANT A PRECISION TEST OF SOME TYPE. ALSO TOLD HER REG # AND ASSOCIATED SPILL #'S. TRxlÃCcÃ4 ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCd ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿ3DI ON TANK 5 CHECKED, AND PASSED FOR + - W/IN 1% PHxl Ã+Á  Â]xlxlÂxlþÿþÿþÿþÿþÿþÿþÿDMATHIEU LUCIEN CALLED ON 1/26/2009 BECAUSE HE IS CHANGING SUPPLIERS. I TOLD HIM OUT OF SERVICE REQUIREMENTS WILL APPLY IF HE HAS BEEN OUT OF SERVICE GREATER THAN 3 MONTHS, BUT HE STILL NEEDS TO MAINTAIN HIS LEAK DETECTION. HE ALSO HAS TWO POTENTIAL BUYERS. ONE WOULD REMOVE THE USTS, AND THE OTHER WOULD OPERATE THEM. -LWxlÃDÃ.N Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ¹FILL CAP FAULTY- NOT LIQUID TIGHT (REPLACED) SPILL BUCKET CONTAINS ICE AND DEBRIS (REMOVED AND CLEAN)(RECOMMENDED SPILL CONTAINMENT BE KEPT FREE OF ALL LIQUIDS AND DREBRIS AT ALL TIMES)xmÂc ÃRÂÂxjxjÂxi þÿþÿþÿþÿþÿþÿþÿ08/03/09: MIKE VASHON (CITIZEN, BUT A FORMER TWN MNGR) CALLED: THE FIRE DEPT (FIRE CHIEF) IS CONCERNED ABOUT THE ABANDONED TANK. GARDINER SAVINGS (582-5350) ATTEMPTED AUCTION, BUT POTENTIAL BUYER BACKED OUT WHEN FOUND OUT ABOUT "PROBLEMS WITH THE TANK." WP THE ABOVE "PROBLEMS" WITH THE TANK ARE THAT IT CANNOT BE BROUGHT BACK INTO SERVICE DUE TO LENGTH OF TIME OOS. OWNER HAS BEEN TOLD THIS, AS HAS BANK. DON ROBBINS DID PHASE I SA FOR BANK, AND TED HASKELL HAS WRITTEN QUOTE TO REMOVE TANK FOR THE BANK. NO MOVEMENT ON THIS AS OF LATE. WILL BE WRITING GYTO NOV AND SENDING TO GARDINER SAVINGS AND CARL (ALTHOUGH HE HAS NO CONTROL OVER PROPERTY, BUT TECHNICALLY OWNS IT)-8/3/09 PH 1/27/09-CALL FROM DON ROBBINS WHO IS DOING PHASE I FOR GARDINER SAVINGS. HE WAS JUST ONSITE WITH TED HASKELL, WHO IS PUTTING TOGETHER QUOTE TO REMOVE TANK (EVEN THOUGH BANK WILL LIKELY ASK AGAIN IF TANK CAN RETURN TO SERVICE). WHILE ONSITE THEY DETERMINED TANKS STILL HAVE THE SAME AMOUNT OF FUEL IN THEM THEY HAD DURING UST INSPECTION. ALSO, BUILDING HAS POWER, BUT MONITORING CONSOLE IS POWERED OFF (NO LIGHTS) AND IS THUS IMPROPERLY OOS. -PH REQUEST BY CARL MCCASLIN TO REMAIN OOS FOR MORE THAN 12 MO.-DENIED-LETTER TO OWNER AND BANK 11/25/08-PH SEE UST INSPECTION NOTES ALSO. @*@*@*@*@*@* NOTE 1/8/2008 *@*@*@*@*@*@ CALL FROM DON ROBBINS, AS CONCERNED CITIZEN. CARLS IS CLOSED, HAS NOT PUMPED GAS FOR SEVERAL, MAYBE AS MANY AS 8 OR 9 MONTHS. BUSINESS IS CLOSED AND CARL IS NOT PAYING TAXES OR BANK LOANS AND WILL PROBABLY BE FORECLOSED ON. I AM PLACING THE TANK OOS (THOUGH NOT PROPERLY NECCASARILLY) AS OF AUGUST 1, 2007. THIS WILL ALLOW US TO TRY TO GET IT OUT FALL OF 2008. OBVIOUSLY INSPECTION IS OVERDUE. I AM ALSO ADDING TO "INSPECT THIS" LIST FOR 2008 FIELD SEASON. TR 1/8/08xi ÃDÃdL Â)xmxmÂxl þÿþÿþÿþÿþÿþÿþÿ4BULB REPLACED ON PETROMETER BRAND OVERFILL DEVICE PHxl ÃDÂ3  ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿeCTI CARVER MARKED AI SUMMARY AS FAIL FOR COPPER PIPING NOT BEING SPACED-1989 INSTALL, NOT REQUIRED PHxl ÃDÂaN ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃDÂaO ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿD10/6/09-COPI REC'D FOR CTI CARVER TO INSTALL NEW SPILL BUCKET-PH PHxl ÃDÃ!  xmxmÂxlþÿþÿþÿþÿþÿþÿþÿWINITIAL FAIL FOR CP 11/28/08-COUNTY INSTALLED NEW ANODES-CTI HERSEY-PASSING READINGS PHxlÃ1ÃU. ÂTxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ+Â%H Á$xlxlÁ`þÿþÿþÿþÿþÿþÿþÿþÿ»12/11/09-COPI REC;D FOR CTI GAFF TO INSTALL NEW TANK PADS AND SPILL BUCKETS-PH SENSOR HAS BEEN INSTALLED. AI CAME IN WITH QUESTION AS TO WHETHER SITE USES ATG. NOT REGISTERED AS SUCH. G. KANE IS WORKING WITH OWNER TO GET THIS SORTED OUT-PH G. KANE EMAILED AND SAID INSPECTION HAS BEEN DONE, AND FACILITY NEEDS NEW SUMP SENSORS TO PASS, WHICH WILL BE IN 12/22/08-PH IT APPEARS THAT THERE MAY BE A TANK GUAGE AT THIS LOCATION THOUGH IT DIDN'T PASS IN THE 2007 INSPECTION, IN THIS INSPECTION, 2008, IT WASN'T EVEN INSPECTED. 2/27/08 PASSING INSPECTION: STILL DOES NOT SOLVE INVENTORY JUSTIFICATION FAILURE REPLACED AND TESTED SUMP SENSOR IN TANK #6 SUMP REPLACED BALL FLOATS IN TANKS #4 AND #6 -PHxk Ã-V Á xlxlÂxmþÿþÿþÿþÿþÿþÿþÿ„UPDATE REC'D 6/12/09, CP READING FOR TANK 7= -.902, PIPE READING= -.1.233, TANK 6= -.90 INITIAL INSPECTION CAME IN SAYING TANK 6 COPPER PIPING COULD NOT BE SEEN. I TALKED TO CTI BEAUMONT, AND HE TOLD ME THAT HE IS NOW CONSIDERING IT PASSING, BECAUSE HE HAD TO EXCAVATE A PORTION OF THE LINE A FEW YEARS AGO, AND HAD TAKEN NOTES WHICH HE FOUND STATING THE LINES ARE SLEEVED AND SPACED. PHxlÃDÃ& ÂUxmxmÂxlþÿþÿþÿþÿþÿþÿþÿr8/11/10-NOITR, REGISTRATION REC'D FOR CTI CHAPMAN TO REPLACE PIPING, FESSENDEN TO DO SA-PH CP ON PIPING -.851. BBxlÃD à A ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃD à = ÂxmxmÂxmÃ.þÿþÿþÿþÿþÿþÿPHxmÃD ÂLX ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃG UÂÁ"xk xkÂþÿÃ6O/þÿþÿþÿþÿþÿþÿº8/26/2010 SENT TROY ROMANOSKI TANKSMART MANUAL AND EXAM MATERIALS PER HIS REQUEST. -LW 2/4/09-COPI FOR CTI COUTURE TO INSTALL NEW FLAPPER PH TANK 8 SENSOR REPLACED 7/24/07 CP FAIL LETTER -ML ******* 2/3/09 ********** TELEPHONE CALL FROM TONY COUTURE CALLED, HE IS DOING AN INSPECTION AT THIS LOCATION. HE IS UNABLE TO FIND TEST WIRE LEADS FROM THE TANK(S) FOR DOING CP TESTING. TANKS ARE EMPTY CURRENTLY. 2ND TELEPHONE CALL FROM TONY COUTURE AND SPOKE ALSO WITH OWNER TROY, GAS TANKS HAVE BEEN NOT IN USE SINCE EARLY/MID DECEMBER, OWNER SAID "ABOUT 6 WEEKS, WHEN I RAN OUT OF MONEY TO BUY GAS". DISCUSSED THAT THERE WAS NO INSPECTION ON FILE FOR 2008 AND HE COULD NOT PUT THE TANKS BACK INTO SERVICE UNTIL WE GOT THE 2008 INSPECTION, WHICH HE CLAIMS WADLEIGHS DID, OR A PASSING 2009 INSPECTION, UNLIKELY DUE TO FROZEN GROUND. TONY AND TROY HAVE DISCUSSED DIGGING DOWN BELOW FROST LINE TO TEST CP ON DW TANK ONLY. I INDICATED THIS WAS OKAY IF THEY GET BELOW FROST WHICH I THOUGHT TO BE UNLIKELY. ALSO NEED PASSING INSPECTION FOR ALL OTHER ASPECTS OF FACILITY EXCEPT CP BEFORE THE JACKETED TANK AND DW CP TANK COULD RETURN TO SERVICE. ABSENT PASSING RESULTS AND PREFERABLY A 2008 INSPECTION ALSO, COULD NOT RETURN TANKS TO SERVICE. TR 2/11/09 THERE IS SUPPOSED TO BE A 2ND INSPECTION DONE IN JUNE 2007 THAT IS PASSING. IT IS BEING FAXED TO THE DEPARTMENT THIS DATE. TR 2/20/09 TONY COUTURE HAS FAXED A PASSING INSPECTION FORTHE FACILITY. THE 5000 GALLON TANK IS OOS AND WILL NOT GO BACK IN DUE TO FAILING CP. THE DW CP TANK HAS GOTTEN A PASSING CP READING, THEY DRILLED A 3+/- FOOT HOLE (FROST TO 2+ FT) TOGET TO SOFT SOIL TO DO THE CP TEST. TRxkÃD Ã#d ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃD Â1 ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃDÂ31 ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃDÂT* ÂxmxmÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ+-Ã" ÂxlxlÁ`xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃDà  Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃDÃ"& Â)xmxmÂxmÂ=þÿþÿþÿþÿþÿþÿþÿxmÃDÃ(F ÂbxmxmÂxm ÃRþÿþÿþÿþÿþÿþÿ•FACILITY WAS OOS. T. SHARF GAVE DAVE HOWE FROM MAPES THE GO AHEAD TO BRING THEM BACK INTO SERVICE WITHOUT PRECISION TESTING DUE TO THEIR YOUNG AGE PHxm Ã(ÃN[ÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿ38/21/09-PHONE CALL FROM JOHN WENTWORTH. HE HAS AVOIDED GOING OOS BY PERIODICALLY PUMPING GAS FOR A FEW HOURS. HIS BUILDING IS BEING REBUILT, AND CTI CARVER WILL DO NEW INSPECTION. THE INITIAL AI FROM 2009 WAS NEVER COMPLETED, AS NO UPDATE WAS DONE, BUT PROBLEMS WERE FIXED. HE WILL NOTIFY ME WHEN THE STORE IS BACK TO NORMAL.-PH 9/18/08 AI RECIEVED-WATER IN INTERSTICE-BROKEN RISER, ML NOTIFIED BILL CARVER HAS DONE REPAIR AND WILL SEND IN UPDATE 12/24/08-WATER LINE BROKE AND ESSENTIALLY DESTROYED BUILDING. THEY ARE REBUILDING. SINCE THIS DATE, FACILITY HAS NOT OPERATED. I HAVE EXPLAINED TO OWNER THAT HE HAS UNTIL 3/24/09 UNTIL HE HAS TO REGISTER AS OOS. ALL FUNCTIONS OF BUILDING RELATED TO THE TANKS ARE STILL COMPLETELY INTACT, AND HE MAY RUN THE GAS BUSINESS WITHOUT THE REST OF THE STORE IN THE MEAN TIME-PH xkÃDÃ\. Â\xmxm ÂxmþÿþÿþÿþÿþÿþÿþÿBFILL CAP REPLACED SMALL AMOUNT OF ICE REMOVED FROM SPILL BUCKET PHxmÃ""Â9  xk xk ÂþÿÃ+`þÿþÿþÿþÿþÿþÿÐ2/9/09- AI WAS DONE IN AUGUST, FAILED FOR BAD SPILL BUCKET-NOW REPLACED AND AI WILL BE REDONE AND SENT IN-PH 1/28/09-CTI WINSLOW INSTALLED 5 GALLON SPILL BUCKET BECAUSE 15 GALLON WOULD NOT FIT DUE TO PROXIMITY TO INTERSTITIAL RISER-ONLY 4" BETWEEN NEW SPILL BUCKET AND INT. RISER COVER-PH REPLACED INTERSTITIAL SENSOR ON TANK 13 REPLACED FILL ADAPTER GASKET ON 6-1 AND 8-1 2 ANODES INSTALLED. CP READINGS ON TANK 8 -.922, -.932, -.897. UPGRADE TO PASS 9/20/07xkÃDÂY" Â)xm xm ÂxmÃ%þÿþÿþÿþÿþÿþÿþÿxmÃDà % Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃDÃ" Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃDÂ2P Â%xm xm Âxl þÿþÿþÿþÿþÿþÿþÿ 10/5/09-NOITA REC'D FOR CTI HERSEY TO REMOVE TANKS AND PIPING-PH DAILY INVENTORY RECORDS WERE REVIEWED FOR OCTOBER 2008 TANK #7 FAILED DUE TO LOW THRUPUT. -LWxl Ã3Ã-* Â'xlxlÂxlÄ($1þÿþÿþÿþÿþÿþÿO2/12/09-UPGRADE REG. FOR CTI CYR TO REPLACE OLD VR CONSOLE WITH VR TLS 360 PHxlÃDÂP ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿÔINITIAL AI FAILED FOR BAD CONSOLE THAT WOULD NOT GO INTO ALARM 1/31/09 CONSOLE REPLACED AND FACILITY PASSED PH TANK 13 HAS FAILED AND IS BEING REPLACED WITH AST'S. TIMELINE TO PUMP DOWN TANK AND REPLACE IS ALL TO BE DONE BY 12/15/09. REGGIE FAULKINGHAM FROM GAFTEK IS WORKING WITH THEM ON THIS. INSPECTION OF OTHER TANKS IS PASSING AND THEY WILL DO AN OOS INSPECTION OF THE TANK THAT IS BEING REMOVED IN 2010 AND THEN WILL SUBMIT. TR 11/25/09xl à ÂJ&ÂÂ)xj xj Âxj þÿþÿþÿþÿþÿþÿþÿ8/17/09-NOITA REC'D FOR CTI BEAUMONT TO REMOVE TANK AND PIPING PH FACILITY BEING AUCTIONED OFF 2/27/2009. TANKS REQUIRED TO BE REMOVED. -LW SPILL BUCKETS REPLACED ON 9/16/06 WITH NEW OPW 15 GAL BY CTI MIKE ARBOUR CP TESTED PIPING - TANK 5: -1.18, TANK 6: -1.29xj Ã-$ ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿË2/18/09-CALL FROM CTI LEGASSE SAYING SUMP HAS BEEN PUMPED, AND UPDATE WILL BE SUBMITTED PH WATER REMOVED FROM 7-2 AND 7-3 SUMPS AND DIRT MOVED TO FACILITATE GOOD LID SEAL REPLACED SPILL BUCKET COVERS-PHxlÃDÃ2 ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃDÂ7X ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ7<ÃFb Â]xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ…2/23/09-JODY PULKINNEN CALLED TO SAY THIS SITE WILL BE COMING BACK INTO SERVICE IN MARCH, 2009. THEY ARE SCHEDULING PRECISION TEST-PHxlÃDÂ&a ÂxmxmÂxl Ã\IþÿþÿþÿþÿþÿþÿPHxl ÃQà ÂÁ xkxkÂxkþÿþÿþÿþÿþÿþÿþÿb4/29/08 UPGRADE REGN FOR CTI BEAUMONT TO REPLACE ONE OF THE OFFSET FILLS WITH "STRAIGHT IN FILL"-THIS WAS DUE TO AN INCORRECTS ASSUMPTION THAT A BOILER PROBLEM WAS CAUSED BY A BAD OFFSET FILL LINE THAT ALLOWED WATER INTO THE TANK. THE PROBLEM WAS FOUND TO BE ON THE BOILER SIDE OF THINGS, BUT THE OFFSET WAS REPLACED BY A TANK TOP FILL EXTENSION RISER-PHxkÃDà  Á xmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃD ' ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDÂ9  xmxmÂxl Ã0=þÿþÿþÿþÿþÿþÿ¸INITIAL FAILED FOR BAD SPILL BUCKET ON K-1 TANK-REPLACED BY MARK WINSLOW TANK 6 BALLFLOAT REPLACED CP TESTING ON 6,7,8 DONE BY CTI MCALLISTER PH TANK READING: TESTING BY CTI MCALLISTERxl ÃDÂA ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃD Á4  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿeREPLACED INTERSTITIAL SENSOR PIPING IS STEEL INSIDE PVC, IN SEPERATE PVC CHASES. SUMP IS MONITORED PHxmÃD!ÂK  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃD"Ã. Âxl xm Á`xl þÿþÿþÿþÿþÿþÿþÿ\INSPECTION WAS FAILING FOR DAILY INVENTORY. INVENTORY RECORDS FOR THE PERIOD JULY 2008 - DECEMBER 2008 INCLUSIVE WERE PROVIDED TO THE DEPARTMENT IN FEBRUARY 2009 WHICH CREATED THE PASSING INSPECTION. INSPECTION WAS ENTERED 3/11/09 AFTER VERFYING THE INVENTORY. TENNEY'S STILL NEEDS TO PROVIDE AN SIA. ### TANK 3 REMAINS OUT OF SERVICE ### TRxl ÃD#Â6 Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿ 6/8/10-NOITR TO REMOVE PIPING BETWEEN DIESEL AND KERO DISPENSERS-PH 05/24/10: PER RODNEY BELANGER: AI LATE DUE TO DELAYS IN GETTING UNUSED PIPING REMOVED. PIPING GOES TO UNUSED DISP SUMP. SUBMITTING REMOVAL NOTICE TO JOHN D. WP TANK 4 INTERSTITAL SENSOR REPLACED PHxm ÃD$Ã0& Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃD%ÂLb Á xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃD&Â^ Â)xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ!REMOVED ICE FROM SPILL BUCKETS PHxmÃD'Â3T Â)xm xm Âxmþÿþÿþÿþÿþÿþÿþÿw5/24/10-COPI REC'D FOR CTI BUBAR TO REPLACE BOTH SPILL BUCKETS WITH 15'S-PH REMOVED ICE AND DIRT FROM SPILL BUCKETS PHxmÃD(ÃB Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿa4/3/09-NOTICE OF INTENT TO ABANDON ALL PIPING ON TANK 7, AND DO TANK UP UPGRADE-CTI SIMARD PH PHxm ÃD)Â$ Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿB4/9/09-COPI REC'D, CTI GEORGE REPLACED EMCO ATG WITH VR 350 PH PHxm ÃD*ÂTa Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿEALL SPILL BUCKETS CLEANED OUT DIESEL FULL SERVICE FILTER TIGHTENED PHxm ÃD+Â$ Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿOLOOK FOR MON. WELL LOG-CIRCLE K IS SENDING-PH ALL SPILL BUCKETS CLEANED OUT PHxm ÃD,à /  xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ4THIS IS THE ONLY FACILITY THAT PASSES AT DECOSTER PHxmà Ã(ÂÂUxj xj Á`þÿþÿþÿþÿþÿþÿþÿþÿË2/1/10-CTI LEGASSE SR. CALLED TO SAY THESE TANKS ARE NOT IN USE, AND WILL BE PUMPED DOWN. PH 2/11/09-CTI BUBAR SUBMITTED PASSING INSPECTION *BUT* TANK FEEDS A GENERATOR, AND THE CU PIPING IS NOT MONITORED, SO IT STILL FAILS PH CTI INDICATED FAILING CP, TANK IS JACKETED, NOT CP, ALSO 1994 INSTALL SPACERS REQUIRED ON PIPING. 5/9/07 REGN UPGRADE FOR CTI BISKUPIAK TO REPAIR INTERSTITIAL MONITORING, REPLACE PIPING SUMP PROBE, REPLACE PIPING ANODE, AND OTHERxj ÃD-Ã-  xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃD.Ã"E ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿATG SCLD TEST PASS PHxm ÃD/Â7 Â"xmxmÂxm Ã<@QþÿþÿþÿþÿþÿþÿPHxm ÃD0Â7 Â"xmxmÂxm ÃV(þÿþÿþÿþÿþÿþÿ2/2/10-2010 AI CAME IN SCREWED UP BY CROMPCO AS USUAL-PH INTIIALLY CAME IN WITH NO DI CHECK, OBTAINED 2 MO. INVENTORY AND CHECKED. TANKS 7 AND 8 PASS TANK 6 PASSED FOR MAY, FAILED FOR JUNE, DUE TO LOW THRUPUT, PASSING BULB IN CONSOLE REPLACED SPILL BUCKETS CLEANED OUT PHxm ÃD1 Â"xmxmÂxm ÃY!YþÿþÿþÿþÿþÿþÿPHxm Ã,  ÂNxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿÒ2/10/09-FAILING AI BY CTI RENAUD-FAIL FOR 5-1 SPILL BUCKET, DROP TUBES MORE THAN 6" FROM BOTTOM-4 AND 5-PH WATER FOUND IN 004 STP SUMP. CSLD RUNNING IN CONJUCTION WITH INTERSTITIAL MONITORING. RNL 004 USING HOSE CLAMP TO SECURE, WILL NEED TO REMOVE AND REPLACE WITH PROPER UNIT. RNL 005 STAGE I MANHOLE COVER BROKEN. 7/15/08-"REPAIRS MADE TO TANK FIELD AND STP SUMP"-CTI ARTHUR JOHNSON TANK 5 VR LID REPLACED CRASH VALVE ON DISPENSER 5 REPLACED AND SECURED PHxlÃ,ÂIH ÂNxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ„2/11/09-CTI RENAUD SUBMITTED INCOMPLETE AI-DID NOT CHECK TANK 8 PIPING INTERSTICE AS CTI "TREATING PRODUCT PIPING AT SINGLE WALL"-PHxlÃD2ÂD* ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃD3ÂG. ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ|DIESEL SUMP SENSOR IN ALARM ON ARRIVAL-ICE HAD SPLIT AND DISCONNECTED WIRING-FIXED WIRING-ALL CLEAR CLEANED SPILL BUCKETS PHxmÃD4Ã` ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ<CLEANED SPILL BUCKETS REPLACED REG. TANK SPILL BUCKET LID PHxmÃD5Ã\ ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃD6Â$ ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ.CLEANED OUT ALL SPILL BUCKETS ATG CSLD PASS PHxm ÃD7Ã6b  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃD8ÃK/  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿMSOME WATER IN SUMP, REMOVED, COMING IN FROM TOP, REMOVED SOIL AND RESEALED PHxmÃD9ÃT%  xmxmÂxm þÿþÿþÿþÿþÿþÿþÿXSMALL AMOUNT OF BRINE REMOVED FROM INTERSTICE. THERE WAS A LITTLE TOO MUCH APT PIPING PHxm ÃD:Ãc  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ:ICE REMOVED FROM SPILL BUCKET DOUBLE WALLED FLEX PIPING PHxmÃD;ÃK2  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ­KEN LEGASSE CALLED WHILE ONSITE DOING AI, HE WAS CONCERNED ABOUT STEEL PIPING...THE PIPING IS MONITORED, IN A PVC CHASE, AND DOES NOT FEED A GENERATOR. ENTERING AS A PASS PHxmÃD<ÂG5 ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ˜INITIAL AI FAILED FOR TANK #7 SPILL BUCKET BEING DAMAGED-3/19/09 IT WAS REPLACED WITH 15 GAL. BUCKET-COPI DATED 3/19/09 ALL SPILL BUCKETS CLEANED OUT PHxm ÃD@ÂAU Â"xmxmÂxmÃGþÿþÿþÿþÿþÿþÿPHxmÃDAÂb ÂbxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃDBàÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDCÃ*[ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDD Â ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDE ÂRxmxmÂxmþÿþÿþÿþÿþÿþÿþÿr07/07/10: JOE BOSSE ON SITE TO WORK NOV DEFICIENCIES. WP PH SEE EVIDENCE OF POSSIBLE LEAK REPORT 6/30/2010 TRxmÃDFÃd ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿzBULK PLANT, NO DISPENSERS ALL PIPING IS ABOVE GROUND, AS ARE FILLS NO DISPENSERS, BUT PIPING IS FREE OF WEEPS AND LEAKS PHxmÃDGÂW ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿMINITIAL FAILED FOR BROKEN SPILL BUCKET LID-3/20/09 CTI KANE REPLACED COVER PHxmà AÂ"VÂÁ4xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿd3/30/09-LONG FORM RECIEVED FOR CTI GEORGE TO INSTALL ELECTRONIC OVERFILL, INSTALL SPACERS ON COPPER LINES, EXTEND INTERSTITIAL RISER PIPE SO IT CAN BE ACCESSED FROM GRADE LEVEL, INSTALL NEW MANWAY ACCESS TO TANKTOP BECAUSE TANK IS BUIRED DEEP ENOUGH IT IS CONSIDERED CONFINED SPACE TO DO INSPECTIONS AND MAINTENANCE. ALSO WILL BE INSTALLING NEW ANODES-PH xj ÃDHÂc ÂHxmxmÂxm þÿþÿþÿþÿþÿþÿþÿÖBRINE FILLED INTERSTICE IN ALARM, CAUSED BY WATER INTO INTERSTICE MANWAY, WHICH FROZE AND LIFTED CAP AND ALLOWED INTRUSION-ICE REMOVED AND CAP REINSTALLED FILL CAP REPLACED EXTRACTOR VALVE MANHOLE CLEANED OF ICE PHxm ÃDIÃ` Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDJÂ.@ Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDKÂP[ Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ7RÂ^  Â]xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ¼4/10/09-COPI REC'D FROM CTI BROWN, INSTALLED NEW SPILL BUCKETS AND TANK PADS PH NAME CHANGED TO ZOOM-IN, AND UPGRADE REG. RECIEVED TO REPAIR COUPLINGS ON DIESEL AND SUPER TANKS-PH ILS250xlÃDMà  ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿšIMPRESSED CURENT CP SYSTEM PASS FILL CAPS REPLACED ON BOTH TANKS TANK 9 ATG RECALIBRATED TO MATCH STICK READINGS IMP. CURRENT SYSTEM INSTALLED 6/29/07 PH xmÃDNÂC. ÂRxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDQÂPT ÂXxmxmÂxmþÿþÿþÿþÿþÿþÿþÿàAI CONDUCTED ON 3/16/2009 NOT 4/1/2009. -LW ANNUAL INSPECTION UPDATED DATED 3/30/2009 TANK #6 CP READING ON PIPING -1.008 AND TANK #7 CP READING ON PIPING -.999 TONY MEASURED TANK #8-1'S DROPTUBE AT 6.5'' FROM THE BOTTOM OF THE TANK. JOE BOSSE MEASURED THE DROPTUBE 6'' FROM THE BOTTOM OF THE TANK (SEE FILE FOR MORE DETAILS). WILL ACCEPT AI AS A PASSING, BUT IN THE FUTURE IF THE DROPTUBE IS DETERMINED TO BE GREATER THAN 6'' FROM THE BOTTOM IT WILL HAVE TO BE REPAIRED. -LWxmÃLÃ/ ÂÂ)xkxkÂxkþÿþÿþÿþÿþÿþÿþÿH10/23/08-RECIEVED FAILING AI FROM GAFTEK-CP-COUNTY INSTALLED NEW ANODE, BUT DID NOT RAISE READINGS ENOUGH-THEY SUGGESTED AN IMPRESSED SYSTEM, GAFTEK IS WORKING ON GETTING SOME QUOTES, AND WILL DO CURRENT DEMAND TESTING TO FACILITATE IMPRESSED SYS. DESIGN-4/1/09-G. KANE CALLED AND SAID IMPRESSED SYSTEM WILL NOT WORK BECAUSE LP LINE IS TOO CLOSE TO TANK, SO THE PLAN IS TO INSTALL 6-8 ANODES AROUND THE TANK WHICH WILL SUPPLY AMPLE PROTECTION FOR TANK. UPGRADE WILL BE DONE THIS SPRING.-PH #5 OIL HEATED TANK READING: DRY SOIL DUE TO HEATED TANK WATERED TANK, RETESTED TO PASS -.857xkÃDRÃ=  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿSPILL BUCKET CLEANED OUT PHxmÃDSÃ9  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDTÃ;  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDUÃ#  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDVÃ<  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDWÃP  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿŠ12/21/09-REGISTRATION REC'D FOR CTI SIMS TO INSTALL 12,000 GAL HEATING OIL TANK, DOUBLE WALLED GLASS WITH DOUBLE WALLED FLEX PIPING-PH PH 10/14/09 PER TELEPHONE CALL FROM PORTLAND THIS TANK HAS BEEN REMOVED AND IS BEING REPLACED, SCHOOL ITSELF WAS TORN DOWN AND TANK WAS REMOVED. NEW SCHOOL BEING BUILT AND NEW TANK ISNTALLED AT THAT LOCATION. TRxmÃDXÂc^  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿhCTI NOTED THAT 7 RETAINER NUTS WERE RUSTED OFF, NOT EXACTLY SURE WHAT HE IS REFERRING TO, SUMP COVER? PHxmÃDYÃB  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDZÂ+V  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃD[Ãd  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ9TANK HAS TANK PIPING SUMP, AND 2 MORE TRANSITION SUMPS PHxmÃD\Ã< ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃD]Â>` Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃD^ÂW Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿOTANK 7-1, 7-2 HAVE SUCTION PIPING, NOT PRESSURIZED SPILL BUCKETS CLEANED OUT PHxmÃD_ÂJ= Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿLEANED SPILL BUCKETS PHxmÃD`àÂ)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDaÂJ Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿSPILL BUCKETS CLEANED OUT PHxmÃB ÃP Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿŸ3/31/09-NOTICE OF INTENT TO ABANDON TANKS 4,5,6, AND INSTALL AN 8000 AND A 2000 PH TANK 5 HAD PRODUCT IN INTERSTICE AND HAS BEEN PUMPED DOWN AND PLACED OOS PHxl ÃDbÃ0 Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDcÃ.M Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃDdÂ[L Â[!xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEÂ[- Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿI5/10/10-REG. REC'D FOR REPLACEMENT TANKS, CTI ARBOUR TO INSTALL, 3 DOUBLE WALLED FIBERGLASS TANK, DOUBLE WALLED FLEX PRESSURIZED PIPING-PH 05/07/10 - ECS CALLED. ALL 3 TANKS SCHEDULED FOR REMOVAL THIS MONDAY, MAY 10, BUT ECS & CF FORGOT TO SUBMIT NOTICE OF INTENT TO REMOVE PAPERWORK. I ADVISED ECS TO CALL RESPONSE NOW. WP PHxmÃEÃ[  Á$xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPREMIUM SUMP CAUSING ALARM WHEN ARRIVED ONSITE-REPORTED TO TR REMOVED WATER FROM SUMP REG. INTERSTITIAL SENSOR SLOW TO GO INTO ALARM WHEN TESTING, RESET CONSOLE, WHICH FIXED PROBLEM CLEANED ALL BUCKETS TIGHTENED LOOSE SCREWS ON FLAPPERS SHEAR VALVES PASS, BUT ARE CLOSE PHxmÃ>RÃ=$ ÂYxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ>S Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>TÂ$' Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿSTHIS SITE HAS FIRST GEN TC PIPE WATER REMOVED FROM BOTH SUMPS AND DISPENSER SUMP PHxl Ã!ÃA_ Âxk xk Â<xkþÿþÿþÿþÿþÿþÿþÿ¥7/7/08 CTI LEGASSE FAILED FOR CP-VERY LOW READINGS DOUBLE WALL TANK HAS INTERSTITIAL SENSOR, BUT IT IS NOT HOOKED UP OWNER IS GETTING QUOTES TO REPAIR TANK SYSTEM-PHxkÃ>UÂ) Â)xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿîTANKS 37 AND 38, CAME IN ON FORM WITH # 18274-MUST HAVE HAD SOME CONFUSION ABOUT #'S 37 AND 38 ARE PROPERLY OOS, AS TANKS ARE <1", BUT, CONSOLES WERE VANDALIZED AND ARE NOT FUNCTIONAL-AS LONG AS TANKS STAY EMPTY, THEY ARE IN COMPLIANCE PHxlÃ>VÃL ÂMxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>WÃ\E Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ>XÂ1 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã$!ÃS Â!xkxk Âxl þÿþÿþÿþÿþÿþÿþÿXFACILITY REGISTRATION RECIEVED FOR 3 NEW TANKS TO BE INSTALLED IN NOVEMBER TANKS 1,3,4 INTENT TO ABANDON FOR RECIEVED 9/30/08-SIMARD TO DO REMOVAL, COUNTY TO DO SA TANK #2 IS A GENERATOR TANK AND NEEDS TO MEET THE MOTOR FUEL REQUIREMENTS. NEEDS LEAK DETECTION ON THE TANK AND PIPING, AND NEEDS OVER FILL. 9/11/08 TANK #2 REPLACED; GENERATORxkÃ>YÂ5 Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿØIT IS A LITTLE UNCLEAR, BUT I BELIEVE THE INSPECTION SAYS THE INITIAL FAIL FOR THE SPILL BUCKETS WAS FIXED BY REPLACING THE LIDS WATER REMOVED FROM PIPING SUMP, THERE IS ONLY 1 SUMP FOR BOTH CHAMBERS/TURBINE PUMPS PHxlÃ>ZÃ5" Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ#REPLACED SPILL BUCKET LID ON 6-1 PHxl Ã>[ÃQ Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ LESS THAN 10000/MONTH THRUPUT PHxl Ã>]Â^ Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>^Â& Â:xl xl Âxl à þÿþÿþÿþÿþÿþÿ#DIESEL SPILL BUCKET LID REPLACED PHxl Ã>_Ã^ ÂDxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>`ÃK ÂDxl xl Âxl ÃP7þÿþÿþÿþÿþÿþÿPHxl Ã>aÃ[ ÂDxl xl Âxl Ã(BTþÿþÿþÿþÿþÿþÿPHxl Ã>bÃV  ÂDxl xl Âxl ÄD?þÿþÿþÿþÿþÿþÿFTANK 1 SPILL BUCKET REPLACED W/15 GAL. TIGHTENED UNIONS ON DISP 1/2 PHxl Ã>cÃ# ÂIxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã>dÂM> ÂIxl xl Âxl ÃR&XþÿþÿþÿþÿþÿþÿPHxl Ã?Ã/ ÂIxl xl Âxl Ä]þÿþÿþÿþÿþÿþÿPHxl Ã?ÂSX Â:xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?ÂF Â:xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?Ã9 Â:xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?Ã`a Âbxl xl Âxl ÃO/2þÿþÿþÿþÿþÿþÿPHxl Ã?ÂP Â:xl xl Âxl Ã4<þÿþÿþÿþÿþÿþÿQLLD'S REPLACED WITH "CORRECT FLEX" DETECTORS TIGHTENED UNIONS ON DISP. 1 AND 2 PHxl Ã?àÂ:xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?ÃG ÂRxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã? ÂN* Â:xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã? Ã!Q Â;xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã? Ã6N  xlxl Âxl þÿþÿþÿþÿþÿþÿþÿoTANKS 9 AND 10 ARE THE ONLY TANKS ACTUALLY IN EXISTENCE AT THIS FACILITY-TANK 7 DOES NOT EXIST 9 AND 10 PASS PHxl Ã? à O ÂRxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã? ÂU" Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã?Ã\& Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?à  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?Â%5 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ"AUDIBLE ALARM HAD TO BE REWIRED PHxl Ã?Ã`  Â:xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPREPAIRED CONDUIT TO SENSORS NEW STEEL SPILL BUCKET LID AND SUMP MANHOLE COVER PHxl Ã?Ã3 Â]xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?Â%A  xl xl Âxl Ä@Yþÿþÿþÿþÿþÿþÿ!CP TEST DONE BY CTI MCALLISTER PHxl Ã?Â1  xl xl Âxl ÃPþÿþÿþÿþÿþÿþÿRFILL ADAPTER GASKET ON BOTH TANKS REPLACED PH PASSING AST INSPECTION 9/19/2008. BBxl Ã? ÂYxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?Ã2 ÂDxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?à < Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ*REQUEST TO REMAIN O-OS OK'D 10/10/2008. BBxl Ã?ÂH] Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿK4/14/09-UPGRADE REG. RECIVED FOR CTI HAZEL TO REPLACE 14-2 SPILL BUCKET PHxl Ã?Ã@ Âaxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?Ã$ Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ>PH ALSO HAS PASSING INSPECTION FOR AST UG PIPING 10/9/2008. BBxl Ã?Â- Á$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿrREPLACED ALL 3 CONSOLE BULBS ON PNEUMERCATOR FILL RISER LOWERED SO AS NOT TO TOUCH LID-BOTH FIXED BY CTI HAZEL PH xl Ã?ÃH Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?à  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?ÃT  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?Ã; Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ10/12/10: DALE MITCHELL CALLED REGARDING NOV FOR NO AI. WILL CONTACT GAFTEK; HAVE RETAINER CONTRACT FOR AI'S. WILL RESOLVE AI ISSUES. -WP PHxl Ã? Â3E Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?!Ã/+ Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?"à  Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã&X ÂKxk xk Âxk þÿþÿþÿþÿþÿþÿþÿÉ10/14/08 CALL FROM SCOTT CYR, TYREE, THIS FACILITY HAS CHANGED HANDS AGAIN NOW CALLED SONNY'S (?) SMOKE SHOP. SOME PERSON OWNS A PLACE IN NAPLES(?). THEY ARE GETTY/LUKOIL BRANDED BUT DEALER OWNED. TRxk Ã?#à : ÂMxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ–VERY LOW THRUPUT ON PREMIUM UST. OVER/SHORTS NOT WITHIN 1%, BUT VERY CLOSE. SUBMITTED DAILY INVENOTRY FOR MAY-SEPT. 2008. WILL PASS INSPECTION. -LWxlÃ?$Ã3[ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿYANNULAR SPACE SENSOR REPLACED FILL CAP REPLACED TANK HAS 1.5" WATER-REMOVAL RECOMENDED PHxl Ã?%Ã3Y Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ\SUMP LID AND SURROUND CLEANED OUT FILL CAPS REPLACED .5" WATER IN TANK-REMOVAL RECOMENDED PHxl Ã?&Ã3Z Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã?'Ã3\ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿLPIPING SUMP MANHOLE LID CORRODED-REPLACEMENT RECOMENDED FILL CAP REPLACED PHxl Ã?(ÃTV Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ)SUMP SENSOR REPLACED FILL CAP REPLACED PHxl Ã?) $ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã?*Ã@ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿº10/20/09-CTI WILSON INSTALLED NEW SPILL BUCKET ON GAS TANK-PH FILL CAPS REPLACED DISPENSER 1 NO SWIVEL ON HOSE DISPENSER 2 NO BREAK AWAY VALVE ON HOSE-RECOMENDED INSTALLATION OF BOTH PHxl Ã?+ # Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã?, ` Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿJNO SPILL BUCKET ON REMOTE ABOVE GROUND FILL-RECOMENDED ONE BE INSTALLED PHxl Ã?-ÂJ Â\xl xl Âxl Ã6þÿþÿþÿþÿþÿþÿ„BOTH FILL CAPS REPLACED TANK HAS BALL FLOAT OVERFILL-OPERATOR TOLD OF PROBLEM-SHOULD BE REPLACED BECAUSE THIS IS A SUCTION SYSTEM PHxl Ã?.ÃP Â\xl xl Âxl Ã.(þÿþÿþÿþÿþÿþÿPHxl Ã?/Â7 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFNO SPILL BUCKET ON REMOTE ABOVE GROUND FILL-INSTALLATION RECOMENDED PHxl Ã?0ÂAM Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿMALL FILL CAPS REPLACED CLEANED GUAGING PROBES 4-1; 4-2 VAPOR CAPS REPLACED PHxl Ã?2ÂO ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿDREPLACED FILL CAP AND ADAPTOR 1" WATER IN TANK-REMOVAL RECOMENDED PHxl Ã?3ÂO ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ?INTERSTITIAL SPACE SENSOR REPLACED FILL CAP ADAPTOR REPLACED PHxl Ã?4ÂO ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿgADJUSTED BRINE IN TANK RESERVOIR LOW PROFILE FILL CAP INSTALLED .5" WATER IN TANK-REMOVAL RECOMENDED PHxl Ã?5ÂO  ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ*FILL CAPS REPLACED GUAGE PROBES CLEANED PHxl Ã?6Ãc ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ)SUMP SENSOR REPLACED FILL CAP REPLACED PHxl Ã?7Ã@` Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl Ã?9 Â Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿMREPLACED INT. SENSOR REPAIRED BALLFLOAT-IT WAS TOO SHORT FILL CAP REPLACED PHxl Ã?:Ã! Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ212/29/2008 FACILITY REOPENING NEXT MONDAY. RECEIVED MASS MAILING SIA NOV. AS SOON AS HE HAS AT LEAST 30 DAYS WORTH OF DI, WILL SEND IT TO SIA VENDOR. -LW SITE STILL OOS PH 10/16/08 CALL FROM THE CURRENT OWNER, HE IS FILING PAPERWORK TO BRING THE FACILITY BACK INTO SERVICE. TRxl Ã?;ÂQ+ Áxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?<Â3M Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ0INITIAL FAIL FOR DI-RECIEVED PASSING INVENTORY 10/15/08 SWITCHING RELAY TO FUEL PUMP ON TANK 5 STUCK IN ON POSITION-CONTACTS CLEANED, MANAGER WAS SHOWN WHAT TO LOOK FOR TO PREVENT FROM HAPPENING AGAIN 5-1 FILL CAP REPLACED CRASH VALVE HEIGHT CORRECTED ON DISPENSERS 1/2; 5/6; 9/10-CTI HAZEL AND DENNIS PHxlÃ?=Ã3S Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ-INITIAL AI FAILED FOR DI-RECIEVED 2 MONTHS PASSING 10/15/08 CTI DAVIS WROTE THAT CONSOLE IS IN A BAD LOCATION-STORE EMPLOYEES DID NOT KNOW WHERE IT WAS REPLACED 2-1 SPILL BUCKET LID ASSEMBLY CRASH VALVES ON DISPENSERS 1/2 AND 3/4 TRANSITION SUMP WAS IN ALARM, CLEANED OUT WATER AND REPORTED TO ML PHxlÃ??ÂX] Âxl xl ÂxlÃIDþÿþÿþÿþÿþÿþÿPHxlÃ?@ÃV Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ#INSPECTION YEAR IS ACTUALLY 2009 PHxl Ã?AÃ`b Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿL9/25/09-COPI REC'D FOR CTI CHAMBERLAIN TO REPLACE TANK 3 SPILL BUCKET-PH PHxl Ã?BÃ`2 Âbxl xl Âxl Ä 'þÿþÿþÿþÿþÿþÿPHxl Ã?CÃV Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?Dà - Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ:INSPECTION UPDATE DATED 11/19/2008 BY CTI DENNIS DAVIS. BBxl Ã?EÃCH Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?FÂ/6 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ]11/24/08- ATTACHMENT A RECIEVED FROM CTI MULLINS FOR PIPING REPLACEMENT ON 5-1 AND 7-1-PH PHxl Ã?Gà  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?HÃaL Â[!xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ4/3/09-COPI RECIEVED FOR CTI GEORGE TO REPLACE VENT LINE THAT RUPTURED PH SPILL BUCKET REPLACED BY CTI GEORGE 10/10/08 DUE TO CAP MAKING CONTACT WITH LID PHxlÃ?IÂ[ Âxl xl Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxl Ã?JÃ/ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã?L Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿšCHAMBER 1 IS O-O-S. BB SPOKE WITH DAVE WRIGHT ON 6/23/2009. TANK CHAMBER 1 IS NOT O-O-S. WILL WAIT FOR ANNUAL INSPECTION BEFORE UPDATING DATABASE. BB xl Ã?MÂ7) Âxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ¾16-1 LEAK DETECTION CONSOLE HAS BEEN CHANGED TO AN OMNTEC-NEW SPILL BUCKET COVER REMOVED 3 GAL OF WATER FROM SUMP CTI RECOMENDED 14, 16, 17 SPILL BUCKETS GET EPOXY COATING TO PREVENT RUST PHxlÃ?NÂL' Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?OÃ/6 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿWCTI HUNTLEY COULD NOT SEE SPACERS ON COPPER, ODD BECAUSE HE INSTALLED IT BACK IN '89 PHxl Ã?PàÂxl xl Âxl þÿþÿþÿþÿþÿþÿþÿã07/27/09: CALLED CTI HUNTLEY, SENSOR IS FIXED. WILL SEND PASSING AI SOON. WP 06/24/09: FAILED AI DUE TO LLD, AWAITING SENSOR REPLACEMENT. WP CONSOLE HAD TO BE SHUT OFF, THEN BACK ON BEFORE OVERFILL AND INTERSTICE WOULD TEST PHxl Ã?QÂL( Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ·REMOVED +- 30 GAL WATER FROM SUMP, MOVED PROBE TO BOTTOM OF SUMP SPILL BUCKET LID IS NOT CONNECTED TO BUCKET AND CANNOT BE DRIVEN OVER-CTI WILL CONTACT FACILITY TO DISCUSS SOLUTION PHxl Ã?R  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?SÃS1 Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?TÃ[ Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?UÃ>C Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ?VÂG ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?WÃd* ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?XÃW" ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ_12/1/09-UPGRADE REG. REC'D FOR CTI BISKUPIAK TO REPLACE TANK 2 SPILL BUCKET WITH 15 GAL. PH PHxl Ã?YÃF ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?Z Â Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿQ7/28/09-NOITA REC'D FOR PRECISION TANKS INC. TO REMOVE OOS TANK AND PIPING PH PHxlÃ?[ÂZ+ ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?\Â1 ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?]ÂP[ ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?^ÂT2 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?_àÁYxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?`Âbd Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ=PH 10/30/08-COPI FOR CTI BEAUMONT TO REPLACE SPILL BUCKET-PHxl Ã?aÂ"% Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?bÂ4 Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ=9/8/08-COPI FROM CTI BEAUMONT TO INSTALL 2 21 LB. ANODES PHxl Ã?cÂ4 Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã?dÂD- Â[!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@Âb Âxlxl ÂxlÃ9;þÿþÿþÿþÿþÿþÿ`COPI REC'D FOR REPAIRS TO CRACKED VENT LINE AND SUCTION FITTINGS AT TANK FOR DIESEL AND SUPER PHxlÃ@ÃXA Âxlxl ÂxlÃ.þÿþÿþÿþÿþÿþÿPHxlÃ@Ã! Á$xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@Ã6* ÂRxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ0AI WAS A FAIL FOR CP; HAS BEEN FIXED FOR 2009 PHxlÃ@Ã' ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@Ã]9 ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ7REPLACED LAMPPS ON CONSOLE REPLACED SPILL BUCKET LID PHxl Ã@Ã`, ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@Ã`* ÂPxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@ Ã$$ ÂPxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿQEACH TANK HAS A CONSOLE, TANK 9'S FAILED INITIALLY, CHANGES OUT FOR OMNTECLU-3 PHxlÃ@ Ã% Â*xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@ Ã'' Âbxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿREPLACED CONSOLE BULBS PHxlÃ@ Â&U Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@ Ã6 Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@àÂ[!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã5Â+ Â:xlxlÂxlþÿþÿþÿþÿþÿþÿþÿÕ2/17/10-NOITA REC'D FOR CTI WILSON TO REMOVE TANK-PH FACILITY IS CONVERTING TO LNG, AND IS NOW MOVING FORWARD WITH THE PLAN TO REMOVE THE TANK FASTER AFTER I TALKED TO THEM ABOUT DOING SO MORE RAPIDLY SO THEY WOULD NOT HAVE A TANK IN VIOLATION. THERE IS A CRACK IN THE SUMP THAT HAS BEEN ALLOWING WATER IN. THE SENSOR WORKS, AND ONCE THE TANK IS EMPTY, IT WILL BE REMOVED BY THE END OF 2010 AT THE LATEST. SEE EMAIL IN FILE-PH 9/16/09, CALL FROM DAVE SMALL, INITIAL IN MAY FAILED, AND THEY HAVE HAD TROUBLE GETTING PORTLAND PUMP TO GET BACK TO THEM. IT WILL BE ADDRESSED, AND A PASSING ANNUAL WILL BE SENT IN.-PH COPPER PIPING HAS FOAM AROUND IT. TANK READING: -1.19, -1.18, -1.19 #%#% NOTE: THIS FACILITY RECEIVED A NOV FOR FAILURE TO FILE AN AI IN 2008. THEY DID FILE THE AI IN A TIMELY FASHION, THE DATE ENTERED WAS 6/18/0208. IT APPEARS TO HAVE BEEN A TYPOGRAPHICAL ERROR. AN EMAIL WAS SENT TO APOLOGIZE AND WITHDRAW THE NOV, COPY IN THE FILE. TR 10/27/08. #%#%flà +ÃÂÂLxj xj Âxjþÿþÿþÿþÿþÿþÿþÿ|10/27/2008 BEKKA KOROSKI GOT A CALL FROM THE OWNER REGARDING THE MASS MAILING NOV. SHE WILL CALL HIM BACK TO GO OVER THE AI REQUIREMENTS. HE CALLED HER BECAUSE HE HAS DEALT WITH HER BEFORE. BEKKA SAID SHE'D HAVE HIM CONTACT SOMEONE IN THE TANKS UNIT IF HE HAD ADDTIONAL QUESTIONS. -LW ABOVE-GROUND SPILL BUCKET; TANK TO BE REMOVED THIS SEASON ACCORDING TO CTI LARRY WINCHESTERxjÃ@Ã3 Â!xl xl Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxl Ã2/Ã, ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿVUPDATE DONE 10/29/08-ALL ISSUES FIXED-PH ANDREW MOORE CALLED 10/27/2008 REGARDING MASS MAILING NOV. GAFTEK ORDER THE PART (SOMETHING TO DO WITH THE WIRING NOT FUNCTION PROPERLY) AND WILL TRY AND GET OUT THERE ASAP. TOLD ANDREW TO SEND IN AN UPDATED INSPECTION WHEN COMPLETED. -LW INTERSTITIAL SENSOR WON'T GO INTO ALARM ON LOW BRINE LEVELxlÃ@Ãc Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ#INSPECTION UPDATE ON 12/11/2008. BBxl Ã@ÂSB Á$xlxl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ@Ã`9 Âxl xl Âxlþÿþÿþÿþÿþÿþÿþÿþÿxlà Â&XÂÂxkxkÂxj þÿþÿþÿþÿþÿþÿþÿñ10/28/08-RECIEVED COPI DATED 5/29/07 FOR INSTALLATION OF FLAPPER DROP TUBES IN BOTH CHAMBERS-PH 1/30/07 SENT OWNER LETTER RECOMMENDING UPGRADE OF OVERFILL PREVENTION EQUIPMENT. 5/14/07 UPGRADE REGN TO REPLACE VENT BALLS WITH FLAPPERS. - MLxj Ã@Ã/ Á$xl xl Âxl Ã-þÿþÿþÿþÿþÿþÿPHxl Ãc \ÂÂ)xkxkÂxj þÿþÿþÿþÿþÿþÿþÿÇ10/28/2008 ELLA FROM THE EASTPORT TOWN OFFICE CALLED. GAVE HER A FEW DIFFERENT COMPANIES TO CALL. FACILITY HAD PREVIOUSLY USED GAFTEK AND WILL PROBABLY GO WITH THEM TO DO THE ANNUAL INSPECTION. -LWxj Ã@Ã#G ÂYxl xl Âþÿþÿþÿþÿþÿþÿþÿþÿ6PIPING INSTALLED IN 2002 WITH NO MONITORING SYSTEM. BBxl ÃÂOQÂÂ`xkxkÂxkþÿþÿþÿþÿþÿþÿþÿð11/26/08-SCOTTY FROM SIMARDS CALLED AND SAID AI WILL BE DONE 12/2/08-PH OWNER CALLED 10/29/2008 ABOUT ANNUAL INSPECTION NOV. ASKED WHAT IT WAS AND WHAT IT INCLUDED. JUST HAD SIMARDS AT FACILITY TO PREPARE IT FOR ETHANOL. ASKED IF THAT WAS WHAT WE WERE TALKING ABOUT. I TOLD HIM I AM NOT SURE WHAT SIMARDS DID, BUT I WOULD GIVE THEM A CALL AND ASK IF THEY COMPLETED AN ANNUAL INSPECTION AND IF NOT HE'D HAVE TO HAVE SOMEONE OUT THERE TO COMPLETE AN ANNUAL INSPECTION BY NOVEMBER 30, 2008. -LWxkÃ@ÃZ Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ-REPLACED VAPOR CAP ON 2-1 DROP TUBE REPLACED xl Ã@ÃF Á$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿUDROPPED FLOAT FOR ELECTRIC HIGH LEVEL SENSOR INTO TANK, CTI HAZEL REPLACED 10/6/08 PHxl Ã@Â9: ÂXxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@ Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ$NEW GUAGE STICK DELIVERED TO SITE PHxl Ã@Ãa> Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ„12/7/11-CALL FROM GRETCHEN DRAKE WHO IS HAVING BILL CARVER COME BACK AND REPLACE SPILL BUCKETS, AND THEN WILL SEND PASSING AI-PH PHxl Ã@ÂF ÂSxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ INSTALLED 2 ADDITIONAL ANODES PHxl Ã@Â$> Âxl xl Âxl Ã$þÿþÿþÿþÿþÿþÿGNOTICE OF INTENT TO ABANDON PIPING RECIEVED, CTI BEAUMONT TO DO WORK PHxl Ã@Â<ÂÂUxl xl ÂxkþÿþÿþÿþÿþÿþÿþÿL6/3/09- COPI FOR CTI CARVER TO REPLACE SPILL BUCKETS ON TANK 6-1, 6-2 PH PHxkÃ@Â< Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@Ã0 Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿÄPH 9/30/09 PER TELEPHONE CALL FROM BOB CORMIER, ATG HAS BEEN DISABLED HE HAS REPROGRAMMED IT AND WILL TRY TO GET A PASSING REPORT FROM IT SOON. DISCOVERED DURING ANNUAL INSPECTION. TRxlÃ@Â> Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿINTERSTICE SENSOR REPLACED PHxl Ã@ ÂP Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@!Â&X Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@"Â2L Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@#ÂX$ Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@$ÃVO Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@% Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@&Ã*= Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@(Ãb Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ/DISP. 17/18, CRASH VALVES ADJUSTED-CTI HAZEL PHxl Ã@)ÂV7 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ{TANK INTERSTICE SENSOR NOT OPERATING PROPERLY, INSTALLED POWER LINE RESISTOR TO MAKE IT WORK CORRECTLY FILL CAP REPLACED PHxl Ã@*ÃD Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿHTANK HAS 1.25 " WATER, REMOVAL RECOMENDED NO STAGE 1- <50000 GAL/YEAR PHxl Ã@+Ã:F Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ<FILL CAP REPLACED LINE TO GENERATOR HAS BEEN DISCONTINUED PHxl Ã@.Â' Â`xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ†SYSTEM WAS COMPLETELY DOWN INITIALLY, OWNER SAID ELECTRICIAN WAS COMING TO HOOK IT UP. NON-FUNCTIONING PROBES WERE REPLACED 6/27/08 PHxlÃ@/Â$O Âxl xl Âxl à JþÿþÿþÿþÿþÿþÿPHxl Ã@0Â.+ Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@1Ã( Â!xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@2Â"> Âxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@3ÃbY ÂTxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿ{11/18/08-REGISTRATION TO INSTALL NEW TANKS-CTI BARTON-PH 11/13/08-INTENT TO ABANDON FORM RECIEVED, CTI BARTON TO DO WORK-PHxl Ã@4Ã=" ÂTxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ@5Â9Q Â\xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ@6ÂPN Â`xl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ@7Ã] Â\xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@8ÂV3 Â\xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@9Â5- Â\xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@:ÂL Â\xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@;àÂ\xl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@< Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿ:4/8/10-NOITR REC'D FOR GAFTEK TO REMOVE TANK AND PIPING-PHxlÃ@=ÃWO Âbxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@>ÁC Âbxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@? Âbxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@@Â$ Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿ©2/3/09 TELEPHONE CALLS FROM BOTH RODNEY AT PETROSERVE AND JESSICA AT IRVING, THEY ARE SENDING A LETTER TO REQUEST AN ADDITIONAL 12 MONTHS OF OUT OF SERVICE. THEY WILL PRECISION TEST THE TANKS NOW AS WELL TO CONFIRM TIGHTNESS. LETTER SHOULD ARRIVE BEFORE 2/6/09. I HAVE ALREADY GRANTED THE EXTENSION VERBALLY AND WILL SEND A LETTER UPON RECEIPT OF THEIRS, ASSUMING IT COMES TO ME. TRxlÃ@AÂ7 Âbxl xl Â<xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@BÃQQ ÂTxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ@CÂF Â:xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@DÁE ÂKxl xl Âxk þÿþÿþÿþÿþÿþÿþÿ THIS INSPECTION WAS NOT SENT IN BACK IN 2007, NEW FACILITIES GUY REALIZED IT, SENT THIS ONE, AND WILL BE GETTING NEW INSPECTION DONE NEW DISPENSERS INSTALLED PHxk Ã@EÃU ÂKxl xl Âxk þÿþÿþÿþÿþÿþÿþÿsTHIS INSPECTION WAS NEVER SENT IN, SO NEW FACILITY GUYS SENT THIS ONE IN, AND IS GETTING ANOTHER INSPECTION DONE PHxk Ã@FÃ- Â!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@GÃS Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@IÃ!F Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@Kà  Â)xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ CTI BUBAR COULD FIND NO OVERFILL, AND FAILED INSPECTION. 1987 INSTALL, DUE TO DATE, WE CANNOT FORCE THEM TO INSTALL AN OVERFILL DEVICE-FAIL CHANGED TO A PASS PHxlÃ@LàÂ`xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@Mà $ ÂMxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@NÂ=R Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@Oà M Âxl xl Âxl à þÿþÿþÿþÿþÿþÿPHxl Ã@PÃEJ Â`xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿÊ-INSPECTION SAYS FAIL DUE TO NO SPACERS BETWEEN COPPER PIPING, BUT SYSTEM WAS INSTALLED BEFORE SPACERS WERE REQUIRED IN 1991, SO IT PASSES. -COVER FOR THE BALL FLOAT ACCESS IS MAKING CONTACT WITH CAP PHxlÃ@SÃ" ÂPxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿÞTHESE INSPECTIONS HAVE DRIBBLED IN OVER THE COURSE OF 3 MONTHS. -TANKS 378, 382, 383, 409 ALL DONE 7/7/08 BY CTI LIGHTBOWN-NOT CP -TANK 396 DONE 9/5/08 BY CTI LIGHTBOWN-NOT CP -TANK 403 DONE 9/12/08 BY CTI LIGHTBOWN-*PIPING IS NOT CP* -TANKS 412, 413, 414, 415 DONE 7/1/08 BY CTI LIGHTBOWN -TANK 391 DONE 7/18/08 BY CTI LIGHTBOWN -TANK 399 DONE 7/11/08 BY CTI LIGHTBOWN ALL CP TANKS TESTED SEPERATELY ON 10/30/08 BY CTI BRESCIA TANK 387 IS OWNED BY MOHAVE PROPERTY MANAGEMENT PHxlÃ@TÃ6  Âxl xl Âxlþÿþÿþÿþÿþÿþÿþÿf5/17/11 NOITR REC'D FOR CTI WILSON TO REMOVE TANK AND PIPING-PH VENT RISER HAS CP TEST LEADS--1.09 PHxlÃ@UÃ*E Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ@VÃ9 Âxl xl ÂxlÃ$Cþÿþÿþÿþÿþÿþÿ£TANK9 WAS RELINED BACK IN 2007, AND BROUGHT BACK INTO SERVICE, BUT TANKS WAS NEVER UPDATED. TANK 8 WAS PLACED OOS AS WELL BECAUSE IT WAS A MANIFOLDED TANK TO 9. PHxlÃ@WÃ:J Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿJ11/11/09-COPI REC'D FROM CTI DODGE WHO REPLACED ALL 3 SPILL BUCKETS-PH PHxlÃ@XÃ< Âxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ¹10/6/09-JEFF EATON IS IN THE PROCESS OF INSPECTING THIS FACILITY, THEY HAD TO SEND OUT THE OMNTEC CONSOLE TO THE MANUFACTURER TO REPLACE A BURNED OUT CHIP. WILL SEND AI WHEN DONE-PH PHxlÃ@YÁ% ÂLxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@ZÂX^ ÂXxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿM11/18/08-COPI RECIEVED FOR CTI COUTURE TO INSTALL NEW PNEUMERCATOR CONSOLE PHxlÃ@[  Á xl xl Á`xlþÿþÿþÿþÿþÿþÿþÿ†DAVE BEAUMONT REPLACED A SPILL BUCKET ON ONE CHAMBER ON 6/2/08 HE SENT IN THE CERTIFICATE OF PROPER INSTALLATION. FACILITY PASSES. TRxlÃ@\ÂW Áxl xl Á`xlþÿþÿþÿþÿþÿþÿþÿÎINITIAL INSPECTION FAILED DUE TO A BAD SENSOR. SENSOR WAS CHANGED OUT BY NICK GUAY 10/15/08 AND CREATED PASSING INSPECTION. ENTERING INSPECTION AS A PASS AND NOTING THE FAILED DEVICE AND CORRECTED DATE. TRxlÃ@]àÂ)xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ¬INITIAL AI FAILED FOR COPPER LINE SPACING, AS IT DID LAST YEAR AS WELL 10/23/08-UPDATE RECIEVED PASSING FOR LINE SPACERS, NEVER GOT CERT OF PROPER INSTALL-PH-COPI RECIEVEDxlÃ@^à  Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃ@_Â41 ÂXxl xl Âxl þÿþÿþÿþÿþÿþÿþÿT11/20/08-UPGRADE REG REC'D, CTI COUTURE TO REPLACE 6-1 PIPING W/ DOUBLE WALL FLEX-PHxl Ã@`ÃB4 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@aÂ41 ÂXxl xl Âxl þÿþÿþÿþÿþÿþÿþÿFANNUAL INSPECTION DATE 10/29/2008. I MESSED UP ENTERING IT TWICE. -LWxl Ã@bÂ?, Âxl xl Â7xl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã@cÂC' Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã@dÃA Âbxl xl Âxl ÃF UþÿþÿþÿþÿþÿþÿPHxl ÃAÃ4@ ÂYxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAÂ4Q Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA U Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿDINSTALLED AND TESTED NEW GROUNDWATER MONITORING SENSOR IN WELL #2 PHxl ÃAÃX Â%xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAÂD Â%xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAÃ) Â%xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAÃc Â%xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA ÃQ1 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA Â4  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA àÂ\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA ÂN ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿREPAIRED BOTH FLAPPERS PHxl ÃA Ã@ ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ3FILL CAP REPLACED COPPER NOT SPACED-NOT REQUIRED PHxl ÃA  Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿjFILL CAP AND ADAPTOR REPLACED DISPENSER HOSES DO NOT HAVE SWIVELS OR BREAKAWAYS-INSTALLATION RECOMENDED PHxl ÃAÃ#@ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿƒREPLACED CONSOLE LIGHTS FILL CAPS REPLACED REPLACED FLAPPER ON 3-2 REPAIRED TANK 2 LLD REPLACED VAPOR RECOVERY CAPS AND ADAPTORS PHxl ÃAÂ5 Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAÃc\ Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã'6ÃNÂÂxk xk Âþÿþÿþÿþÿþÿþÿþÿþÿ11/10/08 UPDATE, MIKE LEWIS OF PMSI CALLED THEY DID AN INSPECTION AND FAILED IT DUE TO NO SPACERS. SCHOOL DOESN'T WANT TO DO THE WORK BECAUSE THEY ARE SUPPOSEDLY BEING TORN DOWN NEXT YEAR (2009). I TOLD MIKE NOT PASSING UNLIKELY ADDITIONAL ENFORCEMENT CURRENTLY BUT HIGHER DEDUCTIBLE IF CONTAMINATION IS FOUND DURING REMOVAL. TR 11/10/08 11/18/08 ISSOLATED AS ABLE PER MIKE LEWIS. TR 8/8/2007 WOOLWICH CENTRAL SCHOOL CALLED AFTER RECEIVING A QUOTE FROM SIMARDS & SONS REGARDING THEIR COPPER PIPING, AND HAD AN ESTIMATE TO INSTALLED SPACERS. ASKED IF THE DEPARTMENT WOULD BE TAKING ACTION, BECAUSE THE SCHOOL SYSTEM DOES NOT HAVE THE MONEY THIS YEAR TO FIX IT. I TOLD HIM AT THIS POINT IT IS UNLIKELY THE DEPARTMENT WILL TAKE FURTHER ENFORCEMENT ACTION, BUT THE FACILITY WILL BE IN VIOLATION, AND TO INCLUDE THE REPAIR IN THE SCHOOL BUDGET FOR NEXT YEAR. THEY NEED TO SEND IN THIER 2007 ANNUAL INSPECTION. -TRxkÃAÃ*D Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿNDISPENSER PIPING NOT CAPPED OFF, BUT NO POWER TO FACILITY TO RUN PUMPS-PASS PHxl ÃAÂ%X Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAÃ:  Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿi10/16/09-UPGRADE REG. FOR CTI HAZEL TO REPLACE 4 AND 5-1 SPILL BUCKETS-PH RAISED CRASH VALVE ON 11/12 PHxl ÃAÃV Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿREPLACED 2 BULBS IN CONSOLE PHxl ÃAÃ_a Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃAà F Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ=AI STATES THAT CHAMBER 1-3 DOES NOT EXIST-IS BEING CHANGED PHxl ÃAÃc Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAà   xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃA Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAÂ$ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAÃR Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿfMONITORING WELL LOG NOT PASSED ON ORIGINAL INSPECTION, THEY SENT IN WEEKLY LOG AFTER THE FACT-PASS. PHxl ÃAà P Â%xl xl Âxl à þÿþÿþÿþÿþÿþÿþÿxl ÃAÃAb Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿvRETURNING TO SERVICE 5/29/2009. RECIEVED RETURN TO SERVICE NOTIFICATION FORM, P-TEST RESULT, AND ANNUAL INSPECTION INFORMATION. -LW WILL BE RE-OPENIGN JUNE 1ST. MOVED DEADLINE DUE TO P-TESTING ISSUE WITH TANKNOLOGY. P-TEST TO OCCUR ON MAY 28TH, AND AI FOR 29TH. -LW OOS INSPECTION. PASSED. WILL BE SENDING IN A LETTER REQUESTING PREMISSION TO STAY OOS GREATER THAN 12 MONTHS. -LW PREMISSION TO REMAIN OOS GRANTED UNTIL 5/1/2009. 4/27/2009 RETURNING TO SERVICE. P-TEST SCHEDULED FOR 5/4/2009-OKAY. WILL ALSO NEED TO SUBMIT COMPLETE AI, RETURN TO SERVICE NOTIFICATION, SIA BY 7/1/2009 AND TWO MONTHS DI BY 7/1/5/2009. -LWxl ÃA à D ÂLxl xl Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxl ÃA!Â>  ÂLxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã.  ÂLxlxl Âxlþÿþÿþÿþÿþÿþÿþÿ(COPI-CTI CARVER INSTALLED NEW VENT LINE ON DIESEL-11/13/08-PH 11/18/2008 SUBMITTED A RETURN TO SERVICE NOTIFICATION. PASSED A PRECISION TEST AND HAVE A PASSING AI. ALL SET TO RETURN TO SERVICE. -LW CTI CARVER SUBMITTED UPGRADE REG. TO REPAIR VENT PIPE AND PRESSURE TEST-10/21/08 OWNER WILL SUBMIT THRUPUT VACUUM TEST PERFORMED ON INTERSTICE, 5" HG FOR 3 HOURS-PASSED PH 9/10/08 TOLD OWNER BRIAN BLOOD MUST GET PIPING TESTED, SUBMIT PASSING RESULTS, AND SUBMIT REQUEST TO RTS AND OBTAIN WRITTEN APPROVAL FROM DEP BEFORE CAN RESUME USING TANKS. -MLxlÃA#ÃD Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿOSPILL BUCKET SEALS REPLACED #13 CRASH VALVE RAISED TO PROPER HEIGHT 11/10/08 PHxl ÃA$Ã`3 Â[!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿK4/14/09-COPI REC'D FOR CTI DAVIS TO INSTALL NEW 15 GAL. BUCKET ON TANK 3 PHxl ÃA%Âc  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ-FLAPPER REPLACED-WAS NOT CLOSING CORRECTLY PHxl ÃA& ÂDxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ'REPLACED RUBBER SPILL BUCKET GASKETS PHxl ÃA'Â# Â$xl xl Âxl Ã&3þÿþÿþÿþÿþÿþÿPHxl ÃA(ÃV# Â$xl xl Âxl Ã9QþÿþÿþÿþÿþÿþÿPH xl ÃA)Ã_ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã%ÃPÂÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿ³10/29/08-TANKS 4,5 PUMPED DOWN-TANK 5 HAD PRODUCT IN INTERSTICE ACCORDING TO CONVERSATION TR HAD WITH SOMEONE, THE TANKS WILL BE REPLACED IN SPRING-SEE EVIDENCE OF A LEAK NOTES-PHxkÃA*Â;( Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿCINTERSTICE SENSOR REPLACED TANK HAS NO RETURN LINE, JUST SUCTION PHxl ÃA+Â=6 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿñ11/10/11: CTI BILL CARVER WORKING ON NEW AI. CONSOLE WAS REPAIRED BY SOMEONE HIRED BY OWNER - UNK IF PERSON WAS V/R QUALIFIED. ALL FAC COMPONENTS NOW PASSING. RECEIVING SM AMTS FUEL TO KEEP FACILITY ACTIVE. SHOULD SEE PASSING AI SHORTLY. -WPxl ÃA, ÂMxl xl Âxl Ã2%dþÿþÿþÿþÿþÿþÿOTANK 4 (PREMIUM) FAILED AUG AND OCT DUE TO LOW THRUPUT, BUT PASSED FOR SEPT. PHxl ÃA-àÂ:xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA.Ã_ ÂMxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA/Â1! Â[!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ!UNION ON DISP. 11/12 TIGHTENED PHxl ÃA0àÂLxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ10/25/10-NOITR REC'D FOR CTI LEGASSE JR TO REMOVE TANK AND LINES, AND FESSENDEN TO DO SA-PH 10/18/2010 SPOKE WITH LARRY CONSERNING REPAIRS TO PASS 2010 INSPECTION. DUE TO NEED TO REMOVE BECAUSE OF WARRENTY WANT TO REMOVE. I WILL GET A LETTER WITH SCHEDULE TO APROVE. TEDxl ÃA2ÃZX ÂXxl xl Âxl þÿþÿþÿþÿþÿþÿþÿÂ6/9/09-COPI FOR CTI LEWIS TO INSTALL NEW VR TLS 300 AND NEW INT. SENSOR, ATG, PIPE SUMP PROBE PH SUMP LID CONNECTION CLEANED OFF AND RESEALED FILL CAP REPLACED REPAIRED FAULTY GUAGING PROBE PHxl ÃA3Â+? Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿºGAUGING PROBE IS DIRECTLY WIRED TO THE TANK MONITOR AND CAN'T BE REMOVED TO CHECK. CTI THORNDIKE RECOMMENDED REPAIR SO THAT IT COULD BE CLEANED AND CHECKED ANNUALLY. FILL CAP REPLACED PHxl ÃA4Â+> Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ<REPLACED INTERSTICE SENSOR GUIDE STRING REPLACED FILL CAP PHxl ÃA5Â+3 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ&FILL CAP REPLACED ATG PROBE CLEANED PHxl ÃA6ÂR@ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ[NO SPILL BUCKET AND NO OVERFILL-BOTH WERE RECOMENDED COPPER LINES NOT SPACED-'86 INSTALL PHxl ÃA7Â+0 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ&FILL CAP REPLACED CLEANED ATG PROBE PHxl ÃA8Â+= Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED GAUAGE PROBE IS WIRED STRAIGHT TO CONSOLE MAKING IT IMPOSSIBLE TO REMOVE AND INSPECT/CLEAN-REPAIR RECOMENDED PHxl ÃA9Â. Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ&FILL CAPS REPLACED-ADAPTOR REPLACED PHxl ÃA:Â1/ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl ÃA;Ã%@ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ%3/12/2009 TELPHONE CALL FROM MIKE LEWIS OF PMS. HE IS TRYING TO LOCATE THIS INDIVIDUAL, RON ROBERGE, TO GET PAID FOR WORK PERFORMED IN 2008. ALL NUMBERS ARE EITHER DISCONNECTED OR NO LONGER CONNECTED TO RON ROBERGE. DEP WILL ADD THIS FACILITY TO INSPECTIONS IN 2009. NOTIFY MIKE IF HE IS LOCATED. TR FOLLOW UP, NUMBER IS NOW 384-2150, NEW OWNER AS OF 12/08 NOW CALLED "BUBBLE TIME"....PER MIKE LEWIS. TR ALL FILL CAPS REPLACED VR CAPS REPLACED UNABLE TO INSPECT DROP TUBES, REMOTE FILLS PHxl ÃA<ÂQ  xl xl Á`xl þÿþÿþÿþÿþÿþÿþÿ2 3/4 " APT FLEXIBLE PIPExl ÃA= W  xl xl Á`xl þÿþÿþÿþÿþÿþÿþÿHINSTALLING SPACERS 11/08 PER CTI HASKELL. INSTALLING NEW FLAPPER AS WELLxl ÃA>ÂU Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA?Ã:M Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ889 INSTALL, WHISTLE NOT ACCESSABLE COPPER NOT SLEEVED PHxl ÃAAÃ]T Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃABÂP  xl xl Á`xl þÿþÿþÿþÿþÿþÿþÿ=ATG NOT WORKING BUT ALSO NOT REQUIRED. LEAK DETECTOR IS OKAY.xl ÃACÂ; ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAD ÂLxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃAE ÂLxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿKTANK 4 AI DONE 8/8/08; TANK 5 AI DONE 10/31/08 ALL SUMP SENSORS REPLACED PHxlÃAFÃ\, ÂLxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ<REPLACED SENSOR IN INTERSTITIAL WITH NEW SUMP LID SUPPORT PHxl ÃAG O Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ;11/12/08-CTI GUAY INSTALLED NEW ANNULAR SENSOR IN TANK 7 PHxl ÃAHÂGX Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ 7/8/09-NOITA FOR SIMARD TO REMOVE ALL TANKS AND PIPING, AND MIKE WHITE TO DO SA-8/12/09-REGISTRATION FOR CTI PAUL BROWN TO INSTALL 2 NEW TANKS AND PIPING PH PHxl ÃAIà W Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃAJà > Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ„5/9/08-INITIAL FAILED THE INTERSTITIAL FOR WATER IN SUMP 9/9/08-UPDATE PASSED SUMP-WAS REPAIRED BY CTI DODGE-UPDATE DONE BY EATON PHxl ÃAKÂ^a Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿU7/2/09-NOITA REC'D FOR LEE BROS. TO PULL TANK, SW COLE TO DO SA PH OOS INSPECTION PHxl ÃÂ!ÂÂ:xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ8RECIEVED PASS MISSING PAGES ON 11/21/08 DATED 3/24/08-PHxkÃALÂT3 Â4xl xl Âxl ÃGC8þÿþÿþÿþÿþÿþÿPHxl ÃAMÂB Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃANÃF Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿREPLACED POWER BULB ON CONSOLExl ÃAOÂ^, Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿq6/25/09-COPI REC'D FOR CTI LEGASSE SR. TO REPLACE DROP TUBE AND REPLACE SPILL BUCKET-PH CONSOLE BULB REPLACED PHxl ÃAPÃb? Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã]ÃS  xkxkÂxkþÿþÿþÿþÿþÿþÿþÿ[7/24/09-COPI REC'D FOR CTI BISSON TO INSTALL NEW ANODES ON TANK 2 PH 11/24/08-ELWIN SCOTT CALLED TO SAY THEY HAD FAILING CP, PLANNING TO RETEST IN SPRING (EARLY APRIL)-PH CP TESTED BY CTI CHAMBERLAIN 8/14/07 5/1/08 UPGRADE REGN FOR CTI MCALLISTER TO INSTALL 42" MANWAY FOR TANK 2 7/2/08 COPI - CTI MCALLISTER INSTALLED 12" VAPOR RECOVERY MANWAYxkÃAQà M Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃARÂZ  Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃASÃGF Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃATÂB Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ011/12/08-CTI GUAY REPLACED COAX DROP TUBE ON 5-1xl ÃAUÃH ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAVÂ' ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAWÃ5+ ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAXÃ/Y ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAYÂ' ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿREPLACED LLD ON DIESEL PHxl ÃAZÂ' ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA[Ã@  ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA\ \ ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ2SUMP FULL OF WATER, CTI REPORTED EVIDENCE TO LW PHxl ÃA]Ã> Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã6Â7 ÂxlxlÂxmÄ#þÿþÿþÿþÿþÿþÿo9/17/09-BURNER BOB HAD THIS, AND A NUMBER OF OTHER LOCAL FACILITIES ON A SCHEDULE, WHERE HE WOULD JUST COME OUT AND DO THEIR INSPECTIONS. APPARENTLY BOB HAS BEEN TIED UP WITH A PROJECT IN LIMESTONE, AND DIDN'T GET TO A NUMBER OF FACILITIES ON TIME. HE WILL BE DOING THIS ONE 9/19/09-PH TANK 5 FAILED, REMOVED, SITE ASSESSMENT REC'D 1/6/09, NOW PASSING INSPECTION. TR 3/11/09 COPI RECIEVED FOR INSTALL OF NEW TANK, 11/18/08-CTI CORMIER-PH TANK 5 HAD 1.5-2 GALLONS SNL IN THER INTERSTITIAL SPACE. DEP NOTIFIED AND TANK WILL BE REMOVED AFTER JULY 8, 2008. TANK WILL BE EMPTIED AND OUT OF SERVICE UNTIL REMOVAL.xlÃÂ%>ÂÂUxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ¬FACILITY MAY ACTUALLY BE OUT OF SERVICE. WOMAN I TALKED TO DID NOT KNOW HOW LONG THEY HAD NOT BEEN PUMPING, BUT THOUGHT THEY WOULD START AGAIN ONCE SNOW MOBILE SEASON HITS.xkÃA^Ã\I Â!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃA_Ãc Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAaÂ; Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿNEW PIPING PHxl ÃAbÂc Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ8PH 10/13/08-COPI, CTI BAUMONT REPLACED SPILL BUCKETS-PHxl ÃAcÃ3W ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃAdÃN Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ SPACERS INSTALLED ON CU LINES PHxl ÃB Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ~TANK 4 IS OOS, AND WOULD BE REMOVED BUT IS TOO CLOSE TO TANK 3. NO CP READINGS FOR TANK 4, BECAUSE THEY WOULD FAIL IF TAKEN PHxl ÃBÂ/ Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBàÂ!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBÂ2 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿEATG NOT FUNCTIONING PROPERLY, BUT INTERSTICE PROBE IS WORKING WELL PHxl ÃBÂ[1 Áxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿzINITIAL INSPECTION WAS A FAIL FOR DI WENT BACK AND FORTH WITH CF AND ENDED UP MAKING THEM PRECISION TEST, WHICH PASSED. PHxlÃBÁE ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ[NOITR REC'D FOR CTI REDMOND TO REMOVE TANKS AND PIPING, ENGEL ENVIRONMENTAL TO DO SA-PH PHxl ÃBÃU ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃB Ã7A Â`xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃB ÂWI Â`xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃB Â= Á$xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿrINITIAL INSPECTION FAILED AS CONSOLE DID NOT WORK CONSOLE REPLACED AND REINSPECTED 10/31/08 BY CTI CHAMBERLAIN PH xlÃB Â!M Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃBÂ%> Âxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ°FACILITY MAY ACTUALLY BE OUT OF SERVICE. WOMAN I TALKED TO DID NOT KNOW HOW LONG THEY HAD NOT BEEN PUMPING, BUT THOUGHT THEY WOULD START AGAIN ONCE SNOW MOBILE SEASON HITS. PHxlÃBÂ[ Á xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃBÃa ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBÃDd ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃBÃ_ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBÃ#c Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBÂY Â!xl xl Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxl Ã,ÃX Â!xkxlÂxkþÿþÿþÿþÿþÿþÿþÿK8/24/09-NOITA TO REMOVE OLD TANK AND REGISTRATION REC'D FOR CTI SIMARD TO INSTALL REPLACEMENT TANK PH 12/1/2008 MATT JOHNSON LEFT MESSAGE REGARDING FAILING ANNUAL INSPECTION AND LETTER. TANK IS GOING TO BE REPLACED NEXT YEAR. -LW 9/2/08 ACCORDING TO DON BUBAR TANK IS HOOKED UP TO A GENERATOR. TOLD HIM TO SEND IN THE FAILING ANNUAL INSPECTION. -LW AI DATED 8/28/2008 FAIL DUE TO OVERFILL PREVENTION. COULD NOT INSPECT VENT WHISTLE TO ENSURE PROPER FUNCTION AND HEIGHT. SENT THE FACILITY A LETTER 11/18/2008 EXPLAINING THE FAILURE AND HOW THE DEP DOES NOT ACCEPT FAILNG AI'S. -LWxkÃBÃ] Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBà " Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃBÃ+ ÂUxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBÂÂPY Á$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ!REPLACED POWER BULB IN CONSOLE PHxl ÃB?àÁ$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃB@ÂG@ Á$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBDÂA; Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBEÂV Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿè12/30/09-COPI REC'D CTI WINSLOW TO REPLACE COPPER PIPING WITH COATED COPPER, AND INSTALL FLAPPER ON 4,000 GAL #2 OIL TANK, TANK #2-PH TANK 9 MARKED AS COPPER LINES NOT BEING SLEEVED-PASS BECAUSE THE LINES ARE IN SEPERATE SLEEVES PHxl ÃBFà > Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã"ÂÂÂ)xjxjÂþÿþÿþÿþÿþÿþÿþÿþÿp7/20/09-NOITA REC'D FOR CTI BEAUMONT TO PULL TANKS, AND SW COLE TO DO SA PH 5/7/2009 SEE ENFORCEMENT NOTES. -LW PER DEP INSPECTION ON 10/15/2007 FACILITY HAS BEEN OOS SINCE 6/2007. 6/23/2008 PER LOCAL KNOWLEDGE FACILITY IS OUT-OF SERVICE (MAINE REVENUE SERVICE?) 6/1/2008. -LW INSPECTOR INDICATED THAT TANK #3 IS CURRENTLY NOT IN USE DUE TO BAD FLEX CONNECTOR. BBxjÃ/?ÃP Á$xlxlÂxlþÿþÿþÿþÿþÿþÿþÿ%11/30/08-NOTICE OF INTENT TO ABANDON RECIEVED FOR ALL 6 TANKS-CTI KANE, ACADIA ENV. TO DO SA-PH SUMPS AND SPILL BUCKETS CLEANED OUT REPLACED 3-1 VAPOR RECOVERY ADAPTOR REPLACED 4-1 FILL CAP 1-1 MAN HOLE LID NEEDS REPLACING PH 1-1 VAPOR RECOVERY LID REPLACED-CTI DENNIS DAVIS-NOW PASSING PHxlÃBGÂIW Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿÆ6/24/08-CTI GUAY DID INSPECTION THAT WAS FAILING 7/2/08-REPAIRS MADE AND PASSING INSPECTION WAS SUBMITTED, HOWEVER, THE CP WAS NEVER TESTED. 11/4/08-CTI BISKUPIAK WENT BACK OUT AND TOOK READINGS PHxlÃ*Nà  Â)xlxlÂþÿþÿþÿþÿþÿþÿþÿþÿUST INSPECTION APPEARS TO BE A PASS, BUT AST FAILS, SO IT WILL REMAIN A FAIL-PH INSPECTION REPORT FOR BOTH USTS AND ASTS. ASTS HAVE NO STAGE 1 VAPOR RECOVERY SYSTEM INSTALLED. BB REC'D UST ONLY REPORT ON 1/23/08 AND ALL PASSES PER CTI BUBAR 12/5/07. TRxk ÃBH Â Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿdINITIAL FAILED FOR BROKEN INTERSTITIAL CAP BEING BROKEN 10/2/08-CAP REPLACED AND UPDATE DONE-PASS PHxl ÃBIàÂDxl xl Âxl Ã22PþÿþÿþÿþÿþÿþÿPHxl ÃBJÃY  ÂDxl xl Âxl Ä;_þÿþÿþÿþÿþÿþÿ‚TANKS 1,2 3 , WERE IN TANKS AS REMOVED, ALTHOUGH THEY NEVER WERE. IN 2004 THEY HAD THEIR PIPING REPLACED REPLACED LLD ON TANK 1 PHxl ÃBKàÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBLÂ1@ ÂXxl xl Á`xl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃBMÃ- Áxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ›REMOVED SMALL AMOUNT OF H20 FROM SUMP PIPING NOT SPACED-'89 INSTALL INITIAL WAS A FAIL FOR OVERFILL-WHISTLE NOT ACCESSABLE-UPDATE 11/1/08-PASSES WHISTLE PHxl ÃBNÃ@_ Âxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿKCONSOLE INITIALLY NOT RESPONDING TO SENSORS, POWER CYCLED, AND TESTED OK PHxlÃBOàÂbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ)INTERSTITIAL SENSOR REPLACED IN TANK 1 PHxl ÃBPÂQS Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ›TANK 3 INITIALLY FAILED CP, AND CRASH VALVES 8/7/08 CTI DAVIS FIXED CRASH VALVE HEIGHT 10/22/08-CTI ST. PETER ADDED NEW ANODES, AND GOT PASSING READINGS PHxlÃ%ÂV`ÂÂ4xkxkÂxkÃ. þÿþÿþÿþÿþÿþÿà5/20/09-NOI TO ABANDON REC'D-CTI BARTON TO PULL, DON ROBBINS TO DO SA PH 11/21/08-OOS AI, NO CP READINGS DONE DUE TO FROST, ACCORDING TO CTI J. BOSSE, THEY WILL GET IT DONE IN THE SPRING-PH RON MASON CALLED ON 12/15/2008 REGARDING MASS MAILING SIA NOV. WANTED TO VERFIY FACILITY WAS NOT IN VIOLATION BECAUSE HE IS OOS, AND HE PLANS ON REMOVING HIS TANKS IN THE SPRING OF 2009. TOLD HIM YES, FACILITY IS NOT IN VIOLATION OF THE SIA, B/C FACILITY IS OOS. -LW RON MASON CALLED ON 10/27/2008. DID NOT KNOW HE STILL HAD TO HAVE AN ANNUAL INSPECTION ON OOS TANKS. I TOLD HIM HE DID. WILL SCHEDULE TO HAVE IT DONE ASAP. PLANNING ON REMOVING THE TANKS SPRING 2009. -LW ERIC T. ELLIOTT ASSISTED IN INSPECTION. CP TANK READING: -.851xkÃBQÂ%7  xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBRÂC Â`xl xl Âxl þÿþÿþÿþÿþÿþÿþÿË01/21/11: STEVE REDMOND THINKS 6-2 PIPING IS FLEX. WILL STOP BY SOON, CHECK & ATTEMPT CP READING. -WP 10/27/10: INCOMPLETE AI - MISSING CP EVAL ON PIPING. PORTLAND PUMP TO RETURN TO COMPLETE IT. -WP PHxl ÃBSÃ!T Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃBTÂ86 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃBUÃ* Á$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿsREPLACED ALL BULBS ON CONSOLE REPACED TANK 1 AND 2 INT. SENSORS REPLACED 2-2 FILL CAP SPILL BUCKETS CLEANED OUT PHxl ÃBV  Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ?CRASH VALVES INITIALL TOO HIGH-114/08-CTI GEORGE RAISED THEM PHxl ÃBWà  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBXÂ% Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿÒINITIAL INSPECTION ARRIVED AS A PASS, BUT WAS ACTUIALLY A FAIL FOR NO SPILL BUCKET OR ACCESSABLE WHISTLE 8/19/08-CTI BUBAR RETURNED AND EXPOSED WHISTLE FOR TESTING 11/28/08-CTI LEGASSE INSTALLED SPILL BUCKET ON GAS TANK AND DROP TUBE, AS WELL AS REMOVING REMOTE 2 INCH FILL-COPI 12/10/08 PH 8/19/08-CTI BUBAR RETURNED AND EXPOSED WHISTLE FOR TESTING 11/28/08-CTI LEGASSE INSTALLED SPILL BUCKET ON GAS TANK AND DROP TUBE, AS WELL AS REMOVING REMOTE 2 INCH FILL PHxl ÃBYÃT Âxl xl Âþÿþÿþÿþÿþÿþÿþÿþÿþÿxl ÃBZÂQQ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿÈTANK 1 HAS GROUND WATER MONITORING AS LEAK DETECTION, BUT AI SAYS BAILER IS DAMAGED. NEW BAILER IS ON ORDER-WILL CHECK BACK WITH OWNER-PH TANK 9 INTERSTITIAL SENSOR REPLACED 12/1/08 BY CTI LEGASSE PH xl ÃB]à L Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃB^ÂJ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃB_Ã! Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃB`Ã;* ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿSCONSOLE ALARM NOT VERY LOUD, BUT DOES FUNCTION, RECOMENDED THAT HORN BE REPLACED PHxl ÃBaÃE@ ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBbÃ&H Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBcÂT Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃBdÂOQ ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCÃTX Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCÂ[N Áxl xl Âxlþÿþÿþÿþÿþÿþÿþÿ_12/18/08-NOTICE OF INTENT TO ABANDON TANKS REC'D, TO BE DONE BY CTI LEGASSE-PH OOS INSPECTION.xlÃCÃ< Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCÂD/ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCà  Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCàÂ*xl xl Âxl þÿþÿþÿþÿþÿþÿþÿSITE HAS A YARD SUMP, WITH SENSOR THAT SHUTS DOWN THE STP IF IT ALARMS. THE SIGNAL RUNS FROM THE SENSOR, TO THE CONSOLE, THEN TO THE PUMP. PHxl ÃCÂ5b Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCÂ$Q Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl Ã&_ÃYD Âxk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿP11/24/08-AI BY CTI DAVIS, FAIL FOR TANK 1 HAVING 7.25" WATER AND .25"FUEL IN IT.xk ÃC Ã*P Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿs7/29/09-COPI REC'D FOR CTI LETELLIER TO INSTALL NEW SPILL BUCKET AND FILL RISER PH INTERSTITIAL SENSOR REPLACED PHxl ÃC Ã, Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ¬FIRST INSPECTION WITH NEW CSLD INSTALLED PH 12/26/2008 SENT FACILITY A LETTER OUTLINING ATG REQUIREMENTS TO BE EXEMPT FROM DI AND SIA; INCLUDED ATG REGISTERATION FORM. -LWxl ÃC Ã& ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃC Ã;+ Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ@REPLACED 1,2,3,4,5 FILL CAPS VAPOR RECOVERY ADAPTORS REPLACED PHxl ÃCÂ86 Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCÂ3 Â!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿºNEW OMNTEC CONSOLE AND SENSOR NO SUMPS, BUT LINES ARE SLEEVED AND SPACED NEW WHISTLE INSTALLED INTRERSTITIAL ACCESS BROUGH UP TO GRADE CP TEST PORT BROUGHT UP TO GRADE... -.88 READING PHxl ÃCÂ4 Â!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿO9/10/10-NOITR REC'D FOR PEASLEY AND OHALLORAN CONTRUCTION TO REMOVE TANK-PH PHxl ÃCà 1 Â!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿµINITIAL FAILED FOR NO ACCESS TO WHISTLE 12/12/08-CTI CAME BACK AND WITNESSED DELIVERY, AND PASSED PH %%%% NOTE %%%%% 5/12/09 CALL FROM DON BUBAR, WANTING TO CHECK THE VENT WHISTLE, WHICH HAS NO ACCESS, BY JUST BLOWING AIR THROUGH IT. LAST YEAR IT WAS VERIFIED BY STICKING AFTER A DELIVERY TO VERIFY SHUT OFF AT 90% AND OPERATIONAL PROPERLY. AGREED THAT JUST BLOWING AIR WOULD SUFFICE FOR THIS YEAR. TRxl ÃCÂ! ÂKxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿPHxlÃ`Ã] ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ 1/22/09-CALL FROM BILL BAKER (GORHAM SAVINGS)-FACILITY WILL BE OFFICIALLY SOLD TO KING WEINSTEIN ON 2/14/09-AL DOGGETT IS SCHEDULED TO REPLACE PIPING AND ADDRESS OTHER ISSUES AT FACILITY TO BRING INTO SERVICE. PRECISION TEST/ AI WILL BE DONE 5/22/09-CALL FROM SHAI PATEL REGARDING FACILITY, HE IS A POTENTIAL LEASEE AND WANTED TO KNOW WHAT HE NEEDS TO DO TO BRING FACILITY BACK INTO SERVICE. I PUT HIM IN CONTACT WITH JOE BOSSE AS HE WAS AT FACILITY DURING THE WINTER TO PUT TOGETHER REPAIR QUOTE FOR BANK. HE WILL CALL BACK WITH MORE INFORMATION ONCE HE HAS IT. PH REPLACED TANK 1 FLAPPER; ADJUSTED FLAPPERS FOR TANKS 2,3,4 12/19/08-GOT CALL FROM BILL BAKER @ GORHAM SAVINGS UPON RECEIPT OF NOV, BANK IS NEW OWNER (ACTUAL, REALLY, REAL OWNER) AND HE IS GOING TO TAKE PROPERLY OOS. HE THINKS THE PLACE WILL BE SOLD BY EARLY SUMMER AT LATEST-PH $%$%$% NOTE, 10/29/08 CALL FROM KING WEINSTEIN OF KING REALTY IN OLD ORCHARD BEACH WITH QUESTIONS REGARDING THIS FACILITY. IT APPEARS IT HAS BEEN OUT OF SERVICE SINCE SUMMER 2008, ESTIMATED DATE 7/1/08 COULD BE EVEN EARLIER. WEINSTEIN #207-934-7622 EXT 22. EMAIL KREKW1@AOL.COM. TR EMAIL FROM STEPHEN BREZINSKI INDICATES A SITE VISIT 11/26/08. FOUND 7" IN 2 TANKS, AND 5" (INCLUDING 2" OF H2O) IN A THIRD TANK. FILL PIPES NOT LOCKED, ONE DISPENSER HAS BEEN HIT AND IS KNOCKED OFF ITS MOUNT, PROBABLY UNUSABLE, SITE IS FOR LEASE, KING REAL ESTATE LISTING AGENT. MIKE FRESHETTE HAD CONTACTED STEPHEN, INTERESTED IN BUYING SITE, HE, MIKE, CLAIMS GORHAM SAVINGS ACTUALLY OWNS NOW. TRxkÃCÂZ ÂRxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCÃN ÂRxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCàÂ!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ(ACTUAL INSPECTION DATE WAS 9/22/2008. BBxl ÃCÂ^: ÂMxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ5REPLACED MLLDS ON BOTH TANKS #5 AND #6. TANK #7 OOS.xl ÃCÂG Á$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿÁINITIALLY FAILED FOR A NUMBER OF ISSUES, SEE BELOW: 12/18/08-CTI KANE INSTALLED A FLAPPER ON 1-2 AND A FLAPPER/COAX VR ON 1-1 AND REPLACED NON UL APPROVED 2" NIPPLE IN SUMP WITH APPROVED ONE PHxl ÃCàÂxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCÃ"8 ÂDxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCÃZ) ÂDxl xl Âxl ÃPNþÿþÿþÿþÿþÿþÿPHxl ÃCÃSK Â)xl xl ÂxlþÿþÿþÿþÿþÿþÿþÿMINITIALLY FAILED FOR MORE THAN 1" PRODUCT CTI LEGASSE PUMPED DOWN 12/15/08 PHxlÃCÂXB Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿlINITIALLY FAILED FOR BAD GUAGE STICK, WHICH WAS ORDERED AND REPLACED PER SUPPLIER 8-1 BALL FLOAT REPLACED PHxl ÃCà ' Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃCÃF- Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿôCTI CLANCY FAILED INITIAL FOR 2 QT OF OIL IN SUMP CTI WILSON WENT OUT AND FOUND NO SOURCES AND DETERMINED THAT IT MUST HAVE COME FROM THE BOILER ROOM. HE LEFT OIL PADS UNDER ALL THE POSSIBLE SOURCES AND CHECKED BACK ON 12/1/08, THEY WERE DRY PHxl ÃC ÂA0 Â$xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃC!ÂG Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃC"Ã4 Â`xl xl Âxl þÿþÿþÿþÿþÿþÿþÿrINITIAL FAILED CP= -.674 CP LETTER OUT 11/4/08 CTI HERSEY INSTALLED NEW ANODE 11/28/08 AND HAD READING OF -1.06 PHxl ÃC#Ã\- Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿhNEW SUMP LID AND REDUCER INSTALLED TANK HAS .5" WATER, RECOMEND REMOVAL BALL FLOAT RISER CAP REPLACED PHxl ÃC$ÂE Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl ÃC&Ã8 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿÈOVERFILL AND SPACERS ARE STILL BEING RECOMMENDED BY CTI THORNDIKE. THEY ARE NOT REQUIRED DUE TO THE AGE OF THE INSTALL, 1989. FILL CAP REPLACED COPPER SUCTION/RETURN LINES RECOMENDED TO BE SPACED PHxl ÃC'Ã8 Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ’OVERFILL AND SPACERS ARE STILL BEING RECOMMENDED BY CTI THORNDIKE. THEY ARE NOT REQUIRED DUE TO THE AGE OF THE INSTALL, 1986 FILL CAP REPLACED PHxl ÃC(Â. Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ=EXTRACTOR VALVE CAP REPLACED FILL CAP AND ADAPTOR REPLACED PHxl ÃC)Â. Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ;3.5" WATER IN TANK, RECOMENDED REMOVAL FILL CAP REPLACED PHxl ÃC*Â4P Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl ÃC+Â-# Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ0REPLACED FILL CAPS REPLACED FLAPPER ON TANK 9 PHxl ÃC,Â- Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ0RECOMENDED REPAIR OF INT. SENSOR JUNCTION BOX PHxl ÃC-ÃQ; Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ{RECOMENDED INT. SPACE SENSOR JUNCTION BOX BE REPLACED FILL CAP REPLACED EXTRACTOR VALVE CORRODED, RECOMENDED REPLACEMENT PHxl ÃC.ÃQ: Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl ÃC/Â4B Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxl ÃC0Â4C Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿc7/8/09-NOITA FOR LES WILSON AND SONS TO REMOVE TANKS, AND MIKE WHITE TO DO SA PH OOS INSPECTION PHxl ÃC2Â-  Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ“TANK 9 INT. SPACE SENSOR REPLACED 9 AND 10 INT. RISER CAPS REPLACED ALL FILL CAPS REPLACED TANK 12 FILL ADAPTOR REPLACED 8,9,10 VR CAPS REPLACED PHxl ÃC3Â4Y Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ}FILL CAPS REPLACED TANK 10 VR CAP REPLACED TANK 10 SMALL AMOUNT OF WATER REMOVED FROM PIPING SUMP, LOOKS LIKE CONDENSATION PHxl ÃC4Â5E Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿš11-14 MANHOLE COVERS SHOULD BE REPLACED SOON 11-14 FILL CAPS REPLACED 11,13 FILL ADAPTORS REPLACED 13 ATG PROBE CAP REPLACED 11,12,13 VR CAPS REPLACED PHxl ÃC5Â5D Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿÐ11-14 MANHOLE COVERS SLIGHTLY DAMAGED, RECOMENDED REPLACEMENT TANK 11 CONTAINED 2 QT. FUEL, MOST LIKELY FROM LLD CHANGE 12,13,14 FILL CAPS REPLACED TANK 11 FILL ADAPTOR REPLACED TANKS 11-13 VR CAP REPLACED PHxl ÃC6Â_ Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿfAI FAILED FOR DI ON THE PREMIUM TANK, ASKED FOR AND RECIEVED 2 MONTHS, SEPTEMBER PASSED=LOW THRUPUT PHxl ÃC7Â* ÂKxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃC8Â" ÂTxl xl ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃC9Â; Â`xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃC:ÃJ< Â[!xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ°INITIAL FAILED FOR NOT HAVING SPACERS ON THE COPPER LINES, ALTHOUGH THEY WERE NOT REQUIRED WHEN INSTALLED IN 1990 CTI GEORGE REPLACED LINES WITH DOUBLE WALL FLEX ON 12/16/08 PHxlÃC;à  Â)xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ®INITIALLY FAILED FOR BAD GUAGE STICK AND CONSOLE NOT FUNCTIONING PROPERLY NEW STICK WAS SUPPLIED, AND SENSOR WAS REPAIRED 12/11/08 TANK 1 HAD 3" PRODUCT, WHICH WAS REMOVED PHxl ÃC<àÂ!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃC=Â? Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿŸ9/9/09 SPOKE WITH BOTH DALE CHAPMAN AND STEVE DONOVAN ABOUT THE OPTION OF REOPENING THIS FACILITY. TOLD THEM THAT THIS WAS NOT AN OPTION, FACILITY OOS OVER 12 MONTHS WITHOUT ANY REQUEST FROM WEBBER TO STAY OUT MORE THAN 12 MONTHS. HAS BEEN OOS ALMOST 18 MONTHS. DENIED REQUEST TO REOPEN. TR 8/19/09-NOITA REC'D FOR CTI KANE TO REMOVE TANKS AND PIPING PH OOS PHxl ÃC>Â;R Âbxl xl Âxl þÿþÿþÿþÿþÿþÿþÿINITIAL FAILED AS BOARD SMOKED WHEN NEW BULBS WERE INSTALLED ON IT 12/26/08-NICK GUAY RETURNED AND REPLACED KEYBOARD, AND CONSOLE TESTED FINE PHxl Â^Á+ÂÂUxjxjÁ`xjþÿþÿþÿþÿþÿþÿþÿÊ12/29/2008 JAMES MEADER CALLED TO REPORT TONY COUTURE WAS COMING TO THE FACILITY ON 12/31/2008 TO COMPLETE AN ANNUAL INSPECTION. -LW 12/30/08 TONY COMPLETED ANNUAL INSPECTION WILL BE FAXING IT IN. -LWxjÃ,7Ã9  xl xlÂxlþÿþÿþÿþÿþÿþÿþÿ12/26/08-NOTICE OF INTENT TO ABANDON PIPING AND REGISTRATION TO INSTALL NEW DOUBLE WALL FLEX AND NEW PIPE SUMP-PH PIPING SUMP COMPLETELY FULL OF WATER INTERSTITIAL SENSOR IS RUSTY AND LIGHT ON CONSOLE STAYS ON NO CAP ON VENT-PH ALL PROBLEMS FIXED ON 4/21/08 BY CTI C. WILSON-PHxlÃC?Á+ ÂXxl xl Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃC@Ã? Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ1/31/09-CTI DODGE DID VAC TEST, PASSED-PH INITIAL AI DONE BY TONY COUTURE, AND FAILED AS HE FOUND 28" WATER IN INTERSTICE, WHICH HE REPORTED JEFF EATON WAS CALLED BY OWNER (AS HE WAS INVOLVED IN TANK UP UPGRADE), AND PUMPED OUT WATER. JEFF FOUND THAT THE CORD GRIP ON THE INT. RISER WAS LOOSE. JEFF RETURNED 1 WEEK AFTER PUMP OUT AND FOUND INTERSTICE TO BE ALMOST DRY, WITH .5 CUP WATER. HE CHECKED CONSOLE AND FOUND IT FUNCTIONING PROPERLY OPERATOR HAS BEEN INSTRUCTED TO CHECK CONSOLE REGULARLY, AS IT IS IN THE BOILER ROOM PHxl ÃCBÃ? ÂXxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCCÃ/] Áxl xl Âxl þÿþÿþÿþÿþÿþÿþÿPHxl à #Ã#d ÂxkxkÂ<xkþÿþÿþÿþÿþÿþÿþÿ9BIG DAVE CALLED, AND AI IS DONE, WILL BE SENT IN-12/31/08xkÃCDÃb  xl xl Âxl Ã*N þÿþÿþÿþÿþÿþÿRTHIS AI CAME IN A LITTLE BIT INCORRECTLY, BUT ALL OF THE REQUIRED INFO IS THERE PHxl ÃCEÂ]E ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCFÂ6> Á xm xm Âxl þÿþÿþÿþÿþÿþÿþÿÁUPGRADE REG. AND NOTICE OF INTENT TO ABANDON PIPING, AND GASOLINE TANK REC'D. GAS TANK, GAS PIPING AND DISPENSERS TO BE INSTALLED, AND DIESEL TRANSITION SUMP TO BE INSTALLED-CTI BEAUMONT PH PHxl ÃCGÂC] Á xm xm Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCHÂc Á xm xm Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCIà  Á xm xm Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCJÂ:- Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿREPLACED LAMP ON CONSOLE PHxmÃCKÃ, Â)xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ1HAS ABOVE GROUND OFFSET FILL WITH SPILL BUCKET PHxmÃCMà & Â)xm xm Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCNÂGU Â)xm xm Âxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃCO $ Â)xm xm Âxl þÿþÿþÿþÿþÿþÿþÿSYSTEM IS O-O-S. BBxl ÃCPà F Â)xm xm Âxl þÿþÿþÿþÿþÿþÿþÿþÿxl Ã!3 Â)xk xk ÂþÿþÿþÿþÿþÿþÿþÿþÿÅOFFSET FILL HARD PIPED TO TANKS. UNABLE TO DERTERMINE IF DROP TUBES ARE PRESENT. BB SPOKE TO TED K. ON 1/12/2008. FACILITY IS O-O-S. WILL SEND IN O-O-S PAPERWORK OR HAVE CTI REMOVE UG PIPING. BBxkÃCRà I Âxm xm Âxl à Zþÿþÿþÿþÿþÿþÿ­11/12/10-COPI REC'D FOR CTI GREENWOOD TO REPLACE TANK 6-1 SPILL BUCKET-PH SUCTION SYSTEM, NO PIPING SUMPS PIPING IS FIBERGLASS, WITH FLEX CONNECTORS-FLEX FITTINGS ARE CP PHxl ÃCSÃK Áxl xmÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃCTÃ_ ÂbxmxmÂxl þÿþÿþÿþÿþÿþÿþÿ¥ANNUAL INSPECTION UPDATE DATED 1/7/2009 ALSO SUBMITTED ON 1/14/2009. UPDATE COMPLETED BY DENNIS DAVIS. -LW PREMIUM PIPING SUMP SNESOR NOT ALARMING. DENNIS DAVIS REPLACED SENSOR AND REPAIRED WIRING AT JUNCTION BOX ON 1/7/2009. SHUT DISPENSER #11 REMOTE DOWN AS PIPING IS LEAKING 1 1/2 ENVIRON PIPE NEEDS NEW RUBBER GASKET. HAD TO ORDER GASKET TO FIT ENVIRON FITTING, REPAIRED 12/9/2008 DENNIS DAVIS AND RICHARD HAZEL.xl Ã+?Ã5(  xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ410/20/09-KEN LEGASSE JR CALLED TO SAY HE WAS AT THIS FACILITY TO REPLACE THE SPILL BUCKETS. ONE OF THE TANKS HAS VENT LINES THAT ARE RIGHT UNDERNEATH THE EXISTING 5 GAL. BUCKET. HE IS TAKING PICS TO SEND TO ME. I HAVE GIVEN HIM THE OK TO INSTALL A 5 GALLON BUCKET AS TO NOT DISTURB THE VENTS.-PH 10/21/09-COPI FOR CTI LEGASSE JR TO INSTALL NEW SPILL BUCKETS-PH BELINDA CALLED ON 1/13/2009 LEFT MESSAGE REGARDING SIA NOV, CALLED BACK ON 1/14/2009; UNCLEAR WHY SHE HAD TO DO ANOTHER SIA. TOLD HER IT IS BASED ON THE DATE OF THE SIA, NOT WHEN IT WAS SUBMITTED. SAID SHE WILL GET ANOTHER SIA DONE AS SOON AS POSSIBLE. WILL STILL BE IN VIOLATION UNTIL WE RECEIVE IT. -LW 9/22/09 CALL FROM BELINDA, SHE IS GETTING TANK PRECISION TESTED. TR O/S >1% FOR ALL 3 CHAMBERS TANK 1-3 FLAPPER TOO HIGH - REPLACED DROP TUBExlÃMÃ]% ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃMÃaA ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ-TRACE WATER IN SUMP REMOVED, NOT IN ALARM PH xmÃM Â7) ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿõ11, 14 & 17 - WATER REMOVED FROM SPILL BUCKETS 15 - CRACKED NUT ON HIGH LVL ALRM RPLCD 17 - SPLY & RTRN LINES IN SEPERATE 1.5" PVC 18 - SUMP IN ALARM, 10 GAL WATER REMOVED CALLED CTI, SPOKE W/ SPOUSE: REMINDER FOR CTI TO CALL IN ALARMS TO DEP WPxmÃM!  ÂbxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿf5/11/10-NOITR REC'D FOR CTI LEGASSE SR. TO REMOVE TANK AND PIPING, FESSENDEN TO DO SA-PH STILL OOS WPxmÃM"Â1a ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃM#ÂL( ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿxCTI SAYS OVERFILL PREV IS VENT WHISTLE & FLAPPER SB LID TOUCHES THE RISER, BUT NOT IN AREA WHERE WOULD BE DRIVEN OVER WPxmÃM$ÃG Â;xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃM%Ã/6 ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ:CTI HUNTLEY SAY OVERFILL PREV IS VENT WHISTLE & FLAPPER WPxmÃM&Ãd2 Â;xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ PHxmÃM'ÂL' ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ:CTI HUNTLEY SAY OVERFILL PREV IS VENT WHISTLE & FLAPPER WPxmÃM(Â\J Â;xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃM)Ã^U Â;xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃM*Ã0 ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ*CTI HUNTLEY SAY 17 OVERFILL PREV IS E/F WPxmÃM,Â4. Â;xmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃM+Ãa2 ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ\PER CTI TRASK, 1-2 PRODUCT CHANGED TO DIESEL; CHANGED UPPER COAXIAL TUBE TO REG DROP TUBE WPxmÃM-Â0a Â;xmxmÂxm þÿþÿþÿþÿþÿþÿþÿCP READINGS -.911xm ÃM.ÂJ Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃM/ÂZ? Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ4REPLACED INT. SENSOR ON 31-1 TANK 33 LLD REPLACED PHxmÃM0Ã[5 Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿQ10/15/09-UPGRADE REG. FOR CTI BEAUMONT TO REPAIR OR REPLACE FLEX CONNECTOR-PH PHxmÃM1ÃS ÂxmxmÂ!xmÃ)þÿþÿþÿþÿþÿþÿWPxmÃM2Â[ Â#xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ! Â6 Á$xk xk Â<xkþÿþÿþÿþÿþÿþÿþÿë6/30/09-UPGRADE REG. FOR CTI THOMPSON TO INSTALL NEW SPILL BUCKET ON TANK 7-PH 4/8/09-OWNERSHIP CHANGE RECIEVED, NOW OWNED BY RH FOSTER-PH 3/28/08 UPGRADE REGN FOR CTI GRANT TO MODIFY ALL VENT PIPES TO ACCOMODATE FOUNDATION EXTENSIONxkÃM3 ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ$WP TANK READING: -0.89 -0.86 -0.89xmÃM4à ) ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃM5ÃQQ ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃM6Ã) ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ&CTI TRASK SAYS OVERFILL PREV IS E/F WPxmÃM7ÃbW Â-xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃM9Â=4 Â-xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃM:Â9 ÂXxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃM;ÂB' ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ°6/2/10-NOITR AND REG. REC'D FOR CTI CHAPMAN TO REPLACE YELLOW PIPE AND SUMPS, FESSENDEN TO DO SA-PH WP NOTE: THIS FACILITY HAS 1ST GENERATION TOTAL CONTAINMENT YELLOW PIPING.xmÃM<Â7/ ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿã*TANK 10 (SUPER) TURBINE FEEDING PUMPS 5-8 HAS BROKEN FB LINE IN GRND, CANNOT TEST LLD UNTIL FIXED. *CRASH VALVES ON DISPS 5-8 TOO LOW. WP 06/30/09: FB LINE REPLACED, LLD TESTED & PASSED; CRASH VALVES SET TO CORRECT HEIGHT. WPxmÃM=ÂF, ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ!CTI TRASK'S AI SAYS T7 IS 10K. WPxmÃM>Â1a ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿUTHRUPUT IS UNKNOWN-NO STAGE 1 VAPOR RECOVERY. WP TANK READING: -0.911 -0.912 -0.912xmÃM?Ã* ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿö10/26/09: REG. REC'D FOR CTI COUTURE TO INSTALL NEW 3/4" DW FLEX PIPING, AND REPLACE EXISTING COPPER WITH COPPER SLEEVED IN PVC, AS WELL AS REPLACE SPILL BUCKET AND INSTALL NEW 4" FILL RISER-PH 07/10/09: INCOMPLETE AI; NO SPACERS IN PIPING. WPxmÃM@Ã" ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃMAÂ0 ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ2CTI TRASK'S AI HAS OVERFILL PREV AS ELECTRONIC. WPxmÃMBÃS ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃMCàÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ41-LS-ASC PIPING SUMP SENSOR NOT WORKING: REPLACED WPxmÃMDÃ8X ÂTxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃMEÂL` ÂTxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃMGÂL ÂYxmxmÂ!xmÃ)Z#þÿþÿþÿþÿþÿþÿ$WP TANK READING: -1.19 -1.15 -1.18xmÃ7Ã5 Á$xlxlÂxl þÿþÿþÿþÿþÿþÿþÿë7/6/09-UPGRADE REG. FOR CTI GEORGE TO INSTALL NEW SPILL BUCKETS ON TANKS 2 AND 3 PH CONDUIT TO 2-1 SUMP BROKEN AND PROBE NOT FUNCTIONING-REPAIRED ALL AND RESET CLEANED SPILL BUCKETS REPLACED FILL CAP ON 4-1 WITH LOW PRO FOR EXTRA ROOMxl ÃMHÃB ÂZxmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿ°10/8/10-NOITR REC'D FOR LYNCH TO REMOVE TANK, G. KANE TO OVERSEE, AND FESSENDEN TO DO SA-PH 6/18/09-COPI REC'D FROM CTI COUTURE WHO INSTALLED OMNTEC RA-1 OVERFILL HORN-PH TRxm ÃMIÃQ ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿNCTI TRASK SAYS THIS IS A CONFORMING SUCTION SYSTEM; NO DISP OR PIPING SUMPS WPxmÃMJÂCS ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿÑ11/22/10-COPI REC'D FOR CTI THOMPSON TO REPLACE PIPING ON ALL TANKS AND INSTALL NEW SPILL BUCKETS AND INCON CONSOLE-PH FLAPPER PLACARDS REPLACED VR CAP AND ADAPTOR REPLACED REMOVED SILT FROM SUMP SURROUNDS PHxmÃMKÃ+I ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ[TANKS 2 AND 3 INT RISER CAPS REPLACED TANK 3 SPILL BUCKET CLEANED OUT FILL CAPS REPLACED PHxmÃMLàÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿKPIPING SUMP LID GASKET REINSTALLED REMOVED EXCESS SILT FROM AROUND SUMP PHxmÃMMÂ^ Â]xmxmÂxmÃ[Q6þÿþÿþÿþÿþÿþÿPHxmÃMN a ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿˆMANUAL INTERSTICE MONITORING, LOG PASSED LOWERED BRINE LEVEL CLEANED BUCKET .25" WATER IN TANK, REMOVAL RECOMMENDED FILL CAP REPLACED PHxmÃMO ` ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿfLOWERED BRINE LEVEL TANK HAS 1" WATER, RECOMEND REMOVAL REPLACED SPILL BUCKET LID REPLACED FILL CAP PHxmÃMP b ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ9REPLACED FILL CAP TANK HAS .5" WATER, RECOMEND REMOVAL PHxmÃMQ _ ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿTANK INT. SPACE MANHOLE LID REPLACED TANK MANWAY LID CORRODED, RECOMEND REPAIR TANK HAS 1.5" WATER, RECOMEND REMOVAL FILL CAP REPLACED REPLACED BUCKET LID PHxmÃMRÂ` ÂXxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃMSÃQ ÂXxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃMTÂF ÂXxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃMUÃ9 ÂXxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃMVÃ] ÂXxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ5CTI COUTURE REPLACED LS-ASC SENSOR IN PIPING SUMP. WPxmÃMWà  ÂXxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃMXÂN] ÂXxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃMZÃ5L ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿLF.E. PETRO M-LLD; COAX VAPOR RECVRY CTI DAVID BEAUMONT, NOT NICK GUAY. WP WPxmÃM[ÃP Á xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ&WP TANK READING: -1.059 -0.989 -1.001xmÃM\ÃN ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ11/19/10-REG. REC'D FOR CTI ANDERSON TO INSTALL NEW 5,000 GAL DOUBLE WALLED GLASS TANK WITH DOUBLE WALLED FLEX PIPING-PH REPLACED SUMP SENSOR PIPING SUMP CONTAINED WATER, REMOVED REMOVED SILT FROM SUMP SURROUND SUMP GASKET REPLACED REPLACED FILL ADAPTOR SPILL BUCKET CLEANED PHxmÃM]Â9+ ÂXxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃM^Â_Y ÂXxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃM_ÃF/ ÂXxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃM`ÃY Á xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃMaÃ_` Á xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿyCTI BEAUMONT REPLACED CAP & ELEC BOX ON T3 (DIESEL) LEVEL PROBE; REPLACED SNL SPILL BOX PLASTIC PLUG WITH STEEL PLUG. WPxmÃMbÃ_ Á xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿª9/27/09-ATTATCHMENT A REC'D FOR BOTH PIPING RUNS THAT WERE REPLACED BY CTI BEAUMONT-PH 7/21/09-NOITA AND REGISTRATION FOR REPLACEMENT OF YELLOW PIPE, CTI BEAUMONT PH WPxmÃMdÂX Á xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃNÂd Á xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ4WP TANK READING: INSTALLED 2 ANODES 191B ON TANK 4-1xmÃNÃR= ÂXxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃNÃ3 Á xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ,9/27/09-ATTATCHMENT A REC'D FROM CTI BEAUMONT-PH 8/31/09-UPGRADE REG FOR CTI BEAUMONT TO INSTALL DISPENSER SUMP PH 7/7/09-NOITA AND REGISTRATION FOR OLD YELLOW PIPE TO GE REMOVED AND REPLACED, APPEARS TO BE INTENDING TO USE ATT. A PH PER CTI BEAUMONT, OVERFILL PREV IS BALL FLOAT FOR BOTH TANKS WPxmÃNÂQ Á xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿ:SPILL BUCKETS RUSTED OUT FOR TANKS 4-2 & 4-3: REPLACED. WPxm ÃNÂ.  ÂxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿuPASSING INSPECTION. HOWEVER, WATER IN ALL THREE PIPING SUMPS, APPROXIMATE TOTAL 125 GALLONS. ALSO ISSUE OF PIPING OUT TO DOCK AND DISPENSER ON DOCK AND IT'S CRASH VALVE, CRASH VALVE IS SET TOO HIGH BY SEVERAL INCHES. NO DISPENSER PAN UNDER DOCK DISPENSER, DIRECT LEAKS TO OCEAN WATER IN CASTINE. PLACING ON INSPECTION LIST FOR 2009 SEASON BY DEP. THIS FACILITY MAY END UP NEEDING ESCALATED ENFORCEMENT, HE NEVER REPORTS SUMP ALARMS AND THE SUMPS ARE NOT LIQUID TIGHT, THEY ALWAYS HAVE WATER INTHEM, SEE PRIOR INSPECTIONS BY BOTH 3RD PARTIES AND DEP. HE HAS ALSO BEEN TOLD TO REPORT ALL ALARMS TO DEP BUT FAILS TO DO SO. TRxmÃNÃ-- ÂxmxmÁ`xmÃP )þÿþÿþÿþÿþÿþÿTRxmÃNÂ=G Á xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿ3PER CTI BEAUMONT- 2K GAL CHAMBER (3-1) IS DIESEL WPxm ÃNÃCb Á xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ'WP TANK READING: -0.881 -0.872 -1.027xmÃN Ã.I ÂxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTINVENTORY IS OFF ON PREMIUM, THIS IS DUE TO LOW THROUGH PUT. PASSING INSPECTION. TRxmÃN Â70 Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿÕINITIAL FAIL FOR TANK 7 FOR THE ATG HAVING BAD WIRING. AFTER CONVERSATIONS WITH LW, THEY DID DAILY INVENTORY WHILE ATG WAS OUT FOR TANK 7 5/4/09-ATG WAS FIXED, AND PLLD ON TANK 5 FUNCTIONAL ELEMENT WAS REPLACED PHxmÃN  ÂHxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ.FILL CAP REPLACED TANK HAS 8" OIL, NO WATER PHxmÃN  Â\xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ5BOTH FILL CAPS REPLACED MIKE LEWIS DID CP READINGS PHxmÃN ÂU Â\xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿREPLACED FILL CAP PHxmÃNÂW: Â>xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNÂW< Â>xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNÂW; Â>xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNÂW? Â>xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNÂW= Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿINSPECTION YEAR IS 2010 PHxmÃNÂW9 Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿINSPECTION YEAR IS 2010 PHxmÃNÃbS Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNÃ/ Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNÂ^\ Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿNGASKET FOR VR POPPET REPLACED SUCTION SYSTEM WITH DISPENSER SUMPS, NO SENSORS xmÃNÂLA Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNÃY ÂTxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNÃCb Á xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNÃR Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ'TANK 1 MANUAL GW SAMPLING LOG PASSES PHxmÃNÃ. Á xm xm Â!xmþÿþÿþÿþÿþÿþÿþÿAINITIAL ATG PRINOUT TOO OLD, CURRENT ONE RCVD FROM DIAGLE OIL. WPxmÃ@RÂ2 Â[!xl xl Âxl þÿþÿþÿþÿþÿþÿþÿñ7/9/2009 OWNER CALLED TO VERIFY THAT HAVING THEIR AI'S COMPLETED IN OCTOBER WAS OK. I TOLD THEM AS LONG AS THEY ARE HAVING AI EVERY 12 MONTHS THAT'S OK. ALSO NOTED THAT AI'S HAVE TO BE SUBMITTED WITHIN 30 DAYS OF THEIR COMPLETION. -LW PHxl ÃN Â#xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ 6/30/10-ATT. A REC'D FROM CTI CHAPMAN, MOLD PRESENT, NO EOPL-PH 5/17/10-NOITR AND REG. REC'D FOR CTI CHAPMAN TO REMOVE AND REPLACE YELLOW PIPING-PH INITIAL AI FAILED FOR INT. SENSOR AND FLUID IN SPILL BUCKET 7/1/09-SENSOR WAS REPLACED AND SPILL BUCKET CLEANED OUT PHxmÃNà = Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNà > Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ3TWO PIPING SENSORS, ONE IN SUMP, ONE IN BUILDING PHxmÃN Ã]T Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃN!Â2O Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃN"Â$O Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃN#Â#@ Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ§INITIAL AI FAILED FOR OVERFILL PROBES NOT FUCTIONING OWNER HAD LAKES REGION FUEL FROM NH REPAIR, AND CTI BUBAR WENT BACK 6/23/09 AND CERTIFIED IT WAS DONE CORRECTLY PHxmÃN$ÂA  xm xm Â!xm þÿþÿþÿþÿþÿþÿþÿ6WP LESS THAN 1" OF PRODUCT: TANK 11 OOS SINCE 05/06/06xm ÃN%Ã! Âxmxm Á`xmÃSþÿþÿþÿþÿþÿþÿ^STILL MISSING PRECISION TEST OF THESE TANKS REQUESTED UPON REMOVAL OF TANK 1 IN DEC. 2008. TRxmÃN&Ã] Âbxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿàCLEANED WATER OUT OF TANK 1-3 DUE TO A BAD LLD - REPLACED 06/25/09, NOW PASSING. WATER REMOVED FROM ALL SPILL BUCKETS. NOTE: NO LLD ON TANK 1-1 AS IT SIPHONS INTO TANK 2-1; BOTH ARE NL. WATER CLEANED FROM DISP 1&2 AND 3&4 WPxmÃN'Â(A Âxmxm Á`xm Ã]#+þÿþÿþÿþÿþÿþÿuSUMP SENSOR IN SUPER CHANGED, CROMPCO DID LEAK DETECTOR CHECK, PCA ENGINEERING DID CP TESTING.PASSING INSPECTION. TRxm ÃEÂYU ÂHxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿËCTI LEWIS INSPECTED TANKS 10,11,12, AND CTI SIROIS (MDOT) INSPECTED TANKS 8,9 TANK 10-TRANSITION SUMP CONTAINS WATER AND ICE, REMOVED-INTRUSION APPEARS TO COME FROM SUMP PIPING BOOT ENTRY SEALANT, LW NOTIFIED, OWNER NOTIFIED TANKS 10,11,12 SPILL CONTAINMENTS ARE CONCRETE AT FUELING CABINETS CLEANED SPILL BUCKETS CLEANED GAUGING PROBES TANK 10 4" EXTRACTOR VALVE CORRODED TO RISER-CUT OFF AND REPLACED TANK 12-GAUGING PROBE ADAPTOR GASKET FAULTY-REPLACED PHxmÃEÂ?  ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃEÂ$% ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿEPOWER BULB ON CONSOLE REPLACED SUMP COVER BROKEN, REPLACED 4/10/09 PHxmÃEÂ[7 Á$xmxmÂxm þÿþÿþÿþÿþÿþÿþÿ,CLEANED SPILL BUCKETS REPLACED VR CAP 6-1 PHxm Ã0NÂ$? ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿY4/2/09-NOTICE OF INTENT TO ABANDON PIPING, AND UPGRADE REG. TO DO TANK UP CTI GEORGE PHxlÃEÃ-] Â[!xmxmÂxm þÿþÿþÿþÿþÿþÿþÿTANK 5 SYPHON TANK.xm ÃEÂ[G ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ5TANKS 1 & 2 SYPHONED. ONLY TANK 1 HAS LEAK DETECTOR.xmÃE Â[: Â[!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃE Â[? ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ@TANKS 4 & 5 ARE SYPHONED AND HAVE ONE STP AND ONE LEAK DETECTOR.xmÃE Â[B ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ9TANK 5 & 6 ARE SYPHONED. ONLY ONE STP AND LEAK DETECTOR.xmÃE Â$- Âxm xmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃE ÂA ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿî6/4/10-ATT. A REC'D FROM CTI SIMARD, REMOVED YELLOW PIPING ON TANKS 8 AND 9, NO DETERIORATION, PASSED PRESSURE TESTING-PH 4/15/10-REG. AND NOITR REC'D FOR MIKE SIMARD TO REMOVE OLD PIPING AND INSTALL NEW, NOT SURE IF IT IS YELLOW PIPE-PHxmÃEà V Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿMCTI BUBAR NOTED THE FACILITY HAS DOUBLE WALL FLEX PIPING-CHECKING WITH HIM PHxmÃEÂQ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿINTERSTITIAL SENSOR REPLACED PHxmÃEÃ) ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEÂ]d ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ"COPPER NOT SPACED, 1988 INSTALL PHxmÃEÂ^? ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEÂQ/ ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ%CU PIPING NOT SPACED, 1990 INSTALL PHxm ÃEÂQ5 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ!COPPER NOT SPACED-1989 INSTALL PHxmÃEÂ]a ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ,REMOVED A SMALL AMOUNT OF WATER FROM SUMP PHxmÃEÂ2T ÂZxmxmÂxm þÿþÿþÿþÿþÿþÿþÿTANK 6 HAS 2 WALL APT PIPING PHxm ÃEÂ]_ ÂZxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃEà C ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃEÂY% Â]xmxmÂxm þÿþÿþÿþÿþÿþÿþÿ¿CURRENTLY REGISTERED AS DOUBLE WALL FLEX PIPING INSTALLED IN 2003, BUT THE INSTALL NEVER ACTUALLY HAPPENED, AND THE COPPER LINES THAT GO TO THE BOILER ARE ORIGINAL, SO NO SPACERS REQUIRED. PHxm ÃEÂBa ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ–11/17/09-UPGRADE REG. REC'D FOR CTI CHAMBERLAIN TO REPLACE TANK 11 MANWAY-PH 10/14/09-UPGRADE REG. REC'D FOR CTI CHAMBERLAIN TO REPLACE K1 MANWAY PHxmÃEÂ[6 ÂbxmxmÂxm þÿþÿþÿþÿþÿþÿþÿpREMOVED WATER FROM REGULAR SUMP, REPLACED BROKEN LID CTI DAVIS ADJUSTED CRASH VALVES ON DISPENSER 3/4-4/13/09 PHxm ÃEàÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ ATG PASS PHxmÃEÂT ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ6REMOVED DIRT AND SOME RUST SCALE FROM SPILL BUCKETS PHxm Ã+)ÃSJ Âxl xlÂxlþÿþÿþÿþÿþÿþÿþÿL10/8/09-NOITA REC'D FOR CTI KANE TO REMOVE TANK 1,2, 4,5 AND 6, SA WILL BE DONE BY STANTEC CONSULTANTS; SHOULD BE REMOVED BY 10/19/09-PH 4/8/09-CTI TRASK DID AI. TANK 1 FAILED FOR FAULTY INT. SENSOR, CURRENTLY NOT IN USE, TANK WILL BE REMOVED, TANKS 2, 4, 5, 6 ALL PASS 4/17/2009 BOB BECKTILL CALLED ABOUT THEIR FAILING AI FOR TANK #1. BRINE FILLED INTERSTICE PROBE NOT FUNCTIONING PROPERLY. IF QUOTE FOR WORK IS MORE THAN $2500 IT WILL HAVE TO GO OUT TO BID AND THAT WOULD TAKE A LONG TIME. THEY ALSO PLAN ON REMOVING THE TANK, BUT ARE WAITING FOR MONEY. I TOLD THEM THEY COULD PLACE IT PROPERLY OUT OF SERVICE UNTIL IT IS REMOVED. BOB IS GOING TO GET MORE DETAILS AND GET BACK TO THE DEP. -LW 2" WATER IN TANK 3 INTERSTICE. PUMPED WATER FROM PIPING SUMP, DID NOT PUMP OUT INTERSTICE. TANK 3 HAS REMOTE, 2" SCULLY FILL PIPED INTO YARD SUMP. TANK HAD BEEN OVERFILLED AND ALARM WAS ON. 3.5" WATER INSIDE TANK. TOLD BECHTOLD MUST MANUALLY MONITOR INTERSTICE UNTIL REPAIRS COMPLETED. -ML 2/25/08 LEGASSE SR PUMPED WATER FROM INTERSTITIAL SPACE, REPLACED INTERSTITIAL SENSOR AND TESTED OKxlÃEÂ?1 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿh3/2/10-NOITA REC'D FOR CTI SIMARD TO REMOVE TANKS 6,7,8 AND PIPING, SUMMIT ENVIRONMENTAL TO DO SA-PH PHxmÃEÃU Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿˆTRANSITION SUMP ON REGULAR LINES BAD SUMP SENSOR, REPLACED WATER IN SAME SUMP REMOVED AND CLEANED, LID RESEALED CLEANED SPILL BUCKETS PHxmÃE ÃG ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃE!ÃF, ÂBxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃE"ÂY ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿREPLACED SPILL BUCKET LID PHxmÃE#Â2 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃE$Â]T ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃE%ÂY ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ0NO SPACERS ON COPPER LINES-OK, 4/1/89 INSTALL PHxm ÃE&Â]b ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃE'Â[H Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿò10/22/09- COPI FOR CTI LEGASSE TO INSTALL NEW SPILL BUCKET ON TANK 1-PH GUAGE STICK REPLACED, OLD ONE MISSING BUTTON DI PASSED FACILITY ALSO HAS CSLD, AND HAD PASSING TESTS CLEANED SPILL BUCKETS VAPOR ADAPTOR ON TANK 1 REPLACED, RUSTED ON PHxmÃE(Â[; Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿù04/09/2010: NOTIFIED BY CF AI IS INCOMPLETE; INTERSTITIAL SENSOR NEEDED CHANGING, HAD TO DIG TO TANKTOP TO CHANGE, FINAL INSPECTION ON 04/12. WP REMOVED WATER FROM DISPENSER PAN 3/4 REPLACED MISSING SCREW IN 5-1 FLAPPER SPILL BUCKETS CLEANED OUT PHxmÃE)ÂIb ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿE4/14/10-UPGRADE REG. REC'D FOR CTI GEORGE TO REPLACE FILL PIPE, DIELECTRIC BUSHING, AND SPILL BUCKET-PH NEW GUAGE STICK ONSITE, OWNER TOLD TO USE IT, OLD ONE WORN OUT WATER REMOVED FROM 7-1, 7-2 SUMPS-WAS IN ALARM UPON ARRIVAL, REPORT TO TR CP TESTED BY CTI KANE TANK 5 LISTED AS PRESSURIZED, IS ACTUALLY SUCTION-CHANGING PHxmÃE*àÂ[!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃE+Â[@ Á$xmxmÂxm þÿþÿþÿþÿþÿþÿþÿ«LOWERED SUMP SENSORS IN BOTH REGULAR SUMPS REPLACED INT. SENSOR IN 6-1 CLEANED AND PAINTED ALL LIDS OLD STAINING ON 5/6 DISPENSER PIPE AND UNION, NOT SURRENTLY WEEDPING PHxm ÃE,Ã"  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃE-Ã: ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃE.ÂL ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿOCOPPER LINE REPLACED WITH COATED LINE TO SATISFY SPACING REQUIREMENT-4/17/09 PHxmÃE/ÂC ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿWDI WAS CHECKED AND PASSED, BUT FACILITY USES AND IS REGISTERED FOR ATG, WHICH PASSED PHxm ÃE0Â[C Â[!xmxmÂxm þÿþÿþÿþÿþÿþÿþÿSUPER TANK LLD REPLACED PHxm ÃE1Â$ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃE2Â[0 ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃE3Ã! ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿCLEANED SPILL BUCKET PHxmÃE4ÃX ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ05/4/10-NOITR REC'D FOR YET UNNAMED CTI TO REMOVE TANK 5-PH TANK 5 PIPING SUMP MANWAY RIM DAMAGED, RECOMENDED REPAIR INT. SPACE MANWAY LID DAMAGED, RECOMEND REPAIR PIPING SUMP PUMPED OUT, REMOVED SAND AND RESEALED PIPING DICONNECTED AT BOILER (UNDER REPAIR), TANK HAS 6" FUEL, RECOMENDED THAT TANK BE OOS UNTIL REPAIR MADE, OR TANK REMOVED TANK 6 SENSOR WIRING REPAIRED REMOVED SMALL AMT. WATER, CONDENSATION TANK 7 PIPING SUMP CLEANED OUT, RESEALED ALL FILL CAPS REPLACED TANK 5 SPILL BUCKET LID DAMAGED, RECOMENDED REPLACEMENT TANK 6 FILL ADAPTOR REPLACED PHxmÃE5ÂNE ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ†PIPING SUMP MISSING SOME HARDWARE, INSTALLED NEW HARDWARE REMOVED FUEL FROM BUCKET COPPER LINES NOT SPACED, RECOMENDED INSTALLATION PHxmÃE6ÂY  ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxmÃE7 Â\xmxmÂxlþÿþÿþÿþÿþÿþÿþÿ˜AI FAILED FOR >1% DI, AND FOR NO MANUAL INTERSTICE LOG BOTH HAVE BEEN RECIEVED, AND NOW PASSING PIKE IS PLANNING ON INSTALLING CONT. ELEC. MONITORING PHxlÃE8Â[= ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿhREGULAR SLAVE TANK SUMP HAS WIRING ISSUE WITH SENSOR 4/20/09- CTI DAVIS REPLACED WIRING, SENSOR RESET PHxmÃE9Â[3 Â[!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃE:Â[M ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ2A FEW COVERS WERE REPLACED BY CTI DAVIS-4/20/09 PHxmÃE;ÃQ  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿOTANK HAS NO SENSOR IN INT. SPACE-1989 INSTALL DOES HAVE OMNTEC LU-1 FOR SUMP PHxmÃE<Ã+, ÂHxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ>TANK 6 SUMP LID CONTAINED SAND, REMOVED AND CLEANED FILL CAP AND ADAPTOR REPLACED CLEANED SPILL BUCKET 1" WATER IN TANK TANK 6 SUMP LID CONTAINED SAND, REMOVED AND CLEANED TANK 8 SUMP HAD 25 GAL WATER, LID RESEALED SUMP SENSOR REPLACED FILL CAP REPLACED TANK 9 INT. SPACE SENSOR WIRE GRIP REPAIRED FILL CAP REPLACED PHxm ÃE=ÃX  xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃE>ÃS8 ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿREWIRED PROBE JUNCTION BOX PHxm ÃE?ÃXG ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿzTANK FEEDS GENERATOR, PIPING MONITORED, CHANGE MADE TO TANKS WATER REMOVED FROM SUMP, RESEALED LID CLEANED SPILL BUCKET PHxmÃE@Â/  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEAÃH'  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿÐTANK 1 OOS, TANK HAS 1.25" WATER, BUT LEAK DETECTION SYSTEM IS STILL FUNCTIONING ONE OF THE TWO ACTIVE TANKS BALL FLOAT COULD NOT BE REMOVED TO CHECK, SO FLAPPER WAS INSTALLED, NOW BOTH TANKS HAVE FLAPPERS PHxmÃEBÁ ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿrAI STATES COPPER SPACERS IS UNKNOWN, BUT FACILITY REGISTERED AS HAVING DOUBLE WALL F-GLASS PIPING W/ MONITORING PHxmÃECà N ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿCSINGLE WALL F-GLASS TANK WITH SINGLE WALL F-GLASS SUCTION PIPING PHxmÃEDÂ5a ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ$4/15/10-COPI REC'D FROM CTI BISKUPIAK WHO INSTALLED A 15 GAL SPILL BUCKET ON TANK 6-PH FAIRLY COMPLEX FACILITY... TANK 6 AND 7 ARE SUCTION, TANK 8 IS PRESSURIZED AND HAS ELLD TANK 6-2, 7-1, 8 HAVE DOUBLE WALLED PIPING AND MONITORING TANK 6-2 AND 8 HAVE ELLD'S, AS WELL AS MONITORED PIPING PHxmÃEEÃ#A ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ,SINGLE WALLED F-GLASS PIPING-1987 INSTALL PHxmÃEF ÂxmxmÂxmÃK%JþÿþÿþÿþÿþÿþÿPHxmÃEGÂ' ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃEHÂP ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃEIÃJ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ¬DON BABMAN (APPRAISAL COMPANY) CALLED ON 5/20/2009 AND WANTED TO KNOW TANK INFORMATION, SUCH AS, SIZES AND DATES OF INSTALL. -LW PIPING LISTED AS STEEL WITH SECONDARY CONTAINMENT, PERHAPS A CONCRETE CHASE? LISTED AS CONTINUOUSLY MONITORED, BUT NO SUMPS AT TANK TOP, AND NO MONITORED DISPENSER SUMPS PRESENT. UNLIKELY IT IS A CONFORMING SUCTION SYSTEM DUE TO FACT THE DISPENSERS ARE LIKELY ON A DOCK. WILL INSPECT THIS SEASON PHxmÃEJÁ( ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEKÂK[ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿNO SPACERS, 1990 INSTALL PHxmÃELÂ@^ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEMà  ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃENÃ_ ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃEOÃXD Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿKSPILL BUCKETS VERY CORRODED, BUT ARE LIQUID TIGHT, RECOMMEND REPLACEMENT PHxmÃEPÃX ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ!DOUBLE WALL PIPING WITH ELLD'S PHxmÃEQÂ[4 ÁxmxmÂxmþÿþÿþÿþÿþÿþÿþÿMINITIAL FAILED FOR BROKEN VR COVER ON REG. TANK 4/20/09 CTI DAVIS REPLACED PHxmÃER ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿSPILL BUCKETS CLEANED OUT PHxmÃESÃ" Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃETÃL Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEUÂ!M ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEVÃ/ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ^INSPECTION DONE BY CTI DON BUBAR, NOT STEPHEN REDMOND-PH REPLACED INT. SENSOR WIRING 4/1/09 PHxmÃEXÂB% ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEYÃ; ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ}TANK 1 HAS DOUBLE WALLED FLEX PIPING, OTHER THREE TANKS HAVE SINGLE WALL F-GLASS, PRESSURIZED PIPING ALL PIPING HAS ELLD'S PHxmÃEZÂ[9 ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃE[Â[5 ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿMCTI DAVIS REPAIRED SENSOR WIRE AND REPLACED SENSOR ON TANK 5 INT. -4/17/09 PHxmÃE\ÂU ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿTREPLACED 2 BULBS ON CONSOLE TANK 2 VR POPPET INOPERABLE, REPLACED ENTIRE ASSEMBLY PHxmÃ$OÂ%M Â)xk xk Á`xk þÿþÿþÿþÿþÿþÿþÿ`09/22/09: GAFTEK IN TO FINISH THE AI ON 09/15/09. FOUND NEW OMNTEC CONSOLE IS FAULTY; WORKING WITH OMNTEC ON REPLACEMENT. I ADVISED ANNETTE HIGGINS (BAY FERRIES) TO INITIATE MANUAL MONITORING UNTIL REPLACEMENT CONSOLE IS IN PLACE. WP 4/24/09-LONG FORM RECIEVED, CTI GEORGE WILL REPLACE PIPING WITH DOUBLE WALL FLEX, AND INSTALL NEW SUMP AT TANK TOP WITH SENSOR PH INSPECTION IS MARKED AS FAILING. PASSING IT AT THIS TIME. NOTES ARE AS FOLLOWS: CHECKED WHISTLE, WORKS. WHISTLE IS UNACCESSABLE WAS CHECKED BY DELIVERY DRIVER ON PASS INSPTECTION FOR 90% PASSES, VENT IS 12 -14 FEET AWAY FROM THE FILL. TRxk ÃE]Â$/ Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃE^Ã!F Â)xmxmÂxm þÿþÿþÿþÿþÿþÿþÿ<INSTALLED NEW ADAPTOR ON INT. RISER CLEANED SPILL BUCKETS PHxm Ã6<Ã:T Â)xlxlÂxl þÿþÿþÿþÿþÿþÿþÿî3/21/10-COPI REC'D FROM CTI CHAMBERLAIN WHO INSTALLED NEW SPILL BUCKETS-PH *********SEE BELOW FOR NOTES ON CLOSURE 4/1/09**************** OMNTEC HAD BAD BOARD & WIRING. PULLED NEW WIRE, MONITOR & SENSOR TESTED OK. CLEANED OUT SPILL BUCKETS TANK READING: HAD TO SOAK GROUND TO GET PASS ARTICLE IN MORNING SENTINEL 4/27/09 INDICATING THE STORE CLOSED APRIL 1, 2009. ARTICLE QUOTES JIM PROVOST AS CLOSING DUE TO THE POOR ECONOMY. GAS TOO EXPENSIVE AND LOW PROFITS. BUSINESS CLOSED IT APPEARS 4/1/09, UNSURE WHEN GAS STOPPED BEING DISPENSED. TAKING TANK/CHAMBERS INTO NOT IN USE STATUS AS OF 4/1/09 BASED ON THE ARTICLE. TR 4/27/09 INFORMATION FROM REBECCA KOROSKI INIDCATES A CONVERSATION WITH JIM PROVOST THAT DISCUSSED HIS PENDING BANKRUPTCY AND FORECLOSURE BY BANGOR SAVINGS BANK ON THE PROPERTY. BANGOR SAVINGS CONTACT IS PETER JOHNSON 262-4984. TR 5/4/09 NEW CONTACT NICKY SMITH AT BANGOR SAVINGS BANK, DIRECT LINE 974-4136. 10/5/09 TRxl ÃE_Â[K Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿjSPILL BUCKET CLEANED OUT OLD STAINS AND "BUILD UP" ON UNION. FACILITY ALSO HAS CSLD, BUT NOT REGISTERED PHxmÃE`ÃK ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEaà K Â!xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃEbÂY  ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEcÂQ1 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃEdÂ1^ ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÂL ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÂ]F ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿNO SPACERS, 1989 INSTALL PHxmÃ>Ã! Â)xl xl Âþÿþÿþÿþÿþÿþÿþÿþÿ812/2/2009 NEW OPERATOR DEBBIE BURKE. SENDING IN AI, SIA, AND CHANGE OF OPERATOR NOTIFICATION. -LW 10/23/2008 FACILITY WENT BACK INTO SERVICE. BUILDING HAD A FIRE IN LATE SUMMER. USING TANKS FOR CONSTRUCTION BUSINESS UNTIL BUILDING IS REBUILT. NEED TO MAINTAIN DAILY INVENTORY AND SUBMIT SIA. -LW 4/29/2009 DAVE WRIGHT FROM DYSARTS CALLED REGARDING THIS FACILITY. I TOLD DAVE THEY HAVE NOT SUBMITTED THEIR DI OR SIA AS REQUIRED. THEY ALSO HAVE A FAILING ANNUAL INSPECTION, NEED TO SUBMIT DI. -LW NO DAILY INVENTORY RECORDS. BUILDING HAD A FIRE. REBUILDING.xlÃFÂ]L ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿXAPPARENTLY COPPER LINES FOR THE BOILER HAVE BEEN SWITCHED TO DOUBLE WALL FLEX AS WELL PHxmÃFÂ]] ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÂQ. ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÃ]  ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÃ] ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF Ãa( Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ.CLEANED OUT SPILL BUCKETS DIESEL IS SUCTION PHxmÃF ÂU= Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF ÂU Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF ÃZ ÂMxmxmÂxmþÿþÿþÿþÿþÿþÿþÿo1-1 REPLACED OMNTEC OVERFILL SENSOR 4-1 REPLACED SUMP SENSOR AND CIRCUIT BOARD REPAIRED BY MANUFACTURER 5-1 INSTALLED NEW TLS-300C CONSOLE AND SENSORS-UPGRADE REG. REC'D 3/27/09 7-1 REPLACED SUMP AND INT. SENSORS, CONSOLE CIRCUIT BOARD REPAIRED BY MANUFACTURER 9-1 REPLACED SUMP SENSOR, AND CIRCUIT BOARD REPAIRED BY MANUFACTURER 2-1 HAS OFFSET FILL WITH SPILL BOX PHxmÃF  S ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ:5-1 REPLACED FILL ADAPTOR AND REPLACED SPILL BUCKET LID PHxmÃFà  ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFà  ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFà  ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÂAa ÁKxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÃV ÁKxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÂ[O Â[!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÃ. ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ9DISPENSER 18/19 HAD BEEN HIT, AND WAS REPAIRED 4/24/09 PHxm ÃFà  ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÂ< ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÂ.= ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFà & Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿB4-1 LISTED AS PRESSURIZED, BUT IS ACTUALLY SUCTION, WILL CHANGE PHxmÃ?1ÂO ÂHxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ¿PASSING OOS AI PH 4/29/09 - SPOKE WITH MIKE LEWIS. MSAD 75 WANTS TO KEEP THE TANK OOS INDEFINITELY AS LONG AS THE "PORTABLE CLASSROOMS" ARE LOCATED ON TOP OF IT. THEY WOULD PREFER NOT TO ABANDON THE TANK IN PLACE BECUASE IT WILL BE REMOVED AT SOME FUTURE DATE. I REQUESTED THAT MSAD SEND A LETTER TO THAT AFFECT AND THAT I DIDN'T SEE IT AS A PROBLEM. THE THINKING BEING THAT WE WOULD PREFER TO HAVE THE TANK PHYSICALLY REMOVED IN THE LONG RUN. TRxl ÃFà xmxmÂxl Ã,\*þÿþÿþÿþÿþÿþÿ&CP DONE 4/27/09 BY CTI CHAMBERLAIN PH xl ÃFÃ<  xmxmÂxm þÿþÿþÿþÿþÿþÿþÿ?OFFSET FILL LINE IS STEEL. OWNER TO REPLACE SPRING OF 2009. BBxm ÃFÂ;d Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÃR# Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFÃXb Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿP5/4/09-CTI BEAUMONT TO REPLACE YELLOW PIPE WITH APT, AND INSTALL DISP. SUMPS PHxmÃ1 Ã,P Â!xlxl Âxlþÿþÿþÿþÿþÿþÿþÿ]FAILING 2009 AI REC'D FROM CTI MULLINS, CALL FROM OWNER 9/16/09 INDICATED THEY HAVE ADDRESSED PROBLEMS, AND OWNER WILL GET C&C TO SEND IN UPDATE-PH COPI REC'D 5/14/09 FOR CTI MULLINS TO INSTALL NEW 15 GAL SPILL BUCKET PH DIANA WAS NOTIFIED BY CTI THAT THERE WERE A FEW QUARTS OF WATER IN INTERSTICE, WATER PUMPED OUT. CHECKED BACK TWICE, ALL DRY PHxlÃFàÁ xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃFÂ)D ÂRxmxmÂxl þÿþÿþÿþÿþÿþÿþÿPHxl ÃF Â[K Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ(FACILITY IS SIA, BUT HAS CSLD AS WELL PHxmÃF"ÂI^ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿY4/15/10-NOITR REC'D FOR CTI CHAPMAN TO REMOVE TANKS AND PIPING, FESSENDEN TO DO SA-PH PHxmÃF#ÃZY Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF$ÃT# ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF%ÃK ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF&ÂR ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿdLINES TO ANODES WERE SEVERED WHEN CONTRACTOR WAS DIGGING CTI ST. PETER REWIRED AND TESTED 4/16/09 PHxmÃF'Â3L ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ†5/18/09-UPGRADE REG. FOR CTI LEGASSE JR. TO INSTALL FALPPER IN PLACE OF BALL FLOAT-PH NICK GUAY ADJUSTED BALL FLOAT HEIGHT 4/29/09 PHxmÃF(Â[8 Â[!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ&TANK 5 INT. SENSOR REPLACED 4/28/09 PHxmÃF*ÃC ÂRxmxmÂxl þÿþÿþÿþÿþÿþÿþÿ@INSPECTION CAME IN MISSING A PAGE, DID NOT GET IT FOR A WHILE PHxl ÃF+ Â ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ†9/18/09-COPI FOR CTI COUTURE TO INSTALL NEW 1" APT LINE FROM #2 OIL TANK EXISTING PIPING SUMP TO NEW SUMP WHICH WILL HAVE A STP PH PHxmÃ3TÂ$4 Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿ5/4/2009 CHANGED FACILITY BACK TO DI AND SIA BECAUSE THEY NOW HAVE MLLDS (THEY NEED TO HAVE ELLDS TO BE EXEMPT FROM DI AND SIA). LETTER DATED 5/4/2009 TO ALLIANCE ENERGY OUTLINED THIS UPDATE TO THEIR LEAK DETECTION METHOD. SIA REQUIRED TO BE SUBMITTED BY 7/1/2009. -LWxlÃ3VÂaP Á=xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿ5/4/2009 CHANGED FACILITY BACK TO DI AND SIA BECAUSE THEY NOW HAVE MLLDS (THEY NEED TO HAVE ELLDS TO BE EXEMPT FROM DI AND SIA). LETTER DATED 5/4/2009 TO ALLIANCE ENERGY OUTLINED THIS UPDATE TO THEIR LEAK DETECTION METHOD. SIA REQUIRED TO BE SUBMITTED BY 7/1/2009. -LWxlÃ-@Â7' ÂXxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ05/5/09-REGISTRATION REC'D FOR CTI COUTURE TO REPLACE 1.5" STEEL LINE WITH NEW FLEXWORKS 1: 2 WALL PIPING AND INSTALL SUMP-PH COPI RECIEVED 9/25/08-SPILL BUCKET REPLACEMENT BY CTI COUTURE PH TANK#14 REPLACED LS-ASC PIPING SUMP SENSOR TANK #15 REPLACED ELECTRICAL CONNECTORS ON TOP OF INTERSTICE RISER-PHxlÃF,ÂY ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF-ÂL ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF.Â]U ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF/Â3X ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF0ÂY) ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ 11/16/09: CHANGE OF OWNERSHIP ONGOING TO COUNTY OF AROOSTOOK, BRYAN JANDREAU, FACILITIES MANAGER. WP PIPING SUMP HAD 6" WATER. WATER TABLE VERY HIGH, MAY BECOME A CHRONIC PROBLEM. WATER REMOVED, AND ATTEMPTS ARE BEING MADE TO DIVERT SOME WATER, OR BETTER SEAL SUMP PHxmÃF1àÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF2Â]K ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ(PRE 9/16/91 INSTALL, LINES NOT SPACED PHxmÃF3ÂY? ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿaFACILITY RARELY IS USED, ONLY 8" WATER IN TANK WATER PRESENT IN MANWAY DUE TO HEAVY RAIN EVENT PHxmÃF4Â1_ ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ)6/1/91 INSTALL, NO SPACERS ON CU LINES PHxmÃF5ÂY= ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿINO SPACERS, COPPER ORIGINAL IN '89, OTHER LINES REPLACED MORE RECENTLY PHxmÃF6Ã'2 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ FACILITY ALL DOUBLE WALL FLEX PHxmÃF7ÂY ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿALL DOUBLE WALL FLEX PHxmÃF8Â]O ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ%COPPER NOT SPACED, PRE '91 INSTALL PHxmÃF9Ã5  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ™PIPING SUMP MANWAY FRAM RUSTED INTERSTITIAL SPACE FRAM BROKEN DUE TO BLANK RISER CONTACTING LID NOT SPECIFIED WHETHER FIXED STILL APPEARS TO BE A PASS PHxmÃF:ÃW Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF;ÂL$ Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF<ÂJ9 Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF=Â$E Â.xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃF?Ã5[  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ`REMOVED WATER FROM SUMP, RESEALED SUMP LID INSTALLED NEW ELEC. OVERFILL PROBE TO PASS AI-4/21 PHxmÃF@à D Â!xmxmÂxmÄ[þÿþÿþÿþÿþÿþÿþÿxmÃFAÂB%  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ!REPLACED POWER LAMP IN CONSOLE PHxmÃFBÂS  ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFDÃ%< ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFEÂ' ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ'Â2ÂÂTxk xk Á`xkþÿþÿþÿþÿþÿþÿþÿN5/15/09-REQUEST TO REMAIN OOS FOR ADDITIONAL 12 MONTHS DUE TO BRIDGE WORK BLOCKING ACCESS TO FACILITY GRANTED EXTENDING OOS PERIOD UNTIL 6/1/2010 PH 5/14/09-CTI COUTURE CALLED AND SAID TANKS ARE GOING TO BE PUMPED OUT, ALTHOUGH THE ELECTRONICS ARE STILL ON.-PH 5/7/09-ANOTHER CALL FROM CHRIS KRUSE, NEW OWNER, TOLD HIM HE REALLY NEEDS TO GET THE OWNERSHIP CHANGE INFO IN, APPARENTLY HE DID SEND IT IN, BUT DID NOT CHANGE OWNER/OPERATOR NAME. HE'S SENDING THE REST. TONY COUTURE DID INITIAL INSPECTION 11/08, BUT IT WAS EITHER INCOMPLETE, OR NEEDED WORK. TONY RETURNING NEXT WEEK TO FINISH. HE WILL REQUEST OOS EXTENSION, BECAUSE BRIDGE WORK IS NOT DONE YET-PH 11/17/08-NEW OWNER WILL BE GETTING AI DONE AND SENDING IN CHANGE OF OWNERSHIP INFO/OOS INFO-WILL BE RETURNING TO SERVICE AFTER WINTER-ROAD CONSTRUCTION WILL BLOCK ACCESS TO STORE-PHxkÃFFÂ[< ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃFGÂ[J ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃFHÂ%5 ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPUMPED CONDENSATION OUT OF INTERSTICE AND REPLACED SENSOR 1 DISPENSER, SUCTION, MOVED 18" TO THE RIGHT, SLEEVED PIPING EXTENSION, WHICH RUNS ABOVE GROUND FROM ORIGINAL LOCATION TO THE NEW LOCATION, AND FILLED IN SPACE WHERE DISPENSER WAS AND RE CONCRETED AREA. PHxmÃFIÂ[> Á$xmxmÂxm þÿþÿþÿþÿþÿþÿþÿINITIALLY FAILING FOR WATER INTRUSION IN 5-1 SUMP, PROBLEM IS ENTRY BOOT-REPAIRED 4/27/09-CTI DAVIS-SENSOR WAS IN ALARM, REPORTED TO TS BALL MISSING ON 6-1 BALL FLOAT, REPLACED WITH SPRING CAGE TYPE REPLACED SPILL BUCKET LID ON 6-1, AND PAINTED ALL LIDS PHxm Ã:%Ã[  xlxlÂxl þÿþÿþÿþÿþÿþÿþÿß12/23/09-COPI REC'D FOR CTI LEGASSE JR TO INSTALL NEW SPILL BUCKET, WHICH WILL BE A 5 GALLON. **SEE NOTES BELOW**-PH 11/23/09-CALL FROM CTI LEGASSE JR. HE IS REPLACING SPILL BUCKET, AND THE VENT LINE IS RIGHT NEXT TO THE BUCKET. I GAVE HIM PERMISSION TO INSTALL A 5 GALLON BUCKET-PH 5/26/09-COPI REC'D FOR CTI'S LEGASSE JR. AND BUBAR TO REPAIR SECONDARY AND INSTALL SUMP, SENSOR, AND TEST SECONDARY TO FIX DAMAGE FROM LANDSCAPERS DAMAGING SECONDARY PH TANK HAS SCULLY FILL PHxl ÃFJÂU ÂXxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ¹LAST YEARS INSPECTION WAS A FAIL BECAUSE IT COULD NOT BE DETERMINED WHETHER THE COPPER WAS SPACED. CTI COUTURE INSTALLED NEW SLEEVED LINES. PH MISSING COPI FOR NEW PIPING? 4/8/10. TRxmÃFKÂR[ ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿOAI CAME IN PASSING FOR ATG, BUT REGISTERED AS DI/SIA, PASSING DI REC'D, PASS PHxmÃ2"Ã_* ÂxlxlÂxlÄþÿþÿþÿþÿþÿþÿp5/14/09-UPGRADE REG FOR CTI MULLINS TO REPLACE PIPING WITH DOUBLE WALLED FLEX AND INSTALLE DISP SUMPS, PROBES PHxlÃFLÂRF ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿJSUPER TANK FAILED FOR DI. REC'D DI, AND SUPER TANK HAS LOW THRUPUT-PASS PHxmÃFMÂ[F Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ¬FAILED AI FOR DI. REC'D DI AND TANK 3, SUPER TANK HAS LOW THRUPUT-PASS REPLACED VAPOR ADAPTOR ON TANKS 1 AND 3, REMOVED SAND SO IT WOULD NOT COME IN CONTACT WITH ADAPTOR PHxmÃFNÂ*  Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFOÂb Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFPÂ$  Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFQÃ` Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFRÃ3 Â!xmxmÂxmà 3þÿþÿþÿþÿþÿþÿ 4/30/10-REG. AND NOITR REC'D FOR CTI COUTURE TO INSTALL REPLACEMENT 2500 GAL AST TO REPLACE FAILED 3000 UST, WILL REUSE PIPING-PH CTI REDMOND DID CP TESTING PHxmÃFSÂ7' ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFTÂ. ÂbxmxmÂxmÃOJ<þÿþÿþÿþÿþÿþÿZCTI HOWE DID CP TESTING 4/30/09 REMOVED WATER FROM SPILL BUCKETS REPLACED CAP ON TANK 7 PHxmÃFUÃ,# Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ–INT. SPACE HAD SMALL AMOUNT OF WATER, WIRING AND SENSOR FOUND TO BE FAULTY-REPLACED FILL CAP REPLACED ELEC. HIGH LEVEL AND OVERFILL SENSOR REPLACED PHxmÃFVàÂ\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿOREPLACED DAMAGED SUMP LID HARWARE FILL CAP REPLACED CTI LEWIS DID CP TESTING PHxmÃFWÃ2  ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿíDISP. SUMP CLEANED, SMALL AMT. WATER DISP. SENSOR REPLACED REMOVED EXCESS SAND FROM AROUND SUMP LID CLEANED SPILL BUCKET FILL CAP REPLACED TANK HAS 1" WATER, RECOMMENDED REMOVAL NO VR, UNDER REQUIRED THRUPUT REPAIRED CP WIRING AT SUMP PHxmÃFXÃ, Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ 11/5/09-REG. REC'D FOR CTI SIMS TO INSTALL NEW FLEX PIPING ON TANK 5-PH TANK 1 HEATING OIL, MANUAL GWM PASSED TANK 2 JET FUEL, HAS ATG, PASSED REMOVED AND CLEANED ATG PROBE REMOVED EXCESS SAND AROUND SUMP LIDS CLEANED SPILL BUCKETS REPLACED BOTH SPILL BUCKET LIDS PHxmÃFYÃ, Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿˆ11/13/09 COPI REC'D FOR CTI BISSON TO INSTALL NEW OMNTEC CONSOLE-PH NO WEATHER PROOF JUNCTION BOXES AT PIPING SUMP OR INT. SPACE ACCESS, RECOMMENDED THEY BE INSTALLED PIPING SUMP CONTAINED SMALL AMOUNT OF WATER, COMING FROM CONDUIT, SEALED TO PREVENT INTRUSION FILL ADAPTOR REPLACED, MISSING GASKET RIM OF SPILL BUCKET APPEARS TO BE DAMAGED, BUT STILL LIQUID TIGHT, RECOMENDED REPLACEMENT PHxmÃFZÃM Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ&REPLACED FILL CAP CLEADED ATG PROBE PHxmÃF[à  Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ)FILL CAP REPLACED SPILL BUCKET CLEANED PHxmÃF\ÃR7 ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ¹PIPING SUMP AND GENERATOR SUMP CONTAIN SMALL AMOUNT OF CONDENSATION, NOT ENOUGH TO TRIP SENSORS, REMOVED FILL CAP REPLACED OMNTEC OVERFILL ALARM REPLACED, FAULTY SPILL BUCKET CLEANED PHxmÃF]àÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED PHxmÃF^ÃT ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃF_Ã2 ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ×UNABLE TO FIND MONITORING WELL LOG SHEET, NO EMPLOYEE AVAILABLE. PROCEEDURE REVIEWED WITH OWNER AND NEW SHEET STARTED SUMP HAD SMALL AMT. CONDENSATION, NOT IN ALARM, REMOVED SPILL BUCKET CLEANED FILL CAP REPLACED PHxmÃF`ÂY ÂZxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃFaÃ\* ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿÔSUMP CONT. 200 ML OIL, RETURN LINE FOUND NOT TO BE TIGHT, TIGHTENED REMOVED AND CLEANED GAUGE PROBE SPILL BUCKET CLEANED FILL CAP REPLACED TANK HAD 1.5" WATER, REMOVED BY EPI REPLACED SPILL BUCKET LID REPLACED PHxmÃFbÂL ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFcÂ]C Â]xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃFdÂ^ Â]xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGÂ]` Â]xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGÂ]S Â]xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGÂ2  Â]xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGÂY_ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGÂ]B ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGÂQ0 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGÂY8 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGÂQ Â/xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃG Ã. ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃG Ã79 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃG  2 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃG Ã` Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃG Â1H Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿl5/4/09-COPI REC'D FOR FOLLOWING WORK REPLACED SPILL BUCKET WITH 15 GALLON AND POURED SMALL PAD AROUND IT PHxmÃGà  ÂMxmxmÂxmÃþÿþÿþÿþÿþÿþÿþÿxmÃG 7 ÂbxmxmÂxl þÿþÿþÿþÿþÿþÿþÿINITIAL CP FAILED TANKS 2 AND 3 CTI HERSEY DID UPGRADE, AND GOT PASSING READINGS 5/6/09 TANK 3 COAX DROP TUBE/FLAPPER REPLACED PHxl ÃGÂX0  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGà D ÂLxmxmÂxmþÿþÿþÿþÿþÿþÿþÿà9/17/10-NOITR AND REG. REC'D FOR CTI LEGASSE TO REMOVE PIPING, AND REPLACE FESSENDEN TO DO SA-PH 8/25/10-COPI REC'D FOR CTI CTI BISKUPIAK TO REPAIR BROKEN LINE AND REPLACE FLEX CONNECTOR-PH PIPING MUST BE REPLACED BY 2011.xmÃGÂK, ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÃ4 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÃ`4 ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ TANK READING: -.977, .977, .976xmÃGÂS ÂKxmxmÂxmà "þÿþÿþÿþÿþÿþÿþÿxmÃGÂXc ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÂ]M ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÂ2 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÂ2 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÂ12 Â]xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÂY[ Â]xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÂY ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÂ15 ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGÂY ÂZxmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃGÂY# ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿASURFACE WATER IN MANWAYS FOR 6 & 7 WILL TRY TO PREVENT INTRUSION.xmÃG ÃR+ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿOPIPING IS 1 1/2 BLACK IRON IN SECONDARY PIPING ALL THE WAY THRU TO BOILER ROOM.xmÃG!Ã. ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG"ÂR9 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG#Â. ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG$Â.  ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG%Â. ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG&Â28 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG'ÂB ÂYxmxmÂxm þÿþÿþÿþÿþÿþÿþÿCP READINGS-.95, -.96, -.97xm ÃG(ÁY ÂYxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.91, -.90, -.90xm ÃG)Â? ÂYxmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃG*Â> ÂYxmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃG+Âb ÂYxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.97, -.98, -1.0xm ÃG,Â]0 ÂYxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.9, -.9, -.91xm ÃG-ÂSZ ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG.Â7$ ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ6REPLACED 9-1 PIPE SUMP SENSOR AND INT. SPACE SENSOR PHxmÃG/à R ÂTxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃG0Â3; ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG1Ã( ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG2 ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG3Â& ÂXxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG4Ã& ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃG5Â9Q Â\xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG6 A Â\xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG7ÂD2 Â\xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG8Â9P Â\xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG9ÃaR ÂLxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿ$09/23/10: 2010 AI "IN THE MAIL". -WPxmÃG:Â.Y ÂLxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃG; ÂXxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃG<ÂbA ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG=Á] ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG>ÁH ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG?Á\ ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG@Á^ ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGAàÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGB  ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGC ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGDÂRM ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGEÃ7U ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGF  ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃGG ÂXxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃGHÃ4@ ÂYxmxmÂxm þÿþÿþÿþÿþÿþÿþÿñANNUAL INSPECTION INDICATES UST HAS BEEN OUT OF SERVICE SINCE 10/11/2006. SENDING OWNER AN OOS FORM TO FILL OUT. 6/8/2009 SPOKE WITH ALLEN GREEN ((207) 764-7370) FROM THE MAINE POTATOE GROWER ASSO. REGARDING THE NOTICE TO REMOVE THE UST. CANNOT MEET THE AUGUST 2009 DEADLINE DUE TO BUDGET REASONS. WILL BE ABLE TO PUT IT IN THE BUDGET FOR NEXT YEAR. BELIEVE THEY WILL BE ABLE TO REMOVE IT BY JUNE 2010. I ASKED FOR THAT IN WRITING. I WILL ALSO SEND THEM A OOS NOTIFATION FORM TO SUBMIT. -LWxm ÃGIà  ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ7ZÃ,< Á xlxlÂ<xlþÿþÿþÿþÿþÿþÿþÿ~5/20/09-UPGRADE REG. FOR CTI BEAUMONT TO INSTALL NEW DISP SUMPS (2, DIESEL) PH 4/20/09-CTI BEAUMONT TO DO TANK TOP UPGRADE-PHxlÃGJàÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGKÂ& ÂYxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGL ) ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGMÃa\ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿBREWIRED INTERSTICE PROBE WIRING ON TANK 6 CLEANED SPILL BUCKETS PHxmÃGNÂ5 ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ REPLACED TWO LAMPS ON CONSOLE PHxmÃGOÂU ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ4DISP. 13/14 HAD LEAKY FILTER, REPLACED AND PASSED PHxmÃGPà 5 Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ)CLEANED SPILL BUCKET CLEANED DISP SUMP PHxmÃGQÃX Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿôNOTE: DEP EXEMPTED THIS FACILITY REGARDING THE WHISTLE FOR OVERFILL ON THE 500 GALLON SUPER NO LEAD CHAMBER. THERE IS ONLY A 2" BUNG ON THIS CHAMBER. LETTER IN FILE AND ATTACHED TO THIS INSPECTION. CTI DAVIS REPLACED INT. SENSOR AND WIRING PHxmÃGRÂ3< ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿÑ08/03/09: DONNY ORDERING FUEL FOR DELIVERY TOMORROW. WP 7/24/09-COPI REC'D FOR CTI SIROIS (DOT) TO REPLACE FILL RISER AND SPILL BUCKET ON GAS TANK PH DI PASS FOR 2-1 TANK 3-1 PASS FOR ELEC. LEAK DETECTION PHxmÃGTÂG ÂKxmxmÂxmÃSþÿþÿþÿþÿþÿþÿ<TANK 5 GROUNDWATER ONITORING IS ELECTRONIC, INCON TS 1001 PHxmÃGUÂ9A Â\xmxmÂxm þÿþÿþÿþÿþÿþÿþÿoCONSOLE AT 115 FOX ST. REPLACED FILL CAP FRONT PANEL MISSING FROM DISPENSER, RECOMENDED NEW ONE BE INSTALLED PHxm ÃGVà 1 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ\INITIAL FAILED FOR NO ACCESS TO WHISTLE CTI CAME BACK AND WITNESSED DELIVERY, AND PASSED PH xmÃGWÃXJ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ.TANKS 1 AND 2 HAVE TWO STP'S AND LLD'S EACH PHxmÃGXÃ`9 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGYÃ`9 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGZÂ$ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃG[à  ÂTxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃG\ÃK ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃG]Â/Z ÂxmxmÂþÿþÿþÿþÿþÿþÿþÿþÿ|10/13/09-REGISTRATION REC'D FOR CTI KANE TO INSTALL NEW PIPING FOR TANKS 33 AND 34-PH ACCIDENTALLY ENTERED AS PASS, FAILINGxmÃG_Â$G ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃG`Â? ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃGaÂ? ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃGbÂH ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃGcÂ9 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿæINITIAL FAILED FOR WATER IN SUMPS, NOT ENOUGH WATER FOR ALARMS, POURING ALL DAY, SO PUMP COULD NOT BE USED TO REMOVE WATER, THUS THE FAIL WATER REMOVED 5/12/09 TANK 6 ALSO FAILED FOR FAULTY WATER SENSOR ON ATG, REPLACED 5/12/09 PHxmÃGdÂ< ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿÅ6/28/10-ATT. A REC'D NO EOPL, CTI THOMPSON-PH 5/27/10-REG AND NOITR REC'D FOR CTI THOMPSON TO REMOVE AND REPLACE YELLOW PIPING ON TANK 4-1 AND 4-2-PH WATER REMOVED FROM ALL SUMPS, NOT IN ALARM PHxm ÃHÃ/ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿÇ6/4/10-COPI REC'D FROM CTI LEGASSE SR WHO REPAIRED CRACK IN 2" AMERON GLASS PIPING FOUND DURING FLEX PIPING REPLACEMENT, TANK 7-1, OWNER WILL CONTACT TANKNOLOGY TO HAVE VACUTECT P.TEST ON LINE-PH PHxmÃHÃ`   xmxmÂxm þÿþÿþÿþÿþÿþÿþÿ:SUCTION SYSTEM WITH DOUBLE WALLED, NON-MONITORED PIPING PHxm ÃHÂ^  ÂSxmxmÂxlþÿþÿþÿþÿþÿþÿþÿŠUST INSPECTION SPURRED THE OWNER TO SEND THIS AI IN TANK 5 HAD 6" WATER IN INT. SPACE, REMOVED WATER 5/6/08, AND RECHECKED 5/7/08, PASS PHxlÃHÂ^ ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃHÂM Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ²FILL CAP AND ADAPTOR REPLACED SPILL BUCKET CLEANED NO VR, NOT REQ'D PUMP HOSE FLATTENED, AND NO RETRIEVAL SYSTEM IN PLACE, RECOMENDED ONE BE INSTALLED CP READINGS BY CTI LEWIS PHxmÃHÃ>4 ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿdWHISTLE HARD PIPED, AND CANNOT BE REMOVED TO TEST. CTI LEWIS DID CERTIFY THAT IT SHUTS OFF AT 90% PHxmÃHàÂ\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ3CLEAN MONITORING WELLS COPPER SLEEVED NOT SPACED PHxmÃHà  Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH Â#. Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH Ã3) Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿhTANKS ARE INSIDE CONCRETE DIKE, THEN WERE BACKFILLED COPPER PIPING IS SLEEVED, NOT SPACED-'87 INSTALL-PHxmÃH Â_ Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃH Â_ Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃH Âc Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃHÃ$$ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃHÃ6+ ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃHÂ# ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ1ÃT ÂKxl xl Â;þÿþÿþÿþÿþÿþÿþÿþÿ"5/26/2009 KEVIN FREDERICK CALLED REGARDING REMOVAL INFORMATION. SENT HIM REMOVAL INFORMATION, REMOVAL NOTICE, SA LIST, AND CTI LIST VIA MAIL ON 5/27/2009. HE ASKED ABOUT ABANDONING IN PLACE AND I SAID THE TANKS WOULD NOT MEET THE CRITRIA TO ABANDON IN PLACE. -LW 6/17/08 CP FAIL LTR -MLxk ÃHÃa ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ#7/12/10-REG. REC'D FOR CTI BUBAR TO REPLACE YELLOW PIPING-PH TANK 1 INVENTORY NOT ON SITE, NEW OWNER HAD JUST TAKEN OVER. DI WAS OBTAINED FROM PREVIOUS OWNER, AND WAS CHECKED BY GARY KANE, PASSED REMOVED WATER FROM TANK 5 TO PASS REPLACED BULB IN CONSOLE FIRST GEN. ENVIROFLEX PIPING ON GAS TANKS PH *************************** SEE BELOW **************************** TELEPHONE CONVERSATION WITH WYMAN TAPLEY, PRIOR OWNER, SOLD FACILITY IN 2008(?) TO A DOUG SMITH, FACILITY NOW CALLED MAIN STREET MARKET & GRILL HE THINKS. PHONE # REMAINS 288-2185. TAPLEY'S # IS 460-6085. TOLD TAPLEY HE STILL HAS RESPONSIBLITY AS OWNER OF RECORD AND NEEDS TO GET PAPERWORK FILED ASAP TO CHANGE OWNERSHIP AND NEW OWNER NEEDS TO FILE ALL MISSING PAPERWORK TO BRING INTO COMPLIANCE. TR 3/16/10xmÃ'QÃ#] Âxk xk Âxk þÿþÿþÿþÿþÿþÿþÿ709/29: DAN MELANSON CALLED - HIRED ADAMS PETROLEUM TO DO THE AI. POSS IN 2 WKS. WP IT APPEARS DUE TO A CLERICAL ERROR, WE ALLOWED THIS FACILITY TO STAY OUT OF SERVICE UNTIL 9/1/09. GYTO NOV WILL BE SENT 9/2/09. PH 10/8/09 SPOKE WITH DANIEL MELANSON ABOUT REMOVAL OF THE TANKS. HE WANTS TO RETURN THEM TO SERVICE. I TOLD HIM THIS IS NOT POSSIBLE THEY MUST BE REMOVED AND HE WILL BE GETTING A NOV ORDERING REMOVAL SOON. THEY MAY NOT COME OUT UNTIL 2010 DUE TO FINANCES. THESE TANKS HAVE BEEN OOS OVER 2 YEARS. TRxk ÃHÃYD Á$xl xmÁ`þÿþÿþÿþÿþÿþÿþÿþÿœSAME EXACT CONSDITION ON 10/11/10 AI FACILITY IS OOS SINCE 1996. CTI FOUND 7 1/4" OF WATER AND 1/4" PRODUCT IN CHAMBER 1-1. CHAMBER 1-2 PASSED AS OOS. TRxl Ã7Ã$^ Â]xlxlÂxlþÿþÿþÿþÿþÿþÿþÿy2/27/09-NOI TO ABANDON TANKS AND PIPING, REC'D 5/28/09. CTI WINSLOW TO PULL, MARK WHITE TO DO SA PH THIS FACILITY IS CURRENTLY OOS, PH IN CONTACT W/CN BROWN TO FIND OUT WHAT SITUATION IS PH 7/30 DEP OBSERVED VACUUM TEST OF INTERSTITIAL - PASSED. FACILITY BEGAN DISPENSING FUEL WEEK OF 7/21. CONDITIONAL APPROVAL TO CONTINUE DISPENSING (RTS) UNTIL PIPING PT IS COMPLETED. -MLxlÃHà K ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH / ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿaPIPING IS ABOVEGROUND. CTI INSPECTED ANTISIPHON VALVES, TANK MONITORING SYSTEM AND DISPENSERS. BBxmÃHÃ!L Â)xmxmÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃHÂ/> Â.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿSSENSOR IN DISPENSER SUMP, NOT PIPING SUMP DUE TO IT BEING LOWER THAN THE TANKTOP PHxmÃHÃb[ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿEREPLACED ALL 3 LAMPS ON CONSOLE REPLACED COVER ON 2-2 SPILL BUCKET PHxmÃHÃ5K ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃHÃY ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ2 STP'S PER TANK PHxmÃHÃ]6 Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃHÂW ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃHÂW! ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃHÂT4 ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃHà   xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH!  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH"Â#  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH#Â18  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH$ÂJ  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH%ÃB  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH&   xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH'à xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH(à   xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH)à xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH*Â- ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH+à F ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH,  ÂKxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH-àÂTxdxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃH. b ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿ+ INVENTORY RECORDS RECONCILED MONTHLY?: .98xmÃH/ a ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH0ÃK8 ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH1 ? ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH2ÂLM ÂXxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃH3ÂM  ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH4ÃUE ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH5ÂLL ÂXxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃ3ÃbM Â)xlxlÂxlþÿþÿþÿþÿþÿþÿþÿä6/2/09-CALL FROM JEFF JAGER, CONSULTANT WITH TARMETTO (OUT OF NORTH CAROLINA) WHO WAS DOING RESEARCH FOR THE BANK THAT MOST LIKELY FORECLOSED ON THIS PROPERTY, WHICH IS CIENA CAPITAL (WHO ACCORDING TO THEIR WEBSITE INVESTS IN COMMUNITY BANKS). HE WAS LOOKING TO FIND OUT WHAT NEEDS TO BE DONE WITH THE FACILITY, AND WHERE THEY STAND WITH US. I EXPLAINED THE OOS STATUS, AND THAT THEY CAN REQUEST ANOTHER 12 MONTHS, BUT THEY NEED TO DO IT SOON (OOS 6/8/08), AND THAT THEY NEED TO DO ANOTHER AI. PH CTI BUBAR LOCKED FILLS, DRAINED SUCTION LINES, LOCKED PUMPS, PUMPED TANKS DRY. FILE DOES NOT CONTAIN OOS NOTICE OR OWNERSHIP CHANGE INFO. CALLS TO OWNER UNSUCESSFUL INQUIRY LETTER OUT 7/1/08 PH LESS THAN 1" OF PRODUCT: CTI BUBAR PUMPED DOWNxlÃH6Â<  ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH7Ã# ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH8Â& ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH9Â= ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH:ÃK  ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH;Â*\ Â,xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH<ÂGD ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH=Ã-a ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH>à  Â,xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH?ÂK  ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH@ÂGK ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHAÂGL ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHBÂ[1 Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ^INITIAL FAILED FOR DI. REC'D 4 MONTHS INVENTORY, SUPER TANK PASSES ONCE IN 4 MONTHS, FAILS REST, LOW THRUPUT IS THE CAUSE REGULAR TANKS PASS 3 OF 4 MONTHS, EXCEPT FOR 1 MONTH WHERE COMPUTER CRASH CAUSED STARTING INVENTORY TO BE LOST. PASSES WITH CORRECTION=PASSING INSPECTION. REPAIRED TANK 2 SUMP LID CLEANED SPILL BUCKETS REPLACED TANK 1 VR CAP PH xmÃHCÂB  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃHDÂd Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ:FACILITY WILL BE RETURNING TO SERVICE, P. TEST RECIEVED PHxmÃF!Âc ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿìPH 6/2/2009 OWNER CALLED AND LEFT MESSAGE SAYING BILL CARVER VACUUM TESTED THE TANK AND IT PASSED. ALSO WANTED TO SUBMIT RETURN TO SERVICE NOTIFICATION FORM VIA FAX. TOLD HIM WE NEED THE ORGINAL COPY SENT TO 17 SHS, AUGUSTA, ME 04333-0017. -LW POTENTIAL BUYER (ED BURNHEART) CALLED ON 5/19/2009 REGARDING FACILITIES OOS STATUS. -LW 5/19/2009 OWNER CALLED WANTED OOS FORM. -LW 5/28/2009 CHARLES SPRINGER CALLED WANTED TO KNOW HOW LONG HE HAD TO RETURN TO SERVICE. TOLD HIM 7/1/2009. -LWxmÃHFÂW  ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃHGÂW ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃHHÂW ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃHIÂ7 ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHJÃ` ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHKÂ.M ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHLÃR\ ÂLxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHMÂ" Â\xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHNÃC Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHOÂS: Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHPà @ Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHQà O Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHRÂTY Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃHSÃR Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHTÂT_ Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHUÂ\# Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃHVÂEG Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHWÃS Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHXÃ21 Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHYÃGK Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃHZÂ\  Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃH[ÃVJ Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH\Ã< Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH]à : Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH^ÂE8 Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃH_Â3K ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ2FACILITY NOW HAS ELECTRONIC OVERFILL PROTECTION PHxmÃH`Ã@ Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ;PH SUBMITTED ATG REGISTRATION INFORMATION ON 6/5/2009. -LWxmÃHaÂ"V ÂxmxmÂxl þÿþÿþÿþÿþÿþÿþÿûINITIAL FAILED BECAUSE ANNULAR SENSOR INACCESSABLE DUE TO CONFINED SPACE ENTRY REQUIRED TO GET TO RISER CP FAILING UPDATE 5/14/09-CTI DAVIS INSTALLED NEW VR CONSOLE WHICH MONITORS INTERSTICE, AND RUNS ELEC. OVERFILL, VENT WHISTLE STILL IN PLACE COPPER LINES REPLACED, WHEN DONE, CP READINGS JUMPED TO -.86 (GALVANIC PROTECTION WAS BEING SAPPED BY COPER CONTACT) NEW ANODES INSTALLED ACCESS TO INT RISER REDONE, NOW COMES TO SURFACE THROUGH A SMALL SUMP NEW TANK LEVEL GUAGE INSTALLED FACILITY NOW PASSING PHxl ÃHbÃ_ ÂHxmxmÂxmþÿþÿþÿþÿþÿþÿþÿƒ1/13/10-COPI REC'D FROM CTI LEWIS WHO INSTALLED MORRISON BROS. PRESSURIZED OVERFILL SHUT OFF DEVICE ON TANKS 3,5,7,9-PH TANK 2 SUMP SENSOR GUAGE JUNCTION BOX CORRODED, REPAIR RECOMENDED FILL CAP REPLACED TANK 3 PIPING SUMP SENSOR REPAIRED PIPING SUMP HAS CRACK, DOES NOT GO THROUGH MATERIAL FILL CAP ADAPTOR REPLACED TANK 5 PAN UNDER PIPING IN BOILER ROOM WITH SENSOR FILL CAP REPLACED FLAPPER NOT SET CORRECTLY, BUT ELECTRONIC OVERFILL IS FUNCTIONING TANK 7 FILL CAP REPLACED TANK 9 PAN UNDER PIPING IN BOILER ROOM WITH SENSOR FILL CAP REPLACED PH 6/17/09 TANK 14 PASSING AI RCVD: VAR PARTS REPLACED; EPI REMOVED 1" WATER FROM TANK BOTTOM WPxmÃHcÃ=$ ÂYxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃHdÂ]$ ÂYxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ¶8/27/09-REGISTRATION FOR CTI HERSEY TO INSTALL A NEW TRANSITION SUMP, AND NEW PIPING IN EXISTING CHASE THAT WAS DAMAGED DURING FENCE INSTALLATION.-PH AI FOR UST AND AST IS A PASS PHxm ÃIÂWP ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿGLISTED AS #2 OIL, BUT BEING USED AS A MOTOR FUEL, CONFORMING AS SUCH PHxmÃIÃ^# ÂDxmxmÂxm ÃJ3þÿþÿþÿþÿþÿþÿPHxm ÃIÂR ÂbxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIà G ÂbxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIÂI ÂbxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIÂGF ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIÂO ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI à / Â.xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI Â*  ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃI Âdb ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI ÃI ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI  ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIÁD Â*xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI Â ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIÂEM ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃI / ÂDxmxmÂxmÃGGþÿþÿþÿþÿþÿþÿPHxmÃIÂYE Â]xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIÂ1] Â]xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ<CORRECTING OVERFILL FROM UNKNOWN TO DROP TUBE/FLAPPER. TRxmÃIÂ2 ÂxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIÂXD ÂZxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿaCORRECTING PUMP TYPE FROM UNKNOWN TO SUCTION BASED ON INSPECTION INFORMATION. TRxmÃIÂQ4 ÂZxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ4CORRECTING PUMP TYPE FROM UNKNOWN TO SUCTION. TRxmÃIÃb ÂKxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI C ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿ?6/4/10-COPI REC'D FOR CTI GORDON TO INSTALL 2 15 GAL BUCKETS-PHxmÃIÂA ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIÂ6N ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃIÂGE ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿd10/31/2011 CALL FROM JOHN MULLINS. THEY INSPECTED THE FACILITY A COUPLE MIONTHS AGO AND IT NEEDS DROP TUBES REPAIRED/REPLACED AND ANODES ADDED TO THE CP. THEY WILL DO THAT WORK SHORTLY IN NOVEMBER 2011 AND THEN SUBMIT THE AI. TR 12/13/11 UPGRADE REG. FOR TANK ANODES ON TK 1, CTI LEGASSE JR. JMD 11/9/11 COPI FOR ANODE REPLACEMENT CTI LEGASSE JR. .JMDxmÃIÃ=  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIÃ@  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI ÃCY ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI!Ã%; ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI"ÂK ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI#ÂbR ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI$Ã9  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI%Â*& Â)xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI&Â3Z Â\xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI'Â,Q ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI(ÃEY ÂYxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI)ÃM ÂXxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI*Â. ÂDxmxmÂxmÃ?)(þÿþÿþÿþÿþÿþÿù12/16/09-PARTIAL AI RCVD FOR TANK 6 ONLY, SHOWING TANK PROPERLY OOS. NOT A COMPLETE AI A INFO PERTAINS TO T-6 ONLY. WP TANKS 4,6,7 HAVE DOUBLE WALLED ENVIRON PIPING, TANKS HAVE SUMPS BUT NO SENSORS-SUCTION SYSTEM TANK 5 STILL HAS THE OLD SINGLE WALLED SMITH FIBERGLASS PIPING, NO SUMP OR SENSORS-SUCTION WHEN CTI JOHNSON SEPERATED PIPING AT CHECK VALVE UNDER DISPENSERS, ALL PRODUCT RAN BACK INTO TANK, DUE TO THIS, I HAVE CHANGED THE INNACCURATE PIPING LEAK DETECTION TO BE CONFORMING SUCTION SYSTEM PHxmÃI+à J Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ;BRASS FILL ADAPTOR CUT OFF DUE TO CORROSION AND REPLACED PHxmÃI,ÂI ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI-ÃW Â.xmxmÂ<xl þÿþÿþÿþÿþÿþÿþÿþÿxl ÃI.à  ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃI/Ã!O ÂbxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI0à : ÂxmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿþÿxm Ã5!Á* ÂxlxlÂxl þÿþÿþÿþÿþÿþÿþÿÇ6/8/09-CTI LEGASSE SR. CALLED TO SAY HE HAS WIRED SUMP SENSOR TO STP, WHICH SHUTS IT DOWN IF IT GOES INTO ALARM, AI TO FOLLOW-PH INITIAL INSPECTION=LINE LEAK DETECTOR FAILS AS IT CANNOT FUNCTION DUE TO TURBINE PUMP CONSTANTLY RUNNING PH ON 12/11/08-CTI LEGASSE WIRED SUMP SENSOR TO STP, SO THAT IF THE SUMP SENSOR TRIPS, IT WILL SHUT DOWN THE PUMP-THIS ADDRESSES THE LLD'S INABILITY TO DETECT A LEAK BECAUSE THE PUMP WOULD NEVER SHUT OFF. NOW PASSING-PHxlÃI1Ã5! ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃI2Â3L ÂxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿP11/25/09-COPI REC'D FROM CTI LEGASSE JR TO INSTALL OPW FLAPPERS IN PLACE OF THE BALL FLOAT, AND NEW SPILL BUCKETS AS WELL AS NEW 42 AND 18" MANHOLES-PH 11/27/09-UPGRADE REG. REC'D FOR CTI LEGASSE JR. TO INSTALL NEW SPILL BUCKET-PH NEW INSPECTION, FACILITY HAD A FLAPPER INSTALLED TO REPLACE BALL FLOAT VENT. TRxmÃI3ÃAb Â)xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ0INSPECTION HAD FAILING DI AND NO SIA BUT IT HAS BEEN OOS FOR 12 MONTHS OR MORE (GRANTED 6 MONTH EXTENSION OF TIME TO REMAIN OOS) SO NO CURRENT RECORD. GOING BACK INTO SERVICE 6/1/09 FACILITY IS ALL PASSING OTHERWISE AND SITE WAS ALSO PRECISION TESTED BY TANKNOLOGY. TRxmÃI4 ÂYxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃI5 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃI6ÂAD Â;xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ|1ST GEN TC YELLOW PIPING STILL IN PLACE. NO INDICATION THAT IT IS PLANNED FOR REPLACEMENT OR REMOVAL. TRxmÃ5?Ã5/ ÂxlxlÂþÿþÿþÿþÿþÿþÿþÿþÿS10/29/09-NOITA REC'D FOR CTI SCOTT TO REMOVE ALL 3 TANKS AND PIPING-PH **IGNORE BELOW, THESE TANKS ARE COMING OUT** 6/8/09-PHONE CONV. WITH BRIAN MOORE AT CARRAIGE HOUSE CONSULTING, THEY WILL SUBMIT REQUEST TO REMAIN OOS, AND WILL WORK ON GETTING ATG REGISTERED AND SET UP CORRECTLY PH AI INITIALLY ENTERED AS A PASS, BUT WASTE OIL TANK IS NOT PROPERLY MONITORED, NEEDS ATG TO BE INSTALLED, SET UP AND REGISTERED, IN CONJUNCTION WITH MONITORING WELL CHECKS DUE TO IT BEING A MOTOR FUEL 1/23/09-PH TANKS 6&7 IS OOS FROM A MECHANICAL STANDPOINT-NOT REGISTERED AS SUCH CTI SAVAGE PUMPED OUT SUMPS SEALED AIRSPACE BETWEEN PRIMARY AND SECONDARY PIPING TO STOP WATER INTRUSION DRAINED DISPENSERS, AND CAPPED LINES BLEW LINES BACK TO TANK, THEN PUMPED OUT TANKS ACCORDING TO AI, RYDER WANTS TO MAKE PIPING REPAIRS W/IN NEXT YEAR, THEN COME BACK ONLINE PHxlÃI7Â+S Âxmxm Âxmþÿþÿþÿþÿþÿþÿþÿ" TANK READING: -.992, -.993, -.953xmÃI8Ã# ÂXxmxm Á`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃI9ÂI Â;xmxm Á`xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI:ÃW^ Â;xmxm Á`xm þÿþÿþÿþÿþÿþÿþÿTRxm ÃI;à G Â;xmxm Á`xmþÿþÿþÿþÿþÿþÿþÿW6/9/10-NOITR AND REG. REC'D FOR CTI ROBINSON TO REMOVE AND REPLACE YELLOW PIPING-PH TRxmÃI< Â;xmxm Á`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃI= Âxmxm Á`xmþÿþÿþÿþÿþÿþÿþÿ,TR TANK READING: PER CTI BILL CARVER 4/29/09xmÃI>ÃM Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ)VENT WHISTLE OVERFILL FOR BOTH POCKETS PHxmÃI?Ãa< Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ)XÃbc ÂKxk xk Âxk þÿþÿþÿþÿþÿþÿþÿvNOITA REC'D 6/5/09, THEY ARE REQUESTING THAT TANK BE ABANDONED IN PLACE, JD IS COORDINATING WITH GREG OBRIEN (SMRO) PHxk ÃI@ÂYT Â;xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIAÃ-N Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃIDÃ)T Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃIEÂXN Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIFÂXP Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIGàÂ^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIHÂ\  Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIIÃ? Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIJÂS? Â^xm xm Âxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃIKÃX Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃILÃP Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIMÂ"P Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃINÂTS Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIOÃQ' Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIPÃ8 Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIQàÂ^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIRÃJ= Â^xm xm Âxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃISÂ\$ Â^xm xm Âxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃITà ? Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIUà K Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIVÂ^  Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ¾5/5/10-NOITR AND REG. REC'D FOR CTI SIMARD TO REMOVE TANKS 4, 5, 6 AND INSTALL NEW 15,000 GAL SPLIT 11000 AND 4000 JACKETED TANK, SUMMIT TO DO SA-PH REPLACED VAPOR ADAPTOR AND CAP ON 5-1 PHxmÃIWà E Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIXà J Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIYÂ\  Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIZÂXK Â^xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI\ÂH: Âxmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI]ÂU& Â,xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI^Ã5  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI_ÃA> Â,xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃI`Â( Âxmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIaÂ&)  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIbÂV]  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIcÂ>D  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃIdà b  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJÂD  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJà W  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJÃH   xm xm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJÂD  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJÃ:R  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJÃbV  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJÃ]S  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ ÂL   xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ à xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ ÃP`  xmxm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ Ãa- ÂLxm xm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ Ã8@ ÂTxm xm Â<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJÃT" Á xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJÃJ9  xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJà Q Á xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJÃ,< Á xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJÂN. Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJÂ@/ Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿ¶11/18/09-CALL AND EMAIL FROM LEE BRAGG WITH SCHOOL. TOWN COUNCIL HAS DECIDED TO REMOVE TANK BEFORE IT GETS MUCH COLDER-PH TANK IS OOS, LONGER THAN 12 MONTHS, NOV HAS BEEN ISSUED. PHxmÃJÂU& Â,xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿOPH TANK ONE TANK SENSOR IS OUT OF PLACE. SMARED WORKING ON REPAIRING 5/24/2010xmÃJÃ^* Â2xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ1KÂD ÂRxl xlÂxlþÿþÿþÿþÿþÿþÿþÿF8/18/09-COPI REC'D FOR FOLLOWING WORK-PH 6/23/09-UPGRADE REG. REC'D FOR CTI BARTON TO MOVE BOTH DISPENSERS ABOUT 40 FEET, REPLACING DISP. SUMP SENSOR, INSTALLING SUMPS, VENT PIPE AND REPAIRING OR REPLACING SPILL BUCKETS PH 6/12/09 TELPHONE CALL FROM PAUL BOSSE. TOWN IS TEARING DOWN EXISTING BUILDING AND MOVING LEAK DETECTION TO A NEW BUILDING. THEY WILL DO DAILY INVENTORY AND MAINTAIN RECORDS ON SITE WHILE SYSTEM IS POWERED DOWN AND THEN REINSTALLED IN THE NEW BUILDING. THERE IS SOME ADDITIONAL WORK BEING DONE AT THE LOCATION, POSSIBLY MOVING THE DISPENSER ISLAND. TRxlÃJÃY Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJÂ*" Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJÂ*( Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJÃ. Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJÂ1 ÂTxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ(REPLACED PIPING SUMP SENSOR ON TANK 4 PHxmÃJÃR  xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJÂ!D  xm xm Âxm ÂK[þÿþÿþÿþÿþÿþÿâTANK #2 IS DOUBLE WALLED JACKETED ELUTRON TANK, WITH SUCTION PIPING, WHICH IS SINGLE WALLED FIBERGLASS. IT DOES HAVE A SUMP SENSOR. I TALKED TO CTI SIMS, AND ASKED WHY HE WROTE THAT THE PIPING IS ELECTRONICALLY MONITORED, IF IT IS SINGLE WALLED, AND HE TOLD ME THAT HE ORDERED THE OMNTEC LU-2, BUT APPARENTLY ONLY NEEDED A LU-1, SO HE INSTALLED THE SENSOR IN THE SUMP ANYWAY. TANK #3 IS SINGLE WALLED CP STIP3, WITH PRESSURIZED SINGLE WALLED PIPING, MLLD, SIA IS LEAK DETECTION. PHxm ÃJ Ã0 Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ ATG PASSED PHxmÃJ!ÂR Â,xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ$Â/4 Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ&ÃA Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ'à  Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ(Â* Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ) Â)xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ*Ã& Â;xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ+ÂYR Â;xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ,ÂOL Â;xm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃJ-Ã> Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿuHAD TO LUBRICATE FLAPPER VALVES, SPRING WAS STICKING. THEY PASS NOW 6/4/09-CTI KANE REPLACED 7-1 VR BUCKET-PASSING PHxmÃJ.ÂP Â,xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ•10/19/09-REGISTRATION FOR REPLACEMENT PIPING-PH 10/13/09-NOITA REC'D FOR CTI SIMARD TO REMOVE OLD YELLOW PIPING, PRESUMABLY USING ATTACHMENT A-PH PHxmÃJ/àÂ.xm xm Âxm þÿþÿþÿþÿþÿþÿþÿ#REPLACED ALL SPILL BUCKET COVERS PHxm ÃJ0ÃK  Â,xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ1ÁB Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ2Â? Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ3ÃE Â,xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ4Ã!] Â.xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ ATG PASSED PHxmÃJ5Âd; Â.xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ6 Â.xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ“6/15/10-COPI REC'D FOR CTI BARTON TO REPLACE ALL SPILL BUCKETS-PH 2010 AI REC'D FAILING FOR SPILL BUCKETS, SUPPOSEDLY THEY WILL BE REPLACED-PH PHxmÃJ7Â5 Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ8ÃJ? Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ9Â5  Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ,SINGLE WALLED, PRESSURIZED PIPING, ELLD'S PHxmÃJ:Ã7 Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ+SINGLE WALLED PRESSURIZED PIPING, ELLD'S PHxmÃJ;Ã0 ÂXxl xm ÂxlþÿþÿþÿþÿþÿþÿþÿþÿxlÃJ<ÂQP Â]xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃ/Â8X ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿ…11/15/09-LETTER FROM OWNER SAYING CTI BEAUMONT IS COMING TO FIX A FEW THINGS, AND AI WILL BE SENT IN WITHIN 45 DAYS-PH 6/5/09-UPGRADE REG. FOR CTI BEAUMONT TO INSTALL A NEW LLD ON THE REG. TANK, SECURE THE CRASH VALVES ON THE MID GRADE LINES, AND INSTALL A 15 GAL SPILL BUCKET ON THE SUPER TANK PH REPLACED COAXIAL DROP TUBES WITH FLAPPER TYPE COAXIAL DROP TUBES, REMOVED BALL FLOATS. PHxlÃJ=à / ÂXxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ>Ãd9 ÂXxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJ?à  ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ@à % ÂKxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJAÃbb ÂDxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJBÂYK Â;xmxmÂxmþÿþÿþÿþÿþÿþÿþÿH10/2/09-COPI FOR CTI ROBINSON TO INSTALL NEW 15 GAL SPILL BUCKETS PH PHxmÃJCà ! ÂKxmxmÂxmÃ.(þÿþÿþÿþÿþÿþÿ&ACTUAL INSPECTION DATE IS 5/8/2009. BBxmÃJDÃ. Â.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿtCTI BISSON RETURNED TO SITE AND FOUND THE TANK HAS NO OVERFILL INSTALLED. NOW PASSING CP PIPING CP READING -1.102 PHxmÃJE  Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJFÂ6 Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJGÂY5 ÂZxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃJHÃb] ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJIÃ! Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ_REPLACED BRASS FILL ADAPTOR ON TANK 3 TANK 3 HAS A TRANSITION SUMP WITH SENSOR, BOTH PASSING PHxmÃJJÃ" Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJKÃ* Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿCP PIPING READING -1.14 PHxmÃJLÂ7* Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ\7/14/09-COPI REC'D FOR CTI HERSEY TO REPAIR/REPLACE SUMP AND SPILL BUCKET ON TANK 15 PH PHxmÃJMÃ6 Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃJNÂSB Á$xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJOÂ$= ÂKxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃJPÃ^) ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJQÂN% ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJRÃA ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJSÂN0 ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJTÃ, ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJUÂ2L ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿG6/18/10-COPI REC'D FOR CTI SIMARD TO INSTALL NEW 15 GAL SPILL BUCKET-PHxm ÃJVÃ1 Â.xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃJWÂV Â\xm xmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJXÂY Â\xm xmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJYÃR Â\xm xmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJZÂ_ Â\xm xmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ[ÂZ Â\xm xmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ\à J ÂTxm xmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ]Â( Á xm xmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ^Â& Á xm xmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ_ÁZ ÂYxm xmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJ`ÂZ/ ÂXxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJaÂR ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃJbÂ81 ÂKxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKà  ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿ7THIS INSPECTION DATE WAS ENTERED IN ERROR, IGNORE IT-PHxdÃK Â ÂTxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿN3/16/10-NOITA REC'D FOR CTI COUTURE TO REMOVE TANK #10, MIKE WHITE TO DO SA-PHxmÃKÃ?  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKà 9 ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ}ALL 3 LIGHTS ON CONSOLE REPLACED TANKS 10 AND 11 ARE OOS, THEY HAVE FAILING CP, AND WILL BE REMOVED WHEN TANK 9 IS REMOVED PHxmÃKÂB4 ÂDxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ@QÂ*; Â`xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ?5/29/09-NOITA REC'D FOR CTI HASKELL TO PULL TANKS 13, 14 PH PHxl ÃK ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKÂ3: Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃKÃ& Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃK Â.M ÂYxmxmÂxmþÿþÿþÿþÿþÿþÿþÿÃREPLACED INT. PROBE PH 6/22/2010 IRA DODGE CALLED TO INFORM DEP ONE OF THE TANKS IS NOW HOOKED UP TO A GENERATOR AND OWNER IS NOW MARDENS. WILL NOTE BOTH ITEMS ON THE AI WHEN IT IS SENT IN. -LWxmÃK Ãc< ÂYxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃK Ã\A Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃK Ã\@ Á xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃK ÂY ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃKÂ3W ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃKÂQ7 ÂZxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKÂY: ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKÂ]V ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKÂYH ÂZxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKÂ]R ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKÂY3 ÂZxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKÂY- ÂZxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKÂY ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKÂ^ ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKÂ^ ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKÂ3U ÂxmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKÃW  Â%xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKÂÃc  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃK?Â*R  xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃK@Ã3O  xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKAÂ<  xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKBÂb Â.xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKCÂEU Â.xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃKDÃ.  Â!xmxmÂxm þÿþÿþÿþÿþÿþÿþÿ*INT SENSOR FAILED, REPLACED, TESTED OK. PHxm ÃKEÂE Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ xmÃKFà  ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃKGÃCF Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ•INITIAL FAILED FOR UNREMOVABLE DROP TUBE INSTALLED REMOTE FILL, TESTED ELEC. OVERFILL, PASS REPLACED INT RISER CAP REPAIR WORK DONE BY CTI MULLINS PHxmÃKHÂ& Â!xmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKIÂ& Â!xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃKJà @ Â!xmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKKàÂ!xmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃKLÂ+ Â"xmxmÂxmþÿþÿþÿþÿþÿþÿþÿXCTI JOHNSON MADE REPAIRS 6/5/09 TO PSSS WATER REMOVED FROM TANK 5 SUMP, RESET SENSOR PH xmÃKMÂ^B Â"xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃKNÂ8 Â"xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ´CTI RENAUD WROTE THAT "UNABLE TO DETERMINE IF ENTIRE PIPING SYSTEM IS DOUBLE WALL". PRESUMABLY THAT MEANS HE DIDN'T DIG UP THE ENTIRE PIPING RUN TO CHECK, I'M CALLING IT A PASS! PHxmÃKOÂ( Â"xmxmÂxmþÿþÿþÿþÿþÿþÿþÿwREPAIRS MADE BY CTI JOHNSON 6/5/09: REMOVED INCORRECTLY SET BALL FLOATS, AND INSTALLED DROP TUBES SET AT 95% 5/21/09 PHxmÃKPÃ.' Â"xmxmÂxmþÿþÿþÿþÿþÿþÿþÿi6/24/10-COPI REC'D FOR CTI CYR TO REPLACE BOTH VR BUCKETS-PH FILL LIDS REPLACED 6/4/09 BY CTI JOHNSON PHxmÃKQÂC!  xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃKRÃ`& ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿTANK 3-2 FLAPPER REPLACED PHxm ÃKSÂ$& ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ™7/24/09-COPI FOR CTI GEORGE TO INSTALL NEW 15 GAL BUCKET ON TANK 10 PH 11/23/09-UPGRADE REG REC'D FOR CTI GEORGE TO INSTALL NEW TLS 350 WITH CSLD PH PHxm ÃKTà * Â.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿM7/21/10-UPGRADE REG. REC'D FOR CTI BISSON TO REPLACE ALL SPILL BUCKETS-PH PHxmÃKUàÂ.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃKVÃR Â.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿHSINGLE WALL TANKS WITH SINGLE WALLED PIPING, PRESSURIZED, ATG, ELLD'S PHxmÃKWÂV Â.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿƒ5/24/10-NOITR REC'D FOR CTI SIMARD TO REMOVE TANKS AND PIPING, ACADIA TO DO SA-PH OOS AI PASS, EXTENSION GRANTED UNTIL 11/17/09 PHxmÃKXÃ/ Â.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃKYÃWE Â.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿQ9/21/10-NOITR REC'D FOR CTI LETELLIER TO REMOVE TANKS, MIKE WHITE TO DO SA-PH PHxmÃKZÂ( Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃK[ ÂVxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃK\Â?8 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ10/04/11: CTI DALE CHAPMAN SAYS HE MAY BE WORKING WITH CTI GARY KANE (LEAD INSTALLER) TO REPLACE THE YELLOW PIPE. DETAILS TO FOLLOW. -WP REPAIRS MADE BY CTI GUAY 6/15/09: REPLACED LAMP IN CONSOLE REPLACED ALL SUMP COVER HARDWARE REPLACED 4-3 SUMP SENSOR PHxmÃK^Â]I ÂxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ+VERIFIED OVERFILL AS BALL VENT TRxmÃK_Â]G Â]xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃK`ÂQM ÂxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃKaÂY ÂxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃKbÂYZ ÂZxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃKcÂP Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃKd & Â.xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃLÃ\R Â.xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃLàÂ,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃLÂY  ÂZxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃLÃ.X ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃLÂ]^ Â]xm xmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃLÃbN ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ³INITIAL AI FAILED FOR TANK 2-1 DROP TUBE BEING TOO SHORT, AND FLAPPER NOT BEING TESTABLE. LAMP REPLACED ON CONSOLE 6/17/09 CTI DAVIS REPLACED FLAPPER AND DROP TUBE, NOW PASSING PHxmÃLà ( ÂxmxmÂxm Ã=þÿþÿþÿþÿþÿþÿþÿxm ÃL ÂF ÂxmxmÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxmÃL Â3 ÂXxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃL ÃV4 Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿeINTERSTICE CONDUIT AT TANK TOP DAMAGED, SHOULD BE REPLACED FILL CAP REPLACED REPLACED CONSOLE LAMP PHxmÃL Â. ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃL Ã\1 ÂTxmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃL   xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃLÂd<  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃLÂP>  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃLÂS)  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃLÂS+  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃLÃV3  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿäPIPING SUMP CLEANED OF CONDENSATION, PETROMETER ALARM INDICATOR LAMP OUT-REPLACED, FILL CAP REPLACED, SPILL BUCKET HAD WATER/FUEL-REMOVED & CLEANED. TANK CP READING: -1.13 -1.04 -1.06 CTI: AARON THORNDIKE, CTI LEWIS DID CP. WPxmÃLÂQ" Â\xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿkWP SPILL BUCKETS PRESENT?: T6 FILL CAP REPLACED SPILL BUCKETS CLEAN?: BOTH CONTAINED FUEL-REMOVED & CLEANEDxmÃLÂd Â\xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿ€10/28/10-UPGRADE REG. REC'D FOR RISBARRA BROS. TO REMOVE TANK AND LINES-PH FILL CAP REPLACED GAUGING PROBE REMOVED & CLEANED WPxm ÃLÃ[  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿv10/27/2010 JOSH INSPECTED NEED TO REPLACE ELCTRONIC MONITORING. SET UP TO DO WEEKLY MONITORING UNTIL REPAIRED TED WP xmÃLÂ8F  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ¬10/27/2010JOSH CALLED AFTER FAILING INSPECTION NEEDS SUMP LID, FLAPPER 2" TOO SHORT, CRACK IN INTERSTICAL CAP, MANWAY TOO LOW. DOING PUMPOFF DELIVERYS WITH FLAPPER. TED WPxmÃLÂ(3  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃLÂ6/  xmxmÂ!þÿþÿþÿþÿþÿþÿþÿþÿWPxmÃLÂ5 ÂTxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃLÂ6& Â\xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿDISP PAN CONTAINED WATER-NOTIFICATIONS MADE WP SPILL BUCKETS CLEAN?: SB CONTAINED WATER-REMOVED & CLEANED TANK READING: -1.18 -1.16 -1.14 CTI LEWIS DID CPxm ÃLÃ(Y Â\xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿFILL CAP REPLACED WPxm ÃA"ÂBE Á$xl xl Âxlþÿþÿþÿþÿþÿþÿþÿÿ8/19/09-COPI REC'D FOR CTI BUBAR TO SHORTEN VENT LINES AND PLACE UPRIGHTS CLOSER TO TANKS PH WATER IN 7-1 SUMP- REMOVED WATER- CONTACTED DEP WITH QUESTION ABOUT NEED FOR SENSOR IN SUCTION SYSTEM. EXTREME HIGH WATER TABLE; WATER ENTERING AT SEAM IN SUMP.xlÃLÃ*= Â.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃLÂE Â*xmxmÂxmþÿþÿþÿþÿþÿþÿþÿBREMOVED WATER FROM SUMP AND INTERSTITIAL (FAULTY CAP, REPLACED) PHxmÃLÃ^ ÂXxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃL Â?   xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ!WP TANK READING: -.90 -.91 -.90xmÃL!àÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ9bÂH ÂMxlxlÂxlþÿþÿþÿþÿþÿþÿþÿœ6/14/09-CALL FROM LEONARD KELLEY, HE WAS LOOKING FOR THE REASON BEHIND THE REQUIREMENT TO PRECISION TEST TANKS BEFORE RETURNING TO SERVICE. HE IS LOOKING TO BRING TANK BACK INTO SERVICE. NO BUYER YET, BUT HE HOPES THAT RETURNING THE TANKS TO SERVICE WILL HELP SELL THE PLACE. HE IS GETTING A PRICE QUOTE FROM COUNTY TO BRING BACK INTO SERVICE. PH OOS INSPECTION APPROVED FINAL EXTENSION OF OOS UNTIL 9/30/09 -MLxlÃL"Â$I Â9xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ,CSLD TEST PASSED REPLACED "LID" ON TANK 2 PHxmÃL#àÂ9xmxmÂxmþÿþÿþÿþÿþÿþÿþÿTANK 2-2 IS A SUCTION SYSTEM PHxmÃL$Ãc4 Â9xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ‡REPLACED DROP TUBE IN TANK 1 REPLACED LLD IN NL TANK REPLACED VR POPPET CAP GASKETS REPLACED METER IN DISP. #8 K-1 IS SUCTION SYSTEM PHxmÃL%ÃW1 Â9xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ‡5/6/10-NOITR AND REG. REC'D FOR CTI BARTON TO REMOVE AND REPLACE YELLOW PIPING-DON ROBBINS TO DO SA-PH TANK 2-2 IS A SUCTION SYSTEM PHxmÃL&Ãa' Â9xmxmÂxmþÿþÿþÿþÿþÿþÿþÿREPLACED LLD ON 2-2 PHxmÃL'Ã3 ÂHxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿÀ-PIPING SUMP CLEANED OF DEBRIS; TANK MANWAY COVER SEVERLY CORRODED (REPLACEMENT RECOMMENDED) -FILL CAP REPLACED -SPILL BUCKET CONTAINED WATER & #6: CLEANED WP TANK READING: -1.39 -1.01 -1.40xm ÃL(à N ÂHxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿCTI: JOHN SIMS WPxm ÃL)ÂG[ Â9xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃL*Ã(Y Â9xmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃL+ÂS-  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃL,Â2 ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃL-Ã`1 ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃL.Â>\ ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿˆ4/21/10-ATT. A REC'D, NO EOPL-PH 4/15/10-NOITR, 30 DAY WAIVER, AND REGISTRATION REC'D FOR PORTLAND PUMP TO REPLACE YELLOW PIPING-PH WPxmÃL/Ã=_  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿdPIPING IS SLEEVED, PER ML STAFF INSPECTION, CTI HARMON HAS NOT PASSED THIS TWO YEARS IN A ROW NOW PHxmÃL0ÂWC  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃL1Ãc ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ*-ALL SPILL BUCKETS-SM AMT WATER & FUEL. WPxmÃL2ÃW Â.xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿy3/30/10-ATTACHMENT A REC'D, CTI SIMARD FOUND NO MOLD OR OTHER EOPL, 30 PSI N2/SOAP TEST PASSED-PH 3/30/10-COPI REC'D FOR CTI SIMARD TO REMOVE OLD AND INSTALL NEW PIPING ONLY FROM PIPING SUMPS TO TRANSITION SUMP. THE PIPING THAT LEAVES THE TRANS SUMP THEN GOES OUT TO DOCKS, AND IS NOT BEING MODIFIED-PH REPLACE INERSTITIAL & SUMP SENSORS NO VAP RECVRY (INSUFF THOROUGHPUT?) WPxmÃL3Ã, ÂHxmxmÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxmÃL4 Â Â.xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃL5Â2D ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ ATG PASSED PHxm ÃL6Ã-  ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿiFACILITY IS UNDER NEW OWNERSHIP, AND IS NOW BACK IN SERVICE, PRECISION TEST PASSED TLS 350 HAS BEEN MODIFIED TO INCLUDE ATG'S, AND WILL SOON BE SET UP WITH THE APPROPRIATE CHIP TO RUN .2 TESTS (CSLD). FOR THE TIME BEING THE FACILITY WILL DO DAILY INVENTORY. ONCE EVERYTHING IS SET UP, THEY WILL SWITCH OVER TO ATG CP READINGS: TANK 1 -1.01, TANK 2 -.94 VOLTS PHxmÃL8Ã60 ÂxmxmÂxl Ä*þÿþÿþÿþÿþÿþÿ4INSPECTION PROVIDED DURING UST INSPECTION 6/25/09 PHxl ÃL9Ã`\ Â9xmxmÂxmþÿþÿþÿþÿþÿþÿþÿhTANK 2-3 IS SUCTION, AND HAS NO LLD WHICH AI INDICATES IT DID-6/25/09 PH AND WP CHECKED THIS FACILITY PHxmÃL:ÃU  ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ¬2-1 DROP TUBE DRAGGING AGAINST RISER, DIFF TO REMOVE; MAY NOT BE REMOVEABLE NEXT YEAR. 2-1 VAPER CAP REPLACED DISP 3/4 CRASH VALVE 1.5" TOO LOW; RAISED TO CORRECT HEIGHT WPxmÃL;Ã[ ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿÇFUEL IN PIPING SUMP FROM LEAKING TURBINE PIPING (NOT ENOUGH TO ALARM); 6-20-09 LEAK REPAIRED BY DENNIS M. DAVIS LIQ REMVD FROM ALL 3 SPILL BUCKETS, PUT INTO 55-GAL DRUM. BROKEN VAPOR CAP REPLACED WPxm ÃL<Ã1 Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿÑINITIALLY FAILED FOR 2.5" WATER IN THE INTERSTICE, AND A INT. SENSOR THAT DID NOT REACH THE BOTTOM, WATER WAS REMOVED 6/15/09-CTI GUAY RETURNED AND LENGTHENED SENSOR WIRE, AND INTERSTICE WAS DRY-PASSING NOW PHxmÃL=ÂTc ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ™REPLACED PWR/WRNG BULBS ON V/R TLS-350R REPLACED 2-1 101BG LID 2-1 PLLD NOT ALARMING; CTI GUAY REPLACED ON 06/24/09: 2-1 & 3-1 SLAVE TESTED AND PASSED WPxmÃL>Â.+ ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃL?ÂE  ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ$WP TANK READING: -1.04 -1.01 -0.99xmÃL@ÂX^ ÂXxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃLAÂW ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿYWP OVERFILL PRESENT?: TANKS 7 & 11 FLAPPER & ELECTRONIC TANK READING: -0.94 -0.92 -0.89xmÃLBÃbT ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿnWILL NEED TO REPLACE PRINTER FOR INCON CONSOLE WP OVERFILL PRESENT?: PER CTI EATON: HAS FLAPPER AND ELECTRONICxmÃLCÂXC Â]xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃLDÂY' Â]xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃLEÂ"^ ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿDWP ARE SUMPS LIQUID TIGHT: SOME CONDENSATION IN PIPING SUMP: REMOVEDxmÃLFÂ^ Â]xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃLGÂ]c Â]xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃLHÂ]Z Â]xmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿTRxm ÃLIÂYD Â]xmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿTR xm ÃLJÂL ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ$WP TANK READING: -0.87 -0.86 -0.87xmÃLKÃ+H ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃLLÃa ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿdCTI SAVAGE SAYS LINES LOOK SPACED PROPERLY 1' IN FROM EACH END. WP TANK READING: -1.11 -0.99 -1.11xmÃLMÂ0 ÂxmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿÛPIPING SUMP HAD WATER IN IT, NOT REPORTED TO DEP AT TIME OF DISCOVERY. BAILED OUT WATER AND RESET SUMP PROBES. HI LEVEL ALARM IS OKAY. CP TEST RESULTS SHOW -.86 AT ALL 3 LOACTIONS. TR TANK READING: -.86, -.86xm ÃLNÂEY Â.xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃLOÃ/\ Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPIPING IS DOUBLE WALLED FLEX PHxmÃLPÂB_ Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃLQÃ9 Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿCLEANED SPILL BUCKET PHxmÃLRÃ\ Â,xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿFFILLS ARE IN THE RACK ABOVE WATER SEPARATOR REPLACED SENSOR ON T4-2 WPxmÃ>ÃB Â[!xlxl Âxlþÿþÿþÿþÿþÿþÿþÿí6/24/09-UPGRADE REG. FOR CTI COUTURE TO INSTALL OMNTEC ELEC. OVERFILL WITH HORN AND LIGHT PH THIS TANK IS AT THE NAVY'S FIRE STATION AND WAS TRANSFERED FROM REG #14505 TO 21465 TO MAKE THE TANKS AT THE FACILITY LESS CONFUSING PH 9/26/08xlÃÃ.ÂÂxkxkÂxkþÿþÿþÿþÿþÿþÿþÿ²6/24/09-UPGRADE REG. REC'D FOR CTI COUTURE TO INSTALL COATED COPPER LINES AND AUDIBLE HORN AND STROBE TO ELEC. OVERFILL ON TANK #28 PH 6 TANKS STILL OWNED BY NAVY, WHICH ARE NOW BROKEN UP INTO 3 DIFFERENT REG. # DUE TO DISTANCE APART: STAYING UNDER 14505 ARE #22; #27; #28-ALL WITHIN GATED VLF ARRAY AREA. THE FIRE STATION, BUILDING #503, TANK #20 IS NOW UNDER REG # 21465 THE HIGH FREQUENCY ARRAY, BUILDINGS 400 AND 401, TANK #23 AND #24 ARE NOW UNDER REG# 21464 PH SUMP SENSOR CONDUIT JUNCTION BOX NEEDS REPLACEMENT. 61SO VALVE ON TANK 23-1 NEEDS REPLACEMENT. -MLG CTI JEFF EATON: REWORKED CONDUIT BOX FOR SUMP SENSOR ON TANK 27-1. REPLACED OVERFILL PROTECTION VALVE ON TANK 23-1.xkÃLSÂA ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃLVÃ\8 Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃLWàÂ!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃ.' Â)xl xl Âxlþÿþÿþÿþÿþÿþÿþÿ{7/6/09-NOITA FOR CTI BEAUMONT TO PULL BOTH TANKS AND 7/9/09, REGISTRATION FOR NEW TANK REC'D PH PH 6/29/09 SPOKE WITH JOHN POLLARD THIS MORNING AND IT LOOKS LIKE DAVID BEAUMONT WILL BE REPLACING HIS 2 TANK SYSTEM WITH A SINGLE TANK. THE TANK HAS BEEN ORDERED AND THE TIME LINE APPEARS TO BE REMOVAL IN LATE JULY/EARLY AUGUST AND THEN REPLACEMENT IN AUGUST. TRxlÃLTÃ,  xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTR TANK READING: -.967, -.997xmÃLUÃYb ÂxmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿ)ISSUES FOUND DURING INSPECTION AND SUBSEQUENTLY REPAIRED OR RECHECKED BY CTI DENNIS DAVIS 4/3/09. SUMPS NOT LIQUID TIGHT, LIDS AND GASKETS REPLACED. SUPER SUMP AND INTERSTIAL SENSORS NOT WORKING, REPLACED, LLD ON RNL NOT WORKING, RETESTED AND PASSED NO PROBLEM FOUND. PASSING INSPECTION. TRxm ÃLXÃ/  Â*xmxmÂxm þÿþÿþÿþÿþÿþÿþÿFACILITY HAD PCA INSTALL AN IMPRESSED CURRENT CP SYSTEM ON THIS TANK, PIPING IS COPPER INSIDE STEEL AND IS ISOLATED FROM THE IMPRESSED SYSTEM NO RECTIFIER LOG SHEET YET AS SYSTEM WAS JUST INSTALLED PH TANK READING: NEW IMPRESSED SYSTEM, INITIAL READING AFTER SETUPxm ÃLYÃ[ ÂRxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃLZÂ/ ÂRxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃL[Â$? ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿAST AND UST AI PASS PHxmÃL\ ? ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃL]Ã( Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃL^Ã$ Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃL_Â2  ÂZxmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿTRxm ÃL`ÂQ6 ÂxmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿTR xm ÃLaÃ!L ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃLbÃd  Â;xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃLcà ( ÂxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿY2/17/09-COPI REC'D FOR CTI CYR TO REPLACE OC CONSOLE AND SENSORS WITH TLS -350, AND INSTALLED ATG PROBES-PH RENE SMITH HAD FAILED THE INSPECTION FOR INVENTORY ON THE SUPER TANK. PASSING INSPECTION AND MARKING INVENTORY AS NA DUE TO THE FACT THAT THE TANK IS DOUBLE WALLED AND ELECTRONICALLY MONITORED. INSPECTION PASSES IN ALL OTHER AREAS. TRxmÃLdÃ4 Â*xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃMÃa ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿZ5/13/10-COPI REC'D FOR CTI LEGASSE SR. TO INSTALL NEW VR PIPING SUMP SENSOR FOR TANK #3-PHxmÃM B ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃMÃ\ Â,xmxmÂxmþÿþÿþÿþÿþÿþÿþÿjFILLS ARE ABOVE OIL/WATER SEPERATOR, ALL PIPING IS VISIBLE, NO "SPILL BUCKETS" 4-2 INT SENSOR REPLACED PH xmÃMÃ3R Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿõINITIAL FAILED FOR INTERSTICE PROBE BEING IN ALARM, FOR NO APPARENT REASON, WITH THE SENSOR UNRESPONSIVE REPLACED BY CTI BISKUPIAK 6/25/09 BRASS FILL ADAPTOR RUSTY, HAD TO BE CUT OFF AND REPLACED SPILL BUCKET LOOKED BAD, BUT PASSED HYDRO TEST PHxmÃMÃG" ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿWCHECKING WITH R. FAULKINGHAM TO CONFIRM PIPING IS NOT MONITORED, PRE 9/16/91 INSTALL PHxmÃMÃ! ÂXxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPNOITR AND REG. REC'D FOR CTI COUTURE TO REPLACE PIPING ONLY, HILLIER TO DO SA-PHxmÃMàÂxmxmÂþÿþÿþÿþÿþÿþÿþÿþÿ:3/5/10-CALL FROM CTI EATON. AIR FORCE HAS SECURED FUNDING FOR REPAIRS ON AST'S, AND WORK WILL COMMENCE SHORTLY. WHEN FINISHED, AI WILL BE DONE-PH THE UST AT THIS FACILITY PASSES, BUT 2 AST'S, TANK 66 AND 67 ARE FAILING FOR A DAMAGED SECONDARY LINES. THIS BEING THE FED. GOV., IT IS GOING OUT TO BID FOR REPAIR.-PHxl ÃM Ã5 ÂxmxmÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxlÃM ÃJ ÂTxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ9CORRECTED OVERFILL TO ELECTRONIC PER THE INSPECTION. TRxmÃM ÂTH ÂTxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ3CORRECTING OVERFILL AND PIPING PER INSPECTION. TRxmÃM à  Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃM ÂaQ Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿMTANK 3 AND 4 POPPETS WERE REPLACED MID GRADE AND SUPER DROP TUBES REPLACED PHxmÃMÂ# Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ,TANK 7-2 SPILL BUCKET MOUNTING RING REPLACEDxmÃMà  Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃMÂ=B Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿW9/8/09-COPI REC'D FOR CTI GREENWOOD TO INSTALL NEW APT DOUBLE WALLED FLEX PIPING-PH PHxmÃMÂT? ÂTxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ+CORRECTING PIPING TYPE PER INSPECTION. TRxmÃMÂ_ Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ<9-1 INT. SENSOR REPLACED 11-1 SENSOR PULL STRING REPLACED PHxmÃMÂ` Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿw8-2 DROP TUBE WAS STUCK, REPLACED 6-1 LLD FAILED, WAS REPLACED, NOW PASSING DISP. 17/18 HAD LEAKS THAT WERE REPAIRED PHxmÃMÂ0 Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿFACILITY LD IS ATG, PASSED PHxmÃMÃ. Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ7FACILITY LD IS ATG, PASSED 4-1 SPILL BUCKET REPLACED PHxmÃMÂ_  Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿf6-1 AND 8-1 FLAPPERS STUCK, REPLACED, NOW PASSING DISP. 5/6 NEEDED NEW "TOP", REPAIRED, NOW PASSING PHxmÃMÂ$4 Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ™11-1 NEEDED NEW DROP TUBE GASKET, REPAIRED, NOW PASSING FACILITY IS BACK TO DI/SIA FOR LD BECAUSE THEY INSTALLED MLLD'S, NOT ELLD'S-PASSING DI SECTION PHxmÃMÂaP Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿZFACILITY NOW DI/SIA BECAUSE THEY INSTALLED MLLD'S, NOT ELLD'S 7-1 SPILL BUCKET REPLACED PHxmÃMÃG Â*xmxmÂxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃMà ; ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃMÃM ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿFMANHOLE SKIRT FOR ACCESS TO EXTRACTORS WILL NEED FUTURE REPLACEMENT WPxm ÃVÂ7. Âbxm xm Âxm þÿþÿþÿþÿþÿþÿþÿ®11/12/10-COPI REC'D FOR CTI BISKUPIAK TO REPLACE 6-2 SPILL BUCKET AND FLAPPER-PH 9/22/2010 RODNEY CALLED FACILITY HAD AI DONE ON 8/18/2010 BUT IT FAILED (DROPTUBE). REPLACING SPILL BUCKET AS WELL. SUBMITTING UPGRADE FORMS SOON. INITIAL FAILED FOR TANK 4 SPILL BUCKET AND AND DISPENSER ISSUES 9/16/09 CTI BISKUPIAK REPLACED TANK 4 SPILL BUCKET LID ASSEMBLY, AND REPIPED MASTER DIESEL TO RAISE CRASH VALVE, AND REMOVED WATER PHxm ÃVÃ=3 Âbxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ­9/16/09-R. FAULKINGHAM CAPPED AND PLUGGED LINES FACILITY IS OOS, AND HAS BEEN FOR A LONG TIME. LETTER AND NOV'S HAVE BEEN SENT TO REMOVE THE TANKS, BUT SO FAR, NO ACTION PHxmÃVÂ? Â-xm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃVÃU Âxm xm Â!xm þÿþÿþÿþÿþÿþÿþÿ^9/22/10- COPI REC'D FROM CTI CARLETON WHO INSTALLED NEW SUMP MANWAY-PH NO COMMENTS IN AI. WPxm ÃVÂ- Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿ^REPLACED FILL ADAPTOR AFTER CUTTING IT OFF TO ACCESS FLAPPER REPLACED BOTH VR AND FILL CAPS PHxm ÃVÃ5 Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃVÂW Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿqPIPE SUMP SENSOR IN ALARM UPON ARRIVAL, 25 GAL WATER, REMOVED, NOT SURE HOW THE WATER GOT IN REPLACED FILL CAP PHxm ÃVÂH] Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿ‹FOUND WATER AND DIESEL IN #2 DISPENSER, FOUND TO BE COMING FROM DISCHARGE SIDE OF SOLENOID, DISCONNECTED PIPING AND RAN NEW PIPE TO PASS PHxm ÃVà b ÂKxm xm Âxl þÿþÿþÿþÿþÿþÿþÿNEW FACILITY PHxl ÃV Ã' Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿ&TANK 6 IS A WET TANK, TANK 9 IS DRY PHxm ÃV! ÂMxm xm Âxm þÿþÿþÿþÿþÿþÿþÿi9/17/09-COPI REC'D FOR BELOW WORK-PH INSTALLED 4 NEW 15 GAL SPILL BUCKETS UPGRADE REG. ATTACHED TO AI PHxm ÃV"Ã\+ ÂMxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃV#ÂD Â4xm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃV$Ã. Âxm xm Âxmà þÿþÿþÿþÿþÿþÿPHxmÃV%Â^2 ÂMxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃV&Â- Â`xm xm ÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃV'Ã]" Â`xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ3TANKS 1 AND 2 ARE PRESSURIZED, TANK 3 IS SUCTION PHxmÃV(àÂbxm xm Âxm þÿþÿþÿþÿþÿþÿþÿ?INITIAL FAILED FOR DI RECIEVED 2 MONTHS WORTH, AND IT PASSES PHxm ÃV)Ã-, Â'xm xm Á`xmþÿþÿþÿþÿþÿþÿþÿÚOTHER TANK READINGS TANK 6: 1.00, 1.05 TANK 7 1.07, 1.07 WATER IN BOTH TANK INTERSTICES. THIS IS A COMMON PROBLEM AT THIS SITE, THE TANKS ARE UNDERWATER DUE TO HIGH GROUND WATER. TR TANK READING: BY SCOTT CYR 4/29/09xmÃV+Ã! ÂDxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃV,Ã-  Â3xm xm ÂxmÃG^bþÿþÿþÿþÿþÿþÿjINITIAL FAILED FOR SUPER TANK DI REPLACED TANK 1 LLD 8/31/09 CTI WALKER RETURNED AND PASSED DI SECTION PH xmÃV-Â> ÂDxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃV.ÃJ; ÂDxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃV/ÃO ÂDxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃV0Ã# ÂDxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃV1ÂM> ÂDxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃV2Ã-* Âxm xm Á`xmþÿþÿþÿþÿþÿþÿþÿ'2/19/09-COPI REC'D FOR SCOTT CYR TO REPLACE OLD ILS VEEDER ROOT CONSOLE WITH TLS-350. ORIGINAL SENSORS REUSED. ATG'S WILL BE INSTALLED AT A LATER DATE-PH 9/25/09-COPI FOR CTI CYR TO INSTALL TANK 8 FLAPPER-PH NOTE THAT RENE SMITH INDICATES HE REPLACED A BALL FLOAT WITH A BALL FLOAT, THIS LOCATION APPEARS TO HAVE FLAPPERS IN ALL 3 TANKS. CALLED CTI SMITH ON 9/25/09 AND CONFIRMED THAT THE BALL FLOAT WAS REMOVED AND A FLAPPER WAS INSTALLED IN THE TANK. WILL ADD THIS SITE TO DEP INSPECT THIS LIST. FACILITY IS OTHERWISE PASSING. TRxmÃV3Ã-+ Â'xm xm Á`xmþÿþÿþÿþÿþÿþÿþÿPTR *** NOTE *** THEY PROVIDED SIRA FROM WRA WHICH SHOWED PASSING PER EPA REQUIREMENT. REVIEW OF THE PAPERWORK SHOWS THAT WR IS USING THE +130 GALLON NUMBER USED BY EPA NOT THE RAW NUMBER REQUIRED BY MEDEP. USING THE MEDEP VALUE, THIS FACILITY DOES NOT PASS, HOWEVER, IT IS DOUBLE WALLED SO DI/SIA IS NOT REQUIRED. TRxmÃV4Ã5' Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃV5 ÂHxm xm Â<xm þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.85xm ÃV7 Â ÂHxm xm Â<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃV8 Â ÂHxm xm Â<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃV:ÂPJ ÂHxm xm Â<xm þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.89xm ÃV;ÃV[ ÂHxm xm Â<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃV<Ã.F Â7xm xm Â<xm þÿþÿþÿþÿþÿþÿþÿJ6/4/10-NOITR REC'D TO PULL TANK, LES WILSON TO PULL-PH TANK READING: -.86xm ÃV=ÂZ< Â7xm xm Â<xm þÿþÿþÿþÿþÿþÿþÿ TANK READING: -.80xm ÃV> Â Â7xm xm Â<xm þÿþÿþÿþÿþÿþÿþÿ85/2911-NOITR REC'D FOR EPI TO REMOVE HEATING OIL TANK-PHxm ÃV?Â26 ÂHxm xm Â<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃV@Â0 ÂHxm xm Â<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃVAÂ^ Â\xm xm Â<xm þÿþÿþÿþÿþÿþÿþÿ TANK READING: -1.03xm ÃÃ&_ÂÂUxkxkÂxk Ã$þÿþÿþÿþÿþÿþÿW10/21/10-CALL FROM ALAN STONE, FLORIDA RESIDENT WHO SPENDS SUMMERS UP HERE, SAYING THIS PLACE HAS NOT SOLD GAS FOR AT LEAST 2 YEARS, AND THE PARKING LOT IS STARTING TO SINK, HE'S WORRIED ABOUT THE TANKS-PH 7/24/10 DEP INSPECTION FACILITY IMPROPERLY OOS OWNER SAYS SINCE 9/2009; HOWEVER, LOCALS SAY IT'S BEEN SINCE FALL 2006. WILL ISSUE A NOV FOR REMOVAL IF CAN CONFIRM DATE (AND UPDATE TANK STATUS). -LW 09/28/09: ROGER MILLS CALLED REF REGISTRATION $$ OWED. REFERRED HIM TO BEKKA KOROSKI. I REMINDED HIM THAT HE IS 2 YEARS OVERDUE FOR AI. WP ROGER MILLS CALLED ON 12/2/2008 REGARDING THE ANNUAL INSPECTION. SIMARDS ALWAYS DOES HIS ANNUAL INSPECTION AND THEY CAN'T GET OUT TO HIS FACILITY FOR A COUPLE OF WEEKS. WILL SEND IN ASAP. -LW INTERSTITIAL SENSOR IS 26 FEET FROM UNLEADED FILL AND INTERSTITIAL SENSOR IS 10 FEET FROM SUPER FILL PIPE. -MLGxk ÃVBÃ+ ÂLxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿ÷SEE 2009 AI FOR DETAILS. EXCAVATED TO TANK TOP. REMOVED 1/4" SS VACUUM GUAGED PIPING. FOUND WATER/SAND IN INTERSTICE. REMOVED WATER; SAND CAN'T BE REMOVED. HAD OWNER REMOVE FILL CAP LOCKS SO COVER COULD SEAT CORRECTLY. ALSO RAISE SPILL BUCKETS. WPxmÃVCÃT Â\xm xm Â!xm þÿþÿþÿþÿþÿþÿþÿªSPILL BUCKETS CLEANED. WATER REMOVED FROM PIPING ACCESSES. FILL & VAPOR RCVR CAPS REPLACED. 3-2 FILL CAP ADAPTER DAMAGED/REPLACED. 3-1 PIPING ACCESS MANHOLE MISSING / LID RESTING ON CONCRETE EDGE. RECOMMEND MANHOLE REPLACEMENT. BALL FLOAT NOT RECOMMENDED ON SUCTION SYSTEMS. RECOMMEND REPLACING WITH FLAPPER OVERFILL. RECOMMEND DISCONNECT, CLEAN AND CAP THE UNUSED STAGE II VAPOR RCVR LINES. WP TANK READING: CTI MICHAEL LEWISxm ÃVDÂ@ Âbxm xm Â!xm þÿþÿþÿþÿþÿþÿþÿ«INITIALLY FAILING DUE TO COULD NOT GET PLUG OUT OF TANK TO CHECK ELECTRONIC OVERFILL. 09/25: CTI FAULKINGHAM REMOVED E-OVERFILL, CHECKED HEIGHT AND TESTED. NOW PASSING. WPxm ÃVEÂ=S Âxm xm Â!xm þÿþÿþÿþÿþÿþÿþÿNO COMMENTS IN AI. WPxm ÃVFÃZ Â.xm xm Â!xmþÿþÿþÿþÿþÿþÿþÿKINITIALLY INCOMPLETE FOR PIPING MONITORING. 09/25/09: RECVD COMPLETE AI. WPxmÃ4VÂD, Âxl xl Â<xlþÿþÿþÿþÿþÿþÿþÿz09/29: BILL FLYNN AT PORTLAND FIRE HQ CALLED: NOV RCVD HAD BOTH FD & JETPORT DATA IN IT. WILL FORWARD COPY TO JETPORT. WPxlà /ÂP\ÂÁxj xj Â<xj þÿþÿþÿþÿþÿþÿþÿf09/29/09: BILL FLYNN AT PRTLD FD HQ CALLED; RCVD NOV. HAD FAILING AI, REPAIRS COMPLETED. WILL CONTACT SIMARD & SONS FOR STATUS OF PASSING AI AND SEND TO US. WP 7/13/09-UPGRADE REG FOR SIMARDS TO REPLACE COPPER LINE WITH COATED COPPER FOR SPACER PH 12/4/08-SIMARD SAYS THEY ARE DOING AI'S FOR THESE GUYS, BUT WILL BE A LITTLE LATER THAN MASS NOV REQUIRED-PHxj ÃVG 1 Â\xm xm Á`xmþÿþÿþÿþÿþÿþÿþÿFACILITY HAS A FAILING CP READING AND MIKE HAS RECOMMENDED THAT THEY UPGRADE CP ON THE TANK. HE TAKES 3 READINGS BUT ONLY ONE IS REQUIRED FOR DW TANKS. ALSO NOTE CP READING WAS DONE 4/7/08. TR TANK READING: NOTE THIS IS DW TANK MIKE LEWIS TOOK 3 READINGS, -.796, -.884, -.852xmÃVHÂ& Â\xm xm Á`xmþÿþÿþÿþÿþÿþÿþÿYINITIAL CP TEST FAILED, RE TESTED 4/8/09 AND NOW PASSING. TR TANK READING: -.901, -.982xmÃ+ÂP) ÂxlxlÂxk þÿþÿþÿþÿþÿþÿþÿP9/29/09 TELEPHONE CALL WITH TOM ESTABROOKE FROM THE HOSPITAL. NO INSPECTION DONE IN 2008, LAST DONE IN JULY 2009 BY BOB CORMIER. FACILITY IS PASSING(?) BUT BOB HASN'T COMPLETED THE PAPERWORK YET. REMINDED ESTABROOKE THAT PAPERWORK DUE TO DEP WITHIN 30 DAYS OF PASSING INSPECTION. HE WILL CONTACT BURNER BOB. TRxk ÃBCÂE> Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿ—PH 9/29/09 TELEPHONE CALL FROM KURT CRESSEY, C&C (DALE CHAPMAN AND COMPANY) HAVE INSPECTED THE FACILITY. THERE ARE SOME MINOR THINGS TO BE DONE TO PASS THE INSPECTION, HE IS GETTING A QUOTE AND WILL TAKE CARE OF IT VERY SOON, WITHIN THE 30 DAY PERIOD. CURRENT FUEL SUPPLIER IS TAMMARRO, HAD BEEN SOMEONE ELSE BEFORE THAT TOOK CARE OF THE INSPECTION WHICH IS WHY THE INSPECTION IS LATE THIS YEAR. TRxl ÃVIÂSX ÂKxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿCWP NOTE: STILL AWAITING CONFIRMATION OF OIL-STAINED SOILS REMOVAL.xmÃVJÂF ÂKxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿ!NO ACCESS TO TANK TOP PIPING. WPxmÃVLÃ45 Âbxm xm Á`xm þÿþÿþÿþÿþÿþÿþÿµ12/31/09-CTI CHAPMAN REPLACED YELLOW PIPE ON CHAMBER 2, NO EVIDENCE OF A LEAK FOUND-PH 10/26/09-REGISTRATION REC'D FOR CTI KANE TO REPLACE PIPING ON CHAMBER #2, THE GAS TANK-PH TRxm ÃVMà  Âxm xm Á`xm þÿþÿþÿþÿþÿþÿþÿ!PIPING IS FLEX IN CONTAINMENT TRxm Ã8Ã,3 ÂRxlxlÂ<xk þÿþÿþÿþÿþÿþÿþÿÚ09/29/09: RCVD PASSING AI, BUT TANKS STILL OFFICIALLY OOS EVEN THOUGH FAC IS DISPENSING FUELS. CALLED STORE, TALKED TO OWNER. TOLD HIM THAT HE COULD CONTINUE DISP FUEL IF HE IMMEDIATELY SCHED A VAC TEST, AND IF PASSING THEN DO NOTIFICATION TO PUT TANKS BACK IN SVC. WP 09/29/09: CTI BOSSE DID NOT DO VAC TEST FOR NEW OWNERS. ALSO BELIEVES THAT FAC PIPING IS YELLOW, BUT NOT SURE. WP DEP STAFF DROVE BY FACILITY ON 4/1/2009 AND FACILITY APPEARS TO BE DISPENSING FUEL. -LWxk ÃVN Â Âxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃVOà " Âxm xm Â!xm þÿþÿþÿþÿþÿþÿþÿ@TANK 2 SIPHON TANK-NO STP. DISP 13 & 14 ARE SATELLITES DISPS. WPxm ÃVPÂP\ Âxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿ5CTI DRABECK INSTALLED COATED COPPER LINE 08/04/09. WPxmÃVQÃ$ Â.xm xm Â!xm þÿþÿþÿþÿþÿþÿþÿCOPPER LINES ARE COATED. WPxm ÃVRÃQ Âxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿREPLACED SPILL BUCKET. WPxmÃVSÂ7I Â\xm xm Âxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃVTÃK ÂHxm xm Âxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃVUÃL ÂHxm xm Âxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃVVÂO  ÂHxm xm Á`xm þÿþÿþÿþÿþÿþÿþÿTRxm ÃVWÂO Â\xm xm Á`xm þÿþÿþÿþÿþÿþÿþÿTRxm ÃVXÂO Â\xm xm Á`xm þÿþÿþÿþÿþÿþÿþÿITANK CONNECTED TO A GENERATOR. SEE NOTES FROM UST INSPECTION IN 2006. TRxm ÃVYÂO ÂHxm xm Á`xm þÿþÿþÿþÿþÿþÿþÿÉFACILITY REMAINS PROPERLY OOS. TANK WILL BE REMOVED WHEN THE "PORTABLE" CLASSROOMS ARE REMOVED FROM THE SITE AT SOME POINT IN THE FUTURE. PERMISSION WAS GRANTED TO THEM TO REMAIN OOS INDEFINITELY. TRxm ÃV[Â%M Âxm xm Â!xm þÿþÿþÿþÿþÿþÿþÿÏ09/05/10: FAILING 2011 AI RCVD; VENT WHISTLE CAN'T BE ACCESSED AND CTI GUAY CAN'T VERIFY 90% AS FAC ONLY RECEIVING 100-200 GAL DELIVERIES. ALL ELSE PASSING. -WP 09/30/09: CTI PAINE REPLACED OMNTEC LU1 CONSOLE WITH A NEW ONE. WP INITIALLY FAILING DUE TO OMNTEC LU-1 INOP - IN CONSTANT STATE OF ALARM, THOUGH SUMP WAS DRY. VENT IS 24' FROM FILL [BUT] DRIVERS CAN HEAR THE WHISTLE. PREVIOUS AI NOTES THAT WHISLTE WAS CHECKED WITH DELIVERY, CTI GUAY PASSED IT. WPxm ÃV\Ãa  Â,xm xm Âxmþÿþÿþÿþÿþÿþÿþÿ¥11/12/09-COPI-CTI BISSON REPLACED BOTH PIPING RUNS, AND INSTALLED 2 STAND ALONE SENSORS IN THE DISPENSER SUMPS-PH FACILITY HAS YELLOW PIPE WHICH WILL BE REPLACED PHxmÃV]àÂKxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm Ã=#ÂSS Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿy9/29/09-REGISTRATION FOR CTI COUTURETO INSTALL NEW SUMP AND DOUBLE WALLED FLEX SUCTION AND RETURN LINES-PH SUMP CONTAINED WATER-LW NOTIFIED-INTRUSION AT SUMP LID-REMOVED SILT AND CLEANED GASKET REPLACED SUMP SENSOR SENSOR WIRING AT CONSOLE MISSING JUMPER-REPAIRED FILL CAP REPLACED 1" WATER IN TANK-REMOVAL RECOMENDED PIPING APPEARS TO BE STEEL WITH PVC SECONDARY-MONITORED PHxl Ã@JÃFO Âxl xl Âxl þÿþÿþÿþÿþÿþÿþÿS10/8/09-COPI FOR CTI CARVER TO INSTALL NEW SPILL BUCKET ON PREMIUM TANK, 1-1-PH PHxl ÃV^ÃH Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃV_Âd5 ÂKxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃV`Â2G Âbxm xm Â!xm þÿþÿþÿþÿþÿþÿþÿ!2/4/10-UPGRADE REG. FOR CTI HAZEL TO REPLACE FILL, AS IT WAS DAMAGED BY A PLOW-PH INITIALLY FAILING DUE TO UNWIRED SENSOR IN TRANSITION SUMP. 09/30/09: CTI PAINE WIRED IN THE SENSOR TO THE VR TLS 300 CONSOLE; REMOVED 4-5" WATER FROM TRANSITION SUMP. PIPING IS 1.5 ENVIRON FLEX (GREEN). WPxm ÃVb Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃVcÂ"9 Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃVdÃTH Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ:INITIAL FAILED FOR TANK 1 INT. SENSOR, REPLACED 9/15/09 PHxmÃWÃU  xm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃWÂN* Â:xm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃWà b Â4xm xm Âxm þÿþÿþÿþÿþÿþÿþÿCTI ELLIOT ALSO SIGNED AI PHxm ÃWÃcW Â4xm xm Âxm þÿþÿþÿþÿþÿþÿþÿCTI ELLIOT ALSO SIGNED AI PHxm ÃWÂ5 Âxm xm Âxm þÿþÿþÿþÿþÿþÿþÿPHxm ÃWÃ0 Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃN(Ãc( Âbxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿ½CTI ELLIOT CONFIRMED VIA TELECON THAT IN 2004 PIPING WAS CHANGED TO STEEL W/ SECONDARY CONTAINMENT/CONT ELEC MON -AND- TANK 2 IS NOW CONT ELEC MONITORED. WATER REMOVED FROM SPILL BUCKET. WPxmÃN)à  Âbxm xm Â!xm þÿþÿþÿþÿþÿþÿþÿ`TANK HAS BRINE SOLUTION IN THE INTERSTICE. CTI ELLIOT SAYS OVERFILL PROTECTION IS ELECTRONIC. WPxm ÃN* Â Â.xm xm Â!xmþÿþÿþÿþÿþÿþÿþÿœ5/10/10-REG. REC'D FOR CTI SIMARD TO INSTALL NEW 10,000 GAL JACKETED HEATING OIL TANK, DOUBLE WALLED FLEX LINES-PH FLEX LINES ON WASTE OIL TANK (TANK 7) WPxmÃN+ÃP Âxmxm Á`xmÄ0AXþÿþÿþÿþÿþÿþÿçCTI SMITH SUBMITTED FAILING INSPECTION DUE TO INVENTORY ON SUPER, TANKS ARE DW FG SO INVNTORY IS IRRELEVANT. SPOKE WITH CTI 7/9/09 ABOUT NOT NEEDING DI ON ALL INSPECTIONS, JUST WHERE PRIMARY LEAK DETECTION METHOD. TRxmÃN,Ã\S Â.xm xm Â!xmÃd>þÿþÿþÿþÿþÿþÿWPxmÃN- V Â,xm xm Â!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃN.ÂG Â,xm xm Â!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃN/Ãd* Â,xm xm Â!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃN0ÂD1 Â.xm xm Â!xm þÿþÿþÿþÿþÿþÿþÿÒ8/31/09-REGISTRATION REC'D FOR 3 NEW TANKS TO BE INSTALLED IN OCTOBER, 15000, 4000, 6000, REGULAR, PREMIUM AND DIESEL PH 8/27/09-NOITA REC'D FOR CTI GEORGE TO REMOVE OLD TANKS TO MAKE WAY FOR NEW INSTALL-PH WPxm ÃN1Â&O Â.xm xm Â!xm þÿþÿþÿþÿþÿþÿþÿ/5/6/10-SIMARD FLUSHED OUT INTERSTICE WITH WATER, ISOLATED AND CAPPED PIPING, LOCKED FILL, PULLED DROP TUBE AND DID OOS AI - PH 4/2/10-MIKE SIMARD CONFIRMED THAT TANK #7 HAS FAILED, AND HAS BEEN PUMPED OUT-PH 7/10/09-COPI REC'D FOR CTI SCOTT TO REPAIR FIBERGLASS COUPLING ON SUCTION LINE, TANK 9 PH WPxm ÃN2Â3 Âbxkxm Á`xj þÿþÿþÿþÿþÿþÿþÿBMISSING INSPECTION FOUND AND LOGGED ACTUAL INSPECTION YEAR IS 2007xj ÃC1Â- Â\xl xl Âxl þÿþÿþÿþÿþÿþÿþÿ¼7/8/09-NOITA FOR LES WILSON AND SONS TO REMOVE TANKS, MIKE WHITE TO DO SA PH OOS TANK 12 HAD 27.5" WATER-REMOVED TO LESS THAN 1" INTRUSION SOURCE BROKEN ATG RISER CAP-NEW ONE INSTALLED PHxl ÃN3ÂA Âbxm xm ÂxlþÿþÿþÿþÿþÿþÿþÿnINITIAL FAILED FOR 7 AND 8-2 SPILL BUCKET COVERS BEING BROKEN 6/18/09-CTI CHAMBERLAIN REPLACED LID ASSEMBLY PHxlÃN4Â7, Â2xm xm ÂþÿÃþÿþÿþÿþÿþÿþÿþÿxm ÃN5ÃI Â)xm xm Âþÿþÿþÿþÿþÿþÿþÿþÿ³5/19/11-NOITR REC'D FOR REMOVAL OF THE UNDERGROUND PIPING, WOODARD AND CURRAN WILL DO SA-PH PIPING IS LISTED AS BARE COPPER. OWNER IS WORKING WITH GREENWOOD CONST TO UPGRADE. BBxmÃN6Â>S Âbxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿTOTAL CONTAIN 2ND GEN PIPING WPxmÃN7Ã`? ÂZxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿ$WP TANK READING: -0.94 -0.88 -0.92xmÃN8ÂW> Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃN9ÂW@ Âxm xm ÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃN:Â> Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ˜PIPING SUMP CONTAINED SMALL AMOUNT OF WATER, REMOVED, CLEAND LID, REPLACED GASKET, REPAIRED BROKEN SENSOR WIRE, AND REPAIRED CEMENT ON MANHOLE SHROUD PHxmÃ3?Â< ÂxlxlÂxlþÿþÿþÿþÿþÿþÿþÿç06/10/09: FAILING AI (OSS, ITEM #77) SUBMITTED BY CTI GUAY. WHY? WILL INQUIRE. WP OOS SINCE 8/06 CTI GUAY BROKE UNION AT CHECK VALVE UNDER DISPENSERS AND DRAINED LINES BACK INTO TANK TANKS PUMPED DOWN BELOW 1" LOCKED FILL PIPES PHxlÃN;Ã%J Âxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿ{REMOVED 100 GAL WATER FROM REG & PREM SUMPS. SEE EOPL 06/16/09: LID REPAIRS MADE 06/17/09, VERIFIED VIA E-MAIL 07/13/09. WPxmÃN<  Â,xm xm Â!xmþÿþÿþÿþÿþÿþÿþÿfINITIAL AI INCOMPLETE, MISSING PIPING INTERSTITIAL MONITORING. UPDATED & COMPLETE AI SENT 07/13/09. WPxmÃN= Âbxm xm Â!xmþÿþÿþÿþÿþÿþÿþÿ$6/7/10-ATT. A REC'D FROM CTI THOMPSON, 10 AND 11-1 FLAKING FOUND, ALL PASSED PRESS. TEST, NO EOPL-PH 4/29/10-NOITR AND REG. FOR NEW PIPING REC'D FOR CTI GOERGE TO PULL YELLOW PIPING ON TANK 10 AND 11, SA TO BE DONE BY MIKE WHITE, LIKELY INSTALLING NEW DISP. SUMPS, HENCE SITE ASSESSOR-PH WPxmÃN>Ã&J Âxm xm Âxmþÿþÿþÿþÿþÿþÿþÿ,CLEANED SPILL BUCKETS NEW VR CAP ON ORDER PHxmÃN@ Â%xm xmÂxmþÿþÿþÿþÿþÿþÿþÿ³THE CP PAGE RECIEVED WAS SUBMITTED IN ERROR. THE READINGS ENTERED ARE WHAT COUNTY HAS ON THEIR ELECTRONIC COPY, AND MATCH CTI BRESCIA'S FIELD BOOK PH TANK READING: SEE COMMENTS-PHxmÃNAÂB Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNBÃ`! Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNCÃUX Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿcPIPING IS SECONDARILY CONTAINED, CONT. ELEC. MONITORED PIPING GIVEN INSTALL DATE, THIS IS A PASS PHxmÃNDÂ[ Â#xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNEà ] Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNF Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ3TANK HAS NO OVERFILL DEVICE, PRE 9/16/91 INSTALL PHxmÃNGà ] Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNH Â Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNI Â Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNJ Â Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿKPIPING IS COPPER WITH SECONDARY CONTAINMENT, NO MONITORING, 1990 INSTALL PHxmÃNK Â Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNL Â Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNMÂ! Â%xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNNÃ%Z ÂRxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNOÂ+Z ÂRxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃNPÃU) Â)xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ¨FACILITY APPEARS TO BE "NOT IN USE" ACCORDING TO CHANGE AND NOTES BY TR THIS INSPECTION APPEARS TO BE FOR AN ACTIVE FACILITY, WILL CHECK WITH TR TO SEE WHAT STORY IS PHxmÃNQ + ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ±PIPING IS FIBERGLASS INSIDE TOTAL CONTAINMENT SECONDARY (PRE BLUE CORREGATED PIPING) REPLACED BOTH FILL ADAPTORS DISPENSER 1/2 HAS BEEN REMOVED AND LINES HAVE BEEN CAPPED OFF PHxmÃNRÃH  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃNSÂAB ÂbxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ{10-1 IS PRESSURIZED 2 WALL FLEX PIPE, 10-2 IS SUCTION, SINGLE WALLED GLASS 10 GAL WATER REMOVED FROM AST TRANSITION SUMP PHxm ÃNTÃJ ÂBxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃNUÂ8O  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃNVÂB   xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃNWÂ3  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿ¦8/31/10-NOITR REC'D FOR CTI LEGASSE SR. TO REMOVE TANK AND PIPING-PH 7/13/09-COPI FOR CTI LEGASSE JR. TO INSTALL PNEUMERCATOR SENSOR AT LOWEST POINT IN PIPING RUN PHxmÃNX P  xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃNYÂcI Â!xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃNZÂ/ ÂbxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ‚INITIAL FAILED FOR BAD SEALS ON THE PIPING SUMP LIDS 7/7/09-CTI HAZEL RETURNED AND INSTALLED NEW LOCK RINGS AND KNOBS FOR SUMPS PHxm ÃN[à K ÂbxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ,SUCTION SYSTEM, SINGLE WALLED GLASS LINES PHxm ÃN\Ã$& ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿêINITIAL FAILED FOR MULTIPLE CRASH VALVES BEING SET WRONG AND DISPENSER 11/12 HAVING WEEPING FITTINGS 7/6/09 CTI GUAY RETURNED AND MADE REPAIRS, AS WELL AS ADDING SPACERS TO #2 OIL TANK COPPER LINES REPLACED VR CAPS ON TANKS 5 AND 6 PHxmÃN]Ã% ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿÇINITIAL FAILED TANKS 1 AND 2 AS OOS, TANK 1 HAD 5" PRODUCT IN INT. SPACE, AND PIPING NOT CAPPED 7/8/09-CTI GAUY RETURNED AND PUMPED PRODUCT FROM INTERSTICE, AND REMOVED DISPENSERS AND CAPPED LINES PHxmÃN^Â$ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ.OOS EXTENSION GRANTED BY TR UNTIL 1/31/2010 PHxmÃN_ÂSA ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿzINITIAL FAILED FOR SUPER TANK'S LLD NOT FUNCTIONING CORRECTLY 7/6/09 CTI GUAY RETURNED AND REPLACED LLD, TESTED, PASSED PHxmÃN`Â^, Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ–INITIAL FAILED FOR THE FLAPPER NEEDING TO BE REPLACED, AND THE SPILL BUCKET NEEDING REPLACEMENT 6/25/09 CTI BUBAR REPLACED FLAPPER AND SPILL BUCKET PHxmÃNa 0 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ¼INITIAL FAILED FOR 2" SCULLY FILL HITTING BUCKET COVER AND SUMP LID NOT FITTING CORRECTLY 6/24/09 CTI MULLINS RETURNED AND SHORTENED FILL NIPPLE, AND TURNED SUMP LID TO GIVE BETTER SEAL PHxmÃNbÃX  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿC6/3/09 CTI LEGASSE INSTALLED NEW VENT FOR DIESEL, AI NOW PASSING PHxmÃNc 5 Á$xmxmÂxmþÿþÿþÿþÿþÿþÿþÿaPIPING SUMP INITIALLY FAILED BECAUSE IT WAS FULL OF WATER, AND THE SUMP SENSOR HAD BEEN UNDER WATER SO LONG IT BURNED OUT GRADING NEEDED TO BE DONE AT TANK TOP TO DIVERT SHEET FLOW AWAY FROM TANK TOP SUMP AND SPILL BUCKET CLEANED OUT 7/10/09-CTI THOMPSON RETURNED TO BE ONSITE FOR GRADING BY WATER DISTRICT, AND TO INSTALL NEW SUMP SENSOR-NOW PASSING PHxmÃNdÂ#[ Á$xmxmÂxlþÿþÿþÿþÿþÿþÿþÿ‚-DAILY INVENTORY PASSES FOR ALL TANKS REQUIRING IT -TANK 9-1 FLAPPER WAS TOO SHORT, BUT WAS JUST RIGHT FOR TANK #10, AND WAS SWITCHED -TANK 10 FLAPPER REPLACED SPILL BUCKETS WERE CHECKED AS CONFIRMED WITH DENNIS DAVIS-PASS -CONSOLE POWER AND ALARM LAMPS REPLACED ON CONSOLE -1/5/09-CTI GEORGE ADJUSTED HEIGHT ON VARIOUS CRASH VALVES, AND NOW ALL PASS -REPLACED VR CAP ON TANK 8 -ALL LLD'S CHECKED AND PASSED BY CTI GEORGE -TANK 13 OOS, COPPER LINES CAPPED IN BOILER ROOM 7/15/09-SEE EMAIL CHAIN IN FILE FOR MORE INFO, BUT TANK 16 HAS FINALLY BEEN DETERMINED TO BE AN OIL/WATER SEPERATOR-THIS WAS HOLDING UP THE PASS FOR THE WHOLE FACILITY PH xlÃOÂ0c Â;xmxmÂxmþÿþÿþÿþÿþÿþÿþÿO7/31/09-COPI REC'D FOR CTI ROBINSON TO REPLACE 5-1 SPILL BUCKET WITH 15 GAL. PHxmÃOÃ! ÂxmxmÂ;xmÂCþÿþÿþÿþÿþÿþÿÄCTI CARVER FAILED THIS FACILITY FOR OVER AND SHORTS BEING GREATER THAN 1% OF THRUPUT. GIVEN HOW LOW THE THRUPUT IS, AND THAT IT APPEARS THEY ARE DOING THE INVENTORY CORRECTLY, I AM PASSING THIS-PHxmÃOÂ39 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃOà < ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿxINITIAL FAILED FOR SUMP SENSOR WIRING BEING DAMAGED. CTI EATON REPAIRED WIREING, AND NOW PASSING SPILL BUCKET CLEANED PHxm ÃOÃ<0 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ.SUCTION SYSTEM, HAS DISP. SUMPS, NO SENSORS PHxmÃOÃ`P ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃOÂE] ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿREPLACED CONSOLE LAMPS PHxm ÃOà ]  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿe7/22/09-NOITA REC'D FOR TANK AND PIPING PH PIPING APPEARS TO BE COPPER WITH SECONDARY CONTAINMENT PHxmÃO ÂB  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃO Â` Â#xmxmÂxmþÿþÿþÿþÿþÿþÿþÿQINTIIAL CAME IN MISSING PIPING INT. SECTION, DON SUBSEQUENTLY SENT IT IN TO ME PHxmÃO àÂ2xmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃO Ã7V ÂLxmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃO Â[/ ÂZxmxmÂxmþÿþÿþÿþÿþÿþÿþÿÖINITIAL FAILED FOR TANK 1 MISSING BALL IN BALL FLOAT, AND SUPER TANK SPILL BUCKET LID NEEDED REPLACING 4/27/09 CTI DAVIS MADE REPAIRS DI FOR SUPER TANK FAILED, RECIEVED 2 MO. INVENTORY AND IT PASSED NOW PASSING PHxmÃOÃ) ÂRxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃOà  Â^xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOà ` Â)xmxmÂþÿÃþÿþÿþÿþÿþÿþÿþÿxmà Â1ÂÁ xj xj Â<xj þÿþÿþÿþÿþÿþÿþÿB9/10/08 UPGRADE REGN FOR CTI BEAUMONT TO REMOVE TANK PAD, RAISE FILL PIPES, REPLACE PREM SPILL BUCKET, REPAIR RNL INTL RISER, POUR NEW CONCRETE PAD. 7/23/2009 WORK WAS COMPLETED ACCORDNG TO BEAUMONT. TANKS HAVE BEEN PUMPED OUT AND OOS SINCE FALL. HAVE NOT RECEIVED NOTICE OF OOS STORE CLOSED AND PHONES DISCONNECTED. TEDxj ÃOÂ@ ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOÂ@ ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOÂ*  xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOÂG ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOÃ- Â;xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOÃA Â4xmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃOÃ5N Â4xmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃOÂ' ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ!REMOVED WATER FROM SPILL BUCKETS.xmÃOÃ5; Â/xmxmÂxmþÿþÿþÿþÿþÿþÿþÿâ5/28/10-ATT A REC'D FROM STEVE REDMOND, NO EOPL-PH YELLOW 1500 FLEX PIPING WILL BE REPLACED IN SEPT. 2009 THIS PIPING GOES FROM THE GAS SUBMERSIBLE PUMP TO THE TRANSITION SUMP APPROX. 100 FEET AWAY. REPLACED BOTH MECH LLD'SxmÃOÃJG Â]xmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOÂ^   xmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃOàÂxmxmÂxmÄQ,þÿþÿþÿþÿþÿþÿþÿxmÃOÂ@ ÂXxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ1REPLACED I-LS-ASC PIPING SUMP SENSOR NOT WORKING.xmÃOÂQS ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿACLEANED OUT ALL SPILL BUCKETS TIGHTENED UP UNION ON DISP 11/12 WPxm ÃO à 8 ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿE01/11/10: TOM GARRETT CALLED. RH FOSTER NO LONGER OWNER/OPERATOR OF THIS FACILITY. SAYS A DANA CASSIDY (CELL: 227-4160) IS OPERATOR OF NEW TANK. WP 10/15/09-REGISTRATION REC'D FOR CTI BEAUMONT TO INSTALL NEW 20000 WITH THREE POCKETS-PH 9/11/09-NOITA REC'D FOR CTI GAFF TO REMOVE TANKS 4,5,6-PH CLEANED OUT SPILL BUCKETS WPxm ÃO!à O ÂRxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃO"Ã1  ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃO#ÃX? ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ«10/9/09-REG. REC'D FOR CTI GEORGE TO INSTALL NEW PIPING TO REPLACE YELLOW PIPE-PH SITE HAS TC YELLOW FLEX PIPING. SNL LINE IS CORRODING AND MOLDING. ENTERED INTO EOPL. WPxmÃO%ÃK ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ§7/28/10-UPGRADE REG. REC'D FOR CTI GEORGE TO INSTALL 2 NEW FLAPPERS ON 15000 GAL TANK, BOTH CHAMBERS-PH REMOVED 60 GAL WATER FROM EACH UNL, SNL & DIESEL STP SUMPS. WPxmÃO&Ã3S ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿ_T-2 SIPHONS INTO T-1 T-1 & T-2 HAVE ELECTRONIC INTERSTITIAL PIPING MONITORING ON OMNTEC LU3. WPxm ÃO'Á< ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃO(Ã_] ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ/REMOVED WATER FROM BOTH TANK 1 PIPING SUMPS. WPxmÃO)ÂO  ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃO*Ã; ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ<TIGHTENED UNION ON CRASH VALVES DISP 3/4 TO STOP WEEPING. WPxmÃO,Ã5 ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿõ7/16/09-COPI REC'D FOR CTI HAZEL TO INSTALL NEW SPILL BUCKET ON DIESEL TANK PH FAILED AI DUE TO 1-1 & 1-2 FLAPPERS & SPILL BUCKETS. 07/16/09: CTI HAZEL REPLACED BOTH FLAPPERS, 1-2 SPILL BUCKET AND 1-1 SPILL BUCKET LID ASSEMBLY. NOW PASSING. WPxm ÃO-Ã$_ ÂTxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃO.Ã; ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ+DISP 5/6 ARE SEPARATE SATELLITES FOR 1/2 WPxmÃO/ÂOT Â\xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿãREPLACED AC PWR ADAPTER TO VR TLS 300C TANK 3 PIPING SUMP CONTAINED WATER, REMOVED AND CLEANED TANKS 3&4: REPLACED LOOSE FILL CAPS REMOVED, CLEANED & REINSTALLED GUAGING PROBES DISPS 1&2 CONTAINED WATER, REMOVED AND CLEANED. WPxmÃO0Ã4 ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ=DISP 5/6 SUCTION, HOWEVER HAS CRASH VALVES INSTALLED - OK. WPxmÃO1Ã=" ÂTxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿdHAS BOTH FLAPPER & ELECT ALRM OVERFILL PROT. REPLACED VR OUTSIDE OVERFILL ALARM BOX (NOT WORKING) WPxmÃO2ÃR ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿõ2/12/10-NOITA REC'D FOR REMOVAL OF THE TANKS AND PIPING, ED GEORGE TO DO REMOVAL, CES TO DO SA-PH VR TLS350 IN ALARM ON ARRIVAL, WATER IN 11-1 & 12-1 PIPING SUMPS; REMOVED WATER, RESET ALARM, CALLED DEP. 12-1 CHANGED FROM SNL TO #2 FUEL OIL. WPxmÃO3Âc ÂXxm xmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃO4ÂG ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ‘MANUAL INTERSTICE MONITORING ON TANK AND ON PIPING, PIPING IS INSIDE CONCRETE CHASE AND IS ACCESSABLE FROM THE SURFACE, LOGS CHECKED, AND PASS PHxm ÃO5Â@\ ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿ=REMOVED SMALL AMOUNT OF WATER FROM SUMPS AND SPILL BUCKETS PHxm ÃO6Â' ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿmREPAIRED CORRODED SENSOR WIRES, PASS REMOVED WATER FROM SPILL BUCKETS, THEY ARE CORRODED, BUT LIQUID TIGHT PHxmÃO7à xmxmÂxmþÿþÿþÿþÿþÿþÿþÿŠREPLACED BAD WIRING GOING TO INT. SENSOR REMOVED WATER FROM SPILL BUCKET BUCKET IS 2" ABOVE TANK PAD, BUT HAS A BARRICADE PROTECTING IT PHxmÃO8à  Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿµ8/24/10-COPI REC'D FOR CTI LEGASSE SR. TO REPLACE FLAPPER AND SPILL BUCKET-PH INITIAL FAILED FOR FLAPPER NOT BEING CORRECT HEIGHT RETURNED 7/15 AND REPLACED FLAPPER, NOW PASSING PHxmÃO9Âb@ Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿCLEANED OUT SPILL BUCKETS PHxmÃO:Â3M ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿÙ7/23/10-COPI REC'D FOR CTI GEORGE TO REPLACE TANKS 6 AND 8 SPILL BUCKETS-PH FAILED DUE TO TANK 8 FLAPPER. NEW FLAPPER 07/22. CLEANED OUT ALL SPILL BUCKETS. ONLY DISP 5/6 HAS SUMP; TIGHTENED UNION UNDER DISP 9/10. WPxm ÃO;ÂM' Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿEFACILITY USES MAN. GROUND WATER MONITORING, LOG IS KEPT AND PASSES PHxmÃO<ÂE Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿeCHAMBER 6-2 CURRENTLY NOT IN USE ACCORDING TO AI DIRT AND DEBRIS VACUUMED OUT FROM UNDER DISPENSER PHxmÃO=Â< ÂTxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ{ALL SENSORS REPLACED, APPEARED TO HAVE BEEN BURNED OUT BY POSSIBLE LIGHTNING STRIKE? OR SOME OTHER KIND OF POWER SURGE. TRxmÃO>Ã=" ÂTxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿnREPLACED ELECTRONIC OVERFILL DUE TO FAILURE. DUPLICATE ENTRY, INSPECTION WAS RECEIVED ACTUALLY 7/21/09. TRxmÃO?ÂXF Â]xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃO@Â(? ÂxmxmÁ`xmÃG$þÿþÿþÿþÿþÿþÿÍ6/15/2010 CALL FROM RENE SMITH. DOING AI AT THIS FACILITY. HE IS UNABLE TO PHYSICALLY REMOVE THE BFV. HE HAS MEASURED IT AND IS ABLE TO SEE AND MOVE THE BALL WITHOUT PROBLEM. IT ALSO APPEARS TO BE NEW ACCORDING TO RENE. ALLOWING IT TO PASS THIS YEAR SINCE IT IS PRESENT AND IS THE RIGHT LENGTH. 2011 IT WILL NEED TO BE REMOVED OR REPLACED. TR CORRECTING OVERFILL FOR TANK 10 TO DROP TUBE FLAPPER FROM BV. THRUPUT ON GAS IS FROM 2008. TRxmÃOAÃ`  ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿmINITIAL FAILED FOR FLAPPER BEING SET INCORRECTLY 7/7/09 CTI LEGASSE LENGTHENED DROP TUME TO CORRECT LENGTH PHxmÃOBÃ\, ÂLxmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿ\WATER IN PIPING SUMP PROPERLY REPORTED TO DEP ALSO RECOMMENDED REPLACING 4" HUB IN 2010. TRxm ÃOCÂ4  ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ¹INCOMPLETE AI. NO TESTING OF PETROMETER 20T TANK PROBE. HAD TO CLEAN OUT SPILL BUCKET. 07/28/09: CTI SAVAGE CONFIRMED VIA TELEPHONE THAT PROBE WAS REMOVED, TESTED OK AND REINSTALLED. WPxmÃODà d ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ¤AI HAD CP DATA. CONFIRMED W/ CTI SAVAGE THAT WIRES WERE INITIALLY INSTALLED FOR POSSIBLE FUTURE USE--TANK & PIPING IS NOT CP. CLEANED DIRTY 3-2 & 3-3 SPILL BUCKETS.xmÃOFÂG+ ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿUCTI CARVER FAILED AI FOR CPPPER PIPING NOT BEING SPACED-1986 INSTALL, NOT REQUIRED PHxmÃOGà  Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ4CLEANED SPILL BUCKET PULLED AND CLEANED ATG PROBE PHxmÃOHÃ/] Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿkREMOVED WATER FROM PIPING SUMP, REPLACED GASKET FILL CAP REPLACED TANK HAS .5" WATER, REMOVAL RECOMENDED PHxmÃOIÃZ: Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿ)TANK HAS 2" WATER, REMOVAL RECOMMENDED PHxmÃOJÂX Â\xmxmÂxmþÿþÿþÿþÿþÿþÿþÿxTANK 5 SPILL BUCKET LID REPLACED, FILL CAP REPLACED TANK 6 OOS TANK 7 BRINE TOO HIGH, LOWERED LEVEL FILL CAP REPLACED PHxmÃOKÂKX Â!xmxmÂxm þÿþÿþÿþÿþÿþÿþÿ£INITIAL FAILED BECAUSE ELEC. OVERFILL SENSOR SETS OFF ALARM ON CONSOLE, BUT NOT OUTSIDE ALARM, NEW ONE ORDERED 7/16/09-CTI BUBAR RETURNED TO REPLACE SENSOR-PASS PHxm ÃOM T Â!xmxmÂxmþÿþÿþÿþÿþÿþÿþÿCHAMBER 2 IS PROPERLY OOS PHxmÃONÂ. ÂbxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃOOÃ\9 ÂRxmxmÂxmþÿþÿþÿþÿþÿþÿþÿPHxmÃOPÂ$ ÂJxmxmÂxmþÿþÿþÿþÿþÿþÿþÿ8REPLACED VR POPPET ON TANKS 5, 6, OR 7, NOT SPECIFIED PHxmÃOQÂ$M Â.xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿÓ12/16/09-ATTACHMENT A REC'D, MOLD PRESENT, NO RELEASE EVIDENCE FOUND, PASSED 28 PSI N2 TEST-PH 10/19/09-REGISTRATION FOR REPLACEMENT PIPING-PH 10/13/09-NOITA REC'D FOR CTI SIMARD TO REMOVE OLD YELLOW PIPE-PH WPxm ÃORàÂ.xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿkINITIALLY INCOMPLETE: WRONG ATG TEST; 0.2 TEST FOR TANK 3 RECEIVED 07/16/07 TANK 4 SIPHONS INTO TANK 5. WPxm ÃOSÂXE Â.xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿWPxm ÃOTÂ&A Â.xmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿ‘QUESTIONED PASSING AI FOR CRASH VALVES HEIGHT (SEE FAILING '08 AI & '08 UST). CTI BISSON CONFIRMED CRASH VALVES REPAIRED BY AL DOGGETT IN '08. WPxm ÃOUÂ6 ÂZxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿÁ6/27/08-COPI REC'D FOR PAUL BROWN TO EXTEND VENT LINES TO ACCOMADATE BUILDING ADDITION-PH 7/9/09-COPI REC'D FROM CTI HAZEL WHO REPLACED PLUS AND SUPER SPILL BUCKETS-PH INITIALLY FAILED DUE TO NUMEROUS PROBLEMS. 07/20: SPILL BUCKET LID ON TANK 6 REPLACED; SPILL BUCKETS ON TANKS 7&8 REPLACED; TANK 6 LLD REPLACED. TANK 7 VAPOR RECVRY LID REPLACED. ALL CRASH VALVE HEIGHTS ADJUSTED. 07/28 TELECON W/ TOM GUERRETTE, VAC TEST DONE ON TANK 6 PASSED. WPxmÃOWàÂ!xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃOXÃ' Â!xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOYÂ5+ Â!xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOZÂ/c ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃ8UÃQ ÂUxlxl ÂxlþÿþÿþÿþÿþÿþÿþÿH7/16/09-COPI REC'D FOR CTI SIMARD TO REPLACE DAMAGED SPILL BUCKET PH PHxlÃO[  ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃO\Ã/- ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃO]Ã/1 ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃO^à  ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃO_Ã/3 ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃO`Ã_a ÂxmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃObÃ8 Â!xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOcÂ3 Á=xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃOdÃD3 Á=xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÁK Â;xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂ\ Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃPÂT` Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃPÃG Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÃ"C Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPàÂ^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃPÂTd Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃP Â\ Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP Ã> Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃP ÃU5 Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP Â[, Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃP Â[ Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃPÂXR Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPà N Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂE6 Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂS: Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂU Â^xmxmÂ<xm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃPà H Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPà H Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂU Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPà : Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂS: Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂE6 Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPà N Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂXR Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂ[ Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂ[, Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÃU5 Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÂ\ Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPÃ> Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP Â\ Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP!ÂT` Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP"ÃG Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿ)DIESEL TANK USED FOR EMERGENCY GENERATOR.xmÃP#Ã"C Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP$ÃC Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP%Ã21 Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP&ÃGK Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP'ÃVJ Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP(àÂ^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP)ÂTd Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP*Â\& Â^xmxmÂ<xmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP+à  ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿDISP 1-4 HAVE DIRT BOTTOMS WPxmÃP, ÂLxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP-Ã]  ÂTxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿ REPLACED FAILED SUMP SENSOR. TRxmÃP.ÂQO ÂTxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃP/Â0 ÂTxmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃP0Ã/S Á$xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿTRxmÃP1ÃR0 Á$xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿi5/10/10-NOITR REC'D FOR CTI CARVER/ENVIRONMENTAL PROJECTS TO PULL TANK AND PIPING, ACADIA TO DO SA-PH TRxmÃP2 ÂLxmxmÁ`xm þÿþÿþÿþÿþÿþÿþÿ?WATER IN LOW POINT SUMP, APPROX 2 GALLONS REPORTED TO DEP. TRxm ÃP3ÃW_ Á$xmxmÁ`xmþÿþÿþÿþÿþÿþÿþÿµ*******NOTE********* THE AST LISTED ON THIS REGISTRATION DOES NOT HAVE UNDERGROUND PIPING AND SO NO INSPECTION IS PROVIDED FOR THE AST. %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% TRxmÃP4ÃN  ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃP5ÂC ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ}7/28/09-COPI FOR CTI GEORGE TO REPLACE 7-2 SPILL BUCKET WITH 15 GAL PH 07/29/09: CTI ED GEORGE REPLACED 7-2 SPILL BUCKET. WPxmÃP6Ã5 ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ%7/29/09-COPI FOR CTI GOERGE TO INSTALL NEW 15 GAL BUCKETS ON TANKS 2 AND 3 PH INITIAL FAILURE DUE TO CRASH VALVES, SPILL BUCKETS & ANNULAR SENSOR. 07/29/09: CTI GEORGE REPAIRED OR REPLACED TANK 2 SENSOR; REPLACED 2&3 SPILL BUCKETS; REPLACED SUPPORT BARS FOR ALL CRASH VALVES. NOW PASSING. WPxmÃP7Ã< ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿþINITIALLY FAILED FOR MULTI-ITEMS. CALLED DEP FOR ALARMS: EOPL-WATER IN ALL SUMPS-REMOVED. REPLACED MISSING 4-1 INTERSTICE SENSOR. STILL BAD WIRING. ALL DISP SUMPS DIRT BOTTOMED. 07/30/09: PASSING AI (4-1 WIRING REPLACED?) WP TANK READING: CTI BERNIE GAFFxmÃP8ÃX Â!xmxmÂ!xmÄDS:þÿþÿþÿþÿþÿþÿWPxmÃP9ÂX ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃP: Â/xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃP<ÂGB ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ·MW'S ON SITE NOT BEING MONITORED. ALL SUMPS & DISP PANS FULL OF WATER: PUMPED OUT. DSL DISP PAN HAS NO SENSOR. COVER ON DSL RISER PIPE BROKEN (OPW 104A 12). REPLACED SNL VAPOR CAP. WPxmÃP=Ã. ÂTxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃP>ÂO5 Â\xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ(FILL CAPS NOT LIQUID TIGHT. REPLACED. WPxmÃP?Â) Â\xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWPxmÃP@Ã]#  xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿÆINITIALLY FAILED FOR BROKEN RING ON SPILL BUCKET & BROKEN SUMP MANWAY COVER. INSTALLED SNAP TAP ON DIESEL TO FACILITATE TESTING. 07/22/09: NOW PASSING. NEW 15-GAL SPILL BUCKET & NEW MANWAY COVER. WPxmÃPAÂGB ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ³MW'S ON SITE NOT BEING MONITORED. ALL SUMPS & DISP PANS FULL OF WATER: PUMPED OUT. DIESEL DISP PAN HAS NOT SENSOR. REPLACED BROKEN DSL RISER PIPE COVER. REPLACED SNL VAPOR CAP. WPxmÃPBà  ÂxmxmÂ!xmÄ3þÿþÿþÿþÿþÿþÿWPxmÃPCÃ8 Â!xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ—INITIALLY FAILED DUE TO BAD SUMP SENSOR; SUMP HAD WATER ON ARRIVAL. VACUUMED OUT SPILL BUCKET. 07/23/09: SUMP SENSOR REPLACED & TESTED. NOW PASSING. WPxmÃPD  ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ—CONCRETE SUPPORT PAD IS SETTLING AROUND PIPING SUMP. PROPOSAL TO REPAIR WILL FOLLOW BY A CTI. BALL FLOAT LOCATED IN PIPING SUMP INSIDE OF EXTRACTOR. WPxmÃPE ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿZ07/02/09: REPLACED SUMP SENSOR & INSTALLED NEW OMNTEC LU2. REPLACED MISSING SUMP CLIPS. WPxmÃPF ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ!COPPER PIPING INSPECTION ONLY. WPxmÃPGÃ" ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿWREPLACED DRAW STRING FOR INTERSTITIAL SPACE SENSOR. REMOVED WATER FROM SPILL BUCKET. WPxmÃPH  ÂxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿ~REMOVED WATER FROM SPILL BUCKET. COPPER PIPING APPEARS TO BE SLEEVED THROUGH THE FLOOR WITH A MATERIAL SEPERATING THE PIPE. WPxmÃPIà 1 ÂxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPJÃP Â!xmxmÂþÿþÿþÿþÿþÿþÿþÿþÿþÿxmÃPKÃL ÂxmxmÂxm þÿþÿþÿþÿþÿþÿþÿþÿxm ÃPLÂ2Y Â.xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿˆINCOMPLETE AI RCVD DURING 07/22/09 DEP UST INSPECTION. MISSING DAILY INV PORTION RCVD 08/04/09. WP TANK READING: ADDED 4 ANODES PER TANKxmÃPMÃ! ÂKxmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿKAI CAME IN W/ WRONG REG# (13024). CTI LETELLIER SAYS PIPING IS DW STEEL. WPxmÃPNÃN ÂKxmxmÂxmþÿþÿþÿþÿþÿþÿþÿþÿxmÃPOÂB[ ÂxmxmÂ!xm þÿþÿþÿþÿþÿþÿþÿšTANK OOS 05/13/09. 07/23/09: CTI BUBAR CHECKED WITH TS-APPROVED PASSING OOS AI, BUT NEED TO SEND IN REMOVAL NOTICE. TANK HAS 28" OIL, DUE FOR PUMP OUT. WPxm ÃPPÂX ÂxmxmÂ!xlþÿþÿþÿþÿþÿþÿþÿú7/8/09-COPI REC'D FROM CTI BISSON WHO INSTALLED 5 NEW ANODES PH INITIALLY FAILED DUE TO LOW CP ON TANKS 5-7. ALL OTHER AREAS PASSING. 04/09/09: RETEST CP FAILED. 07/08/09: CTI BISSON INSTALLED 5 ANODES PER TANK, RETEST CP PASSED. NOW PASSING AI. WPxlÃPQÃD! Â\xmxmÂ!xmþÿþÿþÿþÿþÿþÿþÿßCOPPER SUCTION/RETURN LINES NOT ISOLATED BY SPACERS-RECOMMENDED. REMOVED AND CLEANED WATER FROM SPILL BUCKET. REPLACED LOOSE FILL CAP. TANK BOTTOM CONTAINS APPROX 3" WATER-RECOMMEND REMOVAL. CTI MICHAEL LEWIS PASSING CP. WPxmÃPRÂ