LETTING DATE : 03/29/00 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 1
LOCATION : AURORA TABULATION OF BIDS
CONTRACT ID : 009059.00
=========
COMPLETION DATE : 07/29/00
PROJECT(S): NH-9095(00)E COUNTIE(S) : HANCOCK MAINE STATE DEPTARTMENT OF TRANSPORTATION
A TRUE COPY : __________________________
TITLE : __________________________
CONTRACT DESCRIPTION : LEVEL 2 RESURFACING ATTEST : _______________________________
NOTARY PUBLIC
--------------------------------------------------------------------------------------------------------------------------
TOTAL % OVER
RANK VENDOR NO./NAME BID LOW BID
--------------------------------------------------------------------------------------------------------------------------
1 000010 THOMAS DICENZO, INC. $ 505,535.52 100.0000%
2 000022 THE LANE CONSTRUCTION CORP. $ 518,162.34 102.4977%
====================================================================================================================================
|( 1 ) 000010 |( 2 ) 000022 |( )
|THOMAS DICENZO, INC. |THE LANE CONSTRUCTION CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001 HIGHWAY ITEMS
| | |
0010 107.27 LUMP| 2500.00000 2500.00| 14000.00000 14000.00|
TEMPORARY SOIL EROSION AND WATER | | |
POLLUTION CONTROL | | |
0020 202.20 600.000 M2 | 7.00000 4200.00| 5.50000 3300.00|
REMOVING BITUMINOUS CONCRETE PAVEMENT | | |
0030 202.203 475.000 M2 | 12.00000 5700.00| 7.00000 3325.00|
PAVEMENT BUTT JOINTS | | |
0040 203.202 1510.000 M | 7.00000 10570.00| 5.90000 8909.00|
INSLOPE EXCAVATION | | |
0050 203.203 1600.000 M | 10.00000 16000.00| 7.10000 11360.00|
DITCH EXCAVATION | | |
0060 203.24 100.000 M3 | 25.00000 2500.00| 19.00000 1900.00|
COMMON BORROW | | |
0070 205.51 326.000 M2 | 30.00000 9780.00| 9.50000 3097.00|
WIDENING OF EXISTING SHOULDER | | |
0080 403.209 15.000 MG | 95.00000 1425.00| 85.00000 1275.00|
HOT MIX ASPHALT 9.5 MM(SIDEWALKS,DRIVES | | |
INCIDENTAL ) | | |
0090 403.210 3610.000 MG | 39.50000 142595.00| 41.00000 148010.00|
HOT MIX ASPHALT 9.5 MM NOMINAL MAX SIZE | | |
0100 403.211 2900.000 MG | 39.00000 113100.00| 41.00000 118900.00|
HOT MIX ASPHALT (SHIM) | | |
0110 409.15 3880.000 L | 1.50000 5820.00| 1.30000 5044.00|
BITUMINOUS TACK COAT APPLIED | | |
LETTING DATE : 03/29/00 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 2
LOCATION : AURORA TABULATION OF BIDS
CONTRACT ID : 009059.00
=========
====================================================================================================================================
|( 1 ) 000010 |( 2 ) 000022 |( )
|THOMAS DICENZO, INC. |THE LANE CONSTRUCTION CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0120 411.10 10.000 M3 | 40.00000 400.00| 35.00000 350.00|
UNTREATED AGGREGATE SURFACE COURSE | | |
(TRUCK MEASURE) | | |
0130 603.16 30.000 M | 110.00000 3300.00| 160.00000 4800.00|
375 MM CULVERT PIPE OPTION I | | |
0140 606.151 355.000 M | 37.00000 13135.00| 35.30000 12531.50|
GUARDRAIL TYPE 3AA - SINGLE RAIL | | |
0150 606.178 50.000 M | 16.00000 800.00| 14.85000 742.50|
GUARDRAIL BEAM | | |
0160 606.191 7.600 M | 38.00000 288.80| 36.20000 275.12|
GUARDRAIL TYPE 3AA - 4.5 M RADIUS AND | | |
LESS | | |
0170 606.201 11.400 M | 17.30000 197.22| 36.20000 412.68|
GUARDRAIL TYPE 3AA - OVER 4.5 M RADIUS | | |
0180 606.266 5.000 EA | 53.00000 265.00| 50.00000 250.00|
TERMINAL END - SINGLE RAIL - CORROSION | | |
RESISTANT STEEL | | |
0190 606.35 9.000 EA | 26.00000 234.00| 25.00000 225.00|
GUARDRAIL DELINEATOR POST | | |
0200 606.351 10.000 EA | 9.50000 95.00| 9.00000 90.00|
REMOVE AND RESET GUARDRAIL DELINEATOR | | |
POSTS | | |
0210 606.357 5858.000 M | 8.50000 49793.00| 7.88000 46161.04|
GUARDRAIL, MODIFY, TYPE 3B | | |
0220 606.367 25.000 EA | 26.00000 650.00| 25.00000 625.00|
REPLACE UNUSABLE EXISTING GUARDRAIL | | |
POSTS | | |
0230 606.754 12.000 EA | 1200.00000 14400.00| 670.00000 8040.00|
WIDEN SHOULDER FOR 350 END TREATMENT | | |
0240 606.79 12.000 EA | 1750.00000 21000.00| 1650.00000 19800.00|
GUARDRAIL 350 FLARED TERMINAL | | |
0250 613.319 3675.000 M2 | 1.50000 5512.50| 1.70000 6247.50|
TEMPORARY EROSION CONTROL BLANKET | | |
0260 618.1401 135.000 UN | 16.00000 2160.00| 9.95000 1343.25|
SEEDING METHOD NUMBER 2 - PLAN QUANTITY | | |
0270 618.1411 25.000 UN | 21.00000 525.00| 9.95000 248.75|
SEEDING METHOD NUMBER 3 - PLAN QUANTITY | | |
0280 619.1201 160.000 UN | 10.00000 1600.00| 8.25000 1320.00|
MULCH - PLAN QUANTITY | | |
0290 627.76 LUMP| 3150.00000 3150.00| 3000.00000 3000.00|
TEMPORARY PAVEMENT MARKING LINE, WHITE | | |
OR YELLOW | | |
LETTING DATE : 03/29/00 MAINE DEPARTMENT OF TRANSPORTATION DATE : 12/04/01
PAGE : 3
LOCATION : AURORA TABULATION OF BIDS
CONTRACT ID : 009059.00
=========
====================================================================================================================================
|( 1 ) 000010 |( 2 ) 000022 |( )
|THOMAS DICENZO, INC. |THE LANE CONSTRUCTION CORP. |
LINE NO / ITEM CODE / ALT | | |
ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0300 629.05 30.000 MH | 20.00000 600.00| 19.00000 570.00|
HAND LABOR, STRAIGHT TIME | | |
0310 631.12 50.000 HR | 80.00000 4000.00| 80.00000 4000.00|
ALL PURPOSE EXCAVATOR (INCLUDING | | |
OPERATOR) | | |
0320 631.13 30.000 HR | 70.00000 2100.00| 67.00000 2010.00|
BULLDOZER (INCLUDING OPERATOR) | | |
0330 631.172 100.000 HR | 45.00000 4500.00| 42.00000 4200.00|
TRUCK - LARGE (INCLUDING OPERATOR) | | |
0340 631.18 20.000 HR | 35.00000 700.00| 26.00000 520.00|
CHAIN SAW RENTAL (INCLUDING OPERATOR) | | |
0350 631.32 10.000 HR | 150.00000 1500.00| 125.00000 1250.00|
CULVERT CLEANER (INCLUDING OPERATOR) | | |
0360 652.31 25.000 EA | 30.00000 750.00| 35.00000 875.00|
TYPE I BARRICADE | | |
0370 652.33 25.000 EA | 30.00000 750.00| 25.00000 625.00|
DRUM | | |
0380 652.34 75.000 EA | 20.00000 1500.00| 20.00000 1500.00|
CONE | | |
0390 652.35 38.000 M2 | 80.00000 3040.00| 85.00000 3230.00|
CONSTRUCTION SIGNS | | |
0400 652.36 64.000 CD | 100.00000 6400.00| 100.00000 6400.00|
MAINTENANCE OF TRAFFIC CONTROL DEVICES | | |
0410 652.38 1500.000 MH | 12.00000 18000.00| 15.00000 22500.00|
FLAGGER | | |
0420 656.55 100.000 M3 | 20.00000 2000.00| 39.00000 3900.00|
DUMPED STONE | | |
0430 659.10 LUMP| 28000.00000 28000.00| 41000.00000 41000.00|
MOBILIZATION | | |
SECTION TOTALS | $ 505,535.52| $ 518,162.34| $ 0.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
CONTRACT TOTALS | $ 505,535.52| $ 518,162.34| $
====================================================================================================================================