Skip Maine state header navigation

Agencies | Online Services | Help

Skip First Level Navigation | Skip All Navigation

Salmon Trap Count Statistics

Adult Atlantic Salmon Trap Catch Summary

The Atlantic Salmon Commission (ASC) staff conducts routine monitoring of the abundance and status of adult Atlantic salmon in many Maine rivers. ASC staff operates traps at fishways and barrier weirs to monitor adult Atlantic salmon returns to the Penobscot (Veazie Dam), Narraguagus (Cherryfield Dam), and Dennys rivers (Dennysville weir); Great Lakes Hydro, America operates a trap at Weldon Dam in the upper Penobscot drainage, Pennsylvania Power and Light operates a trap at the Ellsworth Dam on the Union River; Florida Power and Light operates traps and lifts at two hydroelectric projects on the Saco River, Maine Department of Marine Resources operates one on the Androscoggin River, and the St. Croix Waterway Commission operates a trap at the Milltown Dam on the St. Croix River.

These salmon counting facilities are typically operated from May through early November each year. ASC staff updates the statewide trap catch summary weekly or more often during the peak of the salmon migration. The statewide trap catch table includes counts of sea-run salmon captured on Maine rivers and salmon removed from the river as broodstock for restocking of Maine rivers and DOES NOT include captures of aquaculture strays or captive reared adult salmon released from Federal hatcheries.

Adult Salmon Returning to Maine, by River
River Trap Date of count Count Comments
Aroostook Tinker Dam October 31, 2011 51

Tinker trap began operating June, 30 2011.

St. Croix Milltown Dam October 31, 2011 0

Trap operations begin on May 7, 2011 and counts will be available thru June, then the trap will be open for the free passage of fish.

Narraguagus Cherryfield October 31, 2011 196

Trap was installed May 2, 2011 and removed October 26, 2011.

Penobscot Veazie Dam October 31, 2011 3,123

Veazie fishway was opened on Monday May 2, 2011.

Sebasticook Benton Falls October 24, 2011 0

The trap began operating on May 3, 2011.

Penobscot Weldon Dam October 24, 2011 194

Weldon Trap will began operations April 29, was closed from June 13 to 15, and reopened on June 16.

Kennebec Lockwood Dam October 24, 2011 63

The trap started operating on May 9, 2011.

Dennys Weir October 24, 2011 9

Weir was installed and operating as of May 31 and was removed October 17, 2011.

Union Ellsworth October 24, 2011 0
Androscoggin Brunswick October 24, 2011 47
Saco Skelton October 24, 2011 49

The trap began operating on May 9, 2011.

Saco Cataract October 24, 2011 94

Fishways and counting facilitles began operating on May 3rd.