Skip Maine state header navigation

Agencies | Online Services | Help

TransCanada

Volume I

Executive Summary

 

APPLICATION FORMS

            Exhibit A - Corporate Good Standing

            Exhibit B - Right, Title or Interest

            Exhibit C - Location Map

            Exhibit D - On-Site Medium Intensity Soils Mapping

            Exhibit E - Letters Evaluating Impacts of Proposed Rezoning

            Exhibit F - Letters Confirming Availability of Needed Services

            Exhibit G - Demonstration of Need

1.0...... INTRODUCTION

1.1       Project Summary

1.2       Jurisdiction of the Maine Regulatory Agencies

1.3       Other Applicable Regulatory Statutes

1.4       Project History

1.5       Applicant and Project Team

2.0...... Project Description

       Part 1

       Part 2

       Part 3

       Part 4

3.0...... outreach and public participation

4.0...... CONFORMANCE WITH LURC APPROVAL CRITERIA AND THE LURC COMPREHENSIVE LAND USE PLAN

5.0...... Earth Resources

6.0...... Air Resources

7.0...... Natural Resources

Part 1

Part 2

Part 3

Part 4

Part 5

Part 6

 

8.0...... Water Resources

8.1       Surface Water and Floodplain Resources

8.2       Groundwater Resources

8.3       Water Supply

8.4       Wastewater

8.5       Wetlands/Vernal Pools

8.6       Stormwater Management

8.7       References

9.0...... Community Resources

9.1       Land Use

9.2       Socioeconomics

9.3       Noise

9.4       Recreation Resources

9.5       Historical and Archaeological Resources

9.6       Visual Resources

9.7       Roads and Transportation

9.8       Solid Waste

9.9       References

 



 

 

 

 

 

VOLUME II:

SECTION 1 APPENDICES

Appendix 1-A:        Preliminary Site Plans - image1, image2, image3, Image4. image5, image6, image7, image8, image9, image10, image11, image12, image13, image14, image15, image16, image17,

Appendix 1-B:        FAA Documentation

Appendix 1-C:       Kenetech’s LURC Approval

Appendix 1-D:       Pre-Application Conference Memorandum

Appendix 1-E:        TransCanada’s Corporate Responsibility Documentation

Appendix 1-F:        TransCanada’s 2006 Annual Report

Appendix 1-G:       Financial Commitment Letter

 

SECTION 2 APPENDICES

Appendix 2-A:        Preliminary Wind Resource Report

Appendix 2-B:        Greenhouse Gas Initiative MOU

Appendix 2-C:       Progress Report- New England Climate Coalition on Global Warming

Appendix 2-D:       NE- ISO Report on Power Generation and Fuel Diversity in New England

Appendix 2-E:        Energy Resources Council 2005 Work Plan & Legislative Report

 

VOLUME III:

SECTION 2 APPENDICES

Appendix 2-F:        Emissions Displacement Analysis

Appendix 2-G:       Kenetech Site Selection Analysis

Appendix 2-H:        Electrical System Feasibility Study

Appendix 2-I:         Vestas Brochure

Appendix 2-J:        Met Tower Erosion and Sedimentation Control Plan

Appendix 2-K:        Construction and Stormwater Narrative figure1,figure2,figure3,part1,part2,part3

Appendix 2-L:        Transportation Management Report part1,part2,part3,part4

 

SECTION 5 Appendices

Appendix 5-A:        Geological Reconnaissance Report

Appendix 5-B:        Met Tower Anchoring Observations

Appendix 5-C:       TransCanada Blasting Specifications

 

SECTION 7 APPENDICES

Appendix 7-A:        MNAP Correspondence

Appendix 7-B:        MDIFW Correspondence

Appendix 7-C:       Rare Plants Survey part1,part2

Appendix 7-D:       USFWS Correspondence

Appendix 7-E:        Canada Lynx Tracking Survey

Appendix 7-F:        Rare, Threatened, and Endangered Raptor Survey Report

Appendix 7-G:       Nighttime Migration Radar Survey, Fall 2005

Appendix 7-H:        Nighttime Migration Radar Survey, Spring 2006

Appendix 7-I:         Draft Survey of Bat Activity, Summer/Fall 2006

Appendix 7-J:        Daytime Avian Survey Report, Fall 2005

 

VOLUME IV:

SECTION 7 APPENDICES

Appendix 7-K:        Daytime Avian Survey Report, Spring 2006

Appendix 7-L:        Daytime Avian Foraging Survey, Fall 2005

Appendix 7-M:       Daytime Avian Foraging Survey, Spring 2006

Appendix 7-N:        Breeding Bird/Bicknell’s Survey, Spring 2006 figure1,figure2,figure3,figure4, figure5, figure6, figure7, figure8, figure9, figure10, figure 11

Section 8 Appendices

Appendix 8-A:        Vernal Pool Report

SECTION 9 APPENDICES

Appendix 9-A:        Economic Benefits Report

Appendix 9-B:        Unincorporated Township Tax Description

Appendix 9-C:       Noise Analysis

Appendix 9-D:       MHPO and Tribe Correspondence

Appendix 9-E:        Visual Assessment partA, partB, partC

 

VOLUME V:

UTILITY PERMIT APPLICATION – 115 kV TRANSMISSION LINE

 

Exhibit V-A: Corporate Good Standing
Exhibit V-B: Title, Right or Interest
Exhibit V-C: Location Map
Exhibit V-D: Site Plans
Exhibit V-E: Soils Mapping

V-1.0... PROJECT DESCRIPTION

V-2.0... TRANSMISSION CORRIDOR ROUTING SELECTION PROCESS

V-3.0... CONFORMANCE WITH LURC APPROVAL CRITERIA

V-4.0... Earth Resources

V-5.0... Natural Resources , figure 1

V-5.1    Vegetative Communities

V-5.2    Unusual Natural Areas

V-5.3    Essential and Significant Wildlife Habitat

V-5.4    Resident and Migratory Wildlife

V-5.5    Rare, Threatened and Endangered Wildlife Species

V-5.6    Fisheries

V-5.7    References

V-6.0... Water Resources

V-6.1    Surface Water and Floodplain Resources

V-6.2    Groundwater Resources

V-6.3    Water Supply

V-6.4    Wastewater

V-6.5    Wetlands/Vernal Pools

V-6.6    Stormwater Management

V-6.7    References

V-7.0... Community Resources

V-7.1    Land Use

V-7.2    Socioeconomics

V-7.3    Noise

V-7.4    Recreation

V-7.5    Historical and Archaeological Resources

V-7.6    Visual

V-7.7    Roads and Transportation

V-7.8    Solid Waste