Sign Up for Email Alerts
Public Meeting Library
Google Chrome is the recommended browser to access information for both mobile and desktop sites.
Recent Public Meetings
While the specified comment period is over for the projects most recently added to this page, you are still allowed to make comments or ask questions; however they may not be in time to be a part of the official record or in time for us to make appropriate design changes. The links below will lead to different methods of connecting to the information based on the device being used to access the project.
November 2022
October 2022
- Norway, Tannery Brook Bridge
- Rome, Narrows West Bridge
- Freeport-Yarmouth, Route 1, Cousins River Bridge
- Cornish-Hiram, Hiram Bridge Rehabilitation
September 2022
August 2022
July 2022
- Windham, Flashing Beacon at Route 302 and Albion Road
- Cumberland, Tuttle Road/I-295 Bridge
- Southport / Boothbay Harbor Bridge Rehabilitation
- South Portland Multi-Use Trail
June 2022
- MaineDOT's Family of Plans: (Desktop) (Mobile)
- Augusta, Western Avenue Bridge
- Cooperative Planning Process for Non-Metropolitan Local Officials: (Desktop) (Mobile)
- Turner, Routes 4 and 117, Intersection Reconstruction: (Desktop) (Mobile)
- Harrison, Bear River Bridge: (Desktop) (Mobile)
- Maine Plan for Electric Vehicle Infrastructure Deployment (Maine PEVID): (Desktop) (Mobile)
- Bridgewater, Whitney Brook Bridge #2942 Bridge Replacement: (Desktop) (Mobile)
- Pittsfield, I-95 Bridge Bundle: (Desktop) (Mobile)
- Poland, Route 26 and 122, Install Signal: (Desktop) (Mobile)
- Benton, I-95 Southbound Bridge, Bridge Strengthening: (Desktop) (Mobile)
- Portland, Veranda Street Bridge (#2867):(Desktop) (Mobile)
May 2022
- Sanford, Route 4 (Alfred Road), School Street, and Gavel Road, Intersection Improvements with Signals: (Desktop) (Mobile)
- Lincoln, Route 2, Sidewalk: (Desktop) (Mobile)
- Skowhegan, Norridgewock Avenue, Safe Routes to School Sidewalk: (Desktop) (Mobile)
- Camden, Route 1, Pedestrian Safety Crossing Improvements: (Desktop) (Mobile)
- Maine Plan for Electric Vehicle Infrastructure Deployment (Maine PEVID): (Desktop) (Mobile)
April 2022
- Bangor DDI - Exit 187: (Desktop) (Mobile)
- Newport, Route 2: (Desktop) (Mobile)
- Richmond, Alexander Reed Road, Replacement of Stewart Bridge: (Desktop) (Mobile)
- Newcastle, Routes 1B and 215, Drainage Improvements: (Desktop) (Mobile)
- Warren, Route 135, Large Culvert Replacement: (Desktop) (Mobile)
March 2022
- Washburn, Routes 164 and 228, Storm Drain Repair: (Desktop) (Mobile)
- St. George, Route 73, Culvert Replacement: (Desktop) (Mobile)
- Rockport, Rockport Bridge #2724: (Desktop) (Mobile)
- Stonington, Oceanville Bridge #3696 (Desktop) (Mobile)
February 2022
- Falmouth, Bucknam and Johnson Road Bridges (Desktop) (Mobile)
- Richmond Thoroughfare Bridge, #3925 (Desktop) (Mobile)
- Durham, Tracy Brook Bridge #2852 (Desktop) (Mobile)
- Dover-Foxcroft, Dover Bridge #5118 (Desktop) (Mobile)
January 2022
- Turner Route 4 & 219 Intersection (24201.00) - (Desktop) (Mobile)
- Waterville-Winslow, Ticonic Bridge (#2854):(Desktop) (Mobile)
December 2021
- Litchfield - Babcock Bridge (#2029):(Desktop) (Mobile)
- Waterville, I-95/Webb Rd. Bridges:(Desktop) (Mobile)
November 2021
- Augusta, Rines Hill Bridge Project (21872.00):(Desktop) (Mobile)
- Norway, Tannery Brook Bridge #3610:(Desktop) (Mobile)
- Dresden, Middle Bridge #3341:(Desktop) (Mobile)
October 2021
- Solon, Main Street Bridge #2504:(Desktop) (Mobile)
- Pittsfield, Route 11:(Desktop) (Mobile)
- Batchelders Grant, Evans Brook Bridge #5506:(Desktop) (Mobile)
- Stonington-Deer Isle, Mill Hill Bridge #3063 (WIN 022356.01):(Desktop) (Mobile)
- Penobscot, Rt. 166, Large Culvert Replacement: (Desktop) (Mobile)
September 2021
- Rumford-Mexico, Replacement of Red Bridge (# 2707):(Desktop) (Mobile) Available for public comment until September 22nd
Archived Public Meetings
The following projects have been archived. Clicking on the link will still allow for viewing the project information, but not to make official comments. At the end of the information, the contact information for the Project Manager is provided.
August 2021
July 2021
- South Bristol, Route 129 Large Culvert #89044 - Comment Summary
- Gorham, Bridge Culvert Replacement: the Mitchell Bridge (Bridge #0216) - Comment Summary
- Yarmouth, Proposed Replacement of the I-295 NB and SB Exit 17 Bridges (#5833 and #1509) - Comment Summary
- Berwick, Route 9/Saw Mill Hill & School Street Intersection Improvements - Comment Summary
- Freeport, Proposed Replacement of the Mallet Drive/Rt 135/126 Bridge (No 5721) over I295 at Exit 22, and the Desert Road Bridge (No 5720) over I295 at Exit 20 - Comment Summary
May / June 2021
- Frenchville - Highway Reconstruction on Route 1 - Comment Summary
- Milo, Proposed Replacement of Old Toll Bridge (#2867) - Comment Summary
- Bridgewater - Whitney Brook Bridge (#2942) - Comment Summary
April 2021
- Skowhegan, Route 2 West improvements - Comment Summary
- Palmyra, Route 2/152 intersection safety project - Comment Summary
March 2021
- Yarmouth, Bayview Street Bridge:(Desktop) (Mobile)
- Machias, Rehabilitation and Replacement Options for Dyke Bridge - Comment Summary
- West Paris, Bridge Deck Replacement: Penley Avenue Bridge (#3460) - Comment Summary
- Bremen, Large Culvert Replacement - Comment Summary
- Waterville-Winslow, Proposed Replacement of the Ticonic Bridge (#2854) - Comment Summary
- Clinton, Replacement of the Manley Holt Bridge (#2508) - Comment Summary
- Fort Kent, Replacement of the Perley Brook Bridge (#3468) - Comment Summary
February 2021
- Litchfield-West Gardiner (23041.01) - Comment Summary
- Blue Hill, South St. Sidewalk (024315.00) - Comment Summary
- West Gardiner, Gosline Br. WIN: 23090.00 - Comment Summary
- Greenbush, Boom Bridge (#3587), WIN 021727.00 - No comments made on this project
- Brewer Riverwalk (24773.00) - Comment Summary
- Stockton Springs (023779.00) - Comment Summary
January 2021
December 2020
- Wells - Route 109 Traffic Signal - Comment Summary
- Route 1 - Milbridge to Cherryfield - Comment Summary
- Yarmouth - Beth Condon path - Comment Summary
- Westbrook - Route 25 - Comment Summary
November 2020
- Woolwich - Station 46 Bridge Replacement Project
- Hiram Bridge Rehabilitation - Comment Summary
- Wells – Buffam and Branch Bridges - Comment Summary
October 2020
- Brunswick - I-295 Exit 28 Lighting Project - Comment Summary
- Auburn - Rte 4 Intersection Improvements Project - Comment Summary
September 2020
- Waterville Downtown Improvement
- Old Town Stillwater Ave. - Comment Summary
- Lisbon Frazier Bridge - Comment Summary
- Bethel Sidewalk - Comment Summary
- Jefferson Davis No. 1 Bridge - Comment Summary
August 2020
- Chesterville-Farmington, Farmington Falls Bridge - Comment Summary
- Orono Rt. 2 - Large Culvert Replacement Project - Comment Summary
- Searsport - Route 1