Skip Maine state header navigation
LETTING DATNH-9137(00)E MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 1
LOCATION : MONTICELLO TABULATION OF BIDS
BRIDGEWATER
BLAINE CONTRACT ID : 009020.00
=========
COMPLETION DATE : 12/01/00
PROJECT(S): 008809.00 COUNTIE(S) : AROOSTOOK MAINE STATE DEPTARTMENT OF TRANSPORTATION
A TRUE COPY : __________________________
TITLE : __________________________
CONTRACT DESCRIPTION : LEVEL 2 RESURFACING ATTEST : _______________________________
NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000022 THE LANE CONSTRUCTION CORP. $ 3,319,538.86 100.0000%
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 107.27 LUMP| 32000.00000 32000.00| |
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0020 202.202 76525.000 M2 | 1.90000 145397.50| |
REMOVING PAVEMENT SURFACE | | |
0030 202.203 1300.000 M2 | 7.00000 9100.00| |
PAVEMENT BUTT JOINTS | | |
0040 203.20 785.000 M3 | 20.00000 15700.00| |
COMMON EXCAVATION | | |
0050 203.202 927.000 M | 8.80000 8157.60| |
INSLOPE EXCAVATION | | |
0060 203.203 845.000 M | 10.70000 9041.50| |
DITCH EXCAVATION | | |
0070 203.25 30.000 M3 | 20.00000 600.00| |
GRANULAR BORROW | | |
0080 304.103 865.000 M3 | 24.00000 20760.00| |
AGGREGATE SUBBASE - GRAVEL (TRUCK | | |
MEASURE) | | |
0090 403.207 380.000 MG | 85.00000 32300.00| |
HOT MIX ASPHALT 19.0 MM NOMINAL MAX SIZ | | |
0100 403.208 15515.000 MG | 38.00000 589570.00| |
HOT MIX ASPHALT 12.5 MM NOMINAL MAX SIZ | | |
0110 403.209 1050.000 MG | 85.00000 89250.00| |
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
LETTING DATE : 05/17/00 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 2
LOCATION : MONTICELLO TABULATION OF BIDS
BRIDGEWATER
BLAINE CONTRACT ID : 009020.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0120 403.210 32735.000 MG | 37.90000 1240656.50| |
HOT MIX ASPHALT 9.5 MM NOMINAL MAX SIZE | | |
0130 403.211 16900.000 MG | 37.90000 640510.00| |
HOT MIX ASPHALT (SHIM) | | |
0140 409.15 52460.000 L | 1.20000 62952.00| |
BITUMINOUS TACK COAT APPLIED | | |
0150 411.10 1200.000 M3 | 30.00000 36000.00| |
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0160 411.12 50.000 MG | 40.00000 2000.00| |
CRUSHED STONE SURFACE | | |
0170 603.16 50.000 M | 100.00000 5000.00| |
375 MM CULVERT PIPE OPTION I | | |
0180 603.17 50.000 M | 110.00000 5500.00| |
450 MM CULVERT PIPE OPTION I | | |
0190 603.7424 2.400 M | 500.00000 1200.00| |
REMOVE AND RELAY 600 MM CONCRETE PIPE | | |
0200 604.182 40.000 EA | 280.00000 11200.00| |
CLEAN EXISTING CATCH BASIN AND MANHOLE | | |
0210 606.17 15.200 M | 61.80000 939.36| |
GUARDRAIL TYPE 3B - SINGLE RAIL | | |
0220 606.178 60.000 M | 16.00000 960.00| |
GUARDRAIL BEAM | | |
0230 606.22 38.000 M | 58.30000 2215.40| |
GUARDRAIL TYPE 3B - OVER 4.5 M RADIUS | | |
0240 606.265 5.000 EA | 25.00000 125.00| |
TERMINAL END - SINGLE RAIL - GALVANIZED | | |
STEEL | | |
0250 606.35 50.000 EA | 20.00000 1000.00| |
GUARDRAIL DELINEATOR POST | | |
0260 606.367 15.000 EA | 25.00000 375.00| |
REPLACE UNUSABLE EXISTING GUARDRAIL | | |
POSTS | | |
0270 606.79 14.000 EA | 1230.00000 17220.00| |
GUARDRAIL 350 FLARED TERMINAL | | |
0280 609.31 1000.000 M | 15.00000 15000.00| |
CURB TYPE 3 | | |
0290 610.08 10.000 M3 | 50.00000 500.00| |
PLAIN RIPRAP | | |
0300 613.319 1030.000 M2 | 2.00000 2060.00| |
TEMPORARY EROSION CONTROL BLANKET | | |
LETTING DATE : 05/17/00 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 3
LOCATION : MONTICELLO TABULATION OF BIDS
BRIDGEWATER
BLAINE CONTRACT ID : 009020.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0310 615.07 40.000 M3 | 30.00000 1200.00| |
LOAM | | |
0320 618.1301 10.000 UN | 30.00000 300.00| |
SEEDING METHOD NUMBER 1 - PLAN QUANTITY | | |
0330 618.1401 83.000 UN | 30.00000 2490.00| |
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0340 619.1201 93.000 UN | 12.00000 1116.00| |
MULCH - PLAN QUANTITY | | |
0350 620.58 20.000 M2 | 3.50000 70.00| |
EROSION CONTROL GEOTEXTILE | | |
0360 627.76 LUMP| 16000.00000 16000.00| |
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
0370 629.05 20.000 MH | 24.00000 480.00| |
HAND LABOR, STRAIGHT TIME | | |
0380 631.10 20.000 HR | 40.00000 800.00| |
AIR COMPRESSOR (INCLUDING OPERATOR) | | |
0390 631.11 20.000 HR | 30.00000 600.00| |
AIR TOOL (INCLUDING OPERATOR) | | |
0400 631.12 20.000 HR | 100.00000 2000.00| |
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0410 631.172 20.000 HR | 50.00000 1000.00| |
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0420 631.32 80.000 HR | 110.00000 8800.00| |
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0430 639.19 1.000 EA | 4000.00000 4000.00| |
FIELD OFFICE TYPE B | | |
0440 652.31 10.000 EA | 50.00000 500.00| |
TYPE I BARRICADE | | |
0450 652.33 20.000 EA | 50.00000 1000.00| |
DRUM | | |
0460 652.34 120.000 EA | 30.00000 3600.00| |
CONE | | |
0470 652.35 148.000 M2 | 125.00000 18500.00| |
CONSTRUCTION SIGNS | | |
0480 652.36 170.000 CD | 150.00000 25500.00| |
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0490 652.38 4100.000 MH | 15.00000 61500.00| |
FLAGGER | | |
0500 653.22 294.000 M2 | 9.50000 2793.00| |
50 MM POLYSTYRENE PLASTIC INSULATION | | |
LETTING DATE : 05/17/00 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 4
LOCATION : MONTICELLO TABULATION OF BIDS
BRIDGEWATER
BLAINE CONTRACT ID : 009020.00
=========
====================================================================================================================================
|( 1 ) 000022 |( ) |( )
|THE LANE CONSTRUCTION CORP. | |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0510 659.10 LUMP| 170000.00000 170000.00| |
MOBILIZATION | | |
SECTION TOTALS | $ 3,319,538.86| $ 0.00| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 3,319,538.86| $ | $
====================================================================================================================================